Russia participation in EGEE stable core infrastructure - new applications/new

33
http://www.egee-rdig.ru Russia participation in EGEE stable core infrastructure - new applications/new resources/new users V.A. Ilyin on behalf of RDIG consortium Russia- EU meeting at RRC “Kurchatov Institute 24 April 2007

description

Russia participation in EGEE stable core infrastructure - new applications/new resources/new users V.A. Ilyin on behalf of RDIG consortium Russia- EU meeting at RRC “Kurchatov Institute 24 April 2007. RDIG – Russian Data Intensive Grid Consortium (EGEE-II partners): - PowerPoint PPT Presentation

Transcript of Russia participation in EGEE stable core infrastructure - new applications/new

Page 1: Russia participation in EGEE stable core infrastructure -     new applications/new

http://www.egee-rdig.ru V. Ilyin, Russia – EU, 24.04.2007

Russia participation in EGEE stable core infrastructure - new applications/new resources/new users

V.A. Ilyinon behalf of RDIG consortium

Russia- EU meeting at RRC “Kurchatov Institute24 April 2007

Page 2: Russia participation in EGEE stable core infrastructure -     new applications/new

http://www.egee-rdig.ru V.A. Ilyin, Russia - EU, 24.04.2007

RDIG – Russian Data Intensive Grid Consortium (EGEE-II partners): RRC KI, JINR, SINP MSU, IHEP, ITEP, PNPI, KIAM RAS, IMPB RAS

RDIG – regional federation in EGEE-II (SA1, NA2, NA3, NA4)full functional segment in global

grid infrastructure EGEE-II

RDIG now: more than 100 members ,(~>) 15 resource centres, 6 (++) sciences to serve,~ 2000 KSI2K CPU and ~ 50 (300++) Tbyte of data

Page 3: Russia participation in EGEE stable core infrastructure -     new applications/new

http://www.egee-rdig.ru V.A. Ilyin, Russia - EU, 24.04.2007

• RDIG Resource Centres:– ITEP– JINR-LCG2– Kharkov-KIPT-LCG2– RRC-KI– RU-Moscow-KIAM-LCG2– RU-Phys-SPbSU– RU-Protvino-IHEP– RU-SPbSU– Ru-Troitsk-INR-LCG2– ru-IMPB-LCG2– ru-Moscow-FIAN-LCG2– ru-Moscow-GCRAS-LCG2– ru-Moscow-MEPHI-LCG2– ru-PNPI-LCG2– ru-Moscow-SINP-LCG2

Status page:http://grid.sinp.msu.ru/grid/roc/rc

++

Page 4: Russia participation in EGEE stable core infrastructure -     new applications/new

http://www.egee-rdig.ru V.A. Ilyin, Russia - EU, 24.04.2007

RDIG ROC

ROC – regional operation center

– Grid services SINP MSU– Certificate Authority and security RRC KI – Monitoriing and Accounting JINR, SINP

MSU– VO management and support SINP MSU– User support ITEP, KIAM

RAS– Operational support of resource centers PNPI, IHEP

EGEE-II - grid operator on duty6 teams working in weekly rotation CERN, France, Italy, UK, Russia,Taipei

Page 5: Russia participation in EGEE stable core infrastructure -     new applications/new

http://www.egee-rdig.ru V.A. Ilyin, Russia - EU, 24.04.2007

Page 6: Russia participation in EGEE stable core infrastructure -     new applications/new

http://www.egee-rdig.ru V.A. Ilyin, Russia - EU, 24.04.2007

Page 7: Russia participation in EGEE stable core infrastructure -     new applications/new

http://www.egee-rdig.ru V.A. Ilyin, Russia - EU, 24.04.2007

25 June2006, ~ 18:00

Page 8: Russia participation in EGEE stable core infrastructure -     new applications/new

http://www.egee-rdig.ru V.A. Ilyin, Russia - EU, 24.04.2007

25June 2006, ~ 18:00

Page 9: Russia participation in EGEE stable core infrastructure -     new applications/new

http://www.egee-rdig.ru V.A. Ilyin, Russia - EU, 24.04.2007

25 June 2006, ~ 18:00

Page 10: Russia participation in EGEE stable core infrastructure -     new applications/new

http://www.egee-rdig.ru V.A. Ilyin, Russia - EU, 24.04.2007

Page 11: Russia participation in EGEE stable core infrastructure -     new applications/new

http://www.egee-rdig.ru V.A. Ilyin, Russia - EU, 24.04.2007

Page 12: Russia participation in EGEE stable core infrastructure -     new applications/new

http://www.egee-rdig.ru V.A. Ilyin, Russia - EU, 24.04.2007

CIC-on-duty

http://egee.sinp.msu.ru

Page 13: Russia participation in EGEE stable core infrastructure -     new applications/new

http://www.egee-rdig.ru V.A. Ilyin, Russia - EU, 24.04.2007

RDIG Resource Broker monitoring

Page 14: Russia participation in EGEE stable core infrastructure -     new applications/new

http://www.egee-rdig.ru V.A. Ilyin, Russia - EU, 24.04.2007

RDIG testing new MW

Testing/adaptation new gLite components (SA1, -> SA3 through CERN-INTAS project): PNPI, JINR, IHEP, SINP MSU

Testing new MW components (NA4 ARDA): - Metadata catalog, Fireman catalog, gridFTP, ... (JINR, SINP MSU) - testing gLite for ATLAS and CMS (PNPI, SINP MSU)

Evaluation of new MW: 2004: evaluation of GT3 (SINP MSU, JINR) 2005: evaluation OMII (JINR, KIAM RAS) 2005: evaluation GT4 (SINP MSU, JINR, KIAM RAS + CERN+GT4)

Page 15: Russia participation in EGEE stable core infrastructure -     new applications/new

http://www.egee-rdig.ru V.A. Ilyin, Russia - EU, 24.04.2007

VOs

• RDIG supports 16 VOs

• In 2006 ~ 500 000 jobs• (about 50% non-HEP)

Page 16: Russia participation in EGEE stable core infrastructure -     new applications/new

http://www.egee-rdig.ru V.A. Ilyin, Russia - EU, 24.04.2007

VO-jobs

Page 17: Russia participation in EGEE stable core infrastructure -     new applications/new

http://www.egee-rdig.ru V.A. Ilyin, Russia - EU, 24.04.2007

• Infrastructure VO's (all RC's):– dteam– ops• Most RC support the WLCG/EGEE VO's– Alice– Atlas– CMS– LHCb• Supported by some RC's:– gear– Biomed– Fusion• Regional VO's– Ams, eearth, photon, rdteam, rgstest, fusion_grid

VOs

++ crystal apps, engineering apps, medical apps ...

Page 18: Russia participation in EGEE stable core infrastructure -     new applications/new

http://www.egee-rdig.ru V.A. Ilyin, Russia - EU, 24.04.2007

ATLAS: statistics for production jobs

Production mode of the grid usage:millions jobs by few users

on hundreds sites

Jobs per user Jobs per site

Page 19: Russia participation in EGEE stable core infrastructure -     new applications/new

http://www.egee-rdig.ru V.A. Ilyin, Russia - EU, 24.04.2007

CMS: statistics for analysis jobs

Still not chaotic usage of the grid …

Jobs per user Jobs per user

Physicists are sleeping … … 2008 …

Page 20: Russia participation in EGEE stable core infrastructure -     new applications/new

http://www.egee-rdig.ru V.A. Ilyin, Russia - EU, 24.04.2007

RDIG - training, induction courses

PNPI, RRC KI, JINR, IHEP, ITEP, SINP MSU: • Induction courses ~ 600 • Courses for application developers ~ 60 • Site administrator training ~ 100

2007 – series of physicists training how to use EGEE/RDIG in their daily activity (LHC coming ...)

today more than 100 physicists from different LHC centers in Russia got this training

Page 21: Russia participation in EGEE stable core infrastructure -     new applications/new

http://www.egee-rdig.ru V.A. Ilyin, Russia - EU, 24.04.2007

Page 22: Russia participation in EGEE stable core infrastructure -     new applications/new

http://www.egee-rdig.ru V.A. Ilyin, Russia - EU, 24.04.2007

Page 23: Russia participation in EGEE stable core infrastructure -     new applications/new

http://www.egee-rdig.ru V.A. Ilyin, Russia - EU, 24.04.2007

RDIG web

• RDIG portal http://egee-rdig.ru• RDIG ROC http://grid.sinp.msu.ru RDIG CA http://ca.grid.kiae.ru/RDIG RDIG monitoring http://rocmon.jinr.ru:8080 User Support http://ussup.itep.ru • RDIG forum http://www.gridclub.ru

Page 24: Russia participation in EGEE stable core infrastructure -     new applications/new

http://www.egee-rdig.ru V.A. Ilyin, Russia - EU, 24.04.2007

cluster of institutional computing centers;

major centers are of Tier2 level (RRC KI, JINR, IHEP, ITEP, PNPI, SINP MSU), other are (will be) Tier3s. each of the T2-sites operates for all four experiments - ALICE, ATLAS, CMS and LHCb.

this model assumes partition/sharing of the facilities (DISK/Tape and CPU) between experiments. basic functions: analysis of real data; MC generation; users data support plus analysis of some portion of RAW/ESD data for tuning/developing reconstruction algorithms and corresponding programming.

Thus, approximately equal partitioning of the storage: Real AOD ~ Real RAW/ESD ~ SimData

: Russia in World-wide LHC Computing Grid

Page 25: Russia participation in EGEE stable core infrastructure -     new applications/new

http://www.egee-rdig.ru V.A. Ilyin, Russia - EU, 24.04.2007

T1s for Russia:

ALICE - FZK (Karlsruhe) to serve as a canonical T1 center for Russia T2 sites

ATLAS - SARA (Amsterdam) to serve as a canonical T1 center for Russia T2 sites

LHCb - CERN facilities to serve as a canonical T1 center for Russia T2 sites

CMS - CERN as a CMS T1 centre for the purposes of receiving Monte Carlo data from Russian T2 centres. Also as a special-purpose T1 centre for CMS, taking a share of the general distribution of AOD and RECO data as required.

Russia in World-wide LHC Computing Grid

Page 26: Russia participation in EGEE stable core infrastructure -     new applications/new

http://www.egee-rdig.ru V.A. Ilyin, Russia - EU, 24.04.2007

Russian Federation, RDIGPledged Planned to be pledged

Comment2007 2008 2009 2010

CPU (kSI2K) 3000 5000 7000 10000

Disk (Tbytes) 600 1500 3000 5000

Nominal WAN (Mbits/sec) 2500 5000 10000 10000

Tape (Tbytes) 0 0 500 2000

The Russian Capacities are available at the end of the year.

RDIG resource planning for LHC:

Russia in World-wide LHC Computing Grid

Page 27: Russia participation in EGEE stable core infrastructure -     new applications/new

http://www.egee-rdig.ru V.A. Ilyin, Russia - EU, 24.04.2007

Moscow 1 Gbps (ITEP, RRC KI, SINP MSU, …LPI, MEPhI) plans to 10 Gbps in 2007 for some centers

IHEP (Protvino) 100 Mbps fiber-optic (some plans on 1 Gbps)

JINR (Dubna) 1 Gbps f/o development to 10 Gbps in 2007 (autumn)

BINP (Novosibirsk) 45-100 Mbps (GLORIAD++)

INR RAS (Troitsk) f/o under realization (100 Mbps …)

PNPI (Gatchina) f/o link under testing (100 Mbps - 1Gbps)

SPbSU (S-Peterburg) 1 Gbps (potentially is available)

Russia in World-wide LHC Computing Grid

Page 28: Russia participation in EGEE stable core infrastructure -     new applications/new

http://www.egee-rdig.ru V.A. Ilyin, Russia - EU, 24.04.2007

International connectivity for RDIG/LCG:

for connection with LCG centers in Europe:GEANT2 PoP has been upgraded in December 2006 to 2.5

Gbps (plans for 10 Gbps)

dedicated connectivity to “host” T1’s (kind of LHC OPN extension) by use of GLORIAD:

Jan'07 1 Gbps connection Moscow-Amsterdam. Feb'07 Moscow-CERN – 1 Gbps (just today 310 Mbps) testing by JINR – 30 Mbyte/s disk-to-disk.

Russia in World-wide LHC Computing Grid

Page 29: Russia participation in EGEE stable core infrastructure -     new applications/new

http://www.egee-rdig.ru V.A. Ilyin, Russia - EU, 24.04.2007

GEANT2 in action!

Page 30: Russia participation in EGEE stable core infrastructure -     new applications/new

http://www.egee-rdig.ru V.A. Ilyin, Russia - EU, 24.04.2007

CERN-T1 as FTS server for Russian sites (since February) !By use of Moscow-CERN lightpath by RBNet/GLORIAD

March, 19Transfer rate 14 – 32 MBs

99% of successful transfers and 990 GB have been transferred

October-November, 2006 (CNAF as FTS T1 for JINR)

Transfer rates less than 2 MBsRatio of successful transfers ~20-30%

But we need in dedicated solutions now!

Page 31: Russia participation in EGEE stable core infrastructure -     new applications/new

http://www.egee-rdig.ru V.A. Ilyin, Russia - EU, 24.04.2007

New magisterial course on e-Infrastructure.could it be in the form of international cooperation?

Manpower:• involve regional universities• new intervention to major universities:

MFTI+RRC KI MSU+JINR MEPhI+RRC KI + ... StPSU+PNPI ++

To 2nd year of RDIG/EGEE-II and toward to EGEE-III

Page 32: Russia participation in EGEE stable core infrastructure -     new applications/new

http://www.egee-rdig.ru V.A. Ilyin, Russia - EU, 24.04.2007

To 2nd year of RDIG/EGEE-II and toward to EGEE-III

To get new apps and users:• grid core services should “know” Windows jobs (virtualization technology)• grid core services should “know” MPI clusters (of small/medium size) - “90%” of jobs usually asked supercomputing (parallelizing) in reality could be parallelized on (max) 10-15 CPUs.

Stable core infrastructure:• search for new application areas and users• new resource centers should come with new users and applications

Page 33: Russia participation in EGEE stable core infrastructure -     new applications/new

http://www.egee-rdig.ru V.A. Ilyin, Russia - EU, 24.04.2007

• Stable operating of RDIG as full-functional segment of EGEE-II in production mode• Stable “24x7” providing basic grid services at national level, involvement in grid operation management in EGEE-II• Stable functioning CA at national level• Start of massive user support• Start of chaotic use of the grid by LHC users

RDIG has started the (long) way to the sustainable grid infrastructure. EGEE-III - to form Joint Research Unit led by RRC KI. The idea on EGI has got interest and support by RDIG community.

To 2nd year of RDIG/EGEE-II and toward to EGEE-III

Flagship applications: LHC, Fusion (toward to ITER), nanotechnologyCurrent interests from: medicine, engineering, ++