SA Recycling – Terminal Island 901 New Dock Street ......SARB SA Recycling Bakersfield SARTI SA...

47
PREPARED FOR: CALIFORNIA DEPARTMENT OF TOXIC SUBSTANCES CONTROL HAZARDOUS WASTE MANAGEMENT PROGRAM PO BOX 806 SACRAMENTO, CALIFORNIA 95812 PREPARED BY: GEOCON CONSULTANTS, INC. 3160 GOLD VALLEY DRIVE, SUITE 800 RANCHO CORDOVA, CALIFORNIA 95742 GEOCON PROJECT NO. S9850-03-21 DECEMBER 23, 2016 SA Recycling – Terminal Island 901 New Dock Street Terminal Island, California AIR MONITORING SUMMARY REPORT

Transcript of SA Recycling – Terminal Island 901 New Dock Street ......SARB SA Recycling Bakersfield SARTI SA...

Page 1: SA Recycling – Terminal Island 901 New Dock Street ......SARB SA Recycling Bakersfield SARTI SA Recycling Terminal Island SB Senate Bill SMM Sims Metal Management T1/T2/T3 Test 1/Test

PREPARED FOR:CALIFORNIA DEPARTMENT OF TOXIC SUBSTANCES CONTROLHAZARDOUS WASTE MANAGEMENT PROGRAMPO BOX 806SACRAMENTO, CALIFORNIA 95812

PREPARED BY:

GEOCON CONSULTANTS, INC.3160 GOLD VALLEY DRIVE, SUITE 800RANCHO CORDOVA, CALIFORNIA 95742

GEOCON PROJECT NO. S9850-03-21 DECEMBER 23, 2016

SA Recycling – Terminal Island901 New Dock Street

Terminal Island, California

AIR MONITORING SUMMARY REPORT

Page 2: SA Recycling – Terminal Island 901 New Dock Street ......SARB SA Recycling Bakersfield SARTI SA Recycling Terminal Island SB Senate Bill SMM Sims Metal Management T1/T2/T3 Test 1/Test

Project No. S9850-03-21 December 23, 2016 Edward Benelli Hazardous Substances Engineer Hazardous Waste Management Program Department of Toxic Substances Control P.O. Box 806 Sacramento, California 95812-0806 Subject: AIR MONITORING SUMMARY REPORT

SA RECYCLING – TERMINAL ISLAND 901 NEW DOCK STREET TERMINAL ISLAND, CALIFORNIA 90731 CONTRACT NO. 15-T4124 A-1

Dear Mr. Benelli: In accordance with the above-referenced contract, Geocon has performed air monitoring at and prepared the enclosed Air Monitoring Summary Report for the above-referenced metal shredding/recycling facility. The California Department of Toxic Substances Control (DTSC) requested air monitoring to evaluate the potential for off-site migration of airborne particulates, toxic organic compounds, and asbestos from metal shredding/recycling facilities. The report summarizes the air monitoring activities performed including sample collection, laboratory analysis, and the results of a data quality assessment. The DTSC intends to use these results to assess the potential impacts from air emissions from metal shredding/recycling operations. We appreciate the opportunity to work with the DTSC on this project. Please let us know if you have questions concerning the report or we may be of further service. Sincerely, GEOCON CONSULTANTS, INC. Josh Ewert, PG Jim Brake, PG Project Geologist Senior Geologist

Page 3: SA Recycling – Terminal Island 901 New Dock Street ......SARB SA Recycling Bakersfield SARTI SA Recycling Terminal Island SB Senate Bill SMM Sims Metal Management T1/T2/T3 Test 1/Test

i

IDENTIFICATION FORM

Document Title: Air Monitoring Summary Report SA Recycling – Terminal Island

Site Location: 901 New Dock Street, Terminal Island, CA 90731 Contract No.: 15-T4124 A-1

Prepared by: Geocon Consultants, Inc. 3160 Gold Valley Drive, Suite 800 Rancho Cordova, California 95742 916.852.9118 Geocon Project Number: S9850-03-21

Geocon Contract Manager: Jim Brake, PG [email protected] 916.852.9118 Geocon Contract Manager:

Approval: Date: December 23, 2016 Jim Brake, PG No. 5753 Geocon Project Manager:

Approval: Date: December 23, 2016 Josh Ewert, PG No. 9096

This Report has been prepared for the California Environmental Protection Agency (CalEPA), DTSC. The material herein is not to be disclosed to, discussed with, or made available to any person(s) for any reason without prior express approval of the appropriate responsible DTSC officer.

Page 4: SA Recycling – Terminal Island 901 New Dock Street ......SARB SA Recycling Bakersfield SARTI SA Recycling Terminal Island SB Senate Bill SMM Sims Metal Management T1/T2/T3 Test 1/Test
Page 5: SA Recycling – Terminal Island 901 New Dock Street ......SARB SA Recycling Bakersfield SARTI SA Recycling Terminal Island SB Senate Bill SMM Sims Metal Management T1/T2/T3 Test 1/Test

iii

DISTRIBUTION LIST Edward Benelli, Contract Manager (1 hard-copy, e-copy) California Environmental Protection Agency DTSC Hazardous Waste Management Program Megan Cambridge, Project Manager (1 hard-copy, e-copy) California Environmental Protection Agency DTSC Hazardous Waste Management Program Josh Ewert, PG and Jim Brake, PG (project file) Geocon Consultants, Inc.

Page 6: SA Recycling – Terminal Island 901 New Dock Street ......SARB SA Recycling Bakersfield SARTI SA Recycling Terminal Island SB Senate Bill SMM Sims Metal Management T1/T2/T3 Test 1/Test

iv

TABLE OF CONTENTS

AIR MONITORING SUMMARY REPORT SA RECYCLING – TERMINAL ISLAND PAGE

IDENTIFICATION FORM …………………………………………………………………….…….. i APPROVAL FORM …………………………………………………………………………….…….ii DISTRIBUTION LIST ………………………………………………………………………….…….iii TABLE OF CONTENTS …………………………………………………………………….……….iv ACRONYMS AND ABBREVIATIONS………………………………………………….………….vi

1.0  INTRODUCTION .................................................................................................................... 1 1.1  Background .................................................................................................................. 1 1.2  Responsible Agency ..................................................................................................... 2 1.3  Project Contact Information ......................................................................................... 2 

2.0  SITE DESCRIPTION ............................................................................................................... 3 2.1  Facility Description ...................................................................................................... 3 2.2  Regional Climate and Wind Direction ......................................................................... 3 

3.0  METHODS AND PROCEDURES ........................................................................................... 4 3.1  Pre-Field Activities ...................................................................................................... 4 3.2  Sampling Locations ...................................................................................................... 4 3.3  Sampling Equipment .................................................................................................... 4 3.4  Calibration and Leak Check Testing ............................................................................ 6 

3.4.1  TSP Calibration ............................................................................................... 6 3.4.2  PM10 and PM2.5 Calibration Activities ............................................................ 6 3.4.3  PCB Calibration Activities .............................................................................. 7 3.4.4  Formaldehyde and Asbestos Calibration Activities ........................................ 8 

3.5  Air Sampling Description ............................................................................................ 8 3.5.1  First Monitoring Event (T1) ............................................................................ 8 3.5.2  Second Monitoring Event (T2) ....................................................................... 9 3.5.3  Third Monitoring Event (T3) ........................................................................ 10 

3.6  Meteorological Conditions ......................................................................................... 10 3.7  Packaging and Shipping ............................................................................................. 11 3.8  Laboratory Analysis ................................................................................................... 11 3.9  Variance from SAP .................................................................................................... 12 

4.0  RESULTS ............................................................................................................................... 13 4.1  Analytical Results ...................................................................................................... 13 

4.1.1  TSP ................................................................................................................ 13 4.1.2  PM10 ............................................................................................................. 13 4.1.3  PM2.5 ............................................................................................................ 14 4.1.4  Asbestos ........................................................................................................ 14 4.1.5  PCBs ............................................................................................................. 14 4.1.6  Formaldehyde ............................................................................................... 14 4.1.7  VOCs ............................................................................................................. 14 

4.2  Data Quality Analysis ................................................................................................ 14 4.3  Meteorological Data ................................................................................................... 15 

5.0  REPORT LIMITATIONS ....................................................................................................... 18 

6.0  REFERENCES ........................................................................................................................ 19 

Page 7: SA Recycling – Terminal Island 901 New Dock Street ......SARB SA Recycling Bakersfield SARTI SA Recycling Terminal Island SB Senate Bill SMM Sims Metal Management T1/T2/T3 Test 1/Test

TABLE OF CONTENTS (Continued)

v

FIGURES 1. Vicinity Map 2. Site Plan PHOTOGRAPHS 1 through 4 TABLES – IN-TEXT (Identified by the “T” Preface) T1.3 Personnel Contact Information and Title T3.3A Sampling Analytes, Media and Equipment T3.3B Sampler Spacing Requirements T3.4.1 TSP Sampler Flow Rates and Total Flows T3.4.2 PM10 and PM2.5 Sampler Flow Rates T3.4.3 PCB Sampler Flow Rates and Total Flows T3.5 Sample Times and Facility Operations T4.3A Meteorological Data Per Test T4.3B – Frequency of Wind Direction and Its Effect on Sample Location Representativeness for T1 T4.3C – Frequency of Wind Direction and Its Effect on Sample Location Representativeness for T2 T4.3D – Frequency of Wind Direction and Its Effect on Sample Location Representativeness for T3 TABLES – POST-TEXT 1. Summary of Gravimetric and Metals Analytical Data – TSP 2. Summary of Gravimetric and Metals Analytical Data – PM10 3. Summary of Gravimetric and Metals Analytical Data – PM2.5 4. Summary of Asbestos Analytical Data 5. Summary of PCB Analytical Data 6. Summary of Formaldehyde Analytical Data 7. Summary of TOS Analytical Data

APPENDICES A. Health and Safety Plan

B. Geocon Field Logs

C. TSP Calibration Worksheets

D. Sampling Summary, Data Log, and Alarm Log - PM10 Sampling Equipment

E. Sampling Summary, Data Log, and Alarm Log – PM2.5 Sampling Equipment

F. PUF Calibration Worksheets

G. Meteorological Data and Activity Log

H. Analytical Reports

I. Data Quality Assessment Report

J. Wind Rose Diagrams

Page 8: SA Recycling – Terminal Island 901 New Dock Street ......SARB SA Recycling Bakersfield SARTI SA Recycling Terminal Island SB Senate Bill SMM Sims Metal Management T1/T2/T3 Test 1/Test

vi

ABBREVIATIONS AND ACRONYMS

aka Also known as

AHERA Asbestos Hazard Emergency Response Act

AQMD Air Quality Management District

CFR Code of Federal Regulations

CLN CHESTER LabNet

COC Chain-of-custody

COPC Chemical of potential concern

DTSC Department of Toxic Substances Control

EAT Eurofins Air Toxics

ECS Eurofins Calscience

EMSL EMSL Analytical, Inc.

HSP Health and safety plan

in-Hg Inches of mercury pressure

L/min Liters per minute

LCS/LCSD Laboratory control sample/laboratory control sample duplicate

m3 Cubic meter

m3/min Cubic meter per minute

MPH Miles per hour

MRP Metal recovery plant

NELAP National Environmental Laboratory Accreditation Program

NVLAP National Voluntary Laboratory Accreditation Program

PCB Polychlorinated biphenyls

PM10 Particulate matter less than 10 µm

PM2.5 Particulate matter less than 2.5 µm

POLA Port of Los Angeles

PTFE Polytetrafluoroethylene

PUF Polyurethane foam

QA/QC Quality assurance/ quality control

RCRA Resource Conservation and Recovery Act

SAP Sampling and Analysis Plan

SARB SA Recycling Bakersfield

SARTI SA Recycling Terminal Island

SB Senate Bill

SMM Sims Metal Management

T1/T2/T3 Test 1/Test 2/Test 3

TEM Transmission electron microscopy

Tisch Tisch Environmental

TOS Toxic organic species

TSP Total suspended particulates

USEPA United States Environmental Protection Agency

VOC Volatile organic compounds

XRF X-ray fluorescence

°F Degrees Fahrenheit

Page 9: SA Recycling – Terminal Island 901 New Dock Street ......SARB SA Recycling Bakersfield SARTI SA Recycling Terminal Island SB Senate Bill SMM Sims Metal Management T1/T2/T3 Test 1/Test

Air Monitoring Summary Report SA Recycling – Terminal Island

Geocon Project No. S9850-03-21 - 1 - December 23, 2016

AIR MONITORING SUMMARY REPORT SA RECYCLING – TERMINAL ISLAND

CONTRACT NO. 15-T4124 A-1 _____________________________________________________

1.0 INTRODUCTION

Geocon Consultants, Inc. prepared this Air Monitoring Summary Report in compliance with California

Department of Toxic Substances Control (DTSC) Contract Number 15-T4124 A-1, Start Work Order #1.

This report summarizes air monitoring performed at SA Recycling – Terminal Island (SARTI) (the Site)

in Terminal Island, California (Figure 1, Vicinity Map). The work was conducted in accordance with the

DTSC-approved Sampling and Analysis Plan (SAP) dated September 30, 2016 (Geocon, 2016).

1.1 Background

Per the DTSC’s Start Work Order, metal shredding/recycling facilities process end-of-life vehicles, appliances,

and other forms of scrap metal to recover iron, steel, aluminum, and copper for re-use in new metal products.

The metal shredding process generates large amounts of metal shredder waste, which consists of plastics,

rubber, glass, foam, fabrics, automobile fluids, dirt, and residual metals. The metal shredding process can also

potentially create environmental contamination in the forms of stormwater runoff, contaminated soil,

contaminated groundwater, and fugitive air emissions. The purpose of air monitoring was to assess the

potential for fugitive air emissions from facilities generating metal shredding waste.

Although metal shredding waste typically does not exceed the federal regulatory levels established by the

Resource Conservation and Recovery Act (RCRA), metal shredder waste has been regulated as a

California-only, non-RCRA hazardous waste since 1984 because residual levels of copper, lead, and zinc often

exceed California’s more stringent regulatory thresholds. Six large metal shredding facilities are currently

authorized by DTSC to conduct metal shredding operations. Five of the facilities treat the metal shredding

waste with a cement product which is intended to reduce the solubility of the metals and render the waste less

hazardous. The sixth facility transfers their waste out of state for further processing. The treated waste is then

disposed of in Class II or Class III landfills, where it is largely used as alternative daily cover.

Senate Bill (SB) 1249 (Hill, Chapter 756, Statutes of 2014) became law on January 1, 2015 and

authorizes DTSC “to adopt regulations establishing alternative management standards for metal

shredding facilities for hazardous waste management activities within the jurisdiction of the

Department of Toxic Substances Control, that would apply in lieu of the hazardous waste management

standards if the department performs specified actions” (SB 1249, Hill). SB 1249 authorizes the DTSC

to consider the development of alternative management standards for metal shredding facilities. The

DTSC has developed a 3-year plan to conduct the evaluation authorized by SB 1249, which includes an

assessment of the potential impacts from air emissions.

Page 10: SA Recycling – Terminal Island 901 New Dock Street ......SARB SA Recycling Bakersfield SARTI SA Recycling Terminal Island SB Senate Bill SMM Sims Metal Management T1/T2/T3 Test 1/Test

Air Monitoring Summary Report SA Recycling – Terminal Island

Geocon Project No. S9850-03-21 - 2 - December 23, 2016

The SAP describes air monitoring activities at the following metals shredding facilities:

SARTI in Terminal Island, California,

SA Recycling – Bakersfield (SARB) located at 2000 E. Brundage Lane in Bakersfield, California, and

Sims Metal Management (SMM) located at 699 Seaport Boulevard in Redwood City, California. These three facilities were selected to represent examples of larger (SARTI, SMM) and smaller

(SARB) metal shredding/recycling facilities that operate in a variety of different geographic conditions

and under the jurisdiction of various local Air Quality Management Districts (AQMD). At each facility

Geocon staff performed three consecutive 24-hour air monitoring events. Information from the air

monitoring events will be used to develop regulations establishing alternative management standards

for metal shredding facilities for hazardous waste management activities.

1.2 Responsible Agency

DTSC is the lead regulatory agency overseeing this air monitoring program. DTSC regulates hazardous

waste in California under the authority of RCRA and the California Health and Safety Code.

1.3 Project Contact Information

The title/responsibility, names, phone numbers, and e-mail addresses of personnel associated with the

air monitoring project are summarized in Table T1.3:

Table T1.3 – Personnel Contact Information and Title

Agency/Company Name Title/Responsibility Phone Number E-mail Address

DTSC Ed Benelli Contract Manager 916.324.6564 [email protected]

DTSC Megan

Cambridge Project Manager 916.322.4233

[email protected]

Geocon Jim Brake Program/Quality

Assurance Manager 916.852.9118 [email protected]

Geocon Josh Ewert Project/Technical

Manager 916.852.9118 [email protected]

CHESTER LabNet Sheri Meldstab Inorganic Lab

Manager and QA/QC Coordinator

503.624.2183 [email protected]

EMSL Michael

Chapman

Industrial Hygiene Client Services

Manager 800.755.1794 [email protected]

Eurofins Calscience Alan Kemp Northern California Operations Manager

925.786.8606 [email protected]

Eurofins Air Toxics Kelly Buettner Air Toxics Project

Manager 916.605.3378 [email protected]

Page 11: SA Recycling – Terminal Island 901 New Dock Street ......SARB SA Recycling Bakersfield SARTI SA Recycling Terminal Island SB Senate Bill SMM Sims Metal Management T1/T2/T3 Test 1/Test

Air Monitoring Summary Report SA Recycling – Terminal Island

Geocon Project No. S9850-03-21 - 3 - December 23, 2016

2.0 SITE DESCRIPTION

2.1 Facility Description

Site Name: SA Recycling – Terminal Island Site Address: 901 New Dock Street, Terminal Island, CA 90731 County: Los Angeles Site Operator: SA Recycling, LLC Local AQMD: South Coast Air Quality Management District Local AQMD Contact: Mohan Balagopalan (909) 396-2704 SARTI is in the Port of Los Angeles (POLA), on the southern shore of Cerritos Channel and

East Basin Channel on Terminal Island. The metal shredder is in the western-central portion of the Site

while the southeastern portion comprises a metal recovery plant (MRP) (Figure 2, Site Plan). Railroad

tracks along the western border of the Site are used to transport materials to and from the Site. A dock

used for loading and unloading cargo ships comprises the northern boundary. According to SARTI’s

webpage, this Site is not open to the public (SARTI website, 2016).

Properties surrounding the Site are used for heavy industrial purposes. These properties include POLA

Multi-Use Terminal adjacent to the east, New Dock Street and California State Route 47 to the south,

and a cargo terminal for loading and unloading shipping containers both adjacent to the west of the Site

and to the north across the East Basin of the POLA (POLA website, 2016). Surrounding properties and

facilities are shown on Figure 2, Site Plan.

2.2 Regional Climate and Wind Direction

Climate data for San Pedro, which is immediately west of Terminal Island, was used to represent

conditions at Terminal Island for the selection of sampling locations. The monthly average

temperatures range from the high-40s °F in January to the mid-70s °F in September. Annual average

precipitation for the San Pedro is 10.69 inches per year, with the lowest precipitation occurring from

June through August (WRCC, 2016). Wind direction data is obtained from the Long Beach Airport,

located approximately 7.1 miles northeast of SARTI (http://mesonet.agron.iastate.edu, 2016). The

average wind speed ranges from 4.3 miles per hour (mph) in December to 6.4 mph in April. Higher

wind speeds typically occur from March through July. The most common wind directions throughout

the year are from the west-northwest and south. During the month of October, the average wind speed

is 4.9 mph with a predominant wind directions of west-northwest and south.

Page 12: SA Recycling – Terminal Island 901 New Dock Street ......SARB SA Recycling Bakersfield SARTI SA Recycling Terminal Island SB Senate Bill SMM Sims Metal Management T1/T2/T3 Test 1/Test

Air Monitoring Summary Report SA Recycling – Terminal Island

Geocon Project No. S9850-03-21 - 4 - December 23, 2016

3.0 METHODS AND PROCEDURES

This section summarizes the activities to prepare for and the methods and sampling procedures utilized

during each of the three air monitoring events performed at the Site. Detailed information and protocols

for field methods are provided in the SAP (Geocon, 2016).

3.1 Pre-Field Activities

Geocon staff performed the following pre-field activities in preparation for air monitoring:

Performed a site visit on August 16, 2016, to meet with SARTI and DTSC staff and identify the sample locations at the Site.

Prepared a site-specific health and safety plan (HSP) to provide guidelines on the use of personal protective equipment and health and safety procedures to be implemented during the field activities. Field activities were conducted in accordance with the HSP prepared for the air monitoring at SARTI. A copy of the HSP is in Appendix A.

Retained CHESTER LabNet (CLN), a National Environmental Laboratory Accreditation Program (NELAP)-certified laboratory in Tigard, Oregon, to provide gravimetric and metals analysis of air samples.

Retained EMSL Analytical Inc. (EMSL), a National Voluntary Laboratory Accreditation Program (NVLAP) and NELAP-certified laboratory in Cinnaminson, New Jersey, to provide asbestos and volatile organic compounds (VOC) analysis of air samples.

Retained Eurofins Calscience (ECS), a California ELAP and NELAP-certified laboratory in Garden Grove, California, to perform polychlorinated biphenyls (PCB) analysis of air samples.

Retained Eurofins Air Toxics (EAT), a California ELAP and NELAP-certified laboratory in Folsom, California, to perform formaldehyde analysis of air samples.

3.2 Sampling Locations

As described in Section 2.2, the anticipated wind directions during the monitoring events were from the

west-northwest and south. During the August 16, 2016 site visit, SARTI staff stated that they

anticipated the predominant wind direction during the monitoring event would be from the south.

Therefore the four air sampling locations included one upwind (SARTI1), one downwind (SARTI2),

and two crosswind (SARTI3 and SARTI4) location.. SARTI5 was a collocated duplicate sampling

location for SARTI2 and was sampled in accordance with the schedule for quality assurance/quality

control sampling schedule in the SAP. Sample locations are shown on Figure 2. Photos 1 through 4

provide images of the sample equipment in reference to the sample locations.

3.3 Sampling Equipment

At each sampling location, air samples were collected using the equipment in Table T3.3A:

Page 13: SA Recycling – Terminal Island 901 New Dock Street ......SARB SA Recycling Bakersfield SARTI SA Recycling Terminal Island SB Senate Bill SMM Sims Metal Management T1/T2/T3 Test 1/Test

Air Monitoring Summary Report SA Recycling – Terminal Island

Geocon Project No. S9850-03-21 - 5 - December 23, 2016

Table T3.3A – Sampling Analytes, Media and Equipment Analytes Sample Media Sampler

Total suspended particulates (TSP), Metals

8-inch x 10-inch Quartz fiber filter TE-5170V high-volume

Particulate matter (PM) less than 10 micrograms (µm) (PM10), Metals

46.2-mm-diameter PTFE Teflon™ with integral support ring with a pore size of 10

µm TE-Wilbur10 low-volume

PM less than 2.5 µm (PM2.5), Metals 46.2-mm-diameter PTFE Teflon with

integral support ring with a pore size of 10 µm

TE-Wilbur2.5 low-volume

Asbestos Cartridge with a 25-mm-diameter mixed

cellulose ester fiber filter Gillian GilAir 3 personal

air pump

PCBs 3-inch-thick polyurethane foam (PUF) plugs TE-1000 PUF high-volume

air sampler

Formaldehyde Sorbant tube containing 0.35 g of 150-250 μm (60-100 mesh) silica gel coated with 1.0 mg of acidified 2,4-dinitrophenylhydrazine

Gillian GilAir 3 personal air pump

Toxic organic species1 (TOS) 6-Liter Summa canisters

None. Canister shipped with a vacuum inside

which was used to collect a sample.

Note: 1 = TOS includes benzene, chloromethane, 1,1-dichloroethene, ethylbenzene, 4-ethyltoluene, dichlorodifluoromethane [also known as (aka) Freon 12], trichlorofluoromethane (aka Freon 11), 1,2,4-trimethylbenzene, toluene, 1,3,5-trimethylbenzene, xylenes, and vinyl chloride.

A diesel-powered generator was used to supply power to the TSP, PM10, PM2.5, and PCB samplers

located at SARTI2 and SARTI5. Onsite electrical outlets were used to power the TSP, PM10, PM2.5,

and PCB sampling equipment at the remaining sampling locations. Rechargeable batteries were used to

power the asbestos and formaldehyde samplers. Power was not needed for the TOS samplers.

Spatial arrangement of samplers in each location (i.e., distance between samplers, height above ground

surface) were in accordance with the sampling placement requirements listed in 40 CFR Appendix E to Part 58 - Probe and Monitoring Path Siting Criteria for Ambient Air Quality Monitoring [United

States Environmental Protection Agency (USEPA), 2015] and comments provided by the Bay Area Air

Quality Management District (Stevenson, 2016). As such, requirements for sampler spacing were

relative to the sampling unit inlet (edge) and conformed to Table T3.3B:

Table T3.3B – Sampler Spacing Requirements

Parameter Inlet Above Ground Level Height Requirement (meters)

Horizontal Collocation Requirement (meters)

Vertical Collocation Requirement (meters)

TSP, Metals 2-7 2-4 ≤ 3

PM10, Metals 2-7 1-4 ≤ 3

PM2.5, Metals 2-7 1-4 ≤ 3

Asbestos 2-7 1-4 ≤ 3

PCBs 2-7 2-4 ≤ 3

Formaldehyde 2-7 0-4 ≤ 3

TOS 2-7 0-4 ≤ 3

Page 14: SA Recycling – Terminal Island 901 New Dock Street ......SARB SA Recycling Bakersfield SARTI SA Recycling Terminal Island SB Senate Bill SMM Sims Metal Management T1/T2/T3 Test 1/Test

Air Monitoring Summary Report SA Recycling – Terminal Island

Geocon Project No. S9850-03-21 - 6 - December 23, 2016

Additionally, inlets were greater than 2 meters (m) away from supporting structures (like walls,

parapets, or penthouses), greater than 10 m from trees, and between 2 and 10 m from roadways. Inlets

also had unrestricted airflow and were located away from obstacles so that the distance from the

obstacle to the inlet was at least twice the height that the obstacle protruded above the inlet.

3.4 Calibration and Leak Check Testing

The TSP, PM10, PM2.5, asbestos, PCB, and formaldehyde sampling equipment was calibrated onsite on

October 11, 2016. Calibration and leak check activities were performed once the equipment was set up

at a sampling location and prior to its first use. Calibration and leak check procedures were performed

in accordance with the calibration schedule in Table 3 of the SAP. A copy of the field log, which

contains additional information about the calibration and leak check testing, is in Appendix B.

3.4.1 TSP Calibration

Calibration included attaching a calibrated orifice and water manometer to each sampler, operating

each device with the orifice at five positions that varied the flow rate into the sampler, and recording

the measurements of the water manometer for each position directly into the TE-5170V Sampler Calibration Worksheet (Appendix C). Leak checks were performed by covering the top of the orifice

and listening for a high-pitched squeal. The calculated flow rates and total flows for the TSP sampling

equipment are in Table T3.4.1:

Table T3.4.1 – TSP Sampler Flow Rates and Total Flows

Sample Location Calculated TSP Flow Rate (m3/min)

Calculated TSP Total Flow1 (m3)

SARTI1 1.220 1,756.22

SARTI2 1.218 1,754.32

SARTI3 1.217 1,752.07

SARTI4 1.220 1,756.22

SARTI5 1.207 1,738.30

Notes: m3/min = cubic meters per minute m3 = cubic meters No leaks were identified and observed flow rates were acceptable to achieve the desired reporting

limits for a 24-hour sample specified in the SAP (Geocon, 2016).

3.4.2 PM10 and PM2.5 Calibration Activities

Calibration included measuring temperature and pressure using calibrated temperature and barometric

pressure devices, and entering the measurements into the samplers at the appropriate calibration input

screen. Flows were calibrated by placing a calibrated flow standard on the intake of the sampler and

running the flow calibration program for the sampler. External leak checks were performed by

Page 15: SA Recycling – Terminal Island 901 New Dock Street ......SARB SA Recycling Bakersfield SARTI SA Recycling Terminal Island SB Senate Bill SMM Sims Metal Management T1/T2/T3 Test 1/Test

Air Monitoring Summary Report SA Recycling – Terminal Island

Geocon Project No. S9850-03-21 - 7 - December 23, 2016

installing a closed flow rate adapter to the sample inlet and running the leak check program on the

sampler. Internal leak checks were performed by installing internal leak check disks into the samplers

and running the internal leak check program on the sampler. The calibration results for the PM10 and

PM2.5 sampling equipment were recorded in Geocon’s field log (Appendix B) and on the PM10 and

PM2.5 alarm logs on each unit (Appendices D and E, respectively). The calculated flow rates for the

PM10 and PM2.5 sampling equipment are provided in Table T3.4.2:

Table T3.4.2 – PM10 and PM2.5 Sampler Flow Rates

Sample Location Analyte Calculated Flow Rate (m3/min)

SARTI1 PM10 16.671

PM2.5 16.671

SARTI2 PM10 16.671

PM2.5 16.681

SARTI3 PM10 16.681

PM2.5 16.671

SARTI4 PM10 16.671

PM2.5 16.671

SARTI5 PM10 16.671

PM2.5 16.671

No leaks were identified and observed flow rates were acceptable to achieve the desired reporting

limits for a 24-hour sample specified in the SAP (Geocon, 2016).

3.4.3 PCB Calibration Activities

Calibration included attaching a calibrated orifice and water manometer to each sampler, operating

each device with the orifice at five positions that varied the flow rate into the sampler, and recording

the measurements of the water manometer for each position directly into the TE-1000 PUF Calibration Worksheet (Appendix F). The calculated flow rates and total flows for the PCB sampling equipment

are in Table T3.4.3.

Table T3.4.3 – PCB Sampler Flow Rates and Total Flows

Sample Location Calculated PCB Flow Rate (m3/min) Calculated PCB Total Flow1 (m3)

SARTI1 0.262 378.8

SARTI2 0.270 389.5

SARTI3 0.259 373.3

SARTI4 0.264 379.5

SARTI5 0.264 381.1

Page 16: SA Recycling – Terminal Island 901 New Dock Street ......SARB SA Recycling Bakersfield SARTI SA Recycling Terminal Island SB Senate Bill SMM Sims Metal Management T1/T2/T3 Test 1/Test

Air Monitoring Summary Report SA Recycling – Terminal Island

Geocon Project No. S9850-03-21 - 8 - December 23, 2016

The observed flow rates were acceptable to achieve the desired reporting limits for a 24-hour sample

specified in the SAP (Geocon, 2016).

3.4.4 Formaldehyde and Asbestos Calibration Activities

The formaldehyde and asbestos sampling equipment were calibrated on October 11, 2016. Information

from the calibration was recorded in Geocon’s field notes (Appendix B). Calibration included attaching

a calibrated rotometer to each sampler, operating each device and adjusting the flow rates of the

formaldehyde and asbestos samplers to 2.0 and 1.0 liters per minute (lpm), respectively. The observed

flow rates were acceptable to achieve the desired reporting limits for a 24-hour sample specified in the

SAP (Geocon, 2016).

3.5 Air Sampling Description

The three 24-hour monitoring events (T1, T2, and T3) were performed between

October 11 and 14, 2016. The following sub-sections summarize the activities performed during each

event and describe the facility operations during each event.

3.5.1 First Monitoring Event (T1)

After calibrating and installing the appropriate sample media in each sampling device, Geocon staff

began the first 24-hour monitoring event by turning on the sampling equipment for SARTI1 at 1430 on

October 11, 2016. Minutes later, Geocon staff turned on sampling equipment at locations at SARTI4,

SARTI2, and SARTI3 at 1505, 1515, and 1525, respectively. Geocon staff checked on the status of the

sampling equipment after approximately 6 and 18 hours of runtime. After 24 hours, Geocon staff ended

T1 by turning off the sampling equipment at each location, and retrieved and stored the sample media.

No field-based QC parameters were performed during T1.

SARTI staff’s activity log (Appendix G) summarizes receiving, processing, shipping and dust control

procedures for each day of the week of October 10, 2016. For the facility processes, an average of the hours

listed for October 11 and 12, 2016 was assumed because the monitoring event took place across both days.

Approximately 4.5 hours of metals shredding occurred during T1. The MRP operated approximately

8.8 hours while shearing, torch cutting, and welding/fabrication occurred for approximately 9.5, 2.3, and

15.5 hours each, respectively. An average of 106.5 trucks unloaded material on the Site and 7.5 trucks and

containers were loaded and hauled offsite. Three open-topped rail cars were unloaded but no rail cars were

moved nor train engines operated during T1. Two different types of sweepers were operated including a

Tymco sweeper, which is used to clean the street leading up to the main gate of and the haul roads around

the scales and warehouse, and the manual sweeper is used around the shredder, MRP, and piles. The Tymco

and manual sweepers operated for approximately 10 and 2 hours, respectively, and water trucks sprayed

water across the ground surface for approximately 11.5 hours.

Page 17: SA Recycling – Terminal Island 901 New Dock Street ......SARB SA Recycling Bakersfield SARTI SA Recycling Terminal Island SB Senate Bill SMM Sims Metal Management T1/T2/T3 Test 1/Test

Air Monitoring Summary Report SA Recycling – Terminal Island

Geocon Project No. S9850-03-21 - 9 - December 23, 2016

3.5.2 Second Monitoring Event (T2)

At the completion of T1, Geocon staff replaced the sample media in each of the pumps, then began the

next 24-hour monitoring event as soon as practicable. The process of finishing T1 and beginning T2

took approximately 2 hours. T2 began by turning on the sampling equipment for SARTI1, SARTI4,

SARTI3, and SARTI2/SARTI5 at 1630, 1645, 1700 and 1715, respectively.

Geocon staff checked on the status of the sampling equipment after approximately 5.5 and 18 hours of

runtime. Sometime between the 5.5- and 18-hour system check the TSP sampler at SARTI2, PCB

sampler at SARTI3, and the asbestos pump at SARTI5 stopped working. Based on the hour meters on

the TSP and PCB samplers, the systems were not operating between for 12.32 and 8.68 hours during

T2, respectively. Because there were no hour meters on the asbestos pumps, the sampler at SARTI5 is

assumed to have been down from immediately after the 5.5-hour system check during T2. The TSP and

PCB samplers were shut down due to mechanical issues with their mechanical timers and the asbestos

sampler was shut down because of a faulty battery and battery charger. Geocon staff repaired the

equipment and resumed collecting samples by 1200 on October 13, 2016. No other equipment issues

were noted during T2.

After 24 hours, Geocon staff ended T2 by turning off the sampling equipment at each location, and

retrieving and storing the sample media.

Field-based QC parameters performed during T2 included collection of collocated samples and field

blanks. Collocated samples, also referred to as duplicate samples for air sampling, were collected and

analyzed to check for sampling and analysis error, reproducibility, and homogeneity. Collocated

samples SARTI2 (primary sample) and SARTI5 (duplicate sample) were obtained from two identically

configured sampler sets operating simultaneously in one location. Field blanks were collected and

analyzed to assess the possible contamination of samples before, during, and after sample collection.

Each field blank consisted of a clean filter that was placed onto the air sampler and then taken off

without running the sampler. Geocon staff collected a field blank sample from location SARTI1 in

between T1 and T2.

For the facility processes, an average of the hours listed for October 12 and 13, 2016 was assumed

because the sampling took place across both days. Approximately 3.8 hours of metals shredding

occurred during T2. The MRP operated approximately 8.4 hours while shearing, torch cutting, and

welding/fabrication occurred for approximately 9, 2.5, and 16.5 hours each, respectively. An average

of 79.5 trucks unloaded material on the Site and 10 trucks and containers were loaded and hauled

offsite. No rail cars were loaded or moved and no train engines operated during T2. Dust controls

performed at the Site during T2 included 13 hours of watering the ground surface and 2 hours of

sweeping and 10 hours of Tymco sweeping.

Page 18: SA Recycling – Terminal Island 901 New Dock Street ......SARB SA Recycling Bakersfield SARTI SA Recycling Terminal Island SB Senate Bill SMM Sims Metal Management T1/T2/T3 Test 1/Test

Air Monitoring Summary Report SA Recycling – Terminal Island

Geocon Project No. S9850-03-21 - 10 - December 23, 2016

3.5.3 Third Monitoring Event (T3)

At the completion of T2, Geocon staff replaced the sample media in each of the pumps, then began the

next 24-hour monitoring event as soon as practicable. The process of finishing T2 and beginning T3

took approximately 2 hours. T3 began by turning on the sampling equipment for SARTI3,

SARTI2/SARTI5, SARTI4, and SARTI1 at 1910, 1915, 1922 and 1930, respectively.

Geocon staff checked on the status of the sampling equipment after approximately 13.5 hours of

runtime. During the sampling equipment check, Geocon staff noticed that the 6-liter Summa canister

collecting sample SARTI1-T3-TOS was sampling at a faster than anticipated rate. At 1230 and after a

sampling duration of 17 hours, collection of sample SARTI1-T3-TOS was stopped. No replacement

canister was available to collect a sample during the remaining 7 hours. No other equipment issues

were noted during T3.

After 24 hours, Geocon staff ended T3 by turning off the sampling equipment at each location, and

retrieved and stored the sample media.

Field-based QC parameters performed during T3 included collection of collocated samples, field

blanks and filter blanks. Collocated samples SARTI2 (primary sample) and SARTI5 (duplicate sample)

were obtained from two identically configured sampler sets operating simultaneously in one location.

Geocon staff collected a field blank sample from location SARTI4 in between T2 and T3. Filter blanks

(sometimes referred to as trip blanks for air sampling) were collected and analyzed to assess the

contamination of samples from the native presence of target analytes in the filters used for air sample

collection. Each filter blank consisted of a clean filter that was transported with the associated primary

samples, but was not taken out of its protective sleeve. One filter blank was collected after T3.

For the other facility processes, an average of the hours listed for October 13 and 14, 2016 was

assumed because the monitoring event took place across both days. Approximately 3.8 hours of metals

shredding occurred during T3. The MRP operated approximately 4.3 hours while shearing, torch

cutting, and welding/fabrication occurred for approximately 10.3, 0.6, and 11 hours each, respectively.

An average of 84 trucks unloaded material on the Site and 10 trucks and containers were loaded and

hauled offsite. No rail cars were loaded or moved and no train engines operated during T3. Dust

controls performed at the Site during T3 included 13.5 hours of watering the ground surface and 7.5

hours of sweeping and 10 hours of Tymco sweeping.

3.6 Meteorological Conditions

A Davis Vantage Pro2 weather monitoring station recorded site-specific data for wind direction, speed,

temperature, relative humidity, and pressure during the three monitoring events. Weatherlink®

software and a data logger allowed monitoring and downloading of the site-specific data. The location

Page 19: SA Recycling – Terminal Island 901 New Dock Street ......SARB SA Recycling Bakersfield SARTI SA Recycling Terminal Island SB Senate Bill SMM Sims Metal Management T1/T2/T3 Test 1/Test

Air Monitoring Summary Report SA Recycling – Terminal Island

Geocon Project No. S9850-03-21 - 11 - December 23, 2016

of the weather station during the monitoring events is shown on the Site Plan, Figure 2. The

meteorological data is in Appendix G.

3.7 Packaging and Shipping

Geocon staff shipped the asbestos and TOS samples via 2-day shipping under standard

chain-of-custody (COC) to EMSL on October 15, 2016. Geocon staff shipped the TSP, PM10, and

PM2.5 samples via overnight delivery under standard COC to CLN on October 15, 2016. Geocon staff

delivered the PCB and formaldehyde samples to ECS under standard COC on October 15, 2016. ECS

then transported the formaldehyde samples to EAT, which received them on October 19, 2016.

The following summarizes the sample packaging procedures used for the proposed investigation:

Sample and QA/QC containers were placed into re-sealable plastic storage bags that were put into the sample coolers. Blue ice bags were packed on top and around the samples to maintain an appropriate temperature in the cooler.

Empty space in sample coolers was filled with bubble wrap to prevent sample containers from shifting during transportation to the laboratory.

The appropriate COC(s) associated with the sample cooler were double-bagged in re-sealable plastic bags and placed inside the cooler.

3.8 Laboratory Analysis

CLN analyzed the samples for the following:

TSP - 40 CFR Part 50, Appendix B to Part 50 Reference Method for the Determination of Suspended Particulate Matter in the Atmosphere (USEPA, 1998);

PM10 - 40 CFR Part 50, Appendix J to Part 50 Reference Method for the Determination of Particulate Matter as PM10 in the Atmosphere (USEPA, 1998), 40 CFR Part 50, Appendix L to Part 50 Reference Method for the Determination of Particulate Matter as PM2.5 in the Atmosphere (USEPA, 1998) and Quality Assurance Guidance Document 2.12 – Monitoring PM2.5 in Ambient Air Using Designated Reference or Class I Equivalent Methods (USEPA, 2016);

PM2.5 - 40 CFR Part 50, Appendix L to Part 50 Reference Method for the Determination of Particulate Matter as PM2.5 in the Atmosphere (USEPA, 1998) and Quality Assurance Guidance Document 2.12 – Monitoring PM2.5 in Ambient Air Using Designated Reference or Class I Equivalent Methods (USEPA, 2016);

EMSL analyzed the samples for the following:

Asbestos – Asbestos Hazard Emergency Response Act (AHERA)-modified transmission electron microscopy (TEM) as found in 40 CFR part 763 Appendix A Subpart E (USEPA, 1987);

VOCs - USEPA method TO-15 (USEPA, 1999c).

Page 20: SA Recycling – Terminal Island 901 New Dock Street ......SARB SA Recycling Bakersfield SARTI SA Recycling Terminal Island SB Senate Bill SMM Sims Metal Management T1/T2/T3 Test 1/Test

Air Monitoring Summary Report SA Recycling – Terminal Island

Geocon Project No. S9850-03-21 - 12 - December 23, 2016

ECS and EAT respectively analyzed the samples for the following:

PCBs – USEPA method TO-4A (USEPA, 1999a).

Formaldehyde – USEPA method TO-11A (USEPA, 1999b).

3.9 Variance from SAP

Sample location SARTI4 was relocated approximately 50 feet southwest from the location proposed in

the SAP. The Site Plan (Figure 2) shows the modified sampling location for SARTI4. Changing the

sampling location allowed for the sampling equipment to be powered by onsite electrical outlets and

avoided the need to use scissor lifts to elevate the samples due to stacked trailers at the originally

proposed location. DTSC staff approved of this modification in an e-mail dated October 10, 2016.

As described in Section 3.5.2, Geocon staff checked on the status of the sampling equipment after

approximately 5.5 and 18 hours of runtime during T2. Sometime between the 5.5 and 18 hours system

checks, the TSP sampler at SARTI2, PCB sampler at SARTI3, and the asbestos pump at SARTI5

stopped working. Based upon the hour meters on the TSP and PCB samplers, the systems were not

operating between for 12.32 and 8.68 hours during T2, respectively. Because there were no hour

meters on the asbestos pumps, the sampler at SARTI5 is assumed to have been down from immediately

after the 5.5-hour system check during T2. The TSP and PCB samplers were shut down due to

mechanical issues with their mechanical timers and the asbestos sampler was shut down because of a

faulty battery and battery charger. Geocon staff repaired the equipment and resumed collecting samples

by 1200 on October 13, 2016. Because collocated sampling was being performed at SARTI2 and

SARTI5 during T2, representative 24-hour samples from the collected samplers (SARTI5 for TSP and

SARTI2 for asbestos) were collected. SARTI3 was not a collocated sampling location and therefore the

PCB concentrations should be qualified being representative of a 15-hour sampling duration and is not

representative of overnight and early morning (midnight to 10 AM) conditions.

As described in Section 3.5.3, the 6-liter Summa canister collecting sample SARTI1-T3-TOS was

observed sampling at a rate that was faster than anticipated. As a result, collection of this sample

stopped after a sampling duration of 17 hours when the canister only had 3 inches of mercury vacuum

remaining. SARTI1 was not a collocated sampling location and therefore the TOS concentrations

should be qualified being representative of a 17-hour sampling duration and is not representative of

afternoon to early evening (1230 to 1930) conditions.

Data from SARTI’s onsite weather station is used to represent the meteorological conditions at the Site

instead of Geocon’s weather station.

Page 21: SA Recycling – Terminal Island 901 New Dock Street ......SARB SA Recycling Bakersfield SARTI SA Recycling Terminal Island SB Senate Bill SMM Sims Metal Management T1/T2/T3 Test 1/Test

Air Monitoring Summary Report SA Recycling – Terminal Island

Geocon Project No. S9850-03-21 - 13 - December 23, 2016

4.0 RESULTS

This section presents the laboratory analytical results for samples collected during the three monitoring

events and an evaluation of the quality of the data reported by the laboratory.

4.1 Analytical Results

The results of the gravimetric and metals analyses for the TSP, PM10, and PM2.5 samples are shown in

Tables 1 through 3, respectively. The results of the analyses for asbestos, PCBs, formaldehyde, and

TOS samples are shown in Tables 4 through 7, respectively. Copies of the analytical reports are in

Appendix H.

Following are our observations with respect to the analytical results:

4.1.1 TSP

The greatest TSP concentrations were detected in samples from SARTI4, followed by SARTI1, SARTI2, and SARTI3. Potential reasons for SARTI4 having the greatest concentrations are that the sample location was the closest of the four sample locations to stockpile material, was downwind (when the wind was from the northwest) of the both stockpiled materials and metal shredder, and was in a relatively dirtier and dustier area of the Site.

Comparing the results from each of the three monitoring events, the greatest TSP concentrations were detected in samples collected during monitoring event T3, followed by T2, and T1. Worth noting is that of the three days monitored, T3 coincided with the slowest average wind speed, the shortest duration of metal shredding, MRP production, torching, welding/fabrication, and manual sweeping, and the longest durations of shearing and watering the ground surface. T1 coincided with the fastest average wind speed, the longest duration of metal shredding, MRP production, and the shortest duration of manual sweeping. One possible explanation for why the greatest TSP concentrations were during T3 is that there was more material being stored onsite compared to T1. Because the facility was in the process of accruing material to load another freighter ship, the amount of material at the Site increased each day.

The TSP metals with the highest concentrations were iron at 8.046 micrograms per cubic meter (µg/m3), calcium at 5.951 µg/m3, sulfur at 2.224 µg/m3, aluminum at 0.7887 µg/m3, and potassium at 0.7630 µg/m3.

4.1.2 PM10

The greatest PM10 concentrations were detected in samples from SARTI4, followed by SARTI1, SARTI2, and SARTI3.

Comparing the results from each of the three monitoring events, the greatest PM10 concentrations were detected in samples collecting during monitoring event T3, followed by T2, and T1.

Page 22: SA Recycling – Terminal Island 901 New Dock Street ......SARB SA Recycling Bakersfield SARTI SA Recycling Terminal Island SB Senate Bill SMM Sims Metal Management T1/T2/T3 Test 1/Test

Air Monitoring Summary Report SA Recycling – Terminal Island

Geocon Project No. S9850-03-21 - 14 - December 23, 2016

The PM10 metals with the greatest concentrations were iron at 2.786 µg/m3, calcium at 1.784 µg/m3, sulfur at 1.595 µg/m3, silicon at 1.585 µg/m3, and sodium at 0.9007 µg/m3.

4.1.3 PM2.5

The greatest PM2.5 concentrations were detected in samples from SARTI4, followed by SARTI1, SARTI2, and SARTI3.

Comparing the results from each of the three monitoring events, the greatest PM2.5 concentrations were detected in samples collected during monitoring event T3, followed by T2, and T1.

The PM2.5 metals with the greatest concentration were sulfur at 1.120 µg/m3, iron at 0.4986 µg/m3, sodium at 0.2874 µg/m3, silicon at 0.1982 µg/m3, and calcium at 0.1209 µg/m3.

4.1.4 Asbestos

Asbestos was not detected at concentrations greater than or equal to the reporting limit in any of the

samples analyzed.

4.1.5 PCBs

PCBs were not detected at concentrations greater than or equal to the reporting limit in any of the

samples analyzed.

4.1.6 Formaldehyde

Formaldehyde was detected in each of samples analyzed at masses from 1.8 to 3.3 µg.

4.1.7 VOCs

Toluene, xylenes, chloromethane, Freon 12, Freon 11, and were detected in at least one TOS sample.

Benzene, ethylbenzene, 4-ethyltoluene, 1,3,5-trimethylbenzene 1,1-dichloroethene, 1,2,4-trichlorobenzene,

and vinyl chloride were not detected at concentrations equal to or greater than their reporting limits in any of

the samples analyzed.

4.2 Data Quality Analysis

The analytical data was reviewed as described in Section 10 of the SAP. Appendix I includes the

complete data quality assessment for the three air monitoring events. In summary, the laboratory

reported that the samples were received in good condition and that the QC samples analyzed met the

minimum requirements for acceptability. Analysis of the field duplicate samples identified multiple

analytes, mostly metals that had relative percent differences exceeding 20%. However, this variability

of 16 of the metals can be at least moderately attributed to the variability inherent in the filter sample

media.

Page 23: SA Recycling – Terminal Island 901 New Dock Street ......SARB SA Recycling Bakersfield SARTI SA Recycling Terminal Island SB Senate Bill SMM Sims Metal Management T1/T2/T3 Test 1/Test

Air Monitoring Summary Report SA Recycling – Terminal Island

Geocon Project No. S9850-03-21 - 15 - December 23, 2016

4.3 Meteorological Data

The meteorological data is presented in Appendix G. Wind rose diagrams showing the wind directions

and speeds measured during the three 24-hour sampling durations are presented in Appendix J.

Additional meteorological information collected during each of the three 24-hour duration tests is

presented in table T4.3A.

Table T4.3A – Meteorological Data Per Test

Event Start Time/ Date

End Time/ Date

High Temp (°F)

Low Temp (°F)

Avg. Temp (°F)

Avg. Wind Speed (mph)

Dominant Wind Directions

(% of Readings)

Rainfall (inches)

Avg. Pressure (in-Hg)

T1 1430 on 10/11/16

1525 on 10/12/16

71.3 61.7 65.2 3.26

NW (18%), SSW (16%), SW (12%),

SSE (10%), and NNW (10%).

0 30.05

T2 1645 on 10/12/16

1715 on 10/13/16

72.8 61.7 65.9 3.24 SSW (16%),

WNW (14%), and SE (14%).

0 30.04

T3 1915 on 10/13/16

1922 on 10/14/16

73.4 62.3 65.7 3.00 NW (26%), SSE (20%), SE (10%).

0 30.00

T1-T3 1430 on 10/11/16

1922 on 10/14/16

73.4 62.3 65.7 3.17

NW (18%), SSW (13%), SSE (11%), SE (10%)

0 30.03

Notes: °F = Degrees Fahrenheit mph = Miles per hour in-Hg = inches of mercury pressure

Following are our observations with respect to the metrological measurements:

There was measurable wind nearly continuously during each sampling event. Wind speeds of 0 mph were recorded for only 10 of the 154 observations recorded during monitoring events T1, T2, and T3.

The peak wind speeds for each monitoring event generally occurred between noon and 6:00 PM with the lowest wind speeds generally occurring from 11:00 PM to 6:00 AM.

The wind directions were variable during each monitoring event. During monitoring event T1, the most frequently occurring wind direction measured was from the northwest, occurring 18% of the time. However, wind directions from southwesterly and southeasterly variations also occurred. A breakdown of the frequency of similar directions for T1 and upwind, cross-wind, and downwind positions of the sample locations is in Table 4.3B.

Page 24: SA Recycling – Terminal Island 901 New Dock Street ......SARB SA Recycling Bakersfield SARTI SA Recycling Terminal Island SB Senate Bill SMM Sims Metal Management T1/T2/T3 Test 1/Test

Air Monitoring Summary Report SA Recycling – Terminal Island

Geocon Project No. S9850-03-21 - 16 - December 23, 2016

Table T4.3B – Frequency of Wind Direction and Its Effect on Sample Location Representativeness for T1

Wind Direction Frequency of Detection SARTI1

SARTI2 and

SARTI5 SARTI3 SARTI4

NW, NNW, and WNW

34% cross-wind/ downwind

upwind/ cross-wind

upwind downwind

SSW, SW, and WSW

32% upwind downwind upwind/ cross-wind

downwind

SSE, SE, and ESE

16% upwind cross-wind/ downwind

downwind upwind

Other 10% Variable Variable Variable Variable Calm 8% N/A N/A N/A N/A

The table above indicates that during T1, SARTI4 was generally representative of a downwind sample location, SARTI3 was generally representative of an upwind sample location, and sample SARTI1, SARTI2, and SARTI3 were generally more variable.

A breakdown of the frequency of similar wind directions for T2 and upwind, cross-wind, and downwind positions of the sample locations is in Table 4.3C.

Table T4.3C – Frequency of Wind Direction and Its Effect on Sample Location Representativeness for T2

Wind Direction Frequency of Detection SARTI1

SARTI2 and

SARTI5 SARTI3 SARTI4

NW, NNW, and WNW

28% cross-wind/ downwind

upwind/ cross-wind

upwind downwind

SSW, SW, and WSW

24% upwind downwind upwind/ cross-wind

downwind

SSE, SE, and ESE

18% upwind cross-wind/ downwind

downwind upwind

Other 14% Variable Variable Variable Variable N and NNE 10% downwind upwind cross-wind cross-wind

Calm 6% N/A N/A N/A N/A

The table above indicates that during T2, SARTI4 was generally representative of a downwind sample location, SARTI3 was generally representative of an upwind sample location, and sample SARTI1, SARTI2, and SARTI3 were generally more variable.

A breakdown of the frequency of similar wind directions for T3 and upwind, cross-wind, and downwind positions of the sample locations is in Table 4.3D.

Page 25: SA Recycling – Terminal Island 901 New Dock Street ......SARB SA Recycling Bakersfield SARTI SA Recycling Terminal Island SB Senate Bill SMM Sims Metal Management T1/T2/T3 Test 1/Test

Air Monitoring Summary Report SA Recycling – Terminal Island

Geocon Project No. S9850-03-21 - 17 - December 23, 2016

Table T4.3D – Frequency of Wind Direction and Its Effect on Sample Location Representativeness for T3

Wind Direction Frequency of Detection SARTI1

SARTI2 and

SARTI5 SARTI3 SARTI4

S, SSE, and SE 39% upwind cross-wind/ downwind

downwind upwind

NW, NNW, and WNW

31% cross-wind/ downwind

upwind/ cross-wind

upwind downwind

Calm 10% N/A N/A N/A N/A SSW, SW, and

WSW 8% upwind downwind upwind/

cross-wind downwind

N and NNE 8% downwind upwind cross-wind cross-wind Other 4% Variable Variable Variable Variable

The table above indicates that during T3, SARTI2 and SARTI5 were generally representative of a cross-wind sample location, but that SARTI1, SARTI3, and SARTI4 were generally variable.

Page 26: SA Recycling – Terminal Island 901 New Dock Street ......SARB SA Recycling Bakersfield SARTI SA Recycling Terminal Island SB Senate Bill SMM Sims Metal Management T1/T2/T3 Test 1/Test

Air Monitoring Summary Report SA Recycling – Terminal Island

Geocon Project No. S9850-03-21 - 18 - December 23, 2016

5.0 REPORT LIMITATIONS

This report was prepared for the DTSC. Geocon-authorized users of this report are limited to the

DTSC. Individuals or organizations deemed appropriate by the DTSC (including, but not necessarily

limited to other regulatory agencies, prospective real estate brokers and buyers of all or parts of the Site

and their counsel, and/or prospective lending institutions) may utilize the Report for informational

purposes only.

Users of this report should understand that this monitoring event was not a comprehensive

characterization of the Site. Air monitoring was limited to assessing the concentrations of the specified

contaminants of potential concern (COPC) for this project with respect to the specific areas of potential

concern identified in this report.

Geocon does not guarantee or warranty, either express or implied, that there is no environmental,

health, or financial risk associated with the specific areas identified in this report, other areas of the

Site, or the Site as a whole. Users of this report must evaluate the risk of reliance upon the information

herein and assume that risk (if any). Geocon is not responsible for unfavorable results due to reliance

on information provided in this report.

Information herein with respect to the condition of the specific areas associated with this project is

valid only as of the dates of our field activities. Changes in site conditions not brought to our attention

between or subsequent to those dates (if any) could result in the need for additional characterization

investigation and/or mitigation activities.

Information in this report is based on our site observations, analytical results and associated QC data

reported for the air samples. Geocon does not certify or guarantee that the information obtained and

reported by others is accurate or suitable for the intended purpose.

The authors of this report declare that, to the best of their knowledge, the information provided herein

is truthful and accurate, notwithstanding unknown incidental errors or omissions that would not

materially impact or change results of this project or our conclusions. Geocon strived to conduct

activities for this project in accordance with the standard level of care in the local geographic area at

the time the activities were rendered.

Page 27: SA Recycling – Terminal Island 901 New Dock Street ......SARB SA Recycling Bakersfield SARTI SA Recycling Terminal Island SB Senate Bill SMM Sims Metal Management T1/T2/T3 Test 1/Test

Air Monitoring Summary Report SA Recycling – Terminal Island

Geocon Project No. S9850-03-21 - 19 - December 23, 2016

6.0 REFERENCES

Senate Bill 1249, 2013-2014. Ch. 756, 2014 California. http://leginfo.legislature.ca.gov/faces/billNavClient.xhtml?bill_id=201320140SB1249

Geocon Consultants, Inc., Sampling And Analysis Plan -Air Monitoring At Various Metal Shredding Facilities Statewide: Sims Metal Management 699 Seaport Blvd, Redwood City CA, 94063-2712, SA Recycling – Bakersfield, 2000 E. Brundage Lane, Bakersfield, CA 93307-2734, SA Recycling – Terminal Island, 901 New Dock Street, Terminal Island, CA 90731, September 30, 2016.

Iowa Environmental Mesonet Database, http://mesonet.agron.iastate.edu/

Port of Los Angeles webpage, https://www.portoflosangeles.org/pdf/POLA_Cargo_Terminals_Map.pdf

SA Recycling Terminal Island webpage, http://www.sarecycling.com/yard/CA-Los-Angeles-901-New-Dock-Street/

Stevenson, Eric. August 22, 2016. Personal interview

Tisch Environmental, Operations Manual TE-5170V Volumetric Flow Controlled Total Suspended Particulate High-Volume Air Sampler,

Tisch Environmental, TE-Wilbur Operations Manual, Revised January 2016

Tisch Environmental, TE-1000 PUF Polyurethane Foam High-Volume Air Sampler Operations Manual

United States Environmental Protection Agency, 40 CFR Part 50, Appendix B to Part 50 Reference Method for the Determination of Suspended Particulate Matter in the Atmosphere, 1998.

United States Environmental Protection Agency, 40 CFR Appendix E to Part 58 - Probe and Monitoring Path Siting Criteria for Ambient Air Quality Monitoring, 2015.

United States Environmental Protection Agency, 40 CFR Part 50, Appendix J to Part 50 Reference Method for the Determination of Particulate Matter as PM10 in the Atmosphere, 1998.

United States Environmental Protection Agency, 40 CFR Part 50, Appendix L to Part 50 Reference Method for the Determination of Particulate Matter as PM2.5 in the Atmosphere, 1998.

United States Environmental Protection Agency, Quality Assurance Guidance Document 2.12 – Monitoring PM2.5 in Ambient Air Using Designated Reference or Class I Equivalent Methods, 2016.

United States Environmental Protection Agency, Compendium of Methods for the Determination of Toxic Organic Compounds in Ambient Air Second Edition: Compendium Method TO-15 - Determination of Volatile Organic Compounds (VOCs) in Air Collected in Specially-Prepared Canisters and Analyzed By Gas Chromatography/Mass Spectrometry, January, 1999.

United States Environmental Protection Agency, Compendium of Methods for the Determination of Toxic Organic Compounds in Ambient Air Second Edition: Compendium Method TO-11A - Determination of Formaldehyde in Ambient Air Using Adsorbent Cartridge Followed by High Performance Liquid Chromatography (HPLC) [Active Sampling Methodology], January, 1999.

United States Environmental Protection Agency, Compendium of Methods for the Determination of Toxic Organic Compounds in Ambient Air Second Edition: Compendium Method TO-4A - Determination of Pesticides and Polychlorinated Biphenyls in Ambient Air Using High Volume Polyurethane Foam (PUF) Sampling Followed by Gas Chromatographic/Multi-Detector Detection, January, 1999.

Western Regional Climate Center webpage, http://www.wrcc.dri.edu/.

Page 28: SA Recycling – Terminal Island 901 New Dock Street ......SARB SA Recycling Bakersfield SARTI SA Recycling Terminal Island SB Senate Bill SMM Sims Metal Management T1/T2/T3 Test 1/Test

0 21

Scale in Miles

Carson

Del Amo Blvd.

South St.

Artesia Blvd.

Carson St. Carson St.

St.

St.Willow

SpringSepulveda

Blvd.

PacificCoast Hwy.

PacificCoast

Hwy.

Anaheim

SeasideFwy.

St.

7th St.

Ocean

Blvd.

Blvd

.Av

alon

Ave.

Ave.

Blvd

.

Blvd

.Be

llflo

wer

Lake

woo

d

Cher

ry

Atla

ntic

Long

Beac

hBl

vd.

Ave.

Paci

fic

Alam

eda

Alameda

St.

St.

LongBeach

Blvd.

Los

Coyotes

Diagon

al

California StateUniversity

Dominquez Hills

Long BeachMunicipal

Airport

Los

Ange

les

Riv

er

Long Beach Harbor

South BayPavilionat Carson

405

710

710

710

405

405

91

91

103

103

47

47

Long BeachMemorialMedicalCenter

Long BeachMemorialMedicalCenter

N

SkylinksGolfCourse

LakewoodCountry

Club

RecreationPark

Golf Course

VirginiaCountry

Club

TERMINALISLAND

LakewoodLakewood

Long BeachCity College

Long BeachCity College

Long BeachCity College

Long BeachCity College

LakewoodCenter

LakewoodCenter

LongBeachLong

Beach

VICINITY MAP

December 2016 Figure 1S9850-03-21

P H O N E 9 1 6 . 8 5 2 . 9 11 8 – FA X 9 1 6 . 8 5 2 . 9 1 3 23 1 6 0 G O L D VA L L E Y D R – S U I T E 8 0 0 – R A N C H O C O R D O VA , C A 9 5 7 4 2

PROJECTSITE

PROJECTSITE

901 New Dock StreetTerminal Island, California

SA Recycling – Terminal Island

Page 29: SA Recycling – Terminal Island 901 New Dock Street ......SARB SA Recycling Bakersfield SARTI SA Recycling Terminal Island SB Senate Bill SMM Sims Metal Management T1/T2/T3 Test 1/Test

N

0 300

Scale in FeetSITE PLAN

December 2016 Figure 2S9850-03-21

P H O N E 9 1 6 . 8 5 2 . 9 11 8 – FA X 9 1 6 . 8 5 2 . 9 1 3 23 1 6 0 G O L D VA L L E Y D R – S U I T E 8 0 0 – R A N C H O C O R D O VA , C A 9 5 7 4 2

LEGEND:

Approximate Site Boundary

Proposed Air Sampling Location

Railroad Tracks

SARTI1

SARTI1

SARTI2

SARTI4

SARTI1

E A S T B A S I NE A S T B A S I N

SARTI2

SARTI4

901 New Dock StreetTerminal Island, California

SA Recycling – Terminal Island

Port of Los AngelesMulti-Use Terminal

MetalShredder

CargoTerminals

Port of Los AngelesMulti-Use Terminal

SARTI3SARTI3

MetalShredder

MeterologicalStation

MeterologicalStation

CargoTerminals

N E W DO C K S

T R E E T

N E W DO C K S

T R E E T

Wind Rose DiagramsSee Appendix J

T1

T2

T3

Wind Rose DiagramsSee Appendix J

T1

T2

T3

Metal RecoveryPlant

Metal RecoveryPlant

Page 30: SA Recycling – Terminal Island 901 New Dock Street ......SARB SA Recycling Bakersfield SARTI SA Recycling Terminal Island SB Senate Bill SMM Sims Metal Management T1/T2/T3 Test 1/Test

PHOTOS NO. 1 & 2

December 2016GEOCON Project No. S9850-03-21

901 New Dock StreetTerminal Island, California

SA Recycling – Terminal Island

Photo No. 1 Sampling location SARTI1. Equipment shown from right to left: TE-1000 PUF, TE-Wilbur10, TE-5170V, TE-Wilbur2.5. A 6-Liter Summa canister and GilAir pump are difficult to see but shown on top of the SA Recycling sign between the TE-1000 PUF and TE-Wilbur10 samplers.

Photo No. 2 Sampling location SARTI2 along with duplicate sample SARTI5.

P H O N E 9 1 6 . 8 5 2 . 9 11 8 – FA X 9 1 6 . 8 5 2 . 9 1 3 23 1 6 0 G O L D VA L L E Y D R – S U I T E 8 0 0 – R A N C H O C O R D O VA , C A 9 5 7 4 2

Page 31: SA Recycling – Terminal Island 901 New Dock Street ......SARB SA Recycling Bakersfield SARTI SA Recycling Terminal Island SB Senate Bill SMM Sims Metal Management T1/T2/T3 Test 1/Test

PHOTOS NO. 3 & 4

December 2016GEOCON Project No. S9850-03-21

901 New Dock StreetTerminal Island, California

SA Recycling – Terminal Island

Photo No. 4 Sampling location SARTI4.

P H O N E 9 1 6 . 8 5 2 . 9 11 8 – FA X 9 1 6 . 8 5 2 . 9 1 3 23 1 6 0 G O L D VA L L E Y D R – S U I T E 8 0 0 – R A N C H O C O R D O VA , C A 9 5 7 4 2

Photo No. 3 Sampling location SARTI3.

Page 32: SA Recycling – Terminal Island 901 New Dock Street ......SARB SA Recycling Bakersfield SARTI SA Recycling Terminal Island SB Senate Bill SMM Sims Metal Management T1/T2/T3 Test 1/Test

Geocon Project No. S9850-03-21December 23, 2016Page 1 of 4

Client ID Sample Date Tare(g)

Gross (g)

Net (µg)

Volume(m3)

Concentration

(µg/m3)

Aluminium (Al)

(µg/m3)

Phosphorus (P)(µg/m3)

Sulfur (S) (µg/m3)

Chlorine (Cl)

(µg/m3)

Potassium (K)

(µg/m3)

Calcium (Ca)

(µg/m3)

SARTI1-T1-TSP 10/12/2016 4.2948 4.4008 106,000 1,756 60.4 0.5549 0.0000 0.7759 1.1220 0.6552 3.8150SARTI1-T2-TSP 10/13/2016 4.2861 4.4041 118,000 1,756 67.2 0.6298 0.0000 0.8622 0.6342 0.6980 3.826SARTI1-T3-TSP 10/14/2016 4.2727 4.4117 139,000 1,756 79.2 0.7237 0.0000 1.1460 0.4007 0.7112 3.7550

SARTI2-T1-TSP 10/12/2016 4.3034 4.3967 93,300 1,754 53.2 0.6134 0.0000 0.5838 0.8937 0.4977 3.0140SARTI2-T2-TSP 2 10/13/2016 4.2899 4.3443 54,400 854 63.7 0.7887 0.0000 0.5077 0.3795 0.7630 4.2890SARTI2-T3-TSP 10/14/2016 4.3189 4.4220 103,100 1,754 58.8 0.5798 0.0000 0.8435 0.2226 0.5199 2.5300

SARTI3-T1-TSP 10/12/2016 4.3083 4.3828 74,500 1,752 42.5 0.4832 0.0000 0.5617 0.6127 0.4799 2.4610SARTI3-T2-TSP 10/13/2016 4.2877 4.3782 90,500 1,752 51.7 0.5566 0.0000 0.6350 0.2429 0.5418 2.5720SARTI3-T3-TSP 10/14/2016 4.3323 4.4354 103,100 1,752 58.8 0.5657 0.0000 0.8702 0.2417 0.5228 2.6670

SARTI4-T1-TSP 10/12/2016 4.2771 4.3756 98,500 1,756 56.1 0.5951 0.0000 0.7884 1.1040 0.5963 3.9490SARTI4-T2-TSP 10/13/2016 4.3318 4.4759 144,100 1,756 82.1 0.7239 0.0000 1.3650 0.7831 0.6682 5.1100SARTI4-T3-TSP 10/14/2016 4.32 4.4957 175,700 1,756 100 0.6920 0.0000 2.2240 0.5630 0.6645 5.9510

Field DuplicateSARTI5-T2-TSP 10/13/2016 4.2958 4.3995 103,700 1,738 59.7 0.5983 0.0000 0.7123 0.3609 0.6106 2.8970SARTI5-T3-TSP 10/14/2016 4.3021 4.4107 108,600 1,738 62.5 0.5651 0.0000 0.9066 0.2464 0.6018 2.712

Field BlankSARTI1-T1-TSP-FB 1 10/12/2016 4.3056 4.3082 2,600 354.1000 0.0000 4.5470 13.2800 302.7000 2116.0000SARTI4-T2-TSP-FB 1 10/13/2016 4.3042 4.3058 1,600 247.9000 0.0000 5.5620 19.8900 302.5000 2130.0000

Trip BlankSARTI-TB-TSP 1 10/14/2016 4.3070 4.3092 2,200 343.8000 0.0000 17.7000 23.7500 310.7000 2140.000

Lab BlankLab Blank 1 4.2809 4.2818 900 328.7000 0.0000 1.2590 9.2570 302.4000 2118.000Lab Blank 1 4.3054 4.3062 800 295.4000 0.0000 0.0000 13.8400 320.1000 2137.000

TABLE 1SUMMARY OF GRAVIMETRIC AND METALS ANALYTICAL DATA - TSP

DTSC METAL SHREDDING FACILITIESSA RECYCLING TERMINAL ISLAND (SARTI), 901 NEW DOCK STREET, TERMINAL ISLAND, CALIFORNIA

CONTRACT NO. 15-T4124

Page 33: SA Recycling – Terminal Island 901 New Dock Street ......SARB SA Recycling Bakersfield SARTI SA Recycling Terminal Island SB Senate Bill SMM Sims Metal Management T1/T2/T3 Test 1/Test

Geocon Project No. S9850-03-21December 23, 2016Page 2 of 4

TABLE 1SUMMARY OF GRAVIMETRIC AND METALS ANALYTICAL DATA - TSP

DTSC METAL SHREDDING FACILITIESSA RECYCLING TERMINAL ISLAND (SARTI), 901 NEW DOCK STREET, TERMINAL ISLAND, CALIFORNIA

CONTRACT NO. 15-T4124

Client ID Sample DateTitanium

(Ti)(µg/m3)

Vanadium (V)

(µg/m3)

Chromium (Cr)

(µg/m3)

Manganese (Mn)

(µg/m3)

Iron (Fe)(µg/m3)

Cobalt (Co)(µg/m3)

Nickel (Ni)(µg/m3)

Copper (Cu)

(µg/m3)

Zinc (Zn)(µg/m3)

Gallium (Ga)

(µg/m3)

Germanium (Ge)

(µg/m3)

SARTI1-T1-TSP 10/12/2016 0.0892 0.0048 0.0379 0.0538 3.0800 0.0000 0.0097 0.1380 0.3410 0.0052 0.0049SARTI1-T2-TSP 10/13/2016 0.0963 0.0000 0.0413 0.0564 3.2110 0.0000 0.0098 0.1451 0.2682 0.0038 0.0039SARTI1-T3-TSP 10/14/2016 0.1118 0.0000 0.0331 0.0509 3.2760 0.0000 0.0103 0.1256 0.2664 0.0052 0.0030

SARTI2-T1-TSP 10/12/2016 0.0754 0.0000 0.0366 0.0519 4.1320 0.0000 0.0118 0.0976 0.4747 0.0058 0.0029SARTI2-T2-TSP 2 10/13/2016 0.1473 0.0000 0.0608 0.0429 3.0930 0.0000 0.0107 0.0783 0.3007 0.0117 0.0090SARTI2-T3-TSP 10/14/2016 0.0775 0.0000 0.0263 0.0296 2.0100 0.0000 0.0074 0.0963 0.1683 0.0039 0.0030

SARTI3-T1-TSP 10/12/2016 0.0606 0.0036 0.0336 0.0309 2.0230 0.0000 0.0085 0.1187 0.1943 0.0052 0.0027SARTI3-T2-TSP 10/13/2016 0.0754 0.0000 0.0348 0.0336 1.9680 0.0000 0.0086 0.1325 0.1910 0.0052 0.0040SARTI3-T3-TSP 10/14/2016 0.0890 0.0010 0.0292 0.0412 2.3200 0.0000 0.0081 0.1060 0.2169 0.0050 0.0029

SARTI4-T1-TSP 10/12/2016 0.0948 0.0005 0.0400 0.0730 6.1290 0.0000 0.0113 0.1341 0.3857 0.0043 0.0070SARTI4-T2-TSP 10/13/2016 0.1087 0.0000 0.0476 0.0706 5.2530 0.0000 0.0138 0.1948 0.4825 0.0036 0.0034SARTI4-T3-TSP 10/14/2016 0.1376 0.0000 0.0462 0.0950 8.0460 0.0000 0.0080 0.1497 0.4011 0.0048 0.0035

Field DuplicateSARTI5-T2-TSP 10/13/2016 0.1103 0.0000 0.0333 0.0367 2.3300 0.0000 0.0088 0.1362 0.2069 0.0052 0.0027SARTI5-T3-TSP 10/14/2016 0.0874 0.0010 0.0285 0.0344 2.2750 0.0000 0.0066 0.1181 0.1819 0.0029 0.0038

Field BlankSARTI1-T1-TSP-FB 1 10/12/2016 27.7700 0.0000 42.8300 5.1560 140.4000 0.0000 4.9940 13.9700 5.7650 11.0800 7.0640SARTI4-T2-TSP-FB 1 10/13/2016 0.0000 0.0000 44.2100 6.1310 193.5000 0.0000 8.0790 18.8400 17.4600 11.9000 6.6180

Trip BlankSARTI-TB-TSP 1 10/14/2016 25.5000 0.0000 43.5600 8.0390 132.5000 0.0000 6.4550 13.6000 5.6430 13.3600 8.4450

Lab BlankLab Blank 1 21.8400 0.0000 43.1200 7.2670 132.4000 0.0000 8.3230 14.6600 6.6990 11.6100 7.9580Lab Blank 1 26.8000 0.0000 45.5500 8.0790 131.8000 0.0000 5.8870 13.8900 10.0300 13.8900 8.5670

Page 34: SA Recycling – Terminal Island 901 New Dock Street ......SARB SA Recycling Bakersfield SARTI SA Recycling Terminal Island SB Senate Bill SMM Sims Metal Management T1/T2/T3 Test 1/Test

Geocon Project No. S9850-03-21December 23, 2016Page 3 of 4

TABLE 1SUMMARY OF GRAVIMETRIC AND METALS ANALYTICAL DATA - TSP

DTSC METAL SHREDDING FACILITIESSA RECYCLING TERMINAL ISLAND (SARTI), 901 NEW DOCK STREET, TERMINAL ISLAND, CALIFORNIA

CONTRACT NO. 15-T4124

Client ID Sample DateArsenic

(As)(µg/m3)

Selenium (Se)

(µg/m3)

Bromine (Br)

(µg/m3)

Rubidium (Rb)

(µg/m3)

Strontium (Sr)

(µg/m3)

Yttrium (Y)(µg/m3)

Zirconium (Zr)(µg/m3)

Molyb-denum (Mo)

(µg/m3)

Palladium (Pd)

(µg/m3)

Silver (Ag)(µg/m3)

Cadmium (Cd)

(µg/m3)

SARTI1-T1-TSP 10/12/2016 0.0014 0.0009 0.0153 0.0022 0.0234 0.0030 0.0295 0.0425 0.0000 0.0000 0.0000SARTI1-T2-TSP 10/13/2016 0.0005 0.0003 0.0135 0.0028 0.0254 0.0041 0.0298 0.0445 0.0003 0.0000 0.0013SARTI1-T3-TSP 10/14/2016 0.0025 0.0022 0.0161 0.0032 0.0320 0.0023 0.0351 0.0415 0.0000 0.0000 0.0000

SARTI2-T1-TSP 10/12/2016 0.0012 0.0013 0.0096 0.0000 0.0216 0.0008 0.0297 0.0421 0.0000 0.0007 0.0003SARTI2-T2-TSP 2 10/13/2016 0.0006 0.0006 0.0114 0.0045 0.0238 0.0067 0.0463 0.0744 0.0003 0.0000 0.0000SARTI2-T3-TSP 10/14/2016 0.0020 0.0005 0.0112 0.0013 0.0194 0.0023 0.0311 0.0375 0.0000 0.0000 0.0000

SARTI3-T1-TSP 10/12/2016 0.0019 0.0006 0.0103 0.0013 0.0245 0.0030 0.0260 0.0373 0.0000 0.0006 0.0011SARTI3-T2-TSP 10/13/2016 0.0016 0.0001 0.0099 0.0022 0.0173 0.0035 0.0282 0.0368 0.0000 0.0000 0.0023SARTI3-T3-TSP 10/14/2016 0.0016 0.0010 0.0123 0.0018 0.0249 0.0018 0.0273 0.0427 0.0000 0.0018 0.0011

SARTI4-T1-TSP 10/12/2016 0.0038 0.0051 0.0132 0.0021 0.0209 0.0011 0.0271 0.0391 0.0000 0.0018 0.0007SARTI4-T2-TSP 10/13/2016 0.0032 0.0006 0.0129 0.0019 0.0280 0.0035 0.0359 0.0370 0.0002 0.0000 0.0013SARTI4-T3-TSP 10/14/2016 0.0028 0.0002 0.0126 0.0025 0.0322 0.0011 0.0287 0.0335 0.0000 0.0006 0.0004

Field DuplicateSARTI5-T2-TSP 10/13/2016 0.0012 0.0013 0.0101 0.0017 0.0198 0.0028 0.0249 0.0444 0.0021 0.0007 0.0004SARTI5-T3-TSP 10/14/2016 0.0019 0.0015 0.0116 0.0021 0.0207 0.0017 0.0281 0.0396 0.0000 0.0000 0.0000

Field BlankSARTI1-T1-TSP-FB 1 10/12/2016 0.8526 0.0000 0.6496 0.0000 6.0490 2.4360 34.9600 59.6400 0.8120 0.0000 1.2590SARTI4-T2-TSP-FB 1 10/13/2016 2.3140 1.5430 0.0000 1.7460 7.9580 5.0340 35.8500 64.2300 0.1624 2.9640 0.0000

Trip BlankSARTI-TB-TSP 1 10/14/2016 0.0000 0.1624 0.3248 0.8932 6.2520 3.6130 31.8300 59.8400 0.0000 0.0000 0.0000

Lab BlankLab Blank 1 0.5684 1.9490 1.4620 0.0000 5.7650 1.5020 31.5500 56.5200 0.0000 0.0000 0.6902Lab Blank 1 0.9744 0.0000 0.5684 0.0000 8.0390 7.5110 39.7100 61.1000 0.0000 0.9744 2.3550

Page 35: SA Recycling – Terminal Island 901 New Dock Street ......SARB SA Recycling Bakersfield SARTI SA Recycling Terminal Island SB Senate Bill SMM Sims Metal Management T1/T2/T3 Test 1/Test

Geocon Project No. S9850-03-21December 23, 2016Page 4 of 4

TABLE 1SUMMARY OF GRAVIMETRIC AND METALS ANALYTICAL DATA - TSP

DTSC METAL SHREDDING FACILITIESSA RECYCLING TERMINAL ISLAND (SARTI), 901 NEW DOCK STREET, TERMINAL ISLAND, CALIFORNIA

CONTRACT NO. 15-T4124

Client ID Sample DateIndium (In)

(µg/m3)Tin (Sn)(µg/m3)

Antimony (Sb)

(µg/m3)

Barium (Ba)

(µg/m3)

Lanthanum (La)

(µg/m3)

Mercury (Hg)

(µg/m3)

Lead (Pb)(µg/m3)

Beryllium (Be)

(µg/m3)--- --- ---

SARTI1-T1-TSP 10/12/2016 0.0001 0.0166 0.0058 0.1213 0.0203 0.0000 0.0383 <0.0000 --- --- ---SARTI1-T2-TSP 10/13/2016 0.0010 0.0139 0.0030 0.1291 0.0000 0.0000 0.0326 <0.0000 --- --- ---SARTI1-T3-TSP 10/14/2016 0.0000 0.0132 0.0023 0.1308 0.0146 0.0000 0.0319 <0.0000 --- --- ---

SARTI2-T1-TSP 10/12/2016 0.0000 0.0166 0.0006 0.1038 0.0000 0.0015 0.0343 <0.0000 --- --- ---SARTI2-T2-TSP 2 10/13/2016 0.0023 0.0163 0.0011 0.1251 0.0116 0.0000 0.0319 <0.0001 --- --- ---SARTI2-T3-TSP 10/14/2016 0.0027 0.0128 0.0002 0.0851 0.0038 0.0016 0.0151 <0.0000 --- --- ---

SARTI3-T1-TSP 10/12/2016 0.0006 0.0165 0.0000 0.0979 0.0000 0.0000 0.0166 <0.0000 --- --- ---SARTI3-T2-TSP 10/13/2016 0.0000 0.0140 0.0016 0.0993 0.0049 0.0000 0.0147 <0.0000 --- --- ---SARTI3-T3-TSP 10/14/2016 0.0000 0.0128 0.0047 0.0975 0.0024 0.0000 0.0274 <0.0000 --- --- ---

SARTI4-T1-TSP 10/12/2016 0.0001 0.0165 0.0037 0.0912 0.0185 0.0037 0.0561 <0.0000 --- --- ---SARTI4-T2-TSP 10/13/2016 0.0004 0.0183 0.0012 0.1405 0.0202 0.0018 0.0517 <0.0000 --- --- ---SARTI4-T3-TSP 10/14/2016 0.0003 0.0143 0.0013 0.1311 0.0000 0.0000 0.0464 <0.0000 --- --- ---

Field DuplicateSARTI5-T2-TSP 10/13/2016 0.0010 0.0136 0.0000 0.1075 0.0086 0.0000 0.0216 <0.0000 --- --- ---SARTI5-T3-TSP 10/14/2016 0.0017 0.0115 0.0028 0.0954 0.0081 0.0000 0.0176 <0.0000 --- --- ---

Field BlankSARTI1-T1-TSP-FB 1 10/12/2016 0.0000 19.3700 5.5220 30.2500 0.0000 0.0000 0.1624 <0.049 --- --- ---SARTI4-T2-TSP-FB 1 10/13/2016 1.7050 17.6200 0.0000 104.8000 20.0200 0.0000 4.0190 <0.049 --- --- ---

Trip BlankSARTI-TB-TSP 1 10/14/2016 0.8526 19.9300 5.3190 61.7100 2.8010 0.0000 3.2480 <0.049 --- --- ---

Lab BlankLab Blank 1 0.0000 16.6900 0.0000 23.7100 0.0000 0.0000 3.4510 <0.049 --- --- ---Lab Blank 1 0.0000 17.5000 4.6280 38.4100 0.0000 0.0000 3.0450 <0.049 --- --- ---

Notes: g = grams µg/m3 = micrograms per cubic meter Highlighted = concentrations are less than three times the uncertaintym3 = cubic meters --- = not sampled/tested Italics = Quality assurance/quality control samplesµg = micrograms 1 = units for these QA/QC samples are µg/filter2 = Sampler did not operate for full 24 duration mechanical problems and is representative of a 11.7 hour sample duration

Page 36: SA Recycling – Terminal Island 901 New Dock Street ......SARB SA Recycling Bakersfield SARTI SA Recycling Terminal Island SB Senate Bill SMM Sims Metal Management T1/T2/T3 Test 1/Test

Geocon Project No. S9850-03-21December 23, 2016Page 1 of 4

Client ID Sample Date Tare(mg)

Gross (mg)

Net (µg)

Volume(m3)

Concentration

(µg/m3)

Sodium (Na)

(µg/m3)

Magnesium (Mg)

(µg/m3)

Aluminium

(Al)(µg/m3)

Silicon (Si)

(µg/m3)

Phosphorus (P)

(µg/m3)

Sulfur (S) (µg/m3)

SARTI1-T1-PM10 10/12/2016 385.577 386.216 639 24 26.6 0.9007 0.2574 0.4202 1.0650 0.0199 0.8310SARTI1-T2-PM10 10/13/2016 376.509 377.313 804 24 33.5 0.8386 0.2852 0.5061 1.3050 0.0177 0.9021SARTI1-T3-PM10 10/14/2016 377.509 378.433 924 24 38.5 0.9129 0.2866 0.5659 1.5780 0.0229 1.3500

SARTI2-T1-PM10 10/12/2016 380.518 381.096 578 24 24.1 0.7514 0.2282 0.3700 0.9539 0.0123 0.7778SARTI2-T2-PM10 10/13/2016 372.184 372.839 655 24 27.3 0.8047 0.2419 0.3921 1.0460 0.0141 0.8254SARTI2-T3-PM10 10/14/2016 378.458 379.312 854 24 35.6 0.7500 0.2579 0.4295 1.1480 0.0131 1.2020

SARTI3-T1-PM10 10/12/2016 372.674 373.152 478 24 19.9 0.7557 0.2089 0.2781 0.7204 0.0089 0.7110SARTI3-T2-PM10 10/13/2016 379.087 379.751 664 24 27.7 0.7722 0.2150 0.4015 1.0710 0.0158 0.7872SARTI3-T3-PM10 10/14/2016 364.390 365.183 793 24 33.0 0.8371 0.2456 0.4208 1.1630 0.0168 1.2460

SARTI4-T1-PM10 10/12/2016 368.655 369.389 734 24 30.6 0.7486 0.2513 0.4450 1.1530 0.0170 0.8061SARTI4-T2-PM10 10/13/2016 375.272 376.201 929 24 38.7 0.7943 0.3007 0.6239 1.3530 0.0228 1.1510SARTI4-T3-PM10 10/14/2016 368.982 370.206 1224 24 51.0 0.7514 0.3002 0.6041 1.5850 0.0241 1.5950

Field DuplicateSARTI5-T2-PM10 10/13/2016 374.275 374.934 659 24 27.5 0.7665 0.2244 0.3834 1.0380 0.0133 0.7929SARTI5-T3-PM10 10/14/2016 367.632 368.437 805 24 33.5 0.7689 0.2202 0.4315 1.1580 0.0139 1.2770

Field BlankSARTI1-T1-PM10-FB 1 10/12/2016 371.401 371.418 17 0.3446 0.0000 0.0000 0.0079 0.0000 0.0011SARTI4-T2-PM10-FB 1 10/13/2016 372.129 372.127 -2 0.8125 0.0757 0.1266 0.0328 0.0000 0.0000

Trip BlankSARTI-TB-PM10 1 10/14/2016 381.134 381.150 16 0.4012 0.0000 0.0000 0.0034 0.0000 0.0000

Lab BlankLab Blank 1 365.638 365.639 1 0.0000 0.0531 0.0000 0.0000 0.0000 0.0023Lab Blank 1 365.472 365.470 -2 0.6509 0.1514 0.0000 0.0000 0.0000 0.0000Lab Blank 1 373.779 373.780 1 0.2554 0.1017 0.0542 0.0226 0.0000 0.0113Lab Blank 1 380.038 380.033 -5 0.0746 0.0000 0.0734 0.0881 0.0000 0.0011

TABLE 2SUMMARY OF GRAVIMETRIC AND METALS ANALYTICAL DATA - PM10

DTSC METAL SHREDDING FACILITIESSA RECYCLING TERMINAL ISLAND (SARTI), 901 NEW DOCK STREET, TERMINAL ISLAND, CALIFORNIA

CONTRACT NO. 15-T4124

Page 37: SA Recycling – Terminal Island 901 New Dock Street ......SARB SA Recycling Bakersfield SARTI SA Recycling Terminal Island SB Senate Bill SMM Sims Metal Management T1/T2/T3 Test 1/Test

Geocon Project No. S9850-03-21December 23, 2016Page 2 of 4

TABLE 2SUMMARY OF GRAVIMETRIC AND METALS ANALYTICAL DATA - PM10

DTSC METAL SHREDDING FACILITIESSA RECYCLING TERMINAL ISLAND (SARTI), 901 NEW DOCK STREET, TERMINAL ISLAND, CALIFORNIA

CONTRACT NO. 15-T4124

Client ID Sample DateChlorine

(Cl)(µg/m3)

Potassium (K)

(µg/m3)

Calcium (Ca)

(µg/m3)

Titanium (Ti)

(µg/m3)

Vanadium (V)

(µg/m3)

Chromium (Cr)

(µg/m3)

Manganese (Mn)

(µg/m3)

Iron (Fe)(µg/m3)

Cobalt (Co)

(µg/m3)

Nickel (Ni)(µg/m3)

Copper (Cu)(µg/m3)

SARTI1-T1-PM10 10/12/2016 0.8922 0.2189 0.9214 0.0435 0.0116 0.0048 0.0135 0.9464 0.0000 0.0036 0.0490SARTI1-T2-PM10 10/13/2016 0.5052 0.2642 1.1070 0.0540 0.0062 0.0055 0.0189 1.2450 0.0000 0.0039 0.0487SARTI1-T3-PM10 10/14/2016 0.4873 0.2999 1.0710 0.0646 0.0077 0.0044 0.0177 1.2620 0.0000 0.0034 0.0607

SARTI2-T1-PM10 10/12/2016 0.7783 0.1987 0.6992 0.0403 0.0088 0.0044 0.0150 1.2460 0.0000 0.0038 0.0167SARTI2-T2-PM10 10/13/2016 0.3786 0.2198 0.6479 0.0533 0.0036 0.0036 0.0115 0.7547 0.0000 0.0027 0.0298SARTI2-T3-PM10 10/14/2016 0.3758 0.2306 0.5754 0.0479 0.0059 0.0024 0.0107 0.8084 0.0000 0.0029 0.0267

SARTI3-T1-PM10 10/12/2016 0.6578 0.1547 0.4027 0.0292 0.0091 0.0028 0.0060 0.5730 0.0000 0.0031 0.0167SARTI3-T2-PM10 10/13/2016 0.3371 0.2174 0.6126 0.0463 0.0044 0.0034 0.0113 0.8112 0.0000 0.0032 0.0247SARTI3-T3-PM10 10/14/2016 0.4000 0.2413 0.5895 0.0493 0.0061 0.0039 0.0117 0.8800 0.0000 0.0031 0.0212

SARTI4-T1-PM10 10/12/2016 0.8729 0.2254 1.1000 0.0496 0.0111 0.0052 0.0257 2.2880 0.0000 0.0072 0.0492SARTI4-T2-PM10 10/13/2016 0.5947 0.2574 1.6240 0.0586 0.0066 0.0071 0.0238 1.8270 0.0000 0.0045 0.0709SARTI4-T3-PM10 10/14/2016 0.6997 0.2938 1.7840 0.0746 0.0069 0.0084 0.0304 2.7860 0.0000 0.0046 0.0359

Field DuplicateSARTI5-T2-PM10 10/13/2016 0.4326 0.2163 0.6281 0.0483 0.0048 0.0040 0.0106 0.7425 0.0000 0.0021 0.0379SARTI5-T3-PM10 10/14/2016 0.3736 0.2411 0.6050 0.0498 0.0059 0.0029 0.0117 0.8023 0.0000 0.0023 0.0479

Field BlankSARTI1-T1-PM10-FB 1 10/12/2016 0.0000 0.0056 0.0000 0.0000 0.0090 0.0045 0.0000 0.0000 0.0000 0.0023 0.0000SARTI4-T2-PM10-FB 1 10/13/2016 0.0000 0.0068 0.0000 0.0000 0.0011 0.0181 0.0000 0.0000 0.0068 0.0011 0.0000

Trip BlankSARTI-TB-PM10 1 10/14/2016 0.0260 0.0000 0.0000 0.0000 0.0045 0.0000 0.0068 0.0136 0.0000 0.0000 0.0000

Lab BlankLab Blank 1 0.0000 0.0147 0.0000 0.0011 0.0000 0.0158 0.0000 0.0124 0.0000 0.0000 0.0000Lab Blank 1 0.0294 0.0000 0.0000 0.0079 0.0068 0.0000 0.0079 0.0170 0.0000 0.0000 0.0000Lab Blank 1 0.0158 0.0000 0.0079 0.0000 0.0000 0.0000 0.0000 0.0113 0.0068 0.0011 0.0000Lab Blank 1 0.0000 0.0170 0.0000 0.0000 0.0000 0.0158 0.0068 0.0000 0.0170 0.0000 0.0000

Page 38: SA Recycling – Terminal Island 901 New Dock Street ......SARB SA Recycling Bakersfield SARTI SA Recycling Terminal Island SB Senate Bill SMM Sims Metal Management T1/T2/T3 Test 1/Test

Geocon Project No. S9850-03-21December 23, 2016Page 3 of 4

TABLE 2SUMMARY OF GRAVIMETRIC AND METALS ANALYTICAL DATA - PM10

DTSC METAL SHREDDING FACILITIESSA RECYCLING TERMINAL ISLAND (SARTI), 901 NEW DOCK STREET, TERMINAL ISLAND, CALIFORNIA

CONTRACT NO. 15-T4124

Client ID Sample DateZinc (Zn)(µg/m3)

Gallium (Ga)

(µg/m3)

Germanium (Ge)(µg/m3)

Arsenic (As)

(µg/m3)

Selenium (Se)

(µg/m3)

Bromine (Br)

(µg/m3)

Rubidium (Rb)(µg/m3)

Strontium (Sr)

(µg/m3)

Yttrium (Y)

(µg/m3)

Zirconium (Zr)

(µg/m3)

Molyb-denum (Mo)

(µg/m3)

SARTI1-T1-PM10 10/12/2016 0.1102 0.0005 0.0000 0.0000 0.0006 0.0065 0.0009 0.0069 0.0016 0.0039 0.0017SARTI1-T2-PM10 10/13/2016 0.1005 0.0003 0.0003 0.0005 0.0000 0.0074 0.0011 0.0080 0.0000 0.0036 0.0023SARTI1-T3-PM10 10/14/2016 0.0893 0.0005 0.0000 0.0000 0.0008 0.0105 0.0017 0.0100 0.0005 0.0039 0.0034

SARTI2-T1-PM10 10/12/2016 0.1213 0.0003 0.0000 0.0011 0.0003 0.0037 0.0006 0.0064 0.0003 0.0037 0.0000SARTI2-T2-PM10 10/13/2016 0.0542 0.0000 0.0000 0.0000 0.0006 0.0059 0.0013 0.0056 0.0000 0.0027 0.0016SARTI2-T3-PM10 10/14/2016 0.0480 0.0005 0.0001 0.0000 0.0002 0.0073 0.0007 0.0057 0.0000 0.0039 0.0016

SARTI3-T1-PM10 10/12/2016 0.0452 0.0002 0.0000 0.0010 0.0007 0.0039 0.0002 0.0059 0.0000 0.0021 0.0010SARTI3-T2-PM10 10/13/2016 0.0582 0.0002 0.0003 0.0008 0.0000 0.0059 0.0013 0.0072 0.0000 0.0048 0.0011SARTI3-T3-PM10 10/14/2016 0.0726 0.0005 0.0006 0.0000 0.0013 0.0084 0.0007 0.0078 0.0008 0.0053 0.0014

SARTI4-T1-PM10 10/12/2016 0.1256 0.0012 0.0000 0.0066 0.0010 0.0050 0.0009 0.0082 0.0004 0.0029 0.0000SARTI4-T2-PM10 10/13/2016 0.1537 0.0009 0.0001 0.0000 0.0001 0.0065 0.0008 0.0102 0.0022 0.0051 0.0000SARTI4-T3-PM10 10/14/2016 0.1362 0.0005 0.0000 0.0000 0.0008 0.0101 0.0008 0.0117 0.0008 0.0035 0.0001

Field DuplicateSARTI5-T2-PM10 10/13/2016 0.0554 0.0000 0.0000 0.0011 0.0002 0.0047 0.0012 0.0062 0.0000 0.0041 0.0057SARTI5-T3-PM10 10/14/2016 0.0533 0.0000 0.0003 0.0010 0.0004 0.0090 0.0009 0.0057 0.0004 0.0034 0.0013

Field BlankSARTI1-T1-PM10-FB 1 10/12/2016 0.0011 0.0000 0.0068 0.0045 0.0011 0.0000 0.0023 0.0000 0.0000 0.0000 0.0000SARTI4-T2-PM10-FB 1 10/13/2016 0.0000 0.0000 0.0000 0.0000 0.0056 0.0000 0.0000 0.0000 0.0023 0.0000 0.0034

Trip BlankSARTI-TB-PM10 1 10/14/2016 0.0011 0.0000 0.0011 0.0000 0.0000 0.0000 0.0011 0.0000 0.0000 0.0305 0.0000

Lab BlankLab Blank 1 0.0000 0.0023 0.0000 0.0000 0.0090 0.0023 0.0000 0.0000 0.0023 0.0000 0.0023Lab Blank 1 0.0000 0.0023 0.0000 0.0000 0.0000 0.0056 0.0000 0.0000 0.0023 0.0000 0.0158Lab Blank 1 0.0000 0.0023 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0113 0.0023 0.0000Lab Blank 1 0.0000 0.0079 0.0000 0.0034 0.0045 0.0000 0.0068 0.0000 0.0000 0.0000 0.0000

Page 39: SA Recycling – Terminal Island 901 New Dock Street ......SARB SA Recycling Bakersfield SARTI SA Recycling Terminal Island SB Senate Bill SMM Sims Metal Management T1/T2/T3 Test 1/Test

Geocon Project No. S9850-03-21December 23, 2016Page 4 of 4

TABLE 2SUMMARY OF GRAVIMETRIC AND METALS ANALYTICAL DATA - PM10

DTSC METAL SHREDDING FACILITIESSA RECYCLING TERMINAL ISLAND (SARTI), 901 NEW DOCK STREET, TERMINAL ISLAND, CALIFORNIA

CONTRACT NO. 15-T4124

Client ID Sample DatePalladium

(Pd)(µg/m3)

Silver (Ag)(µg/m3)

Cadmium (Cd)

(µg/m3)

Indium (In)(µg/m3)

Tin (Sn)(µg/m3)

Antimony (Sb)

(µg/m3)

Barium (Ba)(µg/m3)

Lanthanum (La)

(µg/m3)

Mercury (Hg)

(µg/m3)

Lead (Pb)(µg/m3)

Beryllium (Be)

(µg/m3)SARTI1-T1-PM10 10/12/2016 0.0000 0.0000 0.0000 0.0000 0.0000 0.0033 0.0393 0.0042 0.0000 0.0159 <0.0003SARTI1-T2-PM10 10/13/2016 0.0000 0.0000 0.0000 0.0000 0.0000 0.0056 0.0480 0.0097 0.0000 0.0146 <0.0003SARTI1-T3-PM10 10/14/2016 0.0025 0.0000 0.0032 0.0000 0.0016 0.0000 0.0394 0.0000 0.0000 0.0151 <0.0003

SARTI2-T1-PM10 10/12/2016 0.0000 0.0000 0.0000 0.0000 0.0000 0.0005 0.0151 0.0000 0.0000 0.0113 <0.0003SARTI2-T2-PM10 10/13/2016 0.0000 0.0000 0.0000 0.0000 0.0043 0.0000 0.0239 0.0000 0.0001 0.0056 <0.0003SARTI2-T3-PM10 10/14/2016 0.0000 0.0012 0.0000 0.0007 0.0000 0.0028 0.0247 0.0021 0.0000 0.0080 <0.0003

SARTI3-T1-PM10 10/12/2016 0.0000 0.0000 0.0017 0.0000 0.0026 0.0056 0.0169 0.0000 0.0003 0.0026 <0.0003SARTI3-T2-PM10 10/13/2016 0.0017 0.0000 0.0000 0.0000 0.0034 0.0000 0.0233 0.0000 0.0000 0.0048 <0.0003SARTI3-T3-PM10 10/14/2016 0.0022 0.0000 0.0013 0.0000 0.0024 0.0039 0.0229 0.0000 0.0012 0.0103 <0.0003

SARTI4-T1-PM10 10/12/2016 0.0000 0.0000 0.0000 0.0000 0.0048 0.0000 0.0199 0.0000 0.0028 0.0166 <0.0003SARTI4-T2-PM10 10/13/2016 0.0000 0.0000 0.0000 0.0000 0.0016 0.0000 0.0332 0.0000 0.0002 0.0228 <0.0003SARTI4-T3-PM10 10/14/2016 0.0000 0.0000 0.0000 0.0000 0.0015 0.0000 0.0314 0.0000 0.0000 0.0224 <0.0003

Field DuplicateSARTI5-T2-PM10 10/13/2016 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0254 0.0000 0.0005 0.0041 <0.0003SARTI5-T3-PM10 10/14/2016 0.0027 0.0000 0.0035 0.0026 0.0000 0.0014 0.0194 0.0000 0.0004 0.0073 <0.0003

Field BlankSARTI1-T1-PM10-FB 1 10/12/2016 0.0576 0.0011 0.0000 0.0056 0.0000 0.1017 0.0000 0.0000 0.0000 0.0034 <0.008SARTI4-T2-PM10-FB 1 10/13/2016 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 <0.008

Trip BlankSARTI-TB-PM10 1 10/14/2016 0.0158 0.0249 0.0034 0.0000 0.0000 0.1582 0.0000 0.0000 0.0000 0.0023 <0.008

Lab BlankLab Blank 1 0.0000 0.0000 0.0000 0.0622 0.0814 0.0678 0.0000 0.0000 0.0000 0.0124 <0.008Lab Blank 1 0.0203 0.0000 0.0610 0.0000 0.0000 0.0904 0.0000 0.0034 0.0000 0.0079 <0.008Lab Blank 1 0.0000 0.0124 0.0000 0.0622 0.0497 0.0000 0.0158 0.0113 0.0000 0.0000 <0.008Lab Blank 1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0079 0.0215 0.0000 0.0023 <0.008

Notes: g = grams µg/m3 = micrograms per cubic meter Highlighted = concentrations are less than three times the uncertaintym3 = cubic meters --- = not sampled/tested Italics = Quality assurance/quality control samplesµg = micrograms 1 = units for these QA/QC samples are µg/filter

Page 40: SA Recycling – Terminal Island 901 New Dock Street ......SARB SA Recycling Bakersfield SARTI SA Recycling Terminal Island SB Senate Bill SMM Sims Metal Management T1/T2/T3 Test 1/Test

Geocon Project No. S9850-03-21December 23, 2016Page 1 of 4

Client ID Sample Date Tare(mg)

Gross (mg)

Net (µg)

Volume(m3)

Concentration

(µg/m3)

Sodium (Na)

(µg/m3)

Magnesium (Mg)

(µg/m3)

Aluminium

(Al)(µg/m3)

Silicon (Si)

(µg/m3)

Phosphorus (P)

(µg/m3)

Sulfur (S) (µg/m3)

SARTI1-T1-PM2.5 10/12/2016 370.501 370.716 215 24 8.96 0.2874 0.0498 0.0791 0.1736 0.0073 0.6041SARTI1-T2-PM2.5 10/13/2016 375.233 375.473 240 24 10.0 0.2280 0.0380 0.0505 0.1234 0.0023 0.6323SARTI1-T3-PM2.5 10/14/2016 365.938 366.256 318 24 13.25 0.2507 0.0451 0.0545 0.1332 0.0064 1.0590

SARTI2-T1-PM2.5 10/12/2016 378.785 378.942 157 24 6.54 0.2452 0.0408 0.0393 0.0984 0.0041 0.5410SARTI2-T2-PM2.5 10/13/2016 372.760 372.980 220 24 9.17 0.2525 0.0441 0.0377 0.0931 0.0034 0.6422SARTI2-T3-PM2.5 10/14/2016 375.598 375.916 318 24 13.25 0.2236 0.0159 0.0394 0.0940 0.0029 1.0950

SARTI3-T1-PM2.5 10/12/2016 374.305 374.491 186 24 7.75 0.2298 0.0371 0.0501 0.1142 0.0040 0.5909SARTI3-T2-PM2.5 10/13/2016 375.797 376.005 208 24 8.67 0.2324 0.0449 0.0500 0.1099 0.0038 0.6413SARTI3-T3-PM2.5 10/14/2016 373.260 373.543 283 24 11.79 0.2397 0.0465 0.0415 0.1064 0.0048 1.1200

SARTI4-T1-PM2.5 10/12/2016 376.564 376.777 213 24 8.88 0.2106 0.0484 0.0882 0.1982 0.0050 0.5782SARTI4-T2-PM2.5 10/13/2016 363.720 363.998 278 24 11.6 0.2114 0.0455 0.0632 0.1431 0.0038 0.6493SARTI4-T3-PM2.5 10/14/2016 351.018 351.468 450 24 18.75 0.1713 0.0366 0.0561 0.1456 0.0032 1.0780

Field DuplicateSARTI5-T2-PM2.5 10/13/2016 367.514 367.730 216 24 9.00 0.2214 0.0333 0.0475 0.1114 0.0040 0.6549SARTI5-T3-PM2.5 10/14/2016 361.420 361.761 341 24 14.21 0.1973 0.0375 0.0425 0.1002 0.0015 1.1270

Field BlankSARTI1-T1-PM2.5-FB 10/12/2016 379.152 379.152 0 0.2768 0.0000 0.1141 0.0407 0.0000 0.0000SARTI4-T2-PM2.5-FB 10/13/2016 375.465 375.470 5 0.3469 0.0000 0.0000 0.0000 0.0000 0.0000

Trip BlankSARTI-TB-PM2.5 1 10/14/2016 377.377 377.388 11 0.0000 0.0000 0.0136 0.0000 0.0000 0.0000

Lab BlankLab Blank 1 365.638 365.639 1 0.0000 0.0531 0.0000 0.0000 0.0000 0.0023Lab Blank 1 365.472 365.470 -2 0.6509 0.1514 0.0000 0.0000 0.0000 0.0000Lab Blank 1 373.779 373.780 1 0.2554 0.1017 0.0542 0.0226 0.0000 0.0113Lab Blank 1 380.038 380.033 -5 0.0746 0.0000 0.0734 0.0881 0.0000 0.0011

TABLE 3SUMMARY OF GRAVIMETRIC AND METALS ANALYTICAL DATA - PM2.5

DTSC METAL SHREDDING FACILITIESSA RECYCLING TERMINAL ISLAND (SARTI), 901 NEW DOCK STREET, TERMINAL ISLAND, CALIFORNIA

CONTRACT NO. 15-T4124

Page 41: SA Recycling – Terminal Island 901 New Dock Street ......SARB SA Recycling Bakersfield SARTI SA Recycling Terminal Island SB Senate Bill SMM Sims Metal Management T1/T2/T3 Test 1/Test

Geocon Project No. S9850-03-21December 23, 2016Page 2 of 4

TABLE 3SUMMARY OF GRAVIMETRIC AND METALS ANALYTICAL DATA - PM2.5

DTSC METAL SHREDDING FACILITIESSA RECYCLING TERMINAL ISLAND (SARTI), 901 NEW DOCK STREET, TERMINAL ISLAND, CALIFORNIA

CONTRACT NO. 15-T4124

Client ID Sample DateChlorine

(Cl)(µg/m3)

Potassium (K)

(µg/m3)

Calcium (Ca)

(µg/m3)

Titanium (Ti)

(µg/m3)

Vanadium (V)

(µg/m3)

Chromium (Cr)

(µg/m3)

Manganese (Mn)

(µg/m3)

Iron (Fe)(µg/m3)

Cobalt (Co)

(µg/m3)

Nickel (Ni)(µg/m3)

Copper (Cu)(µg/m3)

SARTI1-T1-PM2.5 10/12/2016 0.0447 0.0480 0.1306 0.0091 0.0042 0.0009 0.0036 0.1549 0.0000 0.0014 0.0167SARTI1-T2-PM2.5 10/13/2016 0.0169 0.0404 0.1073 0.0049 0.0024 0.0011 0.0028 0.1306 0.0004 0.0007 0.0168SARTI1-T3-PM2.5 10/14/2016 0.0197 0.0393 0.0949 0.0066 0.0029 0.0009 0.0026 0.1240 0.0000 0.0010 0.0153

SARTI2-T1-PM2.5 10/12/2016 0.0234 0.0348 0.0522 0.0033 0.0027 0.0002 0.0045 0.1237 0.0000 0.0015 0.0069SARTI2-T2-PM2.5 10/13/2016 0.0112 0.0345 0.0488 0.0048 0.0021 0.0004 0.0030 0.0784 0.0000 0.0010 0.0189SARTI2-T3-PM2.5 10/14/2016 0.0205 0.0372 0.0442 0.0042 0.0024 0.0000 0.0018 0.0894 0.0000 0.0013 0.0148

SARTI3-T1-PM2.5 10/12/2016 0.0191 0.0409 0.0568 0.0053 0.0045 0.0005 0.0016 0.0965 0.0000 0.0018 0.0069SARTI3-T2-PM2.5 10/13/2016 0.0094 0.0336 0.0581 0.0040 0.0020 0.0000 0.0018 0.0967 0.0000 0.0008 0.0088SARTI3-T3-PM2.5 10/14/2016 0.0193 0.0388 0.0533 0.0064 0.0027 0.0016 0.0024 0.1001 0.0000 0.0013 0.0078

SARTI4-T1-PM2.5 10/12/2016 0.0599 0.0508 0.1209 0.0082 0.0037 0.0010 0.0102 0.4986 0.0000 0.0028 0.0335SARTI4-T2-PM2.5 10/13/2016 0.0353 0.0389 0.0955 0.0068 0.0014 0.0000 0.0047 0.1729 0.0000 0.0015 0.0265SARTI4-T3-PM2.5 10/14/2016 0.0712 0.0446 0.1025 0.0058 0.0035 0.0005 0.0033 0.2816 0.0000 0.0014 0.0189

Field DuplicateSARTI5-T2-PM2.5 10/13/2016 0.0138 0.0368 0.0585 0.0054 0.0012 0.0000 0.0031 0.0882 0.0002 0.0013 0.0161SARTI5-T3-PM2.5 10/14/2016 0.0198 0.0404 0.0451 0.0049 0.0028 0.0000 0.0027 0.0911 0.0000 0.0008 0.0182

Field BlankSARTI1-T1-PM2.5-FB 1 10/12/2016 0.0113 0.0192 0.0045 0.0000 0.0000 0.0000 0.0226 0.0056 0.0000 0.0000 0.0000SARTI4-T2-PM2.5-FB 1 10/13/2016 0.0226 0.0000 0.0000 0.0000 0.0000 0.0000 0.0034 0.0000 0.0000 0.0000 0.0102

Trip BlankSARTI-TB-PM2.5 1 10/14/2016 0.0226 0.0000 0.0000 0.0113 0.0000 0.0011 0.0045 0.0079 0.0000 0.0000 0.0000

Lab BlankLab Blank 1 0.0000 0.0147 0.0000 0.0011 0.0000 0.0158 0.0000 0.0124 0.0000 0.0000 0.0000Lab Blank 1 0.0294 0.0000 0.0000 0.0079 0.0068 0.0000 0.0079 0.0170 0.0000 0.0000 0.0000Lab Blank 1 0.0158 0.0000 0.0079 0.0000 0.0000 0.0000 0.0000 0.0113 0.0068 0.0011 0.0000Lab Blank 1 0.0000 0.0170 0.0000 0.0000 0.0000 0.0158 0.0068 0.0000 0.0170 0.0000 0.0000

Page 42: SA Recycling – Terminal Island 901 New Dock Street ......SARB SA Recycling Bakersfield SARTI SA Recycling Terminal Island SB Senate Bill SMM Sims Metal Management T1/T2/T3 Test 1/Test

Geocon Project No. S9850-03-21December 23, 2016Page 3 of 4

TABLE 3SUMMARY OF GRAVIMETRIC AND METALS ANALYTICAL DATA - PM2.5

DTSC METAL SHREDDING FACILITIESSA RECYCLING TERMINAL ISLAND (SARTI), 901 NEW DOCK STREET, TERMINAL ISLAND, CALIFORNIA

CONTRACT NO. 15-T4124

Client ID Sample DateZinc (Zn)(µg/m3)

Gallium (Ga)

(µg/m3)

Germanium (Ge)(µg/m3)

Arsenic (As)

(µg/m3)

Selenium (Se)

(µg/m3)

Bromine (Br)

(µg/m3)

Rubidium (Rb)(µg/m3)

Strontium (Sr)

(µg/m3)

Yttrium (Y)

(µg/m3)

Zirconium (Zr)

(µg/m3)

Molyb-denum (Mo)

(µg/m3)

SARTI1-T1-PM2.5 10/12/2016 0.0434 0.0003 0.0000 0.0005 0.0000 0.0025 0.0002 0.0013 0.0000 0.0004 0.0000SARTI1-T2-PM2.5 10/13/2016 0.0255 0.0000 0.0002 0.0000 0.0006 0.0035 0.0005 0.0004 0.0000 0.0011 0.0020SARTI1-T3-PM2.5 10/14/2016 0.0115 0.0002 0.0000 0.0009 0.0002 0.0056 0.0002 0.0011 0.0012 0.0000 0.0000

SARTI2-T1-PM2.5 10/12/2016 0.0095 0.0000 0.0000 0.0000 0.0006 0.0017 0.0000 0.0012 0.0000 0.0000 0.0011SARTI2-T2-PM2.5 10/13/2016 0.0088 0.0000 0.0000 0.0000 0.0003 0.0031 0.0000 0.0005 0.0005 0.0005 0.0016SARTI2-T3-PM2.5 10/14/2016 0.0076 0.0000 0.0000 0.0005 0.0009 0.0049 0.0000 0.0000 0.0000 0.0002 0.0031

SARTI3-T1-PM2.5 10/12/2016 0.0140 0.0001 0.0002 0.0000 0.0008 0.0026 0.0005 0.0000 0.0000 0.0000 0.0000SARTI3-T2-PM2.5 10/13/2016 0.0100 0.0003 0.0000 0.0011 0.0005 0.0037 0.0000 0.0007 0.0002 0.0000 0.0016SARTI3-T3-PM2.5 10/14/2016 0.0214 0.0005 0.0000 0.0007 0.0000 0.0066 0.0006 0.0001 0.0000 0.0008 0.0000

SARTI4-T1-PM2.5 10/12/2016 0.0159 0.0000 0.0000 0.0040 0.0001 0.0021 0.0006 0.0009 0.0006 0.0007 0.0009SARTI4-T2-PM2.5 10/13/2016 0.0194 0.0003 0.0003 0.0000 0.0000 0.0045 0.0006 0.0007 0.0005 0.0008 0.0000SARTI4-T3-PM2.5 10/14/2016 0.0160 0.0000 0.0000 0.0001 0.0003 0.0059 0.0003 0.0013 0.0000 0.0002 0.0015

Field DuplicateSARTI5-T2-PM2.5 10/13/2016 0.0088 0.0000 0.0000 0.0000 0.0004 0.0037 0.0000 0.0003 0.0000 0.0004 0.0000SARTI5-T3-PM2.5 10/14/2016 0.0078 0.0003 0.0000 0.0008 0.0004 0.0059 0.0006 0.0006 0.0000 0.0013 0.0005

Field BlankSARTI1-T1-PM2.5-FB 1 10/12/2016 0.0011 0.0068 0.0000 0.0000 0.0000 0.0000 0.0023 0.0000 0.0000 0.0000 0.0000SARTI4-T2-PM2.5-FB 1 10/13/2016 0.0000 0.0000 0.0102 0.0000 0.0011 0.0000 0.0000 0.0000 0.0000 0.0305 0.0000

Trip BlankSARTI-TB-PM2.5 1 10/14/2016 0.0000 0.0000 0.0023 0.0011 0.0000 0.0000 0.0011 0.0113 0.0023 0.0000 0.0000

Lab BlankLab Blank 1 0.0000 0.0023 0.0000 0.0000 0.0090 0.0023 0.0000 0.0000 0.0023 0.0000 0.0023Lab Blank 1 0.0000 0.0023 0.0000 0.0000 0.0000 0.0056 0.0000 0.0000 0.0023 0.0000 0.0158Lab Blank 1 0.0000 0.0023 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0113 0.0023 0.0000Lab Blank 1 0.0000 0.0079 0.0000 0.0034 0.0045 0.0000 0.0068 0.0000 0.0000 0.0000 0.0000

Page 43: SA Recycling – Terminal Island 901 New Dock Street ......SARB SA Recycling Bakersfield SARTI SA Recycling Terminal Island SB Senate Bill SMM Sims Metal Management T1/T2/T3 Test 1/Test

Geocon Project No. S9850-03-21December 23, 2016Page 4 of 4

TABLE 3SUMMARY OF GRAVIMETRIC AND METALS ANALYTICAL DATA - PM2.5

DTSC METAL SHREDDING FACILITIESSA RECYCLING TERMINAL ISLAND (SARTI), 901 NEW DOCK STREET, TERMINAL ISLAND, CALIFORNIA

CONTRACT NO. 15-T4124

Client ID Sample DatePalladium

(Pd)(µg/m3)

Silver (Ag)(µg/m3)

Cadmium (Cd)

(µg/m3)

Indium (In)(µg/m3)

Tin (Sn)(µg/m3)

Antimony (Sb)

(µg/m3)

Barium (Ba)(µg/m3)

Lanthanum (La)

(µg/m3)

Mercury (Hg)

(µg/m3)

Lead (Pb)(µg/m3)

Beryllium (Be)

(µg/m3)SARTI1-T1-PM2.5 10/12/2016 0.0000 0.0001 0.0000 0.0021 0.0000 0.0005 0.0083 0.0014 0.0003 0.0040 <0.0003SARTI1-T2-PM2.5 10/13/2016 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0134 0.0048 0.0004 0.0011 <0.0003SARTI1-T3-PM2.5 10/14/2016 0.0000 0.0000 0.0027 0.0000 0.0000 0.0033 0.0023 0.0000 0.0000 0.0012 <0.0003

SARTI2-T1-PM2.5 10/12/2016 0.0009 0.0008 0.0000 0.0000 0.0000 0.0042 0.0017 0.0000 0.0000 0.0022 <0.0003SARTI2-T2-PM2.5 10/13/2016 0.0012 0.0002 0.0000 0.0000 0.0024 0.0036 0.0030 0.0013 0.0000 0.0009 <0.0003SARTI2-T3-PM2.5 10/14/2016 0.0000 0.0008 0.0000 0.0000 0.0000 0.0000 0.0020 0.0000 0.0000 0.0006 <0.0003

SARTI3-T1-PM2.5 10/12/2016 0.0000 0.0012 0.0009 0.0026 0.0000 0.0033 0.0016 0.0000 0.0002 0.0013 <0.0003SARTI3-T2-PM2.5 10/13/2016 0.0011 0.0000 0.0017 0.0035 0.0000 0.0000 0.0059 0.0024 0.0000 0.0000 <0.0003SARTI3-T3-PM2.5 10/14/2016 0.0017 0.0000 0.0000 0.0012 0.0010 0.0000 0.0049 0.0013 0.0000 0.0024 <0.0003

SARTI4-T1-PM2.5 10/12/2016 0.0000 0.0000 0.0032 0.0016 0.0035 0.0024 0.0054 0.0000 0.0000 0.0031 <0.0003SARTI4-T2-PM2.5 10/13/2016 0.0000 0.0000 0.0030 0.0000 0.0043 0.0000 0.0067 0.0001 0.0000 0.0036 <0.0003SARTI4-T3-PM2.5 10/14/2016 0.0000 0.0008 0.0017 0.0026 0.0017 0.0000 0.0037 0.0000 0.0000 0.0010 <0.0003

Field DuplicateSARTI5-T2-PM2.5 10/13/2016 0.0011 0.0015 0.0000 0.0000 0.0043 0.0000 0.0066 0.0010 0.0002 0.0016 <0.0003SARTI5-T3-PM2.5 10/14/2016 0.0000 0.0010 0.0012 0.0024 0.0017 0.0000 0.0017 0.0000 0.0000 0.0014 <0.0003

Field BlankSARTI1-T1-PM2.5-FB 1 10/12/2016 0.0000 0.0373 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 <0.008SARTI4-T2-PM2.5-FB 1 10/13/2016 0.0181 0.0000 0.0000 0.0170 0.0000 0.0000 0.0000 0.0011 0.0000 0.0000 <0.008

Trip BlankSARTI-TB-PM2.5 1 10/14/2016 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0011 0.0000 <0.008

Lab BlankLab Blank 1 0.0000 0.0000 0.0000 0.0622 0.0814 0.0678 0.0000 0.0000 0.0000 0.0124 <0.008Lab Blank 1 0.0203 0.0000 0.0610 0.0000 0.0000 0.0904 0.0000 0.0034 0.0000 0.0079 <0.008Lab Blank 1 0.0000 0.0124 0.0000 0.0622 0.0497 0.0000 0.0158 0.0113 0.0000 0.0000 <0.008Lab Blank 1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0079 0.0215 0.0000 0.0023 <0.008

Notes: g = grams µg/m3 = micrograms per cubic meter Highlighted = concentrations are less than three times the uncertaintym3 = cubic meters --- = not sampled/tested Italics = Quality assurance/quality control samplesµg = micrograms 1 = units for these QA/QC samples are µg/filter

Page 44: SA Recycling – Terminal Island 901 New Dock Street ......SARB SA Recycling Bakersfield SARTI SA Recycling Terminal Island SB Senate Bill SMM Sims Metal Management T1/T2/T3 Test 1/Test

Geocon Project No. S9850-03-21December 23, 2016Page 1 of 1

SAMPLE I.D. SAMPLE DATE

SAMPLE TYPE

ANALYTICALMETHOD

ASBESTOS CONCENTRATIO

Ns/mm2

ASBESTOS TYPE

SARTI1-T1-Asbestos 10/12/16 Air AHERA - TEM <19.00 N/A

SARTI1-T2-Asbestos 10/13/16 Air AHERA - TEM <19.00 N/A

SARTI1-T3-Asbestos 10/14/16 Air AHERA - TEM <19.00 N/A

SARTI2-T1-Asbestos 10/12/16 Air AHERA - TEM <19.00 N/A

SARTI2-T2-Asbestos 10/13/16 Air AHERA - TEM <19.00 N/A

SARTI2-T3-Asbestos 10/14/16 Air AHERA - TEM <19.00 N/A

SARTI3-T1-Asbestos 10/12/16 Air AHERA - TEM <19.00 N/A

SARTI3-T2-Asbestos 10/13/16 Air AHERA - TEM <19.00 N/A

SARTI3-T3-Asbestos 10/14/16 Air AHERA - TEM <19.00 N/A

SARTI4-T1-Asbestos 10/12/16 Air AHERA - TEM <19.00 N/A

SARTI4-T2-Asbestos 10/13/16 Air AHERA - TEM <19.00 N/A

SARTI4-T3-Asbestos 10/14/16 Air AHERA - TEM <19.00 N/A

Field Duplicate

SARTI5-T2-Asbestos 1 10/13/16 Air AHERA - TEM <19.00 N/A

SARTI5-T3-Asbestos 10/14/16 Air AHERA - TEM <19.00 N/A

Trip Blank

SARTI-TB-Asbestos 10/14/16 Air AHERA - TEM <19.00 N/A

Notes:AHERA = Asbestos Hazard Emergency Response ActTEM =Transmission Electron Microscopys/mm2 = Structures per milimeter squared Italics = Quality assurance/quality control samples< = Less than the respective laboratory test method reporting limits for each tested analyte1 = Sampler did not operate for full 24 duration battery problems and is representative of a 11 hour sample duration (1715 to 2300 on 10/12/16 and 1200 to 1715 on 10/13/16)

TABLE 4SUMMARY OF ASBESTOS ANALYTICAL DATA

DTSC METAL SHREDDING FACILITIESSA RECYCLING TERMINAL ISLAND (SARTI), 901 NEW DOCK STREET, TERMINAL ISLAND, CALIFORNIA

CONTRACT NO. 15-T4124

Page 45: SA Recycling – Terminal Island 901 New Dock Street ......SARB SA Recycling Bakersfield SARTI SA Recycling Terminal Island SB Senate Bill SMM Sims Metal Management T1/T2/T3 Test 1/Test

Geocon Project No. S9850-03-21December 23, 2016Page 1 of 1

SAMPLE I.D. SAMPLE DATE

Aroclor-1016(µg/m3)

Aroclor-1221 (µg/m3)

Aroclor-1232 (µg/m3)

Aroclor-1242 (µg/m3)

Aroclor-1248 (µg/m3)

Aroclor-1254 (µg/m3)

Aroclor-1260 (µg/m3)

Aroclor-1262 (µg/m3)

SARTI1-T1-PCB 10/12/16 <0.0026 <0.0026 <0.0026 <0.0026 <0.0026 <0.0026 <0.0026 <0.0026SARTI1-T2-PCB 10/13/16 <0.0026 <0.0026 <0.0026 <0.0026 <0.0026 <0.0026 <0.0026 <0.0026SARTI1-T3-PCB 10/14/16 <0.0026 <0.0026 <0.0026 <0.0026 <0.0026 <0.0026 <0.0026 <0.0026

SARTI2-T1-PCB 10/12/16 <0.0026 <0.0026 <0.0026 <0.0026 <0.0026 <0.0026 <0.0026 <0.0026SARTI2-T2-PCB 10/13/16 <0.0026 <0.0026 <0.0026 <0.0026 <0.0026 <0.0026 <0.0026 <0.0026SARTI2-T3-PCB 10/14/16 <0.0026 <0.0026 <0.0026 <0.0026 <0.0026 <0.0026 <0.0026 <0.0026

SARTI3-T1-PCB 10/12/16 <0.0027 <0.0027 <0.0027 <0.0027 <0.0027 <0.0027 <0.0027 <0.0027SARTI3-T2-PCB 1 10/13/16 <0.0042 <0.0042 <0.0042 <0.0042 <0.0042 <0.0042 <0.0042 <0.0042SARTI3-T3-PCB 10/14/16 <0.0027 <0.0027 <0.0027 <0.0027 <0.0027 <0.0027 <0.0027 <0.0027

SARTI4-T1-PCB 10/12/16 <0.0026 <0.0026 <0.0026 <0.0026 <0.0026 <0.0026 <0.0026 <0.0026SARTI4-T2-PCB 10/13/16 <0.0026 <0.0026 <0.0026 <0.0026 <0.0026 <0.0026 <0.0026 <0.0026SARTI4-T3-PCB 10/14/16 <0.0026 <0.0026 <0.0026 <0.0026 <0.0026 <0.0026 <0.0026 <0.0026

Field DuplicatesSARTI5-T2-PCB 10/13/16 <0.0026 <0.0026 <0.0026 <0.0026 <0.0026 <0.0026 <0.0026 <0.0026SARTI5-T3-PCB 10/14/16 <0.0026 <0.0026 <0.0026 <0.0026 <0.0026 <0.0026 <0.0026 <0.0026

Trip BlankSARTI-TB-PCB 10/14/16 <0.0026 <0.0026 <0.0026 <0.0026 <0.0026 <0.0026 <0.0026 <0.0026

Notes:Notes: PCB = Polychlorinated biphenyls

µg/m3 = micrograms per cubic meterItalics = Quality assurance/quality control samples< = Less than the respective laboratory test method reporting limits for each tested analyte1 = Sampler did not operate for full 24 duration mechanical problems and is representative of a 15.3 hour sample duration

CONTRACT NO. 15-T4124

TABLE 5SUMMARY OF PCB ANALYTICAL DATA DTSC METAL SHREDDING FACILITIES

SA RECYCLING TERMINAL ISLAND (SARTI), 901 NEW DOCK STREET, TERMINAL ISLAND, CALIFORNIA

Page 46: SA Recycling – Terminal Island 901 New Dock Street ......SARB SA Recycling Bakersfield SARTI SA Recycling Terminal Island SB Senate Bill SMM Sims Metal Management T1/T2/T3 Test 1/Test

Geocon Project No. S9850-03-21December 23, 2016Page 1 of 1

SAMPLE I.D. SAMPLE DATE Formaldehyde (µg)

SARTI1-T1-FORM 10/12/16 3.3 1

SARTI1-T2-FORM 10/13/16 2.7

SARTI1-T3-FORM 10/14/16 3.1 1

SARTI2-T1-FORM 10/12/16 3.0 1

SARTI2-T2-FORM 10/13/16 2.2

SARTI2-T3-FORM 10/14/16 2.6 1

SARTI3-T1-FORM 10/12/16 2.0

SARTI3-T2-FORM 10/13/16 2.2

SARTI3-T3-FORM 10/14/16 2.1

SARTI4-T1-FORM 10/12/16 1.8

SARTI4-T2-FORM 10/13/16 2.2

SARTI4-T3-FORM 10/14/16 2.4 1

Field Duplicates

SARTI5-T2-FORM 10/13/16 3.2 1

SARTI5-T3-FORM 10/14/16 2.8 1

Trip Blank

SARTI-TB-FORM 10/14/16 <0.050

Notes:µg = micrograms Italics = Quality assurance/quality control samples< = Less than the respective laboratory test method reporting limits for each tested analyte1 = Reported value may be biased due to apparent matrix interferences.

TABLE 6SUMMARY OF FORMALDEHYDE ANALYTICAL DATA

DTSC METAL SHREDDING FACILITIESSA RECYCLING TERMINAL ISLAND (SARTI)

CONTRACT NO. 15-T4124901 NEW DOCK STREET, TERMINAL ISLAND, CALIFORNIA

Page 47: SA Recycling – Terminal Island 901 New Dock Street ......SARB SA Recycling Bakersfield SARTI SA Recycling Terminal Island SB Senate Bill SMM Sims Metal Management T1/T2/T3 Test 1/Test

Geocon Project No. S9850-03-21December 23, 2016Page 1 of 1

Benzene Chloromethane

1,1-Dichloro-ethene

Ethyl-benzene

4-Ethyltoluene

Freon 12 (Dichloro-difluoro-methane)

Freon 11 (Trichloro-

fluoro-methane)

1,2,4-Trichloro-benzene

Toluene1,3,5-

Trimethyl-benzene

Xylene (p,m) Xylene (Ortho)

Vinyl chloride

SAMPLE ID DATE

SARTI1-T1-TOS 10/12/16 <1.6 1.3 <2.0 <2.2 <2.5 5.9 20 <3.7 10.0 <2.5 6.3 2.3 <1.3SARTI1-T2-TOS 10/13/16 <1.6 1.3 <2.0 <2.2 <2.5 <2.5 8.0 <3.7 5.3 <2.5 <4.3 <2.2 <1.3

SARTI1-T3-TOS 1 10/14/16 <1.6 1.2 <2.0 <2.2 <2.5 3.3 10 <3.7 3.7 <2.5 <4.3 <2.2 <1.3

SARTI2-T1-TOS 10/12/16 <1.6 1.3 <2.0 <2.2 <2.5 2.7 5.7 <3.7 3.0 <2.5 <4.3 <2.2 <1.3SARTI2-T2-TOS 10/13/16 <1.6 1.3 <2.0 <2.2 <2.5 2.7 6.1 <3.7 2.3 <2.5 <4.3 <2.2 <1.3SARTI2-T3-TOS 10/14/16 <1.6 1.3 <2.0 <2.2 <2.5 <2.5 5.6 <3.7 4.4 <2.5 <4.3 <2.2 <1.3

SARTI3-T1-TOS 10/12/16 <1.6 1.3 <2.0 <2.2 <2.5 2.8 8.0 <3.7 6.3 <2.5 5.3 <2.2 <1.3SARTI3-T2-TOS 10/13/16 <1.6 1.3 <2.0 <2.2 <2.5 2.7 5.2 <3.7 4.4 <2.5 <4.3 <2.2 <1.3SARTI3-T3-TOS 10/14/16 <1.6 1.2 <2.0 <2.2 <2.5 3.1 9.2 <3.7 3.7 <2.5 <4.3 <2.2 <1.3

SARTI4-T1-TOS 10/12/16 <1.6 1.3 <2.0 <2.2 <2.5 3.0 9.0 <3.7 8.0 <2.5 6.0 2.2 <1.3SARTI4-T2-TOS 10/13/16 <1.6 1.4 <2.0 <2.2 <2.5 4.3 18 <3.7 6.5 <2.5 5.2 <2.2 <1.3SARTI4-T3-TOS 10/14/16 <1.6 1.3 <2.0 <2.2 <2.5 2.6 6.6 <3.7 4.4 <2.5 <4.3 <2.2 <1.3

Field DuplicatesSARTI5-T2-TOS 10/13/16 <1.6 1.2 <2.0 <2.2 <2.5 <2.5 5.4 <3.7 2.4 <2.5 <4.3 <2.2 <1.3SARTI5-T3-TOS 10/14/16 <1.6 1.3 <2.0 <2.2 <2.5 <2.5 5.9 <3.7 2.6 <2.5 <4.3 <2.2 <1.3

Notes:< = Less than the respective laboratory test method reporting limits for each tested analyteItalics = Quality assurance/quality control samplesµg/m3 = micrograms per cubic meter1 = Sample stopped before 24 hours and is representative of a 17 hour sample duration (1930 on 10/13/16 to 1230 on 10/14/16)

Results in µg/m3

TABLE 7SUMMARY OF TOS ANALYTICAL DATA DTSC METAL SHREDDING FACILITIES

SA RECYCLING TERMINAL ISLAND (SARTI), 901 NEW DOCK STREET, TERMINAL ISLAND, CALIFORNIACONTRACT NO. 15-T4124