Saurabh Anand_15062015
-
Upload
saurabh-anand -
Category
Documents
-
view
430 -
download
1
Transcript of Saurabh Anand_15062015
CURRICULUM VITAE
Personal Details
Name SAURABH ANANDYear of birth 23.07.1981Nationality INDIANLanguages English, Hindi.Present Position Engineer – Operation CenterPresent Company ABB GISL, India
Education
July 2008 Advance Certificate in Power Distribution Management, IGNOU
University.
May 2006 Bachelor in Engineering (Electrical & Electronics).
KLES college of Engineering & Technology, VTU, Belgaum.
Page: 1 (7) Date: 5/3/23
Training and Certification
For 5 Days T333 – System 800xA with AC 800M - Integration of IEC61850 Devices
For 10 Days T315 – System 800xA with AC 800M.
Work Experience
Duration From 19.04.10 to till date
Company Operation Centre, ABB GISL, Bangalore.
Position Engineer.
System
Knowledge
800xA System, IEC 61850 standard, IET-CCT, 670, CET, PRO Micro-
SCADA SYS600, PCM600, SEL, AREVA-MiCOM, COM-500,Enervista
(GE relays)
Description Power Management System using 800xA System (AC800M,
PPA &PMS library).
Active and Reactive power control schemes.
Fast Load shedding and Freq. based load shedding schemes.
IO configuration with S800 Hardware in AC800M Controller.
Graphical Screen development for Control Schemes and Testing.
MODBUS Communication with AC800M controllers.
Programming AC800M controller with CI868 for Substation
Automation in IEC61850 Network.
IEC61850 Connect Faceplate development for Vertical
Communication (rcb) between the IED’s and PPA
Micro-SCADA system using PRO Micro-SCADA (9.2,9.3)
HOT-STANDBY ,Mirroring and Modbus communication with
different IEDs
Page: 2 (7) Date: 5/3/23
Project Details Name Reliance DMD & HMD, INDIADescription Documentation for BOM, System Architecture,
FDS, etc... IEC 61850 Engineering with ABB & other IEDs. Modbus RTU Engineering of the IEC 61850 electrical integration
with ABB 800xASystem IET600, ITT synthesizer , 800xA 5.1 FP4,CET, ABB & SEL
relays
Duration March 15- Till Date
Project Details Name RHIP_ PDO Oman, ABU DhabiDescription Kick Off Meeting
Project Startup, Documentation for BOM, System Architecture, FDS, etc...
IEC 61850 Engineering with ABB. MIS of 800xA system Modbus RTU IEC104 Engineering and commissioning of the IEC 61850
electrical integration with ABB 800xASystem IET600, ITT synthesizer , 800xA 5.1 FP4,CET, ABB relays
Duration April 15- Till Date
Project Details Name Rio Tinto Aclan, Kitimat CanadaDescription Creation of SCD files
Verification of CID files Run micros for 800xA SCD file and for CET IEC 61850 Engineering with ABB & Siemens IEDs. Pre-commissioning and commissioning of the IEC
61850 electrical integration with ABB 800xASystem IET600, ITT synthesizer , 800xA 5.1 FP4,CET, ABB & SEL
relays
Duration May 14- February 15
Project Details Name Ruwasis Refinery Expansion (ABU Dhabi)Description Creation of Database (LBE file).
Modbus Interface with 415V GE IEDs IEC 61850 Engineering with ABB, Areva & GE
IEDs. Graphics Creation for Micro-SCADA HMI HOT-STANDBY, Mirroring with systems. Yokogawa DCS interface with Micro-SCADA
systems using Modbus TCP/IP protocolSystem PRO Micro-SCADA SYS600 9.3,IET 2.4,Mod-Sim,CET
Duration October 13- April14.
Page: 3 (7) Date: 5/3/23
Project Details Name Bids & Proposal (PMS)Description Basis of Offer
Io List. System Topology. Non ABB items list. ABB Wizard Compliance List & Deviation List Power & Heat Loads Reliability Reports PMS License Reports
System 800xA system, ABB wizard.
Duration August 12- September 13
Project Details Name BILT_PMS, Ballarpur (India)Description Fast Load-Shedding, Over Load shedding & under
Frequency load shedding. IEC 61850 Engineering with ABB, IEDs. Steam Based Load shedding. Serial Modbus communication from IED to 800xA
Systems. DCS interface with PMS systems
System 800xA 5.1 (64 bit),PMS 5.4, PCM600, IET/CCT
Duration May 12- July12 (3 months).
Project Details Name Ruwasis Refinery Expansion (Singapore)Description Creation of Database (LBE file).
Modbus Interface with 415V GE IEDs IEC 61850 Engineering with ABB, Areva & GE
IEDs. Graphics Creation for Micro-SCADA HMI HOT-STANDBY, Mirroring with systems. DCS interface with Micro-SCADA systems
System PRO Micro-SCADA SYS600 9.3,IET 2.4,Mod-Sim
Duration September 11- March 12 (6 months).
Project Details Name APRE Relay Commissioning (Japan)Description Parameters setting for various protection function
Various logic testing using Omicron kitSystem PCM600 2.3, Omicron Kit
Duration July 11- (1 month)
Project Details Name 800xA Upgradation from 4.1 to 5.0 SP2 (South Africa)
Page: 4 (7) Date: 5/3/23
Description 800xA system Upgradation from 4.1 to 5.0 SP2 Integration of IEC61850 Connectivity server to the
upgraded system To established vertical communication between
IEC 61850 Connectivity Server to the upgraded system.
System 800xA System ( 4.1 & 5.0 SP2)
Duration May to June 11- (2 month)
Project Details Name SFI_PMSDescription Implementation of PQ Control Module.
PG2 Faceplate creation for Switchboard areas.System 800xA System ( AC800M, PMS library and .Net (New
Graphic)
Duration March11- (1 month)
Project Details Name T333- Consult IT Training CourseWare DevelopmentDescription Integration of IEC61850 with 800xA.
Implementation of Horizontal Communication Implementation of Vertical Communication. Documentation of T333 course material.
System PCM600, IET-CCT, CET, 800xA 5.1.Duration March11- (2Weeks)
Project Details Name Corrib_PMS SimulationDescription Simulation of CBStandard and CBIndication
Breakers Simulation of Generator Control Modules. Simulation of Transformer Control Modules. Simulation of Load Shedding Module.
System 800xA System (AC800M, PMS library).Duration Feburary11- (1 month)
Project Details Name KPTCL GIS 220/66/11 Sub-stationDescription Remote PC Configuration using COM-500
Integration IEC103 with PRO Micro-SCADA SYS600
System PRO Micro-SCADA SYS600, COM500.Duration January- (1 month)
Project Details Name PGCIL-220/132/66kV Byrnihat Sub-station
Page: 5 (7) Date: 5/3/23
Description IEC-61850 Integration with PRO Micro-SCADA SYS600
To make 220kV Bays online and to implements the interlocks through soft signals.
To make 132kV Bays online and to implements the interlocks through soft signals.
To make 66kV bays online and to implement the interlocks through soft signals.
To established HOT Standby System for the Micro-SCADA.
To configure DRPC so as to upload Disturbance Recorder.
System Pro Micro-SCADA SYS600, PCM600, IET-CCT, CET, AREVA-MiCOM.
Duration November10- (1 month)
Project Details Name PGCIL-220/66kV Khadoli Sub-stationDescription IEC-61850 Integration with PRO Micro-SCADA
SYS600 To make 220kV Bays online and to implements the
interlocks through soft signals. To make 66kV bays online and to implement the
interlocks through soft signals. To established HOT Standby System for the Micro-
SCADA. To configure DRPC so as to upload Disturbance
Recorder.
System Pro Micro-SCADA SYS600, PCM600, IET-CCT, CET, AREVA-MiCOM.
Duration August10-October-10 (2 month)Previous Organization
Duration From 01.03.08 to 09.04.10
Company Projects, Noida Power Company LTD, Greater Noida.
Position Executive Projects.
System
Knowledge
Substation Automation System (SAS): using IEC 61850 Protocol at 33/11kV Substations & 220/33kV Substation.
Page: 6 (7) Date: 5/3/23
Description System Automation/ Erection, Testing, Commissioning & Maintenance of SCADA Equipment & Systems at 220/33kV, 132/33kV & 33/11kV Substations.
Drawing Verification & Updating of 33kV, 11kV of ABB, Siemens, and CSPC & Biecco Lawrie Control & Relay panels.
Panel Inspection, Erection & Testing of 33kV & 11kV Control & Relay Panel.
Communication system & Engineering using Optical Fiber, GSM Modems & Microwave system interconnecting 16No.s Power distribution substation at Greater Noida. Erection, Testing & Maintenance of Optical fiber cable & Microwave. Splicing & Managing fiber breakdowns.
Preparing Reports for Load Monitoring, Load Shedding, Supply Outages, Feeder Reliability Index (MFRI) etc.
Duration From 14.07.06 to 28.02.08
Company SCADA & DMS, BSES Rajdhani Power LTD, New Delhi.
Position Graduate Engineer Trainee.
System
Knowledge
SCADA Adaptation Project of BSES. Handling process automation, Engineering & Services at field side. IEC 104, IEC 103, Modbus.
Description Responsible for Engineering ABB RTU211 terminals and systems forSCADA installed at 11KV Substations/ RMU’s for DMS applications.
ABB RTU 560 at 66/33/11 kV substation configuration, softwareInstallation and testing from main control center (MCC) Balaji,NehruPlace.
Passport Details