Safety Driven Performance Conference 2013 Next Generation Capstone RBMI Jarret Reeves Asset...

11
Safety Driven Performance Conference 2013 Next Generation Capstone RBMI Jarret Reeves Asset Integrity Systems Product Manager Lloyd’s Register Technical Services October 10, 2013

Transcript of Safety Driven Performance Conference 2013 Next Generation Capstone RBMI Jarret Reeves Asset...

Page 1: Safety Driven Performance Conference 2013 Next Generation Capstone RBMI Jarret Reeves Asset Integrity Systems Product Manager Lloyd’s Register Technical.

Safety Driven Performance Conference 2013

Next Generation Capstone RBMI

Jarret ReevesAsset Integrity Systems Product ManagerLloyd’s Register Technical Services

October 10, 2013

Page 2: Safety Driven Performance Conference 2013 Next Generation Capstone RBMI Jarret Reeves Asset Integrity Systems Product Manager Lloyd’s Register Technical.

Safety Driven Performance Conference 2013

Agenda

• State of the Union• Goals of the Next Generation• Next Generation Product Overview Capabilities• Proof of Concept• LR Next Steps• Open the floor for feedback

Page 3: Safety Driven Performance Conference 2013 Next Generation Capstone RBMI Jarret Reeves Asset Integrity Systems Product Manager Lloyd’s Register Technical.

Safety Driven Performance Conference 2013

State of Union (What we’ve done since we last met)• Defined the Capstone RBI replacement feature set and improvements• Defined the broad modular/APM requirements• Understood our biggest technical challenges and executed Proof of

Concept (PoC)

Page 4: Safety Driven Performance Conference 2013 Next Generation Capstone RBMI Jarret Reeves Asset Integrity Systems Product Manager Lloyd’s Register Technical.

Safety Driven Performance Conference 2013

Goals of the Next Generation

• Broader Asset Performance Management Toolset• Open architecture for plugging in new technologies• Configurable, yet powerful risk engine, to allow new models without

software development• Seamless integration points between the RBI/Inspection

Management and other EAM systems such as SAP and Maximo• Single asset taxonomy and database• Incorporate the existing LR technologies and consulting capabilities• Move to a modern software development platform

Page 5: Safety Driven Performance Conference 2013 Next Generation Capstone RBMI Jarret Reeves Asset Integrity Systems Product Manager Lloyd’s Register Technical.

Safety Driven Performance Conference 2013

Where are customers investing 2.5 Billion annually?• Customers are investing heavily on their EAM (Enterprise Asset

Management)• According to ARC Advisory Group… this is why

Source: ARC Advisory Group

Page 6: Safety Driven Performance Conference 2013 Next Generation Capstone RBMI Jarret Reeves Asset Integrity Systems Product Manager Lloyd’s Register Technical.

Safety Driven Performance Conference 2013

Next Generation Product Capability Overview

• Tightly integrated with EAM system• Web enabled• Strong tie to asset management standards (PAS 55 and ISO 55000)• Larger APM toolset• Leverage existing EAM investments and capabilities (workflow, MOC,

etc…)

Page 7: Safety Driven Performance Conference 2013 Next Generation Capstone RBMI Jarret Reeves Asset Integrity Systems Product Manager Lloyd’s Register Technical.

Safety Driven Performance Conference 2013

Proof of Concept Objectives

• Highly configurable, yet powerful risk engine• Inputs and Outputs stored with the EAM system (Maximo was used)• Implement the most complex model we currently use, the Loss of

Containment consequence model

Page 8: Safety Driven Performance Conference 2013 Next Generation Capstone RBMI Jarret Reeves Asset Integrity Systems Product Manager Lloyd’s Register Technical.

Safety Driven Performance Conference 2013

LR Next Steps

• Finalizing business case(budgets, timelines, etc…) within Lloyd’s Register

• Currently have a Global Technology Center (GTC) in Singapore reviewing the RBI models

• Develop the product and support services (support, training, etc…)• Work with industry customers to refine and validate the

requirements and overall solution• There will be migration tools for current Capstone RBMI software• Capstone RBMI will continue to receive investments and support for

our global customers. We’re developing a plan to make the transition as painless as possible.

Page 9: Safety Driven Performance Conference 2013 Next Generation Capstone RBMI Jarret Reeves Asset Integrity Systems Product Manager Lloyd’s Register Technical.

Safety Driven Performance Conference 2013

Open the floor for feedback

• Is this vision down the right path for your organization?• What are the problems your organization faces with Asset Integrity?• What are the current barriers in your organization to achieve safe

production?• What are we missing?• Will this solution help?

Page 10: Safety Driven Performance Conference 2013 Next Generation Capstone RBMI Jarret Reeves Asset Integrity Systems Product Manager Lloyd’s Register Technical.

Safety Driven Performance Conference 2013

Any questions?

Page 11: Safety Driven Performance Conference 2013 Next Generation Capstone RBMI Jarret Reeves Asset Integrity Systems Product Manager Lloyd’s Register Technical.

Safety Driven Performance Conference 2013

Contact

Jarret Reeves

Lloyd’s Register Technical Services

Asset Integrity Systems Product Manager

(w) 281-649-2226

(c) 281-685-6666

[email protected]