6
Well Head Monitoring Plant Water Separator Brine Ultra Filtration Waste Stream Water Gathering System Gas Gathering System Storage Ponds at Tiedmans and CPF Inlet Filter Compression Plant Dehydration Plant Gas Transmission Pipeline Hexham Delivery Station GAS MARKET Pre Treatment via Ultra Filtration (UF) and Chemcial dosing Treatment via Reverse Osmosis Enhanced Evaporation Pond Storage in Treated Storage Ponds at CPF Salt REUSE REUSE/ DISPOSAL Treated Water Water Treatment Facility CPF Process Water (Clean & Oily) Specialised Wastewater Treatment Plant Clean Process Water Oily Process Water GAS WATER FIGURE 5.13 GAS AND WATER TREATMENT CONCEPTUAL PROCESS FLOW DIAGRAM KEY Gas Produced water/clean process water Oily process water

Transcript of S70038 F5.14 Pipeline Right o

Page 1: S70038 F5.14 Pipeline Right o

Well Head

Monitoring

Plant

Water Separator

Brine

Ultra

Filtra

tion

Wast

eStr

eam

Water Gathering System

Gas Gathering SystemStorage Ponds at Tiedmans

and CPF

Inlet Filter

Compression Plant

Dehydration Plant

Gas Transmission Pipeline

Hexham Delivery Station

GAS MARKET

Pre Treatment via Ultra Filtration

(UF) and Chemcial dosing

Treatment via Reverse Osmosis

Enhanced

Evaporation Pond

Storage in

Treated Storage

Ponds at CPF

Salt

REUSE REUSE/

DISPOSAL

Treated

Water

Water Treatment FacilityCPF

Process Water

(Clean & Oily)

Specialised Wastewater

Treatment Plant

Clean Process Water

Oily Process Water

GAS WATER

FIGURE 5.13

GAS AND WATER TREATMENT CONCEPTUAL PROCESS FLOW DIAGRAM

KEY

Gas

Produced water/clean process water

Oily process water

Page 2: S70038 F5.14 Pipeline Right o

FIGURE 5.14

PIPELINE RIGHT OF WAY SCHEMATIC DIAGRAM

WORKING SIDE

20m

30m

10m

SOIL SIDE

75

0m

m(m

in)

Seed stock

Cleared vegetation

Topsoil Subsoil

Trench Line

Watercourse

Riparian zone

50

m

50m

Work area / storage

Cleared right

of way

15m

30m

Work area / storage

Work area / storage Work area / storage

Cleared vegetation

Open trench water

crossing

RIGHT OF WAY SCHEMATIC DIAGRAM

SENSITIVE WATER CROSSINGS

Page 3: S70038 F5.14 Pipeline Right o

FIGURE 5.15

PIPELINE CONSTRUCTION PROCESS

Photograph 1

Photograph 4

Photograph 7

Photograph 2

Photograph 5

Photograph 8

Photograph 3

Photograph 6

Well showing indicative well head infrastructure

Trenching using trenching machinery

Backfilling of trench following lowering of pipeline

Reduced ROW, minimising clearing of remnant vegetation

Padding of pipe trench prior to lowering of pipe

Reinstatement of ROW including pipeline marker

Grading and stockpile preparation including placement of drainage

pipe to allow runoff to drain through stockpile

Lowering in of pipe

Page 4: S70038 F5.14 Pipeline Right o

FIGURE 5.16

THRUST BORING AND HORIZONTAL DIRECTIONAL DRILLING

SCHEMATIC DIAGRAMS

Bellhole

Road/railway

or watercourse

SpoilSediment fence or bund

Bellhole

SCHEMATIC PROFILE OF BORED CROSSING

Horizontal directional drilling rig

Drill exit point

Sediment fence or bund

Road/railway

or watercourse

Sediment fence or bund Sediment fence or bund

Bored crossing

SCHEMATIC PROFILE OF HORIZONTAL DIRECTIONAL DRILLING

Page 5: S70038 F5.14 Pipeline Right o

Month 1 Month 2 Month 3 Month 4 Month 5 Month 6 Month 7 Month 8 Month 9 Month 10 Month 11 Month 12 Month 13 Month 14 Month 15 Month 16

Stage 1 Development

Central Processing Facility

Pipeline

Hexham Delivery Station

Storage Ponds

Trunk Line Construction

Civil Works (Roads and Drill Pads)

Gas and Water Gathering System

Drilling*

Perforation

Fraccing

Completion

Survey, Clear and Grade

Install Foundations

Mechanical Pre-Fabrication

Mechanical Installation

Instrument and Electrical Installation

Pre-Commissioning

Predicted Commissioning

Pipe Stringing & Trenching

Welding

Lowering In

Re-Instate & Rehabilitation

Hydrotest

Clean and Dry

Testing and Pipeline Purging

Commissioning

Survey, Clear and Grade

Survey, Clear and Grade

Install Foundations

Mechanical Pre-Fabrication

Mechanical Installation

Instrument and Electrical Installation

Pre-Commissioning

Predicted Commissioning

* Assumes daytime drilling only. If 24hr drilling is undertaken, drilling time could be reduced by up to 50%

Month 17 Month 18

FIGURE 5.17

PROPOSED PROJECT STAGING - CONSTRUCTION WITHIN STAGE 1 GAS

FIELD DEVELOPMENT AREA AND PIPELINE CORRIDOR

Page 6: S70038 F5.14 Pipeline Right o

96

km

94 km

93 km

92 km

91 km

90 km

88 km

87 km

86 km

85 km

84 km

83 km

82 km

81 km

80 km

79 km

78 km

77 km

76 km

75

km

74km

73 km

72km

71km

70km

69km

80 km

Proposed Pipeline Corridor

Kilometre Point

SEPP 14 Affected Area (Wetland)

SEPP 71 Affected Area (Coastal)

0 4

Kilometres

KEY

2

80 km

Pipeline Corridor

Kilometre Point

SEPP 14 Affected Area (Wetland)

SEPP 71 Affected Area (Coastal)

0 4

Kilometres

KEY

2

NEW

ENGLAND

HIG

HW

AY

NEW

ENGLAND

HIG

HW

AY

PA

CIF

ICH

IGH

WA

Y

PA

CIF

ICH

IGH

WA

Y

HU

NTE

RR

IVE

R

HU

NTE

RR

IVE

R

HU

NT

ER

RIV

ER

HU

NT

ER

RIV

ER

HEXHAM

TOMAGO

BERESFIELD

THORNTON

HUNTER

RIV

ER

HUNTER

RIV

ER

HUNTERRIVER

HUNTERRIVER

HUNTERRIVER

HUNTERRIVER

SEAHAM

NO

RTH

NO

RTH

COAST

COAST

RAILWAY

RAILWAY

FIGURE 6.1

STATE ENVIRONMENTAL PLANNING POLICY 14 AND 71 AFFECTED AREAS