S-band BPM at KNU 2008. 8. 27 Hyoung Suk Kim KNU

description

S-band BPM at KNU. 2008. 8. 27 Hyoung Suk Kim KNU. Left_Cap. Left_Support. Center_Frame. Right_Cap. S-band BPM. Dipole mode. 4. 1. 3. 2. 3-D Measurement for the Laser Alignment. #1SM-BPM. 1. * designed length = 18.0 mm. reference point. a. b. c. h. 4. 2. g. d. f. e. 3. - PowerPoint PPT Presentation

Transcript of S-band BPM at KNU

Page 1: S-band BPM at KNU

S-band BPM at KNU

2008. 8. 27Hyoung Suk Kim

KNU

Page 2: S-band BPM at KNU

S-band BPM

Left_Cap

Right_Cap

Center_Frame

Left_Support

Dipole mode

Page 3: S-band BPM at KNU

3-D Measurement for the Laser Alignment

 1st

meas.(mm)

2nd meas.(mm)

3rd meas.(mm)

Average

(mm)

standard

deviation

(m)

a17.991

317.986

517.991

317.991

32.8

b17.988

417.993

717.983

817.988

45.0

c18.002

318.000

717.983

418.000

710.5

d17.983

717.984

917.984

217.984

20.6

e17.972

117.965

317.996

917.972

116.6

f18.011

218.005

918.002

318.005

94.5

g17.985

117.981

417.985

817.985

12.4

h17.993

417.992

317.992

717.992

70.6

ab

c

d

ef

g

h

referencepoint

1

2

3

4

#1SM-BPM* designed length = 18.0 mm

2 3

1 4

< Center_Frame >

Page 4: S-band BPM at KNU

Beam Pipes for the SBPM

Size of the Cu beam-pipes(OFHC_C1020) to be attached to the SBPM

Beam Pipe SizeQuantit

y(ea)

Usage

I.D=Φ40 / O.D=Φ47, length=177mm (172.5mm) 2

SMI.D=Φ40 / O.D=Φ47,

length=48mm (40.5mm) 2

I.D=Φ40 / O.D=Φ47, length=561mm (556.5mm) 2

QMI.D=Φ40 / O.D=Φ47,

length=58mm (50.5mm) 2

Page 5: S-band BPM at KNU

Pre-assembled SBPM for Quadrupole Magnet

SBPM for Quadrupole Magnets

Page 6: S-band BPM at KNU

SBPM for Sextupole Magnets

Pre-assembled SBPM for Sextupole Magnet

Page 7: S-band BPM at KNU

RF Meas ; f (GHz)

2.883 GHz

slot size = 25 mm

Page 8: S-band BPM at KNU

RF Meas ; Decay Time (ns)

83 ns (average)

slot size = 25 mm

Page 9: S-band BPM at KNU

Summary Shipment schedule- #1SM S-band BPM will be sent to KEK in advance on 10th of September.- #2SM,3QM,4QM S-band BPMs will be scheduled to be sent on around18th of September.

Decay time (cold test) was improved from 31 ns to 83 ns in average (RF simulation (HFSS) = 99ns)

Tentative visiting schedule (KEK) to be discussed. - Sept. 15 ~ Sept. 19 (?) ; Hyoung Suk Kim- Oct. 2 ~ Oct. ?? (?) ; Hyoung Suk Kim, Aeyoung Heo