SAMYANG ENTECH CO., LTD. · PDF filePACKING PROCEDURE FOR WWTP KKS Code HTQ Checked Reg. No....
28
A 2015.01.12 W.H. JUNG H. LEE D.K. JI FOR APPROVAL Rev Date Prepared Checked Approved Details of Revision Owner Contractor Sub-Supplier Project RUTENBERG POWER STATION UNIT 1 & 2 FGD WASTE WATER TREATMENT SYSTEM PC S09091 UAS Code DD03 Date Name Scale Unit Code 12 Prepared Title PACKING PROCEDURE FOR WWTP KKS Code HTQ Checked Reg. No. 540800 Approved Rev. A Dept. Document No. S09091-DD03-12-HTQ-540800 Page-No. 1 of 28 FOR APPROVAL THE ISRAEL ELECTRIC CORPORATION LTD. SAMYANG ENTECH CO., LTD.
Transcript of SAMYANG ENTECH CO., LTD. · PDF filePACKING PROCEDURE FOR WWTP KKS Code HTQ Checked Reg. No....
A 2015.01.12 W.H. JUNG H. LEE D.K. JI FOR APPROVAL
Rev Date Prepared Checked Approved Details of Revision
Owner
Contractor
Sub-Supplier
Project
RUTENBERG POWER STATION UNIT 1 & 2
FGD WASTE WATER TREATMENT SYSTEM
PC
S09091
UAS Code
DD03
Date Name Scale Unit Code
12
Prepared Title
PACKING PROCEDURE FOR
WWTP
KKS Code
HTQ
Checked Reg. No.
540800 Approved
Rev.
A Dept.
Document No.
S09091-DD03-12-HTQ-540800 Page-No.
1 of 28
FOR APPROVAL
THE ISRAEL ELECTRIC CORPORATION LTD.
SAMYANG ENTECH CO., LTD.