Shera Public Company Limited
SAP S/4HANA Migration
and Hosting
Terms of Reference
TOR-IT-GTS-2018-06
4th
April 2018
TOR
Terms of Reference (TOR) | SAP S/4HANA Migration and Hosting
2
Table of Contents
Contents
1. Background ........................................................................................................................................................... 3
2. Scope of Work ....................................................................................................................................................... 6
3. Technical Specification ..................................................................................................................................... 10
4. Bidder Qualification ........................................................................................................................................... 12
5. Goods Receipt / Warranty ................................................................................................................................. 13
6. Bidding Instruction ............................................................................................................................................ 14
7. Delivery Place ..................................................................................................................................................... 14
8. Delivery Time ...................................................................................................................................................... 14
9. Billing and Payment Instruction ...................................................................................................................... 14
10. Attachments ....................................................................................................................................................... 15
SPAM_List_MH2_RQA_DB1 ............................................................................................................................ 18
Development Server Sizing Report - DEV_DB1 .......................................................................................... 21
Quality Assurance Server Sizing Report - QAS_RQA .................................................................................. 28
Production Server Sizing Report - PRD_MH2 ............................................................................................. 35
Terms of Reference (TOR) | SAP S/4HANA Migration and Hosting
3
Terms of Reference: TOR
1. Background
As part of company strategic program on digital transformation, SHERA has a mission to incorporate
digital technology to transform all aspects of the business to create higher business
competitiveness, increased revenue, and higher operation efficiency.
To achieve digital transformation program, SHERA developed 5 key transformation areas on End-
consumer, Contractor, Architecture/Designer, Customers, and SHERA per summarized illustration
below.
Terms of Reference (TOR) | SAP S/4HANA Migration and Hosting
4
To complete SHERA digital transformation program, 21 projects are identified around these 5
stakeholders with consideration of digital, mobile, cloud, and big data technology in mind. These
projects can be summarized per table below.
Key
Stakeholders
Digital
Transformation
Theme
Projects
Glo
bal W
eb
Sit
e a
nd
Com
mu
nit
ies
Pro
ject
E-C
om
merc
e
(B2
B2
C)
Pro
ject
Inte
rnal D
igit
al
Solu
tion
s
(x2
pro
ject
s)
Glo
bal B
luep
rin
t an
d
SA
P S
/4H
AN
A
Pro
ject
Bu
sin
ess
So
luti
on
s
(x6
pro
ject
s)
Bu
sin
ess
An
aly
tics
(x2
pro
ject
s)
Tech
nolo
gy,
Secu
rity
, Com
plian
ce
(x6
pro
ject
s)
End-
Consumer
Personalized Digital
Communication and
Convenient to Purchase
Contractor
Digital Community of
Certified Contractor and
Convenient to Get
Service
Architecture
/ Designer
Digital Community of
Architecture and
Influence to Buyer
Customer
(TT, MT, PS)
Digital Collaboration
from Information
Sharing to Sales Out
Integration
SHERA
Digital Enterprise from
Inside to Outside, both
locally and globally
This Project Scope
Terms of Reference (TOR) | SAP S/4HANA Migration and Hosting
5
In addition to digital transformation objective, SHERA define business strategy to become listed
company in SET and expand business operations in oversea markets as multinational company
(MNC). As such, following are key objectives of the project.
1. Drive Business Transformation and Support Global Expansion
Current SAP ERP system has been implemented since 1997 encountered several design
constraints, which hindering current SAP to support business growth strategy (e.g. lack of inter-
company process, financial statement consolidation with investment countries, etc.)
2. System Upgrade and Documentation
Current system has become difficult to sustain and train to new employee due to the loss of
documentation on business process and user manual overtime. High volume of business
requirements cannot be fulfilled with current SAP version, resulting in higher customization.
3. Improve Operation Efficiency via IT Business Application
New SAP S/4 HANA introduces significant improvement over current platform and will improve
overall operation efficiencies across all business areas. The platform is also simpler for users
and more flexible to integrate with external partners and cloud environment.
Below is IT key events at SHERA.
As part of SAP S/4HANA Project, SAP hosting is subjected to be changed to new hosting or use
existing hosting at TCCT.
Terms of Reference (TOR) | SAP S/4HANA Migration and Hosting
6
2. Scope of Work
Below is current network diagram at Shera PCL
Data Center in scope is
1. Data Center at TCCT Bangna (SAP Production) – Shera MPLS connectivity with corporate WAN
2. Data Center at TCCT Sathorn (SAP DR site) – internal TCCT connectivity between 2 data centers
Terms of Reference (TOR) | SAP S/4HANA Migration and Hosting
7
Below is current data center specification at TCCT Bangna and Sathorn Building
Terms of Reference (TOR) | SAP S/4HANA Migration and Hosting
8
Vendor is to deliver following
1. Solution design of new server environment at vendor’s data center
a. Design/details for identified below SAP S/4HANA and supporting servers
i. SAP S/4 HANA 1709 (Enterprise Resource Planning)
ii. SAP Fiori Front-End Server (FES)
iii. SAP Business Object 4.2 (Business Analytics)
iv. SAP Solution Manager 7.2
v. SAP Web Dispatcher
b. Design/details for backup and recovery plan of above servers
c. Characteristic of the system server must include:
i. Centralize server utilize as the database server
ii. Application servers use for system ERP
iii. Development server
iv. Quality Assurance server
v. Backup server
vi. The computer and server for SAP Fiori, SAP Web Dispatcher, SAP Solution
Manager, and SAP Business Object
1. Hardware Brand, Model, and specification is open for vendor to
propose
2. Operating System - SUSE Linux is recommended, but open for vendor
to propose
3. Database – SAP HANA Database
d. The Design of hardware requirement will based on list of hardware performance as
follow or better determine in later:
i. The system utilization of production system must not over than 50%
effectiveness of the server
ii. System availability must serve and support users on 7 working days at 24
hours/day
iii. The system performance and capacity will support 5 year working time
e. Shera PCL already procured following related licenses
i. SAP S/4HANA Enterprise Management
ii. SAP HANA Database
iii. SAP Business Object
Terms of Reference (TOR) | SAP S/4HANA Migration and Hosting
9
2. Prepare implementation plan and cutover approach
a. Approach on how to migrate existing SAP servers to vendor data center (e.g. physical
backup and restore, over the air)
b. Steps with roles & responsibilities during migration (e.g. infrastructure related,
application related)
3. Procure any infrastructure equipment at vendor’s data center
4. Execute implementation plan and cutover
5. Train any system administration to Shera IT staff
6. Provide maintenance and/or managed service after new data center go-live
Terms of Reference (TOR) | SAP S/4HANA Migration and Hosting
10
3. Technical Specification
Below are minimum servers (with exiting sizing based on SAP ECC6.0 and SAP Business Objects 4.0)
and hardware required to support SAP S/4HANA 1709 Enterprise Management, SAP Fiori Portal, and
SAP Business Objects.
Bidder can propose additional hardware (e.g. load balancing) as required to support overall
solutions.
Name Type vCPUs vMem
(Gb)
vDisk
(Gb)
HW
Brand
Operating System Database
SAP S/4 HANA Enterprise
Management 1709 - DB
Database 4 48 1500 (open) SUSE Linux (optional) SAP HANA
SAP S/4 HANA Enterprise
Management 1709 - App
Application 4 6 80 (open) (open) -
SAP Fiori Front-End Server
(FES)
Web Server (open) (open) -
SAP Business Object 4.2 -
Application
Application 4 12 120 Microsoft Windows Server
2008 R2 Standard (64-bit)
-
SAP Business Object 4.2 -
Database
Database 4 64 460 Microsoft Windows Server
2008 R2 Standard (64-bit)
Microsoft SQL Server
2008 R2 (RTM)
SAP Solution Manager 7.2
Application
SAP Web Dispatcher
Web Server
Please refer to appendix section for additional sizing information.
Aside from SAP S/4HANA and related servers setup, below are additional technical points to be taken
into consideration:
1. Migration approach is still to be opened for both system conversion and system
re-implementation approach. Thus, bidder is required to propose solution and related cost
per each approach.
2. Implementation effort for SAP basis is depends on implementer proposal, which some system
integrators (SI) propose to perform most of SAP basis activities by themselves, while some SI
will leave most of the activity to SAP hosting provider. Thus, bidder is to propose
implementation cost as optional item.
Terms of Reference (TOR) | SAP S/4HANA Migration and Hosting
11
Below is current application landscape illustrating interface between SAP ECC 6.0 and other satellite
applications.
To allow business users to access SAP and work from any device, any time, any place, new SAP
S/4HANA must provide following access channels.
Channel Access By Access Device Access Type Remark
SAP Fiori Portal
Corporate Network Workstation Private Link (MPLS) New Primary Channel
Mobile Device Private Link (MPLS)
Public Internet Workstation VPN
Mobile Device VPN or Public* New Secondary Channel
SAP GUI
Corporate Network Workstation Private Link (MPLS) Existing Primary Channel
Mobile Device Mobile RDS on Private Link (MPLS)
Public Internet Workstation VPN
Mobile Device Mobile RDS on Private Link (MPLS) Existing Secondary Channel
* To be tested if accessing SAP Fiori Portal and work on mobile device via VPN has acceptable
performance or not.
Terms of Reference (TOR) | SAP S/4HANA Migration and Hosting
12
4. Bidder Qualification
BIDDER must possess following qualification:
3.1. BIDDER is not a mutual beneficiary to the other bidder submitted to SHERA.
3.2. BIDDER is the vendor who has been considered / approved by SHERA procurement
department.
3.3. BIDDER must be a limited company or partnership or juristic person registered no less than
1 year with Data Center solution and service to state enterprise or private company.
3.4. BIDDER must own data center with minimum tier-3 standard
3.5. BIDDER must own following certifications for data center
SAP S/4HANA Hosting Certification – mandatory
ISO 27001 – Information Security Management System (ISMS) – mandatory
ISO 22301 – Business Continuity Management (BCM) – preferred but not mandatory
CSA STAR (Security, Trust & Assurance Registry) – preferred but not mandatory
3.6. BIDDER must have qualified personnel who have the knowledge, expertise and experience as
a working group in similar prior project.
3.7. BIDDER must not be named on the company's or government's list of work abandonment.
3.8. BIDDER must not be granted the privilege or immunity which may be refused to the Thai
court. Unless the government of the bidder has ordered such waiver and immunity.
Terms of Reference (TOR) | SAP S/4HANA Migration and Hosting
13
5. Goods Receipt / Warranty
Below are goods and service receipt criteria
Solution design of new server environment at vendor’s data center
1. Design/details for identified SAP S/4HANA and related servers
2. Design/details for backup and recovery plan of SAP S/4HANA and related servers
All SAP S/4HANA and hosting solutions must perform properly
1. SAP S/4HANA and SAP Fiori provide performance at acceptable level
2. DNS & IP address are completely migrated
3. Application work correctly under new environment
4. All interface between SAP and non-SAP Data Center work properly
5. SAP Fiori Portal and SAP GUI can be accessed from Public / Private internet properly
6. Backup system work properly
Train any necessary system administration to Shera IT staff
Provide maintenance and/or managed service after new data center go-live
Terms of Reference (TOR) | SAP S/4HANA Migration and Hosting
14
6. Bidding Instruction
To provide total and break-down price of the solution under 2 scenarios
(1) System Conversion, (2) System Re-implementation
1. One-time implementation / migration fee (if applicable) for 2018 implementation phase
Infrastructure cost
Service fee
2. Monthly fee for 3 years (36 months period) from 1-Jan-2019 onward
Infrastructure cost
Managed service fee
3. Cost of service termination (if applicable)
Moving to new data center provider after the end of 3 years contracts
Moving to new data center provider before the end of 3 years contracts
If cannot provide all requirements, please clearly indicate which scope can be offered
To provide the diagram of overall solutions
To provide project implementation timeline, key tasks, and cutover approach
To provide specification of SAP S/4HANA server and other supporting components
To provide details of following additional items
1. Reference sites of customer hosting SAP S/4HANA on vendor data center
2. Related certification
3. Data center standard
To provide details of SLA / service / warranty
Offer price is in Thai Baht
7. Delivery Place
Mahaphant Building
2426/3 Charoenkrung Road, Bangkolaem, Bangkorlaem, Bangkok 10120 Thailand
8. Delivery Time
SAP S/4HANA environment (DEV/QA) to be delivered within 30 days of receiving the order
SAP S/4HANA environment (PRD) to be delivered at least 60 days before go-live (1 Jan 2019)
9. Billing and Payment Instruction
Payment by credit to the supplier of Shera Public Company Limited for the payment
according to the annual payment schedule
Terms of Reference (TOR) | SAP S/4HANA Migration and Hosting
15
10. Attachments
Map of Mahaphant Building, Bangkok and Map of SHERA Group
Payment Schedule of SHERA in 2018
Existing server information and SAP HANA sizing report
1. SPAM_List_MH2_RQA_DB1
2. Development Server - DEV_DB1
3. Quality Assurance Server - QAS_RQA
4. Production Server - PRD_MH2
Terms of Reference (TOR) | SAP S/4HANA Migration and Hosting
16
ส ำหรบหนวยงำนผรบผดชอบ
ผรองขอ
( …………………………………………….)
ต ำแหนง
ตรวจสอบและอนมตโดย (ระดบ Manager/AVP ขนไป)
( …………………………………………….)
ต ำแหนง
ส ำหรบกรณมหนวยงำนอนทเกยวของ
รวมตรวจสอบโดย
( …………………………………………….)
ต ำแหนง
รวมตรวจสอบโดย
( …………………………………………….)
ต ำแหนง
ส ำหรบหนวยงำนจดซอ
รวมตรวจสอบโดย
( …………………………………………….)
ต ำแหนง
รวมตรวจสอบโดย (กรณประกวดรำคำ,ระดบ VP ขนไป)
( …………………………………………….)
ต ำแหนง
Terms of Reference (TOR) | SAP S/4HANA Migration and Hosting
17
แผนทอำคำรมหพนธ จ.กรงเทพฯ
Terms of Reference (TOR) | Data Center on Cloud
18
SPAM_List_MH2_RQA_DB1
MH2:
MH2 (cont.)
Terms of Reference (TOR) | SAP S/4HANA Migration and Hosting
19
RQA:
RQA (cont.)
Terms of Reference (TOR) | SAP S/4HANA Migration and Hosting
20
DB1:
DB1 (cont.)
Terms of Reference (TOR) | SAP S/4HANA Migration and Hosting
21
Development Server Sizing Report - DEV_DB1
Terms of Reference (TOR) | SAP S/4HANA Migration and Hosting
22
Terms of Reference (TOR) | SAP S/4HANA Migration and Hosting
23
Terms of Reference (TOR) | SAP S/4HANA Migration and Hosting
24
Terms of Reference (TOR) | SAP S/4HANA Migration and Hosting
25
Terms of Reference (TOR) | SAP S/4HANA Migration and Hosting
26
Terms of Reference (TOR) | SAP S/4HANA Migration and Hosting
27
Terms of Reference (TOR) | SAP S/4HANA Migration and Hosting
28
Quality Assurance Server Sizing Report - QAS_RQA
Terms of Reference (TOR) | SAP S/4HANA Migration and Hosting
29
Terms of Reference (TOR) | SAP S/4HANA Migration and Hosting
30
Terms of Reference (TOR) | SAP S/4HANA Migration and Hosting
31
Terms of Reference (TOR) | SAP S/4HANA Migration and Hosting
32
Terms of Reference (TOR) | SAP S/4HANA Migration and Hosting
33
Terms of Reference (TOR) | SAP S/4HANA Migration and Hosting
34
Terms of Reference (TOR) | SAP S/4HANA Migration and Hosting
35
Production Server Sizing Report - PRD_MH2
Terms of Reference (TOR) | SAP S/4HANA Migration and Hosting
36
Terms of Reference (TOR) | SAP S/4HANA Migration and Hosting
37
Terms of Reference (TOR) | SAP S/4HANA Migration and Hosting
38