RPT VLF AND MAG SUR · 2017-01-17 · Conclution and Recommendations 5 EXHIBITS 1. Profile of VLF...
Transcript of RPT VLF AND MAG SUR · 2017-01-17 · Conclution and Recommendations 5 EXHIBITS 1. Profile of VLF...
41015SW001B 2.4580 RANEY 010
MAtt
MINING LANDS SECTION
REPORT ON VLF AND MAGNETOMETER SURVEYS
RANEY TOWNSHIP
PORCUPINE MINING DIVISION
CHAPLEAU, ONTARIO.
J-DEX MINING AND EXPLORATION LTD.
and
INGAMAR RESOURCES LIMITED
and
DONALD O. BAKER
REPORT DATE: FEBRUARY 2*4-, 1982.
41015SW0818 2.4580 RANEY 010C
CONTENTS
Page
1. Summary l
2. Introduction 2
3. Method and Instrumentation 3
4. Presentation of Results b
5. Conclution and Recommendations 5
EXHIBITS
1. Profile of VLF Survey
2. Profile of Magnetometer Survey
Page l
SUMMARY
Access to the survey area is by fixed wing aircraft from the
town of Chapleau.
A VLF survey was instituted over the claim group using Cutler
Maine as the transmitting station.
A Magnetometer survey was also completed over the claim group,
A background of 500 gammas was established as background.
Page 2
INTRODUCTION
The survey was conducted over the following mining claims
53727^ 467^83, 537277, 501022, 537282, 537278, 537279,
537280, 537281, 537275, 551785, 551786, 537283, 53?2?6,
55178?', 551791, 551788, 551790, 551789, 5^2769.
NOTE: Mining claim 5^2769 has lapsed and is not within the
time period for relief from forfieture, althought the survey
was conducted on this claim also.
The general geology of the area consists of rhyolite and
andesite. Numerous fledspar porphry dikes are noted along
various contact zones.
The survey and line cutting began September l, 1981 and
ended October28, 1981.
Page 3
METHOD AND INSTRUMENTATION
Base line was constructed running east and west with the
survey lines running north and south. The lines were
compassed, brushed out and chained with a peg placed every
25 meters and marked. Readings were taken at 25 meter
intervals and the interline spacing was 100 meters.
A Geonics VLF EM l6 was used.
S' A Cientrix MF-2 Magnetometer was used,
Page k
PRESENTATION of RESULTS
As seen by reviewing exhibits l and 2 the surveys are
coincident and resulted in the detection of two large zones
of interest. One zone is located in the south east corner of
the claim group whereas the other zone is located south west
of the south east zone, several hundred meters away.
Page 5
CONCLUTIONS AND RECOMMENDATIONS
As soon as weather permits (spring of 1982) a complete
geological mapping program should be completed over the claim
group based on information obtained and along with the
geophysical surveys a diamond drilling program should be
instituted on the zones of interest.
Respectfully Submitted;
J-DEX Mining 8c Exploration Ltd,
Do/iald 0. Baker
4101SSW0818 2. 4588 RANEY 90(7)
1983 06 06 2.4580
Mining RecorderMinistry of Natural Resources60 Wilson AvenueTimmins, OntarioP4N 2S7
Dear Sir:
RE: Geophysical (Electromagnetic and Magnetometer) Survey on Mining Claims P467483 et al 1n the Township of Raney
The Geophysical (Electromagnetic and Magnetometer) Survey assessment work credits as listed with my Notice of Intent dated May 12, 1983 have been approved as of the above date.
Please Inform the recorded holder of these mining claims and so Indicate on your records.
Yours very truly.
E.F. AndersonDirectorLand Management Branch
Whitney Block, Room 6450Queen's ParkToronto, OntarioM7A 1W3Phone: 416/965-1380
R. P1chette:mc
Cc: J-Dex Mining a Exploration Ltd. Chapleau, Ontario
cc: Mr. G.H. FergusonMining It Lands Commissioner Toronto, Ontario
cc: Resident Geologist Timmins, Ontario
Ontario
9 "5.
Ministry ofNaturalResources
Notification of recording
of assessment work credits
Lands Administration Branch
Mining Lands Section
Ministry of Natural Resources
Room 1617, Whitney Block
Queen's Park, Toronto
M7A 1W3
b l 3 1982
MINING LANDS SECTION
Date of recording of work: December 29, 1981
Recorded holden.
Address:.
Township or Area:.
J-Dex Mining Se Exploration Ltd.P.O. Box: 1270Chapleau, Ontario POM 1KO———
RANF.Y TOMNSHTP________________
Type of survey and number of Assessment days credit per claim
Geophysical
Flpntrnmagnptir V.L.F. 20 -days
Magnetometer.
Radiometric _
40 -days
-days
Induced polarization.
77 IfSection 95(9)—
-days
Jays
Geological. -days
Geochemical. .days
Man days EH
Special provision S
Airborne Lj
Ground 09
Mining claims
P-467483P-501022P-537275 to 537283 incl.P-551785 to 551791 incl.
Notice to recorded holder:
tS Survey reports and maps in duplicate be submitted to the Lands Administration Branch, Toronto with in 60 days from the date of recording of this work. c.c. J-Dex Mining 8c Exploration Ltd
to the Lands
Ministry ofNaturalResources
Technical Assessment Work Credits
Ontario
File
2.4580
1983 05 12Recorded Holder
J-DEX MINING S EXPLORATION LIMITEDTownship or Area
RANEY TOWNSHIP
Type of survey and number of Assessment days credit per claim Mining Claims Assessed
GeophysicalElectromagnetic
Magnetometer
Radiometric
18
Induced polarization .
Section 86 (18) _
Geological ———
Geochemical
.days
.days
.days
.days
.days
.days
.days
P 467483 501022537275 to 537283 incl. 551785 to 551791 incl.
Man days L~H
Special provision 0
Airborne CH
Ground
H Credits have been reduced because of partial coverage of claims.
l l Credits have been reduced because of corrections
to work dates and figures of applicant.
Special credits under section 86 (15a) for the following mining claims
No credits have been allowed for the following mining claims
l_l not sufficiently covered by the survey Insufficient technical data filed
assessment davs recorded on
Ministry of NaturalResources -p- ^
Ontario J O Nc 3f
Your file:
1983 05 12 our me: 2 .4580
Mining RecorderMinistry of Natural Resources60 Wilson AvenueTimmins, OntarioPAN 2S7
Dear Sir:
Enclosed are two copies of a Notice of Intent with state ments listing a reduced rate of assessment work credits to be allowed for a technical survey. Please forward one copy to the recorded holder of the claims and retain the other. In approximately fifteen days from the above date, a final letter of approval of these credits will be sent to you. On receipt of the approval letter, you may then change the work entries on the claim record sheets.
Yours very truly,
For further Information, 1f required, please contact Mr. F.W. Matthews at
E.F. Anderson 416/965-1380.DirectorLands Administration BranchWhitney Block, Room 6450Queen's ParkToronto, OntarioM?A 1W3Phone: 416/965-1316
R. P1chette:sc
cc: J-Dex Mining 4 Exploration Ltd Chapleau, Ontario
cc: Mr. G.H. FergusonMining ft Lands Commissioner Toronto, Ontario
Ministryof Notice of Intent NaturalResources for Technical Reports
Ontario
1983 05 12
2.4580
An examination of your survey report indicates that the requirements of The Ontario Mining Act have not been fully met to warrant maximum assessment work credits. This notice is merely a warning that you will not be allowed the number of assessment work days credits that you expected and also that in approximately 15 days from the above date, the mining recorder will be authorized to change the entries on his record sheets to agree with the enclosed statement. Please note that until such time as the recorder actually changes the entry on the record sheet, the status of the claim remains unchanged.
If you are of the opinion that these changes by the mining recorder will jeopardize your claims, you may during the next fifteen days apply to the Mining and Lands Commissioner for an extension of time. Abstracts should be sent with your application.
If the reduced rate of credits does not jeopardize the status of the claims then you need not seek relief from the Mining and Lands Commissioner and this Notice of Intent may be disregarded.
If your survey was submitted and assessed under the "Special Provision-Performance and Coverage" method and you are of the opinion that a re-appraisal under the "Man-days" method would result in the approval of a greater number of days credit per claim, you may, within the said fifteen day period, submit assessment work breakdowns listing the employees names, addresses and the dates and hours they worked. The new work breakdowns should be submitted direct to the Lands Management Branch, Toronto. The report will be re-assessed and a new statement of credits based on actual days worked will be issued.
February 16, 1983 2.4580
J-Dex Mining 4 Exploration Ltd. P.O. Box 1270 Chapleau* Ontario POM 1KO
Attention: Donald 0. Baker
Dear Sir:
Re: Geophysical (Electromagnetic and Magnetometer) Survey submitted on Mining Claims P 467483 et al In the Township of Raney.
Enclosed 1s a copy of our letter dated December 29, 1982 requesting additional Information for the above mentioned survey.
Unless you can provide the required data by February 26, 1983, the mining recorder will be directed to cancel the work credits recorded on December 29, 1981.
For further Information, please contact Mr. F.W. Matthews at 416/965-1380.
Yours very truly.
E.F. AndersonDirectorLand Management Branch
Whitney Block, Room 6450Queen's ParkToronto, OntarioM7A 1W3Phone: 416/965-1316
D.Mice
End.
cc: Mining Recorder Porcupine
1982 12 29 2.4580
Donald 0. Baker P.O. Box 1270 Chapleau, Ontario POM 1KO
Dear Sir:
I an returning herewith your magnetometer and electromagnetic survey maps covering mining claims P 467483 et al 1n the Township of Raney.
Please date and sign these maps* show the claim limits and claim numbers and return them to this office.
Yours very truly.
E.F. Anderson For further Information, 1f Director required, please contact Land Management Branch Mr. F.W. Matthews at
416/965-1380/ whitney Block, Room 6450 Queen's Park Toronto, Ontario M7A 1W3 Phone: 416/965-1380
F.W. Matthews:se
Encls:
cc: Mining Recorder Timmins, Ontario
Ministryof GeotechnicalSoles Report
Ontario Approval
File
o
Mining Lands Comments
To: Geophysics
Comments
t-~*-Vr -TSa——*-^-l^-——*^"^
S
oproved [ | Wish to see again with corrections
D
Date Signature
To: Geology - Expenditures
Comments
|| Approved | | Wish to see again with correctionsDate Signature
To: Geochemistry
Comments
l j Approved | Wish to see again with correctionsDate Signature
j j To: Mining Lands Section, Room 6462, Whitney Block. (Tel: 5-1380)
1982 03 04 2.4580
Mining RecorderMinistry of Natural Resources60 Wilson Avenuetimmins, OntarioPAN 2S7
Dear Sir:
We have received reports and maps for a Geophysical (Electro magnetic and Magnetomer) Survey submitted under Special Provisions (credit for Performance and Coverage) on Mining Claims P 467483 et al in the Township of Raney.
This material will be examined and assessed and a stat of assessment work credits will be Issued.
Yours very truly,
8.F. AndersonDirectorLand Management Branch
Whitney Block, Room 6450Queen's ParkToronto, OntarioM7A 1W3Phones 416/965-1316
J. Skura/amc
cc: J-DEZ Mining S Exploration Ltd. Chapleau, Ontario Attnt Mr. Donald O. Baker
Ministry ofNaturalResources
Ontario
RECEIVED
MAR - 11982
MINING LANDS SECTION
THE MINING ACT REPORT OF WORK
A seporote form is required for each
type of work to b*
recorded.
To the Recorder of...........................
. J-DEX Mining Se Exploration Ltd..Mining Di vi sion
name of Recorded Holder Prospector's Licence
..............P^Q....Box..127Q,...Chapleau.,...Ontario.... ...POM.. IRQ.................................Post Office Address
do hereby report the performance of ................T.P.9.................. days of ...Line ..Cutting.
Claim No.
5Q102.2.
53.727^
5^2.7.6.9.53.7.2.7.7.. 537282
All the work
Days
?.9....2020
20...
20...
the following
Claim No.
53.7.2.7.853727953.7.28.Q537281
5372*355.1.7.85.
3 C.lai m t s) .
contiguous claims
Days
2.02020
.20..202020
Claim No.
55.7786...551787551788551789
551790551791
over entire
type of work
Days
20
202020
2020
claim group
OeaOfOI-zUJ
Ka.2Q... 20
was performed on Mining (In the case of geological and/or geophysical survey (s) where more than 18 claims are involved attach a schedule)
READ CAREFULLY: THE FOLLOWING INFORMATION IS REQUIRED BY THE MINING RECORDER.
For Manual Work, Stripping or Opening up of Mines, Sinking Shafts or Other Actual Mining Operations Names and
addresses of the men who performed the work and the dates and hours of their employment.For Diamond and other Core Drilling - Footage, No. and angle of holes and diameter of core. Name and address of
owner or operator of drill. Dates when drilling was done. Signed core log and sketch in duplicate.For Compressed Air or Other Power Driven or Mechanical Equipment
Type of drill or equipment. Names and addresses of men engaged in operating equipment and the dates and hours of their employment.For Power Stripping - Type of equipment. Name and address of owner or operator. Amount expended. Dates on which
work was done. Proof of actual cost must be submitted within 30 days of recording.With each of the above types of work sketches are required to show the location and extent of the work in relation to the nearest claim post. In the case of diamond or other core drilling the sketch must be submitted in duplicate. For Geophysical, Geological, Geochemical Surveys and Expenditure Credits - the name of author of report. Covering dates of survey (linecutting 8. office). Type of instrument used. Total amount of expenditure. Technical reports, maps, expenditure breakdown, receipts must be filed in duplicate with the Minister within 60 days of recording. For Land Survey - the name and address of Ontario Land surveyor.
The Required Information is as Follows: (Attach a list if this space is insufficient)
Ingamar Resources Limited Connaught, Ontario.
Donald O. Baker P.O. Box 1270 Chapleau,' Ontario.
POM IKO
- Work was performed during Sept.1/81 to Oct.28/81.
- Instruments used were Geonics VLF Barringer Magnetometer
- Costs 358,200.00
Maps b Reports forwarded to Toronto
xt/)Ofooo in v*
—ut
Ofut uOf.ooz
Of.oa.UJoc
iu*. ut
DateDecember 15, 1981.
UJl/*
Signature of Recorded Holder or Agent
The Mining Act Certificate Verifying Report of Work
i Donald O. Baker•. .•••....••••••••••••..••••••....••-•••••••••••••i
P.O. Box 1270, Chapleau, Ontario. POM IKO(Post Office Address)"""""""""""
Of.o
hereby certify:
1. That l have a personal and intimate knowledge of the facts set forth in the report of work annexed here to, having performed the work or witnessed same during and/or after its completion.
2. That the annexed report is true.
r. , December 15 10 81.Dated........................rT........... IV ..........................................................~..........................................Signature
a.UJX
LA 041
Oniurio
Ministry ofNaturalResources MR - l
THE
A leporate form is required for each
type of work to b* recorded.
To the Recorder of...............................9^.^5.-?.?.......................................................Mining Division
.Ltd....................................T-.;name of Recorded Holder Prospector's Licence.P.:.?.-.. B.? 3C .f. 2.??* c a?^ eau '.9.^ar. i. 0 ' Pp.M IKO
Post Office Address
do hereby report the performance of ..................8.0.0............... days of ......Qe.Qphy.S.iGSl.........type of work
not before reported to be applied on the following contiguous claims
Claim No.
5.01022.^67^8353727^5^.2769..517.277.537282537275All the work(In the case
Days
bobobobobobobo
of geological and/
Claim No.
5.3.7.2Z8537279537280
53.7.281-537.283551785537276
or geophysical survey
Days
bobobo
.b.Q..bobobo
(s) where
Claim No.
55.7.7.86..551787551788
5517.89..5517.90..55.1.7.9.1...
over entiremore than 18 claims are
Days
bQ....bO
bO
bo....bobo
claim groupinvolved attach a schedule)
OCO
Of.o
Ul3 z ovt OHo.
READ CAREFULLY: THE FOLLOWING INFORMATION is REQUIRED BY THE MINING RECORDER. xt/i
For Manual Work, Stripping or Opening up of Mines, Sinking Shafts or Other Actual Mining Operations Names and o
addresses of the men who performed the work and the dates and hours of their employment.For Diamond and other Core Drilling - Footage, No. and angle of holes and diameter of core. Name and address of
owner or operator of drill. Dates when drilling was done. Signed core log and sketch in duplicate.For Compressed Air or Other Power Driven or Mechanical Equipment
Type of drill or equipment. Names and addresses of men engaged in operating equipment and the dates and hours oftheir employment.For Power Stripping - Type of equipment. Name and address of owner or operator. Amount expended. Dates on which
work was done. Proof of actual cost must be submitted within 30 days of recording.With each of the above types of work sketches are required to show the location and extent of the work in relationto the nearest claim post. In the case of diamond or other core drilling the sketch must be submitted in duplicate.For Geophysical, Geological, Geochemical Surveys and Expenditure Credits - the name of author of report. Covering dates of survey (linecutting 8, office). Type of instrument used. Total amount of expenditure. Technical reports, maps, expenditure breakdown, receipts must be filed in duplicate with the Minister within 60 days of recording.For Land Survey - the name and address of Ontario Land surveyor.
The Required Information is os Follows: (Attach a list if this space is insufficient) ac.O
Donald 0. Baker ~ ^Or* ^l^l^T^ /of ing P O Box 1270 Sept. 1/81 to Oct. 28/81. Chapleau, Ontario. - Instruments used were
POM IKO Geonics VLFBarranger Magnetometer
- Cost $8 > 200.00 ~ *
Maps d: Reports forwarded to Toronto
Date December 15, 1981.Signature of Recorded Holder or Agent
The Mining Act Z Certificate Verifying Report of Work S
i Donald 0. Bakeri, ................................................................................................................................................... ^P.O. Box 1270, Chapleau, Ontario. POMIKO o..^.^..-..^ ~~^.^..................... . ................................ ^
hereby certify:
1. That l have a personal and intimate knowledge of the facts set forth in the report of work annexed here to, having performed the work or witnessed same during and/or after its completion.
2. That the annexed report is true.
Signature
LA 041
Ministry ofNaturalResources
W-82-06 5
-C l - tt ^ tOntario
THE MINING ACT REPORT OF WORK
P or cup. in e. Explp.r a t ion. Ltd
A separate form is required for each type of work to be recorded.
To the Recorder of...............................f.^P.HP.l.1?.6.......................................................Mining Division
name of Recorded Holder Prospector's LicenceP.O. Box 1270, Chapleau, Ontario. POM IKO
Post Office Address
do hereby report the performance of ................/1&&...7.2..Q..... days of ......Gfi.QPtoS.iCSl.J....'.'type of work
not before reported to be applied on the following contiguous claims
1 Claim N o. 5.01022.46?483
Days
4p... 40
-40-
53.7.277. 40
4.0 4"0
Claim No.
.5.27.2.7.8537279537280
.5.3.7.28.1 5372835.5.1783537276
Claim ( s) ......
Days
404040
404040
Claim No.
55t.7.8.6.551787551788
551739.. 5J5.1.7.9.9...55.1.7.9.1...
over entire
Days
4.0... .4040
4040
claim group
oCD
Of O
Ofo.
537275All the work v*(In the case of geological and/or geophysical survey (s) where more than 18 claims are involved attach a schedule)
READ CAREFULLY: THE FOLLOWING INFORMATION IS REQUIRED BY THE MINING RECORDER.
For Manual Work, Stripping or Opening up of Mines, Sinking Shafts or Other Actual Mining Operations Names and
addresses of the men who performed the work and the dates and hours of their employment.For Diamond and other Core Drilling - Footage, No. and angle of holes and diameter of core. Name and address ofowner or operator of drill. Dates when drilling was done. Signed core log and sketch in duplicate.For Compressed Air or Other Power Driven or Mechanical EquipmentType of drill or equipment. Names and addresses of men engaged in operating equipment and the dates and hours oftheir employment.For Power Stripping - Type of equipment. Name and address of owner or operator. Amount expended. Dates on which
work was done. Proof of actual cost must be submitted within 30 days of recording.With each of the above types of work sketches are required to show the location and extent of the work in relationto the nearest claim post. In the case of diamond or other core drilling the sketch must be submitted in duplicate.For Geophysical, Geological, Geochemical Surveys and Expenditure Credits - the name of author of report. Covering dates of survey (linecutting 8, office). Type of instrument used. Total amount of expenditure. Technical reports, maps, expenditure breakdown, receipts must be filed in duplicate with the Minister within 60 days of recording. For Land Survey - the name and address of Ontario Land surveyor.
The Required Information is os Follows:
Donald 0. Baker P.O. Box 1270
, Ontario. -- POM IKO ,
(Attach a list if this space is insufficient)
- Work was performed during Sept.1/81 to Oct.28/81.
- Instruments used were Geonics VLF Barranger Magnetometer
- Cost $8,200.00
Maps 8c Reports forwarded to Toronto
/j
xvoOfo
m vt—uii- < yu.i-Ofui U
oz
Of O O- UJ Of
Date
The Mining Act Certificate Verifying Report of Work
l Donald O. BakerP.O. Box 1270, Chapleau, Ontario. POMIKO
JAN - 51982
UJ
*nUI
oz
(Post Office Address)
hereby certify: RECORDEDLl. That l have a personal and intimate knowledge of the facts set forth in the repor of work annexed here- J
'or after its completion.to, having performed the work or witnessed same during a
2. That the annexed report is true.
Date)lSignature
.A 041
- Ministry of Natural
61 . 06- 7-t? 3
vJL*X Resources ^ Ontario
To the Recorder of..................
, J-DEX Mining Se
t --'i'
THE MINING
Exploration
- O b'' '
ACT REPORT OF WORK
ine
Ltd.name of Recorded Holder
do hereby report the performance
not before reported to be applied
Claim No. Days
501022 20
1+67 ii-83 2 0.53727^" -20"
-5^76^- 2tr
537.2.7.7.. 20... 537282 2Q537275 20All the work was performed on M
of "^Post Office Address
Q^.J3.t?.P...... davs of
on the following contiguous claims
Claim No. Days
532.2.78 .2.0... 537279 20
532.280 ^37281
5372,8.3
55.1.7.83.
20
.2Q..
20
20
20 over
A separate form is required for each type of work to be recorded.
Prospector's Licence
..Ai--
Claim No.r* r^rtorjQ f2 ~)M { Q O
55.12.8.7... 5512.8.8... 5517S9
55X29.Q... 551791...
^^I 1C^.A Ltype of work
Days
20
20
20
20
20
20
claim group(In the case of geological and/or geophysical survey (s) where more than 18 claims are involved attach a schedule)
READ CAREFULLY: THE FOLLOWING INFORMATION IS REQUIRED BY THE MINING RECORDER.
SDf O
W
Ofa.
t/*X
For Manual Work, Stripping or Opening up of Mines, Sinking Shafts or Other Actual Mining Operations Names andaddresses of the men who performed the work and the dates and hours of their employment.For Diamond and other Core Drilling - Footage, No. and angle of holes and diameter of core. Name and address ofowner or operator of drill. Dates when drilling was done. Signed core log and sketch in duplicate.For Compressed Air or Other Power Driven or Mechanical EquipmentType of drill or equipment. Names and addresses of men engaged in operating equipment and the dates and hours of their employment.For Power Stripping - Type of equipment. Name and address of owner or operator. Amount expended. Dates on which work was done. Proof of actual cost must be submitted within 30 days of recording.With each of the above types of work sketches are required to show the location and extent of the work in relation to the nearest claim post. In the case of diamond or other core drilling the sketch must be submitted in duplicate. For Geophysical, Geological, Geochemical Surveys and Expenditure Credits - the name of author of report. Covering dates of survey (linecutting 8. office). Type of instrument used. Total amount of expenditure. Technical reports, maps, expenditure breakdown, receipts must be filed in duplicate with the Minister within 60 days of recording. For Land Survey - the name and address of Ontario Land surveyor.
The Required Information is os Follows: (Attach a list if this space is insufficient)
Ofo
Ingamar Resources Limited Connaught, Ontario.
Donald 0. Baker p.o.:-Bqx; ; ;l;27o; Chapleau, Ontario , IKO'
- Work was performed during Sept.1/81 to Oct.28/81.
- Instruments used were Geonics VLF Barringer Magnetometer
- Costs ?8,200.00
Maps Se Reports forwarded ' to Toronto
n De'cerofrer- T5v 7 f 98 i .UO T C * . * .- . * t I^U.**.M*- n-rvrrVfT*"; ,". ...........
fer or Agent
RECEIVEDJAN - 51982
u
Of. IUuOf5ozI- ofoa.
UJ
utt-
felil l/)-l < u.
oz
Ofo
The Mining Act Certificate Verifying Report of Work
(Post Office Address)hereby certify:
1. That l have a personal and intimate knowledge of the facts set forth in the rep to, having performed the work or witnessed same during and/or after its completion.
2. That the annexed report is true. l
DatedDecember 15 1 9 81.
DEC z yReceipt No. ....
zUJo.
Signature"
-A 041
oJr
C*jt(
r*C
r-r-
fr-ito
K
r-O
3bo O
o6
0O(T
(To
LOU1
d
Uri
00
Q.
fO)
lo
Hellyer Twp.(M.926)
s M 2 M l M
Halcrow Twp. (M. 906)
l i i V\ H J WCATTY O L.S
Denyes Twp.( M.7^8)
THE TOWNSHIP OF
RANEYDISTRICT OFSUDBURY
PORCUPINEMINING DIVISION
SCALE: 1-INCH ^ 40 CHAINS
DISPOSITION OF CROWN LANDSj1 - ~ --" 1 - ; -'rr " r li m -.L .. .. -:- ..-1111.
PATENT, SURFACE AND MINING RIGHTS SURFACE RIGHTS ONLY ....1........ 6MINING RIGHTS ONLY.. - O
LEASE, SURFACE AND MINING RIGHTS.- B H , SURFACE RIGHTS ONLY._.___.. B " , MINING RIGHTS ONLY ____^.... B
LICENCE OF OCCUPATION .._______l_ W
ROADSIMPROVED ROADS KING'S HIGHWAYS RAILWAYS POWER LINES MARSH OR MUSKEG
CANCELLED
irc
r x NOTES400* surface rights reservation along the shores of oil lakes and rivers
\
PORCUPINE MINING DIVI SION
l 1981AM~ o
. P J.PlANxNO M. 1069
ONTARIO
MINISTRY OF NATURAL RESOURCESSURVEYS AND MAPBJNG BRANCH_____
\41015SW0018 2 4580 RANEY 200
Hellyer Twp.(M.926)
_____CD———J
4~"~~"
l 537282 f -?-•~ " "p- - Tff ————17 ~ -|
! J l l/ ' |X/ l U l ' l— l II W49B l M***/**! K ft l T* l l m. m Aft l6l 5917*1 9f90 l
1542773 1942770 y
619094 *ltl 6362771636287
290 6,909* 6,9095 -~ "—~ -- J —407050 407048 407047 634S 63634663335^ 5636365H636366 [636306 1636301 .649667 — j— — — — --—i— — —i— — -t- —— ——
-X —1~ —p T p" T p" ""
1 ! i6036(636037 1636036 1636039
Denyes Twp.( M.758)41015SWeei8 2.4580 RANEY
210
THP TOWNSHIP OF
RANEYDISTRICT OFSUDBURY
PORCUPINE'MINING DIVISION
SCALE: 1-INCH = 40 CHAINS
DISPOSITION OF CROWN LANDSPATENT, SURFACE AND MINING RIGHTS ___ 9
•' , SURFACE RIGHTS ONLY ............. C" , MINING RIGHTS ONLY _...____ 9
LEASE, SURFACE AND MINING RIGHTS—— Pi•' , SURFACE RIGHTS ONLY.^.___.. H" , MINING RIGHTS ONLY__.___.. B
LICENCE OF OCCUPATION ________Jl__ T
ROADSIMPROVED ROADS KING'S HIGHWAYS RAILWAYS POWER LINES MARSH OR MUSKFG MINES CANCELLED
(T*?U.. J ^fXr
^ N OTES
400* sur^ce rights reservation along the shores of all lakes and rnvers
DATE OF ISSUE
DEC-9
Minisiryof Natural Resources TORONTO
PLAN NO M |069
ONTARIO
MINISTRY OF NATURAL RESOURCESSURVEYS AND MAPPING BRANCH
lX•JLlJi033A3NVU egg ve
en/n/.ln
LIOIM
LU0N
L800N
L70DN
L 100W
L 1/00 k)
L340N
Lil
70(95
80 OS
LO LI L3 Lfc LI L8\ L? LI0 Lil LU LI3
41015SW0ei8 a .4580 RANEY 230
T