• CP-FLS-6 STRUCTURAL WORKS (CONCRETING)
FAIRVIEW TERRACES (PITTSBURGH)
STRUCTURAL WORKS DIVIDED INTO THREE (3) AREAS
1: RETAIL AREA 12: RETAIL AREA 23: PARKING
3
1
2
Bidders History
LIST OF APPROVED BIDDERS1. ALLAN2. CHRIS3. JOHN4. DINKAR5. ROB
LIST OF BIDDERS WHO DECLINED1. ROLANDO2. JOSE
Bid Abstract RETAIL AREA 1
Rob, Dinkar & Chris are considered for negotiation.
ALLAN CHRIS JOHN DINKAR ROB
A RETAIL AREA 1
I. PRELIMINARIES 18.61 11.47 10.00 5.45 4.10 12.54
II SITE WORKGravel Bedding (100mm) 10.72 2.39 1.53 2.84 1.41 1.21
III CONCRETE REINFORCEMEN 25.36 21.73 25.36 24.05 20.65 25.75
IVCAST IN PLACE CONCRETE (MDC SUPPLPIED)
11.70 9.59 17.01 13.23 8.87 7.66
V CONCRETE FORMS 94.14 52.84 35.23 26.93 31.71 36.99VI CONCRETE ACCESSORIES 3.63 7.83 2.55 7.33 3.22 5.39VII CONCRETE FINISHES 0.86 1.25 1.21 2.71 1.43 1.14VIII SUNDRIES 0.50
Total Amount 165.020 107.100 93.390 82.540 71.390 90.68 Variance from Lowest Bidd 93.630 35.710 22.000 11.150 ‐ % Variance 131.15% 50.02% 30.82% 15.62% 0.00%
(74.340) (16.420) (2.710) 8.140 19.290 81.98% 18.11% 2.99% -8.98% -21.27%
BUDGETITEM WORK DESCRIPTION
BIDDER'S PROPOSAL
VARIANCE
Bid Abstract RETAIL AREA 2
Rob, Dinkar & John are considered for negotiation.
ALLAN CHRIS JOHN DINKAR ROB
B RETAIL AREA 2
I. PRELIMINARIES 18.61 8.66 8.50 5.30 4.11 10.34
II SITE WORKGravel Bedding (100mm) 8.09 1.81 1.19 2.14 1.09 0.91
III CONCRETE REINFORCEMEN 19.13 16.40 19.13 18.14 15.58 19.43
IVCAST IN PLACE CONCRETE (MDC SUPPLPIED) 8.82 7.23 12.83 9.98 6.69 5.78
V CONCRETE FORMS 71.23 39.86 26.58 20.32 23.92 27.9VI CONCRETE ACCESSORIES 2.86 5.91 1.92 5.64 2.45 4.07VII CONCRETE FINISHES 0.64 0.94 0.91 2.04 1.08 0.86VIII SUNDRIES 0.50
Total Amount 129.380 80.810 71.560 63.560 54.920 69.29 Variance from Lowest Bidd 74.460 25.890 16.640 8.640 ‐ % Variance 135.58% 47.14% 30.30% 15.73% 0.00%
(60.090) (11.520) (2.270) 5.730 14.370 86.72% 16.63% 3.28% -8.27% -20.74%
BUDGETITEM WORK DESCRIPTION
BIDDER'S PROPOSAL
VARIANCE
Bid Abstract PARKING
Rob Dinkar & John are considered for negotiation.
ALLAN CHRIS JOHN DINKAR ROB
C PARKING
I. PRELIMINARIES 18.61 8.08 5.36 9.00 4.11 10.00
II SITE WORKGravel Bedding (100mm) 8.99 1.94 2.52 1.37 1.26 1.07
III CONCRETE REINFORCEMEN 13.51 11.58 12.98 13.51 11.00 13.72
IVCAST IN PLACE CONCRETE (MDC SUPPLPIED) 6.59 5.40 7.49 9.59 5.00 4.32
V CONCRETE FORMS 57.93 27.44 13.16 18.29 16.46 19.2VI CONCRETE ACCESSORIES 1.69 3.75 2.96 1.07 1.70 2.13VII CONCRETE FINISHES 7.41 15.78 24.00 10.45 12.64 9.97VIII PRECAST CONCRETE 1.53 1.44 2.70 3.05 0.35 1.3IX SUNDRIES 1.00
Total Amount 116.260 75.410 71.170 67.330 52.522 61.71 Variance from Lowest Bidd 63.738 22.888 18.648 14.808 ‐ % Variance 121.35% 43.58% 35.51% 28.19% 0.00%
(54.550) (13.700) (9.460) (5.620) 9.188 88.40% 22.20% 15.33% 9.11% -14.89%
BUDGETITEM WORK DESCRIPTIONBIDDER'S PROPOSAL
VARIANCE
1.0 RETAIL AREA 1
I. PRELIMINARIES 18.61 11.47 10.00 5.45 4.10 9.00 12.54
II SITE WORKGravel Bedding (100mm) 10.72 2.39 1.53 2.84 1.41 0.99 1.21
III CONCRETE REINFORCEMENT 25.36 21.73 25.36 24.05 20.65 18.11 25.75
IV CAST IN PLACE CONCRETE (MD 11.70 9.59 17.01 13.23 8.87 7.44 7.66
VCONCRETE FORMS & ACCESSORIES
94.14 52.84 35.23 26.93 31.71 36.40 36.99
VI CONCRETE ACCESSORIES 3.63 7.83 2.55 7.33 3.22 2.18 5.39
VII CONCRETE FINISHES 0.86 1.25 1.21 2.71 1.43 0.97 1.14
VIII SUNDRIES 0.50Total Amount 165.02 107.10 93.39 82.54 71.39 75.09 90.68
-74.340 -16.420 -2.710 8.140 19.290 15.590-82% -18% -3% 9% 21% 17%
ITEM WORK DESCRIPTION BUDGETCHRIS ABC EVALUATION
ALLAN DINKARJOHN ROB
VARIANCE
Evaluation: RETAIL AREA 1
ALLAN CHRIS JOHN DINKAR ROB
2.0 RETAIL AREA 2
I. PRELIMINARIES 18.61 8.66 8.50 5.30 4.11 9.00 10.34
II SITE WORKGravel Bedding (100mm) 8.09 1.81 1.19 2.14 1.09 0.74 0.91
III CONCRETE REINFORCEMENT 19.13 16.40 19.13 18.14 15.58 13.66 19.43
IV CAST IN PLACE CONCRETE (MD 8.82 7.23 12.83 9.98 6.69 5.61 5.78
VCONCRETE FORMS & ACCESSORIES
71.23 39.86 26.58 20.32 23.92 27.46 27.90
VI CONCRETE ACCESSORIES 2.86 5.91 1.92 5.64 2.45 1.65 4.07
VII CONCRETE FINISHES 0.64 0.94 0.91 2.04 1.08 0.73 0.86
VIII SUNDRIES 0.50Total Amount 129.38 80.81 71.56 63.56 54.92 58.85 69.29
-60.090 -11.520 -2.270 5.730 14.370 10.440-87% -17% -3% 8% 21% 15%
ITEM WORK DESCRIPTION BUDGETABC EVALUATION
VARIANCE
Evaluation: RETAIL AREA 2
ALLAN CHRIS JOHN DINKAR ROB
3.0 PARKING
I. PRELIMINARIES 18.61 ` 5.36 9.00 4.11 9.00 10.00
II SITE WORKGravel Bedding (100mm) 8.99 1.94 2.52 1.37 1.26 0.87 1.07
III CONCRETE REINFORCEMENT 13.51 11.58 12.98 13.51 11.00 9.65 13.72
IV CAST IN PLACE CONCRETE (MD 6.59 5.41 7.49 9.59 5.00 3.91 4.32
VCONCRETE FORMS & ACCESSORIES
57.93 27.44 13.16 18.29 16.46 18.90 19.20
VI CONCRETE ACCESSORIES 1.69 3.75 2.96 1.07 1.70 0.87 2.13
VII CONCRETE FINISHES 7.41 15.78 24.00 10.45 12.64 7.32 9.97
VIII PRECAST CONCRETE 1.53 1.44 2.70 3.05 0.35 0.58 1.30
IX SUNDRIES 1.00Total Amount 116.26 67.34 71.17 67.33 52.52 51.10 61.71
-54.550 -5.630 -9.460 -5.620 9.188 10.610-88% -9% -15% -9% 15% 17%
ITEM WORK DESCRIPTION BUDGETABC EVALUATION
VARIANCE
Evaluation: PARKING
SUMMARY
ITEM AREA BUDGET ALLAN CHRIS JOHN DINKAR ROB ABC EVALUATION
I. RETAIL AREA 1 90.68 165.29 107.12 93.38 82.55 71.40 75.09 II. RETAIL AREA 2 69.29 129.39 80.81 71.56 63.57 54.92 58.86
159.970 294.680 187.930 164.940 146.120 126.320 133.950
III. PARKING 61.71 116.26 75.41 67.34 71.18 52.53 51.10
61.710 116.260 75.410 67.340 71.180 52.530 51.100
221.680 410.940 263.340 232.280 217.300 178.850 185.050 GRAND TOTAL AMOUNT
Total Amount RETAIL
Total Amount PARKING
Negotiation Points:
Negotiate for ABC rates
Recommendation: ROB, DINKAR & JOHN considered for negotiation.
Benchmark
Description Unit KSP BLDG K
DLM MDC
EvaluationRemarks
CONCRETING WORKSSupply & Installation of FormworksShear Wall sq.m 580.00 580.00 ADV Unit RateRC Stair sq.m 580.00 580.00 ADV Unit RateSuspended Slab sq.m 580.00 580.00 ADV Unit RateCAST IN PLACE CONCRETESlab on Grade cu.m 350.00 350.00 ADV Unit RateShear Wall cu.m 350.00 350.00 ADV Unit RateRC Stair cu.m 350.00 350.00 ADV Unit RateSuspended Slab cu.m 350.00 350.00 ADV Unit RateBeam & Girder cu.m 350.00 350.00 ADV Unit RateRetaining Wall cu.m 350.00 350.00 ADV Unit Rate
END OF PRESENTATION