    Vince Latino

    Chief Maintenance Engineer

    February 20, 2013

  • 7/29/2019 S62_Use of Mobile Devices With Agile Assets in Louisiana_LTC2013

    2/26

    PM/SAP

    ISIS Payroll

    Agile Assets

    2

  • 7/29/2019 S62_Use of Mobile Devices With Agile Assets in Louisiana_LTC2013

    3/26

    Work Order Systems

    Track Cost

    Track Vehicle UsageLabor is in ISIS Labor is on Work Order

    No Activity Codes Activity Codes

    Transactions Reports

    Updated Live Updated Nightly

    PM Agile

    Similarities Differences

    3

  • 7/29/2019 S62_Use of Mobile Devices With Agile Assets in Louisiana_LTC2013

    4/26

    Maintenance Management System Captures Work Orders for Fleet and Facilities

    Tracks Moveable Property Assets

    Module in SAP

    4

  • 7/29/2019 S62_Use of Mobile Devices With Agile Assets in Louisiana_LTC2013

    5/26

    Repair and Maintenance Fleet

    Facility

    Rest Areas are Considered DOTD Facilities

    Operations Cutting Grass in Yard

    Cleaning Yard

    Etc

    MIGO or IFCU Fuel and Goods are Issued out of Inventory

    Equipment Master Record M5 Notifications

    5

  • 7/29/2019 S62_Use of Mobile Devices With Agile Assets in Louisiana_LTC2013

    6/26

    Training

    Leave

    6

  • 7/29/2019 S62_Use of Mobile Devices With Agile Assets in Louisiana_LTC2013

    7/26

    Maintenance Management System Linear Assets

    Captures Work Orders for Road and Structure Assets

    Replaced ZWORD and MOPS

    7

  • 7/29/2019 S62_Use of Mobile Devices With Agile Assets in Louisiana_LTC2013

    8/26

    Repair and Maintenance Roadway

    Bridges

    Pump Stations

    Toll Booths

    Bridge Operators House

    Signs

    Signals

    Etc.

    Supervisor Paper Work PPRs

    Interviews

    Planning and Approving Work Orders

    Soon to Come Dams

    State Parks

    Etc.

    8

  • 7/29/2019 S62_Use of Mobile Devices With Agile Assets in Louisiana_LTC2013

    9/26

    Clerk Receive Complaint (Internal or External) *

    Create Work Request *

    Create Work Order in Agile System *

    Audit Work Order

    Complete Work Order

    Foreman Create Work Order in Agile System *

    Upload to PDA *

    Perform Work and Make Day Cards

    Upload to Agile System

    Supervisor Approve Work Order

    Complete Work Order

    9

  • 7/29/2019 S62_Use of Mobile Devices With Agile Assets in Louisiana_LTC2013

    10/26

    Work Orders DO NOT Go Away After Completion

    Agile Work Orders can also be found in SAP (Cost Only) Backup is done Nightly

    Agile Interfaces with SAP Nightly Updates are done Nightly

    10

  • 7/29/2019 S62_Use of Mobile Devices With Agile Assets in Louisiana_LTC2013

    11/26

    Reports Open Work Orders

    Self Approved Labor Day Cards

    Material Usage

    Printing Work Orders

    Work Order Plans

    Miscellaneous Overhead Activity Code (630-99)

    Control Section (LRS-ID)

    PDA Usage

    Reimbursements/WBS

    Dams

    11

  • 7/29/2019 S62_Use of Mobile Devices With Agile Assets in Louisiana_LTC2013

    12/26

    PDA (Motorola MC75

    Laptops

    12

    ***We are First

    It is our feedback that

    will help develop the PDA Software***

  • 7/29/2019 S62_Use of Mobile Devices With Agile Assets in Louisiana_LTC2013

    13/26

    Agile WO Application (using)

    GPS (using)

    Camera (using)

    Bar Code Scanner

    WiFi

    Phone

    13

  • 7/29/2019 S62_Use of Mobile Devices With Agile Assets in Louisiana_LTC2013

    14/26

    Agile Application loaded on PDA

    Work Orders Download/Upload WOs from system to PDA

    Create WOs in the field on the PDA

    14

  • 7/29/2019 S62_Use of Mobile Devices With Agile Assets in Louisiana_LTC2013

    15/26

    Select Attributes to load on PDA daily Crew

    Labor

    Equipment

    Materials Projects (groupings of activity codes)

    Assets

    TRC (pay code)

    Once complete it will let you know if you have any work orders

    to match your criteria

    15

  • 7/29/2019 S62_Use of Mobile Devices With Agile Assets in Louisiana_LTC2013

    16/26

    Entering data into downloaded WOs Insert you Location from the Location tab window

    Type your LRSID, get your GPS coordinates

    If you have more than one location you can insert additional location

    Labor Day Cardhours work on work order for each employee Equipment Day Cardselect equipment, how many miles used, operator

    Material Day Cardselect material used, quantity used for work order

    Same info needed to create a WO in the field Field WO gets -1000 number until uploaded and assigned WO # by system

    16

  • 7/29/2019 S62_Use of Mobile Devices With Agile Assets in Louisiana_LTC2013

    17/26

    Uploading WOs from PDA Connect PDA to online mode

    Log in to Upload

    Select WO date for WO being uploaded

    Confirmation Message is displayed when upload is complete

    17

  • 7/29/2019 S62_Use of Mobile Devices With Agile Assets in Louisiana_LTC2013

    18/26

    Picture is saved in file on the PDA

    Download picture to folder on computer

    Attach picture to WO on the computer

    18

  • 7/29/2019 S62_Use of Mobile Devices With Agile Assets in Louisiana_LTC2013

    19/26

    Portable

    User Friendly

    Eliminates Paperwork

    Multiple Functions

    Eliminates some errors

    Agile App must upload/download to computer

    19

  • 7/29/2019 S62_Use of Mobile Devices With Agile Assets in Louisiana_LTC2013

    20/26

    Limitation of materials

    Single Asset

    Price New

    Repairs

    Small Screen

    Not as configurable

    Agile App must upload/download to computer

    20

  • 7/29/2019 S62_Use of Mobile Devices With Agile Assets in Louisiana_LTC2013

    21/26

    PDA limitations for signal crews 100 Materials

    Single Asset

    Laptop accesses main application via Web

    21

  • 7/29/2019 S62_Use of Mobile Devices With Agile Assets in Louisiana_LTC2013

    22/26

    Advantages Full functionality

    Larger Screen

    Cheaper than PDA

    No Agile App (no upload/download) Disadvantages

    Limited connectivity

    Price for service

    No Agile App (no upload/download)

    22

  • 7/29/2019 S62_Use of Mobile Devices With Agile Assets in Louisiana_LTC2013

    23/26

    Employees Fear

    Limited computer skills

    Limited reading & writing skills in some cases

    Multiple training needed Application

    GPS

    DOTD Control Section Network

    Few minor Software Issues

    Uses entire Control Section instead of detailed location

    23

  • 7/29/2019 S62_Use of Mobile Devices With Agile Assets in Louisiana_LTC2013

    24/26

    Went Live November 2010 Initially more WOs on Computer than PDA

    February 201160% WOs created on PDA

    24

  • 7/29/2019 S62_Use of Mobile Devices With Agile Assets in Louisiana_LTC2013

    25/26

    More field training Continually monitor data to catch errors

    Keep up to date on Mobile technology

    Get Computer Section involved from start

    25