    Truss Retrofit to Mitigate

    Substructure Displacements atI-20 Mississippi River Bridge

    at Vicksburg

    Zolan Prucz, Ph.D., P.E.,

    Modjeski and Masters, Inc.

    New Orleans, LA

    2013 Louisiana Transportation EngineeringConference

    Baton Rouge, Louisiana

  • 7/29/2019 S67_Truss Retrofit to Mitigate Substructure Displacement at I-20 Mississippi Bridge at Vicksburg_LTC2013

    2/60

    Burns Cooley Dennis, Inc. Dr. James H. May and Dr. Richard J. Lutten

    Lazenby and Associates, Inc.

    Boh Brothers, LLP C.E.C., Inc.

    LADOT Headquarters and District

    FHWA

    Ardaman & Associates, Inc. and their Teamof Experts

    Acknowledgements:

  • 7/29/2019 S67_Truss Retrofit to Mitigate Substructure Displacement at I-20 Mississippi Bridge at Vicksburg_LTC2013

    3/60

    W-1

    E-1

    E-2

    E-3

    PP15

    PP15

    US 80

    I-20

  • 7/29/2019 S67_Truss Retrofit to Mitigate Substructure Displacement at I-20 Mississippi Bridge at Vicksburg_LTC2013

    4/60

    E-1

    E-2

    E-3

    Pier-2

    Pier-1

  • 7/29/2019 S67_Truss Retrofit to Mitigate Substructure Displacement at I-20 Mississippi Bridge at Vicksburg_LTC2013

    5/60

    Pier-2

    Pier-1

  • 7/29/2019 S67_Truss Retrofit to Mitigate Substructure Displacement at I-20 Mississippi Bridge at Vicksburg_LTC2013

    6/60

    Pier E-2

  • 7/29/2019 S67_Truss Retrofit to Mitigate Substructure Displacement at I-20 Mississippi Bridge at Vicksburg_LTC2013

    7/60

  • 7/29/2019 S67_Truss Retrofit to Mitigate Substructure Displacement at I-20 Mississippi Bridge at Vicksburg_LTC2013

    8/60

    426 423 870 423 426

    W-3 W-2 W-1 E-1 E-2 E-3

    PP15 PP15

    E E EF F EFF F

    SuspendedSpan AnchorSpan SimpleSpanSimpleSpan AnchorSpan

    EastWest

    Cantilever

    Spans

    Bridge Characteristics

  • 7/29/2019 S67_Truss Retrofit to Mitigate Substructure Displacement at I-20 Mississippi Bridge at Vicksburg_LTC2013

    9/60

    Original Bearings

    E-2 E-3E-1

  • 7/29/2019 S67_Truss Retrofit to Mitigate Substructure Displacement at I-20 Mississippi Bridge at Vicksburg_LTC2013

    10/60

    PP15

    PP15

  • 7/29/2019 S67_Truss Retrofit to Mitigate Substructure Displacement at I-20 Mississippi Bridge at Vicksburg_LTC2013

    11/60

    Truss Elevation View at PP15

    EAST

    L14 L15

    TRUSS ELEVATION VIEW AT PP15

    L16

    SUSPENDED SPANCANTILEVER SPAN

    WEST

    U14

    U15 U16FALSE CHORD U15-U16

    FALSE CHORD L14-L15

    SUSPENDED

    SPAN

    HANGER

  • 7/29/2019 S67_Truss Retrofit to Mitigate Substructure Displacement at I-20 Mississippi Bridge at Vicksburg_LTC2013

    12/60

    Top Lateral System at PP15

    SUSPENDED SPANCANTILEVER SPAN

    U14 U15

    TOP LATERAL SYSTEM AT PP15

    U16

    EASTWEST

    FALSE CHORD U15-U16

    FALSE CHORD U15-U16

  • 7/29/2019 S67_Truss Retrofit to Mitigate Substructure Displacement at I-20 Mississippi Bridge at Vicksburg_LTC2013

    13/60

    CANTILEVER SPANSUSPENDED SPANSUSPENDED SPANCANTILEVER SPAN

    EAST WEST

    L14 L15 L14L15L16

    PP15 PP15

    BOTTOM LATERAL SYSTEM AT PP15

    L16

    LONGITUDINAL

    STRUT

    BOTTOM LATERAL SYSTEM AT PP15

    Bottom Lateral System at PP15 and PP15

    FALSE

    CHORD L14-L15

    FALSE

    CHORD L14-L15

  • 7/29/2019 S67_Truss Retrofit to Mitigate Substructure Displacement at I-20 Mississippi Bridge at Vicksburg_LTC2013

    14/60

  • 7/29/2019 S67_Truss Retrofit to Mitigate Substructure Displacement at I-20 Mississippi Bridge at Vicksburg_LTC2013

    15/60

    Long Strut

    Stringer PP 15PP 14

    Jointmeter

  • 7/29/2019 S67_Truss Retrofit to Mitigate Substructure Displacement at I-20 Mississippi Bridge at Vicksburg_LTC2013

    16/60

    PIER E-3U 15

    EXP DAM AT PP 15 EXP DAM AT PIER E-3

    Bridge Condition After 2000 / 2001 MovementsBEARINGS E-3

  • 7/29/2019 S67_Truss Retrofit to Mitigate Substructure Displacement at I-20 Mississippi Bridge at Vicksburg_LTC2013

    17/60

    Channel Migrations

  • 7/29/2019 S67_Truss Retrofit to Mitigate Substructure Displacement at I-20 Mississippi Bridge at Vicksburg_LTC2013

    18/60

    U.S. Route 80 Bridge

    I-20 Mississippi River Bridge

    F

    PIER 3

    E

    F

    F

    EE

    E F E

    PIER 2 PIER 1TOWER 1ER DR

    E-1 E-2

    E-3

    E

    AR

    BRCR

    -70-75

    7

    -46

    18

    75

    158

  • 7/29/2019 S67_Truss Retrofit to Mitigate Substructure Displacement at I-20 Mississippi Bridge at Vicksburg_LTC2013

    19/60

    Bridge Instrumentation

    PP15

    Location of Tiltmeters

    Location of Jointmeters

    Location of Datalogger PP15

  • 7/29/2019 S67_Truss Retrofit to Mitigate Substructure Displacement at I-20 Mississippi Bridge at Vicksburg_LTC2013

    20/60

    (in) (arc-sec) (in) (arc-sec)

    1. 1999 and 2000 Prior to 5/2001 6.00 6.50

    2. 2003 Feb2/5/2003 to

    2/6/20030.50 50 0.50 0

    3. 2005 Aug 8/2/2005 0.75 0 0.50 50

    4. 2005 Nov 11/17/2005 0.25 0 0.25 0

    5. 2006 Aug - Sep8/13/2006 to

    9/21/20060.50 50 0.75 75

    6. 2007 Sep - Dec9/21/2009 to

    12/19/20070.50 50 0.50 25

    7. 2009 Sep - Dec0/28/2009 to

    12/22/20090.20 25 0.00 20

    8. 2010 Nov 11/7/2010 to11/22/2010 0.20 25 0.00 10

    9. 2011 Oct10/20/2011 to

    10/24/20110.25 0 0.25 25

    10. 2012 June - Dec6/29/2012 to

    12/21/20121.50 75 1.25 75

    10.75 300 10.50 300Total Movement (+/-)

    Summary of I-20 Bridge Pier Movements

    Top of Pier E-1Top of Pier E-2

    Estimated Time or Time Period

  • 7/29/2019 S67_Truss Retrofit to Mitigate Substructure Displacement at I-20 Mississippi Bridge at Vicksburg_LTC2013

    21/60

    PP-15: Jointmeter Readings

    Starting 8/27/2004; Updated 2/02/2013

    -5.00

    -4.00

    -3.00

    -2.00

    -1.00

    0.00

    1.00

    8/27

    /200

    4

    12/7/200

    4

    3/21

    /200

    5

    7/6/2005

    10/29/20

    05

    2/26/200

    6

    6/24/200

    6

    10/6/200

    6

    1/14/200

    7

    4/24

    /200

    7

    8/2/20

    07

    11/10/20

    07

    2/18/200

    8

    5/28

    /200

    8

    9/5/2008

    12/14/20

    08

    3/24

    /200

    9

    7/2/2009

    10/10/20

    09

    1/18/201

    0

    4/28/201

    0

    8/6/20

    10

    11/14/20

    10

    2/22

    /201

    1

    6/2/20

    11

    9/10/201

    1

    12/19/20

    11

    3/28

    /201

    2

    7/6/20

    12

    10/14/20

    12

    1/22

    /201

    3

    PierTilt(arc-sec)

    -10

    0

    10

    20

    30

    40

    50

    60

    RiverStage

    (feet)

    E-3: Jointmeter Readings

    Starting 8/27/2004; Updated 2/02/2013

    -1.00

    -0.50

    0.00

    0.50

    1.00

    1.50

    2.00

    2.50

    3.00

    3.50

    4.00

    8/27/200

    4

    12/7/200

    4

    3/21

    /200

    5

    7/6/2005

    10/29/20

    05

    2/26/200

    6

    6/24

    /200

    6

    10/6/200

    6

    1/14/200

    7

    4/24

    /200

    7

    8/2/20

    07

    11/10/20

    07

    2/18/200

    8

    5/28

    /200

    8

    9/5/2008

    12/14/20

    08

    3/24

    /200

    9

    7/2/20

    09

    10/10/20

    09

    1/18/201

    0

    4/28/201

    0

    8/6/20

    10

    11/14/20

    10

    2/22

    /201

    1

    6/2/20

    11

    9/10/201

    1

    12/19/20

    11

    3/28

    /201

    2

    7/6/20

    12

    10/14/20

    12

    1/22/201

    3

    PierTilt(arc-se

    c)

    -10

    0

    10

    20

    30

    40

    50

    60

    RiverStage(fe

    et)

    Joint

    Opening at E-3

    Joint

    Closing at PP15

  • 7/29/2019 S67_Truss Retrofit to Mitigate Substructure Displacement at I-20 Mississippi Bridge at Vicksburg_LTC2013

    22/60

    Pier E-3: Jointmeter Readings vs. River Stage

    Started 1/4/2003; Updated 3/10/2003

    0.00

    0.20

    0.40

    0.60

    0.80

    1.00

    1.20

    1.40

    1.60

    0:00

    1/4/2003

    0:00

    1/14/2003

    0:00

    1/22/2003

    0:00

    1/31/2003

    18:00

    2/8/2003

    18:00

    2/16/2003

    12:00

    2/24/2003

    12:00

    3/4/2003

    JointmeterReading(in)

    0

    5

    10

    15

    20

    25

    30

    35

    40

    45

    Gageheight(ft)

    Difference Between Measured and Calculated Expansion Readings for 419.38' Span

    River Stage

    2/4

    2/7

    February 5-6, 2003 Movement of Piers E-1 and E-2

  • 7/29/2019 S67_Truss Retrofit to Mitigate Substructure Displacement at I-20 Mississippi Bridge at Vicksburg_LTC2013

    23/60

    June 22, 2003 Longitudinal Strut Damage

    PP 15

  • 7/29/2019 S67_Truss Retrofit to Mitigate Substructure Displacement at I-20 Mississippi Bridge at Vicksburg_LTC2013

    24/60

    2004 Bridge Modifications (Remedial)Contractor: Boh Bros., Constr. Company, LLC.

    2010 Bridge Modifications (Proactive)Contractor: C.E.C. Inc., David Huval Jr.

    426 426 423 870 423426 426

    W-5 W-4 W-3 W-2 W-1 E-1 E-2 E-3

    PP15 PP15

    E E E E EF F F EFF F

  • 7/29/2019 S67_Truss Retrofit to Mitigate Substructure Displacement at I-20 Mississippi Bridge at Vicksburg_LTC2013

    25/60

    2004 Bridge Modifications

    Measure 1

    Measure 2

    Measure 3

    PP15PP14

    PP15 PP14

  • 7/29/2019 S67_Truss Retrofit to Mitigate Substructure Displacement at I-20 Mississippi Bridge at Vicksburg_LTC2013

    26/60

    Summary of 2004 Bridge Modification Measures

    Shorten span between Piers

    E-1 and W-1.

    Repair longitudinal strut L15-L14.

    Eliminate locked-in

    stresses between Piers

    E-1 and W-1.

    3

    Widen top of pier area.Add catch blocks under the

    trusses.

    Prevent Span E-2 E-3drop at Pier E-3.

    2

    Replace expansion dam at

    Pier E-3.

    Prevent roadway traffic

    hazard at expansion dam

    at Pier E-3.

    1

    RetrofitObjectiveMeasure

  • 7/29/2019 S67_Truss Retrofit to Mitigate Substructure Displacement at I-20 Mississippi Bridge at Vicksburg_LTC2013

    27/60

    EXISING CONDITION

    E-3

    E-3

    Expansion Dam Modifications at Pier E-3

    EXPANSION DAM MODIFICATION

  • 7/29/2019 S67_Truss Retrofit to Mitigate Substructure Displacement at I-20 Mississippi Bridge at Vicksburg_LTC2013

    28/60

    Expansion Dam at Pier E-3 After Modifications

  • 7/29/2019 S67_Truss Retrofit to Mitigate Substructure Displacement at I-20 Mississippi Bridge at Vicksburg_LTC2013

    29/60

    E-3

    Pier E-3 Modifications

    EXISING CONDITION

    MODIFICATION OF PIER E-3

    AFTER MODIFICATIONS

  • 7/29/2019 S67_Truss Retrofit to Mitigate Substructure Displacement at I-20 Mississippi Bridge at Vicksburg_LTC2013

    30/60

    PP15

    PP14

    Opening of Expansion Dam at PP15

    by Jacking Span PP15-PP14

    Towards PP14

    Shortening of Span Between Piers E-1 and W-1

  • 7/29/2019 S67_Truss Retrofit to Mitigate Substructure Displacement at I-20 Mississippi Bridge at Vicksburg_LTC2013

    31/60

    EXISTING CONDITION

    PP 15

    PP 14

    PP 14

    Shortening of Span L14 L15

    SHORTENING OF STRINGERS

    BETWEEN L14 AND L15

    SHIFT AFTER CUT

    CUT OUT

  • 7/29/2019 S67_Truss Retrofit to Mitigate Substructure Displacement at I-20 Mississippi Bridge at Vicksburg_LTC2013

    32/60

  • 7/29/2019 S67_Truss Retrofit to Mitigate Substructure Displacement at I-20 Mississippi Bridge at Vicksburg_LTC2013

    33/60

    PP 14 AFTER SPAN SHORTENING EXPANSION DAM AT

    PP 15 AFTER SPAN SHORTENING

  • 7/29/2019 S67_Truss Retrofit to Mitigate Substructure Displacement at I-20 Mississippi Bridge at Vicksburg_LTC2013

    34/60

    Truss False Chord Modifications at U15 U16

  • 7/29/2019 S67_Truss Retrofit to Mitigate Substructure Displacement at I-20 Mississippi Bridge at Vicksburg_LTC2013

    35/60

  • 7/29/2019 S67_Truss Retrofit to Mitigate Substructure Displacement at I-20 Mississippi Bridge at Vicksburg_LTC2013

    36/60

    Longitudinal Strut Shortening at Span L14 L15

    PP14

    PLAN - PANEL POINT 14

    MODIFICATION OF LONGITUDINAL STRUT

  • 7/29/2019 S67_Truss Retrofit to Mitigate Substructure Displacement at I-20 Mississippi Bridge at Vicksburg_LTC2013

    37/60

  • 7/29/2019 S67_Truss Retrofit to Mitigate Substructure Displacement at I-20 Mississippi Bridge at Vicksburg_LTC2013

    38/60

    Longitudinal Strut Repair at Span L14 L15

  • 7/29/2019 S67_Truss Retrofit to Mitigate Substructure Displacement at I-20 Mississippi Bridge at Vicksburg_LTC2013

    39/60

    PP 15 E-3

    PP 15

    Deck Joints After 2004 Repairs

  • 7/29/2019 S67_Truss Retrofit to Mitigate Substructure Displacement at I-20 Mississippi Bridge at Vicksburg_LTC2013

    40/60

    Measure 5

    Measure 2

    Measure 3

    Measure 4

    Measure 1

    PP15

    PP14

    PP15PP14

    2010 Bridge Modifications for Increased Movement Capacity

  • 7/29/2019 S67_Truss Retrofit to Mitigate Substructure Displacement at I-20 Mississippi Bridge at Vicksburg_LTC2013

    41/60

    Summary of 2010 Bridge Modification Measures

    Add eyebars at each suspended

    span hanger.

    Provide redundancy to the

    suspended span hangers.

    5

    Replace bearings at E-3 and E-2

    with inverted sliding disc

    bearings.

    Increase movement capacity

    at bearings at Piers E-3 and

    E-2.

    2

    Widen top of pier area at E-2

    and E-1. Add bearing blocks atE-2 and E-1.

    Prevent span drop at Pier E-2

    and E-1.

    4

    Shorten span PP14-15 and

    replace expansion dams at Pier

    E-2 and PP15.

    Increase movement capacity

    within the deck, between Pier

    E-1 and W-1.

    3

    Replace expansion dam at Pier

    E-3.

    Increase movement capacity

    of expansion dam at Pier E-3.

    1

    RetrofitObjectiveMeasure

  • 7/29/2019 S67_Truss Retrofit to Mitigate Substructure Displacement at I-20 Mississippi Bridge at Vicksburg_LTC2013

    42/60

    Expansion Dam Replacement at Pier E-2

  • 7/29/2019 S67_Truss Retrofit to Mitigate Substructure Displacement at I-20 Mississippi Bridge at Vicksburg_LTC2013

    43/60

    Bearing Replacement at Pier E-3

  • 7/29/2019 S67_Truss Retrofit to Mitigate Substructure Displacement at I-20 Mississippi Bridge at Vicksburg_LTC2013

    44/60

    Bearing Replacement at Pier E-2

  • 7/29/2019 S67_Truss Retrofit to Mitigate Substructure Displacement at I-20 Mississippi Bridge at Vicksburg_LTC2013

    45/60

    E-2E-3

  • 7/29/2019 S67_Truss Retrofit to Mitigate Substructure Displacement at I-20 Mississippi Bridge at Vicksburg_LTC2013

    46/60

    PP 14

    Shortening of Span L14 L15

    SHORTENING OF STRINGERS

    BETWEEN L14 AND L15

    SHIFT AFTER CUT

    CUT OUT

    PP14

  • 7/29/2019 S67_Truss Retrofit to Mitigate Substructure Displacement at I-20 Mississippi Bridge at Vicksburg_LTC2013

    47/60

    PP14

  • 7/29/2019 S67_Truss Retrofit to Mitigate Substructure Displacement at I-20 Mississippi Bridge at Vicksburg_LTC2013

    48/60

    PP14

  • 7/29/2019 S67_Truss Retrofit to Mitigate Substructure Displacement at I-20 Mississippi Bridge at Vicksburg_LTC2013

    49/60

    PP15

  • 7/29/2019 S67_Truss Retrofit to Mitigate Substructure Displacement at I-20 Mississippi Bridge at Vicksburg_LTC2013

    50/60

    PP15

  • 7/29/2019 S67_Truss Retrofit to Mitigate Substructure Displacement at I-20 Mississippi Bridge at Vicksburg_LTC2013

    51/60

    Expansion Dam Replacement at PP15

  • 7/29/2019 S67_Truss Retrofit to Mitigate Substructure Displacement at I-20 Mississippi Bridge at Vicksburg_LTC2013

    52/60

    PP 14 AFTER SPAN SHORTENINGEXPANSION DAM AT

    PP 15 AFTER SPAN SHORTENING

  • 7/29/2019 S67_Truss Retrofit to Mitigate Substructure Displacement at I-20 Mississippi Bridge at Vicksburg_LTC2013

    53/60

    False Chord Adjustments at U15 False Chord Modifications at U15

  • 7/29/2019 S67_Truss Retrofit to Mitigate Substructure Displacement at I-20 Mississippi Bridge at Vicksburg_LTC2013

    54/60

    Widening of Pier Top Area at Pier E-1

  • 7/29/2019 S67_Truss Retrofit to Mitigate Substructure Displacement at I-20 Mississippi Bridge at Vicksburg_LTC2013

    55/60

  • 7/29/2019 S67_Truss Retrofit to Mitigate Substructure Displacement at I-20 Mississippi Bridge at Vicksburg_LTC2013

    56/60

    Addition of Eyebars to the Suspended Span Hangers at PP15 and PP15

  • 7/29/2019 S67_Truss Retrofit to Mitigate Substructure Displacement at I-20 Mississippi Bridge at Vicksburg_LTC2013

    57/60

  • 7/29/2019 S67_Truss Retrofit to Mitigate Substructure Displacement at I-20 Mississippi Bridge at Vicksburg_LTC2013

    58/60

    PP 15

    E-3

    E-2

    Deck Joints After 2010 Modifications

  • 7/29/2019 S67_Truss Retrofit to Mitigate Substructure Displacement at I-20 Mississippi Bridge at Vicksburg_LTC2013

    59/60

    Remedial Structural Modifications

    Proactive Structural Modifications for: Anticipated movements

    Extreme scenarios

    Summary