San Pasqual Valley Groundwater Basin Sustainable Groundwater Management Act (SGMA) Workshop
March 16, 2017
City of San Diego Public Utilities Department
George Adrian Larry Abutin
Senior Hydrogeologist, GEI John Ayres, Larry Rodriguez
County of San Diego Jim Bennett Leanne Crow
Presentation Overview • Terminology • Meeting Objectives • SGMA Overview • San Pasqual GSA Filing • GSP Chapters • Stakeholder Engagement • Next Steps • Questions
2
Terminology
• SGMA – Sustainable Groundwater Management Act • GSA – Groundwater Sustainability Agency • GSP – Groundwater Sustainability Plan • MOU – Memorandum of Understanding
3
Meeting Objectives • Respond to the clear message from the last
meeting: Stakeholder Engagement • Provide a brief SGMA overview • Discuss GSA filing • Share GSP contents • Answer questions
4
Sustainable Groundwater Management Act • Signed into law by the Governor in Sept. 2014 • Intent is for groundwater management to be
strengthened at local level • Requires all High and Medium Priority groundwater
basins be managed in a sustainable manner
5
• Local agencies to form GSAs to prepare a GSP for their basin
• GSAs are granted broad authorities
Sustainable Groundwater Management Act (SGMA)
• SGMA is a major change in approach to groundwater management
• Requires coordination among groundwater users, specific technical work and management actions
• DWR will act as reviewers and resources
• SWRCB will act as regulators for non-compliant basins
6
Sustainable GW Management
• Must manage the basin to avoid negative changes in: ‒ Groundwater Levels ‒ Groundwater Storage ‒ Seawater Intrusion ‒ Degraded Water Quality ‒ Land Subsidence ‒ Depletions of Surface Water
7
Prevent “Undesirable Results”
SGMA Timeline and Activities
8
Time Action June 30, 2017 Formation of GSAs
Jan. 31, 2022 Completion of GSPs
5 Year Updates Implementation of GSPs under local management, with regular check ins
2040’s Manage Groundwater Sustainably
San Pasqual GSA Filing
• County of San Diego filed GSA in August 2016 • City of San Diego filed GSA in November 2016 • Legal agreement between City and County under
development (to be adopted by June 30, 2017)
9
10
• Memorandum of Understanding (MOU) is used to formalize the County/City partnership to sustainably manage the basin
• Documents how the County and City will collaboratively work together
• Establishes a “Core Team” of City and County staff • Eliminates GSA overlap • Identifies interagency communication
Memorandum of Understanding
11
GSP Development: Major GSP Chapters • Stakeholders and GSA Governance • Basin Settings
‒ Hydrogeologic Conceptual Model ‒ Groundwater Conditions ‒ Water Budget
• Undesirable Results Narrative • Monitoring Network • Sustainability Goals and Milestones • Management Actions and Projects • Plan Revision and Updates
Stakeholder Engagement Goals
• In-Basin representation • Resource for GSP development
‒ Local knowledge ‒ Input by those ‘on the ground’
• Input and Recommendations to City/County team on: ‒ GSP development and components ‒ Projects and Management Actions
• Enforcement, curtailments, fines ‒ GSP plan review
13
Proposed Stakeholder Engagement
• Stakeholder Advisory Committee • Stakeholder Workshops • Public Meetings • Website • Newsletters/Handouts
14
Over the next set of slides, we are looking for your input
Stakeholder Advisory Committee
• Purpose ‒ More involved understanding ‒ Regular meetings and input ‒ Data sharing ‒ Brown Act body
15
Stakeholder Workshops
• Purpose ‒ Involved understanding ‒ Less meetings ‒ Less time commitment ‒ No Brown Act
16
Public Meetings
• Purpose ‒ Open to all ‒ Distribution of information
17
Website, Flyers, Newsletters
• Purpose ‒ Clear communication ‒ Detailed content available
18
Path Forward Next steps • Formal Approval of GSA Filings • Completion of MOU • Identify GSP Development Process • Establish Stakeholder Engagement • Further Outreach Summer/Fall 2017?
19
Questions/Discussion
20
For additional information, please contact: George Adrian: (619) 533-4680 [email protected] Larry Abutin (619) 533-5306 [email protected] Jim Bennett (619) 495-5514 [email protected] Leanne Crow (619) 495-5514 [email protected]