SAFE 2012 Typhoon Helmet Mounted Symbology System (HMSS ... · SAFE 2012 Typhoon Helmet Mounted...

27
SAFE 2012 Typhoon Helmet Mounted Symbology System (HMSS) Concept to Capability Richard Taylor Head of Programme Integration Typhoon Aircraft Programmes, BAE SYSTEMS © BAE Systems 2012. All rights reserved

Transcript of SAFE 2012 Typhoon Helmet Mounted Symbology System (HMSS ... · SAFE 2012 Typhoon Helmet Mounted...

Page 1: SAFE 2012 Typhoon Helmet Mounted Symbology System (HMSS ... · SAFE 2012 Typhoon Helmet Mounted Symbology System (HMSS) Concept to Capability Richard Taylor – Head of Programme

SAFE 2012

Typhoon Helmet Mounted Symbology System (HMSS)

Concept to Capability

Richard Taylor – Head of Programme Integration

Typhoon Aircraft Programmes, BAE SYSTEMS

© BAE Systems 2012. All rights reserved

Page 2: SAFE 2012 Typhoon Helmet Mounted Symbology System (HMSS ... · SAFE 2012 Typhoon Helmet Mounted Symbology System (HMSS) Concept to Capability Richard Taylor – Head of Programme

HMSS – Concept to Capability - Presentation Contents

• What it does, how it works and components

• Qualification

• Leading the Entry Into Service

Page 3: SAFE 2012 Typhoon Helmet Mounted Symbology System (HMSS ... · SAFE 2012 Typhoon Helmet Mounted Symbology System (HMSS) Concept to Capability Richard Taylor – Head of Programme

HMSS – What is does, how it works and components

2

© BAE Systems 2012. All rights reserved

Page 4: SAFE 2012 Typhoon Helmet Mounted Symbology System (HMSS ... · SAFE 2012 Typhoon Helmet Mounted Symbology System (HMSS) Concept to Capability Richard Taylor – Head of Programme

REAL PERFORMANCE. REAL ADVANTAGE.

What does HMSS do?

3

© BAE Systems 2012. All rights reserved

Page 5: SAFE 2012 Typhoon Helmet Mounted Symbology System (HMSS ... · SAFE 2012 Typhoon Helmet Mounted Symbology System (HMSS) Concept to Capability Richard Taylor – Head of Programme

REAL PERFORMANCE. REAL ADVANTAGE.

How does it work?

4

© BAE Systems 2012. All rights reserved

Page 6: SAFE 2012 Typhoon Helmet Mounted Symbology System (HMSS ... · SAFE 2012 Typhoon Helmet Mounted Symbology System (HMSS) Concept to Capability Richard Taylor – Head of Programme

HMSS – Key Components

• Projection system inside the helmet gives the pilot the same flight data as HUD.

• Allows the pilot to see, lock on and engage targets, wherever he/she looks.

• Provides critical information enhancing mission success.

Man Mounted

• Outer Helmet

• Inner Helmet

• Comfort Fitting Protection Liner

• Optics Blast/Display Visor

• Oxygen mask

Aircraft Mounted

• On aircraft Avionics System

• Head Tracking System

• Processing Unit

• Interface Unit

Multiple suppliers throughout UK and Europe

6

© BAE Systems 2012. All rights reserved

Page 7: SAFE 2012 Typhoon Helmet Mounted Symbology System (HMSS ... · SAFE 2012 Typhoon Helmet Mounted Symbology System (HMSS) Concept to Capability Richard Taylor – Head of Programme

Laser

visor

Blast

visor

Glare

visor

Outer Helmet Inner Helmet

MaskCFPL

Head Mounted HMSS Equipment

Inner Helmet Liner

7

© BAE Systems 2012. All rights reserved

Page 8: SAFE 2012 Typhoon Helmet Mounted Symbology System (HMSS ... · SAFE 2012 Typhoon Helmet Mounted Symbology System (HMSS) Concept to Capability Richard Taylor – Head of Programme

Aircraft Mounted HMSS Equipment

Forward Sensor Seat Sensor HTS Processor Unit HTS Power Supply

8

© BAE Systems 2012. All rights reserved

Page 9: SAFE 2012 Typhoon Helmet Mounted Symbology System (HMSS ... · SAFE 2012 Typhoon Helmet Mounted Symbology System (HMSS) Concept to Capability Richard Taylor – Head of Programme

HMSS - Qualification

10

© BAE Systems 2012. All rights reserved

Page 10: SAFE 2012 Typhoon Helmet Mounted Symbology System (HMSS ... · SAFE 2012 Typhoon Helmet Mounted Symbology System (HMSS) Concept to Capability Richard Taylor – Head of Programme

HMSS - Protection Sub-system

Outer Helmet

• Impact

• Airblast

• Ejection

• Thermal

Inner Helmet

• Impact

• Airblast

• Ejection

• Noise

• Thermal

Oxygen Mask

• Altitude/”g”

• Ejection

Blast/Display Visor

• Airblast

• Ejection

• Thermal

• UV/Blue Light/IR

Glare/Laser Visor

• Solar Glare

• Laser

• UV/Blue Light/IR

• Thermal

11

© BAE Systems 2012. All rights reserved

Page 11: SAFE 2012 Typhoon Helmet Mounted Symbology System (HMSS ... · SAFE 2012 Typhoon Helmet Mounted Symbology System (HMSS) Concept to Capability Richard Taylor – Head of Programme

HMSS - Impact Protection

Scanner and Head Positioning Fixture

Additional Equipment

Head Scanning

• Head is scanned using a Non-

contact 3D Digitizer.

• Scan is manipulated to achieve

required liner thicknesses.

12

© BAE Systems 2012. All rights reserved

Page 12: SAFE 2012 Typhoon Helmet Mounted Symbology System (HMSS ... · SAFE 2012 Typhoon Helmet Mounted Symbology System (HMSS) Concept to Capability Richard Taylor – Head of Programme

HMSS - Impact Protection

• Standard test for UK Motorcycle

Helmets.

• Test item must remain intact

following impact.

13

© BAE Systems 2012. All rights reserved

Page 13: SAFE 2012 Typhoon Helmet Mounted Symbology System (HMSS ... · SAFE 2012 Typhoon Helmet Mounted Symbology System (HMSS) Concept to Capability Richard Taylor – Head of Programme

HMSS - Penetration Protection

Head Protection

• Penetration protection is provided

largely by the construction and

composition of the OHA shell supported

by the IHA shell.

Facial Protection

• Penetration protection is provided by the blast/display visor.

OHA

BDV

14

© BAE Systems 2012. All rights reserved

Page 14: SAFE 2012 Typhoon Helmet Mounted Symbology System (HMSS ... · SAFE 2012 Typhoon Helmet Mounted Symbology System (HMSS) Concept to Capability Richard Taylor – Head of Programme

HMSS - Facial Protection

• “Ballistic Impact” test for aircrew

visors.

• Test involves firing a .22 calibre

Fragment Simulating Projectile

at the test visor.

• The test visor must survive 3 impacts

without penetration.

15

© BAE Systems 2012. All rights reserved

Page 15: SAFE 2012 Typhoon Helmet Mounted Symbology System (HMSS ... · SAFE 2012 Typhoon Helmet Mounted Symbology System (HMSS) Concept to Capability Richard Taylor – Head of Programme

HMSS - Airblast / Ejection Protection Requirements

• HEA (both OHA and IHA) remains

structurally intact and on the head.

• Oxygen mask remains attached and

secured on the face.

• Oxygen hose remains attached and

undamaged such that oxygen supply is

maintained.

• Blast/Display Visor remains latched

down and covers the eyes, protecting

against direct exposure to the airstream.

16

© BAE Systems 2012. All rights reserved

Page 16: SAFE 2012 Typhoon Helmet Mounted Symbology System (HMSS ... · SAFE 2012 Typhoon Helmet Mounted Symbology System (HMSS) Concept to Capability Richard Taylor – Head of Programme

HMSS - Thermal Blast Protection

• Airgap between Outer and Inner Shells.

• Two layers of visor with air gap in between.

• Inside surface of outer shell can reach high

temperatures.

• Inside surface of inner and liner remains at

tolerable temperatures.

17

© BAE Systems 2012. All rights reserved

Page 17: SAFE 2012 Typhoon Helmet Mounted Symbology System (HMSS ... · SAFE 2012 Typhoon Helmet Mounted Symbology System (HMSS) Concept to Capability Richard Taylor – Head of Programme

HMSS – Leading the Programme to Entry Into Service

18

© BAE Systems 2012. All rights reserved

Page 18: SAFE 2012 Typhoon Helmet Mounted Symbology System (HMSS ... · SAFE 2012 Typhoon Helmet Mounted Symbology System (HMSS) Concept to Capability Richard Taylor – Head of Programme

Why is HMSS Important for Typhoon?

• A significant Typhoon capability enhancement.

• Delivers combat advantage.

• Allow the RAF to redefine tactics.

19

© BAE Systems 2012. All rights reserved

Page 19: SAFE 2012 Typhoon Helmet Mounted Symbology System (HMSS ... · SAFE 2012 Typhoon Helmet Mounted Symbology System (HMSS) Concept to Capability Richard Taylor – Head of Programme

• Technically challenging product.

• Entry into Service planning maturity .

• Production challenges with supply chain.

• Production challenges with outer helmet.

• Customer / Supplier relationship.

The Context for HMSS (Mid 2009)

20

© BAE Systems 2012. All rights reserved

Page 20: SAFE 2012 Typhoon Helmet Mounted Symbology System (HMSS ... · SAFE 2012 Typhoon Helmet Mounted Symbology System (HMSS) Concept to Capability Richard Taylor – Head of Programme

• Develop a “one team” approach.

• Deliver service excellence to

customers.

• Accelerating High Performance

programme.

Plan to Move forward (Sep 2009)

21

© BAE Systems 2012. All rights reserved

Page 21: SAFE 2012 Typhoon Helmet Mounted Symbology System (HMSS ... · SAFE 2012 Typhoon Helmet Mounted Symbology System (HMSS) Concept to Capability Richard Taylor – Head of Programme

Working with our Customers

• UK Launch Workshop (October 2009)

• Follow on UK workshop (November 2009)

• Align and improve stakeholder perceptions

• Integrate experience and knowledge to enable successful Entry into Service planning

• First International HMSS Entry into Service Workshop (March 2010)

• UK Entry into Service Workshop at RAF Coningsby (March 2010)

• 2nd International HMSS Entry Into Service Workshop (June 2010)

• UK trial review at RAF Coningsby (July 2010)

22

© BAE Systems 2012. All rights reserved

Page 22: SAFE 2012 Typhoon Helmet Mounted Symbology System (HMSS ... · SAFE 2012 Typhoon Helmet Mounted Symbology System (HMSS) Concept to Capability Richard Taylor – Head of Programme

HMSS Service Excellence - Examples

• Personal Helmet Fitting Service for all initial pilots

• Entry into Service - personal support before, during and after flying

• Early HMSS customer flying at BAE SYSTEMS Warton – ability to learn from our

pilots – exploit full potential

GOAL = Improvement in customer satisfaction

23

© BAE Systems 2012. All rights reserved

Page 23: SAFE 2012 Typhoon Helmet Mounted Symbology System (HMSS ... · SAFE 2012 Typhoon Helmet Mounted Symbology System (HMSS) Concept to Capability Richard Taylor – Head of Programme

Accelerating High Performance Programme

• Recognise that how we do it is as important as the what we do.

• Highlights key areas which make a difference to improve performance:-

• One team

• Valuing our people

• High performance culture

• Customer communications

• Simple one page STOP, START, CONTINUE actions against each key area.

• Teams to implement in their own areas at their own sites.

24

© BAE Systems 2012. All rights reserved

Page 25: SAFE 2012 Typhoon Helmet Mounted Symbology System (HMSS ... · SAFE 2012 Typhoon Helmet Mounted Symbology System (HMSS) Concept to Capability Richard Taylor – Head of Programme

REAL PERFORMANCE. REAL ADVANTAGE.

What the customers and pilots said about HMSS

“Biggest single SA aid in the cockpit”

“Provides the bigger picture – like a blown up

HUD image.”

26

© BAE Systems 2012. All rights reserved

Page 26: SAFE 2012 Typhoon Helmet Mounted Symbology System (HMSS ... · SAFE 2012 Typhoon Helmet Mounted Symbology System (HMSS) Concept to Capability Richard Taylor – Head of Programme

Hopefully you now understand …….

• How HMSS works

• What the HMSS is made up of

• How we qualified the HMSS

• What HMSS is and why it is important to the Typhoon Programme

• How we engaged with our customers to support HMSS Entry into Service

27

© BAE Systems 2012. All rights reserved

Page 27: SAFE 2012 Typhoon Helmet Mounted Symbology System (HMSS ... · SAFE 2012 Typhoon Helmet Mounted Symbology System (HMSS) Concept to Capability Richard Taylor – Head of Programme

Questions

28

© BAE Systems 2012. All rights reserved