  • HASIL PEMBANGUNAN

    PEMBANGUNAN SALURAN AIR RW 05

    RW 1 Gorong-gorong (50%)

    RW 1 GORONG-GORONG

    RW 1 PEMBANGUNAN TPT (0%)

  • RW 1 TPT (50%)

    RW 2-3 rehap paving (0%)

    RW 2-3 Rhb damping jalan (0%)

    RW 2-3 Rhp damping jalan (0%)

  • RW 2-3 Rhp damping jalan (50%)

    RW 4 Saluran air (0%)

    RW 4 saluran air (40 %)

    RW 5 Pemasangan box cluivert (0%)

  • RW 5 saluran air (50%)

    RW 7 saluran air (0%)

    RW 7 SALURAN AIR (50%)

    RW 7 SALURAN AIR (100%)