S62_Use of Mobile Devices With Agile Assets in Louisiana_LTC2013
Transcript of S62_Use of Mobile Devices With Agile Assets in Louisiana_LTC2013
-
7/29/2019 S62_Use of Mobile Devices With Agile Assets in Louisiana_LTC2013
1/26
Vince Latino
Chief Maintenance Engineer
February 20, 2013
-
7/29/2019 S62_Use of Mobile Devices With Agile Assets in Louisiana_LTC2013
2/26
PM/SAP
ISIS Payroll
Agile Assets
2
-
7/29/2019 S62_Use of Mobile Devices With Agile Assets in Louisiana_LTC2013
3/26
Work Order Systems
Track Cost
Track Vehicle UsageLabor is in ISIS Labor is on Work Order
No Activity Codes Activity Codes
Transactions Reports
Updated Live Updated Nightly
PM Agile
Similarities Differences
3
-
7/29/2019 S62_Use of Mobile Devices With Agile Assets in Louisiana_LTC2013
4/26
Maintenance Management System Captures Work Orders for Fleet and Facilities
Tracks Moveable Property Assets
Module in SAP
4
-
7/29/2019 S62_Use of Mobile Devices With Agile Assets in Louisiana_LTC2013
5/26
Repair and Maintenance Fleet
Facility
Rest Areas are Considered DOTD Facilities
Operations Cutting Grass in Yard
Cleaning Yard
Etc
MIGO or IFCU Fuel and Goods are Issued out of Inventory
Equipment Master Record M5 Notifications
5
-
7/29/2019 S62_Use of Mobile Devices With Agile Assets in Louisiana_LTC2013
6/26
Training
Leave
6
-
7/29/2019 S62_Use of Mobile Devices With Agile Assets in Louisiana_LTC2013
7/26
Maintenance Management System Linear Assets
Captures Work Orders for Road and Structure Assets
Replaced ZWORD and MOPS
7
-
7/29/2019 S62_Use of Mobile Devices With Agile Assets in Louisiana_LTC2013
8/26
Repair and Maintenance Roadway
Bridges
Pump Stations
Toll Booths
Bridge Operators House
Signs
Signals
Etc.
Supervisor Paper Work PPRs
Interviews
Planning and Approving Work Orders
Soon to Come Dams
State Parks
Etc.
8
-
7/29/2019 S62_Use of Mobile Devices With Agile Assets in Louisiana_LTC2013
9/26
Clerk Receive Complaint (Internal or External) *
Create Work Request *
Create Work Order in Agile System *
Audit Work Order
Complete Work Order
Foreman Create Work Order in Agile System *
Upload to PDA *
Perform Work and Make Day Cards
Upload to Agile System
Supervisor Approve Work Order
Complete Work Order
9
-
7/29/2019 S62_Use of Mobile Devices With Agile Assets in Louisiana_LTC2013
10/26
Work Orders DO NOT Go Away After Completion
Agile Work Orders can also be found in SAP (Cost Only) Backup is done Nightly
Agile Interfaces with SAP Nightly Updates are done Nightly
10
-
7/29/2019 S62_Use of Mobile Devices With Agile Assets in Louisiana_LTC2013
11/26
Reports Open Work Orders
Self Approved Labor Day Cards
Material Usage
Printing Work Orders
Work Order Plans
Miscellaneous Overhead Activity Code (630-99)
Control Section (LRS-ID)
PDA Usage
Reimbursements/WBS
Dams
11
-
7/29/2019 S62_Use of Mobile Devices With Agile Assets in Louisiana_LTC2013
12/26
PDA (Motorola MC75
Laptops
12
***We are First
It is our feedback that
will help develop the PDA Software***
-
7/29/2019 S62_Use of Mobile Devices With Agile Assets in Louisiana_LTC2013
13/26
Agile WO Application (using)
GPS (using)
Camera (using)
Bar Code Scanner
WiFi
Phone
13
-
7/29/2019 S62_Use of Mobile Devices With Agile Assets in Louisiana_LTC2013
14/26
Agile Application loaded on PDA
Work Orders Download/Upload WOs from system to PDA
Create WOs in the field on the PDA
14
-
7/29/2019 S62_Use of Mobile Devices With Agile Assets in Louisiana_LTC2013
15/26
Select Attributes to load on PDA daily Crew
Labor
Equipment
Materials Projects (groupings of activity codes)
Assets
TRC (pay code)
Once complete it will let you know if you have any work orders
to match your criteria
15
-
7/29/2019 S62_Use of Mobile Devices With Agile Assets in Louisiana_LTC2013
16/26
Entering data into downloaded WOs Insert you Location from the Location tab window
Type your LRSID, get your GPS coordinates
If you have more than one location you can insert additional location
Labor Day Cardhours work on work order for each employee Equipment Day Cardselect equipment, how many miles used, operator
Material Day Cardselect material used, quantity used for work order
Same info needed to create a WO in the field Field WO gets -1000 number until uploaded and assigned WO # by system
16
-
7/29/2019 S62_Use of Mobile Devices With Agile Assets in Louisiana_LTC2013
17/26
Uploading WOs from PDA Connect PDA to online mode
Log in to Upload
Select WO date for WO being uploaded
Confirmation Message is displayed when upload is complete
17
-
7/29/2019 S62_Use of Mobile Devices With Agile Assets in Louisiana_LTC2013
18/26
Picture is saved in file on the PDA
Download picture to folder on computer
Attach picture to WO on the computer
18
-
7/29/2019 S62_Use of Mobile Devices With Agile Assets in Louisiana_LTC2013
19/26
Portable
User Friendly
Eliminates Paperwork
Multiple Functions
Eliminates some errors
Agile App must upload/download to computer
19
-
7/29/2019 S62_Use of Mobile Devices With Agile Assets in Louisiana_LTC2013
20/26
Limitation of materials
Single Asset
Price New
Repairs
Small Screen
Not as configurable
Agile App must upload/download to computer
20
-
7/29/2019 S62_Use of Mobile Devices With Agile Assets in Louisiana_LTC2013
21/26
PDA limitations for signal crews 100 Materials
Single Asset
Laptop accesses main application via Web
21
-
7/29/2019 S62_Use of Mobile Devices With Agile Assets in Louisiana_LTC2013
22/26
Advantages Full functionality
Larger Screen
Cheaper than PDA
No Agile App (no upload/download) Disadvantages
Limited connectivity
Price for service
No Agile App (no upload/download)
22
-
7/29/2019 S62_Use of Mobile Devices With Agile Assets in Louisiana_LTC2013
23/26
Employees Fear
Limited computer skills
Limited reading & writing skills in some cases
Multiple training needed Application
GPS
DOTD Control Section Network
Few minor Software Issues
Uses entire Control Section instead of detailed location
23
-
7/29/2019 S62_Use of Mobile Devices With Agile Assets in Louisiana_LTC2013
24/26
Went Live November 2010 Initially more WOs on Computer than PDA
February 201160% WOs created on PDA
24
-
7/29/2019 S62_Use of Mobile Devices With Agile Assets in Louisiana_LTC2013
25/26
More field training Continually monitor data to catch errors
Keep up to date on Mobile technology
Get Computer Section involved from start
25
-
7/29/2019 S62_Use of Mobile Devices With Agile Assets in Louisiana_LTC2013
26/26
26