San Francisco Transbay Terminal - Designs by WPI - Summer 2010
-
Upload
words-pictures-ideas -
Category
Design
-
view
1.321 -
download
0
Transcript of San Francisco Transbay Terminal - Designs by WPI - Summer 2010
Transbay Transit Center
PUBLIC OUTREACH
Summer 2010
TRANSBAY TRANSIT CENTER PUBLIC OUTREACH —Summer 2010 | 2Transbay Transition: Temporary Terminal Opening Signage
Canopy Sign
Fence Sign
TRANSBAY TRANSIT CENTER PUBLIC OUTREACH —Summer 2010 | 3
Facing Howard St.
Canopy and Fence SignageTransbay Transition: Temporary Terminal Opening Signage
Signage Facing Howard Street
TRANSBAY TRANSIT CENTER PUBLIC OUTREACH —Summer 2010 | 4Fence Signage
Facing Folsom St.
Transbay Transition: Temporary Terminal Opening Signage
Signage Facing Folsom Street
TRANSBAY TRANSIT CENTER PUBLIC OUTREACH —Summer 2010 | 5Transbay Transition: Ambassador Tees
TRANSBAY TRANSIT CENTER PUBLIC OUTREACH —Summer 2010 | 6Transbay Transition: Wayfinding Signage
Metal Street Sign
Sidewalk Decal
a la terminal temporalLOCALIZADA EN LAS CALLES
HOWARD Y MAIN: EMPEZANDO EL
7 DE AGOSTO, 2010
臨時巴士總站位於HOWARD夾MAIN街
啟用時間
2010年8月7日
WE’RE MAKING THE MOVE巴士總站遷址
NOS ESTAMOS MUDANDO
For more information, visit | 詳情請瀏覽網頁 Para más información, visite
temporaryterminal.org
to the Temporary TerminalLOCATED AT HOWARD AND MAIN
STREETS: STARTING
AUGUST 7, 2010
®
Bus Card
TRANSBAY TRANSIT CENTER PUBLIC OUTREACH —Summer 2010 | 7
www.transbaycenter.org
Transbay Transit Center
Opening 2017
www.transbaycenter.org
Transbay Transit Center
Opening 2017
Transbay Transit Center: Visionary Banners
Fremont Street 1st Street
TRANSBAY TRANSIT CENTER PUBLIC OUTREACH —Summer 2010 | 8v
Do you have a memory of the Transbay Terminal that you
would like to share?The TJPA is collecting positive memories about the Transbay Terminal and its place in San Francisco’s history. Please share your memories by emailing [email protected]. Memories will be posted on our website in the coming weeks.
TRANSBAY TerminalCALL FOR MEMORIES
Transbay Terminal: Historical Tours
E-Blast Invitation Event Handout
TRANSBAY TERMINALHISTORICAL TOURS
PAULTRANSBAY TERMINAL
HISTORICAL TOURS
JaniceTRANSBAY TERMINAL
HISTORICAL TOURS
Frank Smith
Tour Group Name Badges
TRANSBAY TRANSIT CENTER PUBLIC OUTREACH —Summer 2010 | 9
Transbay Terminal
Transbay Terminal
Transbay Terminal
Transbay Terminal
Transbay Terminal
Transbay Terminal
Transbay Terminal
Transbay Terminal
Transbay Terminal
Transbay Terminal
Transbay Terminal
Transbay Terminal
Transbay Terminal
Transbay Terminal
Transbay Terminal
Transbay Terminal: Historical Tours
Historical Photos Posters
TRANSBAY TRANSIT CENTER PUBLIC OUTREACH —Summer 2010 | 10Transbay Terminal: Historical Tours
Cuddles Bar Transbay Diner
Transbay Jail Transbay Pursuit of Happyness Benches
TRANSBAY TRANSIT CENTER PUBLIC OUTREACH —Summer 2010 | 11
GEORGE MILLER
CONGRESSMAN RAY LAHOOD SECRETARY OF TRANSPORTATION
BARBARA BOXER
UNITED STATES SENATOR
Transbay Transit Center: Groundbreaking Ceremony
NANCY PELOSI SPEAKER OF THE HOUSE
GAVIN NEWSOM
MAYOR, CITY OF SAN FRANCISCO
Speaker Name Badges
TRANSBAY TRANSIT CENTER PUBLIC OUTREACH —Summer 2010 | 12
Transbay Transit Center
10 DAY LOOK AHEAD: Transbay Demolition and Construction Activities
Friday, October 8, 2010 – Monday, October 18, 2010
THIS WEEK AT TRANSBAY...
WEEKEND WORK: This Saturday, October 9, 2010, sidewalk paving will occur on the south side of Howard Street, between Main and Beale Streets, as well as on the east side of Beale Street between Howard and Mission Streets. These sidewalks will be closed for repair and restoration work. Abatement of the Terminal will continue through the weekend in order to prepare for the removal of the roof later this month. This work will occur from 7:00 AM until 3:30 PM.
The Temporary Terminal contractor, McGuire and Hester, will be repairing the sidewalk on the west side of Main Street between Mission and Howard Streets. This sidewalk will be closed during this activity. Trenching and utility installation work will also occur in the Temporary Terminal phase II site between 7:00 AM until 3:30 PM.
WEEKDAY WORK: Weekday work for the demolition project between Monday, October 11, 2010, and Friday, October 15, 2010, will focus on the completion of preparations for the demolition of the roof and upper deck of the Transbay Terminal building. Demolition of the East Terminal roof and upper deck will follow.
Weekday work at the Temporary Terminal between Monday, October 11, 2010, and Friday, October 15, 2010, will focus on trenching and grading activities, as well as foundation work. Delivery of remaining site palm trees is also expected.
HOURS OF WORK: The contractors will be working between the hours of 7:00 AM and 11:00 PM Monday-Friday. Weekend work may be conducted 24-hours a day with a moratorium on jack hammering and other excessive noise producing activities between the hours of 11:00 PM and 6:00 AM.
STREET AND SIDEWALK CLOSURE: This weekend, sidewalks on the west side of Main Street between Howard and Mission Streets, the east side of Beale Street between Howard and Mission Streets, and the south side of Howard Street between Main and Beale Streets will be closed for repair and restoration work. Due to significant progress made in the past few weeks, there will be no full street closures this weekend.
WHAT TO EXPECT NEXT WEEKEND (10/15 – 10/17): The demolition contractor will continue work on the demolition of the existing Terminal East of Fremont Street. Due to the upcoming demolition of the Fremont Street Crossing, the Fremont Street sidewalk may be closed beginning Friday, October 15, 2010 until November 15, 2010.
Weekend work may be conducted 24 hours a day with a moratorium on jack hammering and other excessive noise producing activities between the hours of 11:00 PM and 6:00 AM.
COMMUNITY MEETINGS: Please join us for our upcoming community meetings on Wednesday, October 20, 2010. The first community meeting will be held from 12:00 noon until 1:00 PM. The second community meeting will be held from 6:00 PM until 7:00 PM. Both meetings will feature the same content and will be held at the TJPA’s offices located at 201 Mission Street, Suite 2100.
NOTICE: The demolition of Terminal is expected to begin on Saturday, October 16, 2010. In order to safely bring down the facility, the demolition contractor will be working, at a minimum, double shifts. It is highly likely that weekend and weekday 24 hour work will need to occur between October 16th and November 15th. The TJPA has instructed its demolition contractors to make every effort to minimize the impact to the community and to progress through this phase of work as quickly as possible. However, due to the nature of this portion of demolition, safety will require 24 hour work to be conducted regularly over the 30 day span. It may also require periodic lifting of the moratorium.
Should you have any general questions about the Transbay Transit Center Project, please call Courtney Lodato or Adam Alberti, Transbay Outreach Team, at: (415) 227-9700 or via e-mail at: [email protected].
If you have any urgent questions regarding site-specific demolition activities, please call our construction activity number: (415) 409-TJPA (8572).
Please continue to check our website for the most up to date schedule of activities at www.transbaycenter.org/demolition
Demolition Update
Learn more at:
www.transbaycenter.org
Transbay Terminal: Demolition Public Outreach
Downloadable PDF