S16 Application No AFSS280
Proposed Minor Relaxation of Plot Ratio and Building Height Restrictions
for Permitted Public Housing Development in ldquoResidential (Group A)4rdquo Zone
Government Land in Areas 4 and 30 Sheung Shui New Territories
Responses to Comments
Comments Responses
Railway Development Office Highways Department (1342021)
General Comments-
1 The application site falls within the
railway protection boundary of the
existing East Rail Line As the operation
of the existing railway system is not under
the jurisdiction of this office the applicant
should consult MTRCL with respect to
operation maintenance safety and future
construction of the existing railway
network with reference to the procedures
in PNAP APP-24 and DEVB TC(W) No
12019 for private and public works
respectively
Site 2
Please refer to the attached letter to MTRC
dated 1062020 (Attachment 1) ldquo20200610
1st GBP Submission to MTRCrdquo for our
submission of GBP seeking MTRCrsquos comment
and the reply letter from MTRC dated
2962020 (Attachment 2) ldquo20200629_reply
from MTRC for 1st GBP submissionrdquo
respectively Since that there is only a small
western corner of the development within the
railing protection boundary and no major works
was proposed in such area MTRC had no
adverse comment for the GBP submission
The procedures in PNAP APP-24 and DEVB
TC(W) No 12019 will be referred and MTRC
will be consulted for works within the existing
railing protection zone
Comments on Traffic Impact Assessment-
2 Para 731 - The applicant should make
reference to the latest information on the
maximum capacity of North South
Corridor from the public domain andor
Subcommittee on Matters Relating to
Railways of Legislative Council and
update the paragraph accordingly
The quoted capacity in the TIA report has made
reference to the latest available information
from the public domain ie Executive
Summary of Review and Update of the Railway
Development Strategy 2000
(httpswwwhydgovhkenpublications_and_
publicitypublicationsreview_and_update_rail
way_development_strategy_2000_esdoces_e
pdf)
- 2 4 -
Comments Responses
3 Para 732 - Please further elaborate how
the additional 1127 passengers during the
critical AM peak hour can be determined
Please also provide the overall critical
patronage and vc ratio (in 4 ppsm and 6
ppsm) of the East Rail Line
The additional 1127 passengers are derived by
37 (ie adopted modal split of rail mode as
stated in Para 732) x 3046 (ie estimated
pedestrian trips induced by the proposed
developments at Sites 1 and 2 as detailed in
Table 65)
The patronage and vc ratio of the East Rail
Line should be assessed holistically under
strategic study Nevertheless the increase in
passenger demand induced by the proposed
development on the future North South
Corridor is no more than 15 of its carrying
capacity Hence the additional passenger
demand on the future North South Corridor is
considered negligible
4 Please advise whether the additional
patronage from NOL contributing to the
East Rail Line has been considered A
table showing the railway network
assumption for the design year when
conducting the traffic impact assessment
may be required
Further to responses to above item 3 the
patronage and vc ratio of the East Rail Line
should be assessed holistically under strategic
study Nevertheless the increase in passenger
demand induced by the proposed development
on the future North South Corridor is no more
than 15 of its carrying capacity Hence the
additional passenger demand on the future
North South Corridor is considered negligible
Urban Design and Landscape Section Planning Department (1642021)
1 Figure 40 ndash 43 ndash The consultant should
show the test point IDs and demarcation of
each focus area on the same figure
Noted Figure 43 is revised (Attachment 3) to
show the test point IDs and demarcation of each
focus area in the same figure
2 Summer weighted average VR contour
plot (Figure 47) ndash It is confusing and
arbitrary to identify the air paths based on
the weighted average VR contour plots
The consultant should revise the
arguments and indicate the air paths where
appropriate
Noted Figure 47 is revised (Attachment 4)
removing the air path mark-up
In Section 62 ldquobuilding separationsrdquo are
identified the phase ldquoair pathrdquo are removed to
avoid confusion (Attachment 5)
- 3 4 -
Comments Responses
3 S wind (section 638) ndash The consultant
should make sure the discussions in this
section are referred to S wind but not SSE
wind
It is confirmed that the section 638 is referred
only to S wind The typo ldquoSSESrdquo are removed
from all paragraphs in this section
(Attachment 6)
Urban Design and Landscape Section Planning Department (2042021)
Both Site 1 and Site 2
1 Approximate number of trees to be
affected due to the proposed development
and new tree planting should be provided
in the application
320 numbers of trees including 114 numbers of
dead trees (but excluding invasive tree species)
were affected within Site 1 and 33 numbers of
trees (excluding invasive tree species) were
affected within Site 2
Approximately 87 numbers of trees will be
provided within Site 1 and 74 numbers of trees
will be provided within Site 2 Relevant tree
felling applications were submitted and
approved by Tree Preservation Committee of
Housing Department
2 Typical landscape details with major
dimensions for the proposed works and
planning arrangement etc should be
provided in the application to demonstrate
the viability of the proposal
Noted Please refer to typical planter details
(attached Details 1 amp 2 for Site 1 and Details
3 amp 4 for Site 2) and planting schedules for
information
3 Spot levels vehicular and pedestrian
entrances should be clearly indicated on
the plans
Noted Please refer to the attached revised
plans showing the spot levels vehicular and
pedestrian entrances for your information
Hong Kong Police Force (2042021)
1 Proposed number of parking spaces for
both motor vehicle and bicycle may not be
sufficient to meet with the demand of
residents
The motor vehicle parking provision is in
accordance with the standard under HKPSG
which has been agreed with TD while the
bicycle parking provision has been agreed with
TD
2 There is an anticipated growth of traffic
flow in light of the Fanling North
Development in the vicinity and the
adjacent industrial buildings
New Development Area in Fanling North and
the developments in the adjacent industrial
buildings have been considered in the traffic
forecast Please refer to para 422 and 423 of
the TIA report
- 4 4 -
Comments Responses
Drainage Services Department (2642021)
1 We have no comment on the subject
submission from public drainage
sewerage operation and maintenance point
of view but the following for your note -
Sewerage Impact Assessment (SIA)
Section 416 ndash To our understanding the
required upgrading works (ie section of
the proposed manhole WS02-FMH002
and existing manhole FMH1004850 and
section of FMH1004850 and
FMH1004853 to be enlarged to 375mm
dia and 450mm dia respectively) will be
carried out by the applicant (not
CE492018(CE)) Please indicate it in the
section for sake of clarity
Noted Section 416 and Drawing no
WS02SIA005 have been revised accordingly
- End -
Hong Kong Housing Authority Proposed Public Housing Developments at Sheung Shui Areas 4 amp 30 Sites 1 amp 2 Report for Air Ventilation Assessment ndash Initial Study
-- | Issue Rev3 | 21 April 2021
NPROJECT251828 HKHA TERM CONSULTANCY 2016 (BATCH H1)02amp03amp04
SHEUNGSHUI_AREA30OUTAVAIS20210419_PLANDRTOC_20200421_AVAIS_ISSUE_REV3DOCX
Page 43
Figure 46 Contour Plot for Summer Weighted Average VR for Baseline Scheme
Figure 47 Contour Plot for Summer Weighted Average VR for Proposed Scheme
Po Shek Wu Road
Blk 1
Blk 2 Blk 3
CHampW
ampDHC
Blk 2
Blk 3
Blk 1
CP
PSWR Site
Choi Yuen Road
Ka Fu Close
San Wan Road
Choi Fai Street
Choi Fat Street
Farmland Tai Tau Leng
N
Jumbo Plaza
Open
Carpark 1
Shek Wu Hui Jockey Club Playground
Po Wan Road
Po Shek Wu Road
Blk 1
Blk 2 Blk 3
CHampW
ampDHC
Blk 2
Blk 3
Blk 1
CP
PSWR Site
Choi Yuen Road
Ka Fu Close
San Wan Road
Choi Fai Street
Choi Fat Street
Farmland Tai Tau Leng
N
Jumbo Plaza
Open
Carpark 1
Shek Wu Hui Jockey Club Playground
Po Wan Road
Hong Kong Housing Authority Proposed Public Housing Developments at Sheung Shui Areas 4 amp 30 Sites 1 amp 2 Report for Air Ventilation Assessment ndash Initial Study
-- | Issue Rev3 | 21 April 2021
NPROJECT251828 HKHA TERM CONSULTANCY 2016 (BATCH H1)02amp03amp04
SHEUNGSHUI_AREA30OUTAVAIS20210419_PLANDRTOC_20200421_AVAIS_ISSUE_REV3DOCX
Page 39
Figure 43 Location of Focus Areas outside the Application Site
18Po Sheung Tsuen
19 Sheung Shui
Heung Sitting-Out
Area No 9
11 Tai Tau Leng
1 Po Shek Wu Road
2 Choi Yuen Road
3 Choi Fat Street
4 Choi Fai Street
5 San Wan Road
6 Ka Fu Close
7 Po Wan Road
8 Sheung Shui
Tung Hing Road
9 Hak Ka Wai Village
amp Tsung Pak Long
12 Choi Po Court
13 Po Shek Wu
Estate
14 Open Carpark 1
15 Open Carpark 2
16 PSWR Site
17 Shek Wu Hui
Jockey Club
Playground
10 Farmland
N 22 Footpath 3
23 Footpath 4
21 Footpath 2
20 Footpath 1
Hong Kong Housing Authority Proposed Public Housing Developments at Sheung Shui Areas 4 amp 30 Sites 1 amp 2 Report for Air Ventilation Assessment ndash Initial Study
-- | Issue Rev3 | 21 April 2021
NPROJECT251828 HKHA TERM CONSULTANCY 2016 (BATCH H1)02amp03amp04
SHEUNGSHUI_AREA30OUTAVAIS20210419_PLANDRTOC_20200421_AVAIS_ISSUE_REV3DOCX
Page 42
Summer Weighted Average
The contour plots of summer weighted VR for the Baseline Scheme and Proposed
Scheme are shown Figure 46 and Figure 47
Majority of the summer prevailing winds comes from the south-western quadrant
the wide-open farmland at the upwind location of the Development allow more
wind to reach SS Site 1 and SS Site 2 The provided 15m building separations in
SS Site 1 and SS Site 2 align with the south-western prevailing winds The widened
building separation (15m) between Block 3 and Carpark of SS Site 2 in the
Proposed Scheme further increase the wind permeability and the wind performance
of the Proposed Scheme is slightly better than that of the Baseline Scheme under
annual condition The most observable difference is found at the San Wan Road
and Sheung Shui Wai (black circle)
The more permeable podium of SS Site 1 would also be effective to allow summer
prevailing winds to channel from the farmland towards the downwind areas such
as San Wan Road and SS Site 2 When the prevailing wind arrives SS Site 2 the
provided ground and podium floor empty bays further widened the building
separation in the Proposed Scheme which would promote more wind penetration
across the SS Site 2 Development to reach downwind area such as Sheung Shui
Wai Thus an overall higher VR would be observed in San Wan Road and Sheung
Shui Wai in the Proposed Scheme
On the other hand under Baseline Scheme with less wind enhancement features
the Development would have lower wind permeability A portion of the prevailing
wind is likely to be diverted by SS Site 2 then travel towards Open Carpark 1 Po
Shek Wu Road and further towards Shek Wu Hui Jockey Club Playground instead
Thus slightly higher VR would be observed near Open Carpark 1 and Shek Wu
Hui Jockey Club Playground in Baseline Scheme (brown circle)
Hong Kong Housing Authority Proposed Public Housing Developments at Sheung Shui Areas 4 amp 30 Sites 1 amp 2 Report for Air Ventilation Assessment ndash Initial Study
-- | Issue Rev3 | 21 April 2021
NPROJECT251828 HKHA TERM CONSULTANCY 2016 (BATCH H1)02amp03amp04
SHEUNGSHUI_AREA30OUTAVAIS20210419_PLANDRTOC_20200421_AVAIS_ISSUE_REV3DOCX
Page 43
Figure 46 Contour Plot for Summer Weighted Average VR for Baseline Scheme
Figure 47 Contour Plot for Summer Weighted Average VR for Proposed Scheme
Po Shek Wu Road
Blk 1
Blk 2 Blk 3
CHampW
ampDHC
Blk 2
Blk 3
Blk 1
CP
PSWR Site
Choi Yuen Road
Ka Fu Close
San Wan Road
Choi Fai Street
Choi Fat Street
Farmland Tai Tau Leng
N
Jumbo Plaza
Open
Carpark 1
Shek Wu Hui Jockey Club Playground
Po Wan Road
Po Shek Wu Road
Blk 1
Blk 2 Blk 3
CHampW
ampDHC
Blk 2
Blk 3
Blk 1
CP
PSWR Site
Choi Yuen Road
Ka Fu Close
San Wan Road
Choi Fai Street
Choi Fat Street
Farmland Tai Tau Leng
N
Jumbo Plaza
Open
Carpark 1
Shek Wu Hui Jockey Club Playground
Po Wan Road
Hong Kong Housing Authority Proposed Public Housing Developments at Sheung Shui Areas 4 amp 30 Sites 1 amp 2 Report for Air Ventilation Assessment ndash Initial Study
-- | Issue Rev3 | 21 April 2021
NPROJECT251828 HKHA TERM CONSULTANCY 2016 (BATCH H1)02amp03amp04
SHEUNGSHUI_AREA30OUTAVAIS20210419_PLANDRTOC_20200421_AVAIS_ISSUE_REV3DOCX
Page 58
S Wind Direction
Under S wind the incoming wind would be slightly diverted by the low-rise village
clusters Tai Tau Leng to the south of the Development A portion of the S wind
would be diverted towards the open Farmland and then reach Choi Yuen Road and
southwest boundary of the SS Site 1 Development (grey arrow) The incoming wind
would penetrate through the reserved air paths and permeable PTI in SS Site 1 and
reach Choi Fai Street
Another portion of incoming S wind would stream along Po Shek Wu Road and
reach SS Site 2 The Jumbo Plaza would block some of the wind from reaching SS
Site 2 The southwest faccedilade of SS Site 2 would downwash and divert the wind
towards San Wan Road Slightly better wind environment is observed there (brown
circle) The two reserved air paths allow the S wind to penetrate through the SS Site
2 Development and re-join the stream at Po Shek Wu Road As the Open Carpark
2 and East portion of Po Wan Road are located at the leeward area of SS Site 2
slightly calm wind environment is observed in these areas (black circle)
Baseline Scheme
As the incoming S wind reach SS Site 1 the permeable PTI and the building
separations between building blocks in Baseline Scheme allow wind to penetrate
through the Development and reach Choi Fai Street
At SS Site 2 the empty bays provided on ground floor and podium floor in Baseline
Scheme allow wind penetration across the Development The provided building
separation in SS Site 2 also allows good wind penetration and allow wind to re-join
Po Shek Wu Road
Proposed Scheme
The two reserved ~ 15m building separations and the wider air paths (24 - 34m)
provided at podium level in the SS Site 1 Proposed Scheme creates higher wind
permeability Thus the S prevailing wind can more effectively penetrate through
SS Site 1 (pink arrow) to reach SS Site 2 then more prevailing wind could be
downwashed towards San Wan Road (brown circle) comparing to Baseline
Scheme
At SS Site 2 the larger building separation of ~ 15m between Carpark Block and
Block 2 and wider wind entrance (24 - 27m) at ground and podium levels allow
more wind to penetrate through the Development (purple arrow) and divert to Open
Carpark 2 and Eastern part of Po Wan Road (black circle) The wind shadow effect
at these areas is mitigated
Hong Kong Housing Authority Proposed Public Housing Developments at Sheung Shui Areas 4 amp 30 Sites 1 amp 2 Report for Air Ventilation Assessment ndash Initial Study
-- | Issue Rev3 | 21 April 2021
NPROJECT251828 HKHA TERM CONSULTANCY 2016 (BATCH H1)02amp03amp04
SHEUNGSHUI_AREA30OUTAVAIS20210419_PLANDRTOC_20200421_AVAIS_ISSUE_REV3DOCX
Page 59
Figure 62 Contour Plot of VR for Baseline Scheme under S Wind
Figure 63 Contour Plot of VR for Proposed Scheme under S Wind
Po Shek Wu Road
Blk 1
Blk 2 Blk 3
CHampW
ampDHC
Blk 2
Blk 3
Blk 1
CP
PSWR Site
Choi Yuen Road
Ka Fu Close
San Wan Road
Choi Fai Street
Choi Fat Street
Farmland Tai Tau Leng
N
Jumbo Plaza
Open
Carpark 2
Po Wan Road
Po Shek Wu Road
Blk 1
Blk 2 Blk 3
CHampW
ampDHC
Blk 2
Blk 3
Blk 1
CP
PSWR Site
Choi Yuen Road
Ka Fu Close
San Wan Road
Choi Fai Street
Choi Fat Street
Farmland Tai Tau Leng
N
Jumbo Plaza
Open
Carpark 2
Po Wan Road
PROJECT DRAWING TITLE
DATEMARCH 2021
PROPOSED PUBLIC HOUSING DEVELOPMENTS AT AREAS 4 amp 30 SITES 1 amp 2
LEGEND
Application Site Boundary
Building Line
Development Area Existing trees to be affected
BLOCK 1BLOCK 3
BLOCK 2
CARPARK BLOCK
PLAN 15SCALE 1600 (A3)
SITE 2 LAYOUT PLAN (CURRENT SCHEME)
+43 +45
+117
+112
+18
+14
+120
+128
+30
+14
North
0 5 10 20 25M15
PROJECT DRAWING TITLE
DATEMARCH 2021
PROPOSED PUBLIC HOUSING DEVELOPMENTS AT AREAS 4 amp 30 SITES 1 amp 2
LEGEND
Application Site Boundary
Building Line
Comparison Table of Current Scheme (OZP) and Proposed Scheme of Site 2
Development Parameters Current Scheme Proposed Scheme
Gross Site Area About 113ha About 113ha
Maximum Total PR-Overall-Domestic-Non-domestic
666006
716506
Maximum Building Height(main roof level) +130mPD +149mPD
No additional impact on existing landscape resources landsacpe characters is incurred compared to current scheme due to minor amendments on development parameters and no change in site boundary and development area
Development Area Existing trees to be affected
BLOCK 1BLOCK 3
BLOCK 2
CARPARK BLOCK
LANDSCAPE PODIUM
PLAN 16SCALE 1600 (A3)
SITE 2 LAYOUT PLAN (PROPOSED SCHEME)
+143
+45
+43
+129
+18
+14
+149
+30
North
0 5 10 20 25M15
PROJECT DRAWING TITLE
DATEMARCH 2021
PROPOSED PUBLIC HOUSING DEVELOPMENTS AT AREAS 4 amp 30 SITES 1 amp 2
PLAN 17
LEGEND
Proposed Architectural Scheme
Proposed New Tree Planting
Proposed Green Roof
Proposed Shrub Planting
Proposed Tile Paving at Podium
Proposed Seating
Proposed Community Farm Planter Pots
Proposed Pavilion
Proposed Vertical Greening
Application Site Boundary
Proposed Community Play Area
Proposed Block Paving at Ground Floor
North
CPA
Moveable Planter
Proposed Basketball Court
Proposed Badminton Court
Proposed Green Roof on Covered Walkway
SCALE 1600 (A3)
Site Area 11310m2Proposed No of Flats 1556
Design Population 3773
Items Required Provided
Site Coverage of Greenery 2262msup2 Approx 2322msup2Green Ratio 20 Approx 20
Community Play Area 302msup2 Approx 392msup2Local Open Space 3773m2 Approx 4420m2Basketball Court 1 1
Badminton Court 1 1
Table Tennis table 1 1
Planting Area
(including uncovered green area and
vertical green within primary and
non-primary areas)
Approx 1762m2
Covered Plantng Area Approx 560m2
CPA
SITE 2 LANDSCAPE MASTER PLAN (OVERALL)
0 5 10 20 25M15
Finish Floor Level xxxx
730
799
4520
4520
4325
5185
4795 810
745
700 760
760
1835
2230
1390
4745
731
PROJECT DRAWING TITLE
DATEMARCH 2021
PROPOSED PUBLIC HOUSING DEVELOPMENTS AT AREAS 4 amp 30 SITES 1 amp 2
LEGEND
Proposed Architectural Scheme
Proposed New Tree Planting
Proposed Shrub Planting
Application Site Boundary
Proposed Vertical Greening
Proposed Block Paving
Proposed Feature Paving At Lobby
Proposed Seating
Proposed Timber Effect Tile
North
Moveable Planter
PLAN 18SCALE 1600 (A3)
SITE 2 LANDSCAPE MASTER PLAN(GF)
0 5 10 20 25M15
xxxx Finish Floor Level
Vehicular Entrance
Pedestrian Entrance
700 730
799
760
731
810
745
760
PROJECT DRAWING TITLE
DATEMARCH 2021
PROPOSED PUBLIC HOUSING DEVELOPMENTS AT AREAS 4 amp 30 SITES 1 amp 2
LEGEND
Proposed Architectural Scheme
Proposed Green Roof
Proposed Shrub Planting
Application Site Boundary
North
PLAN 19SCALE 1600 (A3)
SITE 2 LANDSCAPE MASTER PLAN (1F)
0 5 10 20 25M15
xxxx Finish Floor Level
1390 1380
1410
PROJECT DRAWING TITLE
DATEMARCH 2021
PROPOSED PUBLIC HOUSING DEVELOPMENTS AT AREAS 4 amp 30 SITES 1 amp 2
LEGEND
Proposed Architectural Scheme
Proposed New Tree Planting
Proposed Shrub Planting
Proposed Tile Paving
Proposed Seating
Proposed Table Tennis
Proposed Community Farm Planter Pots
Application Site Boundary
Proposed Community Play Area
CPA
CPA
CPA
Proposed Green Roof on Covered Walkway
PLAN 20SCALE 1600 (A3)
SITE 2 LANDSCAPE MASTER PLAN (2F)
0 5 10 20 25M15
xxxx Finish Floor Level
2230
1835
1835
1835
North
PROJECT DRAWING TITLE
DATEMARCH 2021
PROPOSED PUBLIC HOUSING DEVELOPMENTS AT AREAS 4 amp 30 SITES 1 amp 2
LEGEND
Proposed Architectural Scheme
Proposed New Tree Planting
Proposed Shrub Planting
Proposed Paving
Proposed Seating
Proposed Pavilion
Application Site Boundary
[Note Residential Tower not shown (no landscape)]
Proposed Badminton Court
Proposed Green Roof
Proposed Basketball Court
PLAN 21SCALE 1600 (A3)
SITE 2 LANDSCAPE MASTER PLAN (8F amp RF)
0 5 10 20 25M15
xxxx Finish Floor Level
4520
4520
4325
5185
4795
4745
North
PROJECT DRAWING TITLE
DATEMARCH 2021
PROPOSED PUBLIC HOUSING DEVELOPMENTS AT AREAS 4 amp 30 SITES 1 amp 2
LEGEND
Application Site Boundary
Local Open Spcace
PLAN 22SCALE 1600 (A3)
SITE 2 LOCAL OPEN SPACE (GF)
0 5 10 20 25M15
xxxx Finish Floor Level
Vehicular Entrance
Pedestrian Entrance
700 730
799
760
731
810
745
760
North
PROJECT DRAWING TITLE
DATEMARCH 2021
PROPOSED PUBLIC HOUSING DEVELOPMENTS AT AREAS 4 amp 30 SITES 1 amp 2
LEGEND
Application Site Boundary
Community Play Area
Local Open Spcace
PLAN 23SCALE 1600 (A3)
SITE 2 LOCAL OPEN SPACE (2F)
1835
1835
1835
xxxx Finish Floor Level
0 5 10 20 25M15
North
PROJECT DRAWING TITLE
DATEMARCH 2021
PROPOSED PUBLIC HOUSING DEVELOPMENTS AT AREAS 4 amp 30 SITES 1 amp 2
LEGEND
Application Site Boundary
Local Open Spcace
PLAN 24SCALE 1600 (A3)
SITE 2 LOCAL OPEN SPACE (8F amp RF)
xxxx Finish Floor Level
0 5 10 20 25M15
4520
4520
4325
5185
4795
4745
North
[Note Residential Tower not shown (no landscape)]
PROJECT DRAWING TITLE
DATEMARCH 2021
PROPOSED PUBLIC HOUSING DEVELOPMENTS AT AREAS 4 amp 30 SITES 1 amp 2
DETAILS 3SCALE NTS (A3)
TYPICAL PLANTER DETAILSAPRIL 2021
M
M
SCALEA
AS-0043KEY PLAN
11200
North
BAS-0043
PROPRIETARY FIBERGLASSOR COATED GMS PLANTERPOT WITH DRAIN HOLES
SCALEE
AS-0043SECTION OF LOW TYPE PLANTER POT
110
SCALED
AS-0043SECTION OF ELEVATED TYPE PLANTER POT
110
SCALEF
AS-0043ISOMETRIC
125
900
375
300
(TYP
ICAL
)
PROPRIETARY FIBERGLASS OR COATED GMSPLANTER POT WITH DRAIN HOLES
10 10
10 10
900
BRICK STAND(225X125X75 mm)
FALL FALLFALL
200
750
7567
5
40X5mm THK GMS FLAT
2 NOS OF 15mm THK SSTRAY WITH Oslash15mm SSSHORT PIPE DRAIN OUTLET
Oslash15mm SS FLEXIBLE DRAINPIPE TIED TO STEEL ANGLE
63X63X6mm PAINTED GMSANGLE SITS ON BRICK STAND
FALLFALL FALL
BRICK STAND(225X125X75 mm)
DRAIN CHANNELWCOVER
300
(TYP
ICAL
)20
0 (F
OR
ELE
VATE
D T
YPE)
PROPRIETARY FIBERGLASSOR COATED GMS PLANTERPOT WITH DRAIN HOLES
1200900
COMMUNAL FARM AT 2FAS-0043
SCALEB
AS-0043PLAN
1200
PLANTER WALLS AND PLANTERS
NR142EXLAS-004P01
AS SHOWN (A1)
(SHEET 1 OF 2)
SCALEC
AS-0043LONG SECTION
120
CAS-0043
1200
1200
MIN 1200MIN 1200
DRAIN CHANNELWCOVER
DRYSTOREROOM
B
P
P
P
P
P
P
P
P
MIN1200
FFL
SFL
1425
575
2000
75deg
150
1385
40
150X25MM THKARTIFICIAL TIMBER
CLADDING ON 50X75MMRHS POST
PPC FINISH
RC STRUCTURETO ENGINEERS DETAIL
TEXTURED PAINTSPRAY GRANITEFINISH AS SPECIFIED
250
150
FALL 175
DRAWING REF LETTERDRAWING NO
REFER TO MATERIAL PLAN amp SCHEDULE FOR SIZECOLOUR AND FINISHES
FFL FINISHED FLOOR LEVELTOW TOP OF WALLTOS TOP OF SOIL
AG001
C11 MATERIAL CODES(REFER TO MATERIAL SCHEDULE)
+000 INDICATIVE FINISH LEVEL
SITE BOUNDARY
LOW TYPE PLANTER POT
ELEVATED TYPE PLANTER POT
COMPOST BIN(REFER TO HARD
LANDSCAPE SCHEDULE)
FREE STANDINGWATER POINT
FALL 175
11
1
2
1
SOIL MIX BY SOFTLANDSCAPE CONTRACTOR
APPROVEDFILTER FABRIC
08mm THK ROOT BARRIER
APPROVED POLYETHYLENEFLEXIBLE DRAINAGE LAYER
20 THK CS RENDERING03mm SS EXPANDED
METAL LATHING NAILEDTO CONCRETE
APPROVED WATERPROOFSHEET MEMBRANE
FLOOR FINISHESAS SPECIFIED
50X50 CSANGLE FILLET
FALL 175
COMPLETELYDECOMPOSEDGRANITE
ONE PART POLYURETHANE SEALANT ON 25X25CONCRETE RECESS COMPATIBLE
WITH WATERPROOFING MEMBRANE
NON-SHRINK GROUT TO CONCRETE RECESS
TOS
50FALL
250
575
125
NOTE
1 THIS DRAWING TO BE READ IN CONJUNCTION WITHARCHITECTURAL DRAWING amp OTHER RELEVANT DRAWINGS
2 CHECK AND VERIFY SITE CONDITION FOR ANY DISCREPANCIESIMMEDIATELY amp NOTIFY CM
3 ACTUAL LEVEL FOR CONSTRUCTION SHALL REFER TOARCHITECTURAL AND STRUCTURAL ENGINEERS DRAWING
4 EXACT LOCATION OF PLANTER DRAIN AND PAVING ARE FLOORDIMENSION SHOULD REFER TO ARCHITECTS AND ENGINEERSDRAWINGS
5 SUBSOIL DRAIN PIPE TO BE INSTALLED IN PLANTERS ASNECESSARY WHERE INDICATED ON PLAN
6 SHOP DRAWINGS AND SAMPLES OF PLANTING POT SHALL BESUBMITTED TO CM FOR APPROVAL
7 DETAILS OF COMMUNITY FARM PLANTER POTS REFER TO HASTANDARD DRAWINGS REFACMF001 AND REFACMF002
W11
ELEVATED TYPE PLANTER POT(WHEEL CHAIR USER ACCESSIBLE)REFER TO HA STANDARD DETAILS(REFACMF001)
REFERENCE TO HA STANDARDDETAILS REFACMF002
100
TEXTURED PAINT SPRAYGRANITE FINISH AS SPECIFIED
TOP LINE OF PLANTER WALL FALL
ONE PART POLYURETHANE SEALANTON CONCRETE RECESS COMPATIBLE
WITH WATERPROOFING MEMBRANE
APPROVED WATERPROOF SHEETMEMBRANE
03mm SS EXPANDED METALLATHING NAILED TO CONCRETE
WITH BITUMEN SEALANT TOMANUFACTURERS DETAILS
20 THK CS RENDERING
08mm THK ROOT BARRIER
APPROVED POLYETHYLENE FLEXIBLEDRAINAGE LAYER
APPROVED FILTER FABRIC
570
50 50
1510
125
APPROVEDFILTER FABRIC
08mm THK ROOT BARRIER
APPROVED POLYETHYLENEFLEXIBLE DRAINAGE LAYER
20 THK CS RENDERING03mm SS EXPANDED
METAL LATHING NAILEDTO CONCRETE
APPROVED WATERPROOFSHEET MEMBRANE
3mm THK PROPRIETARY ALUMIPLATE PRESSED AGAINST FABRIC
08mm THK ROOT BARRIER
1153 WATER PROOFING CEMENT SANDSCREED LAID TO FALL MIN 25 mm THK
APPROVED WATERPROOFSHEET MEMBRANE
25mm THK 13 WATER PROOFINGCEMENT SAND BEDDING
FILTER FABRIC AT SIDE OUTLET(TWO-WAY TYPE)
DRAINAGE AGGREGATES (25-40mm)
RAINWATERPIPE
FLOOR FINISHESAS SPECIFIED
50FALL
12510
0
CAST ALUMINUMRAINWATER OUTLET(TWO-WAY TYPE)COMPLETE WITHCLAMPING RING ANDREMOVABLE GRATINGTO THE APPROVAL OFCONTRACT MANAGER
200mm ANGLEREINFORCINGSTRIP AS SPECIFIED
50X50 CSANGLE FILLET
15mm THK SSMESH TUBE W 20 OslashHOLES AT 50 CC
DECOMPOSEDGRANITE PROTECTIVECOVERING ON FILTERMAT
FALL 175FALL 175
RAINWATERPIPE
CE
FALL 175
COMPLETELYDECOMPOSEDGRANITE
SS DOME GRATING
ONE PART POLYURETHANE SEALANT ON 25X25 CONCRETERECESS COMPATIBLE WITH WATERPROOFING MEMBRANE
NON-SHRINK GROUT TO CONCRETE RECESS
TOS
VARIOUS
TREE PIT TREE PIT
50
100
FALL
FINISHES AS SPECIFIED25mm SEALANT ON BACKERROD AND JOINT FILLER
250
50X50 CS ANGLE FILLET
25mm THK SYNTHETIC STONEGRATING OR SIMILAR AND REVIEWED
WITHOUT OBJECTION
MIN 20mm THK CS SCREED LAID TO FALL
APPROVED WATERPROOF SHEET MEMBRANEMIN 25 mm THK CS BEDDING
SCALEB
AS-0042PLANTER WALL DETAIL
12
SCALEC
AS-0042ISOMETRIC (TYPICAL PLANTER WALL AT GF AND 2F)
NTS
TEXTURED PAINT SPRAYGRANITE FINISH AS SPECIFIED
PLANTING BY SOFT LANDSCAPECONTRACTOR
5MM THK GMS ANGLE FRAME
150 MIN
50
20 THK CS RENDERING
150
1200
1200
12001200
LOW TYPE PLANTER POTREFER TO HA STANDARDDETAILS (REFACMF002)
6040
NOTE REFER TO DRAINAGE LAYER PLAN amp DETAIL
700X500MM SINK
2
TEXTURED PAINT SPRAY GRANITEFINISH AS SPECIFIED
TEXTURED PAINT SPRAY GRANITEFINISH AS SPECIFIED
SG1
575
SG1
HOMOGENEOUS TILEAS SPECIFIED T12
RC STRUCTURE AS ENGRSDESIGN
WPR TO ARCHTS DETAIL
20MM THK CS RENDERING
BUILD-UP TO ARCHTS DETAIL
SG1
1200900
675
FALL
FALL
63X63X6MMPAINTED GMSANGLE
75X75X6MM STEELSTIFFENER WELDEDTO CORNER
2 NOS OF 15MMTHK SS TRAY WITHOslash15MM SS SHORTPIPE DRAIN OUTLET
REFERENCE TO HA STANDARDDETAILS REFACMF002
WPR TO ARCHTS DETAIL
20MM THK CS RENDERING
BUILD-UP TO ARCHTS DETAIL
HOMOGENEOUS TILEAS SPECIFIED T12
HOMOGENEOUS TILEAS SPECIFIED T12
WPR TO ARCHTS DETAIL
20MM THK CS RENDERING
BUILD-UP TO ARCHTS DETAIL
TEXTURED PAINT SPRAY GRANITEFINISH AS SPECIFIED TEXTURED PAINT
SPRAY GRANITE FINISHAS SPECIFIED
COUNTERCHECKED
DATE
OF
ISSU
E
FILE
OF
FICE
Arch
itect
FOR
QS
CE
BS
EG
EIO
WC
OWCo
ntra
ctor
CO
PYR
EOT
HERS
Max WongCA3
Henry Lau
Arthur Au
Teresa Lee
MF Lo
032021
CONSTRUCTION OF PUBLIC HOUSINGDEVELOPMENT AT SHEUNG SHUI AREAS 4AND 30 SITE 2 PHASE 2
DLNt +852 2895 6888
f +852 2576 4074劉榮廣伍振民建築師有限公司DLN ARCHITECTS LIMITED
032021
032021
032021
032021
SCALEA
AS-0053BLOWUP DETAIL
15
SOIL MIX BY SOFTLANDSCAPE CONTRACTOR
20mm THK DRAINAGE COMPOSITE
RC STRUCTURE TO ENGRS DETAILS
50x50 CS ANGLE FILLETTO ARCHTS DETAIL
APPROVED WATERPROOFSHEET MEMBRANE
APPROVEDFILTER FABRIC
08mm THKROOT BARRIER
20 THK CS RENDERING ON03 EXPENDED METAL LATH
NAILED TO CONCRETE
150mm THK AGGREGATE LAYER
PLANTER WALLS AND PLANTERS
NR142EXLAS-005P01
AS SHOWN (A1)
(SHEET 2 OF 2)
TOS
BOS MIN
300
mm
FINISHING TOARCHTS DETAIL
APPROVED GEOTEXTILEFILTER FABRIC
20mm THK DRAINAGECOMPOSITE
RC STRUCTURE TOENGRS DETAILS
150mm THKAGGREGATE
LAYER
08mm THK ROOT BARRIER
APPROVED WATERPROOF SHEET MEMBRANE
20 THK CS RENDERING ON03 EXPENDED METAL LATH
NAILED TO CONCRETE
SCALEB
AS-0054 FRONT SECTION
120
SCALEA
AS-0054 PLAN
120
GLASS FIBREMOVEABLE PLANTER
DRAINAGE HOLES IN BASE OFTHE PLANTER
GEOTEXTILEFABRIC FILTER LAYER
25MM THKCELLULAR DRAINAGE
LAYER
SOIL MULCHAND PLANTINGBY SOFT LANDSCAPECONTRACTOR
1200X30X15THKGMS FLAT BAR
2000
1200
500
5010
0
50
100
30
50
45MIN
600
mm
100
80
1000
2000
15
1200
500
175
2000X30X15THKGMS FLAT BAR
2000X30X15THKGMS FLAT BAR
500X100X20THKGMS FLAT BAR
6 NOS HOTDIPPED
GALVANISEDSTEEL BOLTSDOWN WITH
THE GFRCPLANTER
4MM THK GALVANISED WELDEDWESH PANEL
MELD TO THE FRAME
Note
All PLANTERS AT TOWER BLOCKFACADE TO BE PROVIDED WITH ANAUTO-IRRIGATION SYSTEM INACCORDANCE WITH THE PROJECTSPECIFIC SPECIFICATION
FFL
20
MIN 20
FALL 175FALL 175
15mmTHK S SMESHTUBE W20Oslash HOLESAT 50 CC
DECOMPOSEDGRANITEPROTECTIVECOVERING ONFILTER MAT
CE
RAINWATERPIPE
200mm ANGLEREINFORCING STRIPAS SPECIFIED
SS DOMEGRATING
AS-0051 TYPICAL PLANTER KERB AT GF
AS-0053 TYPICAL PLANTER BLOWUP DETAIL
AS-0054 PROPRIETARY GFRC PLANTER BOX AT GF
50x50 CS ANGLE FILLETTO ARCHTS DETAIL
OPENABLEWINDOW TOARCHITECTSDETAIL
OPENABLEWINDOWGRILLE TOARCHITECTSDETAIL
FIXEDTEMPEREDGLASS TOARCHITECTSDETAIL
1200
200
1050
1400
550
500
300
SOIL MIX BY SOFTLANDSCAPE CONTRACTOR
APPROVEDFILTER FABRIC
08mm THK ROOT BARRIER
APPROVED POLYETHYLENEFLEXIBLE DRAINAGE LAYER
20 THK CS RENDERING
03mm SS EXPANDEDMETAL LATHING NAILED
TO CONCRETE
APPROVED WATERPROOFSHEET MEMBRANE
08mm THKROOT BARRIER
1153 WATERPROOFINGCEMENT SANDSCREEDLAID TO FALLMIN 25 mm THK
APPROVEDWATERPROOFSHEET MEMBRANE
25mm THK13 WATERPROOFINGCEMENTSAND BEDDING
FILTER FABRIC AT SIDE OUTLET(TWO-WAY TYPE)
DRAINAGE AGGREGATES(25-40mm) WRAPPED IN GEOTEX
TILE FILTER MEMBRANE
DRAINAGE PIPETO ENGRSDETAIL
100300
SCALEA
AS-0055TYPICAL PLANTER SECTION
110
AS-0055 TYPICAL PLANTER AT TOWER BLOCK FACADE
WALL FINISH TOARCHITECTSDETAIL
LOW MAINTENANCESPECIES WHICH DOESNOT ATTRACTINSECTS
750
DRAINAGE HOLESIN BASE OFTHE PLANTER
HOMOGENEOUSTILE PAVING AS
SPECIFIEDFALL 175
DRAWING REF LETTERDRAWING NO
AG001
C11 MATERIAL CODES(REFER TO MATERIAL SCHEDULE)
+000 INDICATIVE FINISH LEVEL
NOTE
1 THIS DRAWING TO BE READ IN CONJUNCTION WITHARCHITECTURAL DRAWING amp OTHER RELEVANTDRAWINGS
2 THIS DRAWING IS FOR DESIGN INTENT ONLY SHOPDRAWING AND SAMPLES SHALL BE SUBMITTED TO CMFOR APPROVAL
3 CHECK AND VERIFY SITE CONDITION FOR ANYDISCREPANCIES IMMEDIATELY amp NOTIFY CM
4 ACTUAL LEVEL FOR CONSTRUCTION SHALL REFER TOARCHITECTURAL AND STRUCTURAL ENGINEERSDRAWING
5 EXACT LOCATION OF PLANTER DRAIN AND PAVING AREFLOOR DIMENSION SHOULD REFER TO ARCHITECTS ANDENGINEERS DRAWINGS
6 SUBSOIL DRAIN PIPE TO BE INSTALLED IN PLANTERS ASNECESSARY WHERE INDICATED ON PLAN
7 IT IS CONTRACTORS RESPONSIBILITY TO SUBMIT SHOPDRAWING FOR FIXING DETAILS
SCALEB
AS-0051ISOMETRIC (TYPICAL PLANTER KERB)
NTS
TEXTURED PAINT SPRAYGRANITE FINISH AS
SPECIFIED
PLANTING BY SOFT LANDSCAPECONTRACTOR
250
FALL
125
CONCRETE BLOCK HOMOGENEOUSTILE PAVING AS SPECIFIED
TEXTURED PAINT SPRAYGRANITE FINISH AS SPECIFIED
20 THK CS RENDERING5
GRADE20 20 CONCRETEHAUNCHING AND FOOTING
TO EGNRS DETAIL
25MM COMPACTED AND7MM LEVELING SAND COURSE SAND AND CEMENT BEDDING
COMPACTED NORMALSUBGRADE TO ENGRSDETAIL
150MM THKCOMPACTEDGRANULARSUBBASE MATERIALTO ENGRS DETAIL
50X50 CS ANGLE FILLETTO ARCHTS DETAIL
SCALEB
AS-0055TYPICAL PLANTER PLAN
125
DRAINAGE PIPETO ENGRSDETAIL
300
100
SCALEC
AS-0054 SIDE SECTION
120
FFL
MEDIUM DUTY DRAINAGECHANNEL WITH MATCHING
COVER (DETAILS REFER TODRAWING AS-0034)
SG1
T13
TEXTURED PAINT SPRAYGRANITE FINISH ASSPECIFIED
M
M
SCALEA
AS-0043KEY PLAN
11200
North
BAS-0043
PROPRIETARY FIBERGLASSOR COATED GMS PLANTERPOT WITH DRAIN HOLES
SCALEE
AS-0043SECTION OF LOW TYPE PLANTER POT
110
SCALED
AS-0043SECTION OF ELEVATED TYPE PLANTER POT
110
SCALEF
AS-0043ISOMETRIC
125
900
375
300
(TYP
ICAL
)
PROPRIETARY FIBERGLASS OR COATED GMSPLANTER POT WITH DRAIN HOLES
10 10
10 10
900
BRICK STAND(225X125X75 mm)
FALL FALLFALL
200
750
7567
5
40X5mm THK GMS FLAT
2 NOS OF 15mm THK SSTRAY WITH Oslash15mm SSSHORT PIPE DRAIN OUTLET
Oslash15mm SS FLEXIBLE DRAINPIPE TIED TO STEEL ANGLE
63X63X6mm PAINTED GMSANGLE SITS ON BRICK STAND
FALLFALL FALL
BRICK STAND(225X125X75 mm)
DRAIN CHANNELWCOVER
300
(TYP
ICAL
)20
0 (F
OR
ELE
VATE
D T
YPE)
PROPRIETARY FIBERGLASSOR COATED GMS PLANTERPOT WITH DRAIN HOLES
1200900
COMMUNAL FARM AT 2FAS-0043
SCALEB
AS-0043PLAN
1200
PLANTER WALLS AND PLANTERS
NR142EXLAS-004P01
AS SHOWN (A1)
(SHEET 1 OF 2)
SCALEC
AS-0043LONG SECTION
120
CAS-0043
1200
1200
MIN 1200MIN 1200
DRAIN CHANNELWCOVER
DRYSTOREROOM
B
P
P
P
P
P
P
P
P
MIN1200
FFL
SFL
1425
575
2000
75deg
150
1385
40
150X25MM THKARTIFICIAL TIMBER
CLADDING ON 50X75MMRHS POST
PPC FINISH
RC STRUCTURETO ENGINEERS DETAIL
TEXTURED PAINTSPRAY GRANITEFINISH AS SPECIFIED
250
150
FALL 175
DRAWING REF LETTERDRAWING NO
REFER TO MATERIAL PLAN amp SCHEDULE FOR SIZECOLOUR AND FINISHES
FFL FINISHED FLOOR LEVELTOW TOP OF WALLTOS TOP OF SOIL
AG001
C11 MATERIAL CODES(REFER TO MATERIAL SCHEDULE)
+000 INDICATIVE FINISH LEVEL
SITE BOUNDARY
LOW TYPE PLANTER POT
ELEVATED TYPE PLANTER POT
COMPOST BIN(REFER TO HARD
LANDSCAPE SCHEDULE)
FREE STANDINGWATER POINT
FALL 175
11
1
2
1
SOIL MIX BY SOFTLANDSCAPE CONTRACTOR
APPROVEDFILTER FABRIC
08mm THK ROOT BARRIER
APPROVED POLYETHYLENEFLEXIBLE DRAINAGE LAYER
20 THK CS RENDERING03mm SS EXPANDED
METAL LATHING NAILEDTO CONCRETE
APPROVED WATERPROOFSHEET MEMBRANE
FLOOR FINISHESAS SPECIFIED
50X50 CSANGLE FILLET
FALL 175
COMPLETELYDECOMPOSEDGRANITE
ONE PART POLYURETHANE SEALANT ON 25X25CONCRETE RECESS COMPATIBLE
WITH WATERPROOFING MEMBRANE
NON-SHRINK GROUT TO CONCRETE RECESS
TOS
50FALL
250
575
125
NOTE
1 THIS DRAWING TO BE READ IN CONJUNCTION WITHARCHITECTURAL DRAWING amp OTHER RELEVANT DRAWINGS
2 CHECK AND VERIFY SITE CONDITION FOR ANY DISCREPANCIESIMMEDIATELY amp NOTIFY CM
3 ACTUAL LEVEL FOR CONSTRUCTION SHALL REFER TOARCHITECTURAL AND STRUCTURAL ENGINEERS DRAWING
4 EXACT LOCATION OF PLANTER DRAIN AND PAVING ARE FLOORDIMENSION SHOULD REFER TO ARCHITECTS AND ENGINEERSDRAWINGS
5 SUBSOIL DRAIN PIPE TO BE INSTALLED IN PLANTERS ASNECESSARY WHERE INDICATED ON PLAN
6 SHOP DRAWINGS AND SAMPLES OF PLANTING POT SHALL BESUBMITTED TO CM FOR APPROVAL
7 DETAILS OF COMMUNITY FARM PLANTER POTS REFER TO HASTANDARD DRAWINGS REFACMF001 AND REFACMF002
W11
ELEVATED TYPE PLANTER POT(WHEEL CHAIR USER ACCESSIBLE)REFER TO HA STANDARD DETAILS(REFACMF001)
REFERENCE TO HA STANDARDDETAILS REFACMF002
100
TEXTURED PAINT SPRAYGRANITE FINISH AS SPECIFIED
TOP LINE OF PLANTER WALL FALL
ONE PART POLYURETHANE SEALANTON CONCRETE RECESS COMPATIBLE
WITH WATERPROOFING MEMBRANE
APPROVED WATERPROOF SHEETMEMBRANE
03mm SS EXPANDED METALLATHING NAILED TO CONCRETE
WITH BITUMEN SEALANT TOMANUFACTURERS DETAILS
20 THK CS RENDERING
08mm THK ROOT BARRIER
APPROVED POLYETHYLENE FLEXIBLEDRAINAGE LAYER
APPROVED FILTER FABRIC5
70
50 50
1510
125
APPROVEDFILTER FABRIC
08mm THK ROOT BARRIER
APPROVED POLYETHYLENEFLEXIBLE DRAINAGE LAYER
20 THK CS RENDERING03mm SS EXPANDED
METAL LATHING NAILEDTO CONCRETE
APPROVED WATERPROOFSHEET MEMBRANE
3mm THK PROPRIETARY ALUMIPLATE PRESSED AGAINST FABRIC
08mm THK ROOT BARRIER
1153 WATER PROOFING CEMENT SANDSCREED LAID TO FALL MIN 25 mm THK
APPROVED WATERPROOFSHEET MEMBRANE
25mm THK 13 WATER PROOFINGCEMENT SAND BEDDING
FILTER FABRIC AT SIDE OUTLET(TWO-WAY TYPE)
DRAINAGE AGGREGATES (25-40mm)
RAINWATERPIPE
FLOOR FINISHESAS SPECIFIED
50FALL
12510
0
CAST ALUMINUMRAINWATER OUTLET(TWO-WAY TYPE)COMPLETE WITHCLAMPING RING ANDREMOVABLE GRATINGTO THE APPROVAL OFCONTRACT MANAGER
200mm ANGLEREINFORCINGSTRIP AS SPECIFIED
50X50 CSANGLE FILLET
15mm THK SSMESH TUBE W 20 OslashHOLES AT 50 CC
DECOMPOSEDGRANITE PROTECTIVECOVERING ON FILTERMAT
FALL 175FALL 175
RAINWATERPIPE
CE
FALL 175
COMPLETELYDECOMPOSEDGRANITE
SS DOME GRATING
ONE PART POLYURETHANE SEALANT ON 25X25 CONCRETERECESS COMPATIBLE WITH WATERPROOFING MEMBRANE
NON-SHRINK GROUT TO CONCRETE RECESS
TOS
VARIOUS
TREE PIT TREE PIT
5010
0FALL
FINISHES AS SPECIFIED25mm SEALANT ON BACKERROD AND JOINT FILLER
250
50X50 CS ANGLE FILLET
25mm THK SYNTHETIC STONEGRATING OR SIMILAR AND REVIEWED
WITHOUT OBJECTION
MIN 20mm THK CS SCREED LAID TO FALL
APPROVED WATERPROOF SHEET MEMBRANEMIN 25 mm THK CS BEDDING
SCALEB
AS-0042PLANTER WALL DETAIL
12
SCALEC
AS-0042ISOMETRIC (TYPICAL PLANTER WALL AT GF AND 2F)
NTS
TEXTURED PAINT SPRAYGRANITE FINISH AS SPECIFIED
PLANTING BY SOFT LANDSCAPECONTRACTOR
5MM THK GMS ANGLE FRAME
150 MIN
50
20 THK CS RENDERING
150
1200
1200
12001200
LOW TYPE PLANTER POTREFER TO HA STANDARDDETAILS (REFACMF002)
6040
NOTE REFER TO DRAINAGE LAYER PLAN amp DETAIL
700X500MM SINK
2
TEXTURED PAINT SPRAY GRANITEFINISH AS SPECIFIED
TEXTURED PAINT SPRAY GRANITEFINISH AS SPECIFIED
SG1
575
SG1
HOMOGENEOUS TILEAS SPECIFIED T12
RC STRUCTURE AS ENGRSDESIGN
WPR TO ARCHTS DETAIL
20MM THK CS RENDERING
BUILD-UP TO ARCHTS DETAIL
SG1
1200900
675
FALL
FALL
63X63X6MMPAINTED GMSANGLE
75X75X6MM STEELSTIFFENER WELDEDTO CORNER
2 NOS OF 15MMTHK SS TRAY WITHOslash15MM SS SHORTPIPE DRAIN OUTLET
REFERENCE TO HA STANDARDDETAILS REFACMF002
WPR TO ARCHTS DETAIL
20MM THK CS RENDERING
BUILD-UP TO ARCHTS DETAIL
HOMOGENEOUS TILEAS SPECIFIED T12
HOMOGENEOUS TILEAS SPECIFIED T12
WPR TO ARCHTS DETAIL
20MM THK CS RENDERING
BUILD-UP TO ARCHTS DETAIL
TEXTURED PAINT SPRAY GRANITEFINISH AS SPECIFIED TEXTURED PAINT
SPRAY GRANITE FINISHAS SPECIFIED
A Section showing typical planter wall details (on ground)
B Section showing typical planter kerb details (on ground)
C Section showing typical planter wall blow-up details
Note Min 300mm soil depth for green roof planting min 600mm soil depth for shrub planting min 1200mm soil depth for tree planting
150
PROJECT DRAWING TITLE
DATEMARCH 2021
PROPOSED PUBLIC HOUSING DEVELOPMENTS AT AREAS 4 amp 30 SITES 1 amp 2
DETAILS 4SCALE NTS (A3)
TYPICAL PLANTER DETAILSAPRIL 2021
M
M
SCALEA
AS-0043KEY PLAN
11200
North
BAS-0043
PROPRIETARY FIBERGLASSOR COATED GMS PLANTERPOT WITH DRAIN HOLES
SCALEE
AS-0043SECTION OF LOW TYPE PLANTER POT
110
SCALED
AS-0043SECTION OF ELEVATED TYPE PLANTER POT
110
SCALEF
AS-0043ISOMETRIC
125
900
375
300
(TYP
ICAL
)PROPRIETARY FIBERGLASS OR COATED GMSPLANTER POT WITH DRAIN HOLES
10 10
10 10
900
BRICK STAND(225X125X75 mm)
FALL FALLFALL
200
750
7567
5
40X5mm THK GMS FLAT
2 NOS OF 15mm THK SSTRAY WITH Oslash15mm SSSHORT PIPE DRAIN OUTLET
Oslash15mm SS FLEXIBLE DRAINPIPE TIED TO STEEL ANGLE
63X63X6mm PAINTED GMSANGLE SITS ON BRICK STAND
FALLFALL FALL
BRICK STAND(225X125X75 mm)
DRAIN CHANNELWCOVER
300
(TYP
ICAL
)20
0 (F
OR
ELE
VATE
D T
YPE)
PROPRIETARY FIBERGLASSOR COATED GMS PLANTERPOT WITH DRAIN HOLES
1200900
COMMUNAL FARM AT 2FAS-0043
SCALEB
AS-0043PLAN
1200
PLANTER WALLS AND PLANTERS
NR142EXLAS-004P01
AS SHOWN (A1)
(SHEET 1 OF 2)
SCALEC
AS-0043LONG SECTION
120
CAS-0043
1200
1200
MIN 1200MIN 1200
DRAIN CHANNELWCOVER
DRYSTOREROOM
B
P
P
P
P
P
P
P
P
MIN1200
FFL
SFL
1425
575
2000
75deg
150
1385
40
150X25MM THKARTIFICIAL TIMBER
CLADDING ON 50X75MMRHS POST
PPC FINISH
RC STRUCTURETO ENGINEERS DETAIL
TEXTURED PAINTSPRAY GRANITEFINISH AS SPECIFIED
250
150
FALL 175
DRAWING REF LETTERDRAWING NO
REFER TO MATERIAL PLAN amp SCHEDULE FOR SIZECOLOUR AND FINISHES
FFL FINISHED FLOOR LEVELTOW TOP OF WALLTOS TOP OF SOIL
AG001
C11 MATERIAL CODES(REFER TO MATERIAL SCHEDULE)
+000 INDICATIVE FINISH LEVEL
SITE BOUNDARY
LOW TYPE PLANTER POT
ELEVATED TYPE PLANTER POT
COMPOST BIN(REFER TO HARD
LANDSCAPE SCHEDULE)
FREE STANDINGWATER POINT
FALL 175
11
1
2
1
SOIL MIX BY SOFTLANDSCAPE CONTRACTOR
APPROVEDFILTER FABRIC
08mm THK ROOT BARRIER
APPROVED POLYETHYLENEFLEXIBLE DRAINAGE LAYER
20 THK CS RENDERING03mm SS EXPANDED
METAL LATHING NAILEDTO CONCRETE
APPROVED WATERPROOFSHEET MEMBRANE
FLOOR FINISHESAS SPECIFIED
50X50 CSANGLE FILLET
FALL 175
COMPLETELYDECOMPOSEDGRANITE
ONE PART POLYURETHANE SEALANT ON 25X25CONCRETE RECESS COMPATIBLE
WITH WATERPROOFING MEMBRANE
NON-SHRINK GROUT TO CONCRETE RECESS
TOS
50FALL
250
575
125
NOTE
1 THIS DRAWING TO BE READ IN CONJUNCTION WITHARCHITECTURAL DRAWING amp OTHER RELEVANT DRAWINGS
2 CHECK AND VERIFY SITE CONDITION FOR ANY DISCREPANCIESIMMEDIATELY amp NOTIFY CM
3 ACTUAL LEVEL FOR CONSTRUCTION SHALL REFER TOARCHITECTURAL AND STRUCTURAL ENGINEERS DRAWING
4 EXACT LOCATION OF PLANTER DRAIN AND PAVING ARE FLOORDIMENSION SHOULD REFER TO ARCHITECTS AND ENGINEERSDRAWINGS
5 SUBSOIL DRAIN PIPE TO BE INSTALLED IN PLANTERS ASNECESSARY WHERE INDICATED ON PLAN
6 SHOP DRAWINGS AND SAMPLES OF PLANTING POT SHALL BESUBMITTED TO CM FOR APPROVAL
7 DETAILS OF COMMUNITY FARM PLANTER POTS REFER TO HASTANDARD DRAWINGS REFACMF001 AND REFACMF002
W11
ELEVATED TYPE PLANTER POT(WHEEL CHAIR USER ACCESSIBLE)REFER TO HA STANDARD DETAILS(REFACMF001)
REFERENCE TO HA STANDARDDETAILS REFACMF002
100
TEXTURED PAINT SPRAYGRANITE FINISH AS SPECIFIED
TOP LINE OF PLANTER WALL FALL
ONE PART POLYURETHANE SEALANTON CONCRETE RECESS COMPATIBLE
WITH WATERPROOFING MEMBRANE
APPROVED WATERPROOF SHEETMEMBRANE
03mm SS EXPANDED METALLATHING NAILED TO CONCRETE
WITH BITUMEN SEALANT TOMANUFACTURERS DETAILS
20 THK CS RENDERING
08mm THK ROOT BARRIER
APPROVED POLYETHYLENE FLEXIBLEDRAINAGE LAYER
APPROVED FILTER FABRIC
570
50 50
1510
125
APPROVEDFILTER FABRIC
08mm THK ROOT BARRIER
APPROVED POLYETHYLENEFLEXIBLE DRAINAGE LAYER
20 THK CS RENDERING03mm SS EXPANDED
METAL LATHING NAILEDTO CONCRETE
APPROVED WATERPROOFSHEET MEMBRANE
3mm THK PROPRIETARY ALUMIPLATE PRESSED AGAINST FABRIC
08mm THK ROOT BARRIER
1153 WATER PROOFING CEMENT SANDSCREED LAID TO FALL MIN 25 mm THK
APPROVED WATERPROOFSHEET MEMBRANE
25mm THK 13 WATER PROOFINGCEMENT SAND BEDDING
FILTER FABRIC AT SIDE OUTLET(TWO-WAY TYPE)
DRAINAGE AGGREGATES (25-40mm)
RAINWATERPIPE
FLOOR FINISHESAS SPECIFIED
50FALL
12510
0
CAST ALUMINUMRAINWATER OUTLET(TWO-WAY TYPE)COMPLETE WITHCLAMPING RING ANDREMOVABLE GRATINGTO THE APPROVAL OFCONTRACT MANAGER
200mm ANGLEREINFORCINGSTRIP AS SPECIFIED
50X50 CSANGLE FILLET
15mm THK SSMESH TUBE W 20 OslashHOLES AT 50 CC
DECOMPOSEDGRANITE PROTECTIVECOVERING ON FILTERMAT
FALL 175FALL 175
RAINWATERPIPE
CE
FALL 175
COMPLETELYDECOMPOSEDGRANITE
SS DOME GRATING
ONE PART POLYURETHANE SEALANT ON 25X25 CONCRETERECESS COMPATIBLE WITH WATERPROOFING MEMBRANE
NON-SHRINK GROUT TO CONCRETE RECESS
TOS
VARIOUS
TREE PIT TREE PIT
50
100
FALL
FINISHES AS SPECIFIED25mm SEALANT ON BACKERROD AND JOINT FILLER
250
50X50 CS ANGLE FILLET
25mm THK SYNTHETIC STONEGRATING OR SIMILAR AND REVIEWED
WITHOUT OBJECTION
MIN 20mm THK CS SCREED LAID TO FALL
APPROVED WATERPROOF SHEET MEMBRANEMIN 25 mm THK CS BEDDING
SCALEB
AS-0042PLANTER WALL DETAIL
12
SCALEC
AS-0042ISOMETRIC (TYPICAL PLANTER WALL AT GF AND 2F)
NTS
TEXTURED PAINT SPRAYGRANITE FINISH AS SPECIFIED
PLANTING BY SOFT LANDSCAPECONTRACTOR
5MM THK GMS ANGLE FRAME
150 MIN
50
20 THK CS RENDERING
150
1200
1200
12001200
LOW TYPE PLANTER POTREFER TO HA STANDARDDETAILS (REFACMF002)
6040
NOTE REFER TO DRAINAGE LAYER PLAN amp DETAIL
700X500MM SINK
2
TEXTURED PAINT SPRAY GRANITEFINISH AS SPECIFIED
TEXTURED PAINT SPRAY GRANITEFINISH AS SPECIFIED
SG1
575
SG1
HOMOGENEOUS TILEAS SPECIFIED T12
RC STRUCTURE AS ENGRSDESIGN
WPR TO ARCHTS DETAIL
20MM THK CS RENDERING
BUILD-UP TO ARCHTS DETAIL
SG1
1200900
675
FALL
FALL
63X63X6MMPAINTED GMSANGLE
75X75X6MM STEELSTIFFENER WELDEDTO CORNER
2 NOS OF 15MMTHK SS TRAY WITHOslash15MM SS SHORTPIPE DRAIN OUTLET
REFERENCE TO HA STANDARDDETAILS REFACMF002
WPR TO ARCHTS DETAIL
20MM THK CS RENDERING
BUILD-UP TO ARCHTS DETAIL
HOMOGENEOUS TILEAS SPECIFIED T12
HOMOGENEOUS TILEAS SPECIFIED T12
WPR TO ARCHTS DETAIL
20MM THK CS RENDERING
BUILD-UP TO ARCHTS DETAIL
TEXTURED PAINT SPRAY GRANITEFINISH AS SPECIFIED TEXTURED PAINT
SPRAY GRANITE FINISHAS SPECIFIED
COUNTERCHECKED
DATE
OF
ISSU
E
FILE
OF
FICE
Arch
itect
FOR
QS
CE
BS
EG
EIO
WC
OWCo
ntra
ctor
CO
PYR
EOT
HERS
Max WongCA3
Henry Lau
Arthur Au
Teresa Lee
MF Lo
032021
CONSTRUCTION OF PUBLIC HOUSINGDEVELOPMENT AT SHEUNG SHUI AREAS 4AND 30 SITE 2 PHASE 2
DLNt +852 2895 6888
f +852 2576 4074劉榮廣伍振民建築師有限公司DLN ARCHITECTS LIMITED
032021
032021
032021
032021
SCALEA
AS-0053BLOWUP DETAIL
15
SOIL MIX BY SOFTLANDSCAPE CONTRACTOR
20mm THK DRAINAGE COMPOSITE
RC STRUCTURE TO ENGRS DETAILS
50x50 CS ANGLE FILLETTO ARCHTS DETAIL
APPROVED WATERPROOFSHEET MEMBRANE
APPROVEDFILTER FABRIC
08mm THKROOT BARRIER
20 THK CS RENDERING ON03 EXPENDED METAL LATH
NAILED TO CONCRETE
150mm THK AGGREGATE LAYER
PLANTER WALLS AND PLANTERS
NR142EXLAS-005P01
AS SHOWN (A1)
(SHEET 2 OF 2)
TOS
BOS MIN
300
mm
FINISHING TOARCHTS DETAIL
APPROVED GEOTEXTILEFILTER FABRIC
20mm THK DRAINAGECOMPOSITE
RC STRUCTURE TOENGRS DETAILS
150mm THKAGGREGATE
LAYER
08mm THK ROOT BARRIER
APPROVED WATERPROOF SHEET MEMBRANE
20 THK CS RENDERING ON03 EXPENDED METAL LATH
NAILED TO CONCRETE
SCALEB
AS-0054 FRONT SECTION
120
SCALEA
AS-0054 PLAN
120
GLASS FIBREMOVEABLE PLANTER
DRAINAGE HOLES IN BASE OFTHE PLANTER
GEOTEXTILEFABRIC FILTER LAYER
25MM THKCELLULAR DRAINAGE
LAYER
SOIL MULCHAND PLANTINGBY SOFT LANDSCAPECONTRACTOR
1200X30X15THKGMS FLAT BAR
2000
1200
500
5010
0
50
100
30
50
45MIN
600
mm
100
80
1000
2000
15
1200
500
175
2000X30X15THKGMS FLAT BAR
2000X30X15THKGMS FLAT BAR
500X100X20THKGMS FLAT BAR
6 NOS HOTDIPPED
GALVANISEDSTEEL BOLTSDOWN WITH
THE GFRCPLANTER
4MM THK GALVANISED WELDEDWESH PANEL
MELD TO THE FRAME
Note
All PLANTERS AT TOWER BLOCKFACADE TO BE PROVIDED WITH ANAUTO-IRRIGATION SYSTEM INACCORDANCE WITH THE PROJECTSPECIFIC SPECIFICATION
FFL
20
MIN 20
FALL 175FALL 175
15mmTHK S SMESHTUBE W20Oslash HOLESAT 50 CC
DECOMPOSEDGRANITEPROTECTIVECOVERING ONFILTER MAT
CE
RAINWATERPIPE
200mm ANGLEREINFORCING STRIPAS SPECIFIED
SS DOMEGRATING
AS-0051 TYPICAL PLANTER KERB AT GF
AS-0053 TYPICAL PLANTER BLOWUP DETAIL
AS-0054 PROPRIETARY GFRC PLANTER BOX AT GF
50x50 CS ANGLE FILLETTO ARCHTS DETAIL
OPENABLEWINDOW TOARCHITECTSDETAIL
OPENABLEWINDOWGRILLE TOARCHITECTSDETAIL
FIXEDTEMPEREDGLASS TOARCHITECTSDETAIL
1200
200
1050
1400
550
500
300
SOIL MIX BY SOFTLANDSCAPE CONTRACTOR
APPROVEDFILTER FABRIC
08mm THK ROOT BARRIER
APPROVED POLYETHYLENEFLEXIBLE DRAINAGE LAYER
20 THK CS RENDERING
03mm SS EXPANDEDMETAL LATHING NAILED
TO CONCRETE
APPROVED WATERPROOFSHEET MEMBRANE
08mm THKROOT BARRIER
1153 WATERPROOFINGCEMENT SANDSCREEDLAID TO FALLMIN 25 mm THK
APPROVEDWATERPROOFSHEET MEMBRANE
25mm THK13 WATERPROOFINGCEMENTSAND BEDDING
FILTER FABRIC AT SIDE OUTLET(TWO-WAY TYPE)
DRAINAGE AGGREGATES(25-40mm) WRAPPED IN GEOTEX
TILE FILTER MEMBRANE
DRAINAGE PIPETO ENGRSDETAIL
100300
SCALEA
AS-0055TYPICAL PLANTER SECTION
110
AS-0055 TYPICAL PLANTER AT TOWER BLOCK FACADE
WALL FINISH TOARCHITECTSDETAIL
LOW MAINTENANCESPECIES WHICH DOESNOT ATTRACTINSECTS
750
DRAINAGE HOLESIN BASE OFTHE PLANTER
HOMOGENEOUSTILE PAVING AS
SPECIFIEDFALL 175
DRAWING REF LETTERDRAWING NO
AG001
C11 MATERIAL CODES(REFER TO MATERIAL SCHEDULE)
+000 INDICATIVE FINISH LEVEL
NOTE
1 THIS DRAWING TO BE READ IN CONJUNCTION WITHARCHITECTURAL DRAWING amp OTHER RELEVANTDRAWINGS
2 THIS DRAWING IS FOR DESIGN INTENT ONLY SHOPDRAWING AND SAMPLES SHALL BE SUBMITTED TO CMFOR APPROVAL
3 CHECK AND VERIFY SITE CONDITION FOR ANYDISCREPANCIES IMMEDIATELY amp NOTIFY CM
4 ACTUAL LEVEL FOR CONSTRUCTION SHALL REFER TOARCHITECTURAL AND STRUCTURAL ENGINEERSDRAWING
5 EXACT LOCATION OF PLANTER DRAIN AND PAVING AREFLOOR DIMENSION SHOULD REFER TO ARCHITECTS ANDENGINEERS DRAWINGS
6 SUBSOIL DRAIN PIPE TO BE INSTALLED IN PLANTERS ASNECESSARY WHERE INDICATED ON PLAN
7 IT IS CONTRACTORS RESPONSIBILITY TO SUBMIT SHOPDRAWING FOR FIXING DETAILS
SCALEB
AS-0051ISOMETRIC (TYPICAL PLANTER KERB)
NTS
TEXTURED PAINT SPRAYGRANITE FINISH AS
SPECIFIED
PLANTING BY SOFT LANDSCAPECONTRACTOR
250
FALL
125
CONCRETE BLOCK HOMOGENEOUSTILE PAVING AS SPECIFIED
TEXTURED PAINT SPRAYGRANITE FINISH AS SPECIFIED
20 THK CS RENDERING5
GRADE20 20 CONCRETEHAUNCHING AND FOOTING
TO EGNRS DETAIL
25MM COMPACTED AND7MM LEVELING SAND COURSE SAND AND CEMENT BEDDING
COMPACTED NORMALSUBGRADE TO ENGRSDETAIL
150MM THKCOMPACTEDGRANULARSUBBASE MATERIALTO ENGRS DETAIL
50X50 CS ANGLE FILLETTO ARCHTS DETAIL
SCALEB
AS-0055TYPICAL PLANTER PLAN
125
DRAINAGE PIPETO ENGRSDETAIL
300
100
SCALEC
AS-0054 SIDE SECTION
120
FFL
MEDIUM DUTY DRAINAGECHANNEL WITH MATCHING
COVER (DETAILS REFER TODRAWING AS-0034)
SG1
T13
TEXTURED PAINT SPRAYGRANITE FINISH ASSPECIFIED
COUNTERCHECKED
DATE
OF
ISSU
E
FILE
OF
FICE
Arch
itect
FOR
QS
CE
BS
EG
EIO
WC
OWCo
ntra
ctor
CO
PYR
EOT
HERS
Max WongCA3
Henry Lau
Arthur Au
Teresa Lee
MF Lo
032021
CONSTRUCTION OF PUBLIC HOUSINGDEVELOPMENT AT SHEUNG SHUI AREAS 4AND 30 SITE 2 PHASE 2
DLNt +852 2895 6888
f +852 2576 4074劉榮廣伍振民建築師有限公司DLN ARCHITECTS LIMITED
032021
032021
032021
032021
SCALEA
AS-0053BLOWUP DETAIL
15
SOIL MIX BY SOFTLANDSCAPE CONTRACTOR
20mm THK DRAINAGE COMPOSITE
RC STRUCTURE TO ENGRS DETAILS
50x50 CS ANGLE FILLETTO ARCHTS DETAIL
APPROVED WATERPROOFSHEET MEMBRANE
APPROVEDFILTER FABRIC
08mm THKROOT BARRIER
20 THK CS RENDERING ON03 EXPENDED METAL LATH
NAILED TO CONCRETE
150mm THK AGGREGATE LAYER
PLANTER WALLS AND PLANTERS
NR142EXLAS-005P01
AS SHOWN (A1)
(SHEET 2 OF 2)
TOS
BOS MIN
300
mm
FINISHING TOARCHTS DETAIL
APPROVED GEOTEXTILEFILTER FABRIC
20mm THK DRAINAGECOMPOSITE
RC STRUCTURE TOENGRS DETAILS
150mm THKAGGREGATE
LAYER
08mm THK ROOT BARRIER
APPROVED WATERPROOF SHEET MEMBRANE
20 THK CS RENDERING ON03 EXPENDED METAL LATH
NAILED TO CONCRETE
SCALEB
AS-0054 FRONT SECTION
120
SCALEA
AS-0054 PLAN
120
GLASS FIBREMOVEABLE PLANTER
DRAINAGE HOLES IN BASE OFTHE PLANTER
GEOTEXTILEFABRIC FILTER LAYER
25MM THKCELLULAR DRAINAGE
LAYER
SOIL MULCHAND PLANTINGBY SOFT LANDSCAPECONTRACTOR
1200X30X15THKGMS FLAT BAR
2000
1200
500
5010
0
50
100
30
50
45MIN
600
mm
100
80
1000
2000
15
1200
500
175
2000X30X15THKGMS FLAT BAR
2000X30X15THKGMS FLAT BAR
500X100X20THKGMS FLAT BAR
6 NOS HOTDIPPED
GALVANISEDSTEEL BOLTSDOWN WITH
THE GFRCPLANTER
4MM THK GALVANISED WELDEDWESH PANEL
MELD TO THE FRAME
Note
All PLANTERS AT TOWER BLOCKFACADE TO BE PROVIDED WITH ANAUTO-IRRIGATION SYSTEM INACCORDANCE WITH THE PROJECTSPECIFIC SPECIFICATION
FFL
20
MIN 20
FALL 175FALL 175
15mmTHK S SMESHTUBE W20Oslash HOLESAT 50 CC
DECOMPOSEDGRANITEPROTECTIVECOVERING ONFILTER MAT
CE
RAINWATERPIPE
200mm ANGLEREINFORCING STRIPAS SPECIFIED
SS DOMEGRATING
AS-0051 TYPICAL PLANTER KERB AT GF
AS-0053 TYPICAL PLANTER BLOWUP DETAIL
AS-0054 PROPRIETARY GFRC PLANTER BOX AT GF
50x50 CS ANGLE FILLETTO ARCHTS DETAIL
OPENABLEWINDOW TOARCHITECTSDETAIL
OPENABLEWINDOWGRILLE TOARCHITECTSDETAIL
FIXEDTEMPEREDGLASS TOARCHITECTSDETAIL
1200
200
1050
1400
550
500
300
SOIL MIX BY SOFTLANDSCAPE CONTRACTOR
APPROVEDFILTER FABRIC
08mm THK ROOT BARRIER
APPROVED POLYETHYLENEFLEXIBLE DRAINAGE LAYER
20 THK CS RENDERING
03mm SS EXPANDEDMETAL LATHING NAILED
TO CONCRETE
APPROVED WATERPROOFSHEET MEMBRANE
08mm THKROOT BARRIER
1153 WATERPROOFINGCEMENT SANDSCREEDLAID TO FALLMIN 25 mm THK
APPROVEDWATERPROOFSHEET MEMBRANE
25mm THK13 WATERPROOFINGCEMENTSAND BEDDING
FILTER FABRIC AT SIDE OUTLET(TWO-WAY TYPE)
DRAINAGE AGGREGATES(25-40mm) WRAPPED IN GEOTEX
TILE FILTER MEMBRANE
DRAINAGE PIPETO ENGRSDETAIL
100300
SCALEA
AS-0055TYPICAL PLANTER SECTION
110
AS-0055 TYPICAL PLANTER AT TOWER BLOCK FACADE
WALL FINISH TOARCHITECTSDETAIL
LOW MAINTENANCESPECIES WHICH DOESNOT ATTRACTINSECTS
750
DRAINAGE HOLESIN BASE OFTHE PLANTER
HOMOGENEOUSTILE PAVING AS
SPECIFIEDFALL 175
DRAWING REF LETTERDRAWING NO
AG001
C11 MATERIAL CODES(REFER TO MATERIAL SCHEDULE)
+000 INDICATIVE FINISH LEVEL
NOTE
1 THIS DRAWING TO BE READ IN CONJUNCTION WITHARCHITECTURAL DRAWING amp OTHER RELEVANTDRAWINGS
2 THIS DRAWING IS FOR DESIGN INTENT ONLY SHOPDRAWING AND SAMPLES SHALL BE SUBMITTED TO CMFOR APPROVAL
3 CHECK AND VERIFY SITE CONDITION FOR ANYDISCREPANCIES IMMEDIATELY amp NOTIFY CM
4 ACTUAL LEVEL FOR CONSTRUCTION SHALL REFER TOARCHITECTURAL AND STRUCTURAL ENGINEERSDRAWING
5 EXACT LOCATION OF PLANTER DRAIN AND PAVING AREFLOOR DIMENSION SHOULD REFER TO ARCHITECTS ANDENGINEERS DRAWINGS
6 SUBSOIL DRAIN PIPE TO BE INSTALLED IN PLANTERS ASNECESSARY WHERE INDICATED ON PLAN
7 IT IS CONTRACTORS RESPONSIBILITY TO SUBMIT SHOPDRAWING FOR FIXING DETAILS
SCALEB
AS-0051ISOMETRIC (TYPICAL PLANTER KERB)
NTS
TEXTURED PAINT SPRAYGRANITE FINISH AS
SPECIFIED
PLANTING BY SOFT LANDSCAPECONTRACTOR
250
FALL
125
CONCRETE BLOCK HOMOGENEOUSTILE PAVING AS SPECIFIED
TEXTURED PAINT SPRAYGRANITE FINISH AS SPECIFIED
20 THK CS RENDERING5
GRADE20 20 CONCRETEHAUNCHING AND FOOTING
TO EGNRS DETAIL
25MM COMPACTED AND7MM LEVELING SAND COURSE SAND AND CEMENT BEDDING
COMPACTED NORMALSUBGRADE TO ENGRSDETAIL
150MM THKCOMPACTEDGRANULARSUBBASE MATERIALTO ENGRS DETAIL
50X50 CS ANGLE FILLETTO ARCHTS DETAIL
SCALEB
AS-0055TYPICAL PLANTER PLAN
125
DRAINAGE PIPETO ENGRSDETAIL
300
100
SCALEC
AS-0054 SIDE SECTION
120
FFL
MEDIUM DUTY DRAINAGECHANNEL WITH MATCHING
COVER (DETAILS REFER TODRAWING AS-0034)
SG1
T13
TEXTURED PAINT SPRAYGRANITE FINISH ASSPECIFIED
A Section showing typical planter wall details (on structure)
B Section showing typical green roof details
C Section showing typical green roof blow-up details
Note Min 300mm soil depth for green roof planting min 600mm soil depth for shrub planting min 1200mm soil depth for tree planting
PLANTING SCHEDULETREES
CODE BOTANICAL NAME CHINESE NAME SIZESPACING
(mm)REMARKS
ELHA Elaeocarpus hainanensis 水石榕 HS 4000 on podium
ELCH Elaeocarpus chinensis 中華杜英 HS 4000 on podium
STLA Sterculia lanceolata 假蘋婆 HS 4000 on podium
TACH Tabebuia chrysotricha 黃花風鈐木 HS 4000 on gradeon podium
TEMT Terminalia mantaly Tricolour 錦葉欖仁 HS 4000 on gradeon podium
PALMS
CODE BOTANICAL NAME CHINESE NAMESIZE (HtxSp)
(mm)SPACING
(mm)REMARKS
RHHU Rhapis humilis 細葉棕竹 400 x 300 500 on podium
LARGE SHRUBS
CODE BOTANICAL NAME CHINESE NAMESIZE (HtxSp)
(mm)SPACING
(mm)REMARKS
Aod Aglaia odorata 米仔蘭 600 x 500 750 on grade on podium
Caj Camellia japonica (red) 山茶 500 x 400 600 on grade on podium
Duv Duranta erecta Variegata 花葉假連翹 400 x 300 500 on grade on podium
Ofr Osmanthus fragrans 桂花 500 x 400 600 on grade on podium
Sar Schefflera arboricola 鴨腳木(鵝掌藤) 500 x 400 600 on grade on podium
SMALL SHRUBS
CODE BOTANICAL NAME CHINESE NAMESIZE (HtxSp)
(mm)SPACING
(mm)REMARKS
Asd Asparagus densiflorus Myers 狐尾天冬 300 x 200 400 on grade on podium
Clt Clerodendrum thomsonae 龍吐珠 500 x 450 600 on grade on podium
Dud Duranta erecta Golden Leave 金連翹 300 x 300 500 on grade on podium
Mca Melastoma candidum 野牡丹 400 x 300 500 on grade on podium
GROUND COVER
CODE BOTANICAL NAME CHINESE NAMESIZE (HtxSp)
(mm)SPACING
(mm)REMARKS
Nea Nephrolepis auriculata 腎蕨 250 x 250 400 on grade on podium
Oja Ophiopogon jaburan 花葉沿階草 100 x 100 200 on grade on podium
Pmy Phyllanthus myrtifolius 瘤腺葉下珠 200 x 300 400 on grade on podium
PROJECT DRAWING TITLE
DATEMARCH 2021
PROPOSED PUBLIC HOUSING DEVELOPMENTS AT AREAS 4 amp 30 SITES 1 amp 2
DETAILS 3SCALE NTS (A3)
TYPICAL PLANTER DETAILSAPRIL 2021
M
M
SCALEA
AS-0043KEY PLAN
11200
North
BAS-0043
PROPRIETARY FIBERGLASSOR COATED GMS PLANTERPOT WITH DRAIN HOLES
SCALEE
AS-0043SECTION OF LOW TYPE PLANTER POT
110
SCALED
AS-0043SECTION OF ELEVATED TYPE PLANTER POT
110
SCALEF
AS-0043ISOMETRIC
125
900
375
300
(TYP
ICAL
)
PROPRIETARY FIBERGLASS OR COATED GMSPLANTER POT WITH DRAIN HOLES
10 10
10 10
900
BRICK STAND(225X125X75 mm)
FALL FALLFALL
200
750
7567
5
40X5mm THK GMS FLAT
2 NOS OF 15mm THK SSTRAY WITH Oslash15mm SSSHORT PIPE DRAIN OUTLET
Oslash15mm SS FLEXIBLE DRAINPIPE TIED TO STEEL ANGLE
63X63X6mm PAINTED GMSANGLE SITS ON BRICK STAND
FALLFALL FALL
BRICK STAND(225X125X75 mm)
DRAIN CHANNELWCOVER
300
(TYP
ICAL
)20
0 (F
OR
ELE
VATE
D T
YPE)
PROPRIETARY FIBERGLASSOR COATED GMS PLANTERPOT WITH DRAIN HOLES
1200900
COMMUNAL FARM AT 2FAS-0043
SCALEB
AS-0043PLAN
1200
PLANTER WALLS AND PLANTERS
NR142EXLAS-004P01
AS SHOWN (A1)
(SHEET 1 OF 2)
SCALEC
AS-0043LONG SECTION
120
CAS-0043
1200
1200
MIN 1200MIN 1200
DRAIN CHANNELWCOVER
DRYSTOREROOM
B
P
P
P
P
P
P
P
P
MIN1200
FFL
SFL
1425
575
2000
75deg
150
1385
40
150X25MM THKARTIFICIAL TIMBER
CLADDING ON 50X75MMRHS POST
PPC FINISH
RC STRUCTURETO ENGINEERS DETAIL
TEXTURED PAINTSPRAY GRANITEFINISH AS SPECIFIED
250
150
FALL 175
DRAWING REF LETTERDRAWING NO
REFER TO MATERIAL PLAN amp SCHEDULE FOR SIZECOLOUR AND FINISHES
FFL FINISHED FLOOR LEVELTOW TOP OF WALLTOS TOP OF SOIL
AG001
C11 MATERIAL CODES(REFER TO MATERIAL SCHEDULE)
+000 INDICATIVE FINISH LEVEL
SITE BOUNDARY
LOW TYPE PLANTER POT
ELEVATED TYPE PLANTER POT
COMPOST BIN(REFER TO HARD
LANDSCAPE SCHEDULE)
FREE STANDINGWATER POINT
FALL 175
11
1
2
1
SOIL MIX BY SOFTLANDSCAPE CONTRACTOR
APPROVEDFILTER FABRIC
08mm THK ROOT BARRIER
APPROVED POLYETHYLENEFLEXIBLE DRAINAGE LAYER
20 THK CS RENDERING03mm SS EXPANDED
METAL LATHING NAILEDTO CONCRETE
APPROVED WATERPROOFSHEET MEMBRANE
FLOOR FINISHESAS SPECIFIED
50X50 CSANGLE FILLET
FALL 175
COMPLETELYDECOMPOSEDGRANITE
ONE PART POLYURETHANE SEALANT ON 25X25CONCRETE RECESS COMPATIBLE
WITH WATERPROOFING MEMBRANE
NON-SHRINK GROUT TO CONCRETE RECESS
TOS
50FALL
250
575
125
NOTE
1 THIS DRAWING TO BE READ IN CONJUNCTION WITHARCHITECTURAL DRAWING amp OTHER RELEVANT DRAWINGS
2 CHECK AND VERIFY SITE CONDITION FOR ANY DISCREPANCIESIMMEDIATELY amp NOTIFY CM
3 ACTUAL LEVEL FOR CONSTRUCTION SHALL REFER TOARCHITECTURAL AND STRUCTURAL ENGINEERS DRAWING
4 EXACT LOCATION OF PLANTER DRAIN AND PAVING ARE FLOORDIMENSION SHOULD REFER TO ARCHITECTS AND ENGINEERSDRAWINGS
5 SUBSOIL DRAIN PIPE TO BE INSTALLED IN PLANTERS ASNECESSARY WHERE INDICATED ON PLAN
6 SHOP DRAWINGS AND SAMPLES OF PLANTING POT SHALL BESUBMITTED TO CM FOR APPROVAL
7 DETAILS OF COMMUNITY FARM PLANTER POTS REFER TO HASTANDARD DRAWINGS REFACMF001 AND REFACMF002
W11
ELEVATED TYPE PLANTER POT(WHEEL CHAIR USER ACCESSIBLE)REFER TO HA STANDARD DETAILS(REFACMF001)
REFERENCE TO HA STANDARDDETAILS REFACMF002
100
TEXTURED PAINT SPRAYGRANITE FINISH AS SPECIFIED
TOP LINE OF PLANTER WALL FALL
ONE PART POLYURETHANE SEALANTON CONCRETE RECESS COMPATIBLE
WITH WATERPROOFING MEMBRANE
APPROVED WATERPROOF SHEETMEMBRANE
03mm SS EXPANDED METALLATHING NAILED TO CONCRETE
WITH BITUMEN SEALANT TOMANUFACTURERS DETAILS
20 THK CS RENDERING
08mm THK ROOT BARRIER
APPROVED POLYETHYLENE FLEXIBLEDRAINAGE LAYER
APPROVED FILTER FABRIC
570
50 50
1510
125
APPROVEDFILTER FABRIC
08mm THK ROOT BARRIER
APPROVED POLYETHYLENEFLEXIBLE DRAINAGE LAYER
20 THK CS RENDERING03mm SS EXPANDED
METAL LATHING NAILEDTO CONCRETE
APPROVED WATERPROOFSHEET MEMBRANE
3mm THK PROPRIETARY ALUMIPLATE PRESSED AGAINST FABRIC
08mm THK ROOT BARRIER
1153 WATER PROOFING CEMENT SANDSCREED LAID TO FALL MIN 25 mm THK
APPROVED WATERPROOFSHEET MEMBRANE
25mm THK 13 WATER PROOFINGCEMENT SAND BEDDING
FILTER FABRIC AT SIDE OUTLET(TWO-WAY TYPE)
DRAINAGE AGGREGATES (25-40mm)
RAINWATERPIPE
FLOOR FINISHESAS SPECIFIED
50FALL
12510
0
CAST ALUMINUMRAINWATER OUTLET(TWO-WAY TYPE)COMPLETE WITHCLAMPING RING ANDREMOVABLE GRATINGTO THE APPROVAL OFCONTRACT MANAGER
200mm ANGLEREINFORCINGSTRIP AS SPECIFIED
50X50 CSANGLE FILLET
15mm THK SSMESH TUBE W 20 OslashHOLES AT 50 CC
DECOMPOSEDGRANITE PROTECTIVECOVERING ON FILTERMAT
FALL 175FALL 175
RAINWATERPIPE
CE
FALL 175
COMPLETELYDECOMPOSEDGRANITE
SS DOME GRATING
ONE PART POLYURETHANE SEALANT ON 25X25 CONCRETERECESS COMPATIBLE WITH WATERPROOFING MEMBRANE
NON-SHRINK GROUT TO CONCRETE RECESS
TOS
VARIOUS
TREE PIT TREE PIT
50
100
FALL
FINISHES AS SPECIFIED25mm SEALANT ON BACKERROD AND JOINT FILLER
250
50X50 CS ANGLE FILLET
25mm THK SYNTHETIC STONEGRATING OR SIMILAR AND REVIEWED
WITHOUT OBJECTION
MIN 20mm THK CS SCREED LAID TO FALL
APPROVED WATERPROOF SHEET MEMBRANEMIN 25 mm THK CS BEDDING
SCALEB
AS-0042PLANTER WALL DETAIL
12
SCALEC
AS-0042ISOMETRIC (TYPICAL PLANTER WALL AT GF AND 2F)
NTS
TEXTURED PAINT SPRAYGRANITE FINISH AS SPECIFIED
PLANTING BY SOFT LANDSCAPECONTRACTOR
5MM THK GMS ANGLE FRAME
150 MIN
50
20 THK CS RENDERING
150
1200
1200
12001200
LOW TYPE PLANTER POTREFER TO HA STANDARDDETAILS (REFACMF002)
6040
NOTE REFER TO DRAINAGE LAYER PLAN amp DETAIL
700X500MM SINK
2
TEXTURED PAINT SPRAY GRANITEFINISH AS SPECIFIED
TEXTURED PAINT SPRAY GRANITEFINISH AS SPECIFIED
SG1
575
SG1
HOMOGENEOUS TILEAS SPECIFIED T12
RC STRUCTURE AS ENGRSDESIGN
WPR TO ARCHTS DETAIL
20MM THK CS RENDERING
BUILD-UP TO ARCHTS DETAIL
SG1
1200900
675
FALL
FALL
63X63X6MMPAINTED GMSANGLE
75X75X6MM STEELSTIFFENER WELDEDTO CORNER
2 NOS OF 15MMTHK SS TRAY WITHOslash15MM SS SHORTPIPE DRAIN OUTLET
REFERENCE TO HA STANDARDDETAILS REFACMF002
WPR TO ARCHTS DETAIL
20MM THK CS RENDERING
BUILD-UP TO ARCHTS DETAIL
HOMOGENEOUS TILEAS SPECIFIED T12
HOMOGENEOUS TILEAS SPECIFIED T12
WPR TO ARCHTS DETAIL
20MM THK CS RENDERING
BUILD-UP TO ARCHTS DETAIL
TEXTURED PAINT SPRAY GRANITEFINISH AS SPECIFIED TEXTURED PAINT
SPRAY GRANITE FINISHAS SPECIFIED
COUNTERCHECKED
DATE
OF
ISSU
E
FILE
OF
FICE
Arch
itect
FOR
QS
CE
BS
EG
EIO
WC
OWCo
ntra
ctor
CO
PYR
EOT
HERS
Max WongCA3
Henry Lau
Arthur Au
Teresa Lee
MF Lo
032021
CONSTRUCTION OF PUBLIC HOUSINGDEVELOPMENT AT SHEUNG SHUI AREAS 4AND 30 SITE 2 PHASE 2
DLNt +852 2895 6888
f +852 2576 4074劉榮廣伍振民建築師有限公司DLN ARCHITECTS LIMITED
032021
032021
032021
032021
SCALEA
AS-0053BLOWUP DETAIL
15
SOIL MIX BY SOFTLANDSCAPE CONTRACTOR
20mm THK DRAINAGE COMPOSITE
RC STRUCTURE TO ENGRS DETAILS
50x50 CS ANGLE FILLETTO ARCHTS DETAIL
APPROVED WATERPROOFSHEET MEMBRANE
APPROVEDFILTER FABRIC
08mm THKROOT BARRIER
20 THK CS RENDERING ON03 EXPENDED METAL LATH
NAILED TO CONCRETE
150mm THK AGGREGATE LAYER
PLANTER WALLS AND PLANTERS
NR142EXLAS-005P01
AS SHOWN (A1)
(SHEET 2 OF 2)
TOS
BOS MIN
300
mm
FINISHING TOARCHTS DETAIL
APPROVED GEOTEXTILEFILTER FABRIC
20mm THK DRAINAGECOMPOSITE
RC STRUCTURE TOENGRS DETAILS
150mm THKAGGREGATE
LAYER
08mm THK ROOT BARRIER
APPROVED WATERPROOF SHEET MEMBRANE
20 THK CS RENDERING ON03 EXPENDED METAL LATH
NAILED TO CONCRETE
SCALEB
AS-0054 FRONT SECTION
120
SCALEA
AS-0054 PLAN
120
GLASS FIBREMOVEABLE PLANTER
DRAINAGE HOLES IN BASE OFTHE PLANTER
GEOTEXTILEFABRIC FILTER LAYER
25MM THKCELLULAR DRAINAGE
LAYER
SOIL MULCHAND PLANTINGBY SOFT LANDSCAPECONTRACTOR
1200X30X15THKGMS FLAT BAR
2000
1200
500
5010
0
50
100
30
50
45MIN
600
mm
100
80
1000
2000
15
1200
500
175
2000X30X15THKGMS FLAT BAR
2000X30X15THKGMS FLAT BAR
500X100X20THKGMS FLAT BAR
6 NOS HOTDIPPED
GALVANISEDSTEEL BOLTSDOWN WITH
THE GFRCPLANTER
4MM THK GALVANISED WELDEDWESH PANEL
MELD TO THE FRAME
Note
All PLANTERS AT TOWER BLOCKFACADE TO BE PROVIDED WITH ANAUTO-IRRIGATION SYSTEM INACCORDANCE WITH THE PROJECTSPECIFIC SPECIFICATION
FFL
20
MIN 20
FALL 175FALL 175
15mmTHK S SMESHTUBE W20Oslash HOLESAT 50 CC
DECOMPOSEDGRANITEPROTECTIVECOVERING ONFILTER MAT
CE
RAINWATERPIPE
200mm ANGLEREINFORCING STRIPAS SPECIFIED
SS DOMEGRATING
AS-0051 TYPICAL PLANTER KERB AT GF
AS-0053 TYPICAL PLANTER BLOWUP DETAIL
AS-0054 PROPRIETARY GFRC PLANTER BOX AT GF
50x50 CS ANGLE FILLETTO ARCHTS DETAIL
OPENABLEWINDOW TOARCHITECTSDETAIL
OPENABLEWINDOWGRILLE TOARCHITECTSDETAIL
FIXEDTEMPEREDGLASS TOARCHITECTSDETAIL
1200
200
1050
1400
550
500
300
SOIL MIX BY SOFTLANDSCAPE CONTRACTOR
APPROVEDFILTER FABRIC
08mm THK ROOT BARRIER
APPROVED POLYETHYLENEFLEXIBLE DRAINAGE LAYER
20 THK CS RENDERING
03mm SS EXPANDEDMETAL LATHING NAILED
TO CONCRETE
APPROVED WATERPROOFSHEET MEMBRANE
08mm THKROOT BARRIER
1153 WATERPROOFINGCEMENT SANDSCREEDLAID TO FALLMIN 25 mm THK
APPROVEDWATERPROOFSHEET MEMBRANE
25mm THK13 WATERPROOFINGCEMENTSAND BEDDING
FILTER FABRIC AT SIDE OUTLET(TWO-WAY TYPE)
DRAINAGE AGGREGATES(25-40mm) WRAPPED IN GEOTEX
TILE FILTER MEMBRANE
DRAINAGE PIPETO ENGRSDETAIL
100300
SCALEA
AS-0055TYPICAL PLANTER SECTION
110
AS-0055 TYPICAL PLANTER AT TOWER BLOCK FACADE
WALL FINISH TOARCHITECTSDETAIL
LOW MAINTENANCESPECIES WHICH DOESNOT ATTRACTINSECTS
750
DRAINAGE HOLESIN BASE OFTHE PLANTER
HOMOGENEOUSTILE PAVING AS
SPECIFIEDFALL 175
DRAWING REF LETTERDRAWING NO
AG001
C11 MATERIAL CODES(REFER TO MATERIAL SCHEDULE)
+000 INDICATIVE FINISH LEVEL
NOTE
1 THIS DRAWING TO BE READ IN CONJUNCTION WITHARCHITECTURAL DRAWING amp OTHER RELEVANTDRAWINGS
2 THIS DRAWING IS FOR DESIGN INTENT ONLY SHOPDRAWING AND SAMPLES SHALL BE SUBMITTED TO CMFOR APPROVAL
3 CHECK AND VERIFY SITE CONDITION FOR ANYDISCREPANCIES IMMEDIATELY amp NOTIFY CM
4 ACTUAL LEVEL FOR CONSTRUCTION SHALL REFER TOARCHITECTURAL AND STRUCTURAL ENGINEERSDRAWING
5 EXACT LOCATION OF PLANTER DRAIN AND PAVING AREFLOOR DIMENSION SHOULD REFER TO ARCHITECTS ANDENGINEERS DRAWINGS
6 SUBSOIL DRAIN PIPE TO BE INSTALLED IN PLANTERS ASNECESSARY WHERE INDICATED ON PLAN
7 IT IS CONTRACTORS RESPONSIBILITY TO SUBMIT SHOPDRAWING FOR FIXING DETAILS
SCALEB
AS-0051ISOMETRIC (TYPICAL PLANTER KERB)
NTS
TEXTURED PAINT SPRAYGRANITE FINISH AS
SPECIFIED
PLANTING BY SOFT LANDSCAPECONTRACTOR
250
FALL
125
CONCRETE BLOCK HOMOGENEOUSTILE PAVING AS SPECIFIED
TEXTURED PAINT SPRAYGRANITE FINISH AS SPECIFIED
20 THK CS RENDERING5
GRADE20 20 CONCRETEHAUNCHING AND FOOTING
TO EGNRS DETAIL
25MM COMPACTED AND7MM LEVELING SAND COURSE SAND AND CEMENT BEDDING
COMPACTED NORMALSUBGRADE TO ENGRSDETAIL
150MM THKCOMPACTEDGRANULARSUBBASE MATERIALTO ENGRS DETAIL
50X50 CS ANGLE FILLETTO ARCHTS DETAIL
SCALEB
AS-0055TYPICAL PLANTER PLAN
125
DRAINAGE PIPETO ENGRSDETAIL
300
100
SCALEC
AS-0054 SIDE SECTION
120
FFL
MEDIUM DUTY DRAINAGECHANNEL WITH MATCHING
COVER (DETAILS REFER TODRAWING AS-0034)
SG1
T13
TEXTURED PAINT SPRAYGRANITE FINISH ASSPECIFIED
M
M
SCALEA
AS-0043KEY PLAN
11200
North
BAS-0043
PROPRIETARY FIBERGLASSOR COATED GMS PLANTERPOT WITH DRAIN HOLES
SCALEE
AS-0043SECTION OF LOW TYPE PLANTER POT
110
SCALED
AS-0043SECTION OF ELEVATED TYPE PLANTER POT
110
SCALEF
AS-0043ISOMETRIC
125
900
375
300
(TYP
ICAL
)
PROPRIETARY FIBERGLASS OR COATED GMSPLANTER POT WITH DRAIN HOLES
10 10
10 10
900
BRICK STAND(225X125X75 mm)
FALL FALLFALL
200
750
7567
5
40X5mm THK GMS FLAT
2 NOS OF 15mm THK SSTRAY WITH Oslash15mm SSSHORT PIPE DRAIN OUTLET
Oslash15mm SS FLEXIBLE DRAINPIPE TIED TO STEEL ANGLE
63X63X6mm PAINTED GMSANGLE SITS ON BRICK STAND
FALLFALL FALL
BRICK STAND(225X125X75 mm)
DRAIN CHANNELWCOVER
300
(TYP
ICAL
)20
0 (F
OR
ELE
VATE
D T
YPE)
PROPRIETARY FIBERGLASSOR COATED GMS PLANTERPOT WITH DRAIN HOLES
1200900
COMMUNAL FARM AT 2FAS-0043
SCALEB
AS-0043PLAN
1200
PLANTER WALLS AND PLANTERS
NR142EXLAS-004P01
AS SHOWN (A1)
(SHEET 1 OF 2)
SCALEC
AS-0043LONG SECTION
120
CAS-0043
1200
1200
MIN 1200MIN 1200
DRAIN CHANNELWCOVER
DRYSTOREROOM
B
P
P
P
P
P
P
P
P
MIN1200
FFL
SFL
1425
575
2000
75deg
150
1385
40
150X25MM THKARTIFICIAL TIMBER
CLADDING ON 50X75MMRHS POST
PPC FINISH
RC STRUCTURETO ENGINEERS DETAIL
TEXTURED PAINTSPRAY GRANITEFINISH AS SPECIFIED
250
150
FALL 175
DRAWING REF LETTERDRAWING NO
REFER TO MATERIAL PLAN amp SCHEDULE FOR SIZECOLOUR AND FINISHES
FFL FINISHED FLOOR LEVELTOW TOP OF WALLTOS TOP OF SOIL
AG001
C11 MATERIAL CODES(REFER TO MATERIAL SCHEDULE)
+000 INDICATIVE FINISH LEVEL
SITE BOUNDARY
LOW TYPE PLANTER POT
ELEVATED TYPE PLANTER POT
COMPOST BIN(REFER TO HARD
LANDSCAPE SCHEDULE)
FREE STANDINGWATER POINT
FALL 175
11
1
2
1
SOIL MIX BY SOFTLANDSCAPE CONTRACTOR
APPROVEDFILTER FABRIC
08mm THK ROOT BARRIER
APPROVED POLYETHYLENEFLEXIBLE DRAINAGE LAYER
20 THK CS RENDERING03mm SS EXPANDED
METAL LATHING NAILEDTO CONCRETE
APPROVED WATERPROOFSHEET MEMBRANE
FLOOR FINISHESAS SPECIFIED
50X50 CSANGLE FILLET
FALL 175
COMPLETELYDECOMPOSEDGRANITE
ONE PART POLYURETHANE SEALANT ON 25X25CONCRETE RECESS COMPATIBLE
WITH WATERPROOFING MEMBRANE
NON-SHRINK GROUT TO CONCRETE RECESS
TOS
50FALL
250
575
125
NOTE
1 THIS DRAWING TO BE READ IN CONJUNCTION WITHARCHITECTURAL DRAWING amp OTHER RELEVANT DRAWINGS
2 CHECK AND VERIFY SITE CONDITION FOR ANY DISCREPANCIESIMMEDIATELY amp NOTIFY CM
3 ACTUAL LEVEL FOR CONSTRUCTION SHALL REFER TOARCHITECTURAL AND STRUCTURAL ENGINEERS DRAWING
4 EXACT LOCATION OF PLANTER DRAIN AND PAVING ARE FLOORDIMENSION SHOULD REFER TO ARCHITECTS AND ENGINEERSDRAWINGS
5 SUBSOIL DRAIN PIPE TO BE INSTALLED IN PLANTERS ASNECESSARY WHERE INDICATED ON PLAN
6 SHOP DRAWINGS AND SAMPLES OF PLANTING POT SHALL BESUBMITTED TO CM FOR APPROVAL
7 DETAILS OF COMMUNITY FARM PLANTER POTS REFER TO HASTANDARD DRAWINGS REFACMF001 AND REFACMF002
W11
ELEVATED TYPE PLANTER POT(WHEEL CHAIR USER ACCESSIBLE)REFER TO HA STANDARD DETAILS(REFACMF001)
REFERENCE TO HA STANDARDDETAILS REFACMF002
100
TEXTURED PAINT SPRAYGRANITE FINISH AS SPECIFIED
TOP LINE OF PLANTER WALL FALL
ONE PART POLYURETHANE SEALANTON CONCRETE RECESS COMPATIBLE
WITH WATERPROOFING MEMBRANE
APPROVED WATERPROOF SHEETMEMBRANE
03mm SS EXPANDED METALLATHING NAILED TO CONCRETE
WITH BITUMEN SEALANT TOMANUFACTURERS DETAILS
20 THK CS RENDERING
08mm THK ROOT BARRIER
APPROVED POLYETHYLENE FLEXIBLEDRAINAGE LAYER
APPROVED FILTER FABRIC5
70
50 50
1510
125
APPROVEDFILTER FABRIC
08mm THK ROOT BARRIER
APPROVED POLYETHYLENEFLEXIBLE DRAINAGE LAYER
20 THK CS RENDERING03mm SS EXPANDED
METAL LATHING NAILEDTO CONCRETE
APPROVED WATERPROOFSHEET MEMBRANE
3mm THK PROPRIETARY ALUMIPLATE PRESSED AGAINST FABRIC
08mm THK ROOT BARRIER
1153 WATER PROOFING CEMENT SANDSCREED LAID TO FALL MIN 25 mm THK
APPROVED WATERPROOFSHEET MEMBRANE
25mm THK 13 WATER PROOFINGCEMENT SAND BEDDING
FILTER FABRIC AT SIDE OUTLET(TWO-WAY TYPE)
DRAINAGE AGGREGATES (25-40mm)
RAINWATERPIPE
FLOOR FINISHESAS SPECIFIED
50FALL
12510
0
CAST ALUMINUMRAINWATER OUTLET(TWO-WAY TYPE)COMPLETE WITHCLAMPING RING ANDREMOVABLE GRATINGTO THE APPROVAL OFCONTRACT MANAGER
200mm ANGLEREINFORCINGSTRIP AS SPECIFIED
50X50 CSANGLE FILLET
15mm THK SSMESH TUBE W 20 OslashHOLES AT 50 CC
DECOMPOSEDGRANITE PROTECTIVECOVERING ON FILTERMAT
FALL 175FALL 175
RAINWATERPIPE
CE
FALL 175
COMPLETELYDECOMPOSEDGRANITE
SS DOME GRATING
ONE PART POLYURETHANE SEALANT ON 25X25 CONCRETERECESS COMPATIBLE WITH WATERPROOFING MEMBRANE
NON-SHRINK GROUT TO CONCRETE RECESS
TOS
VARIOUS
TREE PIT TREE PIT
5010
0FALL
FINISHES AS SPECIFIED25mm SEALANT ON BACKERROD AND JOINT FILLER
250
50X50 CS ANGLE FILLET
25mm THK SYNTHETIC STONEGRATING OR SIMILAR AND REVIEWED
WITHOUT OBJECTION
MIN 20mm THK CS SCREED LAID TO FALL
APPROVED WATERPROOF SHEET MEMBRANEMIN 25 mm THK CS BEDDING
SCALEB
AS-0042PLANTER WALL DETAIL
12
SCALEC
AS-0042ISOMETRIC (TYPICAL PLANTER WALL AT GF AND 2F)
NTS
TEXTURED PAINT SPRAYGRANITE FINISH AS SPECIFIED
PLANTING BY SOFT LANDSCAPECONTRACTOR
5MM THK GMS ANGLE FRAME
150 MIN
50
20 THK CS RENDERING
150
1200
1200
12001200
LOW TYPE PLANTER POTREFER TO HA STANDARDDETAILS (REFACMF002)
6040
NOTE REFER TO DRAINAGE LAYER PLAN amp DETAIL
700X500MM SINK
2
TEXTURED PAINT SPRAY GRANITEFINISH AS SPECIFIED
TEXTURED PAINT SPRAY GRANITEFINISH AS SPECIFIED
SG1
575
SG1
HOMOGENEOUS TILEAS SPECIFIED T12
RC STRUCTURE AS ENGRSDESIGN
WPR TO ARCHTS DETAIL
20MM THK CS RENDERING
BUILD-UP TO ARCHTS DETAIL
SG1
1200900
675
FALL
FALL
63X63X6MMPAINTED GMSANGLE
75X75X6MM STEELSTIFFENER WELDEDTO CORNER
2 NOS OF 15MMTHK SS TRAY WITHOslash15MM SS SHORTPIPE DRAIN OUTLET
REFERENCE TO HA STANDARDDETAILS REFACMF002
WPR TO ARCHTS DETAIL
20MM THK CS RENDERING
BUILD-UP TO ARCHTS DETAIL
HOMOGENEOUS TILEAS SPECIFIED T12
HOMOGENEOUS TILEAS SPECIFIED T12
WPR TO ARCHTS DETAIL
20MM THK CS RENDERING
BUILD-UP TO ARCHTS DETAIL
TEXTURED PAINT SPRAY GRANITEFINISH AS SPECIFIED TEXTURED PAINT
SPRAY GRANITE FINISHAS SPECIFIED
A Section showing typical planter wall details (on ground)
B Section showing typical planter kerb details (on ground)
C Section showing typical planter wall blow-up details
Note Min 300mm soil depth for green roof planting min 600mm soil depth for shrub planting min 1200mm soil depth for tree planting
150
PROJECT DRAWING TITLE
DATEMARCH 2021
PROPOSED PUBLIC HOUSING DEVELOPMENTS AT AREAS 4 amp 30 SITES 1 amp 2
DETAILS 4SCALE NTS (A3)
TYPICAL PLANTER DETAILSAPRIL 2021
M
M
SCALEA
AS-0043KEY PLAN
11200
North
BAS-0043
PROPRIETARY FIBERGLASSOR COATED GMS PLANTERPOT WITH DRAIN HOLES
SCALEE
AS-0043SECTION OF LOW TYPE PLANTER POT
110
SCALED
AS-0043SECTION OF ELEVATED TYPE PLANTER POT
110
SCALEF
AS-0043ISOMETRIC
125
900
375
300
(TYP
ICAL
)PROPRIETARY FIBERGLASS OR COATED GMSPLANTER POT WITH DRAIN HOLES
10 10
10 10
900
BRICK STAND(225X125X75 mm)
FALL FALLFALL
200
750
7567
5
40X5mm THK GMS FLAT
2 NOS OF 15mm THK SSTRAY WITH Oslash15mm SSSHORT PIPE DRAIN OUTLET
Oslash15mm SS FLEXIBLE DRAINPIPE TIED TO STEEL ANGLE
63X63X6mm PAINTED GMSANGLE SITS ON BRICK STAND
FALLFALL FALL
BRICK STAND(225X125X75 mm)
DRAIN CHANNELWCOVER
300
(TYP
ICAL
)20
0 (F
OR
ELE
VATE
D T
YPE)
PROPRIETARY FIBERGLASSOR COATED GMS PLANTERPOT WITH DRAIN HOLES
1200900
COMMUNAL FARM AT 2FAS-0043
SCALEB
AS-0043PLAN
1200
PLANTER WALLS AND PLANTERS
NR142EXLAS-004P01
AS SHOWN (A1)
(SHEET 1 OF 2)
SCALEC
AS-0043LONG SECTION
120
CAS-0043
1200
1200
MIN 1200MIN 1200
DRAIN CHANNELWCOVER
DRYSTOREROOM
B
P
P
P
P
P
P
P
P
MIN1200
FFL
SFL
1425
575
2000
75deg
150
1385
40
150X25MM THKARTIFICIAL TIMBER
CLADDING ON 50X75MMRHS POST
PPC FINISH
RC STRUCTURETO ENGINEERS DETAIL
TEXTURED PAINTSPRAY GRANITEFINISH AS SPECIFIED
250
150
FALL 175
DRAWING REF LETTERDRAWING NO
REFER TO MATERIAL PLAN amp SCHEDULE FOR SIZECOLOUR AND FINISHES
FFL FINISHED FLOOR LEVELTOW TOP OF WALLTOS TOP OF SOIL
AG001
C11 MATERIAL CODES(REFER TO MATERIAL SCHEDULE)
+000 INDICATIVE FINISH LEVEL
SITE BOUNDARY
LOW TYPE PLANTER POT
ELEVATED TYPE PLANTER POT
COMPOST BIN(REFER TO HARD
LANDSCAPE SCHEDULE)
FREE STANDINGWATER POINT
FALL 175
11
1
2
1
SOIL MIX BY SOFTLANDSCAPE CONTRACTOR
APPROVEDFILTER FABRIC
08mm THK ROOT BARRIER
APPROVED POLYETHYLENEFLEXIBLE DRAINAGE LAYER
20 THK CS RENDERING03mm SS EXPANDED
METAL LATHING NAILEDTO CONCRETE
APPROVED WATERPROOFSHEET MEMBRANE
FLOOR FINISHESAS SPECIFIED
50X50 CSANGLE FILLET
FALL 175
COMPLETELYDECOMPOSEDGRANITE
ONE PART POLYURETHANE SEALANT ON 25X25CONCRETE RECESS COMPATIBLE
WITH WATERPROOFING MEMBRANE
NON-SHRINK GROUT TO CONCRETE RECESS
TOS
50FALL
250
575
125
NOTE
1 THIS DRAWING TO BE READ IN CONJUNCTION WITHARCHITECTURAL DRAWING amp OTHER RELEVANT DRAWINGS
2 CHECK AND VERIFY SITE CONDITION FOR ANY DISCREPANCIESIMMEDIATELY amp NOTIFY CM
3 ACTUAL LEVEL FOR CONSTRUCTION SHALL REFER TOARCHITECTURAL AND STRUCTURAL ENGINEERS DRAWING
4 EXACT LOCATION OF PLANTER DRAIN AND PAVING ARE FLOORDIMENSION SHOULD REFER TO ARCHITECTS AND ENGINEERSDRAWINGS
5 SUBSOIL DRAIN PIPE TO BE INSTALLED IN PLANTERS ASNECESSARY WHERE INDICATED ON PLAN
6 SHOP DRAWINGS AND SAMPLES OF PLANTING POT SHALL BESUBMITTED TO CM FOR APPROVAL
7 DETAILS OF COMMUNITY FARM PLANTER POTS REFER TO HASTANDARD DRAWINGS REFACMF001 AND REFACMF002
W11
ELEVATED TYPE PLANTER POT(WHEEL CHAIR USER ACCESSIBLE)REFER TO HA STANDARD DETAILS(REFACMF001)
REFERENCE TO HA STANDARDDETAILS REFACMF002
100
TEXTURED PAINT SPRAYGRANITE FINISH AS SPECIFIED
TOP LINE OF PLANTER WALL FALL
ONE PART POLYURETHANE SEALANTON CONCRETE RECESS COMPATIBLE
WITH WATERPROOFING MEMBRANE
APPROVED WATERPROOF SHEETMEMBRANE
03mm SS EXPANDED METALLATHING NAILED TO CONCRETE
WITH BITUMEN SEALANT TOMANUFACTURERS DETAILS
20 THK CS RENDERING
08mm THK ROOT BARRIER
APPROVED POLYETHYLENE FLEXIBLEDRAINAGE LAYER
APPROVED FILTER FABRIC
570
50 50
1510
125
APPROVEDFILTER FABRIC
08mm THK ROOT BARRIER
APPROVED POLYETHYLENEFLEXIBLE DRAINAGE LAYER
20 THK CS RENDERING03mm SS EXPANDED
METAL LATHING NAILEDTO CONCRETE
APPROVED WATERPROOFSHEET MEMBRANE
3mm THK PROPRIETARY ALUMIPLATE PRESSED AGAINST FABRIC
08mm THK ROOT BARRIER
1153 WATER PROOFING CEMENT SANDSCREED LAID TO FALL MIN 25 mm THK
APPROVED WATERPROOFSHEET MEMBRANE
25mm THK 13 WATER PROOFINGCEMENT SAND BEDDING
FILTER FABRIC AT SIDE OUTLET(TWO-WAY TYPE)
DRAINAGE AGGREGATES (25-40mm)
RAINWATERPIPE
FLOOR FINISHESAS SPECIFIED
50FALL
12510
0
CAST ALUMINUMRAINWATER OUTLET(TWO-WAY TYPE)COMPLETE WITHCLAMPING RING ANDREMOVABLE GRATINGTO THE APPROVAL OFCONTRACT MANAGER
200mm ANGLEREINFORCINGSTRIP AS SPECIFIED
50X50 CSANGLE FILLET
15mm THK SSMESH TUBE W 20 OslashHOLES AT 50 CC
DECOMPOSEDGRANITE PROTECTIVECOVERING ON FILTERMAT
FALL 175FALL 175
RAINWATERPIPE
CE
FALL 175
COMPLETELYDECOMPOSEDGRANITE
SS DOME GRATING
ONE PART POLYURETHANE SEALANT ON 25X25 CONCRETERECESS COMPATIBLE WITH WATERPROOFING MEMBRANE
NON-SHRINK GROUT TO CONCRETE RECESS
TOS
VARIOUS
TREE PIT TREE PIT
50
100
FALL
FINISHES AS SPECIFIED25mm SEALANT ON BACKERROD AND JOINT FILLER
250
50X50 CS ANGLE FILLET
25mm THK SYNTHETIC STONEGRATING OR SIMILAR AND REVIEWED
WITHOUT OBJECTION
MIN 20mm THK CS SCREED LAID TO FALL
APPROVED WATERPROOF SHEET MEMBRANEMIN 25 mm THK CS BEDDING
SCALEB
AS-0042PLANTER WALL DETAIL
12
SCALEC
AS-0042ISOMETRIC (TYPICAL PLANTER WALL AT GF AND 2F)
NTS
TEXTURED PAINT SPRAYGRANITE FINISH AS SPECIFIED
PLANTING BY SOFT LANDSCAPECONTRACTOR
5MM THK GMS ANGLE FRAME
150 MIN
50
20 THK CS RENDERING
150
1200
1200
12001200
LOW TYPE PLANTER POTREFER TO HA STANDARDDETAILS (REFACMF002)
6040
NOTE REFER TO DRAINAGE LAYER PLAN amp DETAIL
700X500MM SINK
2
TEXTURED PAINT SPRAY GRANITEFINISH AS SPECIFIED
TEXTURED PAINT SPRAY GRANITEFINISH AS SPECIFIED
SG1
575
SG1
HOMOGENEOUS TILEAS SPECIFIED T12
RC STRUCTURE AS ENGRSDESIGN
WPR TO ARCHTS DETAIL
20MM THK CS RENDERING
BUILD-UP TO ARCHTS DETAIL
SG1
1200900
675
FALL
FALL
63X63X6MMPAINTED GMSANGLE
75X75X6MM STEELSTIFFENER WELDEDTO CORNER
2 NOS OF 15MMTHK SS TRAY WITHOslash15MM SS SHORTPIPE DRAIN OUTLET
REFERENCE TO HA STANDARDDETAILS REFACMF002
WPR TO ARCHTS DETAIL
20MM THK CS RENDERING
BUILD-UP TO ARCHTS DETAIL
HOMOGENEOUS TILEAS SPECIFIED T12
HOMOGENEOUS TILEAS SPECIFIED T12
WPR TO ARCHTS DETAIL
20MM THK CS RENDERING
BUILD-UP TO ARCHTS DETAIL
TEXTURED PAINT SPRAY GRANITEFINISH AS SPECIFIED TEXTURED PAINT
SPRAY GRANITE FINISHAS SPECIFIED
COUNTERCHECKED
DATE
OF
ISSU
E
FILE
OF
FICE
Arch
itect
FOR
QS
CE
BS
EG
EIO
WC
OWCo
ntra
ctor
CO
PYR
EOT
HERS
Max WongCA3
Henry Lau
Arthur Au
Teresa Lee
MF Lo
032021
CONSTRUCTION OF PUBLIC HOUSINGDEVELOPMENT AT SHEUNG SHUI AREAS 4AND 30 SITE 2 PHASE 2
DLNt +852 2895 6888
f +852 2576 4074劉榮廣伍振民建築師有限公司DLN ARCHITECTS LIMITED
032021
032021
032021
032021
SCALEA
AS-0053BLOWUP DETAIL
15
SOIL MIX BY SOFTLANDSCAPE CONTRACTOR
20mm THK DRAINAGE COMPOSITE
RC STRUCTURE TO ENGRS DETAILS
50x50 CS ANGLE FILLETTO ARCHTS DETAIL
APPROVED WATERPROOFSHEET MEMBRANE
APPROVEDFILTER FABRIC
08mm THKROOT BARRIER
20 THK CS RENDERING ON03 EXPENDED METAL LATH
NAILED TO CONCRETE
150mm THK AGGREGATE LAYER
PLANTER WALLS AND PLANTERS
NR142EXLAS-005P01
AS SHOWN (A1)
(SHEET 2 OF 2)
TOS
BOS MIN
300
mm
FINISHING TOARCHTS DETAIL
APPROVED GEOTEXTILEFILTER FABRIC
20mm THK DRAINAGECOMPOSITE
RC STRUCTURE TOENGRS DETAILS
150mm THKAGGREGATE
LAYER
08mm THK ROOT BARRIER
APPROVED WATERPROOF SHEET MEMBRANE
20 THK CS RENDERING ON03 EXPENDED METAL LATH
NAILED TO CONCRETE
SCALEB
AS-0054 FRONT SECTION
120
SCALEA
AS-0054 PLAN
120
GLASS FIBREMOVEABLE PLANTER
DRAINAGE HOLES IN BASE OFTHE PLANTER
GEOTEXTILEFABRIC FILTER LAYER
25MM THKCELLULAR DRAINAGE
LAYER
SOIL MULCHAND PLANTINGBY SOFT LANDSCAPECONTRACTOR
1200X30X15THKGMS FLAT BAR
2000
1200
500
5010
0
50
100
30
50
45MIN
600
mm
100
80
1000
2000
15
1200
500
175
2000X30X15THKGMS FLAT BAR
2000X30X15THKGMS FLAT BAR
500X100X20THKGMS FLAT BAR
6 NOS HOTDIPPED
GALVANISEDSTEEL BOLTSDOWN WITH
THE GFRCPLANTER
4MM THK GALVANISED WELDEDWESH PANEL
MELD TO THE FRAME
Note
All PLANTERS AT TOWER BLOCKFACADE TO BE PROVIDED WITH ANAUTO-IRRIGATION SYSTEM INACCORDANCE WITH THE PROJECTSPECIFIC SPECIFICATION
FFL
20
MIN 20
FALL 175FALL 175
15mmTHK S SMESHTUBE W20Oslash HOLESAT 50 CC
DECOMPOSEDGRANITEPROTECTIVECOVERING ONFILTER MAT
CE
RAINWATERPIPE
200mm ANGLEREINFORCING STRIPAS SPECIFIED
SS DOMEGRATING
AS-0051 TYPICAL PLANTER KERB AT GF
AS-0053 TYPICAL PLANTER BLOWUP DETAIL
AS-0054 PROPRIETARY GFRC PLANTER BOX AT GF
50x50 CS ANGLE FILLETTO ARCHTS DETAIL
OPENABLEWINDOW TOARCHITECTSDETAIL
OPENABLEWINDOWGRILLE TOARCHITECTSDETAIL
FIXEDTEMPEREDGLASS TOARCHITECTSDETAIL
1200
200
1050
1400
550
500
300
SOIL MIX BY SOFTLANDSCAPE CONTRACTOR
APPROVEDFILTER FABRIC
08mm THK ROOT BARRIER
APPROVED POLYETHYLENEFLEXIBLE DRAINAGE LAYER
20 THK CS RENDERING
03mm SS EXPANDEDMETAL LATHING NAILED
TO CONCRETE
APPROVED WATERPROOFSHEET MEMBRANE
08mm THKROOT BARRIER
1153 WATERPROOFINGCEMENT SANDSCREEDLAID TO FALLMIN 25 mm THK
APPROVEDWATERPROOFSHEET MEMBRANE
25mm THK13 WATERPROOFINGCEMENTSAND BEDDING
FILTER FABRIC AT SIDE OUTLET(TWO-WAY TYPE)
DRAINAGE AGGREGATES(25-40mm) WRAPPED IN GEOTEX
TILE FILTER MEMBRANE
DRAINAGE PIPETO ENGRSDETAIL
100300
SCALEA
AS-0055TYPICAL PLANTER SECTION
110
AS-0055 TYPICAL PLANTER AT TOWER BLOCK FACADE
WALL FINISH TOARCHITECTSDETAIL
LOW MAINTENANCESPECIES WHICH DOESNOT ATTRACTINSECTS
750
DRAINAGE HOLESIN BASE OFTHE PLANTER
HOMOGENEOUSTILE PAVING AS
SPECIFIEDFALL 175
DRAWING REF LETTERDRAWING NO
AG001
C11 MATERIAL CODES(REFER TO MATERIAL SCHEDULE)
+000 INDICATIVE FINISH LEVEL
NOTE
1 THIS DRAWING TO BE READ IN CONJUNCTION WITHARCHITECTURAL DRAWING amp OTHER RELEVANTDRAWINGS
2 THIS DRAWING IS FOR DESIGN INTENT ONLY SHOPDRAWING AND SAMPLES SHALL BE SUBMITTED TO CMFOR APPROVAL
3 CHECK AND VERIFY SITE CONDITION FOR ANYDISCREPANCIES IMMEDIATELY amp NOTIFY CM
4 ACTUAL LEVEL FOR CONSTRUCTION SHALL REFER TOARCHITECTURAL AND STRUCTURAL ENGINEERSDRAWING
5 EXACT LOCATION OF PLANTER DRAIN AND PAVING AREFLOOR DIMENSION SHOULD REFER TO ARCHITECTS ANDENGINEERS DRAWINGS
6 SUBSOIL DRAIN PIPE TO BE INSTALLED IN PLANTERS ASNECESSARY WHERE INDICATED ON PLAN
7 IT IS CONTRACTORS RESPONSIBILITY TO SUBMIT SHOPDRAWING FOR FIXING DETAILS
SCALEB
AS-0051ISOMETRIC (TYPICAL PLANTER KERB)
NTS
TEXTURED PAINT SPRAYGRANITE FINISH AS
SPECIFIED
PLANTING BY SOFT LANDSCAPECONTRACTOR
250
FALL
125
CONCRETE BLOCK HOMOGENEOUSTILE PAVING AS SPECIFIED
TEXTURED PAINT SPRAYGRANITE FINISH AS SPECIFIED
20 THK CS RENDERING5
GRADE20 20 CONCRETEHAUNCHING AND FOOTING
TO EGNRS DETAIL
25MM COMPACTED AND7MM LEVELING SAND COURSE SAND AND CEMENT BEDDING
COMPACTED NORMALSUBGRADE TO ENGRSDETAIL
150MM THKCOMPACTEDGRANULARSUBBASE MATERIALTO ENGRS DETAIL
50X50 CS ANGLE FILLETTO ARCHTS DETAIL
SCALEB
AS-0055TYPICAL PLANTER PLAN
125
DRAINAGE PIPETO ENGRSDETAIL
300
100
SCALEC
AS-0054 SIDE SECTION
120
FFL
MEDIUM DUTY DRAINAGECHANNEL WITH MATCHING
COVER (DETAILS REFER TODRAWING AS-0034)
SG1
T13
TEXTURED PAINT SPRAYGRANITE FINISH ASSPECIFIED
COUNTERCHECKED
DATE
OF
ISSU
E
FILE
OF
FICE
Arch
itect
FOR
QS
CE
BS
EG
EIO
WC
OWCo
ntra
ctor
CO
PYR
EOT
HERS
Max WongCA3
Henry Lau
Arthur Au
Teresa Lee
MF Lo
032021
CONSTRUCTION OF PUBLIC HOUSINGDEVELOPMENT AT SHEUNG SHUI AREAS 4AND 30 SITE 2 PHASE 2
DLNt +852 2895 6888
f +852 2576 4074劉榮廣伍振民建築師有限公司DLN ARCHITECTS LIMITED
032021
032021
032021
032021
SCALEA
AS-0053BLOWUP DETAIL
15
SOIL MIX BY SOFTLANDSCAPE CONTRACTOR
20mm THK DRAINAGE COMPOSITE
RC STRUCTURE TO ENGRS DETAILS
50x50 CS ANGLE FILLETTO ARCHTS DETAIL
APPROVED WATERPROOFSHEET MEMBRANE
APPROVEDFILTER FABRIC
08mm THKROOT BARRIER
20 THK CS RENDERING ON03 EXPENDED METAL LATH
NAILED TO CONCRETE
150mm THK AGGREGATE LAYER
PLANTER WALLS AND PLANTERS
NR142EXLAS-005P01
AS SHOWN (A1)
(SHEET 2 OF 2)
TOS
BOS MIN
300
mm
FINISHING TOARCHTS DETAIL
APPROVED GEOTEXTILEFILTER FABRIC
20mm THK DRAINAGECOMPOSITE
RC STRUCTURE TOENGRS DETAILS
150mm THKAGGREGATE
LAYER
08mm THK ROOT BARRIER
APPROVED WATERPROOF SHEET MEMBRANE
20 THK CS RENDERING ON03 EXPENDED METAL LATH
NAILED TO CONCRETE
SCALEB
AS-0054 FRONT SECTION
120
SCALEA
AS-0054 PLAN
120
GLASS FIBREMOVEABLE PLANTER
DRAINAGE HOLES IN BASE OFTHE PLANTER
GEOTEXTILEFABRIC FILTER LAYER
25MM THKCELLULAR DRAINAGE
LAYER
SOIL MULCHAND PLANTINGBY SOFT LANDSCAPECONTRACTOR
1200X30X15THKGMS FLAT BAR
2000
1200
500
5010
0
50
100
30
50
45MIN
600
mm
100
80
1000
2000
15
1200
500
175
2000X30X15THKGMS FLAT BAR
2000X30X15THKGMS FLAT BAR
500X100X20THKGMS FLAT BAR
6 NOS HOTDIPPED
GALVANISEDSTEEL BOLTSDOWN WITH
THE GFRCPLANTER
4MM THK GALVANISED WELDEDWESH PANEL
MELD TO THE FRAME
Note
All PLANTERS AT TOWER BLOCKFACADE TO BE PROVIDED WITH ANAUTO-IRRIGATION SYSTEM INACCORDANCE WITH THE PROJECTSPECIFIC SPECIFICATION
FFL
20
MIN 20
FALL 175FALL 175
15mmTHK S SMESHTUBE W20Oslash HOLESAT 50 CC
DECOMPOSEDGRANITEPROTECTIVECOVERING ONFILTER MAT
CE
RAINWATERPIPE
200mm ANGLEREINFORCING STRIPAS SPECIFIED
SS DOMEGRATING
AS-0051 TYPICAL PLANTER KERB AT GF
AS-0053 TYPICAL PLANTER BLOWUP DETAIL
AS-0054 PROPRIETARY GFRC PLANTER BOX AT GF
50x50 CS ANGLE FILLETTO ARCHTS DETAIL
OPENABLEWINDOW TOARCHITECTSDETAIL
OPENABLEWINDOWGRILLE TOARCHITECTSDETAIL
FIXEDTEMPEREDGLASS TOARCHITECTSDETAIL
1200
200
1050
1400
550
500
300
SOIL MIX BY SOFTLANDSCAPE CONTRACTOR
APPROVEDFILTER FABRIC
08mm THK ROOT BARRIER
APPROVED POLYETHYLENEFLEXIBLE DRAINAGE LAYER
20 THK CS RENDERING
03mm SS EXPANDEDMETAL LATHING NAILED
TO CONCRETE
APPROVED WATERPROOFSHEET MEMBRANE
08mm THKROOT BARRIER
1153 WATERPROOFINGCEMENT SANDSCREEDLAID TO FALLMIN 25 mm THK
APPROVEDWATERPROOFSHEET MEMBRANE
25mm THK13 WATERPROOFINGCEMENTSAND BEDDING
FILTER FABRIC AT SIDE OUTLET(TWO-WAY TYPE)
DRAINAGE AGGREGATES(25-40mm) WRAPPED IN GEOTEX
TILE FILTER MEMBRANE
DRAINAGE PIPETO ENGRSDETAIL
100300
SCALEA
AS-0055TYPICAL PLANTER SECTION
110
AS-0055 TYPICAL PLANTER AT TOWER BLOCK FACADE
WALL FINISH TOARCHITECTSDETAIL
LOW MAINTENANCESPECIES WHICH DOESNOT ATTRACTINSECTS
750
DRAINAGE HOLESIN BASE OFTHE PLANTER
HOMOGENEOUSTILE PAVING AS
SPECIFIEDFALL 175
DRAWING REF LETTERDRAWING NO
AG001
C11 MATERIAL CODES(REFER TO MATERIAL SCHEDULE)
+000 INDICATIVE FINISH LEVEL
NOTE
1 THIS DRAWING TO BE READ IN CONJUNCTION WITHARCHITECTURAL DRAWING amp OTHER RELEVANTDRAWINGS
2 THIS DRAWING IS FOR DESIGN INTENT ONLY SHOPDRAWING AND SAMPLES SHALL BE SUBMITTED TO CMFOR APPROVAL
3 CHECK AND VERIFY SITE CONDITION FOR ANYDISCREPANCIES IMMEDIATELY amp NOTIFY CM
4 ACTUAL LEVEL FOR CONSTRUCTION SHALL REFER TOARCHITECTURAL AND STRUCTURAL ENGINEERSDRAWING
5 EXACT LOCATION OF PLANTER DRAIN AND PAVING AREFLOOR DIMENSION SHOULD REFER TO ARCHITECTS ANDENGINEERS DRAWINGS
6 SUBSOIL DRAIN PIPE TO BE INSTALLED IN PLANTERS ASNECESSARY WHERE INDICATED ON PLAN
7 IT IS CONTRACTORS RESPONSIBILITY TO SUBMIT SHOPDRAWING FOR FIXING DETAILS
SCALEB
AS-0051ISOMETRIC (TYPICAL PLANTER KERB)
NTS
TEXTURED PAINT SPRAYGRANITE FINISH AS
SPECIFIED
PLANTING BY SOFT LANDSCAPECONTRACTOR
250
FALL
125
CONCRETE BLOCK HOMOGENEOUSTILE PAVING AS SPECIFIED
TEXTURED PAINT SPRAYGRANITE FINISH AS SPECIFIED
20 THK CS RENDERING5
GRADE20 20 CONCRETEHAUNCHING AND FOOTING
TO EGNRS DETAIL
25MM COMPACTED AND7MM LEVELING SAND COURSE SAND AND CEMENT BEDDING
COMPACTED NORMALSUBGRADE TO ENGRSDETAIL
150MM THKCOMPACTEDGRANULARSUBBASE MATERIALTO ENGRS DETAIL
50X50 CS ANGLE FILLETTO ARCHTS DETAIL
SCALEB
AS-0055TYPICAL PLANTER PLAN
125
DRAINAGE PIPETO ENGRSDETAIL
300
100
SCALEC
AS-0054 SIDE SECTION
120
FFL
MEDIUM DUTY DRAINAGECHANNEL WITH MATCHING
COVER (DETAILS REFER TODRAWING AS-0034)
SG1
T13
TEXTURED PAINT SPRAYGRANITE FINISH ASSPECIFIED
A Section showing typical planter wall details (on structure)
B Section showing typical green roof details
C Section showing typical green roof blow-up details
Note Min 300mm soil depth for green roof planting min 600mm soil depth for shrub planting min 1200mm soil depth for tree planting
PUBLIC HOUSING DEVELOPMENTS AT AREAS 4 amp 30 ndash SITE 2
PLANTING SCHEDULE TREES
CODE BOTANICAL NAME CHINESE NAME
SIZE SPACING (MM) REMARKS
Cru Crateva unilocularis 魚木 Heavy Standard
4000 On grade On podium
Ilm Ilex rotunda var microcarpa
小果鐵冬青 Heavy Standard
4000 On grade On podium
Tar Tabebuia rosea 紅花風鈴木 Heavy Standard
4000 On grade On podium
Tet Terminalia tricolor 錦葉欖仁 Heavy Standard
4000 On grade On podium
SHRUBS
CODE BOTANICAL NAME CHINESE NAME
SIZE (Ht x Sp) SPACING (MM) REMARKS
Ago Aglaia odorata 米仔蘭 600x500 600 On grade On podium
Duv Duranta repens lsquoVariegatarsquo
花葉假連翹 400x300 500 On grade On podium
Fac Fagraea ceilanica 灰莉 400x300 500 On grade On podium
Mup Murraya paniculata 九里香 600x500 600 On grade On podium
GROUNDCOVER
CODE BOTANICAL NAME CHINESE NAME
SIZE (Ht x Sp) SPACING (MM) REMARKS
Nea Nephrolepis auriculata
腎蕨 250x250 400 On grade On podium
Lis Liriope spicata 山麥冬 100x150 200 On grade On podium
Phm Phyllanthus myrtifolius
瘤腺葉下珠 200x300 400 On grade On podium
CLIMBERS
CODE BOTANICAL NAME CHINESE NAME
SIZE SPACING (MM) REMARKS
Loj Lonicera japonica 忍冬 3 shoots per plant Each shoot 1000mm long
500 On grade
Qui Quisqualis indica (red) 使君子(紅) 500 On grade
Sewerage Impact Assessment
Final Report (Issue 30)
Ref 2512197A-WS02-001B 10 WSP (Asia) Limited January 2021
4 PROPOSED SEWERAGE DISCHARGE SEWERAGE IMPACT
ASSESSMENT AND PROPOSED MITIGATION MEASURES
411 There will be 3 discharge points (ie FTH001 FTH002 and FTH006) within Site 1 which are
connecting to the existing sewage pipe along Choi Fat Street The proposed inlet FTH001 will
connect to proposed manhole WS02-FMH002 between the section of existing manhole FMH1004850 and FMH1004851 while the inlet FTH002 and FTH006 will connect to
proposed manhole WS02-FMH001 The sewage generated from the Site will be conveyed to
the SWHSTW for treatment The proposed sewerage discharge points for Site 1 are shown in
Drawing No WS02SIA005
412 For Site 2 there will 3 nos of discharge points (ie FTH003 FTH004and FTH005) within
Site 2 Through the proposed inlet FTH003 sewage flow generate will be discharged to proposed manhole WS02-FMH003 at the branch near Ka Fu Close carrying with the sewage
flow from the upstream part of the existing sewerage system It will then connect to existing
manhole FMH1004649 which will also collect the remaining sewage flow discharged from Site 2 via discharge points FTH004 and FTH005 The collected sewage flow from Site 2 will
be conveyed to the SWHSTW for treatment through a DN1800 existing sewage main trunk
along the San Wan Road The proposed sewerage discharge points for Site 2 are shown in
Drawing No WS02SIA006
413 The capacity checking on the existing sewerage system are enclosed in Appendix C
414 The sewage flow distributions for Site 1 and Site 2 are summarized in Table 41a and Table
41b respectively Peaking factors with stormwater allowance are adopted for the existing
facilities and the Development Sites The capacity checking on sewerage system under
planned scenario is enclosed in Appendix D
415 Considering the programme of the upgrading works by CE492018(CE) project might not
match with intake year of this project the assessment on the impact to existing sewerage
network due to proposed development is also included in Appendix D For the pipes reached
90 capacity or more additional checking for freeboard was also provided
416 As shown in Drawing no WS02SIA005 in order to cater for the additional sewage flow generated from Site 1 section of the proposed manhole WS02-FMH002 and existing manhole
FMH1004850 and section of FMH1004850 and FMH1004853 are proposed to be enlarged to
375mm dia and 450mm dia respectively The works will be carried out by the applicant who
is under not CEDD Agreement No CE492018 (CE)
晉科中心
深港中心
Jumbo Plaza
Hi Tech Centre
Advanced Technology Centre
A
2
8
A
2
A
3
7
A
1
6
2
A
3
8
A
1
6
3
A
3
5
A
1
6
5
A
2
8
B
A
3
6
9
6
N
u
l
l
a
h
單車徑
單車徑
C
y
c
l
i
n
g
T
r
a
c
k
C
y
c
l
i
n
g
T
r
a
c
k
E
W
C
y
c
l
i
n
g
T
r
a
c
k
彩暉街
彩園路
彩發街
彩暉街
道路
C
H
O
I
F
A
T
S
T
R
E
E
T
C
H
O
I
Y
U
E
N
R
O
A
D
R
o
a
d
C
H
O
I
S
H
U
N
S
T
R
E
E
T
C
H
O
I
F
A
T
S
T
R
E
E
T
C
H
O
I
F
A
I
S
T
R
E
E
T
Aacute Aacute
Aacute Aacute
AacuteAacute
Aacute Aacute
Aacute
Aacute
Aacute
Aacute
Aacute
AacuteAacute
Aacute
Aacute
Aacute
Aacute
AacuteAacute
AacuteAacute
Aacute
Aacute
Aacute
Aacute
Aacute
Aacute
Aacute
Aacute
Aacute Aacute
AacuteAacute
80
45
45
75
75
32
48
80
74
58
81
44
81
74
44
85
76
78
76
73
81
75
38
32
73
54
42
78
76
90
40
79
76
43
70
停車場
Car Park
H
H
H
H
H
H
H
H
H
H
H
H
H
HH
HH
H H
H H
H
HH
H
H
H
H
H
HH
HH
H
H H
H
HH
H
H
H
H
H
HH
H
H
H
L
L
L
E
L
L
L
H
L
L
H
L
L
L
L
L
L
L
L
L
L
L
L
L
L
E
E
L
H
E
H
L
L
E
L
L
H
L
E
L
L
L
H
L
L
L
L
L
E
L
L
C
U
L
C
U
L
CUL
單車徑
單車徑
行人隧道
C
y
c
l
i
n
g
T
r
a
c
k
C
y
c
lin
g
T
r
a
c
k
S
u
b
w
a
y
彩暉街
C
H
O
I
F
A
I
S
T
Aacute
Aacute
Aacute
Aacute
Aacute
Aacute
Aacute
Aacute
Aacute
Aacute
Aacute
Aacute
Aacute
Aacute
Aacute
Aacute
70
77
78
135
79
83
148
74
124
83
73
106
150
83
47
139
H
H
H
H
H
H
HH
HH
HH
H
H
H
H
H
H
H
H
L
L
L
H
H
L
L
E
L
L
L
E
L
L
E
L
L
L
L
L
導管
導管
導管
P
i
p
e
l
i
n
e
P
i
p
e
l
i
n
e
WS02SIA005
1 1000 A3
PROPOSED SEWERAGE PLAN(SHEET 1)
840 600 N
840 400 N
E
T
P
E
T
上水百佳新
鮮食品分發中心
上水貿易廣場
劍橋廣場
行政樓
上水通風大樓
第一電業大廈
嘉里貨倉(上水)
A
lp
h
a
A
p
p
li
a
n
c
e
s
B
u
i
ld
i
n
g
P
H
PH
R
C
P
C
a
m
b
r
i
d
g
e
P
la
z
a
S
h
e
u
n
g
S
h
u
i
P
la
z
a
P
a
r
k
N
S
h
o
p
S
h
e
u
n
g
S
h
u
i
F
r
e
s
h
F
o
o
d
D
i
s
t
r
i
b
u
t
i
o
n
C
e
n
t
r
e
TS
Sheung Shui Ventilation Building
K
e
r
r
y
W
a
r
e
h
o
u
s
e
(
S
h
e
u
n
g
S
h
u
i
)
PH
A
d
m
in
is
t
r
a
t
io
n
B
u
il
d
in
g
P
H
P
H
VS
t
6
2
1
3
1
8
8
2
排水口
排水口
排水口
O
u
t
f
a
ll
O
u
t
f
a
ll
O
u
t
f
a
ll
溝
M
oat
CU
L
FP
F
P
F
B
F
P
FP
FB
港鐵(東鐵綫)
港鐵(
東鐵綫)
M
T
R
(
E
a
s
t
R
a
il
L
in
e
)
M
T
R
(
E
a
s
t
R
a
il
L
in
e
)
道路
卓運街
道路
寶運路
上水東慶路
道路
新寶街
道路
道路
嘉富坊
新運路
S
A
N
W
A
N
R
O
A
D
S
A
N
P
O
S
T
R
E
E
T
P
OW
A
N
R
O
A
D
R
o
a
d
R
o
a
d
R
o
a
d
K
AF
UC
L
O
S
E
R
o
a
d
R
o
a
d
E
le
v
a
t
e
d
R
o
a
d
C
H
E
U
K
W
A
N
S
T
R
E
E
T
S
H
E
U
N
G
S
H
U
I
T
U
N
GH
IN
G
R
O
A
D
圍內村
上水鄉第八休憩處
Sheung Shui Heung Sitting-out Area No8
HeungSitting-out
AreaNo7
Wai Loi Tsuen
AacuteAacute
Aacute
AacuteAacute
Aacute
Aacute
Aacute
AacuteAacute
Aacute
Aacute
AacuteAacute
Aacute
Aacute
Aacute AacuteAacute
AacuteAacute
AacuteAacute
Aacute
AacuteAacute Aacute
AacuteAacute Aacute
Aacute Aacute
AacuteAacute Aacute
Aacute
AacuteAacute
AacuteAacute
Aacute
Aacute
Aacute
Aacute
Aacute Aacute
Aacute
AacuteAacute
AacuteAacute Aacute Aacute
Aacute AacuteAacute
Aacute
AacuteAacute
Aacute
Aacute
AacuteAacute
Aacute
Aacute
Aacute
Aacute
Aacute
Aacute
Aacute
AacuteAacute
Aacute
Aacute
Aacute
Aacute
AacuteAacuteAacute Aacute
Aacute Aacute
54
74
52
62
76
71
60
87
72
76
76
69
67
91
68
71
71
62
64
74
77
74
50
75
47
72
74
51
72
57
72
76
31
60
53
58
76
81
78
73
73
78
72
72
76
63
74
76
75
90
75
63
62
61
54
53
76
75
62
76
90
75
66
73
51
88
78
97
75
72
70
74
70
68
73
76
75
73
74
75
H
H
H
HH
H
H
H
H
H
H
HH
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
HH
H
H H
H
H
HH
H
HH
HH
HH
H
H
H
H
H
H
HH
HHH
H HH
H H
HH
H
H
H
HH
H
H
HH
H
HH
HH H
H
H
H
HH
H
H
HH
HH
H
HH
HH
H
H
H
H
HH
H
H H
E
L
E
L
L
E
L
L
L
L
L
E
E
E
H
L
L
L
H
L
L
E
L
E
L
L
E
L
H
E
L
L
E
L
E
L
L
E
L
L
H
H
H
L
L
L
L
L
L
H
L
L
L
L
L
L
L
L
E
L
L
L
E
E
H
H
L
H
L
L
L
L
E
L
H
H
E
L
E
L
L
L
L
E
L
H
H
L
L
L
L
L
E
L
L
E
L
L
L
L
L
L
L
L
L
L
缸
缸
缸缸
導管
缸
缸
缸
缸
導管
導管
缸
導管
缸
P
i
p
e
li
n
e
s
Tank
Tank
Tank
Tank
Tank
P
i
p
e
li
n
e
Tank
Tank
Tank
P
i
p
e
li
n
e
Tank
Tank
籃球場
足球場
SHR
P
R
R
RCP
F
o
o
tb
a
ll
F
ie
ld
RCP
Basketball Court
鳳溪廖萬石堂中學
東慶堂
亦園
建造業議會訓練 學院上水訓練
中華基督教會上水堂
TS
TS
TS
Fung Kai Liu Man Shek TongSecondary
School
TS
TS
Y
ic
k
Y
u
e
n
TS
T
S
Z
T
S
Z
TS
TS
TS
TS
TS
R
C
P
TS
ESS
TS
TS
TS
TS
TS
TS
TS
Construction Industry
CouncilTraining
AcademySheung Shui Tra
Centre
TS
TS
TS
TS
TS
TS
TS
TS
TS
TS
TS
TS
TS
TS
TS
T
S
TS
t
3
4
1-
2
18
3
4
-
3
3
4
5
B
2
2
9
-
2
8
6
-
4
1
7
14
8
6
B
3
6
3
5
1
5
27
11
3
2
9
-
8
6
4
0
9
2
7
1
8
41
6
38
5
2
0
17
11B
23
1
D
4
5
30
12
23
1
C
1
7
1
2
1
6
4
4
7
2
1
2
1
29
3
1
-
3
0
2
2
A
27
5
1
3
6
11
1
2
1
3
12
2
1
A
11
9
21
1A
4
9
4
1
7
A
-
7
1
6
2
13
2
7
1
4
-
1
3
1
0
5
10
4
19
2
5
2
9
34
2
1
4
5
4
3
23
6
2
2
-
2
1
17
3
4
28
1
12
7
9
34
13
2
0
22
2
7
4
1
1
4
1
1
3
5
2
6
14
5
2
A
33
32
1
0
-
6
28
3
9
4
4
8
4
1
0
1
6
2
1
2
1
5
19
21
7
417
1
1
-
1
0
9
1
6
2
4
6
4
1
0
C
1
6
1
1
2
4
31
1
1
2
1
9
11
1
3
6
28
48B
12
1
5
2
2
5
1
0
-
9
31
6
1
2
13
2
5
7
2
5
1
B
2
6
19
35
1
4
9
1
5
3
0
10
1
6
12
8
A
20
3
3
2
2
18
7
1
5
7
1
B
6
8
-
7
2
9
8
35
1
3
14
5
3
7B
8
6
32
8-
6
2
5
23
7
17
2
6
1
2
2
5
8
1
1
-
1
2
3
11
3
18
2
2
3
6
1
0
A
10
2
1
9
1
0
15
1
2
4
4
-
4
3
1
2
1
3
2
0
1
7
15
2
8
2
2
4
2
2
-
2
1
7
A
2
6
-
2
5
53
K
20
23
3
9
2
0
1
2
10
32
7
18
1
D
1
3
4
15
4
4
5
1
3
0
8
12
3
5
3
3
1
9
4
0
4
3
1
3
1
0
3
7
14
5
3
7
6-5
4A
3
1
13
5
0
A
8
5
12
1
17
3
8
3
1
B
2
2
13
3
42
3
2
5
5
A
-
52
3
9
5
6
5
2
9
-
2
8
2
A
2
0
C
-
A
2
8
11
2
-
4
2
16
B
1
8
7
3
7
2
4
1
13
2
19
8
5-
3
8
2
4
1
1
6
3
5
9
2
5
2
0
2
3
2
1
5
1
0
B 3
8
7
3
1
3
5
12
1
5
1
3
9
-
3
8
7
13
9
1
2
1
4
31
6
7
8
9
1
4
-
1
3
8
1
4
2
0
D
2
7
6
-
5
B
3
9
4
1
A26
1
5
13
17
2
3
6
16
A
1
1
4
1
9
2
4
6
4
A
3
3
16
15
6
3
0
20
18
33
1
1
-
1
0
2
4
10
29
11
1
3
2
2
3
-
1
1
6
2
9
14
4
-
3
4
7
27
1
7
11
12
3
0
13
3
4
4
1
2
6
2
4
3
12 8
7
20
1
0
3
322
11
1
4
14
6
2
A
5
21
2
2
6
5
16
36
4
1
B
-
1
A
5
-
4
8
17
2
6
1
0
-
9
5
13
1
8
9
31
18
28
8
14
2
2
36
8
14
10
1
2
34
3
2
2
4
1
8
37
8
1
9
2
3
2
6
16
9
2
1
0
A
2
3
2
8
46
1
8 8
-
7
16
6
9
14
2
1
9
1
7
6
18
3
3
3
2
2
6
-
2
5
2
2
0
2
2
4
5
2
3
0
1
4
4
2
29
12
B
827
1
5
1
0
-
1
1
3
7
2
9
4
9
7
A
91
0
8
31
22
H
H
H
W
W
W
CUL
CUL
CUL
CUL
CUL
單車
徑
單車徑
單車徑
單車徑
斜路
斜路
單車徑
單車徑
斜路
行人隧道S
u
b
w
a
y
F
P
R
a
m
p
R
a
m
p
R
a
m
p
C
y
c
li
n
g
T
r
a
c
k
C
y
c
lin
g
T
r
a
c
k
C
ycling
T
ra
ck
F
P
C
y
c
lin
g
T
r
a
c
k
F
P
C
W
F
P
F
P
FP
F
B
莆上村第五巷
莆上村第四巷
上水東慶路
莆上村第十二巷
莆上村第八巷
道路
莆上村第五巷
莆上村第十八巷
莆上村第十四巷
莆上村第七巷
莆上村第十巷
莆上村第十一巷
莆上村第十五巷
莆上村第二十一巷
莆上村第十二巷
鳳南路
寶石湖路
莆上村第十六巷
莆上村第三十巷
新豐
路
莆上村第二十九巷
莆上村第六巷
莆上村第二十巷
興仁村第五巷
莆上村第四巷
莆上村新一巷 莆上村第二巷
莆上村第十七巷
莆上村第三巷
莆上村第十九巷
鳳南里
莆上村第三十一巷
莆上村第二巷
興仁村第一巷
莆上村第一巷 興仁村第四巷
莆上村第十巷
馬會道
莆上村第七巷
興仁村第一巷
寶運路
莆上村第九巷
莆上村第二十二巷
興仁村第三巷
莆上村第二十八巷
興仁村第二巷
No
14
P
O
S
H
E
U
N
G
T
S
U
E
N
L
A
N
E
N
o
1
0
P
O
S
H
E
U
N
G
T
S
U
E
N
L
A
N
E
N
o
4
P
O
S
H
E
U
N
G
T
S
U
E
N
L
A
N
E
N
o
2
P
O
S
H
E
U
N
G
T
S
U
E
N
L
A
N
E
N
o
1
P
OS
H
E
U
N
G
T
S
U
E
N
LANE
No6
P
O
S
H
E
U
N
G
T
S
U
E
N
L
A
N
E
N
o
5
T
A
I
Y
U
E
N
T
S
U
E
N
L
A
N
E
N
o
1
T
A
I
Y
U
E
N
T
S
U
E
N
L
A
N
E
N
o
5
P
O
S
H
E
U
N
G
T
S
U
E
N
L
A
N
E
N
o
3
0
PO SHEUNG TSUEN LANE No17
P
O
S
H
E
U
N
G
T
S
U
E
N
L
A
N
E
N
o
8
P
O
S
H
E
U
N
G
T
S
U
E
N
L
A
N
E
N
o
3
1
P
O
S
H
E
U
N
G
T
S
U
E
N
L
A
N
E
N
o
12
NE
N
o
6
H
IN
G
Y
A
N
T
S
U
E
N
L
A
N
E
N
o
5
P
O
S
H
E
U
N
G
T
S
U
E
N
L
A
N
E
N
o
7
P
O
S
H
E
U
N
G
T
S
U
E
N
L
A
N
E
N
o
1
5
P
O
S
H
E
U
N
G
T
S
U
E
N
N
E
W
1
S
T
L
A
N
E
P
O
S
H
E
U
N
G
T
S
U
E
N
L
A
N
E
N
o
2
9
SAN
FUNGAVENUE
P
O
S
H
E
U
N
G
T
S
U
E
N
L
A
N
E
N
o
1
6
o
8
FUNG NAM LANE
P
O
S
H
E
K
W
U
R
O
A
D
H
IN
G
Y
A
N
T
S
U
E
N
L
A
N
E
N
o
2
P
O
S
H
E
U
N
G
T
S
U
E
N
L
A
N
E
N
o
1
1
P
O
S
H
E
U
N
G
T
S
U
E
N
L
A
N
E
N
o
1
0
P
O
S
H
E
U
N
G
T
S
U
E
N
L
A
N
E
N
o
7
J
O
C
K
E
Y
C
L
U
B
R
O
A
D
Y
UEN
TSUE
N
LA
N
E N
o
4
PO SHEUNG TSUEN LANE No19
S
UE
N LAN
E
No
7
T
A
I
Y
U
E
N
T
S
U
E
N
L
A
N
E
N
o
2
P
O
S
H
E
U
N
G
T
S
U
E
N
L
A
N
E
N
o
8
PO SHEUNG TSUEN LANE No18
R
o
a
d
H
IN
G
Y
A
N
T
S
U
E
N
L
A
N
E
N
o
3
P
O
S
H
E
U
N
G
T
S
U
E
N
L
A
N
E
N
o
1
2
P
OW
A
N
R
O
A
D
S
H
E
U
N
G
S
H
U
I
T
U
N
G
H
IN
GR
O
A
D
P
O
S
H
E
U
N
G
T
S
U
E
N
L
A
N
E
N
o
9
H
IN
G
Y
A
N
T
S
U
E
N
L
A
N
E
N
o
1P
O
S
H
E
U
N
G
T
S
U
E
N
L
A
N
E
N
o
3
P
O
S
H
E
U
N
G
T
S
U
E
N
L
A
N
E
N
o
2
8
興仁村
莆上村
上水鄉第五休憩處
莆上村
鳳南路花園
上水堂幼稚園
上水鄉第九休憩處
香港
警務處大
埔警區少
年警訊會
所
上水鄉第十休憩處
Sheung Shui
HeungSitting-outArea
No5
Po Sheung Tsuen
Po Sheung Tsuen
Fung Nam Road Garden
H
o
n
g
K
o
n
g
P
o
lic
e
F
o
rc
e
T
a
i
P
o
D
is
tr
ic
tJ
u
n
io
r
P
o
lic
e
C
a
ll
C
lu
b
h
o
u
s
e
Sheung Shui ChurchKindergarten
Hing YanTsuen
Sheung Shui
HeungSitting-out
Area No9
Sheung Shui
HeungSitting-out
AreaNo10
AacuteAacute
Aacute
AacuteAacute
Aacute
Aacute
AacuteAacute
AacuteAacute
AacuteAacuteAacute
Aacute
Aacute
Aacute
AacuteAacuteAacute
Aacute
AacuteAacute
Aacute
Aacute
Aacute
Aacute
Aacute AacuteAacute Aacute
Aacute
Aacute
Aacute
AacuteAacuteAacute
Aacute
Aacute
Aacute
Aacute
AacuteAacute Aacute
AacuteAacute
AacuteAacute
Aacute
Aacute
AacuteAacute
Aacute
Aacute
AacuteAacute
AacuteAacute
Aacute
Aacute
Aacute
Aacute
Aacute
Aacute
AacuteAacute Aacute
Aacute AacuteAacute
Aacute
Aacute
Aacute
Aacute
AacuteAacute
Aacute
Aacute
79
56
78
73
74
89
101
73
82
89
52
49
76
81
76
77
53
49
101
78
103
52
52
73
77
79
79
48
88
80
87
52
50
66
53
82
53
84
76
78
64
56
70
53
82
60
85
53
76
87
80
48
54
61
82
84
56
51
82
79
54
73
85
71
78
76
92
54
76
91
108
65
86
75
52
51
51
86
p
G
G
G G
ccedil
ccedil
H
HH
HH
H
H
H
H
H
H
H
H
HH
H
H
H
H
H
H
H
H
H
HH
H H
H
H
HHH
HH H
H HH
H
H
HH
HH
HH
H HH
HHHH
HH
HH
HH
H
HH
HH
H
H
HH H
HHHH
HH
HH
HH H
HH
HH
H
HHH
HH
HH
HH
H
HH
H
HH
H
H
H
HH
H
H
HH
H
HH
HH
HH
HH H
HH
H
HH
L
L
H
L
L
L
L
L
L
L
E
L
L
L
H
L
L
E
L
L
L
L
L
L
L
L
L
L
L
L
L
L
H
L
L
L
L
L
E
H
L
L
L
L
L
L
L
H
L
L
L
L
L
L
E
L
L
H
E
L
L
L
L
L
L
L
L
H
L
L
E
L
L
L
L
L
L
L
L
E
H
L
L
L
L
L
L
L
EL
L
L
L
L
L
H
L
L
H
L
L
L
L
L
L
L
L
H
L
L
E
L
H
H
L
L
E
H
E
L
L
L
LL
E
LWT
SHR
SHR
SHR
籃球場
足球場
P
Football Field
SHR
R
R
P
R
R
R
R
R
R
R
R
C
P
SHR
R
R
P
Basketball Court
R
R
R
SHR
R
松柏塱雨水泵房
晉科中心
劍橋廣場
深港中心
TS
TS
RCP
TS
T
S
T
S
TS
T
S
T
S
Z
Stormwater Pumping Station
TS
TS
T
S
T
S
TS
C
a
m
b
r
i
d
g
e
P
la
z
a
T
S
TS
Jumbo Plaza
V
O
TS
T
S
TS
T
S
Z
TS
TS
TS
Hi Tech Centre
TS
Advanced Technology Centre
TS
TS
TS
TS
TS
t
t
t
t
t
C
5
9
A2
A
1
B
1
0
4
B
6
7
C
1
9
C
7
4
C
4
4
C
6
1
C
5
7
3
B57
1
3
A6
C
4
7
B
3
3
A
5
1
1
1
B
7
C
8
1
3
20
B
6
5
B35
C
4
1
2-1
A
1
0
A
2
8
C
14
B15
6
B
1
3
1
A
4
3
13
D
2
20
21
2
213
15
C
5
8
10
A
6
3
B7A
7
1
0
3
18
B
9
5
B74
B
1
0
8
C
1
0
C
9
0
C8
8
B
9
4
131
C
4
B1
A
5
5
A34
9
8
B39
B
2
6
6
22
C
7
7
A32
B79A
2
1
A
17
B
1
0
6
B
2
3
C
8
6
B
6
8
A7C
B
6
4
C89
C2
2
B
7
7
C
2
8
A
5
0
11
A67
B11
17
B
4
5
A
2
8
A
C
6
7
2
3
B
8
0
C
2
5
C
4
8
C
5
2
C
9
1
C
7
2
2
C
3
6
B
8
3
A
6
9
B
4
3
18
C
1
1
5
1
1
0
2
C
1
0
5
B
8
8
A
3
7
C
3
5
C
2
4
B10
1
4
A
7
9
A
6
1
6
B109
C
5
1
1
0
C
6
0
C
3
7
10
A
5
2
A
2
1
B
9
2
C
2
9
B12
1
0
1
1
0
4
1
5
C8
7
B
8
7
A
5
B
6
6
B28
B
2
7
C
6
9
B
5
5
15
B1A
C
7
3
A
196
9
A
16
2
C
5
0
B
6
3
B
8
5
3
7
B
5
1
B
2
9
2
C
7
22
20
9
B76
4
A
3
8
8
C
4
2
A
7
B
7
A
4
B
8
C
116
C
2
1
3
B
9
3
1
B
1
0
5
16
2
4
C
2
B
2
4
-
B
2
5
5
A
15
8
A
5
7
9
A70
B19
C
1
1
0
C
7
1
8
A33
B14
2
3
136
A53
B
4
2
B
2
0
A
7
8
C
6
4
B
7
0
9
B
3
3
1
1
A
1
6
3
C
7
6
C
3
2
B4
11
14
A
6
2
D
12
C
1
3
22
B
5
0
A
1
0
0
B100
A
4
1
C
3
8
12
1
7
C
4
9
C
8
4
A
5
1
B
9
0
2
A
5
6
C
6
3
B
6
0
B
5
9
138
1
2
1A
A
18
C
4
5
B
4
7
A
7
F
A
2
6
A
7
5
A22
1
9
9
B
132
211
C
1
0
7
B
5
8
2-
1
135
8
4
2
A35
A
3
9
8A
24
17
A
5
9
A13
B
4
0
C
7
5
B9
A
5
8
11
12
B107
B31
11
A
1
6
5
B
4
8
6
A
6
0
A8
5
1
A3
B
5
6
4
A71
A1
1B
A7D
B
8
6
1
1
0
1
9
C
1
C
15
1
4
16
3
B13
B
9
7
B
6
9
1
9
133
B72
1
11
2
A
2
8
B
C
8
5
C
5
3
B
1
3
2
B38
B
2
2
2
C
3
1
B
5
3
2
1
A
6
5
C
3
4
A
4
6
1
B
8
2
D
1
1
1
0
5
A
7
E
B2
B
3
3
B
C
1
2
B18
2
3
D
8
7
B
6
1
A
3
6
C
1
1
1
B5
C
4
0
12
C
3
3
B
4
9
B
9
1
B
1
0
1
A72
7
C6
8
1
9
9
A
B
7
8
A11
B3
9
A190
B
8
1
A31
6
1
0
B
5
2
B
4
6
D
1
C
3
9
1
8
8
B
1
7
A
19
A
7
7
A20
8
13
B
1
0
3
B
1
6
C
6
6 A16
19
1
2
A
1
4
15
5
B6
B
7
3
A
4
5
C
3
B96
A
2
3
14
A9
16
A
13
A
C
10
3
C
3
0
C
7
0
B
4
4
4
B1B
B
3
7
7
7
1
4
16
B
7
9
6
1
0
15
A
6
6
B
2
1
B
6
2
C
1
0
6
C
4
6
A191
B36
C
8
0
5
18
A
7
6
C
8
3
B
5
4
A
7
3
B
10
2
13
9
C
11
C
6
C
5
C
4
3
A
7
C
8
1
1
3
C
1
8
A12
6
B32
C
6
5
21
C
2
3
6
34
B30
10
B
8
4
H
H
H
H
H
H
H
H
W
W
W
W
W
渠
渠渠
渠
CUL
PO
CUL
CUL
CUL
CU
L
N
u
lla
h
CUL
O
Nullah
CUL
CUL
N
u
ll
a
h
CUL
O
CUL
N
u
lla
h
CUL
CUL
斜路
單車徑
斜路
單車徑
單車徑
Ramp
FP
C
y
c
lin
g
T
r
a
c
k
F
P
F
P
F
B
E
W
F
B
FP
F
P
F
P
C
y
c
lin
g
T
r
a
c
k
E
W
R
a
m
p
C
ycling
Track
F
P
R
a
m
p
FP
F
P
客家圍
Hak Ka Wai
港鐵(東鐵綫)港
鐵(東鐵綫)
M
T
R
(
E
a
s
t
R
a
il
L
in
e
)
M
T
R
(
E
a
s
t
R
a
il
L
in
e
)
大頭嶺第二巷
彩順街
道路
大頭嶺第二巷
彩暉街
彩園路
大頭嶺第四巷
道路
道路
大頭嶺第五巷
彩發街
新運路
大頭嶺第三巷
大頭嶺第四巷
泥路
大頭嶺第六巷
大頭嶺第一巷
彩暉街
大頭嶺第八巷
道路
彩發街
道路
道路
道路
大頭嶺第七巷
道路
道路
道路
大頭嶺第三巷
TA
I
TA
U
LE
NG
4
TH
L
AN
E
C
H
O
I
F
A
T
S
T
R
E
E
T
C
H
O
I
Y
U
E
N
R
O
A
D
R
o
a
d
R
o
a
d
R
o
a
d
TA
I
TA
U
LE
NG
1
ST
L
AN
E
Road
T
r
a
c
k
TA
I T
AU
L
EN
G
3R
D
LA
NE
R
o
a
d
NLING
GHWAY
TA
I
TA
U
LE
NG
2
ND
L
AN
E
C
H
O
I
S
H
U
N
S
T
R
E
E
T
R
o
a
d
C
H
O
I
F
A
T
S
T
R
E
E
T
R
o
a
d
R
o
a
d
TA
I
TA
U
LE
NG
7
TH
L
AN
E
TA
I
TA
U
LE
NG
5
TH
L
AN
E
TAI
TA
U
LE
NG
2N
D
LA
NE
R
o
a
d
S
A
N
W
A
N
R
O
A
D
R
o
a
d
TA
I
TA
U
LE
NG
4
TH
L
AN
E
TA
I
TA
U
LE
NG
8
TH
L
AN
E
TA
I
TA
U
LE
NG
3
RD
L
AN
E
TA
I
TA
U
LE
NG
6
TH
L
AN
E
C
H
O
I
F
A
I
S
T
R
E
E
T
Road
f
消防處坍塌搜救專隊訓練場
大頭嶺
上水救護站
Fire Services
DepartmentTraining Ground
forUrban Search amp Rescue
Team
Sheung Shui Ambulance Depot
W
IP
M
a
r
2
0
1
9
Tai Tau Leng
Aacute
Aacute
Aacute
Aacute
Aacute Aacute AacuteAacute
Aacute
Aacute
AacuteAacuteAacute
Aacute
Aacute
AacuteAacute
Aacute
Aacute
Aacute AacuteAacute
AacuteAacute Aacute
Aacute
AacuteAacute
Aacute
Aacute
AacuteAacute
AacuteAacute
Aacute
Aacute
AacuteAacute
AacuteAacute
Aacute
Aacute
Aacute
AacuteAacuteAacute
Aacute Aacute
Aacute
AacuteAacute
Aacute Aacute
AacuteAacute
AacuteAacute
AacuteAacute
Aacute
Aacute
AacuteAacute
Aacute
Aacute
Aacute
AacuteAacuteAacute
AacuteAacute
Aacute AacuteAacute
Aacute AacuteAacute Aacute
Aacute
AacuteAacute Aacute
AacuteAacute
AacuteAacute
Aacute
Aacute Aacute
Aacute
Aacute
AacuteAacute
Aacute
Aacute
Aacute
Aacute
AacuteAacute
AacuteAacute
Aacute
AacuteAacuteAacute Aacute
Aacute
Aacute
Aacute Aacute
Aacute
Aacute
AacuteAacute
AacuteAacute
Aacute
AacuteAacute
Aacute
Aacute
AacuteAacute
Aacute
AacuteAacute
Aacute
AacuteAacuteAacute
Aacute
Aacute Aacute
Aacute AacuteAacute
Aacute
Aacute
Aacute
AacuteAacute
AacuteAacute
Aacute
AacuteAacute
Aacute
AacuteAacute
Aacute
Aacute
Aacute
Aacute
AacuteAacute
AacuteAacute
Aacute
AacuteAacute
Aacute Aacute
AacuteAacute
Aacute
AacuteAacuteAacute
Aacute
Aacute
AacuteAacute
Aacute AacuteAacute
AacuteAacuteAacute
Aacute
Aacute
Aacute
Aacute
AacuteAacute
AacuteAacute Aacute
Aacute
Aacute
AacuteAacuteAacute
Aacute
Aacute
54
54
72
52
31
74
80
43
75
64
77
84
45
90
25
72
45
45
66
56
39
42
43
86
71
75
75
39
60
65
62
41
60
36
83
63
69
32
53
66
83
33
48
64
56
33
37
77
54
80
48
42
76
57
74
63
40
24
46
76
88
58
78
67
44
26
48
75
81
44
71
56
70
81
46
74
43
68
77
78
79
44
56
52
63
64
53
57
60
34
79
62
77
74
52
90
43
67
32
61
60
43
72
58
85
62
46
56
55
76
55
76
44
45
71
76
77
78
42
46
50
78
76
74
45
61
42
56
44
40
55
63
54
70
90
73
65
64
81
75
78
38
89
77
79
32
45
44
73
56
38
76
77
54
56
42
65
78
44
55
53
52
41
76
90
55
40
76
92
42
58
79
76
89
46
61
69
61
48
41
71
58
73
75
43
77
77
63
74
187
53
69
45
70
83
停車場
Car Park
GG
G
GG
G
H
H
H
H
H
HH
H
H
H
H
H
H
H
HH
H
H H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
HH
HH
HH
HH
HH
H
H
H
H
H
H
H
H
H
HH
H
HH
H
H
H
H
H
H
H
H
H
H
H
H
H
H H
H
H
HH
HH
H
H
H
H
H
H
H
H
HH
H
H
H
H
HH
HH
HH
H
HH
H
H
HHH
H
H
H
H H HHH
HH
H HH
H
H
H
H HH
H
H H
H
H
H
H
H
HH
H
HH
H
H
H
HH
H H
H
H
H
HH
H
H
H
H H
H
H
H
HH
H
H
HHH
H
H
HH
H
H
H
HH H
H
HH
HH
H
HH
H
HH
H
HHH
H
H
H
H
HH
H
H
H
H
H
H
H
L
L
E
H
L
L
L
L
L
L
L
H
L
L
L
L
E
E
L
L
L
E
L
L
L
L
L
L
E
H
L
L
ET
L
L
H
L
L
E
H
L
L
L
L
L
L
L
L
L
L
L
L
H
L
L
L
L
L
E
L
L
L
L
L
L
L
L
L
L
L
L
E
L
L
E
L
E
L
L
L
L
E
L
E
L
L
H
E
E
H
L
L
H
L
L
L
E
H
L
L
H
L
L
L
L
L
L
E
E
L
L
L
L
L
L
L
H
L
L
L
L
E
L
L
L
E
H
L
ET
ET
H
L
L
L
E
H
L
L
L
L
L
L
L
E
L
E
L
E
L
L
L
E
L
H
H
L
L
L
L
L
L
L
L
L
E
L
L
L
H
L
L
L
L
E
L
L
L
L
ET
E
L
E
E
L
E
L
E
L
E
ET
E
L
L
L
L
L
L
L
L
E
E
導管
導管
導管
Tank
Tank
Tank
Tank
P
ip
e
lin
e
s
Tank
P
ip
e
lin
e
Pipelines
P
ip
e
lin
e
SHR
籃球場
溜冰場
P
SHR
P
P
Basketball Court
Skating
Rink
RCP
P
SHR
新豐大廈
新財樓
平台
孝思堂
大江樓
旭日國際中心
慎忠樓
上水廣場
發誠
新寶大廈
慶豐樓
石湖墟福音堂
彩屏樓
多層停車場
全和大樓
滿華大廈
金誠樓
平台
泰豐樓
張知行大廈
中電北區辦事處上水運作中心
明珠華軒
慶雲樓
彩晶閣
寶禧樓
彩玉樓
新勤樓
平台
上水區鄉事委員會
彩瑩閣
石湖樓
石湖墟郵政局
德豐樓
彩碧閣
品聯樓
金
湖
富興樓
平台
S
h
e
k
W
u
H
u
i
P
o
s
t
O
f
f
i
c
e
Podium
TS
TS
K
en
t
w
oo
d
P
l
ES
S
TS
E
a
r
ly
L
i
g
h
t
I
n
t
e
r
n
a
t
i
o
n
a
l
C
e
n
t
r
e
T
S
S
h
e
k
W
u
H
u
i
G
o
s
p
e
l
H
a
ll
Sheung ShuiRural
Committee
TS
Choi Ying House
TS
P
o
d
iu
m
M
o
o
n
W
a
h
B
u
i
ld
i
n
g
TS
E
T
Choi Ching House
PH
Choi Pik House
Pearl Vista
Choi Ping House
SanFungBuilding
ET
Podium
TS
ESS
Multi-storey Car Park
T
S
N
o
r
t
h
R
e
g
i
o
n
O
f
f
i
c
e
S
h
e
u
n
g
S
h
u
i
D
e
p
o
t
Landmark North
T
S
TS
Choi Yuk House
t
t
4
1
7
68
8-6
7
40
4
8
-
4
4
A
6
7
1
8
56
19
66
1
1
33
1-
3
79
1
5
31
41B-41A
1
4
2
5
8
0
5
26
2
1
7
6
1
4
1
2
0
-
1
1
2
1
2
1
9
58
18
24
8
28
3
8
-
3
6
5
49-47
84-82
24
1
0
1
7
2
7
3
1
70
2
4
49
10
2
2
4
27
2
6
17
3
2
9
81
6
45
94
2
0
4
44
87
10
8
2
1
9
105
78
11
54
7
-
9
2
39-31
7
2
1
6
23
1
5
5
28
15
26
2
1-3
3
6
-
3
7
B
3
12
61
18
3 7
126
12
128
2
8
10
16
1
1
3
4
4
-
4
0
2
7
-
3
5
3
8
30
34
2
2
30
3
0
11
13
2
0
C
2
20B
2
12
3
6
-
4
0
78
9
15
2
1
6
84
7
5
-
7
3
1
4
11
21
76
1
0
0
-
9
8
115
3
8
5
5
5
10
1
0
3
-
9
7
5
0
-
5
2
2
1
1
7
28
5
64
77
122
111
4
18
22
6
2
5
A
-
2
5
C
19
57
2
18
19-15
1
4
1
4
3
3
2
2
5
2
0
1
3
0
117
7
32
2
3
6
45-43
2
7
3
7-
9
3
0
53
68
6
1
9
2
3
24
9
1
1
3
1
8
2
3
20
2
69
8
2-
4
2
1
1
8
1
5
1
9
5
70
39
2
5
4
5
1
2
0
110-106
7
6
-
7
4
17
2
3
-
3
3
4
14
2
6
9
65
124
7
6
22
13
2
-
1
1
-
5
132
6
27-21
107
4
1
6
2
9
2
6
-
3
4
1
74
26
1
1
3
4
2
8
16
4
3
2
4
-
3
4
6
7
2
1
5
4
2
0
2
2
86
1
2
1
3
3
36
4
-
6
1
3
2
1
9
1
0
9
14
1
6
7
80
9
5
1
0
4
-
1
0
2
7
1
34
140-134
6
6
3
20
7
4
5
1
0
11
8
1
2
4
7
119
2
1
H
CUL
PO
C
U
L
C
U
L
CUL
C
U
L
CUL
CUL
CUL
CUL
CUL
單車徑
單車徑
單車徑
單車徑
單車徑
單車徑
單車徑
單車徑
單車徑
單車徑
單車徑
斜路
斜路
單車徑
行人隧道
單車徑
斜路
單車徑
單車徑
行人隧道
單車徑
單車徑
斜路
F
P
C
y
c
lin
g
T
r
a
c
k
E
W
FP
F
P
F
B
F
P
C
y
c
lin
g
T
r
a
c
k
R
a
m
p
Cycling Track
FP
R
a
m
p
C
y
c
li
n
g
T
r
a
c
k
C
y
c
lin
g
T
r
a
c
k
C
y
c
lin
g
T
r
a
c
k
F
P
F
P
FP
Cycling Track
F
P
FP
R
a
m
p
FP
C
y
c
lin
g
T
r
a
c
k
FP
C
y
c
li
n
g
T
r
a
c
k
C
y
c
li
n
g
T
r
a
c
k
EW
C
y
c
li
n
g
T
r
a
c
k
E
W
FP
Subway
CW
CW
R
a
m
p
F
P
C
y
c
lin
g
T
r
a
c
k
FP
EW
C
y
c
lin
g
T
r
a
c
k
F
P
C
y
c
li
n
g
T
r
a
c
k
E
W
C
y
c
lin
g
T
r
a
c
k
F
P
F
P
E
W
C
y
c
lin
g
T
r
a
c
k
EW
S
u
b
w
a
y
C
y
c
li
n
g
T
r
a
c
k
C
W
港鐵(東鐵綫)
港鐵(東鐵綫)
M
T
R
(
E
a
s
t
R
a
il
L
in
e
)
M
T
R
(
E
a
s
t
R
a
il
L
in
e
)
DD
D
D
D
符興街
永生街
彩園路
嘉富坊
嘉富坊
新財街
彩暉街
新樂街
巡撫街
道路
道路
寶石湖路
巡撫街
新運里
寶石湖路
高架道路
新豐路
新康街
新成路
新運路
道路
新
莆上村第二十七巷
新健街
新勤街
寶運路
新運路
道路
寶運路
高架道路
龍琛路
新發街
SAN HONG STREET
P
O
S
H
E
U
N
G
T
S
U
E
N
L
A
N
E
N
o
2
6
Ro
ad
LUNG
SUM
AVENUE
C
H
O
I
Y
U
E
N
R
O
A
D
C
H
O
I
F
A
I
S
T
SAN SHING AVENUE
E
le
v
a
t
e
d
R
o
a
d
K
A
F
U
C
L
O
S
E
S
A
N
W
A
N
L
A
N
E
S
A
N
W
A
N
R
O
A
D
Road
P
OW
AN
R
O
A
D
FU
HING
STREET
SAN KIN STREET
W
I
N
G
S
H
A
N
G
S
T
P
O
S
H
E
U
N
G
T
S
U
E
N
L
A
N
E
N
o
2
7
SAN
F
U
N
G
A
V
E
N
U
E
S
A
N
T
S
O
I
S
T
R
E
E
T
S
A
N
F
A
T
S
T
R
E
E
T
Road
K
AF
UC
L
O
S
E
Elevated Road
S
A
N
K
A
N
S
T
R
E
E
T
Road
M
A
N
S
H
A
N
G
S
T
T
S
U
N
F
U
S
T
R
E
E
T
S
A
N
W
A
N
R
O
A
D
T
S
U
N
F
U
S
T
R
E
E
T
PO
WAN
ROAD
P
O
S
H
E
K
W
U
R
O
A
D
PO
SHEK
WU
ROAD
P
O
S
H
E
U
N
G
T
S
U
E
N
L
A
N
E
N
o
2
5
遊樂場
遊樂場 彩蒲苑
遊樂場
九龍巴士
(一九三三)有限公司上水石湖墟廠
上水單車匯合中心
遊樂場
龍霞樓
市場
遊樂場
上水蔬菜產銷貸款有限責任合作社
石湖墟遊樂場
大頭嶺休憩處
遊樂場遊樂場
石湖墟賽馬會遊樂場
Playground
T
a
i
T
a
u
L
e
n
g
S
i
t
t
i
n
g
-
o
u
t
A
r
e
a
Playground
The Ko
wloon M
otor
Bus Co (1933) Ltd
Shek Wu Hui Depot Bazaar
Sheung Shui Cycling
Entry Exit Hub
S hek Wu Hui P lay
Playground
Playground
Playground
L
u
n
g
H
a
B
u
i
l
d
i
n
g
CHOI PO COURT
Playground
Playground
Shek Wu Hui Jockey Club Playground
WIP Dec 2018
Aacute
Aacute
Aacute
AacuteAacute
Aacute AacuteAacute
Aacute
AacuteAacuteAacute
Aacute
Aacute
Aacute
Aacute
Aacute
Aacute
Aacute
AacuteAacute
Aacute
Aacute
AacuteAacute
Aacute
AacuteAacute
Aacute
Aacute
Aacute
Aacute
Aacute
Aacute
Aacute
AacuteAacute
Aacute
Aacute
AacuteAacute
AacuteAacute
AacuteAacute
Aacute
Aacute
Aacute
Aacute
AacuteAacute
AacuteAacuteAacute
Aacute
Aacute
Aacute
Aacute
AacuteAacute
Aacute
Aacute AacuteAacute
Aacute
Aacute Aacute
AacuteAacute
AacuteAacute
Aacute
AacuteAacute
AacuteAacute
Aacute
Aacute
Aacute
AacuteAacute
Aacute
AacuteAacute
AacuteAacute
Aacute Aacute
Aacute
AacuteAacute
Aacute
Aacute
Aacute Aacute
Aacute
Aacute
Aacute Aacute
AacuteAacute
Aacute
AacuteAacuteAacute
Aacute
AacuteAacute
AacuteAacuteAacute
Aacute
AacuteAacute
AacuteAacute
Aacute
Aacute AacuteAacute
Aacute
Aacute AacuteAacuteAacute
Aacute
AacuteAacute
Aacute
Aacute
Aacute
AacuteAacuteAacute
Aacute
AacuteAacute
Aacute
Aacute
AacuteAacuteAacute
AacuteAacute Aacute
Aacute
Aacute
Aacute
AacuteAacute
AacuteAacute
Aacute Aacute
AacuteAacute
AacuteAacute
Aacute
AacuteAacute
Aacute Aacute
AacuteAacute
Aacute
Aacute Aacute
Aacute Aacute
AacuteAacute Aacute
Aacute
Aacute AacuteAacute
Aacute
Aacute
Aacute
Aacute
Aacute
Aacute
Aacute
Aacute
Aacute
Aacute
Aacute
Aacute
Aacute
70
77
88
62
74
86
81
71
80
88
74
77
80
65
77
78
70
78
135
76
79
82
75
81
124
96
83
75
85
92
74
77
148
85
79
162
78
98
81
85
86
148
74
85
92
79
76
73
79
81
73
156
74
79
78
70
70
80
124
62
80
82
79
86
79
73
80
78
79
148
79
78
94
83
67
77
75
80
80
81
74
81
96
78
76
108
85
84
78
53
90
78
80
72
49
82
73
75
78
61
82
71
82
83
78
176
79
81
79
77
78
106
76
62
86
78
83
75
90
67
76
89
81
80
74
80
94
87
81
87
79
77
78
150
90
81
73
75
75
89
76
48
73
85
80
90
92
156
77
77
75
85
91
77
79
78
74
84
94
82
61
93
83
76
156
90
47
62
92
76
79
77
76
75
78
81
74
90
61
72
77
52
76
82
78
79
91
81
139
71
(下層巴士總站)
(Bus Terminus under)
月台
停車場
月台
停車場
Car Park
P
la
t
f
o
r
m
Car Park
P
la
t
f
o
r
m
G
G
G
H
H
H
H
H
H
H
H
H
H
H
H
H
H
HH
H
H
HH
HH
H
H
H
H
H
H
H
H
H
H
H
H
H
HH
H
H
H
HH
H
H
H
H H
H
H
H
H
H
H
H
H
H
H
H
H
HH
H
H
H
H
H
H
H
H
H
H
H
H
HH
H
H
HH H
H
HH
H
HH
H H
HH
H
H
H
H
H
HH
H
H
HHHH
HH
HH
HH
HH
H
H
HH
H
HHH
H HHH
H HH
H
H
H
HH H
H H
HH H
H
H
H
HH H
HHH
H
H
H H H
HH
HHH H
H H
HH
H HH
H
HH
HH
HH
HHH
HH
HHH
HH
H
H
HH
HH
H
H
HHH
H H
HH
HH H
H
H
H
H
H
H H
H
HHH
HH
H
HH
H
HH
H
H HH H
H H
H
HHH
HH
HH
H
H
H H
H
H HH H
H
H
HH H
HH
HH
HH
H
HH
H
H
H HH
HH H
H
H
HH
HH H
H
H H
HH H
HH H
H
H
HHH
H
H
HH
H HH
HH
HH H
H HH
H
H
H
H
H
H H
H
H
HHH
H
HH
HH
H H
HH
H
H
H HH
HH
H
HH
HH
HH
HH
H
HH
H H
HH
L
L
H
L
E
L
L
L
L
L
L
H
L
L
E
L
L
L
L
L
L
L
L
L
H
L
L
L
L
H
L
H
L
L
L
L
L
L
L
L
L
H
L
L
L
L
H
L
L
L
E
L
H
E
E
L
L
H
L
L
L
L
L
L
H
L
L
E
E
L
E
L
L
L
L
L
L
L
L
L
L
L
L
L
E
L
L
H
E
L
H
L
L
L
L
L
L
L
L
L
L
L
E
E
L
L
L
E
E
L
L
L
L
H
E
L
L
L
H
E
L
L
E
L
L
H
L
E
L
L
L
H
E
L
L
L
L
L
L
H
L
L
L
L
L
L
L
L
L
L
L
H
L
H
L
L
L L
H
L
H
H
L
L
L
L
L
L
L
L
L
L
L
L
H
L
L
L
L
E
L
L
L
H
L
L
L
L
L
L
L
L
L
L
L
L
L
H
L
L
L
L
L
L
L
L
E
L
L
H
L
L L
L
L
L
H
H
L
H
E
L
L
L
H
L
L
L
L
L
E
E
L
L
L
L
L
L
L
L
L
L
H
H
L
L
L
L
L
L
L
L
L
L
H
L
H
H
L
L
H
H
L
L
L
L
H
E
L
L
E
L
L
H
L
L
L
L
L
H
L
L
L
L
L
L
L
L
E
L
L
L
L
H
L
H
L
L
L
L
L
L
L
L
L
L
L
L
L
L
E
L
L
L
L
H
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
E
L
L
L
H
L
L
H
L
E
L
導管
導管
導管
導管
導管
P
ip
e
lin
e
P
ip
e
lin
e
s
P
ip
e
lin
e
s
P
ip
e
lin
e
SHR
TS
TS
TS
TS
TS
TS
TS
TS
TS
TS
TS
PH
TS
1
3
9
4
0
5
172
A
10
6
15
0
15
2
4
0
6
15
1
4
0
7
160
15
3
106
4
0
9
A103
161
C
C
H
渠
渠
CUL
CUL
Nullah
N
u
ll
a
h
CUL
CUL
行人隧道
單車徑
單車徑
S
u
b
w
a
y
FP
F
P
F
P
FP
C
y
c
lin
g
T
ra
c
k
Cycling Track
露天貨倉Open Storage
粉嶺公路
道路
道路
道路
高架道路
青山公路 -古
段
Ro
ad
E
le
v
a
t
e
d
R
o
a
d
R
o
a
d
CASTLE
PEAKROAD
-
KW
UTUNG
F
A
N
L
IN
G
H
IG
H
W
A
Y
Road
E
Aacute
AacuteAacute
AacuteAacute
Aacute
Aacute
Aacute
AacuteAacute
Aacute
Aacute
AacuteAacute
AacuteAacute
AacuteAacute
Aacute
AacuteAacute
AacuteAacute
Aacute AacuteAacute
Aacute
Aacute
AacuteAacute
AacuteAacute
Aacute
Aacute
Aacute
Aacute
67
158
65
73
108
118
121
126
88
140
51
81
62
105
80
101
69
106
77
90
54
90
74
68
87
76
178
70
89
163
63
78
89
102
81
93
103
G
H
H
HH
H
H
H
H
HH
H
HH
HH
H
H
H
H
H
HH
HH
H
HH
HHH
H
H H
H H
HH
HH
HH
H
HH
H H
H
HH
H
HH
HH H
H
HH
HH
H
H
H
H H
H
HH
H
H
L
H
H
L
L
L
L
L
L
L
L
L
L
L
L
L
E
L
L
L
H
ET
L
L
H
L
L
L
L
L
L
E
L
E
L
L
L
E
L
L
L
L
E
L
L
L
L
H
E
L
L
L
L
L
L
H
L
L
L
L
L
L
L
L
E
L
L
L
門球場
GateballCourt
P
RCP
平台
(下層停車場)
彩珠樓
明湖閣
佛教沈東福幼稚園
彩園廣場
上水站
平台
唐湖閣
彩園邨美食中心
彩顏閣
清湖閣
平台
漢湖閣
(下層市場及停車場)
彩麗樓
彩湖樓
Podium
Choi Ngan House
Choi Yuen Food Court
Tong Wu House
Choi Yuen Plaza
(Market amp Car Park under)
Choi Lai House
Podium
Sheung Shui Station
Choi Chu House
Ming Wu House
Podium
Hon Wu House
Ching Wu House
ESS
Choi Wu House
162
1
0
單車徑
單車徑
單車徑
單車徑
行人隧道
斜路
斜路
C
W
EW
Ramp
EW
C
y
c
lin
g
T
r
a
c
k
Sub
wa
y
EW
C
y
c
li
n
g
T
r
a
c
k
FP
F
P
C
y
c
li
n
g
T
r
a
c
k
R
a
m
p
C
y
c
li
n
g
T
r
a
c
k
CW
CW
EW
EW
b
w
ay
CW
D
D
彩園路
高架道路
道路
寶石湖路
道路
道路
E
le
v
a
t
e
d
R
o
a
d
Road
C
H
O
I
Y
U
E
N
R
O
A
D
Road
Road
P
O
S
H
E
K
W
U
R
O
A
D
遊樂場
遊樂場
遊樂場
遊樂場
遊樂場
遊樂場
遊樂場
旭埔
遊樂場
遊樂場
旭埔苑
遊樂場
遊樂場
彩園邨
遊樂場
遊樂場
Playground
Playground
Playground
Playground
Playground
Playground
Playground
P
la
y
g
r
o
u
n
d
CHOI YUEN ESTATE
Playground
YUK PO COURT
Playground
Playground
Playground
Playground
YUK P
Aacute
Aacute
Aacute
Aacute
Aacute
Aacute
Aacute
AacuteAacute
Aacute
Aacute
Aacute
Aacute AacuteAacute
Aacute
Aacute
Aacute
Aacute
Aacute
Aacute
AacuteAacute
Aacute
AacuteAacute
Aacute
Aacute
95
168
87
89
89
89
89
108
87
88
93
88
88
88
89
89
89
95
78
172
167
153
96
91
91
89
82
55
87
(下層巴士總站)
(Bus Terminus under)
H
H
H
H
H
H
H
H
H
H
H
H
HHH
H
HHH
H HH
H
HH
HH
H
H
HH
HH
H
H
H HH
H
H
HH
H
HH
H HH
HH H
HH
H H
H
HH
H H
H
H
H
HHH
H
H
H
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
H
L
L
L
H
L
H
L
L
L
H
L
L
H
H
L
L
L
L
H
L
H
L
H
L
L
L
L
H
L
L
L
H
L
L
840 600 N
840 500 N
83
0 6
00
E
83
0 5
00
E
83
0 7
00
E
83
0 8
00
E
HOUSING DEPARTMENT
Term Engineering Consultancy Services for
2512197A
CB 20180307
New Territories East Region (2018-2020) -
Instruction No WS02 - Proposed Public
Housing Development Sites 1 amp 2
in Sheung Shui Areas 4 and 30