SC2001 Work Flow Diagramhome.fnal.gov/~wolbers/SC2001_info.pdf · SC2001 Work Flow Diagram. PANEL 1...

3
SciArt Media will work directly with Lead Author ONLY Lead Author Contributing Authors Panel 1 Lead Author Contributing Authors Panel 2 Lead Author Contributing Authors Panel 10 Freeman Kiosk Vendor 9/21/2001 7/31/2001-8/31/2001 allows 3 weeks for tweaks Acceptable File formats: Vector (drawings, flowcharts, schematics) .eps Bitmapped (photos, screen dumps, etc.).tif, .jpg, .gif Native formats (photoshop, Illustrator) We will also accept any hand sketched drawings Resolution Issues: Photos need to be no less than 150 dpi at the finished size. Approval Process: Preliminary approval of layout with place holders .pdf Figures will be approved as drawn (saved as .eps) Final Layout will be approved with final figures in .pdf Contact Information: Terry Anderson/[email protected]/650-926-4136 (vacation from 7-23-2001 to 8/10/2001) Chip Dalby/[email protected]/650-926-2001 SC2001 Work Flow Diagram

Transcript of SC2001 Work Flow Diagramhome.fnal.gov/~wolbers/SC2001_info.pdf · SC2001 Work Flow Diagram. PANEL 1...

Page 1: SC2001 Work Flow Diagramhome.fnal.gov/~wolbers/SC2001_info.pdf · SC2001 Work Flow Diagram. PANEL 1 PANEL 2 PANEL 3 PANEL 4 PANEL 5 PANEL 6 PANEL 7 PANEL 8 PANEL 9 PANEL 10 CONTACT

SciArt Mediawill work

directly withLead Author

ONLY

Lead AuthorContributing Authors

Panel 1

Lead AuthorContributing Authors

Panel 2

Lead AuthorContributing Authors

Panel 10

FreemanKiosk Vendor

9/21/2001

7/31/2001-8/31/2001allows 3 weeks for tweaks

Acceptable File formats:Vector (drawings, flowcharts, schematics) .epsBitmapped (photos, screen dumps, etc.).tif, .jpg, .gifNative formats (photoshop, Illustrator)We will also accept any hand sketched drawings

Resolution Issues:Photos need to be no less than 150 dpi at the finished size.

Approval Process:Preliminary approval of layout with place holders .pdf Figures will be approved as drawn (saved as .eps)Final Layout will be approved with final figures in .pdf

Contact Information:Terry Anderson/[email protected]/650-926-4136 (vacation from 7-23-2001 to 8/10/2001)Chip Dalby/[email protected]/650-926-2001

SC2001 Work Flow Diagram

Page 2: SC2001 Work Flow Diagramhome.fnal.gov/~wolbers/SC2001_info.pdf · SC2001 Work Flow Diagram. PANEL 1 PANEL 2 PANEL 3 PANEL 4 PANEL 5 PANEL 6 PANEL 7 PANEL 8 PANEL 9 PANEL 10 CONTACT

PANEL 1 PANEL 2 PANEL 3 PANEL 4 PANEL 5 PANEL 6 PANEL 7 PANEL 8 PANEL 9 PANEL 10

CONTACT

TITLE

STATUS 1

STATUS 2

STATUS 3

STATUS 4

STATUS 5

STATUS 6

STATUS 1: (7/20/2001)Mike has Background Layout Approved by CommitteeSciarts has all Contact Names and Titles for all 10 PanelsSciarts will Supply Word Count for Abstract and Captions

STATUS 2: (7/31/2001)All Panel Material to be Received by Sciarts

STATUS 3: (8/10/2001)Mike has Background Layout with Glass and Electrical Hookups Completed

STATUS 4: (8/24/2001)Terry and Chip have Completed Layouts

STATUS 5: (8/31/2001)Mike has Merged Background with Layouts for Final Review and Minor Tweaks

STATUS 6: (9/21/2001)All Panel Files are Sent to Freemans for Printing

SuperComputing 2001 Project Schedule

Page 3: SC2001 Work Flow Diagramhome.fnal.gov/~wolbers/SC2001_info.pdf · SC2001 Work Flow Diagram. PANEL 1 PANEL 2 PANEL 3 PANEL 4 PANEL 5 PANEL 6 PANEL 7 PANEL 8 PANEL 9 PANEL 10 CONTACT

BIG

BA

NG

PH

YS

ICS

Experim

ent, T

heory &

Obse

rvatio

n3rd

Level T

itle Size at 140 p

t. Helvetica B

old

. Th

is area wo

uld

con

tain th

e ab

stract dealin

g w

ith th

e gen

eral info

rmatio

n co

ntain

ed o

n th

is pan

el. I w

ou

ld assu

me th

at it sho

uld

be fairly sh

ort in

natu

re, since m

ost p

eop

le d

on

't like to invest a g

reat deal o

f time in

som

ethin

g th

at do

esn't h

old

their

attentio

n . H

it them

with

you

r best stu

ff and

leave detail to

the rest o

f the

po

ster. Betw

een 75 an

d 100 w

ord

s. Give it yo

ur b

est sho

t. You

can d

o it.

Fig

ure cap

tion

is at 72 pt. H

elvetica Bo

ld.

Try to keep

un

der 100 w

ord

s. Th

is is abo

ut

80 w

ord

s. F

igu

re cap

tion

is

at 72

pt.

Helvetica

Bo

ld. Try

to

keep

un

der

100 w

ord

s. Wh

ich is ab

ou

t wh

at this is. F

igu

re cap

tion

is at 72 pt. H

elvetica Bo

ld. Try to

keep

u

nd

er 100

wo

rds. W

hich

is

abo

ut

wh

at this is. F

igu

re captio

n is at 72 p

t. H

elvetica B

old

. Try to

keep

u

nd

er 100

wo

rds. W

hich

is abo

ut w

hat th

is is. Fig

ure

captio

n is at 72 p

t. Helvetica B

old

. Try to

keep u

nd

er 100 wo

rds.

Cap

tion

Title S

izeat 100 p

t. Helvetica B

old

Oblig

ue

Cap

tion

Title S

izeat 100 p

t. Helvetica B

old

Oblig

ue

Fig

ure cap

tion

is at 72 pt. H

elvetica Bo

ld.

Try to keep

un

der 100 w

ord

s. Th

is is abo

ut

80 w

ord

s. F

igu

re cap

tion

is

at 72

pt.

Helvetica

Bo

ld. Try

to

keep

un

der

100 w

ord

s. Wh

ich is ab

ou

t wh

at this is. F

igu

re cap

tion

is at 72 pt. H

elvetica Bo

ld. Try to

keep

u

nd

er 100

wo

rds. W

hich

is

abo

ut

wh

at this is. F

igu

re captio

n is at 72 p

t. H

elvetica B

old

. Try to

keep

u

nd

er 100

wo

rds. W

hich

is abo

ut w

hat th

is is. Fig

ure

captio

n is at 72 p

t. Helvetica B

old

. Try to

keep u

nd

er 100 wo

rds.

Fig

ure cap

tion

is at 72 pt. H

elvetica Bo

ld.

Try to keep

un

der 100 w

ord

s. Th

is is abo

ut

80 w

ord

s. F

igu

re cap

tion

is

at 72

pt.

Helvetica

Bo

ld. Try

to

keep

un

der

100 w

ord

s. Wh

ich is ab

ou

t wh

at this is. F

igu

re cap

tion

is at 72 pt. H

elvetica Bo

ld. Try to

keep

u

nd

er 100

wo

rds. W

hich

is

abo

ut

wh

at this is. F

igu

re captio

n is at 72 p

t. H

elvetica B

old

. Try to

keep

u

nd

er 100

wo

rds. W

hich

is abo

ut w

hat th

is is. Fig

ure

captio

n is at 72 p

t. Helvetica B

old

. Try to

keep u

nd

er 100 wo

rds.

Cap

tion

Title S

izeat 100 p

t. Helvetica B

old

Oblig

ue

Au

g-99

0

50

10

0

15

0

20

0

25

0

30

0

35

0Pro

cessin

g R

ate

Sep-99

No

v-99Jan

-00M

ar-00O

ct-99D

ec-99Feb

-00

Nu

mb

er o

f No

des

Avg

. Pro

cessin

g R

ate

/10

0 N

od

es

May-99

Au

g-99

No

v-99Feb

-00M

ay-00A

ug

-00

0

25

50

75

10

0

12

5

15

0

17

5

20

0

Size

of P

rod

uctio

n D

ata

Reco

nstru

ction

, An

aly

sisan

d S

imu

latio

n C

od

e

Tran

sien

t–Persista

nt

Wra

pp

er

BA

BA

R Data

base

So

ftware

Ob

jectiv

ity/D

BC

lien

t an

d S

erv

er

SLA

CEn

han

cem

en

ts

Verita

sFile

Syste

mH

PSS

Ro

les o

f Co

mm

ercia

l an

d ‘H

om

e-G

row

n’ S

oftw

are

Data

base

scala

bility

to a

peta

byte

an

d b

eyo

nd

is ach

ieved

by w

riting

all d

ata

base

files to

tap

es

man

ag

ed

by H

PSS. A

ccess fo

r p

hysics a

naly

sis req

uire

s that th

e

files b

e sta

ged

back

to th

e te

ns o

f te

rab

yte

s of d

isk ca

che.

• op

timize

d lo

gica

l file sy

stem

• disk

cach

e m

an

ag

er

• mass sto

rag

e sy

stem

inte

rface

• real tim

e m

on

itorin

g

• ad

ded

secu

rity• su

pp

orts co

mp

lex sch

em

a

• pro

vid

es C

++ bin

din

gs

• acts a

s typ

ical d

ata

base

en

gin

e

•– tra

nsa

ction

pro

cessin

g

•– jo

urn

alin

g, re

covery

•– p

ag

e la

yo

ut

Over 2

,00

0,0

00

lines o

f C++

cod

e, d

evelo

ped

by h

un

dre

ds o

f p

hysicists a

nd

en

gin

eers

Hu

nd

red

s of d

isks co

mb

ined

into

a

small n

um

ber o

f larg

e v

olu

mes.

Serv

es a

s ”d

isk ca

che”

Over 2

50

,00

0 lin

es o

f C++ co

de:

• com

ple

x p

ersiste

nt sch

em

a

~60

0 p

ersiste

nt cla

sses

• pla

cem

en

t/cluste

ring

strate

gie

s

• meta

data

main

ten

an

ce

• ind

ices, a

dm

in to

ols

Ho

me-G

row

nC

om

mercia

l

50

00

0

40

00

0

30

00

0

20

00

0

10

00

00

Nu

mb

er o

f Data

base

Files

May-99

Au

g-99

No

v-99Feb

-00M

ay-00A

ug

-00

Co

nd

ition

,C

on

figu

ratio

n

Even

ts

Reco

nstru

ction

(200 C

lien

ts x2)

An

aly

sis(~1

00 C

lien

ts)Sim

ula

tion

(~100 C

lien

ts)

Sto

rag

e

30

Ob

jectiv

ityD

ata

Serv

ers

UFS

/VFS

MSS

(e.g

. HPSS)

132"6' Level

92"

40"

77"

33"

24"

189"

Lo

go

Idea

Can

tilever