SBM REVIEW MEETING - localbodies.up.nic.inlocalbodies.up.nic.in/DLBGO/879 20-06-2017.pdf ·...

48

Transcript of SBM REVIEW MEETING - localbodies.up.nic.inlocalbodies.up.nic.in/DLBGO/879 20-06-2017.pdf ·...

Page 1: SBM REVIEW MEETING - localbodies.up.nic.inlocalbodies.up.nic.in/DLBGO/879  20-06-2017.pdf · hyperlink:-  Same documentary evidence should also be uploaded on the ULB website.
Page 2: SBM REVIEW MEETING - localbodies.up.nic.inlocalbodies.up.nic.in/DLBGO/879  20-06-2017.pdf · hyperlink:-  Same documentary evidence should also be uploaded on the ULB website.
Page 3: SBM REVIEW MEETING - localbodies.up.nic.inlocalbodies.up.nic.in/DLBGO/879  20-06-2017.pdf · hyperlink:-  Same documentary evidence should also be uploaded on the ULB website.

SBM REVIEW MEETING

before

Hon’ble Principal Secretary, Dept. Of Urban Development, GoUP

27thJUNE, 2017

Presented by

Name of Municipal Commissioner/Executive Officer Name of ULB

Page 4: SBM REVIEW MEETING - localbodies.up.nic.inlocalbodies.up.nic.in/DLBGO/879  20-06-2017.pdf · hyperlink:-  Same documentary evidence should also be uploaded on the ULB website.

AGENDA -1 ACTION PLAN FOR ACHIEVING 100% ODF & PROGRESS

Page 5: SBM REVIEW MEETING - localbodies.up.nic.inlocalbodies.up.nic.in/DLBGO/879  20-06-2017.pdf · hyperlink:-  Same documentary evidence should also be uploaded on the ULB website.

ULB OVERVIEW

Overall Ranking and Marks of ULB

(As per 03.06.2017 SBM Workshop)

ULB Population

Total Number of Houses

Total Number of Households

Total Number of Houses (With Toilets)

Total Number of Houses (Without Toilets)

Total Number of Houses (Insanitary Toilets)

Total waste Generation (MTD) ULB Map

3

Page 6: SBM REVIEW MEETING - localbodies.up.nic.inlocalbodies.up.nic.in/DLBGO/879  20-06-2017.pdf · hyperlink:-  Same documentary evidence should also be uploaded on the ULB website.

Action Plan for Achieving 100% ODF (Before 02nd October 2018)

Number

Total Wards

100 % ODF/ Protocol Complete wards

Wards which are Not ODF

WARDS EXPECTED TO BE ODF BY -

July, 2017

August , 2017

September , 2017

October, 2017

November, 2017

December, 2017

January, 2018

February, 2018

March, 2018

April, 2018

May, 2018

June, 2018

July, 2018

August , 2018

September, 2018 4

Page 7: SBM REVIEW MEETING - localbodies.up.nic.inlocalbodies.up.nic.in/DLBGO/879  20-06-2017.pdf · hyperlink:-  Same documentary evidence should also be uploaded on the ULB website.

Construction of Individual Household Toilets (IHHTs) in Units

Applications

Received

Application

Verified

Applications

Approved

Applications

Rejected

Applications

Closed

Applications

Disposed

(2+4+5)

Remaining for

Disposal (1-6)

1 2 3 4 5 6 7

Mission

Target

/units

Toilet Survey

(Actual on-

ground)/units

Toilets

Constructed/

units (Actual)

Toilets

Constructed/

units (Photo

Upload)

Toilets

Commenced/

units (Actual)

Toilets

Commenced/

units (Photo

Upload)

Physical

Progress (%)

As per actual

Physical

Progress (%)

As Photo

Upload 1 2 3 4 5 6 7 8

Status of IHHT Fund Utilization (Rs. In Lakhs)

Status of IHHT Online Applications (In No.)

GoI First

Installment

GoI Second

Installment

State First

Installment

State Second

Installment

Total

(1+2+3+4)

Funds

Utilized

No of

beneficiaries

Further Fund

Requirement 1 2 3 4 5 6 7 8

Few photographs may be enclosed 5

Page 8: SBM REVIEW MEETING - localbodies.up.nic.inlocalbodies.up.nic.in/DLBGO/879  20-06-2017.pdf · hyperlink:-  Same documentary evidence should also be uploaded on the ULB website.

Construction of Community Toilet Seats (CT) in Units

Mission

Target

Revised target

based on

survey

Seats

Constructed

Photo upload

against

constructed

Seats

Seats

Commenced

Photo upload

against

commenced

Seats

Physical

Progress %

(Constructed

Seats)

Physical

Progress %

(Photo

Upload)

1 2 3 4 5 6 7 8

Status of Fund Utilization (Rs. In Lakhs) GoI First Installment State First Installment Total (1+2) Funds Utilized

1 2 3 4

Few photographs may be enclosed

Fund Requirement (Rs. In Lakhs) No of Seats Additional Fund Requirement

1 2

6

Page 9: SBM REVIEW MEETING - localbodies.up.nic.inlocalbodies.up.nic.in/DLBGO/879  20-06-2017.pdf · hyperlink:-  Same documentary evidence should also be uploaded on the ULB website.

Construction of Public Toilet Seats (PT) in Units

Mission

Target

Revised target

based on

survey

Seats

Constructed

Photo upload

against

constructed

Seats

Seats

Commenced

Photo upload

against

commenced

Seats

Physical

Progress %

(Constructed

Seats)

Physical

Progress %

(Photo

Upload)

1 2 3 4 5 6 7 8

Fund Requirement (Rs. In Lakhs)

No of Seats Fund Requirement

1 2

Few photographs may be enclosed 7

Page 10: SBM REVIEW MEETING - localbodies.up.nic.inlocalbodies.up.nic.in/DLBGO/879  20-06-2017.pdf · hyperlink:-  Same documentary evidence should also be uploaded on the ULB website.

Construction of Urinal Seats (PT) in Units

Target based on survey Seats Constructed Seats Commenced Physical Progress (%)

1 2 3 4

Few photographs may be enclosed

No of Seats Fund Requirement 1 2

Fund Requirement (Rs. In Lakhs)

8

Page 11: SBM REVIEW MEETING - localbodies.up.nic.inlocalbodies.up.nic.in/DLBGO/879  20-06-2017.pdf · hyperlink:-  Same documentary evidence should also be uploaded on the ULB website.

Solid Waste Management

Fund Requirement (Rs. In Lakhs)

Door to Door Garbage Collection Waste Generation, Transportation and Processing (MTD)

Total wards Wards with 100% D2D Waste Generated Waste Transported Waste Processed

1 2 3 4 5

For Collection and Transportation equipments Fund Requirement

1 2

9

Fund Utilization (Rs. In Lakhs) GoI First Installment State First

Installment

ULB First

Installment

Total Funds Utilized

1 2 3 4 (1+2+3) 5

Page 12: SBM REVIEW MEETING - localbodies.up.nic.inlocalbodies.up.nic.in/DLBGO/879  20-06-2017.pdf · hyperlink:-  Same documentary evidence should also be uploaded on the ULB website.

Scientific Management of Solid Waste

Capacity of Processing

Plant (in TPD)

Plant is Operational or not?

Name of Operator

Compost generated per day

Compost Sold

Status of MSW Processing Plant (If existing) If SWM Plant does not exist- Whether Sufficient land is available for Plant and SLF-

10

Page 13: SBM REVIEW MEETING - localbodies.up.nic.inlocalbodies.up.nic.in/DLBGO/879  20-06-2017.pdf · hyperlink:-  Same documentary evidence should also be uploaded on the ULB website.

CB and IEC Fund Utilization (Rs. In Lakhs)

GoI First Installment State First Installment Total Funds Utilized

1 2 3 (1+2) 4

Capacity Building and Administrative & Office Expenses (CB and A&OE)

IEC and Public Awareness (IEC & PA)

Activities under CB and A&OE

1. 2. 3. 4. 5.

Activities under IEC & PA 1. Banner, Hoarding, Advertisement 2. 3. 4. 5.

11

Page 14: SBM REVIEW MEETING - localbodies.up.nic.inlocalbodies.up.nic.in/DLBGO/879  20-06-2017.pdf · hyperlink:-  Same documentary evidence should also be uploaded on the ULB website.

IEC Progress Report (From 01st April 2016 till 15th June 2017)

SN Work Description No. Expenditure (Rs in Lac)

1 Hoarding / Banner installed in ULBs

2 Poster/ Hand bills distributed in ULBs

3 Wall painting done in ULBs

4 Folk Media used in ULBs (Nukkar Natak, Jadu, Puppet) etc.

5 Swachhata Doots working in ULBs

6 Meeting done by Swachhata Doots

7 Meeting done by Corporators/Brand Ambassadors in ULBs

8 Programs done by School children in ULBs

9 Programs done by NGOs in ULBs

10 Programs detail given in Newspaper by ULBs

11 No of dustbins distributed on 5th June 2017

12 No of places where bulk waste generators are in ULBs

13 No of sanitary inspector are using Swachhata App

14 No of Employees (permanent & contractual) enrolled on SBM portal

15 Campaign photo uploaded on portal (Yes/No)

16 Registration done by ULBs on Swachhata App (Yes/No)

17 Registration done by ULBs on GeM portal (Yes/No)

18 Which social media is being used by ULBs for SBM 12

Page 15: SBM REVIEW MEETING - localbodies.up.nic.inlocalbodies.up.nic.in/DLBGO/879  20-06-2017.pdf · hyperlink:-  Same documentary evidence should also be uploaded on the ULB website.

Any other updates/Issues

13

Page 16: SBM REVIEW MEETING - localbodies.up.nic.inlocalbodies.up.nic.in/DLBGO/879  20-06-2017.pdf · hyperlink:-  Same documentary evidence should also be uploaded on the ULB website.

14

Page 17: SBM REVIEW MEETING - localbodies.up.nic.inlocalbodies.up.nic.in/DLBGO/879  20-06-2017.pdf · hyperlink:-  Same documentary evidence should also be uploaded on the ULB website.

AMRUT REVIEW MEETING

before

Hon’ble Principal Secretary, Dept. Of Urban Development, GoUP

27thJUNE, 2017

Presented by

Name of Municipal Commissioner/Executive Officer Name of ULB

Page 18: SBM REVIEW MEETING - localbodies.up.nic.inlocalbodies.up.nic.in/DLBGO/879  20-06-2017.pdf · hyperlink:-  Same documentary evidence should also be uploaded on the ULB website.

AGENDA -2 Progress on work under AMRUT

Page 19: SBM REVIEW MEETING - localbodies.up.nic.inlocalbodies.up.nic.in/DLBGO/879  20-06-2017.pdf · hyperlink:-  Same documentary evidence should also be uploaded on the ULB website.

UPDATE ON AMRUT PROJECTS

S

N

PROJECT NAME SAAP

YEAR

SECTOR FUND RELEASED

(in Crore)

TENDER

STATUS

WORK

STARTED

3

SN SAAP YEAR SECTOR STATUS ON DPR PREPARATION

STATUS ON SAAP 2 & SAAP 3

Page 20: SBM REVIEW MEETING - localbodies.up.nic.inlocalbodies.up.nic.in/DLBGO/879  20-06-2017.pdf · hyperlink:-  Same documentary evidence should also be uploaded on the ULB website.

INSTRUCTIONS FOR ULB’s

• Hyperlink the documentary evidence against each reform in ANNEXURE column.

• In case any of the reform is done by other department, Kindly provide the hyperlink address. Eg: Marriage registration hyperlink:- http://igrsup.gov.in/igrsup/defaultAction.action

• Same documentary evidence should also be uploaded on the ULB website.

• Kindly make sure to provide detail information along with documentary evidence for following milestones in reforms:

o Children Parks (FY 2015-16 & 2016-17)

o LED conversion in street lights (Energy & Water Audit) 4

Page 21: SBM REVIEW MEETING - localbodies.up.nic.inlocalbodies.up.nic.in/DLBGO/879  20-06-2017.pdf · hyperlink:-  Same documentary evidence should also be uploaded on the ULB website.

5

REFORMS TIMELINE CURRENT STATUS ANNEXURE

1 - E Governance

1 Creation of Website Sept 2016 ANNEX 1.1

2 Publication of e-newsletter, Digital India

Initiative Sept 2016 ANNEX 1.2

3 Support Digital India (ducting to be done on

PPP mode or by the ULB itself.) Sept 2016 ANNEX 1.3

4

Coverage with E-MAAS (from the date of hosting the software) 1. Registration of Birth, Death and Marriage, 2. Water & Sewerage Charges, 3. Grievance Redressal, 4. Property Tax, 5. Advertisement tax, 6. Issuance of Licenses, 7. Building Permissions, 8. Mutations, 9. Payroll, 10. Pension 11. e- procurement

Mar 2017

ANNEX 1.4.1 ANNEX 1.4.2 ANNEX 1.4.3 ANNEX 1.4.4 ANNEX 1.4.5 ANNEX 1.4.6 ANNEX 1.4.7 ANNEX 1.4.8 ANNEX 1.4.9 ANNEX 1.4.10 ANNEX 1.4.11

Uttar Pradesh- Reform Milestones under AMRUT

Page 22: SBM REVIEW MEETING - localbodies.up.nic.inlocalbodies.up.nic.in/DLBGO/879  20-06-2017.pdf · hyperlink:-  Same documentary evidence should also be uploaded on the ULB website.

6

REFORMS TIMELINE CURRENT STATUS ANNEXURE

1 - E Governance (contd..)

5 Personnel Staff Management Mar 2018 ANNEX 1.5

6 Project Management Mar 2018 ANNEX 1.6

2 - Constitution and Professionalization of municipal cadre

1 Cadre linked training Mar 2017 ANNEX 2.1

3 - Augmenting Double Entry Accounting

1 Complete migration to double entry

accounting system. Sept 2016 ANNEX 3.1

2 Obtaining an audit certificate to the

effect from FY 2012-13 onwards. Sept 2016 ANNEX 3.2

3 Publication of annual financial statement

on website Sept 2016 ANNEX 3.3

4 Appointment of internal auditor Mar 2017 ANNEX 3.4

Uttar Pradesh- Reform Milestones under AMRUT

Page 23: SBM REVIEW MEETING - localbodies.up.nic.inlocalbodies.up.nic.in/DLBGO/879  20-06-2017.pdf · hyperlink:-  Same documentary evidence should also be uploaded on the ULB website.

7

REFORMS TIMELINE CURRENT STATUS ANNEXURE

4 - Urban planning and City Development Plans

1 Preparation of SLIP Mar 2017 (REPEAT)

ANNEX 4.1

2 Develop at least one children park every

year in the AMRUT cities

Mar 2017 (REPEAT)

ANNEX 4.2

3 Make action plans to progressively increase

green cover in cities to 15% in 5 years.

March 2016

ANNEX 4.3

4 Energy Efficiency Projects June 2017 ANNEX 4.4

5

Establish a system for maintaining of parks,

playground and recreational areas relying on

public private partnerships (PPP) model

Sep 2016 ANNEX 4.5

Uttar Pradesh- Reform Milestones under AMRUT

Page 24: SBM REVIEW MEETING - localbodies.up.nic.inlocalbodies.up.nic.in/DLBGO/879  20-06-2017.pdf · hyperlink:-  Same documentary evidence should also be uploaded on the ULB website.

8

REFORMS TIMELINE CURRENT STATUS ANNEXURE

5 - Municipal tax and fees improvement

1

At least 90% Coverage

&

At least 90% Collection

Sep 2016

ANNEX 5.1.1

ANNEX 5.1.2

2 Make policy to periodically revise

property tax, levy charges and other fees Sep 2016 ANNEX 5.2

3 Post demand collection book (DCB) of tax

details on the website Sep 2016 ANNEX 5.3

4

Achieve full potential advertisement

revenue by making a policy for destination

specific potential having dynamic pricing

module.

Sep 2016 ANNEX 5.4

Uttar Pradesh- Reform Milestones under AMRUT

Page 25: SBM REVIEW MEETING - localbodies.up.nic.inlocalbodies.up.nic.in/DLBGO/879  20-06-2017.pdf · hyperlink:-  Same documentary evidence should also be uploaded on the ULB website.

9

REFORMS TIMELINE CURRENT STATUS ANNEXURE

6 - Improvement in levy and collection of user charges

1

Adopt a policy on user charges for individual

and institutional assessment in which a

differential rate is charged for water use and

adequate safeguards are included to take care

of interests of the vulnerable.

Sep 2016 ANNEX 6.1

2 Make action plan to reduce water losses to less

than 20 % and publish on website Sep 2016 ANNEX 6.2

3 Separate accounts for user charges Sep 2016 ANNEX 6.3

4

At least 90 % billing

&

At least 90% collection

Sep 2016

ANNEX 6.4.1

ANNEX 6.4.2

Uttar Pradesh- Reform Milestones under AMRUT

Page 26: SBM REVIEW MEETING - localbodies.up.nic.inlocalbodies.up.nic.in/DLBGO/879  20-06-2017.pdf · hyperlink:-  Same documentary evidence should also be uploaded on the ULB website.

10

REFORMS TIMELINE CURRENT STATUS ANNEXURE

7 – Credit Rating

1 Complete the credit ratings of the ULBs June 2017 ANNEX 7.1

8 – Energy and water audit

1 Energy (street lights ) and water audit

(including non-revenue water or losses audit) Sept 2016

ANNEX 8.1

2 Making STPs and WTPs energy efficient Sept 2016 ANNEX 8.2

3

Optimize energy consumption in street lights

by using energy efficient lights and

increasing reliance on renewable energy

Sept 2016

Kindly mention the progress of Water Supply & Sewerage , Energy Audit done by EESL

ANNEX 8.3

Uttar Pradesh- Reform Milestones under AMRUT

S

N

No. of Street

Light points

No. of LED

points

No. of Solar

Energy points

Action Plan on

complete conversion

Page 27: SBM REVIEW MEETING - localbodies.up.nic.inlocalbodies.up.nic.in/DLBGO/879  20-06-2017.pdf · hyperlink:-  Same documentary evidence should also be uploaded on the ULB website.

11

REFORMS TIMELINE CURRENT STATUS ANNEXURE

9 – Swachh Bharat Mission

1 Elimination of open defecation. March 2018 ANNEX 9.1

2 Waste Collection (100%), March 2018 ANNEX 9.2

3 Transportation of Waste (100%). March 2018 ANNEX 9.3

4 Scientific Disposal (100%). March 2018 ANNEX 9.4

Uttar Pradesh- Reform Milestones under AMRUT

Denotes reforms to be completed in FY 2017-18

Page 28: SBM REVIEW MEETING - localbodies.up.nic.inlocalbodies.up.nic.in/DLBGO/879  20-06-2017.pdf · hyperlink:-  Same documentary evidence should also be uploaded on the ULB website.

12

Page 29: SBM REVIEW MEETING - localbodies.up.nic.inlocalbodies.up.nic.in/DLBGO/879  20-06-2017.pdf · hyperlink:-  Same documentary evidence should also be uploaded on the ULB website.

REVIEW MEETING

before

Hon’ble Principal Secretary, Dept. Of Urban Development, GoUP

27thJUNE, 2017

Presented by

Name of Municipal Commissioner/Executive Officer Name of ULB

Page 30: SBM REVIEW MEETING - localbodies.up.nic.inlocalbodies.up.nic.in/DLBGO/879  20-06-2017.pdf · hyperlink:-  Same documentary evidence should also be uploaded on the ULB website.

AGENDA POINTS

SN AGENDA

1 PROGRESS AGAINST PIT FREE ROADS

2 PROGRESS AGAINST SCAVENGING OF DRAINS BEFORE

MONSOON

3 REVIEW OF IMPLEMENTATION OF INSTRUCTIONS GIVEN BY

GOVT. IN PAST DAYS

4 GUIDELINES ON RECOMMENDATION BY 14TH FINANCE

COMMISSION FOR PERFORMANCE GRANT

2

Page 31: SBM REVIEW MEETING - localbodies.up.nic.inlocalbodies.up.nic.in/DLBGO/879  20-06-2017.pdf · hyperlink:-  Same documentary evidence should also be uploaded on the ULB website.

AGENDA - 1 Progress against Pit free Roads

BACK

Page 32: SBM REVIEW MEETING - localbodies.up.nic.inlocalbodies.up.nic.in/DLBGO/879  20-06-2017.pdf · hyperlink:-  Same documentary evidence should also be uploaded on the ULB website.

ftyk fudk;

dk izdkj

Ø0 la0

fudk; dk uke

fudk; ds LokfeRo

dh lMdks dh dqy yEckbZ ¼fdeh0

½

xM~<k ;qDr

lMdks dh

yEckbZ

¼fd0eh0½

lMdks dks

xM~<k eqDr

djus dh vuqekfur ykxr ¼yk[k

:0 esa½

x<~<keqDr djus ds laca/k esa dh x;h dk;Zokgh dk fooj.k

dk;Z iw.kZ gksus

dh laHkkfor frfFk

fufonkvks dh

fLFkfr

tkjh dk;kZns'kks dh fLFkfr

fuxZr

dk;kZns

'kks ds lkis{k vc

rd

x<~<ke

qDr dh

x;h lMdks

dh dqy

y0

¼fd0eh

0½ esa

dqy vkeaf=r

fufonk

dh la[;k

lMdks dh

dqy y0 ftlds fy;s fufonk

vkeaf=r

dh x;h

¼fd0eh0½ esa

fuxZr

dk;Zns

'kks

dh

la[;k

lMdks dh

dqy y0 ftlds fy;s

dk;kZns'k

fuxZr fd;s

x;s

¼fd0eh0½ esa

1 2 3 4 5 6 7 8 9 10 11 12 13

4

izns'k ds fudk;ks dh lMdks dks fnukad 15-06-2017 ds iwoZ x<~<k

eqDr fd;s tkus ds lEcU/k esa

Page 33: SBM REVIEW MEETING - localbodies.up.nic.inlocalbodies.up.nic.in/DLBGO/879  20-06-2017.pdf · hyperlink:-  Same documentary evidence should also be uploaded on the ULB website.

AGENDA - 2 Progress against scavenging of drains before monsoons

BACK

Page 34: SBM REVIEW MEETING - localbodies.up.nic.inlocalbodies.up.nic.in/DLBGO/879  20-06-2017.pdf · hyperlink:-  Same documentary evidence should also be uploaded on the ULB website.

dz

z la

tuin dk uke

fudk; dk uke

lQkbZ ;ksX; ukyks

dh fLFkfr

ekg esa lQkbZ djk;s x;s ukyks

dh fLFkfr

eklkUr rd vo'ks"k ukyks

dh fLFkfr vH;qfDr

la[;k yEckbZ ¼eh0½

la[;k yEckbZ ¼eh0½

laa[;k yEckbZ ¼eh0½

1 2 3 4 5 6 7 8 9 10

6

uxj fudk; {ks= vUrxZr ukyks dh o"kkZ _rq ds iwoZ lQkbZ ds laca/k

esa

Page 35: SBM REVIEW MEETING - localbodies.up.nic.inlocalbodies.up.nic.in/DLBGO/879  20-06-2017.pdf · hyperlink:-  Same documentary evidence should also be uploaded on the ULB website.

AGENDA - 3 Review on implementation of Instructions given by Govt. in past days

BACK

Page 36: SBM REVIEW MEETING - localbodies.up.nic.inlocalbodies.up.nic.in/DLBGO/879  20-06-2017.pdf · hyperlink:-  Same documentary evidence should also be uploaded on the ULB website.

ftyk fudk;

dk izdkj

Ø0 la0

fudk; dk

uke

jk"Vªh; jktekxksZ ls

lEcfU/kr

jkT; jktekxksZZ ls

lEcfU/kr

vU; jktekxksZ ls

lEcfU/kr

;ksx

(6+11+

6) la[;k

yEckbZ

¼fdeh0½

dqy yxs gksfMZax

@ lkbu cksMZ dh la[;k

dqy fdrus

ij vkfM

V fd;k x;k

vo’ks"k

gksfMZax@ lkbu cksMZ dh la[;k

la[;k

yEckbZ

¼fdeh0½

dqy yxs gksfMZax@ lkbu cksMZ dh

la[;k

dqy fdrus ij

vkfMV

fd;k x;k

vo’ks"k

gksfMZax

@ lkbu cksMZ dh la[;k

la[;k

yEckbZ

¼fdeh0½

dqy yxs gksfMZax

@ lkbu cksMZ dh la[;k

dqy fdrus

ij vkfMV fd;k

x;k

vo’ks"k

gksfMZax@ lkbu cksMZ dh la[;k

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

8

desVh vku jksM ls¶Vh }kjk lMdks ds fdukjs yxk;s x;s lkbu cksMZ ,oa

gksfMZax ds vkfMV djk;s tkus ds lEcU/k esa fudk;ks ls izkIr lwpuk

Page 37: SBM REVIEW MEETING - localbodies.up.nic.inlocalbodies.up.nic.in/DLBGO/879  20-06-2017.pdf · hyperlink:-  Same documentary evidence should also be uploaded on the ULB website.

dz

z

la

tuin dk

uke

fudk; dk

uke

lM+d@ukyh@[kM+Utk@fudk;ks dh Hkwfe ds

vfrdze.kksa dk fooj.k

vH;qfD

r

fpfUgr vfrdze.kksa dh la[;k

gVk;s x;s vfrdze.kksa dh

la[;k

fudk; dh Hkwfe ij voS/k dCts dk fooj.k

vLFkkbZ LFkkbZ vLFkkbZ LFkkbZ Hkwfe

dk fooj.k

Hkwfe dk

{ks=Qy

Hkwfe dks [kkyh djkdj fdl mi;ksx esa yk;k tk

ldrk gS

1 2 3 4 5 6 7 8 9 10 11

9

lkoZtfud ekxksZa ,oa Hkwfe;ksa ij vfrØe.kksa@dCtks dk fooj.k

Page 38: SBM REVIEW MEETING - localbodies.up.nic.inlocalbodies.up.nic.in/DLBGO/879  20-06-2017.pdf · hyperlink:-  Same documentary evidence should also be uploaded on the ULB website.

dzz la

tuin dk uke fudk; dk uke

iFk fodz; lfefr dk xBu gqvk gS ;k

ugh ¼gka@ugh½

osafMx@uks

osfUMx tksu

dk fpUgkadu izkjEHk gqvk

gS ;k ugh

¼gka@ugh½

vH;qfDr

1 2 3 4 5 6

10

mRrj izns'k iFk fodzsrk ¼thfodk laj{k.k vkSj iFk fodz; fofu;eu½

fu;ekoyh 2017 ds vuqikyu ds lEcU/k esa

Page 39: SBM REVIEW MEETING - localbodies.up.nic.inlocalbodies.up.nic.in/DLBGO/879  20-06-2017.pdf · hyperlink:-  Same documentary evidence should also be uploaded on the ULB website.

dzz

la tuin dk uke fudk; dk uke

bZ&Vs.Mfjax

O;oLFkk ykxw gS

;k ugh ;fn gka rks iksVZy dk uke

bZ&Vs.Mfjax

ds ek/;e ls gq,

Vs.Mjks dh la[;k

vH;qfDr

1 2 3 4 5 6

11

mRrj izns'k ds 'kkldh; foHkkxks esa bZ&izksD;ksjesUV@bZ&Vs.Mfjax

O;oLFkk ykxw fd;s tkus ds lEcU/k esa

Page 40: SBM REVIEW MEETING - localbodies.up.nic.inlocalbodies.up.nic.in/DLBGO/879  20-06-2017.pdf · hyperlink:-  Same documentary evidence should also be uploaded on the ULB website.

dzz

la tuin dk uke fudk; dk uke

fMftVy ek/;e ls

Hkqxrku@izkfIr

dh O;oLFkk

¼gka@ugh½

Hkqxrkuks@iz

kfIr;kas dh la[;k

vH;qfDr

1 2 3 4 5 6

12

fMftVy ek/;e ls Hkqxrku@izkfIr

Page 41: SBM REVIEW MEETING - localbodies.up.nic.inlocalbodies.up.nic.in/DLBGO/879  20-06-2017.pdf · hyperlink:-  Same documentary evidence should also be uploaded on the ULB website.

14osa foRr vk;ksx dh

laLrqfr;ksa ds vUrxZr fu’iknu

vuqnku dh izkfIr gsrq vko';d

fn'kk&funsZ'k

Page 42: SBM REVIEW MEETING - localbodies.up.nic.inlocalbodies.up.nic.in/DLBGO/879  20-06-2017.pdf · hyperlink:-  Same documentary evidence should also be uploaded on the ULB website.

• fu’iknu vuqnku izns'k dh mu fudk;ksa dks laLrqr dh tk;sxh]

ftuds }kjk fudk; ds futh L=ksrksa dh vk; esa o`f) dh x;h gks

vkSj muds lfoZl ysoy csapekdZ esa c<+ksRrjh gq;h gksA

• uxjh; fudk;ksa dks fu’iknu vuqnku izkfIr gsrq viuk

LoewY;kafdr nkok izR;sd o’kZ dh 30 flrEcj rd jkT; ljdkj ls

fd;k tkuk gSA

• jkT; ljdkj }kjk fudk;ksa ds fu’iknu vuqnku gsrq izkIr nkos dk

ijh{k.k djrs gq;s ladfyr :i ls izR;sd o’kZ dh fnukad 30

vDVwcj rd “kgjh fodkl ea=ky;] Hkkjr ljdkj dks izsf’kr fd;k

tkuk gSA 14

lkekU; fn'kk&funsZ'k

Page 43: SBM REVIEW MEETING - localbodies.up.nic.inlocalbodies.up.nic.in/DLBGO/879  20-06-2017.pdf · hyperlink:-  Same documentary evidence should also be uploaded on the ULB website.

• fu’iknu vuqnku dk nkok izLrqr fd;s tkus gsrq leLr ukxj

fudk;ksa dks viuk lEijhf{kr okf’kZd ys[kk rS;kj fd;k tkuk

gksxkA foRrh; o’kZ 2017&18 esa fu’iknu vuqnku izkIr fd;s

tkus gsrq fudk;ksa dks foRrh; o’kZ 2014&15 ,ao 2015&16

ds rqyui= ¼cSysal'khV½ dh lEijh{kk djk;k tkuk gksxkA

• izR;sd uxjh; fudk; dks vius futh L=ksrksa dh vk; esa o`f)

vko';d :i ls izkIr djuh gksxh ftldh iqf’V lEijhf{kr ys[ks ls

gksxhA

• izR;sd uxjh; fudk; }kjk vius lfoZl ysoy cSapekdZ dk

fu/kkZj.k dj mDr dks uxjh; fudk; dh osclkbV vFkok fdlh vU; 15

lkekU; fn'kk&funsZ'k ¼Øe'k% ---½

Page 44: SBM REVIEW MEETING - localbodies.up.nic.inlocalbodies.up.nic.in/DLBGO/879  20-06-2017.pdf · hyperlink:-  Same documentary evidence should also be uploaded on the ULB website.

fu"iknu vuqnku izkIr fd;s tkus gsrq

vad fu/kkZj.k%&

dz fu/kkZfjr ekud fu/kkZfjr vad ¼vf/kdre½

¼vf/kdre½

1 lEijhf{kr okf’kZd ys[kk ¼1 ladsrd½ 10

2 futh L=ksrks dh vk; esa o`f) ¼2 ladsrd½ 40

3 lfoZl ysoy csapekdZ dk izdk'ku ¼4 ladsrd½ 50

dqy 100

• 60% ;k mlls de vad izkIr djus okyh fudk; gh dsoy fu’iknu vuqnku gsrq ik= gksxhA 60% vad ls de

ikus okyh fudk;sa vik= ekuh tk;sxha ftudk va'k “ks’k ik= fudk;ksa ds e/; fu/kkZfjr QkewZys

¼tula[;k&90% rFkk {ks=Qy 10%½ ds rgr forfjr dj fn;k tk;sxkA

16

Page 45: SBM REVIEW MEETING - localbodies.up.nic.inlocalbodies.up.nic.in/DLBGO/879  20-06-2017.pdf · hyperlink:-  Same documentary evidence should also be uploaded on the ULB website.

Hkkx&1 Okkf"kZd ys[ks dh lEijh{kk

fu/kkZfjr vad&10 ¼vf/kdre½

fu/kkZfjr y{; gka ugha

ukxj fudk; }kjk vius lEijhf{kr

ys[ks dks fudk; dh csolkbV ij

iznf'kZr fd;k tkuk

10 0

17

Back

Page 46: SBM REVIEW MEETING - localbodies.up.nic.inlocalbodies.up.nic.in/DLBGO/879  20-06-2017.pdf · hyperlink:-  Same documentary evidence should also be uploaded on the ULB website.

Hkkx&2 futh L=ksrksa dh vk; esa o`f) ¼v½ futh Jksrksa dh vk; ls LFkkiuk ,oa ifjlEifRr;ksa ds j[k&j[kko ij vkus okys O;; dk vkPNknu

¼c½ dqy O;; esa iwathxr O;; dk izfr'kr

vU; “kgjksa esa 20%

18

fu/kkZfjr y{; 70% ls vf/kd 60% ls 70% ds

e/;

50% ls 60% ds e/; 50% ls de

vad 20 15 10 0

,slh fudk;sa tks fd vius jktLo O;; ¼lsokvksa ds lapkyu ,ao j[kj[kko rFkk LFkkiuk ,ao

osru dk ;ksx½ dh fjdojh vius jktLo izkfIr;ksa ls dj ysxsa ¼jktLo izkfIr;ksa esa pwaxh]

izos”k “kqYd rFkk LVSEi “kqYd “kkfey ugha gksxsaa½

fu/kkZfjr y{; 40% ls vf/kd 30% ls 40% ds e/; 20% ls 30% ds e/; 20% ls de

vad 20 15 10 0

leLr L=ksrksa ls izkIr fudk; dh vk; esa ls iwathxr O;; dk vuqikr

fu/kkZfjr y{; 20% ls vf/kd 15% ls 20% ds e/; 10% ls 15% ds e/; 10% ls de

vad 20 15 10 0

leLr L=ksrksa ls izkIr fudk; dh vk; esa ls iwathxr O;; dk

vuqikr Back

ve`r “kgjksa esa 50%

Page 47: SBM REVIEW MEETING - localbodies.up.nic.inlocalbodies.up.nic.in/DLBGO/879  20-06-2017.pdf · hyperlink:-  Same documentary evidence should also be uploaded on the ULB website.

Hkkx&3 lfoZl ysoy cSapekdZl dk izdk’ku

fu/kkZfjr y{; 90% ls 100% ds e/; 80% ls 90% ds e/; 70% ls 80% ds e/; 70% ls de

vad 15 10 5 0

tykiwfrZ vkPNknu dk vuqikr

2½ xSj jktLo ty ¼,uvkjMCyw½ esa deh ¼vf/kdre 15 vad½

fu/kkZfjr y{; 20% ls de 20% ls 30% ds e/; 30% ls 40% ds e/; 40% ls vf/kd

vad 15 10 5 0

uxjh; fudk;sa tks xSj jktLo ty ds cSapekdZ dks iwjk

djrh gksa

3½ Lkkeqnkf;d@lkoZtfud “kkSpky;ksa esa tykiwfrZ dk vkPNknu ¼vf/kdre 10 vad½

izfr'kr 100% lkeqnkf;d@lkoZtfud 'kkSpky; vkPNkfnr 100% ls de

vad 10 0

Lkkeqnkf;d@lkoZtfud “kkSpky;ksa esa tykiwfrZ

Ck½ Bksl vif’k"V izca/ku vkPNknu ¼vf/kdre 10 vad½

fu/kkZjr y{; 50% ls vf/kd 20% ls 50% ds e/; 20% ls de

vad 10 5 0

oSKkfud fof/k ls dwM+k fuLrkj.k dk izfr”kr 19

v½ tykiwfrZ

1½ tykiwfrZ dk vkPNknu ¼vf/kdre 15 vad½

Back

Page 48: SBM REVIEW MEETING - localbodies.up.nic.inlocalbodies.up.nic.in/DLBGO/879  20-06-2017.pdf · hyperlink:-  Same documentary evidence should also be uploaded on the ULB website.

20