San Jacinto College Center for Petrochemical, Energy & … · FRONT ENTRANCE C45.1001 Eaton Commons...

3
281-998-6150 | www.sanjac.edu Connect with us on The San Jacinto College District is committed to equal opportunity for all students, employees, and applicants without regard to race, creed, color, national origin, citizenship status, age, disability, pregnancy, religion, gender, sexual orientation, gender expression or identity, genetic information, marital status, or veteran status in accordance with applicable federal and state laws. The following College official has been designated to handle inquiries regarding the College’s non-discrimination policies: Vice Chancellor of Human Resources, 4620 Fairmont Pkwy., Pasadena, TX 77504; 281-991-2659; [email protected]. San Jacinto College Center for Petrochemical, Energy & Technology (CPET) Largest petrochemical training facility (151,000-square-foot instructional complex with a separate Process Training Unit) in Gulf Coast Region built for industry, designed by industry Exterior 8,000-square-foot glycol distillation unit used to teach process operations and develop troubleshooting skills for entry, advanced credit students, and incumbent workers Multifunctional glass pilot lab for training process systems Conference, training, and assembly spaces designed to accommodate academic, community, and industrial functions 33 Custom interior labs, including 3 computer labs 20 Interactive classrooms Building designed to accommodate a 50 percent growth in enrollment Degree and certificate programs: Air Conditioning Technology, Electrical Technology, Electronics, Engineering Design Graphics (Drafting), Environmental Health and Safety Technology, Instrumentation/Analyzer Technology, Nondestructive Testing, Pipefitting Fabricator, Process Technology, and Welding Architect: IBI Group Contractor: Tellepsen Builders Total cost of building: $60 million Funded by the College’s $425 million 2015 bond referendum CPET address: 7901 W. Fairmont Parkway, Pasadena, Texas 77507 More information: sanjac.edu/cpet Media contact: Torrie Hardcastle, San Jacinto College director of public relations, 281-998-6139, [email protected] Photos courtesy of Eaton

Transcript of San Jacinto College Center for Petrochemical, Energy & … · FRONT ENTRANCE C45.1001 Eaton Commons...

Page 1: San Jacinto College Center for Petrochemical, Energy & … · FRONT ENTRANCE C45.1001 Eaton Commons OUTER WEST WING C45.1119 Motor Control Lab C45.1134 –Swagelok Instrumentation

281-998-6150 | www.sanjac.edu Connect with us on The San Jacinto College District is committed to equal opportunity for all students, employees, and applicants without regard to race, creed, color, national origin, citizenship status, age, disability, pregnancy, religion, gender, sexual orientation, gender expression or identity, genetic information, marital status, or veteran status in accordance with applicable federal and state laws. The following College official has been designated to handle inquiries regarding the College’s non-discrimination policies: Vice Chancellor of Human Resources, 4620 Fairmont Pkwy., Pasadena, TX 77504; 281-991-2659; [email protected].

San Jacinto College Center for Petrochemical, Energy & Technology (CPET) • Largest petrochemical training facility (151,000-square-foot instructional

complex with a separate Process Training Unit) in Gulf Coast Region built for industry, designed by industry

• Exterior 8,000-square-foot glycol distillation unit used to teach process operations and develop troubleshooting skills for entry, advanced credit students, and incumbent workers

• Multifunctional glass pilot lab for training process systems • Conference, training, and assembly spaces designed to accommodate

academic, community, and industrial functions • 33 Custom interior labs, including 3 computer labs • 20 Interactive classrooms • Building designed to accommodate a 50 percent growth in enrollment • Degree and certificate programs: Air Conditioning Technology, Electrical

Technology, Electronics, Engineering Design Graphics (Drafting), Environmental Health and Safety Technology, Instrumentation/Analyzer Technology, Nondestructive Testing, Pipefitting Fabricator, Process Technology, and Welding

• Architect: IBI Group • Contractor: Tellepsen Builders • Total cost of building: $60 million • Funded by the College’s $425 million 2015 bond referendum • CPET address: 7901 W. Fairmont Parkway, Pasadena, Texas 77507 • More information: sanjac.edu/cpet • Media contact: Torrie Hardcastle, San Jacinto College director of public

relations, 281-998-6139, [email protected]

Photos courtesy of Eaton

Page 2: San Jacinto College Center for Petrochemical, Energy & … · FRONT ENTRANCE C45.1001 Eaton Commons OUTER WEST WING C45.1119 Motor Control Lab C45.1134 –Swagelok Instrumentation

CPET Labs, Industry Partners, and Programs

Room Description Industry Partner Program

C-45.1119 Motor Control Lab Electrical

C-45.1130 Instrumentation Lab INEOS Instrumentation

C-45.1133 Distributed Control System Lab (DCS) Emerson Instrumentation

C-45.1134 Instrumentation Lab Swagelok Instrumentation

C-45.1137 Programmable Logic Control Lab Instrumentation

C-45.1147 Valve Test Lab Emerson Instrumentation and Process Tech

C-45.1220 Nondestructive Testing Quality

Computer Lab Nondestructive Testing

C-45.1224 Multi-Discipline Lab Any

C-45.1304 Heavy Commercial/Industrial Writing

Lab Electrical

C-45.1305 Alternating/Direct Current Lab Electrical

C-45.1311 Industrial Lab Any

C-45.1312 Residential and Light Commercial

Wiring Lab Electrical

C-45.1318 Process Equipment (cut-away) Dow Process Tech

C-45.1322 Analyzer Lab Siemens Instrumentation

C-45.1324 Process Instrument Control Lab (HOT

unit – Hands On Trainer) Instrumentation and Process Tech

C-45.1328 Glass Pilot Plant Lab Any

C-45.1334 Control Simulation Lab Any

C-45.1335 Introductory Chemistry Lab Kuraray Instrumentation and Process Tech

C-45.1336 Glycol Control Room Emerson Process Tech

C-45.1346 Process Covered Dock Lab Process Tech

C-45.1401 Mechanical Skills Lab Instrumentation and Process Tech

C-45.1406 (X-ray) Film Interpretation Lab Nondestructive Testing

C-45.1407 Inspection Exams Lab Nondestructive Testing

C-45.1409 Mechanical Test & Heat Treatment Lab Nondestructive Testing

C-45.1410 Multi-Discipline Lab Any

C-45.1412 Mount Lab Nondestructive Testing

C-45.1412A Microscopy/Hardness Testing Lab Nondestructive Testing

C-45.1417 Ultrasonic Lab 1 & 2 Olympus Any

C-45.1419 Intermediate/Advanced Ultrasonic

Testing Eddy Current (UT Eddy Curr) Olympus Nondestructive Testing

C-45.1420 Multi-Discipline Lab Any

C-45.1429 Magnetic/(Ultra Violet) UV Penetrant

Lab (Mag/Pen) Nondestructive Testing

C-45.1431 Multi-Purpose Lab Any

C-45.1435 Pipe Boiler Lab Nondestructive Testing and

Continuing Education

C-45.1436 High Bay Industrial Lab Nondestructive Testing and

Continuing Education

C-45.1442 Craft Covered Dock Lab Continuing Education

C-45.45A Glycol Process Unit Any

C-45.45B Hunter Building (Blast Resistant

Structure) Any

C-45.45D Multi-Purpose Building Any

C-45.1341 Instrumentation Lecture Classroom Instrumentation

Page 3: San Jacinto College Center for Petrochemical, Energy & … · FRONT ENTRANCE C45.1001 Eaton Commons OUTER WEST WING C45.1119 Motor Control Lab C45.1134 –Swagelok Instrumentation

FRON

T ENT

RANC

EC4

5.100

1 – Ea

ton C

omm

ons

OUTE

R WES

T WIN

GC4

5.1119

– M

otor

Cont

rol L

ab C4

5.1134

–Sw

agelo

k Ins

trum

enta

tion L

ab w

ith em

bedd

ed cl

assro

om IN

NER W

EST W

ING

C45.1

336 –

Emer

son C

ontro

l Roo

m

C45.1

130 –

INEO

S Ins

trum

enta

tion L

ab

C45.1

322 –

Siem

ens A

nalyz

er La

b IN

NER E

AST W

ING

C45.1

419 –

Olym

pus I

nter

med

iate/

Adva

nced

Ultra

sonic

Testi

ng Ed

dy Cu

rrent

Lab

UPST

AIRS

Walk

by Cl

assro

oms,

Stud

ent L

oung

e, Ea

ton C

omm

ons O

verv

iew, C

omple

te In

terv

iews

www.

sanj

ac.ed

u/CP

ETAn

Equa

l Opp

ortu

nity

Insti

tutio

n

CENT

ER FO

R PE

TROC

HEMI

CAL,

ENER

GY, &

TECH

NOLO

GY

PREV

IEW TO

UR M

AP

Glyc

ol U

nit

FIRST

FLOO

R

1 4 5 6 732

Walk

Thro

ugh

North

Sout

h

C45.1134 WALK

THROUGH

East

Wes

t

INNE

R W

EST W

ING

OUTE

R W

EST W

ING

TOUR

ENTR

ANCE

UPST

AIRS

INNER EAST WING

OUTER EAST WING

FINISH

STAR

T

1

2

3

4

5

67

STAR

T

FINISH