Samsung sac global reference catalogue

111
1 Reference Site 2014. 02. 07 Air Conditioning Marketing Group SE

Transcript of Samsung sac global reference catalogue

Page 1: Samsung sac global reference catalogue

1

Reference Site

2014. 02. 07

Air Conditioning Marketing Group

SE

Page 2: Samsung sac global reference catalogue

2

Reference Site

Equipment Selection Image

Application Issue

Global Reference Site Map

Page 3: Samsung sac global reference catalogue

3

1. Europe

2. South East Asia

3. the Middle East

4. Africa

5. South West Asia

6. Latin America

7. Korea

8. China

Content

Page 4: Samsung sac global reference catalogue

4

Reference Site

Equipment Selection Image

Application Issue

1. Europe

Page 5: Samsung sac global reference catalogue

5

Reference Site

Equipment Selection Image

Application Issue

ORCO Shopping Mall

Project ORCO Project

Location Budapest, Hungary

Date of Completion 2012

Size 12,000 m2

Value € 571K

Shopping Mall

7,000

mm

• Limited installation space for the outdoor units

- High walls surrounding the area

- Samsung provided full CFD simulation analysis

• The investor wanted the most energy efficient solution

with best control solution

Classification Type Q’ty / HP

ODU DVM PLUS 3 HR 52 EA

IDU 4way, Duct, Console

Air Handling Units

300 EA

6 EA

Control S-NET 3, DMS, Power distribution

Page 6: Samsung sac global reference catalogue

6

Reference Site

Equipment Selection Image

Application Issue

IKEA Shopping Complex Mall

Complex Mall

Project IKEA Shopping Complex Mall

Location Valladolid, Spain

Date of Completion AUG, 2012

Size 20,700 m2

Value € 210K

Customer Atil Cobra (Big Installer)

Classification Type Q’ty / HP

ERV RHF***EE 166 EA

Control CO2 Sensor, MWR-WE10

• CO2 sensors to control the multiple ERVs

- HQ developed a special software for customer

• Free cooling with volume damper and energy saving

control

• Extended temperature ratio to ±10℃ with energy saving

control of MWR-WE10

Page 7: Samsung sac global reference catalogue

7

Reference Site

Equipment Selection Image

Application Issue

Parkalgar Radisson Hotel

Project Parkalgar Hotel (5 Star Hotel)

Location Portimão, Portugal

Date of Completion 2011

Size 16,000 m2 (208 rooms & 166

apt.)

Value € 450K

Classification Type Q’ty / HP

ODU DVM PLUS 4

FJM

19 EA

166 EA

IDU Duct(Hotel), RAC(Appt.) 737 EA

Control DMS 2, LonWorks gateway

• Customer want to provide an overall total solution, such as

air-conditioner, TV, refrigerators, cookers and microwaves.

- Samsung can provide customers with a tailored total

solution.

• LonWorks BMS connection

Hotel & Resort

Page 8: Samsung sac global reference catalogue

8

Reference Site

Equipment Selection Image

Application Issue

Southend Airport

Airport

Project Southend Airport

Location London, UK

Date of Completion JUN, 2011

Size 4,500 m2

Value € 320K

Classification Type Q’ty / HP

ODU DVM PLUS 3 18 EA

IDU Duct, Wall Mounted 47 EA

Control MWR-WH00

• Management of air conditioning system

- Simplified remote controller

• Interior design

- Compact ducted units

Page 9: Samsung sac global reference catalogue

9

Reference Site

Equipment Selection Image

Application Issue

Murawa Office Park

Office Park

Project Murawa Office Park

Location Poznan, Poland

Date of Completion December, 2010

Size 7,500 m2

Value € 205k

Classification Type Q’ty / HP

ODU DVM PLUS III HR 10 EA

IDU Duct, 4Way Cassette, RAC 151 EA

Control Lonworks Interface

• Monitor power distribution

• Set room temperature

• Control fan speed

• Zone management

• Lonworks Gateway the best solution to integrate DVM

PLUS system into BMS and control the system

simultaneously

Page 10: Samsung sac global reference catalogue

10

Reference Site

Equipment Selection Image

Application Issue

Sheraton Edinburgh Hotel

Hotel & Resort

Project Sheraton Hotel (5-star hotel)

Location Edinburgh, UK

Date of Completion OCT, 2010

Size 11,500 m2 (269 rooms)

Value € 220K

Classification Type Q’ty / HP

ODU DVM PLUS 2 HR 25 EA

IDU Slim Duct 285 EA

Control DMS 2, MWR-WH00

• Fidelio system application with Samsung AC

- Samsung developed the Fidelio application for customer

• PC based centralized control system (DMS2)

Page 11: Samsung sac global reference catalogue

11

Reference Site

Equipment Selection Image

Application Issue

PFRON

Office Building

Project PFRON

Location Warsaw, Poland

Date of Completion 2010

Size 4,525 m2

Value € 150K

Classification Type Q’ty / HP

ODU DVM PLUS 3 22 EA

IDU 4way, Slim 1way, RAC 215 EA

Control DMS 2, Window relay, Use restriction by

Control logic management

• PC based centralized control system (DMS2)

• Window contact control for energy saving

• Electric power use limit combined with DMS2 control

logic management

Page 12: Samsung sac global reference catalogue

12

Reference Site

Equipment Selection Image

Application Issue

Pecsa Sanatorium

Sanatorium

Project Pecsa Sanatorium

Location Madrid, Spain

Date of Completion 2010

Size - m2

Value € 230K

• AHU Systems (Heating load 30%)

- AHU system was installed with Solar panels for

corresponding the energy regulation

• PC based centralized control system (DMS2)

Classification Type Q’ty / HP

ODU DVM PLUS 3 HP 16 EA

IDU AHU, 4Way, Duct, 2Way 96 EA

Control DMS2, MWE-WH00

Page 13: Samsung sac global reference catalogue

13

Reference Site

Equipment Selection Image

Application Issue

Classification Type Q’ty / HP

ODU DVM PLUS II HR 11

IDU Wall mounted / Ceiling 171

Control DMS, Key tag, Fidelio

Holiday Inn Hotel

Project Holiday Inn Hotel

Location Slough, UK

Date of Completion Oct, 2008

Size 9 floors

Value -

• ODU Installation Space

- Group installation on the rooftop

Hotel

• Management of air conditioning system

- DMS

- Fidelio : 3rd Party control system

Page 14: Samsung sac global reference catalogue

14

Reference Site

Equipment Selection Image

Application Issue

VAM Design Center

Art Gallery

Project VAM Design Center (Art Gallery)

Location Budapest, Hungary

Date of Completion 2007

Size 11,500 m2

Value € 286K

Classification Type Q’ty / HP

ODU DVM PLUS 2 24 EA

IDU Duct, Wall Mounted 86 EA

Control DMS, Power Distribution

• PC based centralized control system (DMS)

• Power distribution system (SiM, WHM)

Page 15: Samsung sac global reference catalogue

15

2. South East Asia

Page 16: Samsung sac global reference catalogue

16

Reference Site

Equipment Selection Image

Application Issue

RASUNA Tower

Project RASUNA Tower

Location Jakarta, Indonesia

Date of Completion 2014

Size 60 floors

Value 5.0M US$

• Optimize indoor humidity control

• Improved design with DVM +4

• Interlock control with BACnet

• Power distribution

- PIM (WHM interface module - MIM-B16)

- Local watt-hour meter (Pulse type)

Classification Type Q’ty / HP

ODU DVM PLUS IV 380

IDU 4 Way, Duct, ERV+ 1,223

Control BACnet

Office & Residential Building

Page 17: Samsung sac global reference catalogue

17

Reference Site

Equipment Selection Image

Application Issue

Arya Residences

Project Arya Residences

Location Taguig City, philippines

Date of Completion 2013

Size 2 towers

Value 2.0M US$

• LEED-registered residential building

- SAC with high EER

- DVM Mini

- DVM+4 / CAC

• Optimized design for ODU

- Air flow analysis by CFD

- Proposal of optimized ODU space

Classification Type Q’ty / HP

ODU DVM Mini 1720HP

IDU 4 Way & Duct 895

Control Individual remote controller

Luxury Residential Building

Page 18: Samsung sac global reference catalogue

18

Reference Site

Equipment Selection Image

Application Issue

Project Viet Han Tower (Space 21)

Location Hanoi, Vietnam

Date of Completion July, 2011

Size 17 floors

Value 460k US$

Viet Han Tower (Space 21)

• High-rise building

- Level different over 50m

- PDM(Pressure Drop Modulation) Kit

• Countermeasures of region with high humidity

- Reinforced insulator

Office Building

• Power distribution

- PIM (WHM interface module - MIM-B16)

- Local watt-hour meter (Pulse type)

Classification Type Q’ty / HP

ODU DVM PLUS III 65

IDU 4way 222

Control DMS2, Power distribution with PIM

Page 19: Samsung sac global reference catalogue

19

Reference Site

Equipment Selection Image

Application Issue

Kumho Asiana Plaza

Project Kumho Asiana Plaza

Location Hochiminh, Vietnam

Date of Completion 2009

Size Service residential 32th floor

Value 3.2M US$

• PC based centralized control system

- S-Net 3 & DMS

- Function : Monitoring & operation

• Power distribution : SiM, WHM

Luxury Residential Apartment

• Countermeasures of region with high humidity

- Reinforced insulator

Classification Type Q’ty / HP

ODU DVM PLUS III 128

IDU Slim 1way 1,155

Control S-Net 3, DMS, Power distribution with SiM

Page 20: Samsung sac global reference catalogue

20

Reference Site

Equipment Selection Image

Application Issue

Project Imperial Palace

Location Cebu, Philippines

Date of Completion 2009

Size 6 buildings

Value 3.2M US$

• Damage from sea wind (water)

- Install Wall against the wind

- Anticorrosive agent

• Interlock control with BMS system

Classification Type Q’ty / HP

ODU DVM/DVM PLUS 2,3 2850HP

IDU 1way / Slim duct 1355

Control BMS interlock control

Imperial Palace

Resort

Page 21: Samsung sac global reference catalogue

21

Reference Site

Equipment Selection Image

Application Issue

West Sands Resort

Project West Sands Resort

Location Mai Khao Beach, Thailand

Date of Completion 2009

Size 426 villas & residences

Value 1.0M US$

• Prevention from Damage of sea wind (water)

- Install Wall against the wind

- Anticorrosive agent

Resort

• Countermeasures of region with high humidity

- Reinforced insulator

Classification Type Q’ty / HP

ODU DVM PLUS III 984HP

IDU 1 Way / Duct 755

Control DMS

Page 22: Samsung sac global reference catalogue

22

Reference Site

Equipment Selection Image

Application Issue

St. Joseph School

Project St. Joseph School

Location Sydney, Australia

Date of Completion 2011

Size 10 Different Buildings

Value 250K AUD$

• Management of air conditioning system

- Integrated and centralized control system

- DMS : PC, Web based centralized control system

- Monitoring & Operation

School

• Refurbishment of HVAC system

- SAC(DVM system) application

Classification Type Q’ty / HP

ODU DVM PLUS III (HP/HR) 500HP

IDU 1 Way / 4 Way 250

Control Central Controller, DMS2

Page 23: Samsung sac global reference catalogue

23

Reference Site

Equipment Selection Image

Application Issue

Rockhampton Aged Care

Project Rockhampton Aged Care

Location Rockhampton, QLD Australia

Date of Completion 2011

Size 100 Beds Aged Care Residents

Value 120K AUD$

• Management of air-conditioning system

- Easy Control : S-NET Mini with touch screen

- Monitoring & Operation

Residence

• Retirement Village

- Emergency Shutdown A/C System in Fire Mode

Classification Type Q’ty / HP

ODU DVM PLUS III 72HP

IDU Wall mounted 100

Control S-NET Mini

Page 24: Samsung sac global reference catalogue

24

Reference Site

Equipment Selection Image

Application Issue

Breakfast Point Apartment

Project Breakfast Point Apartment

Location Sydney, Australia

Date of Completion 2011

Size 3 Buildings each with 5 Levels

Value 450k AUD$

• High end value residential apartment

- System combination : DVM Mini & 2~4 IDUs

Luxury Residential Apartment

• Location of ODU

- Roof & Basement

- Securing air circulation of ODU located in basement

Classification Type Q’ty / HP

ODU DVM Mini 1670HP

IDU Wall mounted 450

Control Individual Wireless Controller

Page 25: Samsung sac global reference catalogue

25

Reference Site

Equipment Selection Image

Application Issue

Thai Hoa Pediatrics Hospital

Project Thai Hoa Pediatrics Hospital

Location Dong Thap, Vietnam

Date of Completion June, 2011

Size 7 floors

Value 249K US$

• Management of air conditioning system

- Integrated and centralized control system

- DMS : PC, Web based centralized control system

- Monitoring & Operation

Hospital

• N/A

Classification Type Q’ty / HP

ODU DVM PLUS III 25 / 382HP

IDU 4 Way 213

Control Central Controller, DMS

Page 26: Samsung sac global reference catalogue

26

Reference Site

Equipment Selection Image

Application Issue

Golf Phu My Hotel

Project Golf Phu My Hotel

Location Ba Ria Vung Tau, Vietnam

Date of Completion December, 2011

Size 12 floors

Value 500K US$

• Management of air conditioning system

- Integrated and centralized control system

- DMS + S-Net 3

• Watt-hour Meter interface Module

• ERV

- Interlock with SAC

Classification Type Q’ty / HP

ODU DVM PLUS III 21 / 74HP

IDU 4 Way & Duct 313

Control S-Net 3

Hotel

Page 27: Samsung sac global reference catalogue

27

Reference Site

Equipment Selection Image

Application Issue

Green Boutique Hotel

Project Green Boutique Hotel

Location Puchong, Selangor, Malaysia

Date of Completion Jan, 2011

Size 6 floors

Value 70K US$

• Management of air conditioning system

- Easy Control : S-NET Mini with touch screen

- Monitoring & Operation

Hotel

• Interior design

- Compact ducted units

Classification Type Q’ty / HP

ODU DVM PLUS III 3 / 48HP

IDU Duct 57

Control S-Net Mini

Page 28: Samsung sac global reference catalogue

28

Reference Site

Equipment Selection Image

Application Issue

Bangsar Hill Bungalow

Project Bangsar Hill Bungalow

Location Kuala Lumpur, Malaysia

Date of Completion Feb, 2012

Size 4 floors

Value 65K US$

• Management of air conditioning system

- Easy Control : S-NET Mini with touch screen

- Simplified remote controller

Bungalow

• Interior design

- Compact ducted units

Classification Type Q’ty / HP

ODU DVM PLUS III 4 / 56HP

IDU Duct 23

Control S-Net Mini

Page 29: Samsung sac global reference catalogue

29

Reference Site

Equipment Selection Image

Application Issue

Plaza Damas 3

Project Plaza Damas 3

Location Kuala Lumpur, Malaysia

Date of Completion May, 2011

Size 10 floors

Value 370K US$

• Management of air conditioning system

- Simplified remote controller

Service Apartment

• Compact 4-way cassette

• Ceiling Concealed Duct

• RAC with Virus doctor

Classification Type Q’ty / HP

ODU CAC 81 / 960HP

IDU 4 Way & Duct 81

Control Individual remote controller

Page 30: Samsung sac global reference catalogue

30

Reference Site

Equipment Selection Image

Application Issue

The Beaufort

Project The Beaufort

Location Taguig City, philippines

Date of Completion December, 2012

Size 42 floors(2 towers)

Value 2.0M US$

• High-rise building

• Complex building

- Office & Residence

Office & Residential Building

• Management of air conditioning system

- Simplified remote controller

Classification Type Q’ty / HP

ODU DVM PLUS III 2000HP

IDU 4 Way & Duct 1,500

Control Individual remote controller

Page 31: Samsung sac global reference catalogue

31

Reference Site

Equipment Selection Image

Application Issue

Trillium tower

Project Trillium tower

Location Surabaya, Indonesia

Date of Completion 2011

Size 110m’s height

Value -

• High-rise building

- Level different over 50m

- PDM(Pressure Drop Modulation) Kit

• Management of air conditioning system

- Simplified remote controller

Classification Type Q’ty / HP

ODU DVM PLUS III 3

IDU Ceiling 50

Control Individual remote controller

Office & Residential Building

Page 32: Samsung sac global reference catalogue

32

Reference Site

Equipment Selection Image

Application Issue

Design Hub

Project Design Hub

Location Singapore

Date of Completion 2011

Size 1428HP

Value -

• Optimized piping design against long piping issue

for storage space.

• CFD analysis for limited outdoor space

• Management of air conditioning system

- Easy Control : S-NET Mini with touch screen

- Simplified remote controller

Classification Type Q’ty / HP

ODU DVM PLUS III 119

IDU 4 Way & Duct 334

Control S-Net Mini

Office Building

Page 33: Samsung sac global reference catalogue

33

Reference Site

Equipment Selection Image

Application Issue

The New iLoiLo City Hall

Project The New iLoiLo City Hall

Location iLoiLo City, Philippines

Date of Completion December, 2011

Size 7 floors

Value 0.5M US$

• Energy evaluation in comparison with Chiller.

• Previous building is using chiller.

Office Building

• Management of air conditioning system

- S-Net Mini controller

Classification Type Q’ty / HP

ODU DVM PLUS III 600HP

IDU 4 Way 550HP

Control S-Net Mini controller

Page 34: Samsung sac global reference catalogue

34

3. the Middle East

Page 35: Samsung sac global reference catalogue

Classification Type Q’ty / HP

ODU DVM PLUS IV HR 79

IDU AHU, Duct, Ceiling 650

Control S-Net 3, DMS, Key-Tag. Wired R/C

Reference Site

Equipment Selection Image

Application Issue

Project The Hilton Dead Sea Resort

Location Dead Sea, Jordan

Date of Completion 2014

Size 1320 HP

Value 1.0M US$

Hilton Dead Sea Resort

• Powerful Performance in High Ambient Temperature

• Heat Recovery & Technology

- Continuously Simultaneous Heating & Cooling

• Energy Saving & Eco-friendly

- Top Class Energy Efficiency

Hotel

Page 36: Samsung sac global reference catalogue

36

Reference Site

Equipment Selection Image

Application Issue

Mall of Istanbul

Project Mall of Istanbul

Location Istanbul, Turkey

Date of Completion 2012

Size 762,000 m2

Value 1.8M US$

• PC based centralized control system

- S-Net 3 & DMS

- Function : Monitoring & operation

• Power distribution : SiM, WHM

Commercial Complex

• Countermeasures of region with high humidity

- Reinforced insulator

Classification Type Q’ty / HP

ODU DVM PLUS IV 108 EA / 2,080 HP

IDU Slim Duct 2,136 EA

Control S-Net 3, DMS, Power distribution with SiM

Page 37: Samsung sac global reference catalogue

37

Reference Site

Equipment Selection Image

Application Issue

AJMAN One

Luxury Residential Apartment

Project AJMAN One

Location Ajman, UAE

Date of Completion 2012

Size Twelve towers, 26 floors

Value 3.7M US$

Classification Type Q’ty / HP

ODU CAC Camel 6,754 EA

IDU MSP Duct 6,754 EA

Control Wired remote controller

• Design machine room

- Louver for better air circulation

- Exhaust fan and SVC space for

• The Biggest CAC Ref. Site in the GCC Countries.

• Oil trap & additional accumulator

Page 38: Samsung sac global reference catalogue

38

Reference Site

Equipment Selection Image

Application Issue

Titanic Hotel

Project Titanic Hotel

Location Istanbul, Turkey

Date of Completion 2012

Size 331 Rooms

Value 1.2M US$

• Management of air conditioning system

- Integrated and centralized control system

- DMS : PC, Web based centralized control system

- Monitoring & Operation

• Interior design

Classification Type Q’ty / HP

ODU DVM PLUS IV

IDU

Control

Hotel

Page 39: Samsung sac global reference catalogue

39

Reference Site

Equipment Selection Image

Application Issue

SBG Plaza

Office Building

Project SBG plaza

Location Muscat, Oman

Date of Completion 2012

Size 3700Ton

Value 1.6M US$

Classification Type Q’ty / HP

CAC MSP Duct (60K) 1500 EA

RAC RAC (18K) 500 EA

Control

• Power distribution

- Local pulse type watt hour meter

• Interior design

- Compact ducted units

Page 40: Samsung sac global reference catalogue

40

Reference Site

Equipment Selection Image

Application Issue

Braka Nuclear Power Plant

Commercial Building

Project Braka Nuclear Power Plant

Location Braka, UAE

Date of Completion 2011

Size

Value 1.25M US$

Classification Type Q’ty / HP

ODU DVM+3 High 137 EA

IDU 4way, MSP Duct 214 EA

Control Centralized controller, DMS, S-Net Mini

• Management of air conditioning system

- Easy Control : S-NET Mini with touch screen

- Simplified remote controller

• Power distribution

- Local pulse type watt hour meter

Page 41: Samsung sac global reference catalogue

41

Reference Site

Equipment Selection Image

Application Issue

Dead Sea Lagoon Hotel

Hotel

Project Lagoon Hotel

Location Dead Sea, Jordan

Date of Completion 2011

Size

Value US$

Classification Type Q’ty / HP

ODU DVM+3 High 44

IDU Duct 760

Control S-NET 3

• Management of air conditioning system

- Integrated and centralized control system

- S-Net 3 : PC, Web based centralized control system

- Monitoring & Operation

• Interior design

- Compact ducted units

Page 42: Samsung sac global reference catalogue

42

Reference Site

Equipment Selection Image

Application Issue

Seasons Community

Luxury Residential Apartment

Project Seasons Community

Location UAE

Date of Completion 2009~2012

Size 365 Flats

Value US$

Classification Type Q’ty / HP

ODU CAC 694 EA

IDU MSP Duct 694 EA

Control Wired remote controller

• Management of air conditioning system

- Simplified remote controller

• Interior design

- Compact ducted units

Page 43: Samsung sac global reference catalogue

43

Reference Site

Equipment Selection Image

Application Issue

Glozny

Hotel

Project Glozny

Location Glozny, Chechnya

Date of Completion 2011

Size 4.5-hectar (5 building)

Value 1.86M US$

Classification Type Q’ty / HP

ODU DVM +3, Mini DVM, FJM 5248HP

IDU 1 Way / Duct 3526EA

Control DMS, On/Off

• Management of air conditioning system

- Integrated and centralized control system

- DMS : PC, Web based centralized control system

- Monitoring & Operation

• Hotel, Shopping center, swimming pool, restaurant

Page 44: Samsung sac global reference catalogue

44

Reference Site

Equipment Selection Image

Application Issue

Princess Resort

Resort

Project Princess Resort

Location Izmir, Turkey

Date of Completion 2004

Size

Value $

Classification Type Q’ty / HP

ODU DVM PLUS

IDU Duct Type

Control

• Management of air conditioning system

- Simplified remote controller

• Interior design

- Compact ducted units

Page 45: Samsung sac global reference catalogue

45

Reference Site

Equipment Selection Image

Application Issue

Project Brandium

Location Turkey,İstanbul

Date of Completion 2013

Size 7891 KW (INDOOR)

Value 1.4M$

Classification Type Q’ty / HP

ODU DVM+4 HP, HR 154

IDU AHU, Duct, Ceiling, Wall 2607

Control S-NET3, DMS, Key-tag, Automation

Brandium

Residence and Hotel

• Management of air conditioning system

- Integrated and centralized control system

- S-Net 3 : PC, Web based centralized control system

- Monitoring & Operation

Page 46: Samsung sac global reference catalogue

46

Reference Site

Equipment Selection Image

Application Issue

Project Sinpaş Ottomare

Location Turkey,İstanbul

Date of Completion 2013

Size 3200 KW (INDOOR)

Value 0.5M$

Classification Type Q’ty / HP

ODU DVM+4 HP, HR 76

IDU AHU, Duct, Ceiling, Wall 2985

Control S-NET3, DMS, Key-tag, Automation

• Management of air conditioning system

- Integrated and centralized control system

- S-Net 3 : PC, Web based centralized control system

- Monitoring & Operation

• Limited installation period

Sinpaş Ottomare

Residence and Hotel

Page 47: Samsung sac global reference catalogue

47

Reference Site

Equipment Selection Image

Application Issue

Classification Type Q’ty / HP

ODU DVM+4 HP, HR 45

IDU AHU, Duct, Ceiling, Wall 849

Control S-NET3, DMS, Key-tag, Automation

Project Terrace Tema

Location Turkey,İstanbul

Date of Completion 2014

Size 3250 KW (INDOOR)

Value 662k$

Terrace Tema

Residence

• Management of air conditioning system

- Integrated and centralized control system

- S-Net 3 : PC, Web based centralized control system

- Monitoring & Operation

Page 48: Samsung sac global reference catalogue

48

Reference Site

Equipment Selection Image

Application Issue

Classification Type Q’ty / HP

ODU DVM+4 HP, HR 333

IDU AHU, Duct, Ceiling, Wall 1736

Control S-NET3, DMS, Key-tag, Automation

Project Mandarin Oriental

Location Turkey,İstanbul

Date of Completion 2013

Size 9000 KW (INDOOR)

Value 1.6M$

Mandarin Oriental

• Variety design for the project

Residence

Page 49: Samsung sac global reference catalogue

49

Reference Site

Equipment Selection Image

Application Issue

Classification Type Q’ty / HP

ODU CAC 262

IDU MSP Duct 262

Control Wired

Project Narges Complex

Location Tehran, Iran

Date of Completion Jul 2013

Size ODU 805 HP

Value 420K USD

Narges Complex

Residence

• Powerful Performance in High Ambient Temperature

Page 50: Samsung sac global reference catalogue

50

Reference Site

Equipment Selection Image

Application Issue

Classification Type Q’ty / HP

ODU CAC 226

IDU MSP Duct 226

Control Wired

Project Zeytun Complex

Location Tehran, Iran

Date of Completion Jul 2013

Size ODU 813 HP

Value 410K USD

Zeytun Complex

Residence

• Powerful Performance in High Ambient Temperature

Page 51: Samsung sac global reference catalogue

51

Reference Site

Equipment Selection Image

Application Issue

Classification Type Q’ty / HP

ODU DVM+4 HP 16

IDU 4Way Cassette, Ceiling, Wall 115

Control Wireless, S-Net

Project Commercial Center of Elahiye

Location Tehran, Iran

Date of Completion Aug 2013

Size ODU 222HP

Value 110K USD

Zeytun Complex

Commercial Building

• Management of air conditioning system

- Integrated and centralized control system

- S-Net 3 : PC, Web based centralized control system

- Monitoring & Operation

Page 52: Samsung sac global reference catalogue

52

4. Africa

Page 53: Samsung sac global reference catalogue

53

Reference Site

Equipment Selection Image

Application Issue

Intercontinental Hotel

Luxury Hotel

Project Intercontinental Hotel (5 star)

Location Libreville, Gabon

Date of Completion 2013

Size 714 HP

Value $ 0.5 M

Classification Type Q’ty / HP

ODU DVM+4 714 HP

IDU Slim Duct 394 ea

Control S-NET Mini

• Change the design from chiller to DVM S.

• Winning Factor : Winning through SSA installer co-work in no installation infrastructure country

Page 54: Samsung sac global reference catalogue

54

Reference Site

Equipment Selection Image

Application Issue

Icon Tower (Land Mark)

Luxury Office + Residence

Project ICON Tower

Location Kinshasa, DR Congo

Date of Completion 2013

Size 596 HP

Value 0.5 M$

Classification Type Q’ty / HP

ODU DVM S 596 HP

IDU High wall / Cassette 394 ea

Control S-NET Mini

• Winning Factor

- Customer confidence (Local Manager direct sale activity, SE design support)

- Energy Efficiency of product

Page 55: Samsung sac global reference catalogue

55

Reference Site

Equipment Selection Image

Application Issue

Congo Trade Center (Land Mark)

Luxury Office + Residence

Project CTC (Congo Trade Center)

Location Kinshasa, DR Congo

Date of Completion 2014

Size 690 HP

Value 0.5 M$

Classification Type Q’ty / HP

ODU DVM S, DVM Eco 690 HP

IDU Wall mount 465 ea

Control Wireless RMC

• Change the design from chiller to DVM S.

• Winning Factor :

- Relationship with client

- HQ RPM & SE local support in DVM S launching conference on Sep.2013

- DVM S advertisement in local premium magazine

Page 56: Samsung sac global reference catalogue

56

Reference Site

Equipment Selection Image

Application Issue

Du Grand Palais Des Nations

The National Assembly building

Project Du Grand Palais Des Nations

Location Conakry, Guinea

Date of Completion 2013

Size 340 HP

Value 0.2 M$

Classification Type Q’ty / HP

ODU DVM S 596 HP

IDU High wall / HSP & MSP Duct 113 ea

Control DMS 2, S Net 3

• Management of air conditioning system

- Integrated and centralized control system

- DMS 2 + S-Net 3

• Change the design from 2 among 4 blocks of Competitor air-cooled chiller to DVM S.

Page 57: Samsung sac global reference catalogue

57

Reference Site

Equipment Selection Image

Application Issue

National Security Center

Government office building

Project National Security Center

Location Khartoum, Sudan

Date of Completion 2014

Size 780 HP

Value 0.5 M$

Classification Type Q’ty / HP

ODU DVM S, Desert 780 HP

IDU Slim / MSP Duct 227 ea

Control DMS 2

• Management of air conditioning system

- Integrated and centralized control system

- DMS 2 + S-Net 3

• Winning factor : Samsung brand image., Technical Support.

Page 58: Samsung sac global reference catalogue

58

Reference Site

Equipment Selection Image

Application Issue

Accra Financial Center

Premium office building

Project Accra Financial Center

Location Accra, Ghana

Date of Completion 2014

Size 758 HP

Value 0.4 M$

Classification Type Q’ty / HP

ODU DVM S 758 HP

IDU MSP/HSP Duct, Mini 4W CST 127 ea

Control Wired RMC, Group Controller

• Land mark PJT in Accra

Page 59: Samsung sac global reference catalogue

59

Reference Site

Equipment Selection Image

Application Issue

Hilltop Private Hospital

Hospital

Project Hilltop Private Hospital

Location Lusaka, Zambia

Date of Completion 2014

Size 384 HP, CAC 40 set

Value 0.4 M$

Classification Type Q’ty / HP

ODU DVM S, CAC 384 HP

IDU Mini 4W CST, Slim Duct,

High-Wall

164 ea

Control Wired RMC, Group Controller

• Winning Factor : Technical Support to new SAC Distributer.

Page 60: Samsung sac global reference catalogue

60

Reference Site

Equipment Selection Image

Application Issue

Department of Military Veterans

Government office building

Project Department of Military Veterans

Location Pretoria, South Africa

Date of Completion 2013

Size 120 HP

Value 0.3 M$

Classification Type Q’ty / HP

ODU DVM S, HR 110 HP

IDU Mini 4W & 4W CST 43 ea

Control Wired RMC, Motion detect sensor

Page 61: Samsung sac global reference catalogue

61

Reference Site

Equipment Selection Image

Application Issue

Venetia Housing Development

Residence

Project Venetia Housing Development

Location Venetia (North Limpopo Province)

Date of Completion 2014

Size 368 HP

Value 0.37 M$

Classification Type Q’ty / HP

ODU DVM S Eco 368 HP

IDU Wall mount 368 ea

Control

• Housing development for open cast diamond mine.

• Winning Factor :

- New Relationship with Consulting Engineer

- Competitiveness

- Design Assistance

X 92

Page 62: Samsung sac global reference catalogue

62

Reference Site

Equipment Selection Image

Application Issue

Sun City Vacation Club

Residence

Project Sun City Vacation Club

Location North West Province (South Africa)

Date of Completion 2014

Size 500 HP

Value 0.4 M$

Classification Type Q’ty / HP

ODU FJM 7kw/10kw 110 HP

IDU Wall mount 43 ea

Control

X 142

• Vacation Time-Share Housing

• Winning Factor

- Relationship with Consulting Engineer

- Design Assistance

- Competitiveness (Budget Constraints)

Page 63: Samsung sac global reference catalogue

63

Reference Site

Equipment Selection Image

Application Issue

English Point Marina

Luxury Town Villa

Project English Point Marina

Location Mombasa, Kenya

Date of Completion 2011. May (Start)

Size 1056HP

Value $ 0.9 M

Classification Type Q’ty / HP

ODU DVM+4 1056HP

IDU 4Way CST, Duct, RAC 734 ea

Control S-NET 3

• Management of air conditioning system

- Integrated and centralized control system

- S-Net 3 : PC, Web based centralized control system

- Monitoring & Operation

• Cooling Efficiency

• Anti- Corrosion performance

Page 64: Samsung sac global reference catalogue

64

Reference Site

Equipment Selection Image

Application Issue

The Houghton

Exclusive Residence

Project The Houghton

Location Johannesburg, South Africa

Date of Completion 2012. Mar (Start)

Size 440 HP

Value $ 469 K

Classification Type Q’ty / HP

ODU DVM+4 HR 440HP

IDU Duct 198 ea

Control S-Net 3, DMS2

• PC based centralized control system

- S-Net 3 & DMS 2

- Function : Monitoring & operation

• Energy Efficiency of product

• Relationship with client.

• Design support

Page 65: Samsung sac global reference catalogue

65

Reference Site

Equipment Selection Image

Application Issue

Universal Plaza

Commercial Center

Project Universal Plaza

Location Gaborone, Botswana

Date of Completion 2012. Feb (Start)

Size 928 HP

Value $ 0.7 M

Classification Type Q’ty / HP

ODU DVM+4 928HP

IDU Big Duct, 4W CST 119 ea

Control

• Management of air conditioning system

- Simplified remote controller

• Interior design

- Compact ducted units

• Office Building + Shopping Mall

• Design support

Page 66: Samsung sac global reference catalogue

66

Reference Site

Equipment Selection Image

Application Issue

• Brand Value

• High Efficiency

•Technical Support

Key Tag

Project Tribe Hotel

Location Nairobi, Kenya

Date of Completion 2010

Size 137rooms, 450HP

Value $ 150 K

Classification Type Q’ty / HP

ODU DVM+2,3, Mini 450HP

IDU 4Way CST, Duct 160 ea

Control Wired remote controller, Key Tag

• Brand Value

• High Efficiency

• Technical Support

Tribe Hotel

Hotel

Page 67: Samsung sac global reference catalogue

67

5. South West Asia

Page 68: Samsung sac global reference catalogue

68

Reference Site

Equipment Selection Image

Application Issue

Project Yoo Pune

Location Pune in India

Date of Completion 2015 (under construction)

Size 6 buildings( total 228 flats)

Value 2.2M$ (partially bid)

Classification Type Q’ty / HP

ODU DVM S 4500HP

IDU 1Way Cassette

Control Individual control

• Client(Panchshil, developer) prefers Samsung 1way CST.

- Daikin also have 1way CST, but our design is better.

• The Client has been satisfied with previous site. (One North PJT)

- When claiming noise of 1 way CST, HQ visited site and changed S/W to reduce noise.

• CRM with client is good. (HQ directors and executives visited, and visited in Laxmi TF.)

Reason for win

19 floors & 38 flats each building

EON HADAPSAR YOO

Residential Apartment

GSBN ID: IN201305140031

Page 69: Samsung sac global reference catalogue

69

Reference Site

Equipment Selection Image

Application Issue

Project AAMBY VALLEY

Location Lonavala, Maharashtra

Date of Completion December 2014

Size 496 HP

Value 2 M$

Classification Type Q’ty / HP

ODU DVM S 26EA (16HP)

8EA (10HP)

IDU DUCTABLES 132

Control Individual control

• DVM S Technology - We presented DVM S PPT and had detailed discussion with M/s Aamby Valley team and we proved our technology

better than our competition.

• Site Inspections - We requested M/s Aamby Valley team to visit our installed and ongoing project sites in Pune and get the true feedback from

the End users. It has helped us a lot as all the Customer gave positive feedback specially Persistent Systems Ltd.

• Follow up - We have kept close watch on this BO continuously.

• Dealer Support - Dealer supported for Custom clearance and Import duty related concerns.

Aamby Valley City

Residential Apartment

GSBN ID: IN201401071127

Reason for win

Page 70: Samsung sac global reference catalogue

70

Reference Site

Equipment Selection Image

Application Issue

International City

Residential

Project International City

Location Gurugaon in India

Date of Completion 2015 (under construction)

Size 188 Villas

Value 2.3M$

Classification Type Q’ty / HP

ODU DVM S 3500HP

IDU MSP/HSP 760ea

Mini 4way 294

Control Individual control

• Solution: High efficiency & Prove our superiority over competitors

• Access: Making Sobha developer confident on in-house design team.

Customized control system on controllers for chairman house(special requirement of 16℃)

• Value : DVM S efficiency against other VRFs save electric charges

• Education : Requirements from client on design, approvals, expectation were taken well promptly.

※ This PJT is phase 1 and Phase 2(4M$) will be start in 2014.

GSBN ID: IN201210120011

Reason for win

Page 71: Samsung sac global reference catalogue

71

Reference Site

Equipment Selection Image

Application Issue

DLF Park Tower

Residential Apartment

Project DLF Park Tower, Park Height

Location Gurgaon, India

Date of Completion 2012

Size 1975 - 2704 Sq.Ft.

Value 4.3M$

Classification Type Q’ty / HP

ODU DVM PLUS III 1,611 EA

IDU 4 Way Cassette, RAC 10,018 EA

Control Wired Remote Controller

• Individual Control System

- Wired Remote Controller

• The Largest contract amount in India

Page 72: Samsung sac global reference catalogue

72

6. Latin America

Page 73: Samsung sac global reference catalogue

73

Reference Site

Equipment Selection Image

Application Issue

Novotel Manaus Hotel

Hotel

Project Novotel Manaus Hotel

Location Manaus, Brazil

Date of Completion 2013

Size

Value $ 400 K

Classification Type Q’ty / HP

ODU DVM+4 364HP

IDU EA

Control S-NET 3

• Management of air conditioning system

- Integrated and centralized control system

- S-Net 3 : PC, Web based centralized control system

- Monitoring & Operation

• Interior design

- Compact ducted units

Page 74: Samsung sac global reference catalogue

74

Reference Site

Equipment Selection Image

Application Issue

Mexico Secrets Hotel

Hotel

Project Mexico Secrets Hotel

Location Huatulco, Mexico

Date of Completion 2012

Size 25,000㎡ (1,100HP)

Value $750K

Classification Type Q’ty / HP

ODU DVM+2 38 EA / 1,100HP

IDU 4Way Cassette,

4Way Cassette (Interior) 658 EA

Control DMS2, S-NET 3

• Management of air conditioning system

- Integrated and centralized control system

- S-Net 3 : PC, Web based centralized control system

- Monitoring & Operation

• Interior design - 4Way Cassette (Interior)

• Long piping length design (Over 90m)

• Anti- Corrosion performance

Page 75: Samsung sac global reference catalogue

75

Reference Site

Equipment Selection Image

Application Issue

Project Marriot

Location Santiago, Chile

Date of Completion April 2014

Size 230 HP

Value Total 0.25 M$

Classification Type Q’ty / HP

ODU DVM S 20

IDU DUCTABLES 249

Control Central Control BMS.

• DVM S Technology – We presented DVM S PPT to Marriot representatives and they seemed to be pleased with the

reasonable price and top notch technology.

• Technical support – We have good reputation of high quality technical service and 10 years experience on AC business

and for that, other project leaders had recommend our brand to Marriot representatives.

Marriot Hotel

Hotel

Reason for win

GSBN ID: CL201401102979

Page 76: Samsung sac global reference catalogue

76

Reference Site

Equipment Selection Image

Application Issue

Project DRAGAMEX Offices

Location México City

Date of Completion November 2010

Size 700 m2

Value $36K USD

Classification Type Q’ty / HP

ODU DVM PLUS III 4

IDU High Wall

4 Way Cassette

40

8

Control Wireless Remote Controller

DRAGAMEX Offices

Office Building

• VRF system it's a European Concept and Samsung DVM provides to the customer more advantages (image,

dimension, energy saving) to the closer competitors.

• Samsung products quality is better than Chilled Water System (compressor, coils, piping distribution, etc.)

Reason for win

Page 77: Samsung sac global reference catalogue

77

Reference Site

Equipment Selection Image

Application Issue

Hotel West Colonia

Hotel

Project Hotel West Colonia

Location Colonia, Uruguay

Date of Completion 2011

Size 5,800 m2

Value $0.2M USD

Classification Type Q’ty / HP

ODU DVM plus IV 15

IDU Slim Duct

4 Way Cassette

114

25

Control Integrated Management System

• Samsung Products have a good design , image and elegance to the Hotel environment according to the architectural

design.

• Samsung products have a high technology focus in energy saving and environment cares.

Page 78: Samsung sac global reference catalogue

78

Reference Site

Equipment Selection Image

Application Issue

Hotel Orpheo

Hotel

Project Hotel Orpheo

Location Montevideo, Uruguay

Date of Completion 2012

Size 3,300 m2

Value $0.1M USD

Classification Type Q’ty / HP

ODU DVM plus IV 15

IDU Wall-mounted 108

Control Wireless remote controller

• VRF system it's a European Concept and Samsung DVM provides to the customer more advantages (image,

dimension, energy saving) to the closer competitors.

• Samsung products quality is better than Chilled Water System (compressor, coils, piping distribution, etc.)

Page 79: Samsung sac global reference catalogue

79

Reference Site

Equipment Selection Image

Application Issue

Building Puerto Punta

Residential Building

Project Building Puerto Punta

Location Maldonado, Uruguay

Date of Completion 2012

Size 7,500 m2

Value $0.2M USD

Classification Type Q’ty / HP

ODU DVM plus IV 15

IDU Slim Duct

Wall-mounted / 4Way

140

4 / 6

Control Wireless, Wired remote controller

• Samsung has better disign for this kind of building (elengant desing)

• Samsung products quality is better than Chilled Water System (compressor, coils, piping distribution, etc.)

Page 80: Samsung sac global reference catalogue

80

7. Korea

Page 81: Samsung sac global reference catalogue

81

Reference Site

Equipment Selection Image

Application Issue

SAMSUNG Electronics Semiconductor Research Center - DSR

Project SAMSUNG Electronics

DSR Project

Location Hwasung, Korea

Date of Completion 2014.1

Size 335,125㎡ (28F ~ B5F)

Value 20M$

• Solar, Geothermal, LED lighting, Eco-friendly, and

Renewable Energy Utilization • Energy-Saving Design : Partial Load by Use Zoning

• BEMS, FMS system applies

Office Building

• Application of Mixed HVAC in Office Building

- DVM : 52% (7,610RT included Geothermal 713RT)

- Absorption Chiller : 25% (4,000RT)

- Turbo Chiller : 23% (3,600RT)

Classification Type Q’ty / HP

ODU DVM Water II 328 EA

IDU 1Way CST, 4Way CST,

Slim Duct, MSP Duct, AHU 3,983 EA

Control BEMS, FMS

Page 82: Samsung sac global reference catalogue

82

Reference Site

Equipment Selection Image

Application Issue

SAMSUNG Electronics Research Center - R5

Project SAMSUNG Electronics

R5 Project

Location Suwon, Korea

Date of Completion 2013

Size 275,042㎡ (27F ~ B5F)

Value 16.5M$

• Solar, Geothermal, LED lighting, Eco-friendly, and

Renewable Energy Utilization • Energy-Saving Design : Partial Load by Use Zoning

• BEMS, FMS system applies

Office Building

• Application of Mixed HVAC in Office Building

- DVM : 58.1% (7,196RT)

- Absorption Chiller : 32.3% (4,000RT)

- Turbo Chiller : 9.7% (1,200RT)

Classification Type Q’ty / HP

ODU DVM Water II 273 EA

IDU 1Way CST, 4Way CST,

Slim Duct, MSP Duct, AHU 3,142 EA

Control BEMS, FMS

Page 83: Samsung sac global reference catalogue

83

Reference Site

Equipment Selection Image

Application Issue

SAMSUNG Electronics Seocho Office

Project SAMSUNG Electronics

Seocho Office

Location Seoul, Korea

Date of Completion 2008

Size 195,438㎡ (42F ~ B8F)

Value

• Management of air conditioning system

- Centralized controller

• Special room temperature control : 0.1℃ deviation

Office Building

• Application of Mixed HVAC in Office Building

- AHU : 60% (Central)

- DVM : 40% (Individual)

Classification Type Q’ty / HP

ODU DVM PLUS II / DVM Water 75 / 71EA

IDU LSP DUCT (11 ~14kW) 788 EA

Control BMS

Page 84: Samsung sac global reference catalogue

84

Reference Site

Equipment Selection Image

Application Issue

Yoksam K-Office

Project Yoksam K-Office

Location Seoul, Korea

Date of Completion 2013

Size 12,316㎡ (15F ~ B4F)

Value

• All SAC are controlled with DMS

• Apply the PDM kit, RL/RG stand 70m vertically. ODUs were installed on the roof.

Office Building

Classification Type Q’ty / HP

ODU DVM PLUS IV 79EA

IDU 1,4WAY / Duct 180 EA

Control DMS 2

Page 85: Samsung sac global reference catalogue

85

Reference Site

Equipment Selection Image

Application Issue

Tower Palace

Residential Complex

Project Tower Palace

Location Seoul, Korea

Date of Completion 2004

Size A group of Seven Towers

42-72 Floors

Value 39.4M$

Classification Type Q’ty / HP

ODU DVM 3,614 EA

IDU 1 Way, 4 Way CST, Duct 17,731 EA

Control Centralized Controller, DMS, S-Net 3

• Management of air conditioning system

- Integrated and centralized control system

- DMS : PC, Web based centralized control system

- Monitoring & Operation

• Specific air discharge structure for skyscrapers

• Minimize installation space

• Low-noise design

Page 86: Samsung sac global reference catalogue

86

Reference Site

Equipment Selection Image

Application Issue

Hannam The Hill Town

Project Hannam The Hill Town

Location Seoul, Korea

Date of Completion 2011

Size A group of 32 towers, 12 floors

Value -

• Management of air conditioning system

- Centralized controller

- Easy Control : Integrated home network

interlock with air-conditioner

Luxury Residential Apartment

• CFD analysis for indoor selection & location

Classification Type Q’ty / HP

ODU DVM PLUS IV / SLIM 442

IDU Cassette 2,950

Control Centralized controller, Home Network

Page 87: Samsung sac global reference catalogue

87

Reference Site

Equipment Selection Image

Application Issue

Songdo WorldMark

Residential Apartment

Project Songdo World Mark

Location In-cheon, Korea

Date of Completion 2010

Size A group of 10 towers,

45 floors

Value

Classification Type Q’ty / HP

ODU DVM Water, DVM+4 382

IDU 1 Way / 2 Way / 4 Way 2,388

Control Centralized controller, Home Network

• Management of air conditioning system

- Centralized controller

- Easy Control : Integrated home network

interlock with air-conditioner

Page 88: Samsung sac global reference catalogue

88

Reference Site

Equipment Selection Image

Application Issue

Soowan Noble Land 13 Block

Residential Apartment

Project Soowan Noble Land 13 Block

Location Gwang-ju, Korea

Date of Completion 2011

Size A group of 10 towers,

24 floors

Value

Classification Type Q’ty / HP

ODU DVM+4, DVM Home 659

IDU 1 Way / 2 Way / 4 Way 1,977

Control Centralized controller, Home Network

• Management of air conditioning system

- Centralized controller

- Easy Control : Integrated home network

interlock with air-conditioner

Page 89: Samsung sac global reference catalogue

89

Reference Site

Equipment Selection Image

Application Issue

Jong-am SK View

Residential Apartment

Project Jong-am SK View

Location Seoul, Korea

Date of Completion 2011

Size A group of 6 towers,

20 floors

Value

Classification Type Q’ty / HP

ODU DVM+4 272

IDU 1 Way / 2 Way / 4 Way 942

Control Centralized controller, Home Network

• Management of air conditioning system

- Centralized controller

- Easy Control : Integrated home network

interlock with air-conditioner

Page 90: Samsung sac global reference catalogue

90

Reference Site

Equipment Selection Image

Application Issue

High-1 Resort

Resort

Project High-1 Resort

Location Gangwon-do, Korea

Date of Completion 2010

Size A group of 10 towers,

45 floors

Value -

Classification Type Q’ty / HP

ODU DVM+3 , DVM SLIM 596

IDU 1Way / 2W / 4W / Duct 1,952

Control Room Controller

• Management of air conditioning system

- Wired remote controller

• Interior design

- Compact ducted units, Slim 1 Way Cassette

Page 91: Samsung sac global reference catalogue

91

Reference Site

Equipment Selection Image

Application Issue

Reesom Resort

Resort

Project Reesom Resort

Location Chung-cheong, Korea

Date of Completion 2011

Size 50 Private Villa & 1 Hotel Bidg.

Value -

Classification Type Q’ty / HP

ODU DVM+4 114

IDU 1Way / 2W / 4W / Duct 1,224

Control Room Controller

• Whole houses are equipped with SAC

• Management of air conditioning system

- Simplified remote controller

• Interior design

- Compact ducted units, Slim 1 Way Cassette

Page 92: Samsung sac global reference catalogue

92

Reference Site

Equipment Selection Image

Application Issue

Classification Type Q’ty / HP

ODU DVM PLUS IV 36

IDU Cassette 329

Control DMS 2 , S-NET3

Jongro Pagoda Eng Institute

Project Jongro Pagoda Eng Institute

Location Seoul, Korea

Date of Completion 2011

Size 14 floors

Value -

• PC based centralized control system

- S-Net 3 & DMS 2

- Function : Monitoring & operation

- Fully working during open hour (8AM ~ 10PM)

Commercial Building

Page 93: Samsung sac global reference catalogue

93

Reference Site

Equipment Selection Image

Application Issue

Classification Type Q’ty / HP

ODU DVM PLUS III 45

IDU Cassette 352

Control DMS

Jamsil Parkrio

Project Jamsil Parkrio

Location Seoul, Korea

Date of Completion July, 2008

Size 5 floors

Value 0.5M US$

• ODU Installation Space

- Group installation on the rooftop

Commercial Building

• Noise from ODU

- Installation of soundproofing walls

Page 94: Samsung sac global reference catalogue

94

Reference Site

Equipment Selection Image

Application Issue

Classification Type Q’ty / HP

ODU DVM S 437

IDU Cassette & Duct 1308

Control DMS

Lotte Premium Outlet(Shopping mall)

Project Lotte Premium Outlet

Location Gyeong-gi, Korea

Date of Completion 2013

Size 3 floors / 77,000m2

Value 437 EA( 6500HP )

• ODU Installation Space

- Group installation on the rooftop

Commercial Building

• Vapor injection technology for high heating

performance under low temperature

• Energy efficiency with high IPLV 6.6

Page 95: Samsung sac global reference catalogue

95

Reference Site

Equipment Selection Image

Application Issue

Classification Type Q’ty / HP

ODU DVM S 304

IDU Cassette & Duct 1198

Control DMS

Paju Premium Outlets(Shopping mall)

Project Paju Premium Outlet

Location Gyeng-gi, Korea

Date of Completion 2011

Size 4 floors / 4 blocks

Value 304 EA( 4256HP )

• ODU Installation Space

- Group installation on the rooftop

•Small outdoor unit installation space to save space cost

Commercial Building

• Individual control of 4way cassette louvers

• Long refrigerant piping for flexible design (piping

length 220m, level difference 110m)

Page 96: Samsung sac global reference catalogue

96

Reference Site

Equipment Selection Image

Application Issue

• Rain / Temperature / Humidity sensor for snow detecting

• DVM GEO + Hydro Unit(LT)

• Snow detecting on car entering gate and snow melting system

Raemian Gallery

Gallery

Classification Type Q’ty / HP

ODU DVM +4 23

IDU Cassette & Duct, AHU 97

Hydro Unit LT(Low Temperature) 10 HP

Control DMS BacNet, Wired remote, Central

Project Raemian Gallery

Location Moonjungdong Seoul in Korea

Date of Completion 2012. 7

Size 5 floors

Value

Page 97: Samsung sac global reference catalogue

97

8. China

Page 98: Samsung sac global reference catalogue

98

Reference Site

Equipment Selection Image

Application Issue

Classification Type Q’ty / HP

ODU DVM S 114

IDU Cassette & Duct 1710

Control DMS, S-Net 3

Changsha Greenland Plaza(No.5/6 Building)

Project Changsha Greenland Plaza

Location Changsha, Hunan Province

Date of Completion 2013

Size 33F,36F

Value 4320HP

• Installation of DVM S at middle floors

• Electricity billing system

Commercial Building

• Wide operation temperature range

(Cooling -15-54℃,Heating -23-29℃)

• Air-conditioning electricity billing system for tenants

Page 99: Samsung sac global reference catalogue

99

Reference Site

Equipment Selection Image

Application Issue

Classification Type Q’ty / HP

ODU DVM S 153

IDU Cassette & Duct 862

Control Wired remote control

Huasheng Advanced Business Park

Project Complex building

Location Chengdu, Sichuan Province

Date of Completion 2013

Size 20F

Value 2946HP

• Installation of DVM S and fresh air intake

unit every floor(4~20F)

Commercial Building

• Small installation area fit into machine room

• Sufficient external static pressure of 80Pa

suitable for small-sized machine room

Page 100: Samsung sac global reference catalogue

100

Reference Site

Equipment Selection Image

Application Issue

Image

Tianqi International Building

Classification Type Q’ty / HP

ODU DVM S 94EA / 4000HP

IDU 4Way CST, Duct 1524EA

Control S-Net 3

Project Tianjin, China

Location

Date of Completion

Size 53,000㎡ (25Floor)

Value 2M$

Commercial Building

• Long refrigerant piping for flexible design (piping length 220m, level difference 110m)

• Designed with Slim Duct indoor unit to install in the narrow ceiling space (199mm)

• Low indoor unit noise level(25dBA)

Page 101: Samsung sac global reference catalogue

101

Reference Site

Equipment Selection Image

Application Issue

Classification Type Q’ty / HP

ODU DVM S 63

IDU Cassette & Duct 351

Control DMS, S-Net 3

Hangzhou Wantong Center

Project Hangzhou Wantong Center

Location Gongshu District, Hangzhou City

Date of Completion 2013

Size 12020㎡ (17F,12F)

Value 1010HP

Commercial Building

• Installation of all DVM S units on middle floor for machine room

• Sufficient external static pressure of 80Pa to prevent short-circuit air flow in machine room

• Individual indoor unit control to prevent excessive cooling/heating in open space

Page 102: Samsung sac global reference catalogue

102

Reference Site

Equipment Selection Image

Application Issue

Classification Type Q’ty / HP

ODU DVM S 210

IDU Cassette & Duct 844

Control DMS, S-Net 3

Hangzhou Network Industry & Technology Park

Project Network Industry & Technology

Park

Location Bingjiang District, Hangzhou City

Date of Completion 2013

Size 47628㎡ (19F)

Value 3402HP

Commercial Building

• Installation of DVM S units on podium and rooftop

• Air ventilation using Fresh Air Intake units

• Vapor injection technology for high heating

• performance under low temperature

• Energy efficiency with high IPLV 6.6

Page 103: Samsung sac global reference catalogue

103

Reference Site

Equipment Selection Image

Application Issue

Qingdao Berlin New City Tower

Commercial Building

Classification Type Q’ty / HP

ODU DVM S 100

IDU Cassette & Duct 1006

Control DMS, S-Net 3

Project Qingdao Berlin New City Tower

Location Changjiang dong Street,

Qingdao City

Date of Completion 2013

Size

Value 3022HP

• Management of air conditioning system

- Integrated and centralized control system

- DMS : PC, Web based centralized control system

- Monitoring & Operation

Page 104: Samsung sac global reference catalogue

104

Reference Site

Equipment Selection Image

Application Issue

Classification Type Q’ty / HP

ODU DVM S 312

IDU Cassette & Duct 2056

Control DMS, S-Net 3

Project Tianrun Fuxi Dadao

Location Chaoyang District,

Beijing City

Date of Completion 2013

Size

Value 2216HP

Tianrun Fuxi Dadao, Beijing City

Commercial Building

• Installation of all DVM S units on middle floor

• Backup operation of outdoor unit under emergency status to continue operation

• Small outdoor unit installation space to save space cost

Page 105: Samsung sac global reference catalogue

105

Reference Site

Equipment Selection Image

Application Issue

Dayawan Technological Innovation Building

Office Building

Classification Type Q’ty / HP

ODU DVM S 40

IDU 660

Control Wired remote control

Project Dayawan Technological

Innovation Building

Location Huizhou, Guangdong Province

Date of Completion

Size 27,200㎡ (23F)

Value M$

• Installation of DVM S units on podium and rooftop

• Combination ratio of 120%

Page 106: Samsung sac global reference catalogue

106

Reference Site

Equipment Selection Image

Application Issue

Binhai International School

Education Building

Classification Type Q’ty / HP

ODU DVM S 25

IDU 4Way CST 120

Control Wired remote control

Project Binhai International School

Location Ningbo, Zhejiang Province

Date of Completion

Size 1,400㎡

Value M$

• Installation of DVM S units on rooftop of

• restaurant and office building

• Air ventilation using Fresh Air Intake units

• Air purification with anti-virus module

Page 107: Samsung sac global reference catalogue

107

Reference Site

Equipment Selection Image

Application Issue

Image

Lasa Hotel

Hotel

Classification Type Q’ty / HP

ODU DVM +3 994HP

IDU

Control

Project Tianjin, China

Location

Date of Completion

Size 30,933㎡

Value 0.6M$

• Management of air conditioning system

- Simplified remote controller

Page 108: Samsung sac global reference catalogue

108

Reference Site

Equipment Selection Image

Application Issue

Samsung Electronics Factory Building

Factory Building

Classification Type Q’ty / HP

ODU DVM S 47

IDU 4Way CST 273

Control Interlock control

Project Samsung Electronics Factory

Building

Location Tianjin

Date of Completion

Size 10,518㎡ (1072HP)

Value M$

• Installed in machine room on the ground floor

• Adaptive sine wave control technology to reduce harmonic noise

• Snow removal function

Page 109: Samsung sac global reference catalogue

109

Reference Site

Equipment Selection Image

Application Issue

Bo’ao Sports Center

Sports Center

• Installed in machine room on the ground floor

• Combination ratio of no greater than 110%

• Small installation area for good exterior view

Classification Type Q’ty / HP

ODU DVM 34

IDU AHU 247

Control Wired remote control

Project Samsung Electronics Factory

Building

Location Shaoxing, Zhejiang Province

Date of Completion

Size 12,712㎡ (908HP)

Value M$

Page 110: Samsung sac global reference catalogue

110

Reference Site

Equipment Selection Image

Application Issue

• Individual control of 4way cassette louvers

• RoHs certification for environment protection

Bridge Bray Industrial Park

Office Building

• Installation of DVM S units on rooftop

• Designed with ceiling concealed indoor units

• Combination ratio of no greater than 118%

Classification Type Q’ty / HP

ODU DVM S 87

IDU 4Way CST 910

Control Wired remote control

Project Bridge Bray Industrial Park

Location Ningbo, Zhejiang Province

Date of Completion

Size 18,200㎡ (1300HP)

Value M$

Page 111: Samsung sac global reference catalogue

111

Reference Site

Equipment Selection Image

Application Issue

Thank you