Sample building energy performance proposal jan 2012

2
Fee Proposal Trading Name: Green Bridge Trading Address: 22 Norlington Road, London E11 4BG Registered Office: 16 Beaufort Court, Admirals Way Docklands, London E14 9XL Registered Name: Green Bridge Consultancy Limited Registered Number: 07699629 Date Incorporated: 11 July 2011 VAT Registration: 115 8381 16 www.greenbridgeservices.com Building Energy Performance Review Background This proposal has been prepared for Mr X of Y on date. It is based on the need to undertake energy performance analysis on properties in a country. Assuming that sufficient information was made available, a desktop study should be the first step in analysing performance. It would enable the x properties to be prioritised according to their energy performance. If this was the only criteria, the poorest performers (both offices and industrial) should be visited to establish exactly where the energy was being used and an action plan of initiatives devised for each one. Other factors may influence this prioritised list, such as property value, rental income potential and type/activity of the tenant. For instance, if the energy consumed was on tenant-specific processes there would be less scope to influence improvements to energy performance than if it was a energy used on the provision of building services such as air conditioning, lighting or heating. To adjust the prioritised list according to non-energy performance factors would depend on the availability of additional information, and/or discussions with the ‘agent’ to assess the level of importance they place on each building. Information requirements The following essential information would be required to create a prioritised energy performance list: Floor areas Building type (air conditioned office, naturally ventilated office, light/medium/heavy industrial building) Photographs (external and preferably internal as well) If energy performance certificates, boiler inspections and air conditioning inspections have been undertaken to comply with the energy performance of buildings directive, then these should be made available too. Scope of work: 1. Review quality and quantity of information provided 2. Calculate energy performance using KPIs 3. Produce prioritised list of buildings and summary report 4. Review list with client and adjust according to building importance and potential to affect change The UK’s Carbon Trust Energy Performance Indicators would form the basis for making the initial assessment and site-specific information could be incorporated to adjust the calculated performance. These KPIs are quite broad, but have been tried and tested over many years and would be acceptable in establishing the prioritised list.

description

 

Transcript of Sample building energy performance proposal jan 2012

Page 1: Sample building energy performance proposal jan 2012

Fee Proposal

Trading Name: Green Bridge Trading Address: 22 Norlington Road, London E11 4BG Registered Office: 16 Beaufort Court, Admirals Way Docklands, London E14 9XL Registered Name: Green Bridge Consultancy Limited Registered Number: 07699629 Date Incorporated: 11 July 2011 VAT Registration: 115 8381 16 www.greenbridgeservices.com

Building Energy Performance Review

Background This proposal has been prepared for Mr X of Y on date. It is based on the need to undertake energy performance analysis on properties in a country. Assuming that sufficient information was made available, a desktop study should be the first step in analysing performance. It would enable the x properties to be prioritised according to their energy performance. If this was the only criteria, the poorest performers (both offices and industrial) should be visited to establish exactly where the energy was being used and an action plan of initiatives devised for each one. Other factors may influence this prioritised list, such as property value, rental income potential and type/activity of the tenant. For instance, if the energy consumed was on tenant-specific processes there would be less scope to influence improvements to energy performance than if it was a energy used on the provision of building services such as air conditioning, lighting or heating. To adjust the prioritised list according to non-energy performance factors would depend on the availability of additional information, and/or discussions with the ‘agent’ to assess the level of importance they place on each building.

Information requirements The following essential information would be required to create a prioritised energy performance list:

Floor areas Building type (air conditioned office, naturally ventilated office, light/medium/heavy

industrial building) Photographs (external and preferably internal as well)

If energy performance certificates, boiler inspections and air conditioning inspections have been undertaken to comply with the energy performance of buildings directive, then these should be made available too.

Scope of work: 1. Review quality and quantity of information provided 2. Calculate energy performance using KPIs 3. Produce prioritised list of buildings and summary report 4. Review list with client and adjust according to building importance and potential to affect

change The UK’s Carbon Trust Energy Performance Indicators would form the basis for making the initial assessment and site-specific information could be incorporated to adjust the calculated performance. These KPIs are quite broad, but have been tried and tested over many years and would be acceptable in establishing the prioritised list.

Page 2: Sample building energy performance proposal jan 2012

Fee Proposal

Trading Name: Green Bridge Trading Address: 22 Norlington Road, London E11 4BG Registered Office: 16 Beaufort Court, Admirals Way Docklands, London E14 9XL Registered Name: Green Bridge Consultancy Limited Registered Number: 07699629 Date Incorporated: 11 July 2011 VAT Registration: 115 8381 16 www.greenbridgeservices.com

Fees Action Fee (ex VAT)

Review quality and quantity of information provided for 33 properties £x

Calculate energy performance using KPIs for 33 properties £x

Produce prioritised list of buildings and summary report £x

Review list with client and adjust according to building importance and potential to affect change

£x

Total £x