San Jacinto College Center for Petrochemical, Energy & … · FRONT ENTRANCE C45.1001 Eaton Commons...
Transcript of San Jacinto College Center for Petrochemical, Energy & … · FRONT ENTRANCE C45.1001 Eaton Commons...
281-998-6150 | www.sanjac.edu Connect with us on The San Jacinto College District is committed to equal opportunity for all students, employees, and applicants without regard to race, creed, color, national origin, citizenship status, age, disability, pregnancy, religion, gender, sexual orientation, gender expression or identity, genetic information, marital status, or veteran status in accordance with applicable federal and state laws. The following College official has been designated to handle inquiries regarding the College’s non-discrimination policies: Vice Chancellor of Human Resources, 4620 Fairmont Pkwy., Pasadena, TX 77504; 281-991-2659; [email protected].
San Jacinto College Center for Petrochemical, Energy & Technology (CPET) • Largest petrochemical training facility (151,000-square-foot instructional
complex with a separate Process Training Unit) in Gulf Coast Region built for industry, designed by industry
• Exterior 8,000-square-foot glycol distillation unit used to teach process operations and develop troubleshooting skills for entry, advanced credit students, and incumbent workers
• Multifunctional glass pilot lab for training process systems • Conference, training, and assembly spaces designed to accommodate
academic, community, and industrial functions • 33 Custom interior labs, including 3 computer labs • 20 Interactive classrooms • Building designed to accommodate a 50 percent growth in enrollment • Degree and certificate programs: Air Conditioning Technology, Electrical
Technology, Electronics, Engineering Design Graphics (Drafting), Environmental Health and Safety Technology, Instrumentation/Analyzer Technology, Nondestructive Testing, Pipefitting Fabricator, Process Technology, and Welding
• Architect: IBI Group • Contractor: Tellepsen Builders • Total cost of building: $60 million • Funded by the College’s $425 million 2015 bond referendum • CPET address: 7901 W. Fairmont Parkway, Pasadena, Texas 77507 • More information: sanjac.edu/cpet • Media contact: Torrie Hardcastle, San Jacinto College director of public
relations, 281-998-6139, [email protected]
Photos courtesy of Eaton
CPET Labs, Industry Partners, and Programs
Room Description Industry Partner Program
C-45.1119 Motor Control Lab Electrical
C-45.1130 Instrumentation Lab INEOS Instrumentation
C-45.1133 Distributed Control System Lab (DCS) Emerson Instrumentation
C-45.1134 Instrumentation Lab Swagelok Instrumentation
C-45.1137 Programmable Logic Control Lab Instrumentation
C-45.1147 Valve Test Lab Emerson Instrumentation and Process Tech
C-45.1220 Nondestructive Testing Quality
Computer Lab Nondestructive Testing
C-45.1224 Multi-Discipline Lab Any
C-45.1304 Heavy Commercial/Industrial Writing
Lab Electrical
C-45.1305 Alternating/Direct Current Lab Electrical
C-45.1311 Industrial Lab Any
C-45.1312 Residential and Light Commercial
Wiring Lab Electrical
C-45.1318 Process Equipment (cut-away) Dow Process Tech
C-45.1322 Analyzer Lab Siemens Instrumentation
C-45.1324 Process Instrument Control Lab (HOT
unit – Hands On Trainer) Instrumentation and Process Tech
C-45.1328 Glass Pilot Plant Lab Any
C-45.1334 Control Simulation Lab Any
C-45.1335 Introductory Chemistry Lab Kuraray Instrumentation and Process Tech
C-45.1336 Glycol Control Room Emerson Process Tech
C-45.1346 Process Covered Dock Lab Process Tech
C-45.1401 Mechanical Skills Lab Instrumentation and Process Tech
C-45.1406 (X-ray) Film Interpretation Lab Nondestructive Testing
C-45.1407 Inspection Exams Lab Nondestructive Testing
C-45.1409 Mechanical Test & Heat Treatment Lab Nondestructive Testing
C-45.1410 Multi-Discipline Lab Any
C-45.1412 Mount Lab Nondestructive Testing
C-45.1412A Microscopy/Hardness Testing Lab Nondestructive Testing
C-45.1417 Ultrasonic Lab 1 & 2 Olympus Any
C-45.1419 Intermediate/Advanced Ultrasonic
Testing Eddy Current (UT Eddy Curr) Olympus Nondestructive Testing
C-45.1420 Multi-Discipline Lab Any
C-45.1429 Magnetic/(Ultra Violet) UV Penetrant
Lab (Mag/Pen) Nondestructive Testing
C-45.1431 Multi-Purpose Lab Any
C-45.1435 Pipe Boiler Lab Nondestructive Testing and
Continuing Education
C-45.1436 High Bay Industrial Lab Nondestructive Testing and
Continuing Education
C-45.1442 Craft Covered Dock Lab Continuing Education
C-45.45A Glycol Process Unit Any
C-45.45B Hunter Building (Blast Resistant
Structure) Any
C-45.45D Multi-Purpose Building Any
C-45.1341 Instrumentation Lecture Classroom Instrumentation
FRON
T ENT
RANC
EC4
5.100
1 – Ea
ton C
omm
ons
OUTE
R WES
T WIN
GC4
5.1119
– M
otor
Cont
rol L
ab C4
5.1134
–Sw
agelo
k Ins
trum
enta
tion L
ab w
ith em
bedd
ed cl
assro
om IN
NER W
EST W
ING
C45.1
336 –
Emer
son C
ontro
l Roo
m
C45.1
130 –
INEO
S Ins
trum
enta
tion L
ab
C45.1
322 –
Siem
ens A
nalyz
er La
b IN
NER E
AST W
ING
C45.1
419 –
Olym
pus I
nter
med
iate/
Adva
nced
Ultra
sonic
Testi
ng Ed
dy Cu
rrent
Lab
UPST
AIRS
Walk
by Cl
assro
oms,
Stud
ent L
oung
e, Ea
ton C
omm
ons O
verv
iew, C
omple
te In
terv
iews
www.
sanj
ac.ed
u/CP
ETAn
Equa
l Opp
ortu
nity
Insti
tutio
n
CENT
ER FO
R PE
TROC
HEMI
CAL,
ENER
GY, &
TECH
NOLO
GY
PREV
IEW TO
UR M
AP
Glyc
ol U
nit
FIRST
FLOO
R
1 4 5 6 732
Walk
Thro
ugh
North
Sout
h
C45.1134 WALK
THROUGH
East
Wes
t
INNE
R W
EST W
ING
OUTE
R W
EST W
ING
TOUR
ENTR
ANCE
UPST
AIRS
INNER EAST WING
OUTER EAST WING
FINISH
STAR
T
1
2
3
4
5
67
STAR
T
FINISH