Saturn V design considerations NBC.ppt - NASAVehicles”, Dr. Curtis E. Larsen, JSC, ... “Saturn V...

32
Saturn V - Design Considerations & Launch Issues https://ntrs.nasa.gov/search.jsp?R=20090016309 2020-03-25T00:33:31+00:00Z

Transcript of Saturn V design considerations NBC.ppt - NASAVehicles”, Dr. Curtis E. Larsen, JSC, ... “Saturn V...

Page 1: Saturn V design considerations NBC.ppt - NASAVehicles”, Dr. Curtis E. Larsen, JSC, ... “Saturn V Launch Vehicle Flight Evaluation Report-AS-502 A ll 6 Mi i ” J 25 1968502 Apollo

Saturn V - Design Considerations & Launch Issues

https://ntrs.nasa.gov/search.jsp?R=20090016309 2020-03-25T00:33:31+00:00Z

Page 2: Saturn V design considerations NBC.ppt - NASAVehicles”, Dr. Curtis E. Larsen, JSC, ... “Saturn V Launch Vehicle Flight Evaluation Report-AS-502 A ll 6 Mi i ” J 25 1968502 Apollo

Objectives

Understand some of the design considerations that went into creating the Saturn V launch

hi lvehicle

G i i ti f f thGain an appreciation for some of the manufacturing issues concerning the Saturn V

Review three major problems that affected Saturn V launchesSaturn V launches

Page 3: Saturn V design considerations NBC.ppt - NASAVehicles”, Dr. Curtis E. Larsen, JSC, ... “Saturn V Launch Vehicle Flight Evaluation Report-AS-502 A ll 6 Mi i ” J 25 1968502 Apollo

OutlineLunar VoyagesLunar VoyagesWeight SavingsM f t i IManufacturing IssuesLaunch Issues

Page 4: Saturn V design considerations NBC.ppt - NASAVehicles”, Dr. Curtis E. Larsen, JSC, ... “Saturn V Launch Vehicle Flight Evaluation Report-AS-502 A ll 6 Mi i ” J 25 1968502 Apollo

Lunar Voyages

3 Options considered:Direct AscentEarth Orbit Rendezvous (EOR)Lunar Orbit RendezvousLunar Orbit Rendezvous (LOR)

“NASA concluded that LOR offered the greatest assurance of successful accomplishmentof successful accomplishment of the Apollo objectives at the earliest practical date.”1

Page 5: Saturn V design considerations NBC.ppt - NASAVehicles”, Dr. Curtis E. Larsen, JSC, ... “Saturn V Launch Vehicle Flight Evaluation Report-AS-502 A ll 6 Mi i ” J 25 1968502 Apollo

OutlineLunar VoyagesLunar VoyagesWeight SavingsM f t i IManufacturing IssuesLaunch Issues

Page 6: Saturn V design considerations NBC.ppt - NASAVehicles”, Dr. Curtis E. Larsen, JSC, ... “Saturn V Launch Vehicle Flight Evaluation Report-AS-502 A ll 6 Mi i ” J 25 1968502 Apollo

Weight Savings

To increase the payload by 1 kg (2.2 lbs):Remove 14 kg (30 lbs) from S-ICRemove 4 kg (8.8 lbs) from S-IIR 1 k (2 2 lb ) f S IVBRemove 1 kg (2.2 lbs) from S-IVB

TopicsTopicsCommon BulkheadsTank StructuresTank StructuresPropellant Utilization (PU)

Page 7: Saturn V design considerations NBC.ppt - NASAVehicles”, Dr. Curtis E. Larsen, JSC, ... “Saturn V Launch Vehicle Flight Evaluation Report-AS-502 A ll 6 Mi i ” J 25 1968502 Apollo

Common BulkheadS IC S-II (S-IVB)S-IC

LOX

Intertank

RP1

Intertank

Page 8: Saturn V design considerations NBC.ppt - NASAVehicles”, Dr. Curtis E. Larsen, JSC, ... “Saturn V Launch Vehicle Flight Evaluation Report-AS-502 A ll 6 Mi i ” J 25 1968502 Apollo

Tank Structures

Waffle pattern was etched into the S-IIWaffle pattern was etched into the S II and S-IVB

Page 9: Saturn V design considerations NBC.ppt - NASAVehicles”, Dr. Curtis E. Larsen, JSC, ... “Saturn V Launch Vehicle Flight Evaluation Report-AS-502 A ll 6 Mi i ” J 25 1968502 Apollo

Propulsion Utilization (PU)

Ensure simultaneous depletion of propellantsIncreases stage payload capability

Mass Probe

LH2

LOX

PU on S-II and S-IVBLOXLOXValve

Page 10: Saturn V design considerations NBC.ppt - NASAVehicles”, Dr. Curtis E. Larsen, JSC, ... “Saturn V Launch Vehicle Flight Evaluation Report-AS-502 A ll 6 Mi i ” J 25 1968502 Apollo

OutlineLunar VoyagesLunar VoyagesWeight SavingsM f t i IManufacturing IssuesLaunch Issues

Page 11: Saturn V design considerations NBC.ppt - NASAVehicles”, Dr. Curtis E. Larsen, JSC, ... “Saturn V Launch Vehicle Flight Evaluation Report-AS-502 A ll 6 Mi i ” J 25 1968502 Apollo

Manufacturing Issues

InsulationWelding

Page 12: Saturn V design considerations NBC.ppt - NASAVehicles”, Dr. Curtis E. Larsen, JSC, ... “Saturn V Launch Vehicle Flight Evaluation Report-AS-502 A ll 6 Mi i ” J 25 1968502 Apollo

Insulation

Why is insulation needed?Internal or External?External

Pros: Added material strength, meteorite protectionCons: bonding trouble damage repeated tanking largeCons: bonding trouble, damage, repeated tanking, large boil-off to condition tank

InternalPros: no bonding trouble, no damage issues, repeated tanking, boil-off to condition tankCons: application

Space Shuttle External Fuel Tank

Page 13: Saturn V design considerations NBC.ppt - NASAVehicles”, Dr. Curtis E. Larsen, JSC, ... “Saturn V Launch Vehicle Flight Evaluation Report-AS-502 A ll 6 Mi i ” J 25 1968502 Apollo

InsulationS-II (External Insulation)

First method of application: Glue large panels of insulationTrapped air posed problemsTrapped air posed problemsTried helium purge to remove trapped air

Sprayed insulation on, trimmed excess

Page 14: Saturn V design considerations NBC.ppt - NASAVehicles”, Dr. Curtis E. Larsen, JSC, ... “Saturn V Launch Vehicle Flight Evaluation Report-AS-502 A ll 6 Mi i ” J 25 1968502 Apollo

Insulation

S-IVB (Internal Insulation)

4,300 individually shaped f b i k l d t thfoam bricks glued to the interior

Page 15: Saturn V design considerations NBC.ppt - NASAVehicles”, Dr. Curtis E. Larsen, JSC, ... “Saturn V Launch Vehicle Flight Evaluation Report-AS-502 A ll 6 Mi i ” J 25 1968502 Apollo

WeldingLarge pieces that can deform under their own weightLarge pieces that can deform under their own weightExtremely long welds required with tight tolerances

Page 16: Saturn V design considerations NBC.ppt - NASAVehicles”, Dr. Curtis E. Larsen, JSC, ... “Saturn V Launch Vehicle Flight Evaluation Report-AS-502 A ll 6 Mi i ” J 25 1968502 Apollo

Welding

ProblemsFirst couple of propellant tanks for S-IC scrapped due t ldito poor welding

S-II bulkhead ruptured during testing caused by aS II bulkhead ruptured during testing, caused by a faulty, repaired weld

Cracks in welds of first S-II flight stage caused Saturn V to be de-stacked and the welds repaired (Apollo 4)

S-IVB flight stage exploded during an acceptance test

Page 17: Saturn V design considerations NBC.ppt - NASAVehicles”, Dr. Curtis E. Larsen, JSC, ... “Saturn V Launch Vehicle Flight Evaluation Report-AS-502 A ll 6 Mi i ” J 25 1968502 Apollo

WeldingI i W ld Q liImproving Weld Quality

Propellant tank components cleaned before weldingweldingHumidity and temperature tightly controlledClean room environment

10 – 15 specialists per welding teamEvery cm of weld had to be inspected

S-IC: 10 km/6.2 mi of weldsS-II: 1 km/.62 mi of welds

8 hours of procedures for a single weld8 hours of procedures for a single weld

Page 18: Saturn V design considerations NBC.ppt - NASAVehicles”, Dr. Curtis E. Larsen, JSC, ... “Saturn V Launch Vehicle Flight Evaluation Report-AS-502 A ll 6 Mi i ” J 25 1968502 Apollo

Welding

Page 19: Saturn V design considerations NBC.ppt - NASAVehicles”, Dr. Curtis E. Larsen, JSC, ... “Saturn V Launch Vehicle Flight Evaluation Report-AS-502 A ll 6 Mi i ” J 25 1968502 Apollo

OutlineLunar VoyagesLunar VoyagesWeight SavingsM f t i IManufacturing IssuesLaunch Issues

Page 20: Saturn V design considerations NBC.ppt - NASAVehicles”, Dr. Curtis E. Larsen, JSC, ... “Saturn V Launch Vehicle Flight Evaluation Report-AS-502 A ll 6 Mi i ” J 25 1968502 Apollo

Launch Issues – Apollo 6

Apollo 6 (Saturn 502)S-IC Pogo (duration ~35

d )seconds)S-II Engines 2 & 3 shut down earlyyS-IVB J-2 failed to restart in orbit

Page 21: Saturn V design considerations NBC.ppt - NASAVehicles”, Dr. Curtis E. Larsen, JSC, ... “Saturn V Launch Vehicle Flight Evaluation Report-AS-502 A ll 6 Mi i ” J 25 1968502 Apollo

Launch Issues – Apollo 12

Apollo 12 (Saturn 507)Struck twice by lightningCommand Module lost guidance platformNo issues to the launch vehicle

Page 22: Saturn V design considerations NBC.ppt - NASAVehicles”, Dr. Curtis E. Larsen, JSC, ... “Saturn V Launch Vehicle Flight Evaluation Report-AS-502 A ll 6 Mi i ” J 25 1968502 Apollo

Launch Issues – Apollo 13

Apollo 13 (Saturn 508)Pogo on Stage 2Pogo on Stage 2 caused S-II Center Engine to shut down earlyearly

Page 23: Saturn V design considerations NBC.ppt - NASAVehicles”, Dr. Curtis E. Larsen, JSC, ... “Saturn V Launch Vehicle Flight Evaluation Report-AS-502 A ll 6 Mi i ” J 25 1968502 Apollo

Pogo"Pogo" is a rocket scientist's slang for a longitudinal vibration or oscillation that sometimes occurs in rocketssometimes occurs in rockets

Caused by an interaction between the vehicle structure, propellant feed system, and engine system

Forced harmonic oscillationsForced harmonic oscillations

Can lead to structural failures or exceed human limitations

Tacoma Narrows Bridge collapse

Page 24: Saturn V design considerations NBC.ppt - NASAVehicles”, Dr. Curtis E. Larsen, JSC, ... “Saturn V Launch Vehicle Flight Evaluation Report-AS-502 A ll 6 Mi i ” J 25 1968502 Apollo

Pogo – Stage 1Gaseous helium was pumped into propellant line cavitiesGaseous helium was pumped into propellant line cavities (Prevalve) to dampen out the pressure changes

PrevalvePrevalve

Page 25: Saturn V design considerations NBC.ppt - NASAVehicles”, Dr. Curtis E. Larsen, JSC, ... “Saturn V Launch Vehicle Flight Evaluation Report-AS-502 A ll 6 Mi i ” J 25 1968502 Apollo

Pogo – Stage 2Center Engine (#5) on S-II supported only via cross beams

Allowed engine to move which contributed to the PogoAllowed engine to move, which contributed to the Pogo effect

Page 26: Saturn V design considerations NBC.ppt - NASAVehicles”, Dr. Curtis E. Larsen, JSC, ... “Saturn V Launch Vehicle Flight Evaluation Report-AS-502 A ll 6 Mi i ” J 25 1968502 Apollo

Pogo – Stage 2

Solution was to install a Pogo suppressor on the Center Engine

Accumulator filled with LOX pre-start, Helium post-ignition

Page 27: Saturn V design considerations NBC.ppt - NASAVehicles”, Dr. Curtis E. Larsen, JSC, ... “Saturn V Launch Vehicle Flight Evaluation Report-AS-502 A ll 6 Mi i ” J 25 1968502 Apollo

Post-Flight Analysis of Apollo 6

S-IIEngine 2 shut down d t f l l kdue to a fuel leakEngine 3’s LOX valve was incorrectly ycommanded to close

S-IVBSame fuel leak that occurred in S-II occurred in S-IVB

Page 28: Saturn V design considerations NBC.ppt - NASAVehicles”, Dr. Curtis E. Larsen, JSC, ... “Saturn V Launch Vehicle Flight Evaluation Report-AS-502 A ll 6 Mi i ” J 25 1968502 Apollo

J-2 Engine FailureA t d S k I it (ASI) f l liAugmented Spark Igniter (ASI) fuel line

ASI ignited propellantsASI fuel line broke at attach points in vacuum pconditions

Page 29: Saturn V design considerations NBC.ppt - NASAVehicles”, Dr. Curtis E. Larsen, JSC, ... “Saturn V Launch Vehicle Flight Evaluation Report-AS-502 A ll 6 Mi i ” J 25 1968502 Apollo

J-2 Engine Failure

Page 30: Saturn V design considerations NBC.ppt - NASAVehicles”, Dr. Curtis E. Larsen, JSC, ... “Saturn V Launch Vehicle Flight Evaluation Report-AS-502 A ll 6 Mi i ” J 25 1968502 Apollo

Vehicle Failures

13 Launches0 Catastrophic0 Catastrophic failures

Page 31: Saturn V design considerations NBC.ppt - NASAVehicles”, Dr. Curtis E. Larsen, JSC, ... “Saturn V Launch Vehicle Flight Evaluation Report-AS-502 A ll 6 Mi i ” J 25 1968502 Apollo

Summary

Discussed a couple of pweight saving measures

Discussed a couple of manufacturing issues for the Saturn Vthe Saturn V

Discussed Saturn V launch issues

Page 32: Saturn V design considerations NBC.ppt - NASAVehicles”, Dr. Curtis E. Larsen, JSC, ... “Saturn V Launch Vehicle Flight Evaluation Report-AS-502 A ll 6 Mi i ” J 25 1968502 Apollo

References1 “Saturn V News Reference”, August 1967“Stages to Saturn”, Roger Bilstein, University Press of Florida 1993Florida, 1993“NASA Experience with Pogo in Human Spaceflight Vehicles”, Dr. Curtis E. Larsen, JSC, “Saturn V Flight Manual (SA 503)”, November 1, 1968, “Saturn V Launch Vehicle Flight Evaluation Report-AS-502 A ll 6 Mi i ” J 25 1968502 Apollo 6 Mission”, June 25 1968

For More information, please visit the Apollo-Saturn Wiki