S/4HANA Conversion@Westfalia – ein Erfahrungsbericht March 07, 2019 Christian Walters Managing Director Finance & Controlling, Westfalia Metal Hoses Reimund Lips Head of Global Digital Practices, itelligence AG

Transcript of S/4HANA Conversion@Westfalia ein Erfahrungsbericht...BRF+. Pre-Transition Workshops - Verification -...

Page 1: S/4HANA Conversion@Westfalia ein Erfahrungsbericht...BRF+. Pre-Transition Workshops - Verification - POC | Traditional Model 19 e 9 Initial Assessment (WS0) Readiness Check (WS1) Business

S/4HANA Conversion@Westfalia – ein Erfahrungsbericht

March 07, 2019

Christian Walters Managing Director Finance & Controlling, Westfalia Metal Hoses

Reimund Lips Head of Global Digital Practices, itelligence AG

Page 2: S/4HANA Conversion@Westfalia ein Erfahrungsbericht...BRF+. Pre-Transition Workshops - Verification - POC | Traditional Model 19 e 9 Initial Assessment (WS0) Readiness Check (WS1) Business

Agenda

• Westfalia: Customer Presentation

• S/4HANA Transition and S/4HANA Conversion

• Westfalia Conversion Project

3/8

/2019

© 2

015 ite

llig

ence

2

Page 3: S/4HANA Conversion@Westfalia ein Erfahrungsbericht...BRF+. Pre-Transition Workshops - Verification - POC | Traditional Model 19 e 9 Initial Assessment (WS0) Readiness Check (WS1) Business

3/8

/2019

© 2

016 ite

llig

ence

3

Westfalia Metal Hoses & Itelligence – Together on the road

Member of the HEITKAMP & THUMANN GROUP

Page 4: S/4HANA Conversion@Westfalia ein Erfahrungsbericht...BRF+. Pre-Transition Workshops - Verification - POC | Traditional Model 19 e 9 Initial Assessment (WS0) Readiness Check (WS1) Business

55 OEMs We supply more than 55 On- and Off-Road Vehicle Producers from single components to complete routing systems.

Facts & Figures

30% Market

ShareEvery third commercial vehicle worldwide is equipped with one of our products.

65 Years

Experience65 years of experience in the design, development and production of decoupling elements and exhaust routings.

3 Mio. InvestmentsWe invest more than 3 million Euro every year in the enhancement of capabilities and capacities.

1,5 Mio.

ComponentsIn 2018, we manufactured nearly 1,5 million Stripwound or Gastight Hoses for commercial vehicles.

507 EmployeesWe employ more than 500 employees across the globe in Germany, Czech Republic, USA, China.

Page 6: S/4HANA Conversion@Westfalia ein Erfahrungsbericht...BRF+. Pre-Transition Workshops - Verification - POC | Traditional Model 19 e 9 Initial Assessment (WS0) Readiness Check (WS1) Business

Serving all main commercial vehicle markets

Chicago, USALyon, France

Mumbai, India

Tokyo, Japan

Seoul, Korea

Westfalia Metal Hoses locations

Sales Representations

Shanghai,China

Bristol, CTUSA

HilchenbachGermany

Hustopece,Czech

Republic

Europe:• Supply chain across both plants – significant intercompany transactions• Both plants in Europe run SAP• Go-live in CZ 2009, DE 2017• Version ECC 6.0 EHP7• Same system, same client, 2 company codes• Hosted by Itelligence in Poznan, Poland

Page 7: S/4HANA Conversion@Westfalia ein Erfahrungsbericht...BRF+. Pre-Transition Workshops - Verification - POC | Traditional Model 19 e 9 Initial Assessment (WS0) Readiness Check (WS1) Business

S/4HANA Transition and S/4HANA Conversion

3/8

/2019

© 2

016 ite

llig

ence

Page 8: S/4HANA Conversion@Westfalia ein Erfahrungsbericht...BRF+. Pre-Transition Workshops - Verification - POC | Traditional Model 19 e 9 Initial Assessment (WS0) Readiness Check (WS1) Business

SAP S/4HANA Transition | What has to be considered

SimplifiedFunctionality

S/4HANA Enterprise Management

ProcessRedesign

OLAP&OLTPFIORICDS

Virtual Data ModelsRole based / exception

based user experience

Functional Scope Technical & MethodologyChanges

New Customer/Partner

Development

Framework

Principle of

OptimizationsCustom Code Refactoring ProjectsHANA Optimization

SAP ActivateONE

ModificationClearing

Custom Code

Optimizations

CompatibilityDatabase Migration& Unicode

SyntaxCorrections

Transition

ReleasedIndustry

Solutions

ReleasedAdd on´s

Simplificationdatabase Installation &

Landscape

Management

System conversionactivities & SUM

Relevant for System Conversion only

Relevant for New Install and System Conversion

BRF+

Page 9: S/4HANA Conversion@Westfalia ein Erfahrungsbericht...BRF+. Pre-Transition Workshops - Verification - POC | Traditional Model 19 e 9 Initial Assessment (WS0) Readiness Check (WS1) Business

Pre-Transition Workshops - Verification - POC | Traditional Model

3/8

/2019

© 2

015 ite

llig

ence

9

Initial Assessment (WS0)

ReadinessCheck (WS1)

Business ProcessReview (WS2)

Value Discovery (WS3)

SandboxConversion (Pre-Project)

Transition StrategyProposal(WS4)

Roadmap (WS5)

Evaluatecurrentsituation

andcustomer

expectations

Check system

readinessfor

conversion

Evaluatebusinessprocess

quality andS/4HANA

compliance

Discoverpotential improve-

ments andbenefits

POC: Verifysystem

readinessfor your

transitionstrategy

Decide yourtransition

strategy on reliablefacts

Design yourlongterm IT Roadmap

Need to describe:• Content• Timeline• Ressources• Input• Output• Customer benefit• Step-by-step deliverables

„Value Check“

„S/4 Roadmap“

Page 10: S/4HANA Conversion@Westfalia ein Erfahrungsbericht...BRF+. Pre-Transition Workshops - Verification - POC | Traditional Model 19 e 9 Initial Assessment (WS0) Readiness Check (WS1) Business

Pre-Transition Workshops | Accelerated Model

3/8

/2019

© 2

015 ite

llig

ence

10

Initial Assessment (WS0)

ReadinessCheck (WS1)

Business ProcessReview (WS2)

Value Discovery (WS3)

SandboxConversion (Pre-Project)

Transition StrategyProposal(WS4)

Roadmap (WS5)

Evaluatecurrentsituation

andcustomer

expectations

POC: Verifysystem

readinessfor your

transitionstrategy

Conversionpowered byConversion

Factory

Design yourlongterm IT Roadmap

Need to describe:• Content• Timeline• Ressources• Input• Output• Customer benefit• Step-by-step deliverables

Page 11: S/4HANA Conversion@Westfalia ein Erfahrungsbericht...BRF+. Pre-Transition Workshops - Verification - POC | Traditional Model 19 e 9 Initial Assessment (WS0) Readiness Check (WS1) Business

System Requirements

Your Basic Sequence for the S/4HANA Conversion

08.0

3.2

019

11

Realize Phase

t

Maintenance Planner

Pre-ChecksCustom Code

Migration WorklistSoftware Update Manager (SUM)

Application specificfollow-on activities

Discovery Prepare Phase

4 5

Simplification ListSAP S/4HANA, on-premiseedition

Database Migration

Software Update

Data Conversion

0

Readiness Check

1 2 3

© ite

llig

ence

ERP 6 on any EHP version

Unicode system

AS ABAP only (dual-stack systems are not supported)

Discovery Prepare Phase

System Requirements

System clean-up

Archiving

Customer Vendor Integration

HDB Migration

New GL migration

Optional subprojectsSystem Requirements

Page 12: S/4HANA Conversion@Westfalia ein Erfahrungsbericht...BRF+. Pre-Transition Workshops - Verification - POC | Traditional Model 19 e 9 Initial Assessment (WS0) Readiness Check (WS1) Business

Westfalia Conversion Project

3/8

/2019

© 2

016 ite

llig

ence

Page 13: S/4HANA Conversion@Westfalia ein Erfahrungsbericht...BRF+. Pre-Transition Workshops - Verification - POC | Traditional Model 19 e 9 Initial Assessment (WS0) Readiness Check (WS1) Business

Westfalia | Project Objectives

S/4HANA 1809 Conversion (POC) of SAP ERP Production Copy (“Sandbox Conversion”)

Check system readiness: Is the SAP ERP System ready to convert?

Identify obstacles and show stoppers: How can possible pitfalls be removed?

Calculate effort and timeline: How long does a system conversion really take?

Non-disruptive move from Business Suite on HANA to S/4HANA.

No functional optimizations or changes of business processes.

No usage of new user interface (UX, Fiori), but classical GUI.

No extensive enduser trainings.

Short Project timeline.

3/8

/2019

© 2

015 ite

llig

ence

13

Page 14: S/4HANA Conversion@Westfalia ein Erfahrungsbericht...BRF+. Pre-Transition Workshops - Verification - POC | Traditional Model 19 e 9 Initial Assessment (WS0) Readiness Check (WS1) Business

S/4HANA Conversion | Sandbox Conversion (POC)

3/8

/2019

© 2

016 ite

llig

ence

14

RUN 11. Prod to Sandbox (SBX) Copy2. SBX Conversion3. SBX Functional Testing(UT)

SBX

PRDQASDEV

SBX

Any DB Platform

HANAPlatform

1

2

3

SAP ERP

SAP S/4HANA

Page 15: S/4HANA Conversion@Westfalia ein Erfahrungsbericht...BRF+. Pre-Transition Workshops - Verification - POC | Traditional Model 19 e 9 Initial Assessment (WS0) Readiness Check (WS1) Business

Westfalia | System Landscape, Products, Interfaces

SAP ERP 6 EHP7 on HANA

Database Size: 200 GB

Users: 350

Implementation Year: 2009

No. of Company Codes: 5

SAP BW

SAP Business Connector (WSH tax officecommunication)

3/8

/2019

© 2

015 ite

llig

ence

15

Interfaces:

EDI (Seeburger)

e-banking (Multicash)

SFDC (Fastec)

BAPI (WCZ Barcode system)

CAQ (WSH quality system)

LN databases (file exports)

HR (Perm– employees import)

SMTP (relay to mail server)

Network fileshare mirroring (betweenPoznan hosting center and Hustopece andHilchenbach LANs)

Page 16: S/4HANA Conversion@Westfalia ein Erfahrungsbericht...BRF+. Pre-Transition Workshops - Verification - POC | Traditional Model 19 e 9 Initial Assessment (WS0) Readiness Check (WS1) Business

Westfalia | ERP Core Modules

3/8

/2019

© 2

015 ite

llig

ence

16

Page 17: S/4HANA Conversion@Westfalia ein Erfahrungsbericht...BRF+. Pre-Transition Workshops - Verification - POC | Traditional Model 19 e 9 Initial Assessment (WS0) Readiness Check (WS1) Business

Westfalia | S/4HANA Facts

3/8

/2019

© 2

016 ite

llig

ence

17

S/4HANA FACTS

HANA migration already executed

ABAP Stack only

UNICODE

EHP 7

New GL Migration already done

Number of active Company Codes: 5

Data History: 9 Years

Page 18: S/4HANA Conversion@Westfalia ein Erfahrungsbericht...BRF+. Pre-Transition Workshops - Verification - POC | Traditional Model 19 e 9 Initial Assessment (WS0) Readiness Check (WS1) Business

Westfalia | Project Milestones

3/8

/2019

© 2

015 ite

llig

ence

18

Milestone for Signoff

Project Phase Task Description

Month

Date

Week 1 2 3 4 5 6 7 8 9 10

Prepare Sandbox Server Preperation

Test Source Environment Ready

Realize Sandbox Pre-Conversion Activities

Transactional Data Consistency

Sandbox Technical Conversion

Sandbox Post Conversion Activities

Target Platform Ready for Testing

Functional Testing & Issue Resolution

Functional Testing Signoff

Page 19: S/4HANA Conversion@Westfalia ein Erfahrungsbericht...BRF+. Pre-Transition Workshops - Verification - POC | Traditional Model 19 e 9 Initial Assessment (WS0) Readiness Check (WS1) Business

itelligence Conversion Factory: Communication and Collaboration Model

3/8

/2019

© 2

016 ite

llig

ence

19

• PM / System Architect

• System Admin• Consultant LOG• Consultant FIN

• PM • System Admin• Keyuser LOG• Keyuser FIN• Keyuser N.N.• Keyuser N.N.

CONVERSION FACTORY

Flexible Cluster

Peo

ple

To

ols

ONSITE TEAM CLIENT

Page 20: S/4HANA Conversion@Westfalia ein Erfahrungsbericht...BRF+. Pre-Transition Workshops - Verification - POC | Traditional Model 19 e 9 Initial Assessment (WS0) Readiness Check (WS1) Business

Westfalia | S/4HANA Workshops

3/8

/2019

© 2

015 ite

llig

ence

20

Kick-Off

WS LogisticsWS Finance

WS Changesin S/4HANA

Finance Data Model Changes in Finance and General Ledger

Universal Journal Benefits in Finance and General Ledger

Process Changes in GL Account.

Key Changes in Bank and Cash Management

Asset Accounting Changes in S/4HANA

Key Changes in CO-PA and Material Ledger

Migration and Reports for project Validation Phase

Logistics Business Partner

FSCM

Settlement Management

New MRP Run

SD Pricing Data Model

Field Length Extensions

ECC vs S/4HANA

Important Changes

General Ledger

Bank Accounting

Asset Accounting

Controlling

Production Planning

Page 21: S/4HANA Conversion@Westfalia ein Erfahrungsbericht...BRF+. Pre-Transition Workshops - Verification - POC | Traditional Model 19 e 9 Initial Assessment (WS0) Readiness Check (WS1) Business

Westfalia | Weekly Information Exchange

3/8

/2019

© 2

015 ite

llig

ence

21

Project work

betweenCalls

Prepareand

presentissues

Analyzeissues

Discuss and find

best solution

Track progress, timeline,

cost

Presentprogress

Presentissuesand

Tasks

Provideand

explainoptions

Take decisions

Resolveissues

Page 22: S/4HANA Conversion@Westfalia ein Erfahrungsbericht...BRF+. Pre-Transition Workshops - Verification - POC | Traditional Model 19 e 9 Initial Assessment (WS0) Readiness Check (WS1) Business

Westfalia | Mandatory Simplification Items

22

New General Ledger(Yes)

New Asset AccountingClassic Asset Accounting

(Yes)

Material LedgerUsing Multiple Currencies

Material Ledger(No)

Basic S/4HANA Credit Management

Credit Management AR/SD (Yes)

Bank Account Management (BAM) Lite

ECC Bank Accounting(Yes)

Settlement ManagementRebates Management

(Yes)

Foreign Trade (Yes)

Foreign Trade – Letter of Credit, INTRASTAT

New General Ledger

Business Partners

ERP SYSTEM S/4HANA SYSTEM

Customers / Vendors(Yes)

Page 23: S/4HANA Conversion@Westfalia ein Erfahrungsbericht...BRF+. Pre-Transition Workshops - Verification - POC | Traditional Model 19 e 9 Initial Assessment (WS0) Readiness Check (WS1) Business

Westfalia | Gros and Net Project Timeline

Pre-Conversion: 30 days / 6 weeks

Technical Conversion: 30 days / 6 weeks (36 hours net)

Post Conversion: 10 days

Testing

3/8

/2019

© 2

015 ite

llig

ence

23

Pre-Conversion Tech.-Conversion Post-Conversion

2018/10/11 2019/01/21

t

• Long Material Number• BW Interface• Material Valuation

2019/01/112018/11/26

Page 24: S/4HANA Conversion@Westfalia ein Erfahrungsbericht...BRF+. Pre-Transition Workshops - Verification - POC | Traditional Model 19 e 9 Initial Assessment (WS0) Readiness Check (WS1) Business

Westfalia | Lessons learnt

3/8

/2019

© 2

016 ite

llig

ence

24

Excellent communication between all involved parties.

itelligence Conversion Factory accepted as a trusted partner.

Most issues in FI and AA, local FI consultant mandatory.

Simplification Item Check: all issues to be removed before technical conversion.

Simplification Item Check versus Readiness Check:

Readiness Check best use in Presales Phase („first indication“).

SI Check more detailed with better results.

10 – 12 weeks runtime for an Sandbox Conversion realistic.

OSS issues clearing as a potential hurdle (1809 frontrunner?)

Page 25: S/4HANA Conversion@Westfalia ein Erfahrungsbericht...BRF+. Pre-Transition Workshops - Verification - POC | Traditional Model 19 e 9 Initial Assessment (WS0) Readiness Check (WS1) Business

Q&A

25

3/8

/2019

Page 26: S/4HANA Conversion@Westfalia ein Erfahrungsbericht...BRF+. Pre-Transition Workshops - Verification - POC | Traditional Model 19 e 9 Initial Assessment (WS0) Readiness Check (WS1) Business

Wir machen mehr aus SAP®-Lösungen!

08.0

3.2

019

© 2

018 ite

llig

ence

Page 27: S/4HANA Conversion@Westfalia ein Erfahrungsbericht...BRF+. Pre-Transition Workshops - Verification - POC | Traditional Model 19 e 9 Initial Assessment (WS0) Readiness Check (WS1) Business

Copyright itelligence AG - All rights reserved

Die Weitergabe und Vervielfältigung dieser Publikation oder von Teilen daraus sind, zu welchem Zweck und in welcher Form auch immer, ohne die ausdrückliche schriftliche Genehmigung durch itelligence AG nicht gestattet. In dieser Publikation enthaltene Informationen können ohne vorherige Ankündigung geändert werden.

Einige von der itelligence AG und deren Vertriebspartnern vertriebene Softwareprodukte können Softwarekomponenten umfassen, die Eigentum anderer Softwarehersteller sind. Die in diesem Dokument erwähnten Namen von Produkten und Services sowie die damit verbundenen Firmenlogos sind Marken der jeweiligen Unternehmen. Die Angaben im Text sind unverbindlich und dienen lediglich zu Informationszwecken. Produkte können länderspezifische Unterschiede aufweisen.

Die in diesem Dokument enthaltenen Informationen sind Eigentum von itelligence. Dieses Dokument ist eine Vorabversion und unterliegt nicht Ihrer Lizenzvereinbarung oder einer anderen Vereinbarung mit itelligence. Dieses Dokument enthält nur vorgesehene Strategien, Entwicklungen und Produktfunktionen und ist für itelligence nicht bindend, einen bestimmten Geschäftsweg, eine Produktstrategie bzw. -entwicklung einzuschlagen. itelligence übernimmt keine Verantwortung für Fehler oder Auslassungen in diesen Materialien. itelligence garantiert nicht die Richtigkeit oder Vollständigkeit der Informationen, Texte, Grafiken, Links oder anderer in diesen Materialien enthaltenen Elemente. Diese Publikation wird ohne jegliche Gewähr, weder ausdrücklich noch stillschweigend, bereitgestellt. Dies gilt u. a., aber nicht ausschließlich, hinsichtlich der Gewährleistung der Marktgängigkeit und der Eignung für einen bestimmten Zweck sowie für die Gewährleistung der Nichtverletzung geltenden Rechts.

itelligence übernimmt keine Haftung für Schäden jeglicher Art, einschließlich und ohne Einschränkung für direkte, spezielle, indirekte oder Folgeschäden im Zusammenhang mit der Verwendung dieser Unterlagen. Diese Einschränkung gilt nicht bei Vorsatz oder grober Fahrlässigkeit.

Die gesetzliche Haftung bei Personenschäden oder die Produkthaftung bleibt unberührt. Die Informationen, auf die Sie möglicherweise über die in diesem Material enthaltenen Hotlinks zugreifen, unterliegen nicht dem Einfluss von itelligence, und itelligence unterstützt nicht die Nutzung von Internetseiten Dritter durch Sie und gibt keinerlei Gewährleistungen oder Zusagen über Internetseiten Dritter ab.

No part of this publication may be reproduced or transmitted in any form or for any purpose without the express permission of itelligence AG. The information contained herein may be changed without prior notice.

Some software products marketed by itelligence AG and its distributors contain proprietary software components of other software vendors. All product and service names mentioned and associated logos displayed are the trademarks of their respective companies. Data contained in this document serves informational purposes only. National product specifications may vary.

The information in this document is proprietary to itelligence. This document is a preliminary version and not subject to your license agreement or any other agreement with itelligence. This document contains only intended strategies, developments and product functionalities and is not intended to be binding upon itelligence to any particular course of business, product strategy, and/or development. itelligence assumes no responsibility for errors or omissions in this document. itelligence does not warrant the accuracy or completeness of the information, text, graphics, links, or other items contained within this material. This document is provided without a warranty of any kind, either express or implied, including but not limited to the implied warranties of merchantability, fitness for a particular purpose, or non-infringement.

itelligence shall have no liability for damages of any kind including without limitation direct, special, indirect, or consequential damages that may result from the use of these materials. This limitation shall not apply in cases of intent or gross negligence.

The statutory liability for personal injury and defective products is not affected. itelligence has no control over the information that you may access through the use of hot links contained in these materials and does not endorse your use of third-party Web pages nor provide any warranty whatsoever relating to third-party Web pages.

08.0

3.2

019

© 2

018 ite

llig

ence

27