SAIPEM Technology Requirements - citeph.fr 2017.pdf · Paris, 16th January 2017 2 Saipem Technology...

6
SAIPEM Technology Requirements CITEPH 11 th Call for Project Paris, 16 th January 2017

Transcript of SAIPEM Technology Requirements - citeph.fr 2017.pdf · Paris, 16th January 2017 2 Saipem Technology...

SAIPEM Technology RequirementsCITEPH 11th Call for ProjectParis, 16th January 2017

2Paris, 16th January 2017

Saipem Technology RequirementsSaipem in brief

Engineering & Construction Drilling

Offshore pipe laying

Offshore Works

OnshorePlants

Onshorepipe laying

FloatingPlatforms

Offshore drilling

Onshoredrilling

10,5 B$ revenues - 13,9 B$ Blacklog - 41 000 Staff in 60 countries - 9 fabrication Yards -20 engineering and project centers

OnshorePlants

Onshorepipe laying

Offshore drilling

Onshoredrilling

3Paris, 16th January 2017

Saipem Technology RequirementsSubjects of interest

Subsea Risers Umbilicals& Flowlines Welding Non-Destructive Testing Polymer coating Pipeline cladding Insulation materials Deepwater buoyancy Active heating Monitoring

Floating Offshore Weather downtime Surveying Anchoring systems Execution time reduction Process intensification Energy efficiency Heat exchangers Compact separation LNG safety

Subsea Technology Compact separation Water treatment Chemical handling Sand & scale handling Quality sensors Module handling Power distribution Subsea connectors Data management Life of Field Subsea Robotics

4Paris, 16th January 2017

Saipem Technology RequirementsSubjects of interest

Subsea Risers Umbilicals& Flowlines Welding Non-Destructive Testing Polymer coating Pipeline cladding Insulation materials Deepwater buoyancy Active heating Monitoring

Floating Offshore Weather downtime Surveying Anchoring systems Execution time reduction Process intensification Energy efficiency Heat exchangers Compact separation LNG safety

Subsea Technology Compact separation Water treatment Chemical handling Sand & scale handling Quality sensors Module handling Power distribution Subsea connectors Data management Life of Field Subsea Robotics

5Paris, 16th January 2017

Technology NeedsObjectives

1. reduce project costs

2. decrease project risks

3. increase project valueCITEPH N° Leader Description Increased Value

CITEPH-42-2014 BS COATING Development of a monolayer epoxy field joint coating pipeline systems

CITEPH-13-2015 CEMENTYS Development and qualification of a Fiber Optics Sensor riser monitoring

CITEPH-23-2017 ACOEM definition of a Health and Usage Monitoring System Life prediction

Année Leader Description Cost reduction

CITEPH-17-2016 SUBSEA TECHdevelopment of an Unmanned Surface Vehicle capable of deploying and inspection call Remotely-Operated Vehicle

increase efficiency of ROV operations

CITEPH-20-2017 SINGULARITY INSIGHT

development head high handless communication device with remotely located experts

increase maintenance efficiency

CITEPH-07-2017 PRINCIPIAConception of a mooring system where wire cables are directly connected to a floating unit

decrease anchoringinstallation costs

CITEPH N° Leader Description Risk reductionCITEPH-40-2014 HYDROCEAN Development of a calculation code to simulate heavy parcel lifting heavy lifts

CITEPH-07-2015 CERGExperimental study of vertical upward two-phase flows

severe slugging

CITEPH-11-2015 IFREMER predict the lifetime of synthetic fibre ropes cycling over sheaves. installation

CITEPH-32-2016 ACTIMAR multivariate analysis methods of Metocean parameters weather downtime

CITEPH-05-2017 PRINCIPIAstudy of Vortex Induced Vibrations and Wake Induced Oscillations interactions riser design

CITEPH-09-2017 VIBRATEC Study of Acoustic-Induced Vibrations flare system design

6Paris, 16th January 2017 6Paris, 16th January 2017

Selection Criterias:

• Relevance to Saipem business• Potential• Maturity : proven concept (TRL>4) • Short Duration (1-2 years)• Limited Budget (200-400 k€)

Contact :

Thierry DelahayeInnovation & Technology Development

+ 33 1 61 37 64 [email protected]