Samsung DLP Training 2007 - Orchid Stels
-
Upload
james-jackson -
Category
Documents
-
view
25 -
download
0
description
Transcript of Samsung DLP Training 2007 - Orchid Stels
![Page 1: Samsung DLP Training 2007 - Orchid Stels](https://reader034.fdocuments.net/reader034/viewer/2022042608/55cf8efe550346703b97d660/html5/thumbnails/1.jpg)
2007 DLP Orchid Chassis
HLT5076
HLT5676
HLT6176
![Page 2: Samsung DLP Training 2007 - Orchid Stels](https://reader034.fdocuments.net/reader034/viewer/2022042608/55cf8efe550346703b97d660/html5/thumbnails/2.jpg)
2
2007 DLP Model Comparison
HLT**87HLT**89
HLS5679HLT**76seriesHLT7288HLSHLT**65HLT**75
HLSModel #s
SlimNormalUltra SlimNormalNormalSlimNormalType
LED
K880L680K780K280K280K620K220Engine Series
6LED18.515.518.515.518.5C/Wheel/LED Sensor
50/56/61K856L850/56/61K772K8K346K5, 50/56K6K2/K3Cabinet
2006 Carryover
Yes
-
1080p
Constantine
New
Yes but not replaceable
Yes
1080p
Orchid
New
Yes
Yes
720p
Sunflower
New
Yes
-
720p
Cattleya Laurel
LampLamp
1080p720p
Smooth Picture Actuator
Dynamic Black
DMD Resolution 1080p1080p720P
GalileiEinstein
NoYesYes
New2006 Carryover2006 CarryoverComments
YesYes-
![Page 3: Samsung DLP Training 2007 - Orchid Stels](https://reader034.fdocuments.net/reader034/viewer/2022042608/55cf8efe550346703b97d660/html5/thumbnails/3.jpg)
3
Actuator
Light Engine
Projection Lens
Ultra Slim Light EngineTraditional Light Engine
K780 (Normal vs. Ultra Slim)
Light Engine Comparison
![Page 4: Samsung DLP Training 2007 - Orchid Stels](https://reader034.fdocuments.net/reader034/viewer/2022042608/55cf8efe550346703b97d660/html5/thumbnails/4.jpg)
4
Orchid Chassis Light Path
![Page 5: Samsung DLP Training 2007 - Orchid Stels](https://reader034.fdocuments.net/reader034/viewer/2022042608/55cf8efe550346703b97d660/html5/thumbnails/5.jpg)
5
Projector Cooling System
DMD-BOARD
Ultra Slim Light Engine Overhead View
![Page 6: Samsung DLP Training 2007 - Orchid Stels](https://reader034.fdocuments.net/reader034/viewer/2022042608/55cf8efe550346703b97d660/html5/thumbnails/6.jpg)
6
Lamp
Color wheel
Smooth picture
Dynamic black
DMD (xHD5)
M3 mirror
Projecting Lens
Light Source
M1 mirror
M4 mirror
M2 mirror
Light-tunnel
E1 lens E2/E3 lensE4 lens
Fold mirror
L1 lens
L2 lens
Projection Module
![Page 7: Samsung DLP Training 2007 - Orchid Stels](https://reader034.fdocuments.net/reader034/viewer/2022042608/55cf8efe550346703b97d660/html5/thumbnails/7.jpg)
7
Projection Light Path
![Page 8: Samsung DLP Training 2007 - Orchid Stels](https://reader034.fdocuments.net/reader034/viewer/2022042608/55cf8efe550346703b97d660/html5/thumbnails/8.jpg)
8
LAMP ASSY
Wall
Engine Layout
![Page 9: Samsung DLP Training 2007 - Orchid Stels](https://reader034.fdocuments.net/reader034/viewer/2022042608/55cf8efe550346703b97d660/html5/thumbnails/9.jpg)
9
Main PCB Block Diagram
![Page 10: Samsung DLP Training 2007 - Orchid Stels](https://reader034.fdocuments.net/reader034/viewer/2022042608/55cf8efe550346703b97d660/html5/thumbnails/10.jpg)
10
Clear QAM tuner• A Clear-QAM tuner allows you to tune in both analog and
digital cable signals, including the HD versions of major network channels like CBS and NBC. Basically these are unencrypted digital cable channels such as the HD versions of PBS, Fox, NBC, CBS and ABC.
• Depending on the cable provider you may also be able toview other digital stations using the Clear-QAM tuner.
• Understand that cable providers are not required to carry the HD versions of broadcast channels. They are only required to carry the analog versions by law.
• Additionally just because the signal is transmitted via cable doesn't mean it is always superior to the off the air signal with an antenna.
![Page 11: Samsung DLP Training 2007 - Orchid Stels](https://reader034.fdocuments.net/reader034/viewer/2022042608/55cf8efe550346703b97d660/html5/thumbnails/11.jpg)
11
S5H2201 Video Processor• Improved audio DSP, a programmable
video encoder with a dual output capability of interlaced and progressive scan
• Memory controller, – 4-channel Timers with PWM, I/O Ports, – 2-channel 8-bit ADCs, 5-channel 10-bit DACs, – 2-channel UARTs with handshake, – IIC-BUS interface, IIS-BUS interface, SIO,
USB Card Interface (WiseLink)
![Page 12: Samsung DLP Training 2007 - Orchid Stels](https://reader034.fdocuments.net/reader034/viewer/2022042608/55cf8efe550346703b97d660/html5/thumbnails/12.jpg)
12
SDP62 Scaler
4CH Input• CH1, CH2 : 30Bit (RGB, YCbCr4:4:4, 601,10Bit or 8Bit)• CH3 : 24Bit (RGB,YCbCr4:4:4 each 8bit, 601 10bit)• CH4 : 20Bit (Only 601 8Bit or 10Bit)• OSD InputOutput• Digital RGB (10Bit 444) Digital YCbCr(10Bit 444)• RGB/YCbCr 10bit OUTPUT @ CLK OUT Progressive S
can• RGB/YCbCr 20bit Even/Odd) OUTPUT Interlaced Scan
![Page 13: Samsung DLP Training 2007 - Orchid Stels](https://reader034.fdocuments.net/reader034/viewer/2022042608/55cf8efe550346703b97d660/html5/thumbnails/13.jpg)
13
Audio Signal Flow
L1/R1
L2/R2
SIDE-L/R
CO
MP1
L/R
CO
MP2
L/R
MAIN
-L
MAIN
-R
PC-L/R
DVI-L/R
MO
N-L/R
OU
T
X240_SR
X240_SL
X240H
_MC
LK
X240H
_LR
CL
KX
240H_SC
LK
X240H
_DA
TA A
TI_SPD
IF
I2S-DA
TA_A
MP
I2S-WS_A
MP
I2S-CLK
_AM
P
TU_SIF
HD
MI_L
RC
LK
HD
MI_SC
LK
HD
MI_D
AT
A
I2S_MC
LK
![Page 14: Samsung DLP Training 2007 - Orchid Stels](https://reader034.fdocuments.net/reader034/viewer/2022042608/55cf8efe550346703b97d660/html5/thumbnails/14.jpg)
14
DMD Board Block Diagram
![Page 15: Samsung DLP Training 2007 - Orchid Stels](https://reader034.fdocuments.net/reader034/viewer/2022042608/55cf8efe550346703b97d660/html5/thumbnails/15.jpg)
15
Service Adjustments• Index Delay• Actuator Gain• Focus• Tilt• V/H position• CCA (DMD <-> Digital)• Software Upgrade
![Page 16: Samsung DLP Training 2007 - Orchid Stels](https://reader034.fdocuments.net/reader034/viewer/2022042608/55cf8efe550346703b97d660/html5/thumbnails/16.jpg)
16
Remove the engine by pulling it out of the cabinet.Be careful when removing the Light Engine as it may getcaught up by the upper cable of the case.
4. Disconnect the lamp door switch cable
2. Disconnect the 12P PS cable, LVDS Cable and Ballast PS Cables.
3. Disconnect the 3P cable
1. Remove the four mounting screws and the vertical bar.
Removing the Light Engine
![Page 17: Samsung DLP Training 2007 - Orchid Stels](https://reader034.fdocuments.net/reader034/viewer/2022042608/55cf8efe550346703b97d660/html5/thumbnails/17.jpg)
17
Removing the Color Wheel
• Remove the lamp chimney• Remove the Ballast fan
housing• Remove the three screws
holding the C/W heat sink• The C/W gasket should
stay in place
![Page 18: Samsung DLP Training 2007 - Orchid Stels](https://reader034.fdocuments.net/reader034/viewer/2022042608/55cf8efe550346703b97d660/html5/thumbnails/18.jpg)
18
5. Remove the DMD board, then transfer the current DMD mirror chip to the new DMD board
4. Remove the seven point screws, do NOT remove the screws highlighted in yellow.
2. Remove the retaining spring and the heat sink.
3. Remove the four corner screws and the shield.
1. Remove the DMD Fan and disconnect the two fan drive connectors.
Removing the DMD Board
![Page 19: Samsung DLP Training 2007 - Orchid Stels](https://reader034.fdocuments.net/reader034/viewer/2022042608/55cf8efe550346703b97d660/html5/thumbnails/19.jpg)
19
OrchidChassis
Alignments
2007 DLP K780 Optical Engine _ HLT**76SX Series
![Page 20: Samsung DLP Training 2007 - Orchid Stels](https://reader034.fdocuments.net/reader034/viewer/2022042608/55cf8efe550346703b97d660/html5/thumbnails/20.jpg)
20
1) Shadow Inspection and light tunnel adjustments must be performedif necessary before the geometry adjustments.- Enter Factory mode -> DDP3021 ->Test Pattern -> Select
Raster White Pattern
Test Pattern
Shadow Defect
Shadow Defect
![Page 21: Samsung DLP Training 2007 - Orchid Stels](https://reader034.fdocuments.net/reader034/viewer/2022042608/55cf8efe550346703b97d660/html5/thumbnails/21.jpg)
21
Back Cover
Dust Cap
Shadow Adjustment Access
Remove the dust cap portal to view the screen from the inside
![Page 22: Samsung DLP Training 2007 - Orchid Stels](https://reader034.fdocuments.net/reader034/viewer/2022042608/55cf8efe550346703b97d660/html5/thumbnails/22.jpg)
22
2) Adjust Light Tunnel1) As shown in the left picture, adjust the light
tunnel and inspect the adjust condition.
2) To remove the right side Shadow, do the
following -
- Front Screw : Turn Right (CW)
3) To remove the upper side Shadow, do the
following –
- Rear Screw : Turn Right (CW)
Adjust the Light Tunnel
![Page 23: Samsung DLP Training 2007 - Orchid Stels](https://reader034.fdocuments.net/reader034/viewer/2022042608/55cf8efe550346703b97d660/html5/thumbnails/23.jpg)
23
Illumination Adjustment
![Page 24: Samsung DLP Training 2007 - Orchid Stels](https://reader034.fdocuments.net/reader034/viewer/2022042608/55cf8efe550346703b97d660/html5/thumbnails/24.jpg)
24
1) Shadow Inspection- Enter Factory -> Test Pattern -> Select White Pattern
2) Make sure to inspect the left bottom and right upper corner of thescreen for shadow defect.
Test Pattern
Right upper
Left bottom
Final Inspection
![Page 25: Samsung DLP Training 2007 - Orchid Stels](https://reader034.fdocuments.net/reader034/viewer/2022042608/55cf8efe550346703b97d660/html5/thumbnails/25.jpg)
25
1.Tilt Inspection – Bring up the internal tilt test patternEnter Factory mode (mute+182+Power) -> H/V Position -> Tilt Pattern
Tilt Pattern (Internal Pattern) Inspect the Tilt(with external Lionhead or Overscan pattern)
2) Tilt Specification
8 mm (.31”)7 mm (.27”)
Spec
61”*TOP Tilt : H1-H3 * BOTTOM TILT: H2-H4
50”,56”RemarkInch
Image Tilt InspectionThese adjustments muse be performed after the light tunnel adjustments and after the cabinet back is secured along with the rear cabinet braces.
![Page 26: Samsung DLP Training 2007 - Orchid Stels](https://reader034.fdocuments.net/reader034/viewer/2022042608/55cf8efe550346703b97d660/html5/thumbnails/26.jpg)
26
■Top Tilt Adjustment
Screw A : Fix Engine. B : Tilt Adjustment
1) Loosen Screw A at the 2 points shown. (outside screws)
2) Use Screw B to adjust Top Tilt
-B (Right) : Rotate CW -> Image Down
-B (Left ) : Rotate CCW -> Image Up
3) Reference the overscan test pattern to determine the correct adjustment. As shown in the figure below, align the green line to the cabinet bezel. (see spec pg. 20)
Left Right
4) Fix Screw A at the 2 points shown.
A B AB
Tilt Adjustment (Top Bowing)
![Page 27: Samsung DLP Training 2007 - Orchid Stels](https://reader034.fdocuments.net/reader034/viewer/2022042608/55cf8efe550346703b97d660/html5/thumbnails/27.jpg)
27
![Page 28: Samsung DLP Training 2007 - Orchid Stels](https://reader034.fdocuments.net/reader034/viewer/2022042608/55cf8efe550346703b97d660/html5/thumbnails/28.jpg)
28
![Page 29: Samsung DLP Training 2007 - Orchid Stels](https://reader034.fdocuments.net/reader034/viewer/2022042608/55cf8efe550346703b97d660/html5/thumbnails/29.jpg)
29
(Bottom Bowing Coarse Adjustment)First loosen the 2 screws as shown Fig #1.
If the bottom of the screen is bowing up, (In most cases)
- Insert a flat screwdriver above screw #1 as shown Fig #2.
- While applying upward force on the flat screwdriver handle (causing downward motion of screw #1 by rocking against cabinet), monitorbottom bowing on the screen and tighten screw #2 when straight.
If the bottom of the screen is bowing down,
- Insert a flat screwdriver under #1 as shown Fig #3..
- While applying downward force on the flat screwdriver handle (causing upward motion of screw #1 by rocking against cabinet), monitor bottom bowing on the screen and tighten screw #2 when straight.
1 2
Fig #1
Fig #2
Fig #3
Tilt Adjustment
![Page 30: Samsung DLP Training 2007 - Orchid Stels](https://reader034.fdocuments.net/reader034/viewer/2022042608/55cf8efe550346703b97d660/html5/thumbnails/30.jpg)
30
■Bottom Bowing Fine Adjust1) Loosen Screw A at 4 points as shown.
2) Rotate Screw B to adjust Bottom Tilt
-B (Right): Rotate CW -> Image Up
-B (Left) : Rotate CCW -> Image Down
3) Refer to the monoscope pattern to determine the correct adjustment. Asshown in the figure below, align thegreen line to the cabinet bezel.
4) Fix Screw A at the 4 points as shown.
Screw A : Fix Mirror B : Tilt Adjustment
CD
A A A A
BB
Tilt Adjustment Part 2
![Page 31: Samsung DLP Training 2007 - Orchid Stels](https://reader034.fdocuments.net/reader034/viewer/2022042608/55cf8efe550346703b97d660/html5/thumbnails/31.jpg)
1st : Measure inner Red box line2nd: Measure 2 end point of Red box for bottom and top side.3rd: Compare with the tilt specification
8 mm (.31”)
7 mm (.27”)
QC
61”
TOP TILT : H1-H3BOTTOM TILT: H2-H4
50”, 56”
Measuresize
Tilt Specifications
![Page 32: Samsung DLP Training 2007 - Orchid Stels](https://reader034.fdocuments.net/reader034/viewer/2022042608/55cf8efe550346703b97d660/html5/thumbnails/32.jpg)
8 mm (.31”)
7 mm (.27”)
QC
61”
LEFT KEYSTONE : V1-V2RIGHT KEYSTONE : V3-V4
50”, 56”
measuresize
1st : Measure inner Red box line2nd : Measure 2 end point of Red box for right and left side.3rd : Compare with the tilt specification
Keystone Specifications
![Page 33: Samsung DLP Training 2007 - Orchid Stels](https://reader034.fdocuments.net/reader034/viewer/2022042608/55cf8efe550346703b97d660/html5/thumbnails/33.jpg)
1st : Measure both 2 ends and center point (Top, Bottom or Sides)2nd: Connect both 2 ends and measure the distance to center point3rd : Compare with the tilt specification
Measure Center barrel (mm)5mm (.2”)50”
6mm (.24”)
5.5mm (.22”)
QC
61”
56”
MeasureSize
Barrel Specifications