13
CP-FLS-6 STRUCTURAL WORKS (CONCRETING) FAIRVIEW TERRACES (PITTSBURGH)

Transcript of Sample Bidcom Presentation - Structural Works 12-28-11

Page 1: Sample Bidcom Presentation - Structural Works 12-28-11

• CP-FLS-6 STRUCTURAL WORKS (CONCRETING)

FAIRVIEW TERRACES (PITTSBURGH)

Page 2: Sample Bidcom Presentation - Structural Works 12-28-11

STRUCTURAL WORKS DIVIDED INTO THREE (3) AREAS

1: RETAIL AREA 12: RETAIL AREA 23: PARKING

3

1

2

Page 3: Sample Bidcom Presentation - Structural Works 12-28-11

Bidders History

LIST OF APPROVED BIDDERS1. ALLAN2. CHRIS3. JOHN4. DINKAR5. ROB

LIST OF BIDDERS WHO DECLINED1. ROLANDO2. JOSE

Page 4: Sample Bidcom Presentation - Structural Works 12-28-11

Bid Abstract RETAIL AREA 1

Rob, Dinkar & Chris are considered for negotiation.

 ALLAN   CHRIS   JOHN   DINKAR   ROB 

A RETAIL AREA 1

I. PRELIMINARIES 18.61 11.47 10.00 5.45 4.10 12.54

II SITE WORKGravel Bedding (100mm) 10.72 2.39 1.53 2.84 1.41 1.21

III CONCRETE REINFORCEMEN 25.36 21.73 25.36 24.05 20.65 25.75

IVCAST IN PLACE CONCRETE (MDC SUPPLPIED)

11.70 9.59 17.01 13.23 8.87 7.66

V CONCRETE FORMS 94.14 52.84 35.23 26.93 31.71 36.99VI CONCRETE ACCESSORIES 3.63 7.83 2.55 7.33 3.22 5.39VII CONCRETE FINISHES 0.86 1.25 1.21 2.71 1.43 1.14VIII SUNDRIES 0.50

Total Amount 165.020     107.100     93.390       82.540       71.390       90.68 Variance from Lowest Bidd 93.630       35.710       22.000       11.150       ‐            % Variance 131.15% 50.02% 30.82% 15.62% 0.00%

(74.340) (16.420) (2.710) 8.140 19.290 81.98% 18.11% 2.99% -8.98% -21.27%

BUDGETITEM WORK DESCRIPTION

BIDDER'S PROPOSAL

VARIANCE

Page 5: Sample Bidcom Presentation - Structural Works 12-28-11

Bid Abstract RETAIL AREA 2

Rob, Dinkar & John are considered for negotiation.

  ALLAN     CHRIS     JOHN     DINKAR     ROB  

B RETAIL AREA 2

I. PRELIMINARIES 18.61 8.66 8.50 5.30 4.11 10.34

II SITE WORKGravel Bedding (100mm) 8.09 1.81 1.19 2.14 1.09 0.91

III CONCRETE REINFORCEMEN 19.13 16.40 19.13 18.14 15.58 19.43

IVCAST IN PLACE CONCRETE (MDC SUPPLPIED) 8.82 7.23 12.83 9.98 6.69 5.78

V CONCRETE FORMS  71.23 39.86 26.58 20.32 23.92 27.9VI CONCRETE ACCESSORIES 2.86 5.91 1.92 5.64 2.45 4.07VII CONCRETE FINISHES 0.64 0.94 0.91 2.04 1.08 0.86VIII SUNDRIES 0.50

Total Amount 129.380     80.810       71.560       63.560       54.920       69.29 Variance from Lowest Bidd 74.460       25.890       16.640       8.640         ‐            % Variance 135.58% 47.14% 30.30% 15.73% 0.00%

(60.090) (11.520) (2.270) 5.730 14.370 86.72% 16.63% 3.28% -8.27% -20.74%

BUDGETITEM WORK DESCRIPTION

BIDDER'S PROPOSAL

VARIANCE

Page 6: Sample Bidcom Presentation - Structural Works 12-28-11

Bid Abstract PARKING

Rob Dinkar & John are considered for negotiation.

  ALLAN     CHRIS     JOHN     DINKAR     ROB  

C PARKING

I. PRELIMINARIES 18.61 8.08 5.36 9.00 4.11 10.00

II SITE WORKGravel Bedding (100mm) 8.99 1.94 2.52 1.37 1.26 1.07

III CONCRETE REINFORCEMEN 13.51 11.58 12.98 13.51 11.00 13.72

IVCAST IN PLACE CONCRETE (MDC SUPPLPIED) 6.59 5.40 7.49 9.59 5.00 4.32

V CONCRETE FORMS  57.93 27.44 13.16 18.29 16.46 19.2VI CONCRETE ACCESSORIES 1.69 3.75 2.96 1.07 1.70 2.13VII CONCRETE FINISHES 7.41 15.78 24.00 10.45 12.64 9.97VIII PRECAST CONCRETE 1.53 1.44 2.70 3.05 0.35 1.3IX SUNDRIES 1.00

Total Amount 116.260     75.410       71.170       67.330       52.522       61.71 Variance from Lowest Bidd 63.738       22.888       18.648       14.808       ‐            % Variance 121.35% 43.58% 35.51% 28.19% 0.00%

(54.550) (13.700) (9.460) (5.620) 9.188 88.40% 22.20% 15.33% 9.11% -14.89%

BUDGETITEM WORK DESCRIPTIONBIDDER'S PROPOSAL

VARIANCE

Page 7: Sample Bidcom Presentation - Structural Works 12-28-11

1.0  RETAIL AREA 1

I. PRELIMINARIES 18.61 11.47 10.00 5.45 4.10 9.00 12.54

II SITE WORKGravel Bedding (100mm) 10.72 2.39 1.53 2.84 1.41 0.99 1.21

III CONCRETE REINFORCEMENT 25.36 21.73 25.36 24.05 20.65 18.11 25.75

IV CAST IN PLACE CONCRETE (MD 11.70 9.59 17.01 13.23 8.87 7.44 7.66

VCONCRETE FORMS & ACCESSORIES

94.14 52.84 35.23 26.93 31.71 36.40 36.99

VI CONCRETE ACCESSORIES 3.63 7.83 2.55 7.33 3.22 2.18 5.39

VII CONCRETE FINISHES 0.86 1.25 1.21 2.71 1.43 0.97 1.14

VIII SUNDRIES 0.50Total Amount 165.02 107.10 93.39 82.54 71.39 75.09 90.68

-74.340 -16.420 -2.710 8.140 19.290 15.590-82% -18% -3% 9% 21% 17%

ITEM WORK DESCRIPTION BUDGETCHRIS ABC EVALUATION

ALLAN DINKARJOHN ROB

VARIANCE

Evaluation: RETAIL AREA 1

Page 8: Sample Bidcom Presentation - Structural Works 12-28-11

ALLAN CHRIS JOHN DINKAR ROB

2.0  RETAIL AREA 2

I. PRELIMINARIES 18.61 8.66 8.50 5.30 4.11 9.00 10.34

II SITE WORKGravel Bedding (100mm) 8.09 1.81 1.19 2.14 1.09 0.74 0.91

III CONCRETE REINFORCEMENT 19.13 16.40 19.13 18.14 15.58 13.66 19.43

IV CAST IN PLACE CONCRETE (MD 8.82 7.23 12.83 9.98 6.69 5.61 5.78

VCONCRETE FORMS & ACCESSORIES

71.23 39.86 26.58 20.32 23.92 27.46 27.90

VI CONCRETE ACCESSORIES 2.86 5.91 1.92 5.64 2.45 1.65 4.07

VII CONCRETE FINISHES 0.64 0.94 0.91 2.04 1.08 0.73 0.86

VIII SUNDRIES 0.50Total Amount 129.38 80.81 71.56 63.56 54.92 58.85 69.29

-60.090 -11.520 -2.270 5.730 14.370 10.440-87% -17% -3% 8% 21% 15%

ITEM WORK DESCRIPTION BUDGETABC EVALUATION

VARIANCE

Evaluation: RETAIL AREA 2

Page 9: Sample Bidcom Presentation - Structural Works 12-28-11

ALLAN CHRIS JOHN DINKAR ROB

3.0  PARKING

I. PRELIMINARIES 18.61 ` 5.36 9.00 4.11 9.00 10.00

II SITE WORKGravel Bedding (100mm) 8.99 1.94 2.52 1.37 1.26 0.87 1.07

III CONCRETE REINFORCEMENT 13.51 11.58 12.98 13.51 11.00 9.65 13.72

IV CAST IN PLACE CONCRETE (MD 6.59 5.41 7.49 9.59 5.00 3.91 4.32

VCONCRETE FORMS & ACCESSORIES

57.93 27.44 13.16 18.29 16.46 18.90 19.20

VI CONCRETE ACCESSORIES 1.69 3.75 2.96 1.07 1.70 0.87 2.13

VII CONCRETE FINISHES 7.41 15.78 24.00 10.45 12.64 7.32 9.97

VIII PRECAST CONCRETE 1.53 1.44 2.70 3.05 0.35 0.58 1.30

IX SUNDRIES 1.00Total Amount 116.26 67.34 71.17 67.33 52.52 51.10 61.71

-54.550 -5.630 -9.460 -5.620 9.188 10.610-88% -9% -15% -9% 15% 17%

ITEM WORK DESCRIPTION BUDGETABC EVALUATION

VARIANCE

Evaluation: PARKING

Page 10: Sample Bidcom Presentation - Structural Works 12-28-11

SUMMARY

ITEM AREA BUDGET ALLAN CHRIS JOHN DINKAR ROB ABC EVALUATION

I. RETAIL AREA 1 90.68 165.29    107.12    93.38      82.55      71.40      75.09                II. RETAIL AREA 2 69.29 129.39    80.81      71.56      63.57      54.92      58.86                

159.970  294.680  187.930  164.940  146.120  126.320  133.950            

III. PARKING 61.71 116.26    75.41      67.34      71.18      52.53      51.10                

61.710    116.260  75.410    67.340    71.180    52.530    51.100              

221.680  410.940  263.340  232.280  217.300  178.850  185.050            GRAND TOTAL AMOUNT

Total Amount RETAIL

Total Amount PARKING

Page 11: Sample Bidcom Presentation - Structural Works 12-28-11

Negotiation Points:

Negotiate for ABC rates

Recommendation: ROB, DINKAR & JOHN considered for negotiation.

Page 12: Sample Bidcom Presentation - Structural Works 12-28-11

Benchmark

Description Unit KSP BLDG K 

DLM MDC 

EvaluationRemarks

CONCRETING WORKSSupply & Installation of FormworksShear Wall sq.m 580.00                 580.00      ADV Unit RateRC Stair sq.m 580.00                 580.00      ADV Unit RateSuspended Slab sq.m 580.00                 580.00      ADV Unit RateCAST IN PLACE CONCRETESlab on Grade cu.m 350.00                 350.00      ADV Unit RateShear Wall cu.m 350.00                 350.00      ADV Unit RateRC Stair cu.m 350.00                 350.00      ADV Unit RateSuspended Slab cu.m 350.00                 350.00      ADV Unit RateBeam & Girder cu.m 350.00                 350.00      ADV Unit RateRetaining Wall cu.m 350.00                 350.00      ADV Unit Rate

Page 13: Sample Bidcom Presentation - Structural Works 12-28-11

END OF PRESENTATION

THANK YOU!