PNPM - Mandiri Perdesaan Pola Khusus MP3KI RENCANA PENGGUNAAN DANA MP3KI PENGUATAN RPD KE : Kecamatan Banjarwangi Kabupaten Garut Jumlah BLM : Rp 2 NO URAIAN VOLUME KEBUTUHAN SISA a b c d e = c + d f = b - e g h I RABAT BETON (BANJARWANGI-BOJONG-JAYABAKTI) A BAHAN 1 Semen 50 kg 2,856 - 2,856 Zak 69,500 2 Pasir beton 255 - 255 m³ 315,000 3 Pasir urug 285 - 285 m³ 100,000 4 Batu split 2/3 434 - 434 m³ 265,000 5 Kayu u/bekisting 6 - 6 m³ 600,000 6 Paku 51 - 51 m³ 12,000 7 Plastik Cor (lebar 1,5cm) 4,998 - 4,998 m2 2,500 8 Aspal Pen 60/70, 155 Kg 5 - 5 drum ### SUB TOTAL ( I.A ) B A L A T 1 Biaya Transparansi : 2 a. Papan Proyek 100 x 120 c 1 1 1 - Ls 100,000 3 b. Papan Informasi 100 x 18 1 1 1 - Ls 120,000 4 c. Prasasti 60 x 40 cm 1 - 1 Ls 450,000 5 c. Spanduk/umbul umbul 3 3 3 - Ls 120,000 6 d. Kamera Digital 1 1 1 - hari ### 7 Concrete Mixer 51 - 51 Ls 350,000 8 Mobilisasi / Demob 1 - 1 hari 500,000 9 Sekop 4 - 4 hari 75,000 10 Ember 110 - 110 Ls 8,000 11 Arco/dolag 4 - 4 buah 250,000 12 Benang Kasur 4 - 4 buah 5,000 SUB TOTAL ( I.B ) C UPAH 1 Pekerja Konstruksi 1,287 - 1,287 HOK 24,000 2 Tukang 326 - 326 HOK 33,000 SUB TOTAL ( I.C ) JUMLAH SUB TOTAL I II TPT (BANJARWANGI-BOJONG-JAYABAKTI) A BAHAN 1 Semen 50 kg 475 - 475 Zak 69,500 2 Pasir Pasang 95 - 95 m³ 160,000 3 Batu Belah 190 - 190 m³ 120,000 SUB TOTAL ( II.A ) B ALAT 1 Ember 40 - 40 buah 8,000 2 Cat Tembok 5 - 5 kg 30,000 3 Pralon 1/2 inch 3 - 3 btg 20,000 4 Kuas 1/2 inch 2 - 2 bh 20,000 5 Bambu 10 - 10 btg 8,000 6 Benang kasur 4 - 4 buah 5,000 SUB TOTAL ( II.B ) C UPAH 1 Pekerja Konstruksi 307 - 307 HOK 24,000 2 Tukang 151 - 151 HOK 33,000 SUB TOTAL ( II.C ) JUMLAH SUB TOTAL II UNIT / SATUAN HARGA SATUAN (Rp) PENGAJUAN TAHAP LALU PENGAJUAN SAAT INI JUMLAH S.D SAAT INI

description

teknik sipil

Transcript of Rpd 2014 Mp3ki - Penguatan

Page 1: Rpd 2014 Mp3ki - Penguatan

PNPM - Mandiri Perdesaan Pola Khusus MP3KI Form.36.

RENCANA PENGGUNAAN DANAMP3KI PENGUATAN

RPD KE : 1C Kecamatan : Banjarwangi Kabupaten : Garut

Jumlah BLM : Rp 2,830,320,000

NO URAIAN

VOLUME

SISA

a b c d e = c + d f = b - e g h i = d * h

I RABAT BETON (BANJARWANGI-BOJONG-JAYABAKTI)

A BAHAN1 Semen 50 kg 2,856 - 2,856 Zak 69,500 - 2 Pasir beton 255 - 255 m³ 315,000 - 3 Pasir urug 285 - 285 m³ 100,000 - 4 Batu split 2/3 434 - 434 m³ 265,000 - 5 Kayu u/bekisting 6 - 6 m³ 600,000 - 6 Paku 51 - 51 m³ 12,000 - 7 Plastik Cor (lebar 1,5cm) 4,998 - 4,998 m2 2,500 - 8 Aspal Pen 60/70, 155 Kg 5 - 5 drum 1,700,000 -

SUB TOTAL ( I.A ) - B A L A T

1 Biaya Transparansi : 2 a. Papan Proyek 100 x 120 cm 1 1 1 - Ls 100,000 100,000 3 b. Papan Informasi 100 x 180 cm 1 1 1 - Ls 120,000 120,000 4 c. Prasasti 60 x 40 cm 1 - 1 Ls 450,000 - 5 c. Spanduk/umbul umbul 3 3 3 - Ls 120,000 360,000 6 d. Kamera Digital 1 1 1 - hari 2,000,000 2,000,000 7 Concrete Mixer 51 - 51 Ls 350,000 - 8 Mobilisasi / Demob 1 - 1 hari 500,000 - 9 Sekop 4 - 4 hari 75,000 -

10 Ember 110 - 110 Ls 8,000 - 11 Arco/dolag 4 - 4 buah 250,000 - 12 Benang Kasur 4 - 4 buah 5,000 -

SUB TOTAL ( I.B ) 2,580,000 C UPAH

1 Pekerja Konstruksi 1,287 - 1,287 HOK 24,000 - 2 Tukang 326 - 326 HOK 33,000 -

SUB TOTAL ( I.C ) - JUMLAH SUB TOTAL I 2,580,000

II TPT (BANJARWANGI-BOJONG-JAYABAKTI)

A BAHAN1 Semen 50 kg 475 - 475 Zak 69,500 - 2 Pasir Pasang 95 - 95 m³ 160,000 - 3 Batu Belah 190 - 190 m³ 120,000 -

SUB TOTAL ( II.A ) - B ALAT

1 Ember 40 - 40 buah 8,000 - 2 Cat Tembok 5 - 5 kg 30,000 - 3 Pralon 1/2 inch 3 - 3 btg 20,000 - 4 Kuas 1/2 inch 2 - 2 bh 20,000 - 5 Bambu 10 - 10 btg 8,000 - 6 Benang kasur 4 - 4 buah 5,000 -

SUB TOTAL ( II.B ) - C UPAH

1 Pekerja Konstruksi 307 - 307 HOK 24,000 - 2 Tukang 151 - 151 HOK 33,000 -

SUB TOTAL ( II.C ) - JUMLAH SUB TOTAL II -

UNIT / SATUA

N

HARGA SATUAN

(Rp)

JUMLAH (Rp)

KEBUTUHAN PENGAJUAN TAHAP LALU

PENGAJUAN SAAT INI

JUMLAH S.D SAAT

INI

Page 2: Rpd 2014 Mp3ki - Penguatan

NO URAIAN

VOLUME

SISA

a b c d e = c + d f = b - e g h i = d * h

UNIT / SATUA

N

HARGA SATUAN

(Rp)

JUMLAH (Rp)

KEBUTUHAN PENGAJUAN TAHAP LALU

PENGAJUAN SAAT INI

JUMLAH S.D SAAT

INI

III BRONJONG

A BAHAN1 Batu Belah 132 - 132 M3 120,000 - 2 Bronjong Dia. (2X1X0,5) 110 110 110 - Bh 135,000 14,850,000

SUB TOTAL ( III.A ) 14,850,000 B ALAT

1 Benang 2 - 2 roll 5,000 - 2 Bambu 30 - 30 btg 8,000 -

SUB TOTAL ( III.B ) - C UPAH

1 Pekerja Konstruksi 134 - 134 HOK 24,000 - 2 Tukang 27 - 27 HOK 33,000 -

SUB TOTAL ( III.C ) - JUMLAH SUB TOTAL III 14,850,000

JUMLAH TOTAL A 17,430,000

I RABAT BETON (BANJARWANGI-TALAGASARI)

A BAHAN1 Semen 50 kg 3,360 - 3,360 Zak 67,500 - 2 Pasir beton 300 58 58 242 m³ 295,000 - 3 Pasir urug 310 - 310 m³ 100,000 - 4 Batu split 2/3 502 - 502 m³ 245,000 - 5 Kayu u/bekisting 7 - 7 m³ 600,000 - 6 Paku 60 - 60 m³ 12,000 - 7 Plastik Cor (lebar 1,5cm) 5,880 - 5,880 m2 2,500 -

SUB TOTAL ( I.A ) - B A L A T

1 Biaya Transparansi : 2 a. Papan Proyek 100 x 120 cm 1 1 1 - Ls 100,000 100,000 3 b. Papan Informasi 100 x 180 cm 1 1 1 - Ls 120,000 120,000 4 c. Prasasti 60 x 40 cm 1 - 1 Ls 450,000 - 5 Concrete Mixer 60 - 60 hari 350,000 - 6 Mobilisasi / Demob 1 - 1 Ls 500,000 - 7 Meteran 5 M 1 - 1 buah 10,000 - 9 Sekop 3 - 3 buah 75,000 -

10 Ember 200 - 200 buah 8,000 - 11 Arco/dolag 2 - 2 buah 250,000 - 12 Benang Kasur 6 - 6 Roll 5,000 -

SUB TOTAL ( I.B ) 220,000 C UPAH

1 Pekerja Konstruksi 1,726 - 1,726 HOK 24,000 - 2 Tukang 384 - 384 HOK 33,000 -

SUB TOTAL ( I.C ) - JUMLAH SUB TOTAL I 220,000

II TPT (BANJARWANGI-TALAGASARI)

A BAHAN1 Semen 50 kg 74 - 74 Zak 67,500 - 2 Pasir Pasang 15 15 15 - m³ 160,000 - 3 Batu Belah 21 14 14 7 m³ 120,000 -

SUB TOTAL ( II.A ) - B ALAT

1 Ember 100 - 100 kg 8,000 - 2 Bambu 1 - 1 bh 6,000 - 3 Benang kasur 2 - 2 btg 5,000 -

SUB TOTAL ( II.B ) -

Page 3: Rpd 2014 Mp3ki - Penguatan

NO URAIAN

VOLUME

SISA

a b c d e = c + d f = b - e g h i = d * h

UNIT / SATUA

N

HARGA SATUAN

(Rp)

JUMLAH (Rp)

KEBUTUHAN PENGAJUAN TAHAP LALU

PENGAJUAN SAAT INI

JUMLAH S.D SAAT

INI

C UPAH1 Pekerja Konstruksi 58 - 58 HOK 24,000 - 2 Tukang 25 - 25 HOK 33,000 -

SUB TOTAL ( II.C ) - JUMLAH SUB TOTAL II -

JUMLAH TOTAL B 220,000

I RABAT BETON (KADONGDONG-WANGUNJAYA)

A BAHAN1 Semen 50 kg 1,008 - 1,008 Zak 69,500 - 2 Pasir beton 90 23 23 67 m³ 315,000 7,245,000 3 Pasir urug 101 - 101 m³ 100,000 - 4 Batu split 2/3 153 6 6 147 m³ 265,000 1,590,000 5 Kayu u/bekisting 2 - 2 m³ 600,000 - 6 Paku 18 2 2 16 m³ 12,000 24,000 7 Plastik Cor (lebar 1,5cm) 1,828.52 - 1,828.52 m2 2,500 - 8 Aspal Pen 60/70, 155 Kg 2 2 2 - drum 1,700,000 3,400,000

SUB TOTAL ( I.A ) 12,259,000 B A L A T

1 Biaya Transparansi : 2 a. Papan Proyek 100 x 120 cm 1 1 1 - Ls 100,000 100,000 3 b. Papan Informasi 100 x 180 cm 1 1 1 - Ls 120,000 120,000 4 c. Prasasti 60 x 40 cm 1 - 1 Ls 450,000 - 5 d. Spanduk/umbul2 2 2 2 - Ls 120,000 240,000 6 Concrete Mixer 18 - 18 hari 350,000 - 7 Mobilisasi / Demob 1 - 1 Ls 500,000 - 8 Sekop 2 - 2 hari 70,000 - 9 Ember 90 - 90 hari 8,000 -

10 Arco/dolag 2 - 2 Ls 250,000 - 11 Sapu Lidi 2 - 2 buah 6,000 - 12 Benang Kasur 5 - 5 buah 5,000 -

SUB TOTAL ( I.B ) 460,000 C UPAH

1 Pekerja Konstruksi 398 - 398 HOK 24,000 - 2 Tukang 115 - 115 HOK 33,000 -

SUB TOTAL ( I.C ) - JUMLAH SUB TOTAL I 12,719,000

II TPT (KADONGDONG-WANGUNJAYA)

A BAHAN1 Semen 50 kg 472 - 472 Zak 69,500 - 2 Pasir Pasang 95 42 42 53 m³ 160,000 6,720,000 3 Batu Belah 186 78 78 108 m³ 120,000 9,360,000

SUB TOTAL ( II.A ) 16,080,000 B ALAT

1 Ember 30 - 30 buah 8,000 - 2 Cat Tembok 6 - 6 kg 30,000 - 3 Pralon 1/2 inch 2 - 2 buah 24,000 - 4 Bambu 10 - 10 btg 8,000 - 5 Benang kasur 3 - 3 buah 5,000 -

SUB TOTAL ( II.B ) - C UPAH

1 Pekerja Konstruksi 344 - 344 HOK 24,000 - 2 Tukang 165 - 165 HOK 33,000 -

SUB TOTAL ( II.C ) - JUMLAH SUB TOTAL II 16,080,000

Page 4: Rpd 2014 Mp3ki - Penguatan

NO URAIAN

VOLUME

SISA

a b c d e = c + d f = b - e g h i = d * h

UNIT / SATUA

N

HARGA SATUAN

(Rp)

JUMLAH (Rp)

KEBUTUHAN PENGAJUAN TAHAP LALU

PENGAJUAN SAAT INI

JUMLAH S.D SAAT

INI

III JEMBATAN BAJA

A BAHAN1 bouwplank 1 - 1 Ls 1,200,000 - 2 Besi WF 500.200 6,592 6,592 6,592 - kg 16,700 - 3 Besi WF 200.100 379 379 379 - kg 16,700 - 4 Besi L.100.100.10 1,775 1,775 1,775 - kg 16,700 - 5 Besi L.70.70.7 245 245 245 - kg 16,700 - 6 Besi L.60.60.6 590 590 590 - kg 16,700 - 7 Baud 1/2" x 4 cm 154 154 154 - buah 8,000 - 8 Baud 5/8" x 6 cm 184 184 184 - buah 10,000 - 9 Lantai Kayu 8/20 6 - 6 m3 3,000,000 -

10 Baut kokot 5/8' x 25 cm 192 192 192 - buah 18,000 - 11 Baut kokot 5/8' x 16 cm 736 736 736 - buah 23,000 - 12 Plat sambungan gelagar utama A 78 78 78 - kg 16,700 - 13 Plat sambungan tipe B 20 20 20 - kg 16,700 - 14 Plat sambungan tipe C 37 37 37 - kg 16,700 - 15 Baut sambungan gelagar utama 384 384 384 - buah 24,000 - 16 Plat Klem Lantai 736 736 736 - buah 15,000 - 17 Karet Peredam Lantai 64 64 64 - m 10,000 - 18 Elastomer 8 8 8 - buah 250,000 - 19 Kayu Bekisting 6 - 6 m3 600,000 - 20 Paku 15 - 15 kg 12,000 - 21 Besi beton polos 1,069 - 1,069 kg 7,000 - 22 Kawat beton 24 - 24 kg 16,000 - 23 Semen 529 - 529 zak 69,500 - 24 Pasir beton 5 - 5 m3 315,000 - 25 Split 5 - 5 m3 265,000 - 26 Batu Belah 162 - 162 m3 120,000 - 27 Pabrikasi Ereksion 10,650 3,650 3,650 7,000 kg 3,000 - 28 Cat tembok 12 - 12 kg 30,000 - 29 Cat finishing besi 1 - 1 ls 2,000,000 - 30 Pasir pasang 80 - 80 m3 160,000 -

SUB TOTAL ( III.A ) - B ALAT

1 Papan Kegiatan 1 1 1 - Unit 120,000 120,000 2 Cangkul 1 1 1 - Buah 50,000 50,000 3 Linggis 1 1 1 - Buah 25,000 25,000 4 Sekop 1 1 1 - Buah 70,000 70,000 5 Bambu 50 25 25 25 Buah 8,000 200,000 6 Benang nilon 2 2 2 - Buah 5,000 10,000 7 Selang waterpass 15 15 15 - m 1,500 22,500 8 Ember Aduk Kecil 40 20 20 20 Buah 8,000 160,000 9 Sewa molen 3 - 3 Hari 350,000 -

10 Mobilisasi Molen 1 - 1 Ls 500,000 - 11 Kuas 3 inch 4 4 4 - bh 10,000 40,000 12 Kunci besi 1 1 1 - Buah 10,000 10,000 13 Karung Tanggul 125 125 125 - Buah 1,000 125,000 14 Sewa Pompa Sedot 6 - 6 Hari 50,000 - 15 Prasasti 1 - 1 Buah 450,000 -

SUB TOTAL ( III.B ) 832,500 C UPAH

1 Pekerja 319 - 319 HOK 24,000 - 2 Tukang 105 - 105 HOK 33,000 -

SUB TOTAL ( III.C ) - JUMLAH SUB TOTAL III 832,500

JUMLAH TOTAL C 29,631,500

Page 5: Rpd 2014 Mp3ki - Penguatan

NO URAIAN

VOLUME

SISA

a b c d e = c + d f = b - e g h i = d * h

UNIT / SATUA

N

HARGA SATUAN

(Rp)

JUMLAH (Rp)

KEBUTUHAN PENGAJUAN TAHAP LALU

PENGAJUAN SAAT INI

JUMLAH S.D SAAT

INI

I PENGASPALAN (TALAGAJAYA-TANJUNGJAYA)

A BAHAN1 Batu Pecah 3/5 Cm 130 106 106 24 m2 235,000 - 2 Batu Pecah 2/3 Cm 137 12 12 125 m3 255,000 - 3 Batu Pecah 1/2 Cm 69 18 18 51 m3 295,000 - 4 Pasir Aspal / Abu batu 37 - 37 m3 245,000 - 5 Aspal Pen 60/70, 155 Kg 139 - 139 Drum 1,700,000 - 6 Aspal Emulsi @ 200 kg 16 - 16 Drum 1,850,000 - 7 Ban Bekas Mobil 25 - 25 Buah 20,000 - 8 Kayu bakar 2 - 2 m3 100,000 -

SUB TOTAL ( I.A ) - B A L A T

1 Papan proyek ( Uk.1,20 cm x 1.00 cm 1 1 1 - Unit 100,000 100,000 2 Papan Informasi ( Uk.120 cm x 100 c 1 1 1 - Unit 120,000 120,000 3 Prasasti ( Uk. 60 cm x 40 cm ) 1 - 1 Unit 450,000 - 4 Spanduk/umbul2 2 2 2 - paket 200,000 400,000 5 Meteran 7,5 m 2 2 2 - bh 20,000 40,000 6 Sapu Lidi 4 - 4 bh 12,125 - 7 meteran 50 m 1 1 1 - bh 60,000 60,000 8 Kamera Dokumentasi 1 1 1 - paket 1,500,000 1,500,000 9 Mesin Gilas 12 - 12 Hari 800,000 -

10 Mob./Demob. Mesin Gilas 1 - 1 Ls 2,500,000 - SUB TOTAL ( I.B ) 2,220,000

C UPAH1 Pekerja Konstruksi (Aspal ) 281 - 281 HOK 30,000 - 2 Pekerja Galian Saluran 220 - 220 HOK 24,000 - 3 Tukang ( Aspal) 42 - 42 HOK 45,000 -

SUB TOTAL ( I.C ) - JUMLAH SUB TOTAL I 2,220,000

II TPT (TALAGAJAYA-TANJUNGJAYA)

A BAHAN1 Semen 50 kg 288 - 288 Zak 69,500 - 2 Pasir Pasang 58 6 19.0 25 33 m³ 150,000 2,850,000 3 Batu Belah 115 42 42 73 m³ 120,000 5,040,000

SUB TOTAL ( II.A ) 7,890,000 B ALAT

1 Bambu 18 - 18 btg 8,000 - 2 Benang Kasur 3 - 3 bh 5,000 - 3 Pralon 1/2 inch 4 - 4 btg 20,000 - 4 Ember 20 - 20 bh 8,000 - 5 Cat Tembok 6 - 6 kg 30,000 -

SUB TOTAL ( II.B ) - C UPAH

1 Pekerja Konstruksi 232 - 232 HOK 24,000 - 2 Tukang 93 - 93 HOK 33,000 -

SUB TOTAL ( II.C ) - JUMLAH SUB TOTAL II 7,890,000

III TPT JEMBATAN (TALAGAJAYA-TANJUNGJAYA)

A BAHAN1 Semen 50 kg 197 - 197 Zak 69,500 - 2 Pasir Pasang 40 - 40 m³ 150,000 - 3 Batu Belah 80 5 5 75 m³ 120,000 600,000 4 Besi dia 12 7 - 7 btg 110,000 - 5 Pasir Beton 1 - 1 m3 295,000 - 6 Kawat beton 1 - 1 kg 16,000 -

SUB TOTAL ( III.A ) 600,000

Page 6: Rpd 2014 Mp3ki - Penguatan

NO URAIAN

VOLUME

SISA

a b c d e = c + d f = b - e g h i = d * h

UNIT / SATUA

N

HARGA SATUAN

(Rp)

JUMLAH (Rp)

KEBUTUHAN PENGAJUAN TAHAP LALU

PENGAJUAN SAAT INI

JUMLAH S.D SAAT

INI

B ALAT1 Bambu 28 25 25 3 btg 8,000 200,000 2 Benang Kasur 3 - 3 bh 5,000 - 3 Pralon 1/2 inch 3 - 3 btg 20,000 - 4 Ember 26 - 26 bh 8,000 - 5 Cat Tembok 6 - 6 kg 30,000 -

SUB TOTAL ( III.B ) 200,000 C UPAH

1 Pekerja Konstruksi 135 - 135 HOK 24,000 - 2 Tukang 61 - 61 HOK 33,000 -

SUB TOTAL ( III.C ) - JUMLAH SUB TOTAL III 800,000

IV GG PLAT BETON (TALAGAJAYA-TANJUNGJAYA)

A BAHAN1 Semen 90 - 90 zak 69,500 - 2 Batu belah 26 6 6 20 M3 120,000 720,000 3 Pasir Pasang 8 - 8 m3 150,000 - 4 Pasir Beton 2 - 2 m3 295,000 - 5 Batu Pecah 2-3 cm 4 - 4 m3 255,000 - 6 Kayu Begisting 1.2 - 1 m3 600,000 - 7 Kawat Beton 4 - 4 Kg 16,000 - 8 Paku 4 - 4 kg 12,000 - 9 Besi dia. 10 64 - 64 Buah 47,000 -

SUB TOTAL ( IV.A ) 720,000 B ALAT

1 Ember 25 - 25 buah 8,000 - 2 Benang Kasur 3 - 3 roll 5,000 - 3 Bambu 17 - 17 Btg 8,000 -

SUB TOTAL ( IV.B ) - C UPAH

1 Pekerja Konstruksi 98 - 98 HOK 24,000 - 2 Tukang 58 - 58 HOK 33,000 -

SUB TOTAL ( IV.C ) - JUMLAH SUB TOTAL IV 720,000

JUMLAH TOTAL D 11,630,000

I RABAT BETON (WANGUNJAYA-MULYAJAYA)

A BAHAN1 Semen 50 kg 1,241 - 1,241 Zak 69,500 - 2 Pasir beton 111 50.5 50.5 61 m³ 315,000 15,907,500 3 Pasir urug 124 - 124 m³ 100,000 - 4 Batu split 2/3 188 163.5 163.5 24.5 m³ 265,000 43,327,500 5 Kayu u/bekisting 3 - 3 m³ 600,000 - 6 Paku 22 - 22 m³ 12,000 - 7 Plastik Cor (lebar 1,5cm) 2,171 - 2,171 m2 2,500 - 8 Aspal Pen 60/70, 155 Kg 1 - 1 drum 1,700,000 -

SUB TOTAL ( I.A ) 59,235,000 B A L A T

1 Biaya Transparansi : 2 a. Papan Proyek 100 x 120 cm 1 1 1 - Ls 100,000 100,000 3 b. Papan Informasi 100 x 180 cm 1 1 1 - Ls 120,000 120,000 4 c. Prasasti 60 x 40 cm 1 - 1 Ls 450,000 - 5 d. Spanduk Program 2 2 2 - Ls 120,000 240,000 6 Concrete Mixer 22 - 22 hari 350,000 - 7 Mobilisasi / Demob 1 - 1 Ls 500,000 - 8 Meteran 5 M 1 - 1 buah 10,000 - 9 Pipa Railing/Pilar Jembatan 8 - 8 btg 250,000 -

Page 7: Rpd 2014 Mp3ki - Penguatan

NO URAIAN

VOLUME

SISA

a b c d e = c + d f = b - e g h i = d * h

UNIT / SATUA

N

HARGA SATUAN

(Rp)

JUMLAH (Rp)

KEBUTUHAN PENGAJUAN TAHAP LALU

PENGAJUAN SAAT INI

JUMLAH S.D SAAT

INI

10 Sekop 2 - 2 buah 70,000 - 11 Ember 77 - 77 buah 8,000 - 12 Arco/dolag 2 - 2 buah 250,000 - 13 Benang Kasur 4 - 4 Roll 5,000 -

SUB TOTAL ( I.B ) 460,000 C UPAH

1 Pekerja Konstruksi 544 - 544 HOK 24,000 - 2 Tukang 142 - 142 HOK 33,000 -

SUB TOTAL ( I.C ) - JUMLAH SUB TOTAL I 59,695,000

II TPT (WANGUNJAYA-MULYAJAYA)

A BAHAN1 Semen 50 kg 1,480 - 1,480 Zak 69,500 - 2 Pasir Pasang 297 71.5 71.5 226 m³ 160,000 11,440,000 3 Batu Belah 593 403.5 403.5 189.5 m³ 120,000 48,420,000

SUB TOTAL ( II.A ) 59,860,000 B ALAT

1 Ember 50 - 50 buah 8,000 - 2 Cat Tembok 4 - 4 kg 30,000 - 3 Pipa pralon 5 - 5 btg 24,000 - 4 Bambu 20 - 20 bh 8,000 - 5 Benang kasur 3 - 3 btg 5,000 -

SUB TOTAL ( II.B ) - C UPAH

1 Pekerja Konstruksi 957 - 957 HOK 24,000 - 2 Tukang 411 - 411 HOK 33,000 -

SUB TOTAL ( II.C ) - JUMLAH SUB TOTAL II 59,860,000

III BRONJONG

A BAHAN1 Batu Belah 231 - 231 M3 120,000 - 2 Bronjong Dia. (2X1X0,5) 192 192 192 - Bh 135,000 25,920,000

SUB TOTAL ( III.A ) 25,920,000 B ALAT

1 Benang 2 - 2 roll 5,000 - 2 Bambu 20 - 20 btg 8,000 -

SUB TOTAL ( III.B ) - C UPAH

1 Pekerja Konstruksi 256 - 256 HOK 24,000 - 2 Tukang 52 - 52 HOK 33,000 -

SUB TOTAL ( III.C ) - JUMLAH SUB TOTAL III 25,920,000

IV GG PLAT BETON

A BAHAN1 Semen 34 - 34 zak 69,500 - 2 Batu belah 10 - 10 M3 120,000 - 3 Pasir Pasang 4 - 4 M3 160,000 - 4 Pasir Beton 2 - 2 M3 315,000 - 5 Batu Pecah 2-3 cm 2 - 2 M3 265,000 - 6 Kayu Begisting 2 - 2 M3 600,000 - 7 Kawat Beton 2 - 2 Kg 16,000 - 8 Paku 2 - 2 Kg 12,000 - 9 Besi dia. 10 28 - 28 Btg 47,000 -

SUB TOTAL ( IV.A ) -

Page 8: Rpd 2014 Mp3ki - Penguatan

NO URAIAN

VOLUME

SISA

a b c d e = c + d f = b - e g h i = d * h

UNIT / SATUA

N

HARGA SATUAN

(Rp)

JUMLAH (Rp)

KEBUTUHAN PENGAJUAN TAHAP LALU

PENGAJUAN SAAT INI

JUMLAH S.D SAAT

INI

B ALAT1 Benang 3 - 3 roll 5,000 - 2 Ember 8 - 8 buah 8,000 -

SUB TOTAL ( IV.B ) - C UPAH

1 Pekerja Konstruksi 36 - 36 HOK 24,000 - 2 Tukang 22 - 22 HOK 33,000 -

SUB TOTAL ( IV.C ) - JUMLAH SUB TOTAL IV -

JUMLAH TOTAL E 145,475,000

JUMLAH TOTAL 204,386,500

Terbilang (dengan huruf) : #VALUE!

Banjarwangi, …......…………

Disetujui Oleh : Dibuat Oleh :Ketua TPK Bendahara TPK

Kecamatan Banjarwangi Kecamatan Banjarwangi

Endjang Komara Ahmad Hayun,S.Pd.IMengetahui :

FK / FT Kecamatan Banjarwangi PjOK Kecamatan Banjarwangi

MIFTAH FARID Ujang Suryana.S.SosFasilitator Kecamatan Fasilitator Teknik NIP. 19671201 198703 1 004

Sebagai Catatan :

NO TAHAP ALOKASI BOP TAHAP LALU TAHAP SEKARANG KUMULATIF

1 DANA 40% TAHAP 1 1,132,128,000 219,559,200 204,386,500 423,945,700

2 DANA 40% TAHAP 2 1,132,128,000 - -

3 DANA 20% 566,064,000 - -

JUMLAH 2,830,320,000 219,559,200 - 423,945,700

DEFIK GUNAWAN. ST AHMAD FAUZI, ST

Page 9: Rpd 2014 Mp3ki - Penguatan

PNPM - Mandiri Perdesaan Pola Khusus MP3KI Form.36.

RENCANA PENGGUNAAN DANAMP3KI PENGUATAN

RPD KE : Kecamatan : Banjarwangi Kabupaten : Garut

Jumlah BLM : Rp 2,830,320,000

NO URAIAN

VOLUME

SISA

a b c d e = c + d f = b - e g h i = d * h

I RABAT BETON (BANJARWANGI-BOJONG-JAYABAKTI)

A BAHAN1 Semen 50 kg 2,856 - 2,856 Zak 69,500 - 2 Pasir beton 255 - 255 m³ 315,000 - 3 Pasir urug 285 - 285 m³ 100,000 - 4 Batu split 2/3 434 - 434 m³ 265,000 - 5 Kayu u/bekisting 6 - 6 m³ 600,000 - 6 Paku 51 - 51 m³ 12,000 - 7 Plastik Cor (lebar 1,5cm) 4,998 - 4,998 m2 2,500 - 8 Aspal Pen 60/70, 155 Kg 5 - 5 drum 1,700,000 -

SUB TOTAL ( I.A ) - B A L A T

1 Biaya Transparansi : 2 a. Papan Proyek 100 x 120 cm 1 - 1 Ls 100,000 - 3 b. Papan Informasi 100 x 180 cm 1 - 1 Ls 120,000 - 4 c. Prasasti 60 x 40 cm 1 - 1 Ls 450,000 - 5 c. Spanduk/umbul umbul 3 - 3 Ls 120,000 - 6 d. Kamera Digital 1 - 1 hari 2,000,000 - 7 Concrete Mixer 51 - 51 Ls 350,000 - 8 Mobilisasi / Demob 1 - 1 hari 500,000 - 9 Sekop 4 - 4 hari 75,000 -

10 Ember 110 - 110 Ls 8,000 - 11 Arco/dolag 4 - 4 buah 250,000 - 12 Benang Kasur 4 - 4 buah 5,000 -

SUB TOTAL ( I.B ) - C UPAH

1 Pekerja Konstruksi 1,287 - 1,287 HOK 24,000 - 2 Tukang 326 - 326 HOK 33,000 -

SUB TOTAL ( I.C ) - JUMLAH SUB TOTAL I -

II TPT (BANJARWANGI-BOJONG-JAYABAKTI)

A BAHAN1 Semen 50 kg 475 - 475 Zak 69,500 - 2 Pasir Pasang 95 - 95 m³ 160,000 - 3 Batu Belah 190 - 190 m³ 120,000 -

SUB TOTAL ( II.A ) - B ALAT

1 Ember 40 - 40 buah 8,000 - 2 Cat Tembok 5 - 5 kg 30,000 - 3 Pralon 1/2 inch 3 - 3 btg 20,000 - 4 Kuas 1/2 inch 2 - 2 bh 20,000 - 5 Bambu 10 - 10 btg 8,000 - 6 Benang kasur 4 - 4 buah 5,000 -

SUB TOTAL ( II.B ) - C UPAH

1 Pekerja Konstruksi 307 - 307 HOK 24,000 - 2 Tukang 151 - 151 HOK 33,000 -

SUB TOTAL ( II.C ) - JUMLAH SUB TOTAL II -

UNIT / SATUA

N

HARGA SATUAN

(Rp)

JUMLAH (Rp)

KEBUTUHAN PENGAJUAN TAHAP LALU

PENGAJUAN SAAT INI

JUMLAH S.D SAAT

INI

Page 10: Rpd 2014 Mp3ki - Penguatan

NO URAIAN

VOLUME

SISA

a b c d e = c + d f = b - e g h i = d * h

UNIT / SATUA

N

HARGA SATUAN

(Rp)

JUMLAH (Rp)

KEBUTUHAN PENGAJUAN TAHAP LALU

PENGAJUAN SAAT INI

JUMLAH S.D SAAT

INI

III BRONJONG

A BAHAN1 Batu Belah 132 - 132 M3 120,000 - 2 Bronjong Dia. (2X1X0,5) 110 - 110 Bh 135,000 -

SUB TOTAL ( III.A ) - B ALAT

1 Benang 2 - 2 roll 5,000 - 2 Bambu 30 - 30 btg 8,000 -

SUB TOTAL ( III.B ) - C UPAH

1 Pekerja Konstruksi 134 - 134 HOK 24,000 - 2 Tukang 27 - 27 HOK 33,000 -

SUB TOTAL ( III.C ) - JUMLAH SUB TOTAL III -

JUMLAH TOTAL A -

I RABAT BETON (BANJARWANGI-TALAGASARI)

A BAHAN1 Semen 50 kg 3,360 - 3,360 Zak 67,500 - 2 Pasir beton 300 - 300 m³ 295,000 - 3 Pasir urug 310 - 310 m³ 100,000 - 4 Batu split 2/3 502 - 502 m³ 245,000 - 5 Kayu u/bekisting 7 - 7 m³ 600,000 - 6 Paku 60 - 60 m³ 12,000 - 7 Plastik Cor (lebar 1,5cm) 5,880 - 5,880 m2 2,500 -

SUB TOTAL ( I.A ) - B A L A T

1 Biaya Transparansi : 2 a. Papan Proyek 100 x 120 cm 1 - 1 Ls 100,000 - 3 b. Papan Informasi 100 x 180 cm 1 - 1 Ls 120,000 - 4 c. Prasasti 60 x 40 cm 1 - 1 Ls 450,000 - 5 Concrete Mixer 60 - 60 hari 350,000 - 6 Mobilisasi / Demob 1 - 1 Ls 500,000 - 7 Meteran 5 M 1 - 1 buah 10,000 - 9 Sekop 3 - 3 buah 75,000 -

10 Ember 200 - 200 buah 8,000 - 11 Arco/dolag 2 - 2 buah 250,000 - 12 Benang Kasur 6 - 6 Roll 5,000 -

SUB TOTAL ( I.B ) - C UPAH

1 Pekerja Konstruksi 1,726 - 1,726 HOK 24,000 - 2 Tukang 384 - 384 HOK 33,000 -

SUB TOTAL ( I.C ) - JUMLAH SUB TOTAL I -

II TPT (BANJARWANGI-TALAGASARI)

A BAHAN1 Semen 50 kg 74 - 74 Zak 67,500 - 2 Pasir Pasang 15 - 15 m³ 160,000 - 3 Batu Belah 21 - 21 m³ 120,000 -

SUB TOTAL ( II.A ) - B ALAT

1 Ember 100 - 100 kg 8,000 - 2 Bambu 1 - 1 bh 6,000 - 3 Benang kasur 2 - 2 btg 5,000 -

SUB TOTAL ( II.B ) -

Page 11: Rpd 2014 Mp3ki - Penguatan

NO URAIAN

VOLUME

SISA

a b c d e = c + d f = b - e g h i = d * h

UNIT / SATUA

N

HARGA SATUAN

(Rp)

JUMLAH (Rp)

KEBUTUHAN PENGAJUAN TAHAP LALU

PENGAJUAN SAAT INI

JUMLAH S.D SAAT

INI

C UPAH1 Pekerja Konstruksi 58 - 58 HOK 24,000 - 2 Tukang 25 - 25 HOK 33,000 -

SUB TOTAL ( II.C ) - JUMLAH SUB TOTAL II -

JUMLAH TOTAL B -

I RABAT BETON (KADONGDONG-WANGUNJAYA)

A BAHAN1 Semen 50 kg 1,008 - 1,008 Zak 69,500 - 2 Pasir beton 90 - 90 m³ 315,000 - 3 Pasir urug 101 - 101 m³ 100,000 - 4 Batu split 2/3 153 - 153 m³ 265,000 - 5 Kayu u/bekisting 2 - 2 m³ 600,000 - 6 Paku 18 - 18 m³ 12,000 - 7 Plastik Cor (lebar 1,5cm) 1,828.52 - 1,828.52 m2 2,500 - 8 Aspal Pen 60/70, 155 Kg 2 - 2 drum 1,700,000 -

SUB TOTAL ( I.A ) - B A L A T

1 Biaya Transparansi : 2 a. Papan Proyek 100 x 120 cm 1 - 1 Ls 100,000 - 3 b. Papan Informasi 100 x 180 cm 1 - 1 Ls 120,000 - 4 c. Prasasti 60 x 40 cm 1 - 1 Ls 450,000 - 5 d. Spanduk/umbul2 2 - 2 Ls 120,000 - 6 Concrete Mixer 18 - 18 hari 350,000 - 7 Mobilisasi / Demob 1 - 1 Ls 500,000 - 8 Sekop 2 - 2 hari 70,000 - 9 Ember 90 - 90 hari 8,000 -

10 Arco/dolag 2 - 2 Ls 250,000 - 11 Sapu Lidi 2 - 2 buah 6,000 - 12 Benang Kasur 5 - 5 buah 5,000 -

SUB TOTAL ( I.B ) - C UPAH

1 Pekerja Konstruksi 398 - 398 HOK 24,000 - 2 Tukang 115 - 115 HOK 33,000 -

SUB TOTAL ( I.C ) - JUMLAH SUB TOTAL I -

II TPT (KADONGDONG-WANGUNJAYA)

A BAHAN1 Semen 50 kg 472 - 472 Zak 69,500 - 2 Pasir Pasang 95 - 95 m³ 160,000 - 3 Batu Belah 186 - 186 m³ 120,000 -

SUB TOTAL ( II.A ) - B ALAT

1 Ember 30 - 30 buah 8,000 - 2 Cat Tembok 6 - 6 kg 30,000 - 3 Pralon 1/2 inch 2 - 2 buah 24,000 - 4 Bambu 10 - 10 btg 8,000 - 5 Benang kasur 3 - 3 buah 5,000 -

SUB TOTAL ( II.B ) - C UPAH

1 Pekerja Konstruksi 344 - 344 HOK 24,000 - 2 Tukang 165 - 165 HOK 33,000 -

SUB TOTAL ( II.C ) - JUMLAH SUB TOTAL II -

Page 12: Rpd 2014 Mp3ki - Penguatan

NO URAIAN

VOLUME

SISA

a b c d e = c + d f = b - e g h i = d * h

UNIT / SATUA

N

HARGA SATUAN

(Rp)

JUMLAH (Rp)

KEBUTUHAN PENGAJUAN TAHAP LALU

PENGAJUAN SAAT INI

JUMLAH S.D SAAT

INI

III JEMBATAN BAJA

A BAHAN1 bouwplank 1 - 1 Ls 1,200,000 - 2 Besi WF 500.200 6,592 6,592 6,592 - kg 16,700 110,086,400 3 Besi WF 200.100 379 379 379 - kg 16,700 6,329,300 4 Besi L.100.100.10 1,775 1,775 1,775 - kg 16,700 29,642,500 5 Besi L.70.70.7 245 245 245 - kg 16,700 4,091,500 6 Besi L.60.60.6 590 590 590 - kg 16,700 9,853,000 7 Baud 1/2" x 4 cm 154 154 154 - buah 8,000 1,232,000 8 Baud 5/8" x 6 cm 184 184 184 - buah 10,000 1,840,000 9 Lantai Kayu 8/20 6 - 6 m3 3,000,000 -

10 Baut kokot 5/8' x 25 cm 192 192 192 - buah 18,000 3,456,000 11 Baut kokot 5/8' x 16 cm 736 736 736 - buah 23,000 16,928,000 12 Plat sambungan gelagar utama A 78 78 78 - kg 16,700 1,302,600 13 Plat sambungan tipe B 20 20 20 - kg 16,700 334,000 14 Plat sambungan tipe C 37 37 37 - kg 16,700 617,900 15 Baut sambungan gelagar utama 384 384 384 - buah 24,000 9,216,000 16 Plat Klem Lantai 736 736 736 - buah 15,000 11,040,000 17 Karet Peredam Lantai 64 64 64 - m 10,000 640,000 18 Elastomer 8 8 8 - buah 250,000 2,000,000 19 Kayu Bekisting 6 - 6 m3 600,000 - 20 Paku 15 - 15 kg 12,000 - 21 Besi beton polos 1,069 - 1,069 kg 7,000 - 22 Kawat beton 24 - 24 kg 16,000 - 23 Semen 529 - 529 zak 69,500 - 24 Pasir beton 5 - 5 m3 315,000 - 25 Split 5 - 5 m3 265,000 - 26 Batu Belah 162 - 162 m3 120,000 - 27 Pabrikasi Ereksion 10,650 3,650 3,650 7,000 kg 3,000 10,950,000 28 Cat tembok 12 - 12 kg 30,000 - 29 Cat finishing besi 1 - 1 ls 2,000,000 - 30 Pasir pasang 80 - 80 m3 160,000 -

SUB TOTAL ( III.A ) 219,559,200 B ALAT

1 Papan Kegiatan 1 - 1 Unit 120,000 - 2 Cangkul 1 - 1 Buah 50,000 - 3 Linggis 1 - 1 Buah 25,000 - 4 Sekop 1 - 1 Buah 70,000 - 5 Bambu 50 - 50 Buah 8,000 - 6 Benang nilon 2 - 2 Buah 5,000 - 7 Selang waterpass 15 - 15 m 1,500 - 8 Ember Aduk Kecil 40 - 40 Buah 8,000 - 9 Sewa molen 3 - 3 Hari 350,000 -

10 Mobilisasi Molen 1 - 1 Ls 500,000 - 11 Kuas 3 inch 4 - 4 bh 10,000 - 12 Kunci besi 1 - 1 Buah 10,000 - 13 Karung Tanggul 125 - 125 Buah 1,000 - 14 Sewa Pompa Sedot 6 - 6 Hari 50,000 - 15 Prasasti 1 - 1 Buah 450,000 -

SUB TOTAL ( III.B ) - C UPAH

1 Pekerja 319 - 319 HOK 24,000 - 2 Tukang 105 - 105 HOK 33,000 -

SUB TOTAL ( III.C ) - JUMLAH SUB TOTAL III 219,559,200

JUMLAH TOTAL C 219,559,200

Page 13: Rpd 2014 Mp3ki - Penguatan

NO URAIAN

VOLUME

SISA

a b c d e = c + d f = b - e g h i = d * h

UNIT / SATUA

N

HARGA SATUAN

(Rp)

JUMLAH (Rp)

KEBUTUHAN PENGAJUAN TAHAP LALU

PENGAJUAN SAAT INI

JUMLAH S.D SAAT

INI

I PENGASPALAN (TALAGAJAYA-TANJUNGJAYA)

A BAHAN1 Batu Pecah 3/5 Cm 130 - 130 m2 235,000 - 2 Batu Pecah 2/3 Cm 137 - 137 m3 255,000 - 3 Batu Pecah 1/2 Cm 69 - 69 m3 295,000 - 4 Pasir Aspal / Abu batu 37 - 37 m3 245,000 - 5 Aspal Pen 60/70, 155 Kg 139 - 139 Drum 1,700,000 - 6 Aspal Emulsi @ 200 kg 16 - 16 Drum 1,850,000 - 7 Ban Bekas Mobil 25 - 25 Buah 20,000 - 8 Kayu bakar 2 - 2 m3 100,000 -

SUB TOTAL ( I.A ) - B A L A T

1 Papan proyek ( Uk.1,20 cm x 1.00 cm 1 - 1 Unit 100,000 - 2 Papan Informasi ( Uk.120 cm x 100 c 1 - 1 Unit 120,000 - 3 Prasasti ( Uk. 60 cm x 40 cm ) 1 - 1 Unit 450,000 - 4 Spanduk/umbul2 2 - 2 paket 200,000 - 5 Meteran 7,5 m 2 - 2 bh 20,000 - 6 Sapu Lidi 4 - 4 bh 12,125 - 7 meteran 50 m 1 - 1 bh 60,000 - 8 Kamera Dokumentasi 1 - 1 paket 1,500,000 - 9 Mesin Gilas 12 - 12 Hari 800,000 -

10 Mob./Demob. Mesin Gilas 1 - 1 Ls 2,500,000 - SUB TOTAL ( I.B ) -

C UPAH1 Pekerja Konstruksi (Aspal ) 281 - 281 HOK 30,000 - 2 Pekerja Galian Saluran 220 - 220 HOK 24,000 - 3 Tukang ( Aspal) 42 - 42 HOK 45,000 -

SUB TOTAL ( I.C ) - JUMLAH SUB TOTAL I -

II TPT (TALAGAJAYA-TANJUNGJAYA)

A BAHAN1 Semen 50 kg 288 - 288 Zak 69,500 - 2 Pasir Pasang 58 - 58 m³ 150,000 - 3 Batu Belah 115 - 115 m³ 120,000 -

SUB TOTAL ( II.A ) - B ALAT

1 Bambu 18 - 18 btg 8,000 - 2 Benang Kasur 3 - 3 bh 5,000 - 3 Pralon 1/2 inch 4 - 4 btg 20,000 - 4 Ember 20 - 20 bh 8,000 - 5 Cat Tembok 6 - 6 kg 30,000 -

SUB TOTAL ( II.B ) - C UPAH

1 Pekerja Konstruksi 232 - 232 HOK 24,000 - 2 Tukang 93 - 93 HOK 33,000 -

SUB TOTAL ( II.C ) - JUMLAH SUB TOTAL II -

III TPT JEMBATAN (TALAGAJAYA-TANJUNGJAYA)

A BAHAN1 Semen 50 kg 197 - 197 Zak 69,500 - 2 Pasir Pasang 40 - 40 m³ 150,000 - 3 Batu Belah 80 - 80 m³ 120,000 - 4 Besi dia 12 7 - 7 btg 110,000 - 5 Pasir Beton 1 - 1 m3 295,000 - 6 Kawat beton 1 - 1 kg 16,000 -

SUB TOTAL ( III.A ) -

Page 14: Rpd 2014 Mp3ki - Penguatan

NO URAIAN

VOLUME

SISA

a b c d e = c + d f = b - e g h i = d * h

UNIT / SATUA

N

HARGA SATUAN

(Rp)

JUMLAH (Rp)

KEBUTUHAN PENGAJUAN TAHAP LALU

PENGAJUAN SAAT INI

JUMLAH S.D SAAT

INI

B ALAT1 Bambu 28 - 28 btg 8,000 - 2 Benang Kasur 3 - 3 bh 5,000 - 3 Pralon 1/2 inch 3 - 3 btg 20,000 - 4 Ember 26 - 26 bh 8,000 - 5 Cat Tembok 6 - 6 kg 30,000 -

SUB TOTAL ( III.B ) - C UPAH

1 Pekerja Konstruksi 135 - 135 HOK 24,000 - 2 Tukang 61 - 61 HOK 33,000 -

SUB TOTAL ( III.C ) - JUMLAH SUB TOTAL III -

IV GG PLAT BETON (TALAGAJAYA-TANJUNGJAYA)

A BAHAN1 Semen 90 - 90 zak 69,500 - 2 Batu belah 26 - 26 M3 120,000 - 3 Pasir Pasang 8 - 8 m3 150,000 - 4 Pasir Beton 2 - 2 m3 295,000 - 5 Batu Pecah 2-3 cm 4 - 4 m3 255,000 - 6 Kayu Begisting 1.2 - 1 m3 600,000 - 7 Kawat Beton 4 - 4 Kg 16,000 - 8 Paku 4 - 4 kg 12,000 - 9 Besi dia. 10 64 - 64 Buah 47,000 -

SUB TOTAL ( IV.A ) - B ALAT

1 Ember 25 - 25 buah 8,000 - 2 Benang Kasur 3 - 3 roll 5,000 - 3 Bambu 17 - 17 Btg 8,000 -

SUB TOTAL ( IV.B ) - C UPAH

1 Pekerja Konstruksi 98 - 98 HOK 24,000 - 2 Tukang 58 - 58 HOK 33,000 -

SUB TOTAL ( IV.C ) - JUMLAH SUB TOTAL IV -

JUMLAH TOTAL D -

I RABAT BETON (WANGUNJAYA-MULYAJAYA)

A BAHAN1 Semen 50 kg 1,241 - 1,241 Zak 69,500 - 2 Pasir beton 111 - 111 m³ 315,000 - 3 Pasir urug 124 - 124 m³ 100,000 - 4 Batu split 2/3 188 - 188 m³ 265,000 - 5 Kayu u/bekisting 3 - 3 m³ 600,000 - 6 Paku 22 - 22 m³ 12,000 - 7 Plastik Cor (lebar 1,5cm) 2,171 - 2,171 m2 2,500 - 8 Aspal Pen 60/70, 155 Kg 1 - 1 drum 1,700,000 -

SUB TOTAL ( I.A ) - B A L A T

1 Biaya Transparansi : 2 a. Papan Proyek 100 x 120 cm 1 - 1 Ls 100,000 - 3 b. Papan Informasi 100 x 180 cm 1 - 1 Ls 120,000 - 4 c. Prasasti 60 x 40 cm 1 - 1 Ls 450,000 - 5 d. Spanduk Program 2 - 2 Ls 120,000 - 6 Concrete Mixer 22 - 22 hari 350,000 - 7 Mobilisasi / Demob 1 - 1 Ls 500,000 - 8 Meteran 5 M 1 - 1 buah 10,000 - 9 Pipa Railing/Pilar Jembatan 8 - 8 btg 250,000 -

Page 15: Rpd 2014 Mp3ki - Penguatan

NO URAIAN

VOLUME

SISA

a b c d e = c + d f = b - e g h i = d * h

UNIT / SATUA

N

HARGA SATUAN

(Rp)

JUMLAH (Rp)

KEBUTUHAN PENGAJUAN TAHAP LALU

PENGAJUAN SAAT INI

JUMLAH S.D SAAT

INI

10 Sekop 2 - 2 buah 70,000 - 11 Ember 77 - 77 buah 8,000 - 12 Arco/dolag 2 - 2 buah 250,000 - 13 Benang Kasur 4 - 4 Roll 5,000 -

SUB TOTAL ( I.B ) - C UPAH

1 Pekerja Konstruksi 544 - 544 HOK 24,000 - 2 Tukang 142 - 142 HOK 33,000 -

SUB TOTAL ( I.C ) - JUMLAH SUB TOTAL I -

II TPT (WANGUNJAYA-MULYAJAYA)

A BAHAN1 Semen 50 kg 1,480 - 1,480 Zak 69,500 - 2 Pasir Pasang 297 - 297 m³ 160,000 - 3 Batu Belah 593 - 593 m³ 120,000 -

SUB TOTAL ( II.A ) - B ALAT

1 Ember 50 - 50 buah 8,000 - 2 Cat Tembok 4 - 4 kg 30,000 - 3 Pipa pralon 5 - 5 btg 24,000 - 4 Bambu 20 - 20 bh 8,000 - 5 Benang kasur 3 - 3 btg 5,000 -

SUB TOTAL ( II.B ) - C UPAH

1 Pekerja Konstruksi 957 - 957 HOK 24,000 - 2 Tukang 411 - 411 HOK 33,000 -

SUB TOTAL ( II.C ) - JUMLAH SUB TOTAL II -

III BRONJONG

A BAHAN1 Batu Belah 231 - 231 M3 120,000 - 2 Bronjong Dia. (2X1X0,5) 192 - 192 Bh 135,000 -

SUB TOTAL ( III.A ) - B ALAT

1 Benang 2 - 2 roll 5,000 - 2 Bambu 20 - 20 btg 8,000 -

SUB TOTAL ( III.B ) - C UPAH

1 Pekerja Konstruksi 256 - 256 HOK 24,000 - 2 Tukang 52 - 52 HOK 33,000 -

SUB TOTAL ( III.C ) - JUMLAH SUB TOTAL III -

IV GG PLAT BETON

A BAHAN1 Semen 34 - 34 zak 69,500 - 2 Batu belah 10 - 10 M3 120,000 - 3 Pasir Pasang 4 - 4 M3 160,000 - 4 Pasir Beton 2 - 2 M3 315,000 - 5 Batu Pecah 2-3 cm 2 - 2 M3 265,000 - 6 Kayu Begisting 2 - 2 M3 600,000 - 7 Kawat Beton 2 - 2 Kg 16,000 - 8 Paku 2 - 2 Kg 12,000 - 9 Besi dia. 10 28 - 28 Btg 47,000 -

SUB TOTAL ( IV.A ) -

Page 16: Rpd 2014 Mp3ki - Penguatan

NO URAIAN

VOLUME

SISA

a b c d e = c + d f = b - e g h i = d * h

UNIT / SATUA

N

HARGA SATUAN

(Rp)

JUMLAH (Rp)

KEBUTUHAN PENGAJUAN TAHAP LALU

PENGAJUAN SAAT INI

JUMLAH S.D SAAT

INI

B ALAT1 Benang 3 - 3 roll 5,000 - 2 Ember 8 - 8 buah 8,000 -

SUB TOTAL ( IV.B ) - C UPAH

1 Pekerja Konstruksi 36 - 36 HOK 24,000 - 2 Tukang 22 - 22 HOK 33,000 -

SUB TOTAL ( IV.C ) - JUMLAH SUB TOTAL IV -

JUMLAH TOTAL E -

JUMLAH TOTAL 219,559,200

Terbilang (dengan huruf) : #VALUE!

Banjarwangi, …......…………

Disetujui Oleh : Dibuat Oleh :Ketua TPK Bendahara TPK

Kecamatan Banjarwangi Kecamatan Banjarwangi

Endjang Komara Ahmad Hayun,S.Pd.IMengetahui :

FK / FT Kecamatan Banjarwangi PjOK Kecamatan Banjarwangi

MIFTAH FARID Ujang Suryana.S.SosFasilitator Kecamatan Fasilitator Teknik NIP. 19671201 198703 1 004

Sebagai Catatan :

TAHAP ALOKASI BOP TAHAP LALU KUMULATIF

1 DANA 40% TAHAP 1 1,132,128,000 219,559,200 219,559,200

2 DANA 40% TAHAP 2 1,132,128,000 - -

3 DANA 20% 566,064,000 - -

JUMLAH 2,830,320,000 - 219,559,200 219,559,200

DEFIK GUNAWAN. ST AHMAD FAUZI, ST

NO

TAHAP SEKARANG

Page 17: Rpd 2014 Mp3ki - Penguatan

PNPM - Mandiri Perdesaan Pola Khusus MP3KI Form.36.

RENCANA PENGGUNAAN DANAMP3KI PENGUATAN

RPD KE : Kecamatan : Banjarwangi Kabupaten : Garut

Jumlah BLM : Rp 2,830,320,000

NO URAIAN

VOLUME

SISA

a b c d e = c + d f = b - e g h i = d * h

I RABAT BETON (BANJARWANGI-BOJONG-JAYABAKTI)

A BAHAN1 Semen 50 kg 2,856 - - 2,856 Zak 69,500 - 2 Pasir beton 255 - - 255 m³ 315,000 - 3 Pasir urug 285 - - 285 m³ 100,000 - 4 Batu split 2/3 434 - - 434 m³ 265,000 - 5 Kayu u/bekisting 6 - - 6 m³ 600,000 - 6 Paku 51 - - 51 m³ 12,000 - 7 Plastik Cor (lebar 1,5cm) 4,998 - - 4,998 m2 2,500 - 8 Aspal Pen 60/70, 155 Kg 5 - - 5 drum 1,700,000 -

SUB TOTAL ( I.A ) - B A L A T

1 Biaya Transparansi : 2 a. Papan Proyek 100 x 120 cm 1 - - 1 Ls 100,000 - 3 b. Papan Informasi 100 x 180 cm 1 - - 1 Ls 120,000 - 4 c. Prasasti 60 x 40 cm 1 - - 1 Ls 450,000 - 5 c. Spanduk/umbul umbul 3 - - 3 Ls 120,000 - 6 d. Kamera Digital 1 - - 1 hari 2,000,000 - 7 Concrete Mixer 51 - - 51 Ls 350,000 - 8 Mobilisasi / Demob 1 - - 1 hari 500,000 - 9 Sekop 4 - - 4 hari 75,000 -

10 Ember 110 - - 110 Ls 8,000 - 11 Arco/dolag 4 - - 4 buah 250,000 - 12 Benang Kasur 4 - - 4 buah 5,000 -

SUB TOTAL ( I.B ) - C UPAH

1 Pekerja Konstruksi 1,287 - - 1,287 HOK 24,000 - 2 Tukang 326 - - 326 HOK 33,000 -

SUB TOTAL ( I.C ) - JUMLAH SUB TOTAL I -

II TPT (BANJARWANGI-BOJONG-JAYABAKTI)

A BAHAN1 Semen 50 kg 475 - - 475 Zak 69,500 - 2 Pasir Pasang 95 - - 95 m³ 160,000 - 3 Batu Belah 190 - - 190 m³ 120,000 -

SUB TOTAL ( II.A ) - B ALAT

1 Ember 40 - - 40 buah 8,000 - 2 Cat Tembok 5 - - 5 kg 30,000 - 3 Pralon 1/2 inch 3 - - 3 btg 20,000 - 4 Kuas 1/2 inch 2 - - 2 bh 20,000 - 5 Bambu 10 - - 10 btg 8,000 - 6 Benang kasur 4 - - 4 buah 5,000 -

SUB TOTAL ( II.B ) - C UPAH

1 Pekerja Konstruksi 307 - - 307 HOK 24,000 - 2 Tukang 151 - - 151 HOK 33,000 -

SUB TOTAL ( II.C ) - JUMLAH SUB TOTAL II -

UNIT / SATUA

N

HARGA SATUAN

(Rp)

JUMLAH (Rp)

KEBUTUHAN PENGAJUAN TAHAP LALU

PENGAJUAN SAAT INI

JUMLAH S.D SAAT

INI

Page 18: Rpd 2014 Mp3ki - Penguatan

NO URAIAN

VOLUME

SISA

a b c d e = c + d f = b - e g h i = d * h

UNIT / SATUA

N

HARGA SATUAN

(Rp)

JUMLAH (Rp)

KEBUTUHAN PENGAJUAN TAHAP LALU

PENGAJUAN SAAT INI

JUMLAH S.D SAAT

INI

III BRONJONG

A BAHAN1 Batu Belah 132 - 132 M3 120,000 - 2 Bronjong Dia. (2X1X0,5) 110 - 110 Bh 135,000 -

SUB TOTAL ( III.A ) - B ALAT

1 Benang 2 - 2 roll 5,000 - 2 Bambu 30 - 30 btg 8,000 -

SUB TOTAL ( III.B ) - C UPAH

1 Pekerja Konstruksi 134 - 134 HOK 24,000 - 2 Tukang 27 - 27 HOK 33,000 -

SUB TOTAL ( III.C ) - JUMLAH SUB TOTAL III -

JUMLAH TOTAL A -

I RABAT BETON (BANJARWANGI-TALAGASARI)

A BAHAN1 Semen 50 kg 3,360 - 3,360 Zak 67,500 - 2 Pasir beton 300 58 58 242 m³ 295,000 17,110,000 3 Pasir urug 310 - 310 m³ 100,000 - 4 Batu split 2/3 502 - 502 m³ 245,000 - 5 Kayu u/bekisting 7 - 7 m³ 600,000 - 6 Paku 60 - 60 m³ 12,000 - 7 Plastik Cor (lebar 1,5cm) 5,880 - 5,880 m2 2,500 -

SUB TOTAL ( I.A ) 17,110,000 B A L A T

1 Biaya Transparansi : 2 a. Papan Proyek 100 x 120 cm 1 - 1 Ls 100,000 - 3 b. Papan Informasi 100 x 180 cm 1 - 1 Ls 120,000 - 4 c. Prasasti 60 x 40 cm 1 - 1 Ls 450,000 - 5 Concrete Mixer 60 - 60 hari 350,000 - 6 Mobilisasi / Demob 1 - 1 Ls 500,000 - 7 Meteran 5 M 1 - 1 buah 10,000 - 9 Sekop 3 - 3 buah 75,000 -

10 Ember 200 - 200 buah 8,000 - 11 Arco/dolag 2 - 2 buah 250,000 - 12 Benang Kasur 6 - 6 Roll 5,000 -

SUB TOTAL ( I.B ) - C UPAH

1 Pekerja Konstruksi 1,726 - 1,726 HOK 24,000 - 2 Tukang 384 - 384 HOK 33,000 -

SUB TOTAL ( I.C ) - JUMLAH SUB TOTAL I 17,110,000

II TPT (BANJARWANGI-TALAGASARI)

A BAHAN1 Semen 50 kg 74 - 74 Zak 67,500 - 2 Pasir Pasang 15 15 15 - m³ 160,000 2,400,000 3 Batu Belah 21 14 14 7 m³ 120,000 1,680,000

SUB TOTAL ( II.A ) 4,080,000 B ALAT

1 Ember 100 - 100 kg 8,000 - 2 Bambu 1 - 1 bh 6,000 - 3 Benang kasur 2 - 2 btg 5,000 -

SUB TOTAL ( II.B ) -

Page 19: Rpd 2014 Mp3ki - Penguatan

NO URAIAN

VOLUME

SISA

a b c d e = c + d f = b - e g h i = d * h

UNIT / SATUA

N

HARGA SATUAN

(Rp)

JUMLAH (Rp)

KEBUTUHAN PENGAJUAN TAHAP LALU

PENGAJUAN SAAT INI

JUMLAH S.D SAAT

INI

C UPAH1 Pekerja Konstruksi 58 - 58 HOK 24,000 - 2 Tukang 25 - 25 HOK 33,000 -

SUB TOTAL ( II.C ) - JUMLAH SUB TOTAL II 4,080,000

JUMLAH TOTAL B 21,190,000

I RABAT BETON (KADONGDONG-WANGUNJAYA)

A BAHAN1 Semen 50 kg 1,008 - 1,008 Zak 69,500 - 2 Pasir beton 90 - 90 m³ 315,000 - 3 Pasir urug 101 - 101 m³ 100,000 - 4 Batu split 2/3 153 - 153 m³ 265,000 - 5 Kayu u/bekisting 2 - 2 m³ 600,000 - 6 Paku 18 - 18 m³ 12,000 - 7 Plastik Cor (lebar 1,5cm) 1,828.52 - 1,828.52 m2 2,500 - 8 Aspal Pen 60/70, 155 Kg 2 - 2 drum 1,700,000 -

SUB TOTAL ( I.A ) - B A L A T

1 Biaya Transparansi : 2 a. Papan Proyek 100 x 120 cm 1 - 1 Ls 100,000 - 3 b. Papan Informasi 100 x 180 cm 1 - 1 Ls 120,000 - 4 c. Prasasti 60 x 40 cm 1 - 1 Ls 450,000 - 5 d. Spanduk/umbul2 2 - 2 Ls 120,000 - 6 Concrete Mixer 18 - 18 hari 350,000 - 7 Mobilisasi / Demob 1 - 1 Ls 500,000 - 8 Sekop 2 - 2 hari 70,000 - 9 Ember 90 - 90 hari 8,000 -

10 Arco/dolag 2 - 2 Ls 250,000 - 11 Sapu Lidi 2 - 2 buah 6,000 - 12 Benang Kasur 5 - 5 buah 5,000 -

SUB TOTAL ( I.B ) - C UPAH

1 Pekerja Konstruksi 398 - 398 HOK 24,000 - 2 Tukang 115 - 115 HOK 33,000 -

SUB TOTAL ( I.C ) - JUMLAH SUB TOTAL I -

II TPT (KADONGDONG-WANGUNJAYA)

A BAHAN1 Semen 50 kg 472 - 472 Zak 69,500 - 2 Pasir Pasang 95 - 95 m³ 160,000 - 3 Batu Belah 186 - 186 m³ 120,000 -

SUB TOTAL ( II.A ) - B ALAT

1 Ember 30 - 30 buah 8,000 - 2 Cat Tembok 6 - 6 kg 30,000 - 3 Pralon 1/2 inch 2 - 2 buah 24,000 - 4 Bambu 10 - 10 btg 8,000 - 5 Benang kasur 3 - 3 buah 5,000 -

SUB TOTAL ( II.B ) - C UPAH

1 Pekerja Konstruksi 344 - 344 HOK 24,000 - 2 Tukang 165 - 165 HOK 33,000 -

SUB TOTAL ( II.C ) - JUMLAH SUB TOTAL II -

Page 20: Rpd 2014 Mp3ki - Penguatan

NO URAIAN

VOLUME

SISA

a b c d e = c + d f = b - e g h i = d * h

UNIT / SATUA

N

HARGA SATUAN

(Rp)

JUMLAH (Rp)

KEBUTUHAN PENGAJUAN TAHAP LALU

PENGAJUAN SAAT INI

JUMLAH S.D SAAT

INI

III JEMBATAN BAJA

A BAHAN1 bouwplank 1 - 1 Ls 1,200,000 - 2 Besi WF 500.200 6,592 6,592 6,592 - kg 16,700 - 3 Besi WF 200.100 379 379 379 - kg 16,700 - 4 Besi L.100.100.10 1,775 1,775 1,775 - kg 16,700 - 5 Besi L.70.70.7 245 245 245 - kg 16,700 - 6 Besi L.60.60.6 590 590 590 - kg 16,700 - 7 Baud 1/2" x 4 cm 154 154 154 - buah 8,000 - 8 Baud 5/8" x 6 cm 184 184 184 - buah 10,000 - 9 Lantai Kayu 8/20 6 - - 6 m3 3,000,000 -

10 Baut kokot 5/8' x 25 cm 192 192 192 - buah 18,000 - 11 Baut kokot 5/8' x 16 cm 736 736 736 - buah 23,000 - 12 Plat sambungan gelagar utama A 78 78 78 - kg 16,700 - 13 Plat sambungan tipe B 20 20 20 - kg 16,700 - 14 Plat sambungan tipe C 37 37 37 - kg 16,700 - 15 Baut sambungan gelagar utama 384 384 384 - buah 24,000 - 16 Plat Klem Lantai 736 736 736 - buah 15,000 - 17 Karet Peredam Lantai 64 64 64 - m 10,000 - 18 Elastomer 8 8 8 - buah 250,000 - 19 Kayu Bekisting 6 - - 6 m3 600,000 - 20 Paku 15 - - 15 kg 12,000 - 21 Besi beton polos 1,069 - - 1,069 kg 7,000 - 22 Kawat beton 24 - - 24 kg 16,000 - 23 Semen 529 - - 529 zak 69,500 - 24 Pasir beton 5 - - 5 m3 315,000 - 25 Split 5 - - 5 m3 265,000 - 26 Batu Belah 162 - - 162 m3 120,000 - 27 Pabrikasi Ereksion 10,650 3,650 3,650 7,000 kg 3,000 - 28 Cat tembok 12 - - 12 kg 30,000 - 29 Cat finishing besi 1 - - 1 ls 2,000,000 - 30 Pasir pasang 80 - - 80 m3 160,000 -

SUB TOTAL ( III.A ) - B ALAT

1 Papan Kegiatan 1 - 1 Unit 120,000 - 2 Cangkul 1 - 1 Buah 50,000 - 3 Linggis 1 - 1 Buah 25,000 - 4 Sekop 1 - 1 Buah 70,000 - 5 Bambu 50 - 50 Buah 8,000 - 6 Benang nilon 2 - 2 Buah 5,000 - 7 Selang waterpass 15 - 15 m 1,500 - 8 Ember Aduk Kecil 40 - 40 Buah 8,000 - 9 Sewa molen 3 - 3 Hari 350,000 -

10 Mobilisasi Molen 1 - 1 Ls 500,000 - 11 Kuas 3 inch 4 - 4 bh 10,000 - 12 Kunci besi 1 - 1 Buah 10,000 - 13 Karung Tanggul 125 - 125 Buah 1,000 - 14 Sewa Pompa Sedot 6 - 6 Hari 50,000 - 15 Prasasti 1 - 1 Buah 450,000 -

SUB TOTAL ( III.B ) - C UPAH

1 Pekerja 319 - 319 HOK 24,000 - 2 Tukang 105 - 105 HOK 33,000 -

SUB TOTAL ( III.C ) - JUMLAH SUB TOTAL III -

JUMLAH TOTAL C -

Page 21: Rpd 2014 Mp3ki - Penguatan

NO URAIAN

VOLUME

SISA

a b c d e = c + d f = b - e g h i = d * h

UNIT / SATUA

N

HARGA SATUAN

(Rp)

JUMLAH (Rp)

KEBUTUHAN PENGAJUAN TAHAP LALU

PENGAJUAN SAAT INI

JUMLAH S.D SAAT

INI

I PENGASPALAN (TALAGAJAYA-TANJUNGJAYA)

A BAHAN1 Batu Pecah 3/5 Cm 130 106 106 24 m2 235,000 24,910,000 2 Batu Pecah 2/3 Cm 137 12 12 125 m3 255,000 3,060,000 3 Batu Pecah 1/2 Cm 69 18 18 51 m3 295,000 5,310,000 4 Pasir Aspal / Abu batu 37 - 37 m3 245,000 - 5 Aspal Pen 60/70, 155 Kg 139 - 139 Drum 1,700,000 - 6 Aspal Emulsi @ 200 kg 16 - 16 Drum 1,850,000 - 7 Ban Bekas Mobil 25 - 25 Buah 20,000 - 8 Kayu bakar 2 - 2 m3 100,000 -

SUB TOTAL ( I.A ) 33,280,000 B A L A T

1 Papan proyek ( Uk.1,20 cm x 1.00 cm 1 - 1 Unit 100,000 - 2 Papan Informasi ( Uk.120 cm x 100 c 1 - 1 Unit 120,000 - 3 Prasasti ( Uk. 60 cm x 40 cm ) 1 - 1 Unit 450,000 - 4 Spanduk/umbul2 2 - 2 paket 200,000 - 5 Meteran 7,5 m 2 - 2 bh 20,000 - 6 Sapu Lidi 4 - 4 bh 12,125 - 7 meteran 50 m 1 - 1 bh 60,000 - 8 Kamera Dokumentasi 1 - 1 paket 1,500,000 - 9 Mesin Gilas 12 - 12 Hari 800,000 -

10 Mob./Demob. Mesin Gilas 1 - 1 Ls 2,500,000 - SUB TOTAL ( I.B ) -

C UPAH1 Pekerja Konstruksi (Aspal ) 281 - 281 HOK 30,000 - 2 Pekerja Galian Saluran 220 - 220 HOK 24,000 - 3 Tukang ( Aspal) 42 - 42 HOK 45,000 -

SUB TOTAL ( I.C ) - JUMLAH SUB TOTAL I 33,280,000

II TPT (TALAGAJAYA-TANJUNGJAYA)

A BAHAN1 Semen 50 kg 288 - 288 Zak 69,500 - 2 Pasir Pasang 58 6.0 6 52 m³ 150,000 900,000 3 Batu Belah 115 - 115 m³ 120,000 -

SUB TOTAL ( II.A ) 900,000 B ALAT

1 Bambu 18 - 18 btg 8,000 - 2 Benang Kasur 3 - 3 bh 5,000 - 3 Pralon 1/2 inch 4 - 4 btg 20,000 - 4 Ember 20 - 20 bh 8,000 - 5 Cat Tembok 6 - 6 kg 30,000 -

SUB TOTAL ( II.B ) - C UPAH

1 Pekerja Konstruksi 232 - 232 HOK 24,000 - 2 Tukang 93 - 93 HOK 33,000 -

SUB TOTAL ( II.C ) - JUMLAH SUB TOTAL II 900,000

III TPT JEMBATAN (TALAGAJAYA-TANJUNGJAYA)

A BAHAN1 Semen 50 kg 197 - 197 Zak 69,500 - 2 Pasir Pasang 40 - 40 m³ 150,000 - 3 Batu Belah 80 - 80 m³ 120,000 - 4 Besi dia 12 7 - 7 btg 110,000 - 5 Pasir Beton 1 - 1 m3 295,000 - 6 Kawat beton 1 - 1 kg 16,000 -

SUB TOTAL ( III.A ) -

Page 22: Rpd 2014 Mp3ki - Penguatan

NO URAIAN

VOLUME

SISA

a b c d e = c + d f = b - e g h i = d * h

UNIT / SATUA

N

HARGA SATUAN

(Rp)

JUMLAH (Rp)

KEBUTUHAN PENGAJUAN TAHAP LALU

PENGAJUAN SAAT INI

JUMLAH S.D SAAT

INI

B ALAT1 Bambu 28 - 28 btg 8,000 - 2 Benang Kasur 3 - 3 bh 5,000 - 3 Pralon 1/2 inch 3 - 3 btg 20,000 - 4 Ember 26 - 26 bh 8,000 - 5 Cat Tembok 6 - 6 kg 30,000 -

SUB TOTAL ( III.B ) - C UPAH

1 Pekerja Konstruksi 135 - 135 HOK 24,000 - 2 Tukang 61 - 61 HOK 33,000 -

SUB TOTAL ( III.C ) - JUMLAH SUB TOTAL III -

IV GG PLAT BETON (TALAGAJAYA-TANJUNGJAYA)

A BAHAN1 Semen 90 - 90 zak 69,500 - 2 Batu belah 26 - 26 M3 120,000 - 3 Pasir Pasang 8 - 8 m3 150,000 - 4 Pasir Beton 2 - 2 m3 295,000 - 5 Batu Pecah 2-3 cm 4 - 4 m3 255,000 - 6 Kayu Begisting 1.2 - 1 m3 600,000 - 7 Kawat Beton 4 - 4 Kg 16,000 - 8 Paku 4 - 4 kg 12,000 - 9 Besi dia. 10 64 - 64 Buah 47,000 -

SUB TOTAL ( IV.A ) - B ALAT

1 Ember 25 - 25 buah 8,000 - 2 Benang Kasur 3 - 3 roll 5,000 - 3 Bambu 17 - 17 Btg 8,000 -

SUB TOTAL ( IV.B ) - C UPAH

1 Pekerja Konstruksi 98 - 98 HOK 24,000 - 2 Tukang 58 - 58 HOK 33,000 -

SUB TOTAL ( IV.C ) - JUMLAH SUB TOTAL IV -

JUMLAH TOTAL D 34,180,000

I RABAT BETON (WANGUNJAYA-MULYAJAYA)

A BAHAN1 Semen 50 kg 1,241 - 1,241 Zak 69,500 - 2 Pasir beton 111 - 111 m³ 315,000 - 3 Pasir urug 124 - 124 m³ 100,000 - 4 Batu split 2/3 188 - 188 m³ 265,000 - 5 Kayu u/bekisting 3 - 3 m³ 600,000 - 6 Paku 22 - 22 m³ 12,000 - 7 Plastik Cor (lebar 1,5cm) 2,171 - 2,171 m2 2,500 - 8 Aspal Pen 60/70, 155 Kg 1 - 1 drum 1,700,000 -

SUB TOTAL ( I.A ) - B A L A T

1 Biaya Transparansi : 2 a. Papan Proyek 100 x 120 cm 1 - 1 Ls 100,000 - 3 b. Papan Informasi 100 x 180 cm 1 - 1 Ls 120,000 - 4 c. Prasasti 60 x 40 cm 1 - 1 Ls 450,000 - 5 d. Spanduk Program 2 - 2 Ls 120,000 - 6 Concrete Mixer 22 - 22 hari 350,000 - 7 Mobilisasi / Demob 1 - 1 Ls 500,000 - 8 Meteran 5 M 1 - 1 buah 10,000 - 9 Pipa Railing/Pilar Jembatan 8 - 8 btg 250,000 -

Page 23: Rpd 2014 Mp3ki - Penguatan

NO URAIAN

VOLUME

SISA

a b c d e = c + d f = b - e g h i = d * h

UNIT / SATUA

N

HARGA SATUAN

(Rp)

JUMLAH (Rp)

KEBUTUHAN PENGAJUAN TAHAP LALU

PENGAJUAN SAAT INI

JUMLAH S.D SAAT

INI

10 Sekop 2 - 2 buah 70,000 - 11 Ember 77 - 77 buah 8,000 - 12 Arco/dolag 2 - 2 buah 250,000 - 13 Benang Kasur 4 - 4 Roll 5,000 -

SUB TOTAL ( I.B ) - C UPAH

1 Pekerja Konstruksi 544 - 544 HOK 24,000 - 2 Tukang 142 - 142 HOK 33,000 -

SUB TOTAL ( I.C ) - JUMLAH SUB TOTAL I -

II TPT (WANGUNJAYA-MULYAJAYA)

A BAHAN1 Semen 50 kg 1,480 - 1,480 Zak 69,500 - 2 Pasir Pasang 297 - 297 m³ 160,000 - 3 Batu Belah 593 - 593 m³ 120,000 -

SUB TOTAL ( II.A ) - B ALAT

1 Ember 50 - 50 buah 8,000 - 2 Cat Tembok 4 - 4 kg 30,000 - 3 Pipa pralon 5 - 5 btg 24,000 - 4 Bambu 20 - 20 bh 8,000 - 5 Benang kasur 3 - 3 btg 5,000 -

SUB TOTAL ( II.B ) - C UPAH

1 Pekerja Konstruksi 957 - 957 HOK 24,000 - 2 Tukang 411 - 411 HOK 33,000 -

SUB TOTAL ( II.C ) - JUMLAH SUB TOTAL II -

III BRONJONG

A BAHAN1 Batu Belah 231 - 231 M3 120,000 - 2 Bronjong Dia. (2X1X0,5) 192 - 192 Bh 135,000 -

SUB TOTAL ( III.A ) - B ALAT

1 Benang 2 - 2 roll 5,000 - 2 Bambu 20 - 20 btg 8,000 -

SUB TOTAL ( III.B ) - C UPAH

1 Pekerja Konstruksi 256 - 256 HOK 24,000 - 2 Tukang 52 - 52 HOK 33,000 -

SUB TOTAL ( III.C ) - JUMLAH SUB TOTAL III -

IV GG PLAT BETON

A BAHAN1 Semen 34 - 34 zak 69,500 - 2 Batu belah 10 - 10 M3 120,000 - 3 Pasir Pasang 4 - 4 M3 160,000 - 4 Pasir Beton 2 - 2 M3 315,000 - 5 Batu Pecah 2-3 cm 2 - 2 M3 265,000 - 6 Kayu Begisting 2 - 2 M3 600,000 - 7 Kawat Beton 2 - 2 Kg 16,000 - 8 Paku 2 - 2 Kg 12,000 - 9 Besi dia. 10 28 - 28 Btg 47,000 -

SUB TOTAL ( IV.A ) -

Page 24: Rpd 2014 Mp3ki - Penguatan

NO URAIAN

VOLUME

SISA

a b c d e = c + d f = b - e g h i = d * h

UNIT / SATUA

N

HARGA SATUAN

(Rp)

JUMLAH (Rp)

KEBUTUHAN PENGAJUAN TAHAP LALU

PENGAJUAN SAAT INI

JUMLAH S.D SAAT

INI

B ALAT1 Benang 3 - 3 roll 5,000 - 2 Ember 8 - 8 buah 8,000 -

SUB TOTAL ( IV.B ) - C UPAH

1 Pekerja Konstruksi 36 - 36 HOK 24,000 - 2 Tukang 22 - 22 HOK 33,000 -

SUB TOTAL ( IV.C ) - JUMLAH SUB TOTAL IV -

JUMLAH TOTAL E -

JUMLAH TOTAL 55,370,000

Terbilang (dengan huruf) : #VALUE!

Banjarwangi, …......…………

Disetujui Oleh : Dibuat Oleh :Ketua TPK Bendahara TPK

Kecamatan Banjarwangi Kecamatan Banjarwangi

Endjang Komara Ahmad Hayun,S.Pd.IMengetahui :

FK / FT Kecamatan Banjarwangi PjOK Kecamatan Banjarwangi

MIFTAH FARID Ujang Suryana.S.SosFasilitator Kecamatan Fasilitator Teknik NIP. 19671201 198703 1 004

Sebagai Catatan :

TAHAP ALOKASI BOP TAHAP LALU KUMULATIF

1 DANA 40% TAHAP 1 1,132,128,000 219,559,200 55,370,000 274,929,200

2 DANA 40% TAHAP 2 1,132,128,000 - -

3 DANA 20% 566,064,000 - -

JUMLAH 2,830,320,000 219,559,200 55,370,000 274,929,200

DEFIK GUNAWAN. ST AHMAD FAUZI, ST

NO

TAHAP SEKARANG

Page 25: Rpd 2014 Mp3ki - Penguatan

PNPM - Mandiri Perdesaan Pola Khusus MP3KI Form.36.

RENCANA PENGGUNAAN DANAMP3KI PENGUATAN

RPD KE : 1C Kecamatan : Banjarwangi Kabupaten : Garut

Jumlah BLM : Rp 2,830,320,000

NO URAIAN

VOLUME

SISA

a b c d e = c + d f = b - e g h i = d * h

I RABAT BETON (BANJARWANGI-BOJONG-JAYABAKTI)

A BAHAN1 Semen 50 kg 2,856 100 100 2,756 Zak 69,500 6,950,000 2 Pasir beton 255 102 102 153 m³ 315,000 32,130,000 3 Pasir urug 285 - 285 m³ 100,000 - 4 Batu split 2/3 434 77.0 77 357 m³ 265,000 20,405,000 5 Kayu u/bekisting 6 - 6 m³ 600,000 - 6 Paku 51 - 51 m³ 12,000 - 7 Plastik Cor (lebar 1,5cm) 4,998 - 4,998 m2 2,500 - 8 Aspal Pen 60/70, 155 Kg 5 - 5 drum 1,700,000 -

SUB TOTAL ( I.A ) 59,485,000 B A L A T

1 Biaya Transparansi : 2 a. Papan Proyek 100 x 120 cm 1 - 1 Ls 100,000 - 3 b. Papan Informasi 100 x 180 cm 1 - 1 Ls 120,000 - 4 c. Prasasti 60 x 40 cm 1 - 1 Ls 450,000 - 5 c. Spanduk/umbul umbul 3 - 3 Ls 120,000 - 6 d. Kamera Digital 1 - 1 hari 2,000,000 - 7 Concrete Mixer 51 - 51 Ls 350,000 - 8 Mobilisasi / Demob 1 - 1 hari 500,000 - 9 Sekop 4 - 4 hari 75,000 -

10 Ember 110 - 110 Ls 8,000 - 11 Arco/dolag 4 - 4 buah 250,000 - 12 Benang Kasur 4 - 4 buah 5,000 -

SUB TOTAL ( I.B ) - C UPAH

1 Pekerja Konstruksi 1,287 - 1,287 HOK 24,000 - 2 Tukang 326 - 326 HOK 33,000 -

SUB TOTAL ( I.C ) - JUMLAH SUB TOTAL I 59,485,000

II TPT (BANJARWANGI-BOJONG-JAYABAKTI)

A BAHAN1 Semen 50 kg 475 - 475 Zak 69,500 - 2 Pasir Pasang 95 - 95 m³ 160,000 - 3 Batu Belah 190 - 190 m³ 120,000 -

SUB TOTAL ( II.A ) - B ALAT

1 Ember 40 - 40 buah 8,000 - 2 Cat Tembok 5 - 5 kg 30,000 - 3 Pralon 1/2 inch 3 - 3 btg 20,000 - 4 Kuas 1/2 inch 2 - 2 bh 20,000 - 5 Bambu 10 - 10 btg 8,000 - 6 Benang kasur 4 - 4 buah 5,000 -

SUB TOTAL ( II.B ) - C UPAH

1 Pekerja Konstruksi 307 - 307 HOK 24,000 - 2 Tukang 151 - 151 HOK 33,000 -

SUB TOTAL ( II.C ) - JUMLAH SUB TOTAL II -

UNIT / SATUA

N

HARGA SATUAN

(Rp)

JUMLAH (Rp)

KEBUTUHAN PENGAJUAN TAHAP LALU

PENGAJUAN SAAT INI

JUMLAH S.D SAAT

INI

Page 26: Rpd 2014 Mp3ki - Penguatan

NO URAIAN

VOLUME

SISA

a b c d e = c + d f = b - e g h i = d * h

UNIT / SATUA

N

HARGA SATUAN

(Rp)

JUMLAH (Rp)

KEBUTUHAN PENGAJUAN TAHAP LALU

PENGAJUAN SAAT INI

JUMLAH S.D SAAT

INI

III BRONJONG

A BAHAN1 Batu Belah 132 - 132 M3 120,000 - 2 Bronjong Dia. (2X1X0,5) 110 110 110 - Bh 135,000 14,850,000

SUB TOTAL ( III.A ) 14,850,000 B ALAT

1 Benang 2 - 2 roll 5,000 - 2 Bambu 30 - 30 btg 8,000 -

SUB TOTAL ( III.B ) - C UPAH

1 Pekerja Konstruksi 134 - 134 HOK 24,000 - 2 Tukang 27 - 27 HOK 33,000 -

SUB TOTAL ( III.C ) - JUMLAH SUB TOTAL III 14,850,000

JUMLAH TOTAL A 74,335,000

I RABAT BETON (BANJARWANGI-TALAGASARI)

A BAHAN1 Semen 50 kg 3,360 - 3,360 Zak 67,500 - 2 Pasir beton 300 58 58 242 m³ 295,000 - 3 Pasir urug 310 - 310 m³ 100,000 - 4 Batu split 2/3 502 - 502 m³ 245,000 - 5 Kayu u/bekisting 7 - 7 m³ 600,000 - 6 Paku 60 - 60 m³ 12,000 - 7 Plastik Cor (lebar 1,5cm) 5,880 - 5,880 m2 2,500 -

SUB TOTAL ( I.A ) - B A L A T

1 Biaya Transparansi : 2 a. Papan Proyek 100 x 120 cm 1 - 1 Ls 100,000 - 3 b. Papan Informasi 100 x 180 cm 1 - 1 Ls 120,000 - 4 c. Prasasti 60 x 40 cm 1 - 1 Ls 450,000 - 5 Concrete Mixer 60 - 60 hari 350,000 - 6 Mobilisasi / Demob 1 - 1 Ls 500,000 - 7 Meteran 5 M 1 - 1 buah 10,000 - 9 Sekop 3 - 3 buah 75,000 -

10 Ember 200 - 200 buah 8,000 - 11 Arco/dolag 2 - 2 buah 250,000 - 12 Benang Kasur 6 - 6 Roll 5,000 -

SUB TOTAL ( I.B ) - C UPAH

1 Pekerja Konstruksi 1,726 - 1,726 HOK 24,000 - 2 Tukang 384 - 384 HOK 33,000 -

SUB TOTAL ( I.C ) - JUMLAH SUB TOTAL I -

II TPT (BANJARWANGI-TALAGASARI)

A BAHAN1 Semen 50 kg 74 - 74 Zak 67,500 - 2 Pasir Pasang 15 15 15 - m³ 160,000 - 3 Batu Belah 21 14 14 7 m³ 120,000 -

SUB TOTAL ( II.A ) - B ALAT

1 Ember 100 - 100 kg 8,000 - 2 Bambu 1 - 1 bh 6,000 - 3 Benang kasur 2 - 2 btg 5,000 -

SUB TOTAL ( II.B ) -

Page 27: Rpd 2014 Mp3ki - Penguatan

NO URAIAN

VOLUME

SISA

a b c d e = c + d f = b - e g h i = d * h

UNIT / SATUA

N

HARGA SATUAN

(Rp)

JUMLAH (Rp)

KEBUTUHAN PENGAJUAN TAHAP LALU

PENGAJUAN SAAT INI

JUMLAH S.D SAAT

INI

C UPAH1 Pekerja Konstruksi 58 - 58 HOK 24,000 - 2 Tukang 25 - 25 HOK 33,000 -

SUB TOTAL ( II.C ) - JUMLAH SUB TOTAL II -

JUMLAH TOTAL B -

I RABAT BETON (KADONGDONG-WANGUNJAYA)

A BAHAN1 Semen 50 kg 1,008 - 1,008 Zak 69,500 - 2 Pasir beton 90 23 23 67 m³ 315,000 7,245,000 3 Pasir urug 101 - 101 m³ 100,000 - 4 Batu split 2/3 153 6.0 6 147 m³ 265,000 1,590,000 5 Kayu u/bekisting 2 0.5 0.5 2 m³ 600,000 300,000 6 Paku 18 2.0 2.0 16 m³ 12,000 24,000 7 Plastik Cor (lebar 1,5cm) 1,828.52 - 1,828.52 m2 2,500 - 8 Aspal Pen 60/70, 155 Kg 2 - 2 drum 1,700,000 -

SUB TOTAL ( I.A ) 9,159,000 B A L A T

1 Biaya Transparansi : 2 a. Papan Proyek 100 x 120 cm 1 - 1 Ls 100,000 - 3 b. Papan Informasi 100 x 180 cm 1 - 1 Ls 120,000 - 4 c. Prasasti 60 x 40 cm 1 - 1 Ls 450,000 - 5 d. Spanduk/umbul2 2 - 2 Ls 120,000 - 6 Concrete Mixer 18 - 18 hari 350,000 - 7 Mobilisasi / Demob 1 - 1 Ls 500,000 - 8 Sekop 2 - 2 hari 70,000 - 9 Ember 90 - 90 hari 8,000 -

10 Arco/dolag 2 - 2 Ls 250,000 - 11 Sapu Lidi 2 - 2 buah 6,000 - 12 Benang Kasur 5 2 2 3 buah 5,000 10,000

SUB TOTAL ( I.B ) 10,000 C UPAH

1 Pekerja Konstruksi 398 - 398 HOK 24,000 - 2 Tukang 115 - 115 HOK 33,000 -

SUB TOTAL ( I.C ) - JUMLAH SUB TOTAL I 9,169,000

II TPT (KADONGDONG-WANGUNJAYA)

A BAHAN1 Semen 50 kg 472 - 472 Zak 69,500 - 2 Pasir Pasang 95 42.0 42 53 m³ 160,000 6,720,000 3 Batu Belah 186 78 78 108 m³ 120,000 9,360,000

SUB TOTAL ( II.A ) 16,080,000 B ALAT

1 Ember 30 - 30 buah 8,000 - 2 Cat Tembok 6 - 6 kg 30,000 - 3 Pralon 1/2 inch 2 - 2 buah 24,000 - 4 Bambu 10 - 10 btg 8,000 - 5 Benang kasur 3 - 3 buah 5,000 -

SUB TOTAL ( II.B ) - C UPAH

1 Pekerja Konstruksi 344 - 344 HOK 24,000 - 2 Tukang 165 - 165 HOK 33,000 -

SUB TOTAL ( II.C ) - JUMLAH SUB TOTAL II 16,080,000

Page 28: Rpd 2014 Mp3ki - Penguatan

NO URAIAN

VOLUME

SISA

a b c d e = c + d f = b - e g h i = d * h

UNIT / SATUA

N

HARGA SATUAN

(Rp)

JUMLAH (Rp)

KEBUTUHAN PENGAJUAN TAHAP LALU

PENGAJUAN SAAT INI

JUMLAH S.D SAAT

INI

III JEMBATAN BAJA

A BAHAN1 bouwplank 1 - 1 Ls 1,200,000 - 2 Besi WF 500.200 6,592 6,592 6,592 - kg 16,700 - 3 Besi WF 200.100 379 379 379 - kg 16,700 - 4 Besi L.100.100.10 1,775 1,775 1,775 - kg 16,700 - 5 Besi L.70.70.7 245 245 245 - kg 16,700 - 6 Besi L.60.60.6 590 590 590 - kg 16,700 - 7 Baud 1/2" x 4 cm 154 154 154 - buah 8,000 - 8 Baud 5/8" x 6 cm 184 184 184 - buah 10,000 - 9 Lantai Kayu 8/20 6 - - 6 m3 3,000,000 -

10 Baut kokot 5/8' x 25 cm 192 192 192 - buah 18,000 - 11 Baut kokot 5/8' x 16 cm 736 736 736 - buah 23,000 - 12 Plat sambungan gelagar utama A 78 78 78 - kg 16,700 - 13 Plat sambungan tipe B 20 20 20 - kg 16,700 - 14 Plat sambungan tipe C 37 37 37 - kg 16,700 - 15 Baut sambungan gelagar utama 384 384 384 - buah 24,000 - 16 Plat Klem Lantai 736 736 736 - buah 15,000 - 17 Karet Peredam Lantai 64 64 64 - m 10,000 - 18 Elastomer 8 8 8 - buah 250,000 - 19 Kayu Bekisting 6 - - 6 m3 600,000 - 20 Paku 15 - - 15 kg 12,000 - 21 Besi beton polos 1,069 - - 1,069 kg 7,000 - 22 Kawat beton 24 - - 24 kg 16,000 - 23 Semen 529 - - 529 zak 69,500 - 24 Pasir beton 5 - - 5 m3 315,000 - 25 Split 5 - - 5 m3 265,000 - 26 Batu Belah 162 - - 162 m3 120,000 - 27 Pabrikasi Ereksion 10,650 3,650 3,650 7,000 kg 3,000 - 28 Cat tembok 12 - - 12 kg 30,000 - 29 Cat finishing besi 1 - - 1 ls 2,000,000 - 30 Pasir pasang 80 - - 80 m3 160,000 -

SUB TOTAL ( III.A ) - B ALAT

1 Papan Kegiatan 1 - 1 Unit 120,000 - 2 Cangkul 1 - 1 Buah 50,000 - 3 Linggis 1 - 1 Buah 25,000 - 4 Sekop 1 - 1 Buah 70,000 - 5 Bambu 50 - 50 Buah 8,000 - 6 Benang nilon 2 - 2 Buah 5,000 - 7 Selang waterpass 15 - 15 m 1,500 - 8 Ember Aduk Kecil 40 - 40 Buah 8,000 - 9 Sewa molen 3 - 3 Hari 350,000 -

10 Mobilisasi Molen 1 - 1 Ls 500,000 - 11 Kuas 3 inch 4 - 4 bh 10,000 - 12 Kunci besi 1 - 1 Buah 10,000 - 13 Karung Tanggul 125 - 125 Buah 1,000 - 14 Sewa Pompa Sedot 6 - 6 Hari 50,000 - 15 Prasasti 1 - 1 Buah 450,000 -

SUB TOTAL ( III.B ) - C UPAH

1 Pekerja 319 - 319 HOK 24,000 - 2 Tukang 105 - 105 HOK 33,000 -

SUB TOTAL ( III.C ) - JUMLAH SUB TOTAL III -

JUMLAH TOTAL C 25,249,000

Page 29: Rpd 2014 Mp3ki - Penguatan

NO URAIAN

VOLUME

SISA

a b c d e = c + d f = b - e g h i = d * h

UNIT / SATUA

N

HARGA SATUAN

(Rp)

JUMLAH (Rp)

KEBUTUHAN PENGAJUAN TAHAP LALU

PENGAJUAN SAAT INI

JUMLAH S.D SAAT

INI

I PENGASPALAN (TALAGAJAYA-TANJUNGJAYA)

A BAHAN1 Batu Pecah 3/5 Cm 130 106 106 24 m2 235,000 - 2 Batu Pecah 2/3 Cm 137 12 12 125 m3 255,000 - 3 Batu Pecah 1/2 Cm 69 18 18 51 m3 295,000 - 4 Pasir Aspal / Abu batu 37 - 37 m3 245,000 - 5 Aspal Pen 60/70, 155 Kg 139 - 139 Drum 1,700,000 - 6 Aspal Emulsi @ 200 kg 16 - 16 Drum 1,850,000 - 7 Ban Bekas Mobil 25 - 25 Buah 20,000 - 8 Kayu bakar 2 - 2 m3 100,000 -

SUB TOTAL ( I.A ) - B A L A T

1 Papan proyek ( Uk.1,20 cm x 1.00 cm 1 - 1 Unit 100,000 - 2 Papan Informasi ( Uk.120 cm x 100 c 1 - 1 Unit 120,000 - 3 Prasasti ( Uk. 60 cm x 40 cm ) 1 - 1 Unit 450,000 - 4 Spanduk/umbul2 2 - 2 paket 200,000 - 5 Meteran 7,5 m 2 - 2 bh 20,000 - 6 Sapu Lidi 4 - 4 bh 12,125 - 7 meteran 50 m 1 - 1 bh 60,000 - 8 Kamera Dokumentasi 1 - 1 paket 1,500,000 - 9 Mesin Gilas 12 - 12 Hari 800,000 -

10 Mob./Demob. Mesin Gilas 1 - 1 Ls 2,500,000 - SUB TOTAL ( I.B ) -

C UPAH1 Pekerja Konstruksi (Aspal ) 281 - 281 HOK 30,000 - 2 Pekerja Galian Saluran 220 - 220 HOK 24,000 - 3 Tukang ( Aspal) 42 - 42 HOK 45,000 -

SUB TOTAL ( I.C ) - JUMLAH SUB TOTAL I -

II TPT (TALAGAJAYA-TANJUNGJAYA)

A BAHAN1 Semen 50 kg 288 - 288 Zak 69,500 - 2 Pasir Pasang 58 6 6 52 m³ 150,000 - 3 Batu Belah 115 - 115 m³ 120,000 -

SUB TOTAL ( II.A ) - B ALAT

1 Bambu 18 - 18 btg 8,000 - 2 Benang Kasur 3 - 3 bh 5,000 - 3 Pralon 1/2 inch 4 - 4 btg 20,000 - 4 Ember 20 - 20 bh 8,000 - 5 Cat Tembok 6 - 6 kg 30,000 -

SUB TOTAL ( II.B ) - C UPAH

1 Pekerja Konstruksi 232 - 232 HOK 24,000 - 2 Tukang 93 - 93 HOK 33,000 -

SUB TOTAL ( II.C ) - JUMLAH SUB TOTAL II -

III TPT JEMBATAN (TALAGAJAYA-TANJUNGJAYA)

A BAHAN1 Semen 50 kg 197 - 197 Zak 69,500 - 2 Pasir Pasang 40 - 40 m³ 150,000 - 3 Batu Belah 80 - 80 m³ 120,000 - 4 Besi dia 12 7 - 7 btg 110,000 - 5 Pasir Beton 1 - 1 m3 295,000 - 6 Kawat beton 1 - 1 kg 16,000 -

SUB TOTAL ( III.A ) -

Page 30: Rpd 2014 Mp3ki - Penguatan

NO URAIAN

VOLUME

SISA

a b c d e = c + d f = b - e g h i = d * h

UNIT / SATUA

N

HARGA SATUAN

(Rp)

JUMLAH (Rp)

KEBUTUHAN PENGAJUAN TAHAP LALU

PENGAJUAN SAAT INI

JUMLAH S.D SAAT

INI

B ALAT1 Bambu 28 - 28 btg 8,000 - 2 Benang Kasur 3 - 3 bh 5,000 - 3 Pralon 1/2 inch 3 - 3 btg 20,000 - 4 Ember 26 - 26 bh 8,000 - 5 Cat Tembok 6 - 6 kg 30,000 -

SUB TOTAL ( III.B ) - C UPAH

1 Pekerja Konstruksi 135 - 135 HOK 24,000 - 2 Tukang 61 - 61 HOK 33,000 -

SUB TOTAL ( III.C ) - JUMLAH SUB TOTAL III -

IV GG PLAT BETON (TALAGAJAYA-TANJUNGJAYA)

A BAHAN1 Semen 90 - 90 zak 69,500 - 2 Batu belah 26 - 26 M3 120,000 - 3 Pasir Pasang 8 - 8 m3 150,000 - 4 Pasir Beton 2 - 2 m3 295,000 - 5 Batu Pecah 2-3 cm 4 - 4 m3 255,000 - 6 Kayu Begisting 1.2 - 1 m3 600,000 - 7 Kawat Beton 4 - 4 Kg 16,000 - 8 Paku 4 - 4 kg 12,000 - 9 Besi dia. 10 64 - 64 Buah 47,000 -

SUB TOTAL ( IV.A ) - B ALAT

1 Ember 25 - 25 buah 8,000 - 2 Benang Kasur 3 - 3 roll 5,000 - 3 Bambu 17 - 17 Btg 8,000 -

SUB TOTAL ( IV.B ) - C UPAH

1 Pekerja Konstruksi 98 - 98 HOK 24,000 - 2 Tukang 58 - 58 HOK 33,000 -

SUB TOTAL ( IV.C ) - JUMLAH SUB TOTAL IV -

JUMLAH TOTAL D -

I RABAT BETON (WANGUNJAYA-MULYAJAYA)

A BAHAN1 Semen 50 kg 1,241 - 1,241 Zak 69,500 - 2 Pasir beton 111 55 55 56 m³ 315,000 17,325,000 3 Pasir urug 124 - 124 m³ 100,000 - 4 Batu split 2/3 188 163.5 164 25 m³ 265,000 43,327,500 5 Kayu u/bekisting 3 - 3 m³ 600,000 - 6 Paku 22 - 22 m³ 12,000 - 7 Plastik Cor (lebar 1,5cm) 2,171 - 2,171 m2 2,500 - 8 Aspal Pen 60/70, 155 Kg 1 - 1 drum 1,700,000 -

SUB TOTAL ( I.A ) 60,652,500 B A L A T

1 Biaya Transparansi : 2 a. Papan Proyek 100 x 120 cm 1 - 1 Ls 100,000 - 3 b. Papan Informasi 100 x 180 cm 1 - 1 Ls 120,000 - 4 c. Prasasti 60 x 40 cm 1 - 1 Ls 450,000 - 5 d. Spanduk Program 2 - 2 Ls 120,000 - 6 Concrete Mixer 22 - 22 hari 350,000 - 7 Mobilisasi / Demob 1 - 1 Ls 500,000 - 8 Meteran 5 M 1 - 1 buah 10,000 - 9 Pipa Railing/Pilar Jembatan 8 - 8 btg 250,000 -

Page 31: Rpd 2014 Mp3ki - Penguatan

NO URAIAN

VOLUME

SISA

a b c d e = c + d f = b - e g h i = d * h

UNIT / SATUA

N

HARGA SATUAN

(Rp)

JUMLAH (Rp)

KEBUTUHAN PENGAJUAN TAHAP LALU

PENGAJUAN SAAT INI

JUMLAH S.D SAAT

INI

10 Sekop 2 - 2 buah 70,000 - 11 Ember 77 - 77 buah 8,000 - 12 Arco/dolag 2 - 2 buah 250,000 - 13 Benang Kasur 4 - 4 Roll 5,000 -

SUB TOTAL ( I.B ) - C UPAH

1 Pekerja Konstruksi 544 - 544 HOK 24,000 - 2 Tukang 142 - 142 HOK 33,000 -

SUB TOTAL ( I.C ) - JUMLAH SUB TOTAL I 60,652,500

II TPT (WANGUNJAYA-MULYAJAYA)

A BAHAN1 Semen 50 kg 1,480 - 1,480 Zak 69,500 - 2 Pasir Pasang 297 71.5 72 226 m³ 160,000 11,440,000 3 Batu Belah 593 403.5 403.5 190 m³ 120,000 48,420,000

SUB TOTAL ( II.A ) 59,860,000 B ALAT

1 Ember 50 - 50 buah 8,000 - 2 Cat Tembok 4 - 4 kg 30,000 - 3 Pipa pralon 5 - 5 btg 24,000 - 4 Bambu 20 - 20 bh 8,000 - 5 Benang kasur 3 - 3 btg 5,000 -

SUB TOTAL ( II.B ) - C UPAH

1 Pekerja Konstruksi 957 - 957 HOK 24,000 - 2 Tukang 411 - 411 HOK 33,000 -

SUB TOTAL ( II.C ) - JUMLAH SUB TOTAL II 59,860,000

III BRONJONG

A BAHAN1 Batu Belah 231 - 231 M3 120,000 - 2 Bronjong Dia. (2X1X0,5) 192 192 192 - Bh 135,000 25,920,000

SUB TOTAL ( III.A ) 25,920,000 B ALAT

1 Benang 2 - 2 roll 5,000 - 2 Bambu 20 - 20 btg 8,000 -

SUB TOTAL ( III.B ) - C UPAH

1 Pekerja Konstruksi 256 - 256 HOK 24,000 - 2 Tukang 52 - 52 HOK 33,000 -

SUB TOTAL ( III.C ) - JUMLAH SUB TOTAL III 25,920,000

IV GG PLAT BETON

A BAHAN1 Semen 34 - 34 zak 69,500 - 2 Batu belah 10 - 10 M3 120,000 - 3 Pasir Pasang 4 - 4 M3 160,000 - 4 Pasir Beton 2 - 2 M3 315,000 - 5 Batu Pecah 2-3 cm 2 - 2 M3 265,000 - 6 Kayu Begisting 2 - 2 M3 600,000 - 7 Kawat Beton 2 - 2 Kg 16,000 - 8 Paku 2 - 2 Kg 12,000 - 9 Besi dia. 10 28 - 28 Btg 47,000 -

SUB TOTAL ( IV.A ) -

Page 32: Rpd 2014 Mp3ki - Penguatan

NO URAIAN

VOLUME

SISA

a b c d e = c + d f = b - e g h i = d * h

UNIT / SATUA

N

HARGA SATUAN

(Rp)

JUMLAH (Rp)

KEBUTUHAN PENGAJUAN TAHAP LALU

PENGAJUAN SAAT INI

JUMLAH S.D SAAT

INI

B ALAT1 Benang 3 - 3 roll 5,000 - 2 Ember 8 - 8 buah 8,000 -

SUB TOTAL ( IV.B ) - C UPAH

1 Pekerja Konstruksi 36 - 36 HOK 24,000 - 2 Tukang 22 - 22 HOK 33,000 -

SUB TOTAL ( IV.C ) - JUMLAH SUB TOTAL IV -

JUMLAH TOTAL E 146,432,500

JUMLAH TOTAL 246,016,500

Terbilang (dengan huruf) : #VALUE!

Banjarwangi, …......…………

Disetujui Oleh : Dibuat Oleh :Ketua TPK Bendahara TPK

Kecamatan Banjarwangi Kecamatan Banjarwangi

Endjang Komara Ahmad Hayun,S.Pd.IMengetahui :

FK / FT Kecamatan Banjarwangi PjOK Kecamatan Banjarwangi

MIFTAH FARID Ujang Suryana.S.SosFasilitator Kecamatan Fasilitator Teknik NIP. 19671201 198703 1 004

Sebagai Catatan :

TAHAP ALOKASI BOP TAHAP LALU KUMULATIF

1 DANA 40% TAHAP 1 1,132,128,000 274,929,200 246,016,500 520,945,700

2 DANA 40% TAHAP 2 1,132,128,000 - -

3 DANA 20% 566,064,000 - -

JUMLAH 2,830,320,000 274,929,200 246,016,500 520,945,700

DEFIK GUNAWAN. ST AHMAD FAUZI, ST

NO

TAHAP SEKARANG

Page 33: Rpd 2014 Mp3ki - Penguatan

PNPM - Mandiri Perdesaan Pola Khusus MP3KI Form.36.

RENCANA PENGGUNAAN DANAMP3KI PENGUATAN

RPD KE : 1D Kecamatan : Banjarwangi Kabupaten : Garut

Jumlah BLM : Rp 2,830,320,000

NO URAIAN

VOLUME

SISA

a b c d e = c + d f = b - e g h i = d * h

I RABAT BETON (BANJARWANGI-BOJONG-JAYABAKTI)

A BAHAN1 Semen 50 kg 2,856 100 100 2,756 Zak 69,500 - 2 Pasir beton 255 102 102 153 m³ 315,000 - 3 Pasir urug 285 - - 285 m³ 100,000 - 4 Batu split 2/3 434 77 77 357 m³ 265,000 - 5 Kayu u/bekisting 6 - 6 m³ 600,000 - 6 Paku 51 - 51 m³ 12,000 - 7 Plastik Cor (lebar 1,5cm) 4,998 - 4,998 m2 2,500 - 8 Aspal Pen 60/70, 155 Kg 5 5 5 - drum 1,700,000 8,500,000

SUB TOTAL ( I.A ) 8,500,000 B A L A T

1 Biaya Transparansi : 2 a. Papan Proyek 100 x 120 cm 1 - 1 Ls 100,000 - 3 b. Papan Informasi 100 x 180 cm 1 - 1 Ls 120,000 - 4 c. Prasasti 60 x 40 cm 1 - 1 Ls 450,000 - 5 c. Spanduk/umbul umbul 3 - 3 Ls 120,000 - 6 d. Kamera Digital 1 - 1 hari 2,000,000 - 7 Concrete Mixer 51 - 51 Ls 350,000 - 8 Mobilisasi / Demob 1 - 1 hari 500,000 - 9 Sekop 4 - 4 hari 75,000 -

10 Ember 110 - 110 Ls 8,000 - 11 Arco/dolag 4 - 4 buah 250,000 - 12 Benang Kasur 4 - 4 buah 5,000 -

SUB TOTAL ( I.B ) - C UPAH

1 Pekerja Konstruksi 1,287 - 1,287 HOK 24,000 - 2 Tukang 326 - 326 HOK 33,000 -

SUB TOTAL ( I.C ) - JUMLAH SUB TOTAL I 8,500,000

II TPT (BANJARWANGI-BOJONG-JAYABAKTI)

A BAHAN1 Semen 50 kg 475 - 475 Zak 69,500 - 2 Pasir Pasang 95 - 95 m³ 160,000 - 3 Batu Belah 190 - 190 m³ 120,000 -

SUB TOTAL ( II.A ) - B ALAT

1 Ember 40 - 40 buah 8,000 - 2 Cat Tembok 5 - 5 kg 30,000 - 3 Pralon 1/2 inch 3 - 3 btg 20,000 - 4 Kuas 1/2 inch 2 - 2 bh 20,000 - 5 Bambu 10 - 10 btg 8,000 - 6 Benang kasur 4 - 4 buah 5,000 -

SUB TOTAL ( II.B ) - C UPAH

1 Pekerja Konstruksi 307 - 307 HOK 24,000 - 2 Tukang 151 - 151 HOK 33,000 -

SUB TOTAL ( II.C ) - JUMLAH SUB TOTAL II -

UNIT / SATUA

N

HARGA SATUAN

(Rp)

JUMLAH (Rp)

KEBUTUHAN PENGAJUAN TAHAP LALU

PENGAJUAN SAAT INI

JUMLAH S.D SAAT

INI

Page 34: Rpd 2014 Mp3ki - Penguatan

NO URAIAN

VOLUME

SISA

a b c d e = c + d f = b - e g h i = d * h

UNIT / SATUA

N

HARGA SATUAN

(Rp)

JUMLAH (Rp)

KEBUTUHAN PENGAJUAN TAHAP LALU

PENGAJUAN SAAT INI

JUMLAH S.D SAAT

INI

III BRONJONG

A BAHAN1 Batu Belah 132 - 132 M3 120,000 - 2 Bronjong Dia. (2X1X0,5) 110 110 110 - Bh 135,000 -

SUB TOTAL ( III.A ) - B ALAT

1 Benang 2 - 2 roll 5,000 - 2 Bambu 30 - 30 btg 8,000 -

SUB TOTAL ( III.B ) - C UPAH

1 Pekerja Konstruksi 134 - 134 HOK 24,000 - 2 Tukang 27 - 27 HOK 33,000 -

SUB TOTAL ( III.C ) - JUMLAH SUB TOTAL III -

JUMLAH TOTAL A 8,500,000

I RABAT BETON (BANJARWANGI-TALAGASARI)

A BAHAN1 Semen 50 kg 3,360 - 3,360 Zak 67,500 - 2 Pasir beton 300 58 58 242 m³ 295,000 - 3 Pasir urug 310 - 310 m³ 100,000 - 4 Batu split 2/3 502 - 502 m³ 245,000 - 5 Kayu u/bekisting 7 - 7 m³ 600,000 - 6 Paku 60 - 60 m³ 12,000 - 7 Plastik Cor (lebar 1,5cm) 5,880 - 5,880 m2 2,500 -

SUB TOTAL ( I.A ) - B A L A T

1 Biaya Transparansi : 2 a. Papan Proyek 100 x 120 cm 1 - 1 Ls 100,000 - 3 b. Papan Informasi 100 x 180 cm 1 - 1 Ls 120,000 - 4 c. Prasasti 60 x 40 cm 1 - 1 Ls 450,000 - 5 Concrete Mixer 60 - 60 hari 350,000 - 6 Mobilisasi / Demob 1 - 1 Ls 500,000 - 7 Meteran 5 M 1 - 1 buah 10,000 - 9 Sekop 3 - 3 buah 75,000 -

10 Ember 200 - 200 buah 8,000 - 11 Arco/dolag 2 - 2 buah 250,000 - 12 Benang Kasur 6 - 6 Roll 5,000 -

SUB TOTAL ( I.B ) - C UPAH

1 Pekerja Konstruksi 1,726 - 1,726 HOK 24,000 - 2 Tukang 384 - 384 HOK 33,000 -

SUB TOTAL ( I.C ) - JUMLAH SUB TOTAL I -

II TPT (BANJARWANGI-TALAGASARI)

A BAHAN1 Semen 50 kg 74 - 74 Zak 67,500 - 2 Pasir Pasang 15 15 15 - m³ 160,000 - 3 Batu Belah 21 14 14 7 m³ 120,000 -

SUB TOTAL ( II.A ) - B ALAT

1 Ember 100 - 100 kg 8,000 - 2 Bambu 1 - 1 bh 6,000 - 3 Benang kasur 2 - 2 btg 5,000 -

SUB TOTAL ( II.B ) -

Page 35: Rpd 2014 Mp3ki - Penguatan

NO URAIAN

VOLUME

SISA

a b c d e = c + d f = b - e g h i = d * h

UNIT / SATUA

N

HARGA SATUAN

(Rp)

JUMLAH (Rp)

KEBUTUHAN PENGAJUAN TAHAP LALU

PENGAJUAN SAAT INI

JUMLAH S.D SAAT

INI

C UPAH1 Pekerja Konstruksi 58 - 58 HOK 24,000 - 2 Tukang 25 - 25 HOK 33,000 -

SUB TOTAL ( II.C ) - JUMLAH SUB TOTAL II -

JUMLAH TOTAL B -

I RABAT BETON (KADONGDONG-WANGUNJAYA)

A BAHAN1 Semen 50 kg 1,008 - - 1,008 Zak 69,500 - 2 Pasir beton 90 23 23 67 m³ 315,000 - 3 Pasir urug 101 - - 101 m³ 100,000 - 4 Batu split 2/3 153 6 6 147 m³ 265,000 - 5 Kayu u/bekisting 2 1 0.5 2 m³ 600,000 - 6 Paku 18 2 2.0 16 m³ 12,000 - 7 Plastik Cor (lebar 1,5cm) 1,828.52 - - 1,828.52 m2 2,500 - 8 Aspal Pen 60/70, 155 Kg 2 - 2 2 - drum 1,700,000 3,400,000

SUB TOTAL ( I.A ) 3,400,000 B A L A T

1 Biaya Transparansi : 2 a. Papan Proyek 100 x 120 cm 1 - 1 Ls 100,000 - 3 b. Papan Informasi 100 x 180 cm 1 - 1 Ls 120,000 - 4 c. Prasasti 60 x 40 cm 1 - 1 Ls 450,000 - 5 d. Spanduk/umbul2 2 - 2 Ls 120,000 - 6 Concrete Mixer 18 - 18 hari 350,000 - 7 Mobilisasi / Demob 1 - 1 Ls 500,000 - 8 Sekop 2 - 2 hari 70,000 - 9 Ember 90 - 90 hari 8,000 -

10 Arco/dolag 2 - 2 Ls 250,000 - 11 Sapu Lidi 2 - 2 buah 6,000 - 12 Benang Kasur 5 2 2 3 buah 5,000 -

SUB TOTAL ( I.B ) - C UPAH

1 Pekerja Konstruksi 398 - 398 HOK 24,000 - 2 Tukang 115 - 115 HOK 33,000 -

SUB TOTAL ( I.C ) - JUMLAH SUB TOTAL I 3,400,000

II TPT (KADONGDONG-WANGUNJAYA)

A BAHAN1 Semen 50 kg 472 - - 472 Zak 69,500 - 2 Pasir Pasang 95 42 42 53 m³ 160,000 - 3 Batu Belah 186 78 78 108 m³ 120,000 -

SUB TOTAL ( II.A ) - B ALAT

1 Ember 30 - 30 buah 8,000 - 2 Cat Tembok 6 - 6 kg 30,000 - 3 Pralon 1/2 inch 2 - 2 buah 24,000 - 4 Bambu 10 - 10 btg 8,000 - 5 Benang kasur 3 - 3 buah 5,000 -

SUB TOTAL ( II.B ) - C UPAH

1 Pekerja Konstruksi 344 - 344 HOK 24,000 - 2 Tukang 165 - 165 HOK 33,000 -

SUB TOTAL ( II.C ) - JUMLAH SUB TOTAL II -

Page 36: Rpd 2014 Mp3ki - Penguatan

NO URAIAN

VOLUME

SISA

a b c d e = c + d f = b - e g h i = d * h

UNIT / SATUA

N

HARGA SATUAN

(Rp)

JUMLAH (Rp)

KEBUTUHAN PENGAJUAN TAHAP LALU

PENGAJUAN SAAT INI

JUMLAH S.D SAAT

INI

III JEMBATAN BAJA

A BAHAN1 bouwplank 1 - 1 Ls 1,200,000 - 2 Besi WF 500.200 6,592 6,592 6,592 - kg 16,700 - 3 Besi WF 200.100 379 379 379 - kg 16,700 - 4 Besi L.100.100.10 1,775 1,775 1,775 - kg 16,700 - 5 Besi L.70.70.7 245 245 245 - kg 16,700 - 6 Besi L.60.60.6 590 590 590 - kg 16,700 - 7 Baud 1/2" x 4 cm 154 154 154 - buah 8,000 - 8 Baud 5/8" x 6 cm 184 184 184 - buah 10,000 - 9 Lantai Kayu 8/20 6 - - 6 m3 3,000,000 -

10 Baut kokot 5/8' x 25 cm 192 192 192 - buah 18,000 - 11 Baut kokot 5/8' x 16 cm 736 736 736 - buah 23,000 - 12 Plat sambungan gelagar utama A 78 78 78 - kg 16,700 - 13 Plat sambungan tipe B 20 20 20 - kg 16,700 - 14 Plat sambungan tipe C 37 37 37 - kg 16,700 - 15 Baut sambungan gelagar utama 384 384 384 - buah 24,000 - 16 Plat Klem Lantai 736 736 736 - buah 15,000 - 17 Karet Peredam Lantai 64 64 64 - m 10,000 - 18 Elastomer 8 8 8 - buah 250,000 - 19 Kayu Bekisting 6 - - 6 m3 600,000 - 20 Paku 15 - - 15 kg 12,000 - 21 Besi beton polos 1,069 - - 1,069 kg 7,000 - 22 Kawat beton 24 - - 24 kg 16,000 - 23 Semen 529 - - 529 zak 69,500 - 24 Pasir beton 5 - - 5 m3 315,000 - 25 Split 5 - - 5 m3 265,000 - 26 Batu Belah 162 - - 162 m3 120,000 - 27 Pabrikasi Ereksion 10,650 3,650 3,650 7,000 kg 3,000 - 28 Cat tembok 12 - - 12 kg 30,000 - 29 Cat finishing besi 1 - - 1 ls 2,000,000 - 30 Pasir pasang 80 - - 80 m3 160,000 -

SUB TOTAL ( III.A ) - B ALAT

1 Papan Kegiatan 1 - 1 Unit 120,000 - 2 Cangkul 1 - 1 Buah 50,000 - 3 Linggis 1 - 1 Buah 25,000 - 4 Sekop 1 - 1 Buah 70,000 - 5 Bambu 50 - 50 Buah 8,000 - 6 Benang nilon 2 - 2 Buah 5,000 - 7 Selang waterpass 15 - 15 m 1,500 - 8 Ember Aduk Kecil 40 - 40 Buah 8,000 - 9 Sewa molen 3 - 3 Hari 350,000 -

10 Mobilisasi Molen 1 - 1 Ls 500,000 - 11 Kuas 3 inch 4 - 4 bh 10,000 - 12 Kunci besi 1 - 1 Buah 10,000 - 13 Karung Tanggul 125 - 125 Buah 1,000 - 14 Sewa Pompa Sedot 6 - 6 Hari 50,000 - 15 Prasasti 1 - 1 Buah 450,000 -

SUB TOTAL ( III.B ) - C UPAH

1 Pekerja 319 - 319 HOK 24,000 - 2 Tukang 105 - 105 HOK 33,000 -

SUB TOTAL ( III.C ) - JUMLAH SUB TOTAL III -

JUMLAH TOTAL C 3,400,000

Page 37: Rpd 2014 Mp3ki - Penguatan

NO URAIAN

VOLUME

SISA

a b c d e = c + d f = b - e g h i = d * h

UNIT / SATUA

N

HARGA SATUAN

(Rp)

JUMLAH (Rp)

KEBUTUHAN PENGAJUAN TAHAP LALU

PENGAJUAN SAAT INI

JUMLAH S.D SAAT

INI

I PENGASPALAN (TALAGAJAYA-TANJUNGJAYA)

A BAHAN1 Batu Pecah 3/5 Cm 130 106 106 24 m2 235,000 - 2 Batu Pecah 2/3 Cm 137 12 12 125 m3 255,000 - 3 Batu Pecah 1/2 Cm 69 18 18 51 m3 295,000 - 4 Pasir Aspal / Abu batu 37 - 37 m3 245,000 - 5 Aspal Pen 60/70, 155 Kg 139 139 139 - Drum 1,700,000 236,300,000 6 Aspal Emulsi @ 200 kg 16 16 16 - Drum 1,850,000 29,600,000 7 Ban Bekas Mobil 25 - 25 Buah 20,000 - 8 Kayu bakar 2 - 2 m3 100,000 -

SUB TOTAL ( I.A ) 265,900,000 B A L A T

1 Papan proyek ( Uk.1,20 cm x 1.00 cm 1 - 1 Unit 100,000 - 2 Papan Informasi ( Uk.120 cm x 100 c 1 - 1 Unit 120,000 - 3 Prasasti ( Uk. 60 cm x 40 cm ) 1 - 1 Unit 450,000 - 4 Spanduk/umbul2 2 - 2 paket 200,000 - 5 Meteran 7,5 m 2 - 2 bh 20,000 - 6 Sapu Lidi 4 - 4 bh 12,125 - 7 meteran 50 m 1 - 1 bh 60,000 - 8 Kamera Dokumentasi 1 - 1 paket 1,500,000 - 9 Mesin Gilas 12 - 12 Hari 800,000 -

10 Mob./Demob. Mesin Gilas 1 - 1 Ls 2,500,000 - SUB TOTAL ( I.B ) -

C UPAH1 Pekerja Konstruksi (Aspal ) 281 - 281 HOK 30,000 - 2 Pekerja Galian Saluran 220 - 220 HOK 24,000 - 3 Tukang ( Aspal) 42 - 42 HOK 45,000 -

SUB TOTAL ( I.C ) - JUMLAH SUB TOTAL I 265,900,000

II TPT (TALAGAJAYA-TANJUNGJAYA)

A BAHAN1 Semen 50 kg 288 - 288 Zak 69,500 - 2 Pasir Pasang 58 6 6 52 m³ 150,000 - 3 Batu Belah 115 - 115 m³ 120,000 -

SUB TOTAL ( II.A ) - B ALAT

1 Bambu 18 - 18 btg 8,000 - 2 Benang Kasur 3 - 3 bh 5,000 - 3 Pralon 1/2 inch 4 - 4 btg 20,000 - 4 Ember 20 - 20 bh 8,000 - 5 Cat Tembok 6 - 6 kg 30,000 -

SUB TOTAL ( II.B ) - C UPAH

1 Pekerja Konstruksi 232 - 232 HOK 24,000 - 2 Tukang 93 - 93 HOK 33,000 -

SUB TOTAL ( II.C ) - JUMLAH SUB TOTAL II -

III TPT JEMBATAN (TALAGAJAYA-TANJUNGJAYA)

A BAHAN1 Semen 50 kg 197 - 197 Zak 69,500 - 2 Pasir Pasang 40 - 40 m³ 150,000 - 3 Batu Belah 80 - 80 m³ 120,000 - 4 Besi dia 12 7 - 7 btg 110,000 - 5 Pasir Beton 1 - 1 m3 295,000 - 6 Kawat beton 1 - 1 kg 16,000 -

SUB TOTAL ( III.A ) -

Page 38: Rpd 2014 Mp3ki - Penguatan

NO URAIAN

VOLUME

SISA

a b c d e = c + d f = b - e g h i = d * h

UNIT / SATUA

N

HARGA SATUAN

(Rp)

JUMLAH (Rp)

KEBUTUHAN PENGAJUAN TAHAP LALU

PENGAJUAN SAAT INI

JUMLAH S.D SAAT

INI

B ALAT1 Bambu 28 - 28 btg 8,000 - 2 Benang Kasur 3 - 3 bh 5,000 - 3 Pralon 1/2 inch 3 - 3 btg 20,000 - 4 Ember 26 - 26 bh 8,000 - 5 Cat Tembok 6 - 6 kg 30,000 -

SUB TOTAL ( III.B ) - C UPAH

1 Pekerja Konstruksi 135 - 135 HOK 24,000 - 2 Tukang 61 - 61 HOK 33,000 -

SUB TOTAL ( III.C ) - JUMLAH SUB TOTAL III -

IV GG PLAT BETON (TALAGAJAYA-TANJUNGJAYA)

A BAHAN1 Semen 90 - 90 zak 69,500 - 2 Batu belah 26 - 26 M3 120,000 - 3 Pasir Pasang 8 - 8 m3 150,000 - 4 Pasir Beton 2 - 2 m3 295,000 - 5 Batu Pecah 2-3 cm 4 - 4 m3 255,000 - 6 Kayu Begisting 1.2 - 1 m3 600,000 - 7 Kawat Beton 4 - 4 Kg 16,000 - 8 Paku 4 - 4 kg 12,000 - 9 Besi dia. 10 64 - 64 Buah 47,000 -

SUB TOTAL ( IV.A ) - B ALAT

1 Ember 25 - 25 buah 8,000 - 2 Benang Kasur 3 - 3 roll 5,000 - 3 Bambu 17 - 17 Btg 8,000 -

SUB TOTAL ( IV.B ) - C UPAH

1 Pekerja Konstruksi 98 - 98 HOK 24,000 - 2 Tukang 58 - 58 HOK 33,000 -

SUB TOTAL ( IV.C ) - JUMLAH SUB TOTAL IV -

JUMLAH TOTAL D 265,900,000

I RABAT BETON (WANGUNJAYA-MULYAJAYA)

A BAHAN1 Semen 50 kg 1,241 - 1,241 Zak 69,500 - 2 Pasir beton 111 55 55 56 m³ 315,000 - 3 Pasir urug 124 - - 124 m³ 100,000 - 4 Batu split 2/3 188 164 164 25 m³ 265,000 - 5 Kayu u/bekisting 3 - 3 m³ 600,000 - 6 Paku 22 - 22 m³ 12,000 - 7 Plastik Cor (lebar 1,5cm) 2,171 - 2,171 m2 2,500 - 8 Aspal Pen 60/70, 155 Kg 1 1 1 - drum 1,700,000 1,700,000

SUB TOTAL ( I.A ) 1,700,000 B A L A T

1 Biaya Transparansi : 2 a. Papan Proyek 100 x 120 cm 1 - 1 Ls 100,000 - 3 b. Papan Informasi 100 x 180 cm 1 - 1 Ls 120,000 - 4 c. Prasasti 60 x 40 cm 1 - 1 Ls 450,000 - 5 d. Spanduk Program 2 - 2 Ls 120,000 - 6 Concrete Mixer 22 - 22 hari 350,000 - 7 Mobilisasi / Demob 1 - 1 Ls 500,000 - 8 Meteran 5 M 1 - 1 buah 10,000 - 9 Pipa Railing/Pilar Jembatan 8 - 8 btg 250,000 -

Page 39: Rpd 2014 Mp3ki - Penguatan

NO URAIAN

VOLUME

SISA

a b c d e = c + d f = b - e g h i = d * h

UNIT / SATUA

N

HARGA SATUAN

(Rp)

JUMLAH (Rp)

KEBUTUHAN PENGAJUAN TAHAP LALU

PENGAJUAN SAAT INI

JUMLAH S.D SAAT

INI

10 Sekop 2 - 2 buah 70,000 - 11 Ember 77 - 77 buah 8,000 - 12 Arco/dolag 2 - 2 buah 250,000 - 13 Benang Kasur 4 - 4 Roll 5,000 -

SUB TOTAL ( I.B ) - C UPAH

1 Pekerja Konstruksi 544 - 544 HOK 24,000 - 2 Tukang 142 - 142 HOK 33,000 -

SUB TOTAL ( I.C ) - JUMLAH SUB TOTAL I 1,700,000

II TPT (WANGUNJAYA-MULYAJAYA)

A BAHAN1 Semen 50 kg 1,480 - 1,480 Zak 69,500 - 2 Pasir Pasang 297 72 72 226 m³ 160,000 - 3 Batu Belah 593 404 403.5 190 m³ 120,000 -

SUB TOTAL ( II.A ) - B ALAT

1 Ember 50 - 50 buah 8,000 - 2 Cat Tembok 4 - 4 kg 30,000 - 3 Pipa pralon 5 - 5 btg 24,000 - 4 Bambu 20 - 20 bh 8,000 - 5 Benang kasur 3 - 3 btg 5,000 -

SUB TOTAL ( II.B ) - C UPAH

1 Pekerja Konstruksi 957 - 957 HOK 24,000 - 2 Tukang 411 - 411 HOK 33,000 -

SUB TOTAL ( II.C ) - JUMLAH SUB TOTAL II -

III BRONJONG

A BAHAN1 Batu Belah 231 - 231 M3 120,000 - 2 Bronjong Dia. (2X1X0,5) 192 192 192 - Bh 135,000 -

SUB TOTAL ( III.A ) - B ALAT

1 Benang 2 - 2 roll 5,000 - 2 Bambu 20 - 20 btg 8,000 -

SUB TOTAL ( III.B ) - C UPAH

1 Pekerja Konstruksi 256 - 256 HOK 24,000 - 2 Tukang 52 - 52 HOK 33,000 -

SUB TOTAL ( III.C ) - JUMLAH SUB TOTAL III -

IV GG PLAT BETON

A BAHAN1 Semen 34 - 34 zak 69,500 - 2 Batu belah 10 - 10 M3 120,000 - 3 Pasir Pasang 4 - 4 M3 160,000 - 4 Pasir Beton 2 - 2 M3 315,000 - 5 Batu Pecah 2-3 cm 2 - 2 M3 265,000 - 6 Kayu Begisting 2 - 2 M3 600,000 - 7 Kawat Beton 2 - 2 Kg 16,000 - 8 Paku 2 - 2 Kg 12,000 - 9 Besi dia. 10 28 - 28 Btg 47,000 -

SUB TOTAL ( IV.A ) -

Page 40: Rpd 2014 Mp3ki - Penguatan

NO URAIAN

VOLUME

SISA

a b c d e = c + d f = b - e g h i = d * h

UNIT / SATUA

N

HARGA SATUAN

(Rp)

JUMLAH (Rp)

KEBUTUHAN PENGAJUAN TAHAP LALU

PENGAJUAN SAAT INI

JUMLAH S.D SAAT

INI

B ALAT1 Benang 3 - 3 roll 5,000 - 2 Ember 8 - 8 buah 8,000 -

SUB TOTAL ( IV.B ) - C UPAH

1 Pekerja Konstruksi 36 - 36 HOK 24,000 - 2 Tukang 22 - 22 HOK 33,000 -

SUB TOTAL ( IV.C ) - JUMLAH SUB TOTAL IV -

JUMLAH TOTAL E 1,700,000

JUMLAH TOTAL 279,500,000

Terbilang (dengan huruf) : #VALUE!

Banjarwangi, …......…………

Disetujui Oleh : Dibuat Oleh :Ketua TPK Bendahara TPK

Kecamatan Banjarwangi Kecamatan Banjarwangi

Endjang Komara Ahmad Hayun,S.Pd.IMengetahui :

FK / FT Kecamatan Banjarwangi PjOK Kecamatan Banjarwangi

MIFTAH FARID Ujang Suryana.S.SosFasilitator Kecamatan Fasilitator Teknik NIP. 19671201 198703 1 004

Sebagai Catatan :

TAHAP ALOKASI BOP TAHAP LALU KUMULATIF

1 DANA 40% TAHAP 1 1,132,128,000 520,945,700 279,500,000 800,445,700

2 DANA 40% TAHAP 2 1,132,128,000 - -

3 DANA 20% 566,064,000 - -

JUMLAH 2,830,320,000 520,945,700 279,500,000 800,445,700

DEFIK GUNAWAN,ST AHMAD FAUZI,ST

NO

TAHAP SEKARANG

Page 41: Rpd 2014 Mp3ki - Penguatan

PNPM - Mandiri Perdesaan Pola Khusus MP3KI Form.36.

RENCANA PENGGUNAAN DANAMP3KI PENGUATAN

RPD KE : 1E Kecamatan : Banjarwangi Kabupaten : Garut

Jumlah BLM : Rp 2,830,320,000

NO URAIAN

VOLUME

SISA

a b c d e = c + d f = b - e g h i = d * h

I RABAT BETON (BANJARWANGI-BOJONG-JAYABAKTI)

A BAHAN1 Semen 50 kg 2,890 100 300 400 2,490 Zak 70,000 21,000,000 2 Pasir beton 258 102 71.40 173.40 84.60 m³ 310,000 22,134,000 3 Pasir urug 288 - - 288 m³ 100,000 - 4 Batu split 2/3 439 77 110.5 187.5 251.5 m³ 270,000 29,835,000 5 Kayu u/bekisting 6 - - 6 m³ 600,000 - 6 Paku 52 - - 52 m³ 12,000 - 7 Plastik Cor (lebar 1,5cm) 5,078 - 500 500 4,578 m2 2,500 1,250,000 8 Aspal Pen 60/70, 155 Kg 5 5 5 - drum 1,700,000 -

SUB TOTAL ( I.A ) 74,219,000 B A L A T

1 Biaya Transparansi : 2 a. Papan Proyek 100 x 120 cm 1 - - 1 Ls 100,000 - 3 b. Papan Informasi 100 x 180 cm 1 - - 1 Ls 120,000 - 4 c. Prasasti 60 x 40 cm 1 - - 1 Ls 450,000 - 5 c. Spanduk/umbul umbul 3 - - 3 Ls 120,000 - 6 d. Kamera Digital 1 - - 1 hari 2,000,000 - 7 Concrete Mixer 52 - - 52 Ls 350,000 - 8 Mobilisasi / Demob 1 - - 1 hari 500,000 - 9 Gor. Buis Beton 30 cm 8 - - 8 hari 80,000 -

10 Sekop 2 - - 2 Ls 70,000 - 11 Ember 100 - - 100 buah 8,000 - 12 Arco/dolag 3 - - 3 buah 250,000 - 13 Benang Kasur 4 - - 4 buah 5,000 -

SUB TOTAL ( I.B ) - C UPAH

1 Pekerja Konstruksi 1,300 - - 1,300 HOK 24,000 - 2 Tukang 330 - - 330 HOK 33,000 -

SUB TOTAL ( I.C ) - JUMLAH SUB TOTAL I 74,219,000

II TPT (BANJARWANGI-BOJONG-JAYABAKTI)

A BAHAN1 Semen 50 kg 474 - 84 84 390 Zak 70,000 5,880,000 2 Pasir Pasang 95 - 5.9 6 89 m³ 160,000 944,000 3 Batu Belah 188 - 114 114 74 m³ 120,000 13,680,000

SUB TOTAL ( II.A ) 20,504,000 B ALAT

1 Ember 45 - 45 45 - buah 8,000 360,000 2 Cat Tembok 5 - - 5 kg 30,000 - 3 Pralon 1/2 inch 4 - 3 3 1 btg 20,000 60,000 4 Kuas 1/2 inch 2 - - 2 bh 20,000 - 5 Bambu 6 - 6 6 - btg 8,000 48,000 6 Benang kasur 4 - 4 4 - buah 5,000 20,000

SUB TOTAL ( II.B ) 488,000 C UPAH

1 Pekerja Konstruksi 311 - - 311 HOK 24,000 - 2 Tukang 157 - - 157 HOK 33,000 -

SUB TOTAL ( II.C ) - JUMLAH SUB TOTAL II 20,992,000

UNIT / SATUA

N

HARGA SATUAN

(Rp)

JUMLAH (Rp)

KEBUTUHAN PENGAJUAN TAHAP LALU

PENGAJUAN SAAT INI

JUMLAH S.D SAAT

INI

Page 42: Rpd 2014 Mp3ki - Penguatan

NO URAIAN

VOLUME

SISA

a b c d e = c + d f = b - e g h i = d * h

UNIT / SATUA

N

HARGA SATUAN

(Rp)

JUMLAH (Rp)

KEBUTUHAN PENGAJUAN TAHAP LALU

PENGAJUAN SAAT INI

JUMLAH S.D SAAT

INI

III BRONJONG

A BAHAN1 Batu Belah 132 - 90 90 42 M3 120,000 10,800,000 2 Bronjong Dia. (2X1X0,5) 110 110 110 - Bh 135,000 -

SUB TOTAL ( III.A ) 10,800,000 B ALAT

1 Benang 2 - 2 2 - roll 5,000 10,000 2 Bambu 30 - 30 30 - btg 8,000 240,000

SUB TOTAL ( III.B ) 250,000 C UPAH

1 Pekerja Konstruksi 134 - - 134 HOK 24,000 - 2 Tukang 27 - - 27 HOK 33,000 -

SUB TOTAL ( III.C ) - JUMLAH SUB TOTAL III 11,050,000

JUMLAH TOTAL A 106,261,000

I RABAT BETON (BANJARWANGI-TALAGASARI)

A BAHAN1 Semen 50 kg 2,638 - - 2,638 Zak 69,500 - 2 Pasir beton 236 58 34 92 144 m³ 315,000 10,710,000 3 Pasir urug 263 - 52 52 211 m³ 100,000 5,200,000 4 Batu split 2/3 400 - 69 69 331 m³ 265,000 18,285,000 5 Kayu u/bekisting 6 - - 6 m³ 600,000 - 6 Paku 47 - - 47 m³ 12,000 - 7 Plastik Cor (lebar 1,5cm) 4,628 - 500 500 4,128 m2 2,500 1,250,000 8 Aspal Pen 60/70, 155 Kg 2 - 2 drum 1,700,000 -

SUB TOTAL ( I.A ) 35,445,000 B A L A T

1 Biaya Transparansi : 2 a. Papan Proyek 100 x 120 cm 1 - 1 1 - Ls 100,000 100,000 3 b. Papan Informasi 100 x 180 cm 1 - 1 1 - Ls 120,000 120,000 4 c. Prasasti 60 x 40 cm 1 - - 1 Ls 450,000 - 5 d. Spanduk/umbul2 1 - 1 1 - Ls 120,000 120,000 6 Concrete Mixer 47 - - 47 hari 350,000 - 7 Mobilisasi / Demob 1 - - 1 Ls 500,000 - 9 Sewa Bak Mobil 45 - 11 11 34 hari 250,000 2,750,000

10 Meteran 5 M 2 - 2 2 - buah 20,000 40,000 11 Sekop 2 - 2 2 - buah 70,000 140,000 12 Ember 100 - - 100 buah 8,000 - 13 Arco/dolag 2 - 2 2 - buah 250,000 500,000 14 Benang Kasur 4 - - 4 Roll 5,000 -

SUB TOTAL ( I.B ) 3,770,000 C UPAH

1 Pekerja Konstruksi 1,441 - - 1,441 HOK 24,000 - 2 Tukang 301 - - 301 HOK 33,000 -

SUB TOTAL ( I.C ) - JUMLAH SUB TOTAL I 39,215,000

II TPT (BANJARWANGI-TALAGASARI)

A BAHAN1 Semen 50 kg 121 - 110 110 11 Zak 69,500 7,645,000 2 Pasir Pasang 24 15 9 24 - m³ 160,000 1,440,000 3 Batu Belah 47 14 33 47 - m³ 120,000 3,960,000

SUB TOTAL ( II.A ) 13,045,000 B ALAT

1 Ember 20 - 20 20 - bh 8,000 160,000 2 Cat Tembok 4 - - 4 bh 30,000 - 3 Benang kasur 1 - 1 1 - btg 5,000 5,000

SUB TOTAL ( II.B ) 165,000

Page 43: Rpd 2014 Mp3ki - Penguatan

NO URAIAN

VOLUME

SISA

a b c d e = c + d f = b - e g h i = d * h

UNIT / SATUA

N

HARGA SATUAN

(Rp)

JUMLAH (Rp)

KEBUTUHAN PENGAJUAN TAHAP LALU

PENGAJUAN SAAT INI

JUMLAH S.D SAAT

INI

C UPAH1 Pekerja Konstruksi 94 - - 94 HOK 24,000 - 2 Tukang 45 - - 45 HOK 33,000 -

SUB TOTAL ( II.C ) - JUMLAH SUB TOTAL II 13,210,000

III GG Plat (BANJARWANGI-TALAGASARI)

A BAHAN1 Semen 50 kg 17 17 17 - Zak 69,500 1,181,500 2 Batu Belah 5 5 5 - m³ 120,000 600,000 3 Pasir Pasang 2 2 2 - m³ 160,000 320,000 4 Pasir beton 1 1 1 - m³ 315,000 315,000 5 Batu Pecah 2/3 Cm 1 1 1 - m³ 265,000 265,000 6 Kayu u/bekisting 1 1 1 - m³ 600,000 600,000 7 Kawat beton 1 1 1 - kg 16,000 16,000 8 Paku 1 1 1 - kg 12,000 12,000 9 Besi D 10 14 14 14 - btg 47,000 658,000

SUB TOTAL ( III.A ) 3,967,500 B A L A T

1 Benang 1 1 1 - Roll 5,000 5,000 2 Ember 6 6 6 - buah 8,000 48,000

SUB TOTAL ( III.B ) 53,000 C UPAH

1 Pekerja Konstruksi 18 - 18 HOK 24,000 - 2 Tukang 11 - 11 HOK 33,000 -

SUB TOTAL ( III.C ) - JUMLAH SUB TOTAL III 4,020,500

JUMLAH TOTAL B 56,445,500

I RABAT BETON (KADONGDONG-WANGUNJAYA)

A BAHAN1 Semen 50 kg 1,008 - - 1,008 Zak 69,500 - 2 Pasir beton 90 23 23 67 m³ 315,000 - 3 Pasir urug 101 - - 101 m³ 100,000 - 4 Batu split 2/3 153 6 6 147 m³ 265,000 - 5 Kayu u/bekisting 2 1 0.5 2 m³ 600,000 - 6 Paku 18 2 2.0 16 m³ 12,000 - 7 Plastik Cor (lebar 1,5cm) 1,828.52 - - 1,828.52 m2 2,500 - 8 Aspal Pen 60/70, 155 Kg 2 2 2 - drum 1,700,000 -

SUB TOTAL ( I.A ) - B A L A T

1 Biaya Transparansi : 2 a. Papan Proyek 100 x 120 cm 1 - 1 1 - Ls 100,000 100,000 3 b. Papan Informasi 100 x 180 cm 1 - 1 1 - Ls 120,000 120,000 4 c. Prasasti 60 x 40 cm 1 - - 1 Ls 450,000 - 5 d. Spanduk/umbul2 2 - 2 2 - Ls 120,000 240,000 6 Concrete Mixer 18 - - 18 hari 350,000 - 7 Mobilisasi / Demob 1 - - 1 Ls 500,000 - 8 Sekop 2 - 2 2 - hari 70,000 140,000 9 Ember 90 - - 90 hari 8,000 -

10 Arco/dolag 2 - 2 2 - Ls 250,000 500,000 11 Sapu Lidi 2 - - 2 buah 6,000 - 12 Benang Kasur 5 2 2 3 buah 5,000 -

SUB TOTAL ( I.B ) 1,100,000 C UPAH

1 Pekerja Konstruksi 398 - - 398 HOK 24,000 - 2 Tukang 115 - - 115 HOK 33,000 -

SUB TOTAL ( I.C ) - JUMLAH SUB TOTAL I 1,100,000

Page 44: Rpd 2014 Mp3ki - Penguatan

NO URAIAN

VOLUME

SISA

a b c d e = c + d f = b - e g h i = d * h

UNIT / SATUA

N

HARGA SATUAN

(Rp)

JUMLAH (Rp)

KEBUTUHAN PENGAJUAN TAHAP LALU

PENGAJUAN SAAT INI

JUMLAH S.D SAAT

INI

II TPT (KADONGDONG-WANGUNJAYA)

A BAHAN1 Semen 50 kg 472 - - 472 Zak 69,500 - 2 Pasir Pasang 95 42 42 53 m³ 160,000 - 3 Batu Belah 186 78 78 108 m³ 120,000 -

SUB TOTAL ( II.A ) - B ALAT

1 Ember 30 - - 30 buah 8,000 - 2 Cat Tembok 6 - - 6 kg 30,000 - 3 Pralon 1/2 inch 2 - - 2 buah 24,000 - 4 Bambu 10 - - 10 btg 8,000 - 5 Benang kasur 3 - - 3 buah 5,000 -

SUB TOTAL ( II.B ) - C UPAH

1 Pekerja Konstruksi 344 - - 344 HOK 24,000 - 2 Tukang 165 - - 165 HOK 33,000 -

SUB TOTAL ( II.C ) - JUMLAH SUB TOTAL II -

III JEMBATAN BAJA

A BAHAN1 bouwplank 1 - - 1 Ls 1,200,000 - 2 Besi WF 500.200 6,592 6,592 6,592 - kg 16,700 - 3 Besi WF 200.100 379 379 379 - kg 16,700 - 4 Besi L.100.100.10 1,775 1,775 1,775 - kg 16,700 - 5 Besi L.70.70.7 245 245 245 - kg 16,700 - 6 Besi L.60.60.6 590 590 590 - kg 16,700 - 7 Baud 1/2" x 4 cm 154 154 154 - buah 8,000 - 8 Baud 5/8" x 6 cm 184 184 184 - buah 10,000 - 9 Lantai Kayu 8/20 6 - - 6 m3 3,000,000 -

10 Baut kokot 5/8' x 25 cm 192 192 192 - buah 18,000 - 11 Baut kokot 5/8' x 16 cm 736 736 736 - buah 23,000 - 12 Plat sambungan gelagar utama A 78 78 78 - kg 16,700 - 13 Plat sambungan tipe B 20 20 20 - kg 16,700 - 14 Plat sambungan tipe C 37 37 37 - kg 16,700 - 15 Baut sambungan gelagar utama 384 384 384 - buah 24,000 - 16 Plat Klem Lantai 736 736 736 - buah 15,000 - 17 Karet Peredam Lantai 64 64 64 - m 10,000 - 18 Elastomer 8 8 8 - buah 250,000 - 19 Kayu Bekisting 6 - - 6 m3 600,000 - 20 Paku 15 - - 15 kg 12,000 - 21 Besi beton polos 1,069 - - 1,069 kg 7,000 - 22 Kawat beton 24 - - 24 kg 16,000 - 23 Semen 529 - - 529 zak 69,500 - 24 Pasir beton 5 - - 5 m3 315,000 - 25 Split 5 - - 5 m3 265,000 - 26 Batu Belah 162 - - 162 m3 120,000 - 27 Pabrikasi Ereksion 10,650 3,650 3,650 7,000 kg 3,000 - 28 Cat tembok 12 - - 12 kg 30,000 - 29 Cat finishing besi 1 - - 1 ls 2,000,000 - 30 Pasir pasang 80 - - 80 m3 160,000 -

SUB TOTAL ( III.A ) - B ALAT

1 Papan Kegiatan 1 - - 1 Unit 120,000 - 2 Cangkul 1 - - 1 Buah 50,000 - 3 Linggis 1 - - 1 Buah 25,000 - 4 Sekop 1 - - 1 Buah 70,000 - 5 Bambu 50 - - 50 Buah 8,000 -

Page 45: Rpd 2014 Mp3ki - Penguatan

NO URAIAN

VOLUME

SISA

a b c d e = c + d f = b - e g h i = d * h

UNIT / SATUA

N

HARGA SATUAN

(Rp)

JUMLAH (Rp)

KEBUTUHAN PENGAJUAN TAHAP LALU

PENGAJUAN SAAT INI

JUMLAH S.D SAAT

INI

6 Benang nilon 2 - - 2 Buah 5,000 - 7 Selang waterpass 15 - - 15 m 1,500 - 8 Ember Aduk Kecil 40 - - 40 Buah 8,000 - 9 Sewa molen 3 - - 3 Hari 350,000 -

10 Mobilisasi Molen 1 - - 1 Ls 500,000 - 11 Kuas 3 inch 4 - - 4 bh 10,000 - 12 Kunci besi 1 - - 1 Buah 10,000 - 13 Karung Tanggul 125 - - 125 Buah 1,000 - 14 Sewa Pompa Sedot 6 - - 6 Hari 50,000 - 15 Prasasti 1 - - 1 Buah 450,000 -

SUB TOTAL ( III.B ) - C UPAH

1 Pekerja 319 - - 319 HOK 24,000 - 2 Tukang 105 - - 105 HOK 33,000 -

SUB TOTAL ( III.C ) - JUMLAH SUB TOTAL III -

JUMLAH TOTAL C 1,100,000

I PENGASPALAN (TALAGAJAYA-TANJUNGJAYA)

A BAHAN1 Batu Pecah 3/5 Cm 130 106 106 24 m2 235,000 - 2 Batu Pecah 2/3 Cm 137 12 12 125 m3 255,000 - 3 Batu Pecah 1/2 Cm 69 18 18 51 m3 295,000 - 4 Pasir Aspal / Abu batu 37 - 37.0 37 - m3 245,000 9,065,000 5 Aspal Pen 60/70, 155 Kg 139 139 139 - Drum 1,700,000 - 6 Aspal Emulsi @ 200 kg 16 16 16 - Drum 1,850,000 - 7 Ban Bekas Mobil 25 - 25 25 - Buah 20,000 500,000 8 Kayu bakar 2 - 2 2 - m3 100,000 200,000

SUB TOTAL ( I.A ) 9,765,000 B A L A T

1 Papan proyek ( Uk.1,20 cm x 1.00 cm 1 - 1 1 - Unit 100,000 100,000 2 Papan Informasi ( Uk.120 cm x 100 c 1 - 1 1 - Unit 120,000 120,000 3 Prasasti ( Uk. 60 cm x 40 cm ) 1 - - 1 Unit 450,000 - 4 Spanduk/umbul2 2 - 2 2 - paket 200,000 400,000 5 Meteran 7,5 m 2 - 2 2 - bh 20,000 40,000 6 Sapu Lidi 4 - - 4 bh 12,125 - 7 meteran 50 m 1 - 1 1 - bh 60,000 60,000 8 Kamera Dokumentasi 1 - 1 1 - paket 1,500,000 1,500,000 9 Mesin Gilas 12 - - 12 Hari 800,000 -

10 Mob./Demob. Mesin Gilas 1 - 0.5 0.5 0.5 Ls 2,500,000 1,250,000 SUB TOTAL ( I.B ) 3,470,000

C UPAH1 Pekerja Konstruksi (Aspal ) 281 - - 281 HOK 30,000 - 2 Pekerja Galian Saluran 220 - - 220 HOK 24,000 - 3 Tukang ( Aspal) 42 - - 42 HOK 45,000 -

SUB TOTAL ( I.C ) - JUMLAH SUB TOTAL I 13,235,000

II TPT (TALAGAJAYA-TANJUNGJAYA)

A BAHAN1 Semen 50 kg 288 - 15 15 273 Zak 69,500 1,042,500 2 Pasir Pasang 58 6 6.0 12 46 m³ 150,000 900,000 3 Batu Belah 115 - 27.5 27.5 87.5 m³ 120,000 3,300,000

SUB TOTAL ( II.A ) 5,242,500 B ALAT

1 Bambu 18 - - 18 btg 8,000 - 2 Benang Kasur 3 - - 3 bh 5,000 - 3 Pralon 1/2 inch 4 - - 4 btg 20,000 - 4 Ember 20 - - 20 bh 8,000 -

Page 46: Rpd 2014 Mp3ki - Penguatan

NO URAIAN

VOLUME

SISA

a b c d e = c + d f = b - e g h i = d * h

UNIT / SATUA

N

HARGA SATUAN

(Rp)

JUMLAH (Rp)

KEBUTUHAN PENGAJUAN TAHAP LALU

PENGAJUAN SAAT INI

JUMLAH S.D SAAT

INI

5 Cat Tembok 6 - - 6 kg 30,000 - SUB TOTAL ( II.B ) -

C UPAH1 Pekerja Konstruksi 232 - - 232 HOK 24,000 - 2 Tukang 93 - - 93 HOK 33,000 -

SUB TOTAL ( II.C ) - JUMLAH SUB TOTAL II 5,242,500

III TPT JEMBATAN (TALAGAJAYA-TANJUNGJAYA)

A BAHAN1 Semen 50 kg 197 - 145 145 52 Zak 69,500 10,077,500 2 Pasir Pasang 40 - 30 30 10 m³ 150,000 4,500,000 3 Batu Belah 80 - 74 74 6 m³ 120,000 8,880,000 4 Besi dia 12 7 - 7 7 - btg 110,000 770,000 5 Pasir Beton 1 - 1 1 - m3 295,000 295,000 6 Kawat beton 1 - 1 1 - kg 16,000 16,000

SUB TOTAL ( III.A ) 24,538,500 B ALAT

1 Bambu 28 - 28 28 - btg 8,000 224,000 2 Benang Kasur 3 - 3 3 - bh 5,000 15,000 3 Pralon 1/2 inch 3 - 3 3 - btg 20,000 60,000 4 Ember 26 - 26 26 - bh 8,000 208,000 5 Cat Tembok 6 - - 6 kg 30,000 -

SUB TOTAL ( III.B ) 507,000 C UPAH

1 Pekerja Konstruksi 135 - - 135 HOK 24,000 - 2 Tukang 61 - - 61 HOK 33,000 -

SUB TOTAL ( III.C ) - JUMLAH SUB TOTAL III 25,045,500

IV GG PLAT BETON (TALAGAJAYA-TANJUNGJAYA)

A BAHAN1 Semen 90 - - 90 zak 69,500 - 2 Batu belah 26 - - 26 M3 120,000 - 3 Pasir Pasang 8 - - 8 m3 150,000 - 4 Pasir Beton 2 - - 2 m3 295,000 - 5 Batu Pecah 2-3 cm 4 - - 4 m3 255,000 - 6 Kayu Begisting 1.2 - - 1 m3 600,000 - 7 Kawat Beton 4 - - 4 Kg 16,000 - 8 Paku 4 - - 4 kg 12,000 - 9 Besi dia. 10 64 - - 64 Buah 47,000 -

SUB TOTAL ( IV.A ) - B ALAT

1 Ember 25 - - 25 buah 8,000 - 2 Benang Kasur 3 - - 3 roll 5,000 - 3 Bambu 17 - - 17 Btg 8,000 -

SUB TOTAL ( IV.B ) - C UPAH

1 Pekerja Konstruksi 98 - - 98 HOK 24,000 - 2 Tukang 58 - - 58 HOK 33,000 -

SUB TOTAL ( IV.C ) - JUMLAH SUB TOTAL IV -

JUMLAH TOTAL D 43,523,000

I RABAT BETON (WANGUNJAYA-MULYAJAYA)

A BAHAN1 Semen 50 kg 1,241 - - 1,241 Zak 69,500 - 2 Pasir beton 111 55 55 56 m³ 315,000 - 3 Pasir urug 124 - 88.0 88.0 36.0 m³ 100,000 8,800,000

Page 47: Rpd 2014 Mp3ki - Penguatan

NO URAIAN

VOLUME

SISA

a b c d e = c + d f = b - e g h i = d * h

UNIT / SATUA

N

HARGA SATUAN

(Rp)

JUMLAH (Rp)

KEBUTUHAN PENGAJUAN TAHAP LALU

PENGAJUAN SAAT INI

JUMLAH S.D SAAT

INI

4 Batu split 2/3 188 164 24.5 188.0 - m³ 265,000 6,492,500 5 Kayu u/bekisting 3 - - 3 m³ 600,000 - 6 Paku 22 - - 22 m³ 12,000 - 7 Plastik Cor (lebar 1,5cm) 2,171 - - 2,171 m2 2,500 - 8 Aspal Pen 60/70, 155 Kg 1 1 1 - drum 1,700,000 -

SUB TOTAL ( I.A ) 15,292,500 B A L A T

1 Biaya Transparansi : 2 a. Papan Proyek 100 x 120 cm 1 - 1 1 - Ls 100,000 100,000 3 b. Papan Informasi 100 x 180 cm 1 - 1 1 - Ls 120,000 120,000 4 c. Prasasti 60 x 40 cm 1 - - 1 Ls 450,000 - 5 d. Spanduk Program 2 - 2 2 - Ls 120,000 240,000 6 Concrete Mixer 22 - - 22 hari 350,000 - 7 Mobilisasi / Demob 1 - - 1 Ls 500,000 - 8 Meteran 5 M 1 - 1 1 - buah 10,000 10,000 9 Pipa Railing/Pilar Jembatan 8 - - 8 btg 250,000 -

10 Sekop 2 - 2 2 - buah 70,000 140,000 11 Ember 77 - - 77 buah 8,000 - 12 Arco/dolag 2 - 2 2 - buah 250,000 500,000 13 Benang Kasur 4 - - 4 Roll 5,000 -

SUB TOTAL ( I.B ) 1,110,000 C UPAH

1 Pekerja Konstruksi 544 - - 544 HOK 24,000 - 2 Tukang 142 - - 142 HOK 33,000 -

SUB TOTAL ( I.C ) - JUMLAH SUB TOTAL I 16,402,500

II TPT (WANGUNJAYA-MULYAJAYA)

A BAHAN1 Semen 50 kg 1,480 - 150 150 1,330 Zak 69,500 10,425,000 2 Pasir Pasang 297 72 72 226 m³ 160,000 - 3 Batu Belah 593 404 403.5 190 m³ 120,000 -

SUB TOTAL ( II.A ) 10,425,000 B ALAT

1 Ember 50 - 25 25 25 buah 8,000 200,000 2 Cat Tembok 4 - - 4 kg 30,000 - 3 Pipa pralon 5 - 5 5 - btg 24,000 120,000 4 Bambu 20 - 20 20 - bh 8,000 160,000 5 Benang kasur 3 - 3 3 - btg 5,000 15,000

SUB TOTAL ( II.B ) 495,000 C UPAH

1 Pekerja Konstruksi 957 - - 957 HOK 24,000 - 2 Tukang 411 - - 411 HOK 33,000 -

SUB TOTAL ( II.C ) - JUMLAH SUB TOTAL II 10,920,000

III BRONJONG

A BAHAN1 Batu Belah 231 - 77 77 154 M3 120,000 9,240,000 2 Bronjong Dia. (2X1X0,5) 192 192 192 - Bh 135,000 -

SUB TOTAL ( III.A ) 9,240,000 B ALAT

1 Benang 2 - - 2 roll 5,000 - 2 Bambu 20 - - 20 btg 8,000 -

SUB TOTAL ( III.B ) - C UPAH

1 Pekerja Konstruksi 256 - - 256 HOK 24,000 - 2 Tukang 52 - - 52 HOK 33,000 -

SUB TOTAL ( III.C ) -

Page 48: Rpd 2014 Mp3ki - Penguatan

NO URAIAN

VOLUME

SISA

a b c d e = c + d f = b - e g h i = d * h

UNIT / SATUA

N

HARGA SATUAN

(Rp)

JUMLAH (Rp)

KEBUTUHAN PENGAJUAN TAHAP LALU

PENGAJUAN SAAT INI

JUMLAH S.D SAAT

INI

JUMLAH SUB TOTAL III 9,240,000

IV GG PLAT BETON

A BAHAN1 Semen 34 - - 34 zak 69,500 - 2 Batu belah 10 - - 10 M3 120,000 - 3 Pasir Pasang 4 - - 4 M3 160,000 - 4 Pasir Beton 2 - - 2 M3 315,000 - 5 Batu Pecah 2-3 cm 2 - - 2 M3 265,000 - 6 Kayu Begisting 2 - - 2 M3 600,000 - 7 Kawat Beton 2 - - 2 Kg 16,000 - 8 Paku 2 - - 2 Kg 12,000 - 9 Besi dia. 10 28 - - 28 Btg 47,000 -

SUB TOTAL ( IV.A ) - B ALAT

1 Benang 3 - - 3 roll 5,000 - 2 Ember 8 - - 8 buah 8,000 -

SUB TOTAL ( IV.B ) - C UPAH

1 Pekerja Konstruksi 36 - - 36 HOK 24,000 - 2 Tukang 22 - - 22 HOK 33,000 -

SUB TOTAL ( IV.C ) - JUMLAH SUB TOTAL IV -

JUMLAH TOTAL E 36,562,500

JUMLAH TOTAL 243,892,000

Terbilang (dengan huruf) : #VALUE!

Banjarwangi, …......…………

Disetujui Oleh : Dibuat Oleh :Ketua TPK Bendahara TPK

Kecamatan Banjarwangi Kecamatan Banjarwangi

Endjang Komara Ahmad Hayun,S.Pd.IMengetahui :

FK / FT Kecamatan Banjarwangi PjOK Kecamatan Banjarwangi

MIFTAH FARID Ujang Suryana.S.SosFasilitator Kecamatan Fasilitator Teknik NIP. 19671201 198703 1 004

Sebagai Catatan :

TAHAP ALOKASI BOP TAHAP LALU KUMULATIF

1 DANA 40% TAHAP 1 1,132,128,000 800,445,700 243,892,000 1,044,337,700

2 DANA 40% TAHAP 2 1,132,128,000 - -

3 DANA 20% 566,064,000 - -

JUMLAH 2,830,320,000 800,445,700 243,892,000 1,044,337,700

DEFIK GUNAWAN,ST AHMAD FAUZI,ST

NO

TAHAP SEKARANG

Page 49: Rpd 2014 Mp3ki - Penguatan

PNPM - Mandiri Perdesaan Pola Khusus MP3KI Form.36.

RENCANA PENGGUNAAN DANAMP3KI PENGUATAN

RPD KE : 1F Kecamatan : Banjarwangi Kabupaten : Garut

Jumlah BLM : Rp 2,830,320,000

NO URAIAN

VOLUME

SISA

a b c d e = c + d f = b - e g h i = d * h

I RABAT BETON (BANJARWANGI-BOJONG-JAYABAKTI)

A BAHAN1 Semen 50 kg 2,890 400 400 2,490 Zak 70,000 28,000,000 2 Pasir beton 258 173 173.40 84.60 m³ 310,000 53,754,000 3 Pasir urug 288 - - 288 m³ 100,000 - 4 Batu split 2/3 439 188 187.5 251.5 m³ 270,000 50,625,000 5 Kayu u/bekisting 6 - - 6 m³ 600,000 - 6 Paku 52 - - 52 m³ 12,000 - 7 Plastik Cor (lebar 1,5cm) 5,078 500 500 4,578 m2 2,500 1,250,000 8 Aspal Pen 60/70, 155 Kg 5 5 5 - drum 1,700,000 8,500,000

SUB TOTAL ( I.A ) 142,129,000 B A L A T

1 Biaya Transparansi : 2 a. Papan Proyek 100 x 120 cm 1 - - 1 Ls 100,000 - 3 b. Papan Informasi 100 x 180 cm 1 - - 1 Ls 120,000 - 4 c. Prasasti 60 x 40 cm 1 - - 1 Ls 450,000 - 5 c. Spanduk/umbul umbul 3 - - 3 Ls 120,000 - 6 d. Kamera Digital 1 - - 1 hari 2,000,000 - 7 Concrete Mixer 52 - - 52 Ls 350,000 - 8 Mobilisasi / Demob 1 - - 1 hari 500,000 - 9 Gor. Buis Beton 30 cm 8 - - 8 hari 80,000 -

10 Sekop 2 - - 2 Ls 70,000 - 11 Ember 100 - - 100 buah 8,000 - 12 Arco/dolag 3 - - 3 buah 250,000 - 13 Benang Kasur 4 - buah 5,000 -

SUB TOTAL ( I.B ) - C UPAH

1 Pekerja Konstruksi 1,300 - - 1,300 HOK 24,000 - 2 Tukang 330 - - 330 HOK 33,000 -

SUB TOTAL ( I.C ) - JUMLAH SUB TOTAL I 142,129,000

II TPT (BANJARWANGI-BOJONG-JAYABAKTI)

A BAHAN1 Semen 50 kg 474 84 84 390 Zak 70,000 5,880,000 2 Pasir Pasang 95 6 6 89 m³ 160,000 944,000 3 Batu Belah 188 114 114 74 m³ 120,000 13,680,000

SUB TOTAL ( II.A ) 20,504,000 B ALAT

1 Ember 45 45 45 - buah 8,000 360,000 2 Cat Tembok 5 - - 5 kg 30,000 - 3 Pralon 1/2 inch 4 3 3 1 btg 20,000 60,000 4 Kuas 1/2 inch 2 - - 2 bh 20,000 - 5 Bambu 6 6 6 - btg 8,000 48,000 6 Benang kasur 4 4 4 - buah 5,000 20,000

SUB TOTAL ( II.B ) 488,000 C UPAH

1 Pekerja Konstruksi 311 - - 311 HOK 24,000 - 2 Tukang 157 - - 157 HOK 33,000 -

SUB TOTAL ( II.C ) - JUMLAH SUB TOTAL II 20,992,000

UNIT / SATUA

N

HARGA SATUAN

(Rp)

JUMLAH (Rp)

KEBUTUHAN PENGAJUAN TAHAP LALU

PENGAJUAN SAAT INI

JUMLAH S.D SAAT

INI

Page 50: Rpd 2014 Mp3ki - Penguatan

NO URAIAN

VOLUME

SISA

a b c d e = c + d f = b - e g h i = d * h

UNIT / SATUA

N

HARGA SATUAN

(Rp)

JUMLAH (Rp)

KEBUTUHAN PENGAJUAN TAHAP LALU

PENGAJUAN SAAT INI

JUMLAH S.D SAAT

INI

III BRONJONG

A BAHAN1 Batu Belah 132 90 90 42 M3 120,000 10,800,000 2 Bronjong Dia. (2X1X0,5) 110 110 110 - Bh 135,000 14,850,000

SUB TOTAL ( III.A ) 25,650,000 B ALAT

1 Benang 2 2 2 - roll 5,000 10,000 2 Bambu 30 30 30 - btg 8,000 240,000

SUB TOTAL ( III.B ) 250,000 C UPAH

1 Pekerja Konstruksi 134 - - 134 HOK 24,000 - 2 Tukang 27 - - 27 HOK 33,000 -

SUB TOTAL ( III.C ) - JUMLAH SUB TOTAL III 25,900,000

JUMLAH TOTAL A 189,021,000

I RABAT BETON (BANJARWANGI-TALAGASARI)

A BAHAN1 Semen 50 kg 2,638 - - 2,638 Zak 69,500 - 2 Pasir beton 236 92 92 144 m³ 315,000 28,980,000 3 Pasir urug 263 52 52 211 m³ 100,000 5,200,000 4 Batu split 2/3 400 69 69 331 m³ 265,000 18,285,000 5 Kayu u/bekisting 6 - - 6 m³ 600,000 - 6 Paku 47 - - 47 m³ 12,000 - 7 Plastik Cor (lebar 1,5cm) 4,628 500 500 4,128 m2 2,500 1,250,000 8 Aspal Pen 60/70, 155 Kg 2 - - 2 drum 1,700,000 -

SUB TOTAL ( I.A ) 53,715,000 B A L A T

1 Biaya Transparansi : 2 a. Papan Proyek 100 x 120 cm 1 1 1 - Ls 100,000 100,000 3 b. Papan Informasi 100 x 180 cm 1 1 1 - Ls 120,000 120,000 4 c. Prasasti 60 x 40 cm 1 - - 1 Ls 450,000 - 5 d. Spanduk/umbul2 1 1 1 - Ls 120,000 120,000 6 Concrete Mixer 47 - - 47 hari 350,000 - 7 Mobilisasi / Demob 1 - - 1 Ls 500,000 - 9 Sewa Bak Mobil 45 11 11 34 hari 250,000 2,750,000

10 Meteran 5 M 2 2 2 - buah 20,000 40,000 11 Sekop 2 2 2 - buah 70,000 140,000 12 Ember 100 - - 100 buah 8,000 - 13 Arco/dolag 2 2 2 - buah 250,000 500,000 14 Benang Kasur 4 - - 4 Roll 5,000 -

SUB TOTAL ( I.B ) 3,770,000 C UPAH

1 Pekerja Konstruksi 1,441 - - 1,441 HOK 24,000 - 2 Tukang 301 - - 301 HOK 33,000 -

SUB TOTAL ( I.C ) - JUMLAH SUB TOTAL I 57,485,000

II TPT (BANJARWANGI-TALAGASARI)

A BAHAN1 Semen 50 kg 121 110 110 11 Zak 69,500 7,645,000 2 Pasir Pasang 24 24 24 - m³ 160,000 3,840,000 3 Batu Belah 47 47 47 - m³ 120,000 5,640,000

SUB TOTAL ( II.A ) 17,125,000 B ALAT

1 Ember 20 20 20 - bh 8,000 160,000 2 Cat Tembok 4 - - 4 bh 30,000 - 3 Benang kasur 1 1 1 - btg 5,000 5,000

SUB TOTAL ( II.B ) 165,000

Page 51: Rpd 2014 Mp3ki - Penguatan

NO URAIAN

VOLUME

SISA

a b c d e = c + d f = b - e g h i = d * h

UNIT / SATUA

N

HARGA SATUAN

(Rp)

JUMLAH (Rp)

KEBUTUHAN PENGAJUAN TAHAP LALU

PENGAJUAN SAAT INI

JUMLAH S.D SAAT

INI

C UPAH1 Pekerja Konstruksi 94 - - 94 HOK 24,000 - 2 Tukang 45 - - 45 HOK 33,000 -

SUB TOTAL ( II.C ) - JUMLAH SUB TOTAL II 17,290,000

III GG Plat (BANJARWANGI-TALAGASARI)

A BAHAN1 Semen 50 kg 17 17 17 - Zak 69,500 1,181,500 2 Batu Belah 5 5 5 - m³ 120,000 600,000 3 Pasir Pasang 2 2 2 - m³ 160,000 320,000 4 Pasir beton 1 1 1 - m³ 315,000 315,000 5 Batu Pecah 2/3 Cm 1 1 1 - m³ 265,000 265,000 6 Kayu u/bekisting 1 1 1 - m³ 600,000 600,000 7 Kawat beton 1 1 1 - kg 16,000 16,000 8 Paku 1 1 1 - kg 12,000 12,000 9 Besi D 10 14 14 14 - btg 47,000 658,000

SUB TOTAL ( III.A ) 3,967,500 B A L A T

1 Benang 1 1 1 - Roll 5,000 5,000 2 Ember 6 6 6 - buah 8,000 48,000

SUB TOTAL ( III.B ) 53,000 C UPAH

1 Pekerja Konstruksi 18 - - 18 HOK 24,000 - 2 Tukang 11 - - 11 HOK 33,000 -

SUB TOTAL ( III.C ) - JUMLAH SUB TOTAL III 4,020,500

JUMLAH TOTAL B 78,795,500

I RABAT BETON (KADONGDONG-WANGUNJAYA)

A BAHAN1 Semen 50 kg 1,008 - - 1,008 Zak 69,500 - 2 Pasir beton 90 23 42 65 25 m³ 315,000 20,475,000 3 Pasir urug 101 - - 101 m³ 100,000 - 4 Batu split 2/3 153 6 6 147 m³ 265,000 1,590,000 5 Kayu u/bekisting 2 1 0.5 2 m³ 600,000 300,000 6 Paku 18 2 2.0 16 m³ 12,000 24,000 7 Plastik Cor (lebar 1,5cm) 1,828.52 - - 1,828.52 m2 2,500 - 8 Aspal Pen 60/70, 155 Kg 2 2 2 - drum 1,700,000 3,400,000

SUB TOTAL ( I.A ) 25,789,000 B A L A T

1 Biaya Transparansi : 2 a. Papan Proyek 100 x 120 cm 1 1 1 - Ls 100,000 100,000 3 b. Papan Informasi 100 x 180 cm 1 1 1 - Ls 120,000 120,000 4 c. Prasasti 60 x 40 cm 1 - - 1 Ls 450,000 - 5 d. Spanduk/umbul2 2 2 2 - Ls 120,000 240,000 6 Concrete Mixer 18 - - 18 hari 350,000 - 7 Mobilisasi / Demob 1 - - 1 Ls 500,000 - 8 Sekop 2 2 2 - hari 70,000 140,000 9 Ember 90 - - 90 hari 8,000 -

10 Arco/dolag 2 2 2 - Ls 250,000 500,000 11 Sapu Lidi 2 - - 2 buah 6,000 - 12 Benang Kasur 5 2 2 3 buah 5,000 10,000

SUB TOTAL ( I.B ) 1,110,000 C UPAH

1 Pekerja Konstruksi 398 - - 398 HOK 24,000 - 2 Tukang 115 - - 115 HOK 33,000 -

SUB TOTAL ( I.C ) - JUMLAH SUB TOTAL I 26,899,000

Page 52: Rpd 2014 Mp3ki - Penguatan

NO URAIAN

VOLUME

SISA

a b c d e = c + d f = b - e g h i = d * h

UNIT / SATUA

N

HARGA SATUAN

(Rp)

JUMLAH (Rp)

KEBUTUHAN PENGAJUAN TAHAP LALU

PENGAJUAN SAAT INI

JUMLAH S.D SAAT

INI

II TPT (KADONGDONG-WANGUNJAYA)

A BAHAN1 Semen 50 kg 472 - 150 150 322 Zak 69,500 10,425,000 2 Pasir Pasang 95 42 22.0 64 31 m³ 160,000 10,240,000 3 Batu Belah 186 78 75 153 33 m³ 120,000 18,360,000

SUB TOTAL ( II.A ) 39,025,000 B ALAT

1 Ember 30 - - 30 buah 8,000 - 2 Cat Tembok 6 - - 6 kg 30,000 - 3 Pralon 1/2 inch 2 - - 2 buah 24,000 - 4 Bambu 10 - - 10 btg 8,000 - 5 Benang kasur 3 - - 3 buah 5,000 -

SUB TOTAL ( II.B ) - C UPAH

1 Pekerja Konstruksi 344 - - 344 HOK 24,000 - 2 Tukang 165 - - 165 HOK 33,000 -

SUB TOTAL ( II.C ) - JUMLAH SUB TOTAL II 39,025,000

III JEMBATAN BAJA

A BAHAN1 bouwplank 1 - - 1 Ls 1,200,000 - 2 Besi WF 500.200 6,592 6,592 6,592 - kg 16,700 110,086,400 3 Besi WF 200.100 379 379 379 - kg 16,700 6,329,300 4 Besi L.100.100.10 1,775 1,775 1,775 - kg 16,700 29,642,500 5 Besi L.70.70.7 245 245 245 - kg 16,700 4,091,500 6 Besi L.60.60.6 590 590 590 - kg 16,700 9,853,000 7 Baud 1/2" x 4 cm 154 154 154 - buah 8,000 1,232,000 8 Baud 5/8" x 6 cm 184 184 184 - buah 10,000 1,840,000 9 Lantai Kayu 8/20 6 - - 6 m3 3,000,000 -

10 Baut kokot 5/8' x 25 cm 192 192 192 - buah 18,000 3,456,000 11 Baut kokot 5/8' x 16 cm 736 736 736 - buah 23,000 16,928,000 12 Plat sambungan gelagar utama A 78 78 78 - kg 16,700 1,302,600 13 Plat sambungan tipe B 20 20 20 - kg 16,700 334,000 14 Plat sambungan tipe C 37 37 37 - kg 16,700 617,900 15 Baut sambungan gelagar utama 384 384 384 - buah 24,000 9,216,000 16 Plat Klem Lantai 736 736 736 - buah 15,000 11,040,000 17 Karet Peredam Lantai 64 64 64 - m 10,000 640,000 18 Elastomer 8 8 8 - buah 250,000 2,000,000 19 Kayu Bekisting 6 - 6 6 - m3 600,000 3,600,000 20 Paku 15 - 8 8 7 kg 12,000 96,000 21 Besi beton polos 1,069 - - 1,069 kg 7,000 - 22 Kawat beton 24 - - 24 kg 16,000 - 23 Semen 529 - - 529 zak 69,500 - 24 Pasir beton 5 - - 5 m3 315,000 - 25 Split 5 - - 5 m3 265,000 - 26 Batu Belah 162 - - 162 m3 120,000 - 27 Pabrikasi Ereksion 10,650 3,650 3,650 7,000 kg 3,000 10,950,000 28 Cat tembok 12 - - 12 kg 30,000 - 29 Cat finishing besi 1 - - 1 ls 2,000,000 - 30 Pasir pasang 80 - - 80 m3 160,000 -

SUB TOTAL ( III.A ) 223,255,200 B ALAT

1 Papan Kegiatan 1 - - 1 Unit 120,000 - 2 Cangkul 1 - 1 1 - Buah 50,000 50,000 3 Linggis 1 - - 1 Buah 25,000 - 4 Sekop 1 - - 1 Buah 70,000 - 5 Bambu 50 - 40 40 10 Buah 8,000 320,000

Page 53: Rpd 2014 Mp3ki - Penguatan

NO URAIAN

VOLUME

SISA

a b c d e = c + d f = b - e g h i = d * h

UNIT / SATUA

N

HARGA SATUAN

(Rp)

JUMLAH (Rp)

KEBUTUHAN PENGAJUAN TAHAP LALU

PENGAJUAN SAAT INI

JUMLAH S.D SAAT

INI

6 Benang nilon 2 - - 2 Buah 5,000 - 7 Selang waterpass 15 - 15 15 - m 1,500 22,500 8 Ember Aduk Kecil 40 - 22 22 18 Buah 8,000 176,000 9 Sewa molen 3 - - 3 Hari 350,000 -

10 Mobilisasi Molen 1 - - 1 Ls 500,000 - 11 Kuas 3 inch 4 - - 4 bh 10,000 - 12 Kunci besi 1 - - 1 Buah 10,000 - 13 Karung Tanggul 125 - 50 50 75 Buah 1,000 50,000 14 Sewa Pompa Sedot 6 - - 6 Hari 50,000 - 15 Prasasti 1 - - 1 Buah 450,000 -

SUB TOTAL ( III.B ) 618,500 C UPAH

1 Pekerja 319 - 141 141 178 HOK 24,000 3,384,000 2 Tukang 105 - - 105 HOK 33,000 -

SUB TOTAL ( III.C ) 3,384,000 JUMLAH SUB TOTAL III 227,257,700

JUMLAH TOTAL C 293,181,700

I PENGASPALAN (TALAGAJAYA-TANJUNGJAYA)

A BAHAN1 Batu Pecah 3/5 Cm 130 106 6 112 18 m2 235,000 26,320,000 2 Batu Pecah 2/3 Cm 137 12 41 53 84 m3 255,000 13,515,000 3 Batu Pecah 1/2 Cm 69 18 30 48 21 m3 295,000 14,160,000 4 Pasir Aspal / Abu batu 37 37 37 - m3 245,000 9,065,000 5 Aspal Pen 60/70, 155 Kg 139 139 139 - Drum 1,700,000 236,300,000 6 Aspal Emulsi @ 200 kg 16 16 16 - Drum 1,850,000 29,600,000 7 Ban Bekas Mobil 25 25 25 - Buah 20,000 500,000 8 Kayu bakar 2 2 2 - m3 100,000 200,000

SUB TOTAL ( I.A ) 329,660,000 B A L A T

1 Papan proyek ( Uk.1,20 cm x 1.00 cm 1 1 1 - Unit 100,000 100,000 2 Papan Informasi ( Uk.120 cm x 100 c 1 1 1 - Unit 120,000 120,000 3 Prasasti ( Uk. 60 cm x 40 cm ) 1 - - 1 Unit 450,000 - 4 Spanduk/umbul2 2 2 2 - paket 200,000 400,000 5 Meteran 7,5 m 2 2 2 - bh 20,000 40,000 6 Sapu Lidi 4 - - 4 bh 12,125 - 7 meteran 50 m 1 1 1 - bh 60,000 60,000 8 Kamera Dokumentasi 1 1 1 - paket 1,500,000 1,500,000 9 Mesin Gilas 12 - - 12 Hari 800,000 -

10 Mob./Demob. Mesin Gilas 1 1 0.5 0.5 Ls 2,500,000 1,250,000 SUB TOTAL ( I.B ) 3,470,000

C UPAH1 Pekerja Konstruksi (Aspal ) 281 - 281 281 - HOK 30,000 8,430,000 2 Pekerja Galian Saluran 220 - 220 220 - HOK 24,000 5,280,000 3 Tukang ( Aspal) 42 - 42 42 - HOK 45,000 1,890,000

SUB TOTAL ( I.C ) 15,600,000 JUMLAH SUB TOTAL I 348,730,000

II TPT (TALAGAJAYA-TANJUNGJAYA)

A BAHAN1 Semen 50 kg 288 15 15 273 Zak 69,500 1,042,500 2 Pasir Pasang 58 12 12 46 m³ 150,000 1,800,000 3 Batu Belah 115 28 27.5 87.5 m³ 120,000 3,300,000

SUB TOTAL ( II.A ) 6,142,500 B ALAT

1 Bambu 18 - - 18 btg 8,000 - 2 Benang Kasur 3 - - 3 bh 5,000 - 3 Pralon 1/2 inch 4 - - 4 btg 20,000 - 4 Ember 20 - - 20 bh 8,000 -

Page 54: Rpd 2014 Mp3ki - Penguatan

NO URAIAN

VOLUME

SISA

a b c d e = c + d f = b - e g h i = d * h

UNIT / SATUA

N

HARGA SATUAN

(Rp)

JUMLAH (Rp)

KEBUTUHAN PENGAJUAN TAHAP LALU

PENGAJUAN SAAT INI

JUMLAH S.D SAAT

INI

5 Cat Tembok 6 - - 6 kg 30,000 - SUB TOTAL ( II.B ) -

C UPAH1 Pekerja Konstruksi 232 - 200 200 32 HOK 24,000 4,800,000 2 Tukang 93 - 88 88 5 HOK 33,000 2,904,000

SUB TOTAL ( II.C ) 7,704,000 JUMLAH SUB TOTAL II 13,846,500

III TPT JEMBATAN (TALAGAJAYA-TANJUNGJAYA)

A BAHAN1 Semen 50 kg 197 145 145 52 Zak 69,500 10,077,500 2 Pasir Pasang 40 30 30 10 m³ 150,000 4,500,000 3 Batu Belah 80 74 74 6 m³ 120,000 8,880,000 4 Besi dia 12 7 7 7 - btg 110,000 770,000 5 Pasir Beton 1 1 1 - m3 295,000 295,000 6 Kawat beton 1 1 1 - kg 16,000 16,000

SUB TOTAL ( III.A ) 24,538,500 B ALAT

1 Bambu 28 28 28 - btg 8,000 224,000 2 Benang Kasur 3 3 3 - bh 5,000 15,000 3 Pralon 1/2 inch 3 3 3 - btg 20,000 60,000 4 Ember 26 26 26 - bh 8,000 208,000 5 Cat Tembok 6 - - 6 kg 30,000 -

SUB TOTAL ( III.B ) 507,000 C UPAH

1 Pekerja Konstruksi 135 - - 135 HOK 24,000 - 2 Tukang 61 - - 61 HOK 33,000 -

SUB TOTAL ( III.C ) - JUMLAH SUB TOTAL III 25,045,500

IV GG PLAT BETON (TALAGAJAYA-TANJUNGJAYA)

A BAHAN1 Semen 90 - - 90 zak 69,500 - 2 Batu belah 26 - - 26 M3 120,000 - 3 Pasir Pasang 8 - - 8 m3 150,000 - 4 Pasir Beton 2 - - 2 m3 295,000 - 5 Batu Pecah 2-3 cm 4 - - 4 m3 255,000 - 6 Kayu Begisting 1.2 - - 1 m3 600,000 - 7 Kawat Beton 4 - - 4 Kg 16,000 - 8 Paku 4 - - 4 kg 12,000 - 9 Besi dia. 10 64 - - 64 Buah 47,000 -

SUB TOTAL ( IV.A ) - B ALAT

1 Ember 25 - - 25 buah 8,000 - 2 Benang Kasur 3 - - 3 roll 5,000 - 3 Bambu 17 - - 17 Btg 8,000 -

SUB TOTAL ( IV.B ) - C UPAH

1 Pekerja Konstruksi 98 - - 98 HOK 24,000 - 2 Tukang 58 - - 58 HOK 33,000 -

SUB TOTAL ( IV.C ) - JUMLAH SUB TOTAL IV -

JUMLAH TOTAL D 387,622,000

I RABAT BETON (WANGUNJAYA-MULYAJAYA)

A BAHAN1 Semen 50 kg 1,241 - - 1,241 Zak 69,500 - 2 Pasir beton 111 55 55 56 m³ 315,000 17,325,000 3 Pasir urug 124 88 88.0 36.0 m³ 100,000 8,800,000

Page 55: Rpd 2014 Mp3ki - Penguatan

NO URAIAN

VOLUME

SISA

a b c d e = c + d f = b - e g h i = d * h

UNIT / SATUA

N

HARGA SATUAN

(Rp)

JUMLAH (Rp)

KEBUTUHAN PENGAJUAN TAHAP LALU

PENGAJUAN SAAT INI

JUMLAH S.D SAAT

INI

4 Batu split 2/3 188 188 188.0 - m³ 265,000 49,820,000 5 Kayu u/bekisting 3 - - 3 m³ 600,000 - 6 Paku 22 - - 22 m³ 12,000 - 7 Plastik Cor (lebar 1,5cm) 2,171 - - 2,171 m2 2,500 - 8 Aspal Pen 60/70, 155 Kg 1 1 1 - drum 1,700,000 1,700,000

SUB TOTAL ( I.A ) 77,645,000 B A L A T

1 Biaya Transparansi : 2 a. Papan Proyek 100 x 120 cm 1 1 1 - Ls 100,000 100,000 3 b. Papan Informasi 100 x 180 cm 1 1 1 - Ls 120,000 120,000 4 c. Prasasti 60 x 40 cm 1 - - 1 Ls 450,000 - 5 d. Spanduk Program 2 2 2 - Ls 120,000 240,000 6 Concrete Mixer 22 - - 22 hari 350,000 - 7 Mobilisasi / Demob 1 - - 1 Ls 500,000 - 8 Meteran 5 M 1 1 1 - buah 10,000 10,000 9 Pipa Railing/Pilar Jembatan 8 - - 8 btg 250,000 -

10 Sekop 2 2 2 - buah 70,000 140,000 11 Ember 77 - - 77 buah 8,000 - 12 Arco/dolag 2 2 2 - buah 250,000 500,000 13 Benang Kasur 4 - - 4 Roll 5,000 -

SUB TOTAL ( I.B ) 1,110,000 C UPAH

1 Pekerja Konstruksi 544 - 544 HOK 24,000 - 2 Tukang 142 - 142 HOK 33,000 -

SUB TOTAL ( I.C ) - JUMLAH SUB TOTAL I 78,755,000

II TPT (WANGUNJAYA-MULYAJAYA)

A BAHAN1 Semen 50 kg 1,480 150 150 1,330 Zak 69,500 10,425,000 2 Pasir Pasang 297 72 72 226 m³ 160,000 11,440,000 3 Batu Belah 593 404 403.5 190 m³ 120,000 48,420,000

SUB TOTAL ( II.A ) 70,285,000 B ALAT

1 Ember 50 25 25 25 buah 8,000 200,000 2 Cat Tembok 4 - - 4 kg 30,000 - 3 Pipa pralon 5 5 5 - btg 24,000 120,000 4 Bambu 20 20 20 - bh 8,000 160,000 5 Benang kasur 3 3 3 - btg 5,000 15,000

SUB TOTAL ( II.B ) 495,000 C UPAH

1 Pekerja Konstruksi 957 - - 957 HOK 24,000 - 2 Tukang 411 - - 411 HOK 33,000 -

SUB TOTAL ( II.C ) - JUMLAH SUB TOTAL II 70,780,000

III BRONJONG

A BAHAN1 Batu Belah 231 77 77 154 M3 120,000 9,240,000 2 Bronjong Dia. (2X1X0,5) 192 192 192 - Bh 135,000 25,920,000

SUB TOTAL ( III.A ) 35,160,000 B ALAT

1 Benang 2 - - 2 roll 5,000 - 2 Bambu 20 - - 20 btg 8,000 -

SUB TOTAL ( III.B ) - C UPAH

1 Pekerja Konstruksi 256 - 256 256 - HOK 24,000 6,144,000 2 Tukang 52 - 52 52 - HOK 33,000 1,716,000

SUB TOTAL ( III.C ) 7,860,000

Page 56: Rpd 2014 Mp3ki - Penguatan

NO URAIAN

VOLUME

SISA

a b c d e = c + d f = b - e g h i = d * h

UNIT / SATUA

N

HARGA SATUAN

(Rp)

JUMLAH (Rp)

KEBUTUHAN PENGAJUAN TAHAP LALU

PENGAJUAN SAAT INI

JUMLAH S.D SAAT

INI

JUMLAH SUB TOTAL III 43,020,000

IV GG PLAT BETON

A BAHAN1 Semen 34 - - 34 zak 69,500 - 2 Batu belah 10 - - 10 M3 120,000 - 3 Pasir Pasang 4 - - 4 M3 160,000 - 4 Pasir Beton 2 - - 2 M3 315,000 - 5 Batu Pecah 2-3 cm 2 - - 2 M3 265,000 - 6 Kayu Begisting 2 - - 2 M3 600,000 - 7 Kawat Beton 2 - - 2 Kg 16,000 - 8 Paku 2 - - 2 Kg 12,000 - 9 Besi dia. 10 28 - - 28 Btg 47,000 -

SUB TOTAL ( IV.A ) - B ALAT

1 Benang 3 - - 3 roll 5,000 - 2 Ember 8 - - 8 buah 8,000 -

SUB TOTAL ( IV.B ) - C UPAH

1 Pekerja Konstruksi 36 - - 36 HOK 24,000 - 2 Tukang 22 - - 22 HOK 33,000 -

SUB TOTAL ( IV.C ) - JUMLAH SUB TOTAL IV -

JUMLAH TOTAL E 192,555,000

JUMLAH TOTAL 1,141,175,200

Terbilang (dengan huruf) : #VALUE!

Banjarwangi, …......…………

Disetujui Oleh : Dibuat Oleh :Ketua TPK Bendahara TPK

Kecamatan Banjarwangi Kecamatan Banjarwangi

Endjang Komara Ahmad Hayun,S.Pd.IMengetahui :

FK / FT Kecamatan Banjarwangi PjOK Kecamatan Banjarwangi

MIFTAH FARID Ujang Suryana.S.SosFasilitator Kecamatan Fasilitator Teknik NIP. 19671201 198703 1 004

Sebagai Catatan :

TAHAP ALOKASI BOP TAHAP LALU KUMULATIF

1 DANA 40% TAHAP 1 1,132,128,000 1,044,337,700 1,141,175,200 2,185,512,900

2 DANA 40% TAHAP 2 1,132,128,000 - -

3 DANA 20% 566,064,000 - -

JUMLAH 2,830,320,000 1,044,337,700 1,141,175,200 2,185,512,900

DEFIK GUNAWAN,ST AHMAD FAUZI,ST

NO

TAHAP SEKARANG

Page 57: Rpd 2014 Mp3ki - Penguatan

PNPM - Mandiri Perdesaan Pola Khusus MP3KI Form.36.

RENCANA PENGGUNAAN DANAMP3KI PENGUATAN

RPD KE : 1F Kecamatan : Banjarwangi Kabupaten : Garut

Jumlah BLM : Rp 2,830,320,000

NO URAIAN

VOLUME

SISA

a b c d e = c + d f = b - e g h i = d * h

I RABAT BETON (BANJARWANGI-BOJONG-JAYABAKTI)

A BAHAN1 Semen 50 kg 2,890 400 400 2,490 Zak 70,000 - 2 Pasir beton 258 173 173.40 84.60 m³ 310,000 - 3 Pasir urug 288 - - 288 m³ 100,000 - 4 Batu split 2/3 439 188 187.5 251.5 m³ 270,000 - 5 Kayu u/bekisting 6 - - 6 m³ 600,000 - 6 Paku 52 - - 52 m³ 12,000 - 7 Plastik Cor (lebar 1,5cm) 5,078 500 500 4,578 m2 2,500 - 8 Aspal Pen 60/70, 155 Kg 5 5 5 - drum 1,700,000 -

SUB TOTAL ( I.A ) - B A L A T

1 Biaya Transparansi : 2 a. Papan Proyek 100 x 120 cm 1 - - 1 Ls 100,000 - 3 b. Papan Informasi 100 x 180 cm 1 - - 1 Ls 120,000 - 4 c. Prasasti 60 x 40 cm 1 - - 1 Ls 450,000 - 5 c. Spanduk/umbul umbul 3 - - 3 Ls 120,000 - 6 d. Kamera Digital 1 - - 1 hari 2,000,000 - 7 Concrete Mixer 52 - - 52 Ls 350,000 - 8 Mobilisasi / Demob 1 - - 1 hari 500,000 - 9 Gor. Buis Beton 30 cm 8 - - 8 hari 80,000 -

10 Sekop 2 - - 2 Ls 70,000 - 11 Ember 100 - - 100 buah 8,000 - 12 Arco/dolag 3 - - 3 buah 250,000 - 13 Benang Kasur 4 - buah 5,000 -

SUB TOTAL ( I.B ) - C UPAH

1 Pekerja Konstruksi 1,300 - - 1,300 HOK 24,000 - 2 Tukang 330 - - 330 HOK 33,000 -

SUB TOTAL ( I.C ) - JUMLAH SUB TOTAL I -

II TPT (BANJARWANGI-BOJONG-JAYABAKTI)

A BAHAN1 Semen 50 kg 474 84 84 390 Zak 70,000 - 2 Pasir Pasang 95 6 6 89 m³ 160,000 - 3 Batu Belah 188 114 114 74 m³ 120,000 -

SUB TOTAL ( II.A ) - B ALAT

1 Ember 45 45 45 - buah 8,000 - 2 Cat Tembok 5 - - 5 kg 30,000 - 3 Pralon 1/2 inch 4 3 3 1 btg 20,000 - 4 Kuas 1/2 inch 2 - - 2 bh 20,000 - 5 Bambu 6 6 6 - btg 8,000 - 6 Benang kasur 4 4 4 - buah 5,000 -

SUB TOTAL ( II.B ) - C UPAH

1 Pekerja Konstruksi 311 - - 311 HOK 24,000 - 2 Tukang 157 - - 157 HOK 33,000 -

SUB TOTAL ( II.C ) - JUMLAH SUB TOTAL II -

UNIT / SATUA

N

HARGA SATUAN

(Rp)

JUMLAH (Rp)

KEBUTUHAN PENGAJUAN TAHAP LALU

PENGAJUAN SAAT INI

JUMLAH S.D SAAT

INI

Page 58: Rpd 2014 Mp3ki - Penguatan

NO URAIAN

VOLUME

SISA

a b c d e = c + d f = b - e g h i = d * h

UNIT / SATUA

N

HARGA SATUAN

(Rp)

JUMLAH (Rp)

KEBUTUHAN PENGAJUAN TAHAP LALU

PENGAJUAN SAAT INI

JUMLAH S.D SAAT

INI

III BRONJONG

A BAHAN1 Batu Belah 132 90 90 42 M3 120,000 - 2 Bronjong Dia. (2X1X0,5) 110 110 110 - Bh 135,000 -

SUB TOTAL ( III.A ) - B ALAT

1 Benang 2 2 2 - roll 5,000 - 2 Bambu 30 30 30 - btg 8,000 -

SUB TOTAL ( III.B ) - C UPAH

1 Pekerja Konstruksi 134 - - 134 HOK 24,000 - 2 Tukang 27 - - 27 HOK 33,000 -

SUB TOTAL ( III.C ) - JUMLAH SUB TOTAL III -

JUMLAH TOTAL A -

I RABAT BETON (BANJARWANGI-TALAGASARI)

A BAHAN1 Semen 50 kg 2,638 - - 2,638 Zak 69,500 - 2 Pasir beton 236 92 92 144 m³ 315,000 - 3 Pasir urug 263 52 52 211 m³ 100,000 - 4 Batu split 2/3 400 69 69 331 m³ 265,000 - 5 Kayu u/bekisting 6 - - 6 m³ 600,000 - 6 Paku 47 - - 47 m³ 12,000 - 7 Plastik Cor (lebar 1,5cm) 4,628 500 500 4,128 m2 2,500 - 8 Aspal Pen 60/70, 155 Kg 2 - - 2 drum 1,700,000 -

SUB TOTAL ( I.A ) - B A L A T

1 Biaya Transparansi : 2 a. Papan Proyek 100 x 120 cm 1 1 1 - Ls 100,000 - 3 b. Papan Informasi 100 x 180 cm 1 1 1 - Ls 120,000 - 4 c. Prasasti 60 x 40 cm 1 - - 1 Ls 450,000 - 5 d. Spanduk/umbul2 1 1 1 - Ls 120,000 - 6 Concrete Mixer 47 - - 47 hari 350,000 - 7 Mobilisasi / Demob 1 - - 1 Ls 500,000 - 9 Sewa Bak Mobil 45 11 11 34 hari 250,000 -

10 Meteran 5 M 2 2 2 - buah 20,000 - 11 Sekop 2 2 2 - buah 70,000 - 12 Ember 100 - - 100 buah 8,000 - 13 Arco/dolag 2 2 2 - buah 250,000 - 14 Benang Kasur 4 - - 4 Roll 5,000 -

SUB TOTAL ( I.B ) - C UPAH

1 Pekerja Konstruksi 1,441 - - 1,441 HOK 24,000 - 2 Tukang 301 - - 301 HOK 33,000 -

SUB TOTAL ( I.C ) - JUMLAH SUB TOTAL I -

II TPT (BANJARWANGI-TALAGASARI)

A BAHAN1 Semen 50 kg 121 110 110 11 Zak 69,500 - 2 Pasir Pasang 24 24 24 - m³ 160,000 - 3 Batu Belah 47 47 47 - m³ 120,000 -

SUB TOTAL ( II.A ) - B ALAT

1 Ember 20 20 20 - bh 8,000 - 2 Cat Tembok 4 - - 4 bh 30,000 - 3 Benang kasur 1 1 1 - btg 5,000 -

SUB TOTAL ( II.B ) -

Page 59: Rpd 2014 Mp3ki - Penguatan

NO URAIAN

VOLUME

SISA

a b c d e = c + d f = b - e g h i = d * h

UNIT / SATUA

N

HARGA SATUAN

(Rp)

JUMLAH (Rp)

KEBUTUHAN PENGAJUAN TAHAP LALU

PENGAJUAN SAAT INI

JUMLAH S.D SAAT

INI

C UPAH1 Pekerja Konstruksi 94 - - 94 HOK 24,000 - 2 Tukang 45 - - 45 HOK 33,000 -

SUB TOTAL ( II.C ) - JUMLAH SUB TOTAL II -

III GG Plat (BANJARWANGI-TALAGASARI)

A BAHAN1 Semen 50 kg 17 17 17 - Zak 69,500 - 2 Batu Belah 5 5 5 - m³ 120,000 - 3 Pasir Pasang 2 2 2 - m³ 160,000 - 4 Pasir beton 1 1 1 - m³ 315,000 - 5 Batu Pecah 2/3 Cm 1 1 1 - m³ 265,000 - 6 Kayu u/bekisting 1 1 1 - m³ 600,000 - 7 Kawat beton 1 1 1 - kg 16,000 - 8 Paku 1 1 1 - kg 12,000 - 9 Besi D 10 14 14 14 - btg 47,000 -

SUB TOTAL ( III.A ) - B A L A T

1 Benang 1 1 1 - Roll 5,000 - 2 Ember 6 6 6 - buah 8,000 -

SUB TOTAL ( III.B ) - C UPAH

1 Pekerja Konstruksi 18 - - 18 HOK 24,000 - 2 Tukang 11 - - 11 HOK 33,000 -

SUB TOTAL ( III.C ) - JUMLAH SUB TOTAL III -

JUMLAH TOTAL B -

I RABAT BETON (KADONGDONG-WANGUNJAYA)

A BAHAN1 Semen 50 kg 1,008 - - 1,008 Zak 69,500 - 2 Pasir beton 90 23 42 65 25 m³ 315,000 13,230,000 3 Pasir urug 101 - - 101 m³ 100,000 - 4 Batu split 2/3 153 6 6 147 m³ 265,000 - 5 Kayu u/bekisting 2 1 0.5 2 m³ 600,000 - 6 Paku 18 2 2.0 16 m³ 12,000 - 7 Plastik Cor (lebar 1,5cm) 1,828.52 - - 1,828.52 m2 2,500 - 8 Aspal Pen 60/70, 155 Kg 2 2 2 - drum 1,700,000 -

SUB TOTAL ( I.A ) 13,230,000 B A L A T

1 Biaya Transparansi : 2 a. Papan Proyek 100 x 120 cm 1 1 1 - Ls 100,000 - 3 b. Papan Informasi 100 x 180 cm 1 1 1 - Ls 120,000 - 4 c. Prasasti 60 x 40 cm 1 - - 1 Ls 450,000 - 5 d. Spanduk/umbul2 2 2 2 - Ls 120,000 - 6 Concrete Mixer 18 - - 18 hari 350,000 - 7 Mobilisasi / Demob 1 - - 1 Ls 500,000 - 8 Sekop 2 2 2 - hari 70,000 - 9 Ember 90 - - 90 hari 8,000 -

10 Arco/dolag 2 2 2 - Ls 250,000 - 11 Sapu Lidi 2 - - 2 buah 6,000 - 12 Benang Kasur 5 2 2 3 buah 5,000 -

SUB TOTAL ( I.B ) - C UPAH

1 Pekerja Konstruksi 398 - - 398 HOK 24,000 - 2 Tukang 115 - - 115 HOK 33,000 -

SUB TOTAL ( I.C ) - JUMLAH SUB TOTAL I 13,230,000

Page 60: Rpd 2014 Mp3ki - Penguatan

NO URAIAN

VOLUME

SISA

a b c d e = c + d f = b - e g h i = d * h

UNIT / SATUA

N

HARGA SATUAN

(Rp)

JUMLAH (Rp)

KEBUTUHAN PENGAJUAN TAHAP LALU

PENGAJUAN SAAT INI

JUMLAH S.D SAAT

INI

II TPT (KADONGDONG-WANGUNJAYA)

A BAHAN1 Semen 50 kg 472 - 150 150 322 Zak 69,500 10,425,000 2 Pasir Pasang 95 42 22.0 64 31 m³ 160,000 3,520,000 3 Batu Belah 186 78 75 153 33 m³ 120,000 9,000,000

SUB TOTAL ( II.A ) 22,945,000 B ALAT

1 Ember 30 - - 30 buah 8,000 - 2 Cat Tembok 6 - - 6 kg 30,000 - 3 Pralon 1/2 inch 2 - - 2 buah 24,000 - 4 Bambu 10 - - 10 btg 8,000 - 5 Benang kasur 3 - - 3 buah 5,000 -

SUB TOTAL ( II.B ) - C UPAH

1 Pekerja Konstruksi 344 - - 344 HOK 24,000 - 2 Tukang 165 - - 165 HOK 33,000 -

SUB TOTAL ( II.C ) - JUMLAH SUB TOTAL II 22,945,000

III JEMBATAN BAJA

A BAHAN1 bouwplank 1 - - 1 Ls 1,200,000 - 2 Besi WF 500.200 6,592 6,592 6,592 - kg 16,700 - 3 Besi WF 200.100 379 379 379 - kg 16,700 - 4 Besi L.100.100.10 1,775 1,775 1,775 - kg 16,700 - 5 Besi L.70.70.7 245 245 245 - kg 16,700 - 6 Besi L.60.60.6 590 590 590 - kg 16,700 - 7 Baud 1/2" x 4 cm 154 154 154 - buah 8,000 - 8 Baud 5/8" x 6 cm 184 184 184 - buah 10,000 - 9 Lantai Kayu 8/20 6 - - 6 m3 3,000,000 -

10 Baut kokot 5/8' x 25 cm 192 192 192 - buah 18,000 - 11 Baut kokot 5/8' x 16 cm 736 736 736 - buah 23,000 - 12 Plat sambungan gelagar utama A 78 78 78 - kg 16,700 - 13 Plat sambungan tipe B 20 20 20 - kg 16,700 - 14 Plat sambungan tipe C 37 37 37 - kg 16,700 - 15 Baut sambungan gelagar utama 384 384 384 - buah 24,000 - 16 Plat Klem Lantai 736 736 736 - buah 15,000 - 17 Karet Peredam Lantai 64 64 64 - m 10,000 - 18 Elastomer 8 8 8 - buah 250,000 - 19 Kayu Bekisting 6 - 6 6 - m3 600,000 3,600,000 20 Paku 15 - 8 8 7 kg 12,000 96,000 21 Besi beton polos 1,069 - - 1,069 kg 7,000 - 22 Kawat beton 24 - - 24 kg 16,000 - 23 Semen 529 - - 529 zak 69,500 - 24 Pasir beton 5 - - 5 m3 315,000 - 25 Split 5 - - 5 m3 265,000 - 26 Batu Belah 162 - - 162 m3 120,000 - 27 Pabrikasi Ereksion 10,650 3,650 3,650 7,000 kg 3,000 - 28 Cat tembok 12 - - 12 kg 30,000 - 29 Cat finishing besi 1 - - 1 ls 2,000,000 - 30 Pasir pasang 80 - - 80 m3 160,000 -

SUB TOTAL ( III.A ) 3,696,000 B ALAT

1 Papan Kegiatan 1 - - 1 Unit 120,000 - 2 Cangkul 1 - 1 1 - Buah 50,000 50,000 3 Linggis 1 - - 1 Buah 25,000 - 4 Sekop 1 - - 1 Buah 70,000 - 5 Bambu 50 - 40 40 10 Buah 8,000 320,000

Page 61: Rpd 2014 Mp3ki - Penguatan

NO URAIAN

VOLUME

SISA

a b c d e = c + d f = b - e g h i = d * h

UNIT / SATUA

N

HARGA SATUAN

(Rp)

JUMLAH (Rp)

KEBUTUHAN PENGAJUAN TAHAP LALU

PENGAJUAN SAAT INI

JUMLAH S.D SAAT

INI

6 Benang nilon 2 - - 2 Buah 5,000 - 7 Selang waterpass 15 - 15 15 - m 1,500 22,500 8 Ember Aduk Kecil 40 - 22 22 18 Buah 8,000 176,000 9 Sewa molen 3 - - 3 Hari 350,000 -

10 Mobilisasi Molen 1 - - 1 Ls 500,000 - 11 Kuas 3 inch 4 - - 4 bh 10,000 - 12 Kunci besi 1 - - 1 Buah 10,000 - 13 Karung Tanggul 125 - 50 50 75 Buah 1,000 50,000 14 Sewa Pompa Sedot 6 - - 6 Hari 50,000 - 15 Prasasti 1 - - 1 Buah 450,000 -

SUB TOTAL ( III.B ) 618,500 C UPAH

1 Pekerja 319 - 141 141 178 HOK 24,000 3,384,000 2 Tukang 105 - - 105 HOK 33,000 -

SUB TOTAL ( III.C ) 3,384,000 JUMLAH SUB TOTAL III 7,698,500

JUMLAH TOTAL C 43,873,500

I PENGASPALAN (TALAGAJAYA-TANJUNGJAYA)

A BAHAN1 Batu Pecah 3/5 Cm 130 106 6 112 18 m2 235,000 1,410,000 2 Batu Pecah 2/3 Cm 137 12 41 53 84 m3 255,000 10,455,000 3 Batu Pecah 1/2 Cm 69 18 30 48 21 m3 295,000 8,850,000 4 Pasir Aspal / Abu batu 37 37 37 - m3 245,000 - 5 Aspal Pen 60/70, 155 Kg 139 139 139 - Drum 1,700,000 - 6 Aspal Emulsi @ 200 kg 16 16 16 - Drum 1,850,000 - 7 Ban Bekas Mobil 25 25 25 - Buah 20,000 - 8 Kayu bakar 2 2 2 - m3 100,000 -

SUB TOTAL ( I.A ) 20,715,000 B A L A T

1 Papan proyek ( Uk.1,20 cm x 1.00 cm 1 1 1 - Unit 100,000 - 2 Papan Informasi ( Uk.120 cm x 100 c 1 1 1 - Unit 120,000 - 3 Prasasti ( Uk. 60 cm x 40 cm ) 1 - - 1 Unit 450,000 - 4 Spanduk/umbul2 2 2 2 - paket 200,000 - 5 Meteran 7,5 m 2 2 2 - bh 20,000 - 6 Sapu Lidi 4 - - 4 bh 12,125 - 7 meteran 50 m 1 1 1 - bh 60,000 - 8 Kamera Dokumentasi 1 1 1 - paket 1,500,000 - 9 Mesin Gilas 12 - - 12 Hari 800,000 -

10 Mob./Demob. Mesin Gilas 1 1 0.5 0.5 Ls 2,500,000 - SUB TOTAL ( I.B ) -

C UPAH1 Pekerja Konstruksi (Aspal ) 281 - 281 281 - HOK 30,000 8,430,000 2 Pekerja Galian Saluran 220 - 220 220 - HOK 24,000 5,280,000 3 Tukang ( Aspal) 42 - 42 42 - HOK 45,000 1,890,000

SUB TOTAL ( I.C ) 15,600,000 JUMLAH SUB TOTAL I 36,315,000

II TPT (TALAGAJAYA-TANJUNGJAYA)

A BAHAN1 Semen 50 kg 288 15 15 273 Zak 69,500 - 2 Pasir Pasang 58 12 12 46 m³ 150,000 - 3 Batu Belah 115 28 27.5 87.5 m³ 120,000 -

SUB TOTAL ( II.A ) - B ALAT

1 Bambu 18 - - 18 btg 8,000 - 2 Benang Kasur 3 - - 3 bh 5,000 - 3 Pralon 1/2 inch 4 - - 4 btg 20,000 - 4 Ember 20 - - 20 bh 8,000 -

Page 62: Rpd 2014 Mp3ki - Penguatan

NO URAIAN

VOLUME

SISA

a b c d e = c + d f = b - e g h i = d * h

UNIT / SATUA

N

HARGA SATUAN

(Rp)

JUMLAH (Rp)

KEBUTUHAN PENGAJUAN TAHAP LALU

PENGAJUAN SAAT INI

JUMLAH S.D SAAT

INI

5 Cat Tembok 6 - - 6 kg 30,000 - SUB TOTAL ( II.B ) -

C UPAH1 Pekerja Konstruksi 232 - 200 200 32 HOK 24,000 4,800,000 2 Tukang 93 - 88 88 5 HOK 33,000 2,904,000

SUB TOTAL ( II.C ) 7,704,000 JUMLAH SUB TOTAL II 7,704,000

III TPT JEMBATAN (TALAGAJAYA-TANJUNGJAYA)

A BAHAN1 Semen 50 kg 197 145 145 52 Zak 69,500 - 2 Pasir Pasang 40 30 30 10 m³ 150,000 - 3 Batu Belah 80 74 74 6 m³ 120,000 - 4 Besi dia 12 7 7 7 - btg 110,000 - 5 Pasir Beton 1 1 1 - m3 295,000 - 6 Kawat beton 1 1 1 - kg 16,000 -

SUB TOTAL ( III.A ) - B ALAT

1 Bambu 28 28 28 - btg 8,000 - 2 Benang Kasur 3 3 3 - bh 5,000 - 3 Pralon 1/2 inch 3 3 3 - btg 20,000 - 4 Ember 26 26 26 - bh 8,000 - 5 Cat Tembok 6 - - 6 kg 30,000 -

SUB TOTAL ( III.B ) - C UPAH

1 Pekerja Konstruksi 135 - - 135 HOK 24,000 - 2 Tukang 61 - - 61 HOK 33,000 -

SUB TOTAL ( III.C ) - JUMLAH SUB TOTAL III -

IV GG PLAT BETON (TALAGAJAYA-TANJUNGJAYA)

A BAHAN1 Semen 90 - - 90 zak 69,500 - 2 Batu belah 26 - - 26 M3 120,000 - 3 Pasir Pasang 8 - - 8 m3 150,000 - 4 Pasir Beton 2 - - 2 m3 295,000 - 5 Batu Pecah 2-3 cm 4 - - 4 m3 255,000 - 6 Kayu Begisting 1.2 - - 1 m3 600,000 - 7 Kawat Beton 4 - - 4 Kg 16,000 - 8 Paku 4 - - 4 kg 12,000 - 9 Besi dia. 10 64 - - 64 Buah 47,000 -

SUB TOTAL ( IV.A ) - B ALAT

1 Ember 25 - - 25 buah 8,000 - 2 Benang Kasur 3 - - 3 roll 5,000 - 3 Bambu 17 - - 17 Btg 8,000 -

SUB TOTAL ( IV.B ) - C UPAH

1 Pekerja Konstruksi 98 - - 98 HOK 24,000 - 2 Tukang 58 - - 58 HOK 33,000 -

SUB TOTAL ( IV.C ) - JUMLAH SUB TOTAL IV -

JUMLAH TOTAL D 44,019,000

I RABAT BETON (WANGUNJAYA-MULYAJAYA)

A BAHAN1 Semen 50 kg 1,241 - - 1,241 Zak 69,500 - 2 Pasir beton 111 55 55 56 m³ 315,000 - 3 Pasir urug 124 88 88.0 36.0 m³ 100,000 -

Page 63: Rpd 2014 Mp3ki - Penguatan

NO URAIAN

VOLUME

SISA

a b c d e = c + d f = b - e g h i = d * h

UNIT / SATUA

N

HARGA SATUAN

(Rp)

JUMLAH (Rp)

KEBUTUHAN PENGAJUAN TAHAP LALU

PENGAJUAN SAAT INI

JUMLAH S.D SAAT

INI

4 Batu split 2/3 188 188 188.0 - m³ 265,000 - 5 Kayu u/bekisting 3 - - 3 m³ 600,000 - 6 Paku 22 - - 22 m³ 12,000 - 7 Plastik Cor (lebar 1,5cm) 2,171 - - 2,171 m2 2,500 - 8 Aspal Pen 60/70, 155 Kg 1 1 1 - drum 1,700,000 -

SUB TOTAL ( I.A ) - B A L A T

1 Biaya Transparansi : 2 a. Papan Proyek 100 x 120 cm 1 1 1 - Ls 100,000 - 3 b. Papan Informasi 100 x 180 cm 1 1 1 - Ls 120,000 - 4 c. Prasasti 60 x 40 cm 1 - - 1 Ls 450,000 - 5 d. Spanduk Program 2 2 2 - Ls 120,000 - 6 Concrete Mixer 22 - - 22 hari 350,000 - 7 Mobilisasi / Demob 1 - - 1 Ls 500,000 - 8 Meteran 5 M 1 1 1 - buah 10,000 - 9 Pipa Railing/Pilar Jembatan 8 - - 8 btg 250,000 -

10 Sekop 2 2 2 - buah 70,000 - 11 Ember 77 - - 77 buah 8,000 - 12 Arco/dolag 2 2 2 - buah 250,000 - 13 Benang Kasur 4 - - 4 Roll 5,000 -

SUB TOTAL ( I.B ) - C UPAH

1 Pekerja Konstruksi 544 - 544 HOK 24,000 - 2 Tukang 142 - 142 HOK 33,000 -

SUB TOTAL ( I.C ) - JUMLAH SUB TOTAL I -

II TPT (WANGUNJAYA-MULYAJAYA)

A BAHAN1 Semen 50 kg 1,480 150 150 1,330 Zak 69,500 - 2 Pasir Pasang 297 72 72 226 m³ 160,000 - 3 Batu Belah 593 404 403.5 190 m³ 120,000 -

SUB TOTAL ( II.A ) - B ALAT

1 Ember 50 25 25 25 buah 8,000 - 2 Cat Tembok 4 - - 4 kg 30,000 - 3 Pipa pralon 5 5 5 - btg 24,000 - 4 Bambu 20 20 20 - bh 8,000 - 5 Benang kasur 3 3 3 - btg 5,000 -

SUB TOTAL ( II.B ) - C UPAH

1 Pekerja Konstruksi 957 - - 957 HOK 24,000 - 2 Tukang 411 - - 411 HOK 33,000 -

SUB TOTAL ( II.C ) - JUMLAH SUB TOTAL II -

III BRONJONG

A BAHAN1 Batu Belah 231 77 77 154 M3 120,000 - 2 Bronjong Dia. (2X1X0,5) 192 192 192 - Bh 135,000 -

SUB TOTAL ( III.A ) - B ALAT

1 Benang 2 - - 2 roll 5,000 - 2 Bambu 20 - - 20 btg 8,000 -

SUB TOTAL ( III.B ) - C UPAH

1 Pekerja Konstruksi 256 - 256 256 - HOK 24,000 6,144,000 2 Tukang 52 - 52 52 - HOK 33,000 1,716,000

SUB TOTAL ( III.C ) 7,860,000

Page 64: Rpd 2014 Mp3ki - Penguatan

NO URAIAN

VOLUME

SISA

a b c d e = c + d f = b - e g h i = d * h

UNIT / SATUA

N

HARGA SATUAN

(Rp)

JUMLAH (Rp)

KEBUTUHAN PENGAJUAN TAHAP LALU

PENGAJUAN SAAT INI

JUMLAH S.D SAAT

INI

JUMLAH SUB TOTAL III 7,860,000

IV GG PLAT BETON

A BAHAN1 Semen 34 - - 34 zak 69,500 - 2 Batu belah 10 - - 10 M3 120,000 - 3 Pasir Pasang 4 - - 4 M3 160,000 - 4 Pasir Beton 2 - - 2 M3 315,000 - 5 Batu Pecah 2-3 cm 2 - - 2 M3 265,000 - 6 Kayu Begisting 2 - - 2 M3 600,000 - 7 Kawat Beton 2 - - 2 Kg 16,000 - 8 Paku 2 - - 2 Kg 12,000 - 9 Besi dia. 10 28 - - 28 Btg 47,000 -

SUB TOTAL ( IV.A ) - B ALAT

1 Benang 3 - - 3 roll 5,000 - 2 Ember 8 - - 8 buah 8,000 -

SUB TOTAL ( IV.B ) - C UPAH

1 Pekerja Konstruksi 36 - - 36 HOK 24,000 - 2 Tukang 22 - - 22 HOK 33,000 -

SUB TOTAL ( IV.C ) - JUMLAH SUB TOTAL IV -

JUMLAH TOTAL E 7,860,000

JUMLAH TOTAL 95,752,500

Terbilang (dengan huruf) : #VALUE!

Banjarwangi, …......…………

Disetujui Oleh : Dibuat Oleh :Ketua TPK Bendahara TPK

Kecamatan Banjarwangi Kecamatan Banjarwangi

Endjang Komara Ahmad Hayun,S.Pd.IMengetahui :

FK / FT Kecamatan Banjarwangi PjOK Kecamatan Banjarwangi

MIFTAH FARID Ujang Suryana.S.SosFasilitator Kecamatan Fasilitator Teknik NIP. 19671201 198703 1 004

Sebagai Catatan :

TAHAP ALOKASI BOP TAHAP LALU KUMULATIF

1 DANA 40% TAHAP 1 1,132,128,000 1,044,337,700 95,752,500 1,140,090,200

2 DANA 40% TAHAP 2 1,132,128,000 - -

3 DANA 20% 566,064,000 - -

JUMLAH 2,830,320,000 1,044,337,700 95,752,500 1,140,090,200

DEFIK GUNAWAN,ST AHMAD FAUZI,ST

NO

TAHAP SEKARANG

Page 65: Rpd 2014 Mp3ki - Penguatan

PNPM - Mandiri Perdesaan Pola Khusus MP3KI Form.36.

RENCANA PENGGUNAAN DANAMP3KI PENGUATAN

RPD KE : 2 AKecamatan : Banjarwangi Kabupaten : Garut

Jumlah BLM : Rp 2,830,320,000

NO URAIAN

VOLUME

SISA

a b c d e = c + d f = b - e g h i = d * h

I RABAT BETON (BANJARWANGI-BOJONG-JAYABAKTI)

A BAHAN1 Semen 50 kg 2,890 400 400 2,490 Zak 70,000 - 2 Pasir beton 258 173 173.40 84.60 m³ 310,000 - 3 Pasir urug 288 - - 288 m³ 100,000 - 4 Batu split 2/3 439 188 187.5 251.5 m³ 270,000 - 5 Kayu u/bekisting 6 - - 6 m³ 600,000 - 6 Paku 52 - - 52 m³ 12,000 - 7 Plastik Cor (lebar 1,5cm) 5,078 500 500 4,578 m2 2,500 - 8 Aspal Pen 60/70, 155 Kg 5 5 5 - drum 1,700,000 -

SUB TOTAL ( I.A ) - B A L A T

1 Biaya Transparansi : 2 a. Papan Proyek 100 x 120 cm 1 - - 1 Ls 100,000 - 3 b. Papan Informasi 100 x 180 cm 1 - - 1 Ls 120,000 - 4 c. Prasasti 60 x 40 cm 1 - - 1 Ls 450,000 - 5 c. Spanduk/umbul umbul 3 - - 3 Ls 120,000 - 6 d. Kamera Digital 1 - - 1 hari 2,000,000 - 7 Concrete Mixer 52 - - 52 Ls 350,000 - 8 Mobilisasi / Demob 1 - - 1 hari 500,000 - 9 Gor. Buis Beton 30 cm 8 - - 8 hari 80,000 -

10 Sekop 2 - - 2 Ls 70,000 - 11 Ember 100 - - 100 buah 8,000 - 12 Arco/dolag 3 - - 3 buah 250,000 - 13 Benang Kasur 4 - buah 5,000 -

SUB TOTAL ( I.B ) - C UPAH

1 Pekerja Konstruksi 1,300 - - 1,300 HOK 24,000 - 2 Tukang 330 - - 330 HOK 33,000 -

SUB TOTAL ( I.C ) - JUMLAH SUB TOTAL I -

II TPT (BANJARWANGI-BOJONG-JAYABAKTI)

A BAHAN1 Semen 50 kg 474 84 84 390 Zak 70,000 - 2 Pasir Pasang 95 6 6 89 m³ 160,000 - 3 Batu Belah 188 114 114 74 m³ 120,000 -

SUB TOTAL ( II.A ) - B ALAT

1 Ember 45 45 45 - buah 8,000 - 2 Cat Tembok 5 - - 5 kg 30,000 - 3 Pralon 1/2 inch 4 3 3 1 btg 20,000 - 4 Kuas 1/2 inch 2 - - 2 bh 20,000 - 5 Bambu 6 6 6 - btg 8,000 - 6 Benang kasur 4 4 4 - buah 5,000 -

SUB TOTAL ( II.B ) - C UPAH

1 Pekerja Konstruksi 311 - - 311 HOK 24,000 - 2 Tukang 157 - - 157 HOK 33,000 -

SUB TOTAL ( II.C ) - JUMLAH SUB TOTAL II -

UNIT / SATUA

N

HARGA SATUAN

(Rp)

JUMLAH (Rp)

KEBUTUHAN PENGAJUAN TAHAP LALU

PENGAJUAN SAAT INI

JUMLAH S.D SAAT

INI

Page 66: Rpd 2014 Mp3ki - Penguatan

NO URAIAN

VOLUME

SISA

a b c d e = c + d f = b - e g h i = d * h

UNIT / SATUA

N

HARGA SATUAN

(Rp)

JUMLAH (Rp)

KEBUTUHAN PENGAJUAN TAHAP LALU

PENGAJUAN SAAT INI

JUMLAH S.D SAAT

INI

III BRONJONG

A BAHAN1 Batu Belah 132 90 90 42 M3 120,000 - 2 Bronjong Dia. (2X1X0,5) 110 110 110 - Bh 135,000 -

SUB TOTAL ( III.A ) - B ALAT

1 Benang 2 2 2 - roll 5,000 - 2 Bambu 30 30 30 - btg 8,000 -

SUB TOTAL ( III.B ) - C UPAH

1 Pekerja Konstruksi 134 - - 134 HOK 24,000 - 2 Tukang 27 - - 27 HOK 33,000 -

SUB TOTAL ( III.C ) - JUMLAH SUB TOTAL III -

JUMLAH TOTAL A -

I RABAT BETON (BANJARWANGI-TALAGASARI)

A BAHAN1 Semen 50 kg 2,638 - - 2,638 Zak 69,500 - 2 Pasir beton 236 92 92 144 m³ 315,000 - 3 Pasir urug 263 52 52 211 m³ 100,000 - 4 Batu split 2/3 400 69 69 331 m³ 265,000 - 5 Kayu u/bekisting 6 - - 6 m³ 600,000 - 6 Paku 47 - - 47 m³ 12,000 - 7 Plastik Cor (lebar 1,5cm) 4,628 500 500 4,128 m2 2,500 - 8 Aspal Pen 60/70, 155 Kg 2 - - 2 drum 1,700,000 -

SUB TOTAL ( I.A ) - B A L A T

1 Biaya Transparansi : 2 a. Papan Proyek 100 x 120 cm 1 1 1 - Ls 100,000 - 3 b. Papan Informasi 100 x 180 cm 1 1 1 - Ls 120,000 - 4 c. Prasasti 60 x 40 cm 1 - - 1 Ls 450,000 - 5 d. Spanduk/umbul2 1 1 1 - Ls 120,000 - 6 Concrete Mixer 47 - - 47 hari 350,000 - 7 Mobilisasi / Demob 1 - - 1 Ls 500,000 - 9 Sewa Bak Mobil 45 11 11 34 hari 250,000 -

10 Meteran 5 M 2 2 2 - buah 20,000 - 11 Sekop 2 2 2 - buah 70,000 - 12 Ember 100 - - 100 buah 8,000 - 13 Arco/dolag 2 2 2 - buah 250,000 - 14 Benang Kasur 4 - - 4 Roll 5,000 -

SUB TOTAL ( I.B ) - C UPAH

1 Pekerja Konstruksi 1,441 - - 1,441 HOK 24,000 - 2 Tukang 301 - - 301 HOK 33,000 -

SUB TOTAL ( I.C ) - JUMLAH SUB TOTAL I -

II TPT (BANJARWANGI-TALAGASARI)

A BAHAN1 Semen 50 kg 121 110 110 11 Zak 69,500 - 2 Pasir Pasang 24 24 24 - m³ 160,000 - 3 Batu Belah 47 47 47 - m³ 120,000 -

SUB TOTAL ( II.A ) - B ALAT

1 Ember 20 20 20 - bh 8,000 - 2 Cat Tembok 4 - - 4 bh 30,000 - 3 Benang kasur 1 1 1 - btg 5,000 -

SUB TOTAL ( II.B ) -

Page 67: Rpd 2014 Mp3ki - Penguatan

NO URAIAN

VOLUME

SISA

a b c d e = c + d f = b - e g h i = d * h

UNIT / SATUA

N

HARGA SATUAN

(Rp)

JUMLAH (Rp)

KEBUTUHAN PENGAJUAN TAHAP LALU

PENGAJUAN SAAT INI

JUMLAH S.D SAAT

INI

C UPAH1 Pekerja Konstruksi 94 - - 94 HOK 24,000 - 2 Tukang 45 - - 45 HOK 33,000 -

SUB TOTAL ( II.C ) - JUMLAH SUB TOTAL II -

III GG Plat (BANJARWANGI-TALAGASARI)

A BAHAN1 Semen 50 kg 17 17 17 - Zak 69,500 - 2 Batu Belah 5 5 5 - m³ 120,000 - 3 Pasir Pasang 2 2 2 - m³ 160,000 - 4 Pasir beton 1 1 1 - m³ 315,000 - 5 Batu Pecah 2/3 Cm 1 1 1 - m³ 265,000 - 6 Kayu u/bekisting 1 1 1 - m³ 600,000 - 7 Kawat beton 1 1 1 - kg 16,000 - 8 Paku 1 1 1 - kg 12,000 - 9 Besi D 10 14 14 14 - btg 47,000 -

SUB TOTAL ( III.A ) - B A L A T

1 Benang 1 1 1 - Roll 5,000 - 2 Ember 6 6 6 - buah 8,000 -

SUB TOTAL ( III.B ) - C UPAH

1 Pekerja Konstruksi 18 - - 18 HOK 24,000 - 2 Tukang 11 - - 11 HOK 33,000 -

SUB TOTAL ( III.C ) - JUMLAH SUB TOTAL III -

JUMLAH TOTAL B -

I RABAT BETON (KADONGDONG-WANGUNJAYA)

A BAHAN1 Semen 50 kg 1,008 - - 1,008 Zak 69,500 - 2 Pasir beton 90 65 65 25 m³ 315,000 - 3 Pasir urug 101 - - 101 m³ 100,000 - 4 Batu split 2/3 153 6 6 147 m³ 265,000 - 5 Kayu u/bekisting 2 1 0.5 2 m³ 600,000 - 6 Paku 18 2 2.0 16 m³ 12,000 - 7 Plastik Cor (lebar 1,5cm) 1,828.52 - - 1,828.52 m2 2,500 - 8 Aspal Pen 60/70, 155 Kg 2 2 2 - drum 1,700,000 -

SUB TOTAL ( I.A ) - B A L A T

1 Biaya Transparansi : 2 a. Papan Proyek 100 x 120 cm 1 1 1 - Ls 100,000 - 3 b. Papan Informasi 100 x 180 cm 1 1 1 - Ls 120,000 - 4 c. Prasasti 60 x 40 cm 1 - - 1 Ls 450,000 - 5 d. Spanduk/umbul2 2 2 2 - Ls 120,000 - 6 Concrete Mixer 18 - - 18 hari 350,000 - 7 Mobilisasi / Demob 1 - - 1 Ls 500,000 - 8 Sekop 2 2 2 - hari 70,000 - 9 Ember 90 - - 90 hari 8,000 -

10 Arco/dolag 2 2 2 - Ls 250,000 - 11 Sapu Lidi 2 - - 2 buah 6,000 - 12 Benang Kasur 5 2 2 3 buah 5,000 -

SUB TOTAL ( I.B ) - C UPAH

1 Pekerja Konstruksi 398 - - 398 HOK 24,000 - 2 Tukang 115 - - 115 HOK 33,000 -

SUB TOTAL ( I.C ) - JUMLAH SUB TOTAL I -

Page 68: Rpd 2014 Mp3ki - Penguatan

NO URAIAN

VOLUME

SISA

a b c d e = c + d f = b - e g h i = d * h

UNIT / SATUA

N

HARGA SATUAN

(Rp)

JUMLAH (Rp)

KEBUTUHAN PENGAJUAN TAHAP LALU

PENGAJUAN SAAT INI

JUMLAH S.D SAAT

INI

II TPT (KADONGDONG-WANGUNJAYA)

A BAHAN1 Semen 50 kg 472 150 150 322 Zak 69,500 - 2 Pasir Pasang 95 64 64 31 m³ 160,000 - 3 Batu Belah 186 153 153 33 m³ 120,000 -

SUB TOTAL ( II.A ) - B ALAT

1 Ember 30 - - 30 buah 8,000 - 2 Cat Tembok 6 - - 6 kg 30,000 - 3 Pralon 1/2 inch 2 - - 2 buah 24,000 - 4 Bambu 10 - - 10 btg 8,000 - 5 Benang kasur 3 - - 3 buah 5,000 -

SUB TOTAL ( II.B ) - C UPAH

1 Pekerja Konstruksi 344 - - 344 HOK 24,000 - 2 Tukang 165 - - 165 HOK 33,000 -

SUB TOTAL ( II.C ) - JUMLAH SUB TOTAL II -

III JEMBATAN BAJA

A BAHAN1 bouwplank 1 - - 1 Ls 1,200,000 - 2 Besi WF 500.200 6,592 6,592 6,592 - kg 16,700 - 3 Besi WF 200.100 379 379 379 - kg 16,700 - 4 Besi L.100.100.10 1,775 1,775 1,775 - kg 16,700 - 5 Besi L.70.70.7 245 245 245 - kg 16,700 - 6 Besi L.60.60.6 590 590 590 - kg 16,700 - 7 Baud 1/2" x 4 cm 154 154 154 - buah 8,000 - 8 Baud 5/8" x 6 cm 184 184 184 - buah 10,000 - 9 Lantai Kayu 8/20 6 - - 6 m3 3,000,000 -

10 Baut kokot 5/8' x 25 cm 192 192 192 - buah 18,000 - 11 Baut kokot 5/8' x 16 cm 736 736 736 - buah 23,000 - 12 Plat sambungan gelagar utama A 78 78 78 - kg 16,700 - 13 Plat sambungan tipe B 20 20 20 - kg 16,700 - 14 Plat sambungan tipe C 37 37 37 - kg 16,700 - 15 Baut sambungan gelagar utama 384 384 384 - buah 24,000 - 16 Plat Klem Lantai 736 736 736 - buah 15,000 - 17 Karet Peredam Lantai 64 64 64 - m 10,000 - 18 Elastomer 8 8 8 - buah 250,000 - 19 Kayu Bekisting 6 6 6 - m3 600,000 - 20 Paku 15 8 8 7 kg 12,000 - 21 Besi beton polos 1,069 - - 1,069 kg 7,000 - 22 Kawat beton 24 - - 24 kg 16,000 - 23 Semen 529 - - 529 zak 69,500 - 24 Pasir beton 5 - - 5 m3 315,000 - 25 Split 5 - - 5 m3 265,000 - 26 Batu Belah 162 - - 162 m3 120,000 - 27 Pabrikasi Ereksion 10,650 3,650 3,650 7,000 kg 3,000 - 28 Cat tembok 12 - - 12 kg 30,000 - 29 Cat finishing besi 1 - - 1 ls 2,000,000 - 30 Pasir pasang 80 - - 80 m3 160,000 -

SUB TOTAL ( III.A ) - B ALAT

1 Papan Kegiatan 1 - - 1 Unit 120,000 - 2 Cangkul 1 1 1 - Buah 50,000 - 3 Linggis 1 - - 1 Buah 25,000 - 4 Sekop 1 - - 1 Buah 70,000 - 5 Bambu 50 40 40 10 Buah 8,000 -

Page 69: Rpd 2014 Mp3ki - Penguatan

NO URAIAN

VOLUME

SISA

a b c d e = c + d f = b - e g h i = d * h

UNIT / SATUA

N

HARGA SATUAN

(Rp)

JUMLAH (Rp)

KEBUTUHAN PENGAJUAN TAHAP LALU

PENGAJUAN SAAT INI

JUMLAH S.D SAAT

INI

6 Benang nilon 2 - - 2 Buah 5,000 - 7 Selang waterpass 15 15 15 - m 1,500 - 8 Ember Aduk Kecil 40 22 22 18 Buah 8,000 - 9 Sewa molen 3 - - 3 Hari 350,000 -

10 Mobilisasi Molen 1 - - 1 Ls 500,000 - 11 Kuas 3 inch 4 - - 4 bh 10,000 - 12 Kunci besi 1 - - 1 Buah 10,000 - 13 Karung Tanggul 125 50 50 75 Buah 1,000 - 14 Sewa Pompa Sedot 6 - - 6 Hari 50,000 - 15 Prasasti 1 - - 1 Buah 450,000 -

SUB TOTAL ( III.B ) - C UPAH

1 Pekerja 319 141 141 178 HOK 24,000 - 2 Tukang 105 - - 105 HOK 33,000 -

SUB TOTAL ( III.C ) - JUMLAH SUB TOTAL III -

JUMLAH TOTAL C -

I PENGASPALAN (TALAGAJAYA-TANJUNGJAYA)

A BAHAN1 Batu Pecah 3/5 Cm 130 112 112 18 m2 235,000 - 2 Batu Pecah 2/3 Cm 137 53 53 84 m3 255,000 - 3 Batu Pecah 1/2 Cm 69 48 48 21 m3 295,000 - 4 Pasir Aspal / Abu batu 37 37 37 - m3 245,000 - 5 Aspal Pen 60/70, 155 Kg 139 139 139 - Drum 1,700,000 - 6 Aspal Emulsi @ 200 kg 16 16 16 - Drum 1,850,000 - 7 Ban Bekas Mobil 25 25 25 - Buah 20,000 - 8 Kayu bakar 2 2 2 - m3 100,000 -

SUB TOTAL ( I.A ) - B A L A T

1 Papan proyek ( Uk.1,20 cm x 1.00 cm 1 1 1 - Unit 100,000 - 2 Papan Informasi ( Uk.120 cm x 100 c 1 1 1 - Unit 120,000 - 3 Prasasti ( Uk. 60 cm x 40 cm ) 1 - - 1 Unit 450,000 - 4 Spanduk/umbul2 2 2 2 - paket 200,000 - 5 Meteran 7,5 m 2 2 2 - bh 20,000 - 6 Sapu Lidi 4 - - 4 bh 12,125 - 7 meteran 50 m 1 1 1 - bh 60,000 - 8 Kamera Dokumentasi 1 1 1 - paket 1,500,000 - 9 Mesin Gilas 12 - - 12 Hari 800,000 -

10 Mob./Demob. Mesin Gilas 1 1 0.5 0.5 Ls 2,500,000 - SUB TOTAL ( I.B ) -

C UPAH1 Pekerja Konstruksi (Aspal ) 281 281 281 - HOK 30,000 - 2 Pekerja Galian Saluran 220 220 220 - HOK 24,000 - 3 Tukang ( Aspal) 42 42 42 - HOK 45,000 -

SUB TOTAL ( I.C ) - JUMLAH SUB TOTAL I -

II TPT (TALAGAJAYA-TANJUNGJAYA)

A BAHAN1 Semen 50 kg 288 15 15 273 Zak 69,500 - 2 Pasir Pasang 58 12 12 46 m³ 150,000 - 3 Batu Belah 115 28 27.5 87.5 m³ 120,000 -

SUB TOTAL ( II.A ) - B ALAT

1 Bambu 18 - - 18 btg 8,000 - 2 Benang Kasur 3 - - 3 bh 5,000 - 3 Pralon 1/2 inch 4 - - 4 btg 20,000 - 4 Ember 20 - - 20 bh 8,000 -

Page 70: Rpd 2014 Mp3ki - Penguatan

NO URAIAN

VOLUME

SISA

a b c d e = c + d f = b - e g h i = d * h

UNIT / SATUA

N

HARGA SATUAN

(Rp)

JUMLAH (Rp)

KEBUTUHAN PENGAJUAN TAHAP LALU

PENGAJUAN SAAT INI

JUMLAH S.D SAAT

INI

5 Cat Tembok 6 - - 6 kg 30,000 - SUB TOTAL ( II.B ) -

C UPAH1 Pekerja Konstruksi 232 200 200 32 HOK 24,000 - 2 Tukang 93 88 88 5 HOK 33,000 -

SUB TOTAL ( II.C ) - JUMLAH SUB TOTAL II -

III TPT JEMBATAN (TALAGAJAYA-TANJUNGJAYA)

A BAHAN1 Semen 50 kg 197 145 145 52 Zak 69,500 - 2 Pasir Pasang 40 30 30 10 m³ 150,000 - 3 Batu Belah 80 74 74 6 m³ 120,000 - 4 Besi dia 12 7 7 7 - btg 110,000 - 5 Pasir Beton 1 1 1 - m3 295,000 - 6 Kawat beton 1 1 1 - kg 16,000 -

SUB TOTAL ( III.A ) - B ALAT

1 Bambu 28 28 28 - btg 8,000 - 2 Benang Kasur 3 3 3 - bh 5,000 - 3 Pralon 1/2 inch 3 3 3 - btg 20,000 - 4 Ember 26 26 26 - bh 8,000 - 5 Cat Tembok 6 - - 6 kg 30,000 -

SUB TOTAL ( III.B ) - C UPAH

1 Pekerja Konstruksi 135 - - 135 HOK 24,000 - 2 Tukang 61 - - 61 HOK 33,000 -

SUB TOTAL ( III.C ) - JUMLAH SUB TOTAL III -

IV GG PLAT BETON (TALAGAJAYA-TANJUNGJAYA)

A BAHAN1 Semen 90 - - 90 zak 69,500 - 2 Batu belah 26 - - 26 M3 120,000 - 3 Pasir Pasang 8 - - 8 m3 150,000 - 4 Pasir Beton 2 - - 2 m3 295,000 - 5 Batu Pecah 2-3 cm 4 - - 4 m3 255,000 - 6 Kayu Begisting 1.2 - - 1 m3 600,000 - 7 Kawat Beton 4 - - 4 Kg 16,000 - 8 Paku 4 - - 4 kg 12,000 - 9 Besi dia. 10 64 - - 64 Buah 47,000 -

SUB TOTAL ( IV.A ) - B ALAT

1 Ember 25 - - 25 buah 8,000 - 2 Benang Kasur 3 - - 3 roll 5,000 - 3 Bambu 17 - - 17 Btg 8,000 -

SUB TOTAL ( IV.B ) - C UPAH

1 Pekerja Konstruksi 98 - - 98 HOK 24,000 - 2 Tukang 58 - - 58 HOK 33,000 -

SUB TOTAL ( IV.C ) - JUMLAH SUB TOTAL IV -

JUMLAH TOTAL D -

I RABAT BETON (WANGUNJAYA-MULYAJAYA)

A BAHAN1 Semen 50 kg 1,241 - - 1,241 Zak 69,500 - 2 Pasir beton 111 55 55 56 m³ 315,000 - 3 Pasir urug 124 88 88.0 36.0 m³ 100,000 -

Page 71: Rpd 2014 Mp3ki - Penguatan

NO URAIAN

VOLUME

SISA

a b c d e = c + d f = b - e g h i = d * h

UNIT / SATUA

N

HARGA SATUAN

(Rp)

JUMLAH (Rp)

KEBUTUHAN PENGAJUAN TAHAP LALU

PENGAJUAN SAAT INI

JUMLAH S.D SAAT

INI

4 Batu split 2/3 188 188 188.0 - m³ 265,000 - 5 Kayu u/bekisting 3 - - 3 m³ 600,000 - 6 Paku 22 - - 22 m³ 12,000 - 7 Plastik Cor (lebar 1,5cm) 2,171 - - 2,171 m2 2,500 - 8 Aspal Pen 60/70, 155 Kg 1 1 1 - drum 1,700,000 -

SUB TOTAL ( I.A ) - B A L A T

1 Biaya Transparansi : 2 a. Papan Proyek 100 x 120 cm 1 1 1 - Ls 100,000 - 3 b. Papan Informasi 100 x 180 cm 1 1 1 - Ls 120,000 - 4 c. Prasasti 60 x 40 cm 1 - - 1 Ls 450,000 - 5 d. Spanduk Program 2 2 2 - Ls 120,000 - 6 Concrete Mixer 22 - - 22 hari 350,000 - 7 Mobilisasi / Demob 1 - - 1 Ls 500,000 - 8 Meteran 5 M 1 1 1 - buah 10,000 - 9 Pipa Railing/Pilar Jembatan 8 - - 8 btg 250,000 -

10 Sekop 2 2 2 - buah 70,000 - 11 Ember 77 - - 77 buah 8,000 - 12 Arco/dolag 2 2 2 - buah 250,000 - 13 Benang Kasur 4 - - 4 Roll 5,000 -

SUB TOTAL ( I.B ) - C UPAH

1 Pekerja Konstruksi 544 - - 544 HOK 24,000 - 2 Tukang 142 - - 142 HOK 33,000 -

SUB TOTAL ( I.C ) - JUMLAH SUB TOTAL I -

II TPT (WANGUNJAYA-MULYAJAYA)

A BAHAN1 Semen 50 kg 1,480 150 150 1,330 Zak 69,500 - 2 Pasir Pasang 297 72 72 226 m³ 160,000 - 3 Batu Belah 593 404 403.5 190 m³ 120,000 -

SUB TOTAL ( II.A ) - B ALAT

1 Ember 50 25 25 25 buah 8,000 - 2 Cat Tembok 4 - - 4 kg 30,000 - 3 Pipa pralon 5 5 5 - btg 24,000 - 4 Bambu 20 20 20 - bh 8,000 - 5 Benang kasur 3 3 3 - btg 5,000 -

SUB TOTAL ( II.B ) - C UPAH

1 Pekerja Konstruksi 957 - 417 417 540 HOK 24,000 10,008,000 2 Tukang 411 - - 411 HOK 33,000 -

SUB TOTAL ( II.C ) 10,008,000 JUMLAH SUB TOTAL II 10,008,000

III BRONJONG

A BAHAN1 Batu Belah 231 77 77 154 M3 120,000 - 2 Bronjong Dia. (2X1X0,5) 192 192 192 - Bh 135,000 -

SUB TOTAL ( III.A ) - B ALAT

1 Benang 2 - - 2 roll 5,000 - 2 Bambu 20 - - 20 btg 8,000 -

SUB TOTAL ( III.B ) - C UPAH

1 Pekerja Konstruksi 256 256 256 - HOK 24,000 - 2 Tukang 52 52 52 - HOK 33,000 -

SUB TOTAL ( III.C ) -

Page 72: Rpd 2014 Mp3ki - Penguatan

NO URAIAN

VOLUME

SISA

a b c d e = c + d f = b - e g h i = d * h

UNIT / SATUA

N

HARGA SATUAN

(Rp)

JUMLAH (Rp)

KEBUTUHAN PENGAJUAN TAHAP LALU

PENGAJUAN SAAT INI

JUMLAH S.D SAAT

INI

JUMLAH SUB TOTAL III -

IV GG PLAT BETON

A BAHAN1 Semen 34 - - 34 zak 69,500 - 2 Batu belah 10 - - 10 M3 120,000 - 3 Pasir Pasang 4 - - 4 M3 160,000 - 4 Pasir Beton 2 - - 2 M3 315,000 - 5 Batu Pecah 2-3 cm 2 - - 2 M3 265,000 - 6 Kayu Begisting 2 - - 2 M3 600,000 - 7 Kawat Beton 2 - - 2 Kg 16,000 - 8 Paku 2 - - 2 Kg 12,000 - 9 Besi dia. 10 28 - - 28 Btg 47,000 -

SUB TOTAL ( IV.A ) - B ALAT

1 Benang 3 - - 3 roll 5,000 - 2 Ember 8 - - 8 buah 8,000 -

SUB TOTAL ( IV.B ) - C UPAH

1 Pekerja Konstruksi 36 - - 36 HOK 24,000 - 2 Tukang 22 - - 22 HOK 33,000 -

SUB TOTAL ( IV.C ) - JUMLAH SUB TOTAL IV -

JUMLAH TOTAL E 10,008,000

JUMLAH TOTAL 10,008,000

Terbilang (dengan huruf) : #VALUE!

Banjarwangi, …......…………

Disetujui Oleh : Dibuat Oleh :Ketua TPK Bendahara TPK

Kecamatan Banjarwangi Kecamatan Banjarwangi

Endjang Komara Ahmad Hayun,S.Pd.IMengetahui :

FK / FT Kecamatan Banjarwangi PjOK Kecamatan Banjarwangi

MIFTAH FARID Ujang Suryana.S.SosFasilitator Kecamatan Fasilitator Teknik NIP. 19671201 198703 1 004

Sebagai Catatan :

TAHAP ALOKASI BOP TAHAP LALU KUMULATIF

1 DANA 40% TAHAP 1 1,132,128,000 1,140,090,200 - 1,140,090,200

2 DANA 40% TAHAP 2 1,132,128,000 10,008,000 10,008,000

3 DANA 20% 566,064,000 - -

JUMLAH 2,830,320,000 1,140,090,200 10,008,000 1,150,098,200

DEFIK GUNAWAN,ST AHMAD FAUZI,ST

NO

TAHAP SEKARANG

Page 73: Rpd 2014 Mp3ki - Penguatan

PNPM - Mandiri Perdesaan Pola Khusus MP3KI Form.36.

RENCANA PENGGUNAAN DANAMP3KI PENGUATAN

RPD KE : 2 B Kecamatan : Banjarwangi Kabupaten : Garut

Jumlah BLM : Rp 2,830,320,000

NO URAIAN

VOLUME

SISA

a b c d e = c + d f = b - e g h i = d * h

I RABAT BETON (BANJARWANGI-BOJONG-JAYABAKTI)A BAHAN

1 Semen 50 kg 2,890 400 400 2,490 Zak 70,000 - 2 Pasir beton 258 173 173.40 84.60 m³ 310,000 - 3 Pasir urug 288 - - 288.0 m³ 100,000 - 4 Batu split 2/3 439 188 187.5 251.5 m³ 270,000 - 5 Kayu u/bekisting 6 - - 6 m³ 600,000 - 6 Paku 52 - - 52 m³ 12,000 - 7 Plastik Cor (lebar 1,5cm) 5,078 500 500 4,578 m2 2,500 - 8 Aspal Pen 60/70, 155 Kg 5 5 5 - drum 1,700,000 -

SUB TOTAL ( I.A ) - B A L A T

1 Biaya Transparansi : 2 a. Papan Proyek 100 x 120 cm 1 - - 1 Ls 100,000 - 3 b. Papan Informasi 100 x 180 cm 1 - - 1 Ls 120,000 - 4 c. Prasasti 60 x 40 cm 1 - - 1 Ls 450,000 - 5 c. Spanduk/umbul umbul 3 - - 3 Ls 120,000 - 6 d. Kamera Digital 1 - - 1 hari 2,000,000 - 7 Concrete Mixer 52 - - 52 Ls 350,000 - 8 Mobilisasi / Demob 1 - - 1 hari 500,000 - 9 Gor. Buis Beton 30 cm 8 - - 8 hari 80,000 - 10 Sekop 2 - - 2 Ls 70,000 - 11 Ember 100 - - 100 buah 8,000 - 12 Arco/dolag 3 - - 3 buah 250,000 - 13 Benang Kasur 4 - - 4 buah 5,000 -

SUB TOTAL ( I.B ) - C UPAH

1 Pekerja Konstruksi 1,300 - - 1,300 HOK 24,000 - 2 Tukang 330 - - 330 HOK 33,000 -

SUB TOTAL ( I.C ) - JUMLAH SUB TOTAL I -

II TPT (BANJARWANGI-BOJONG-JAYABAKTI)A BAHAN

1 Semen 50 kg 474 84 84 390 Zak 70,000 - 2 Pasir Pasang 95 6 6 89 m³ 160,000 - 3 Batu Belah 188 114 114 74 m³ 120,000 -

SUB TOTAL ( II.A ) - B ALAT

1 Ember 45 45 45 - buah 8,000 - 2 Cat Tembok 5 - - 5 kg 30,000 - 3 Pralon 1/2 inch 4 3 3 1 btg 20,000 - 4 Kuas 1/2 inch 2 - - 2 bh 20,000 - 5 Bambu 6 6 6 - btg 8,000 - 6 Benang kasur 4 4 4 - buah 5,000 -

SUB TOTAL ( II.B ) - C UPAH

1 Pekerja Konstruksi 311 - - 311 HOK 24,000 - 2 Tukang 157 - - 157 HOK 33,000 -

SUB TOTAL ( II.C ) - JUMLAH SUB TOTAL II -

UNIT / SATUA

N

HARGA SATUAN

(Rp)

JUMLAH (Rp)

KEBUTUHAN PENGAJUAN TAHAP LALU

PENGAJUAN SAAT INI

JUMLAH S.D SAAT

INI

Page 74: Rpd 2014 Mp3ki - Penguatan

NO URAIAN

VOLUME

SISA

a b c d e = c + d f = b - e g h i = d * h

UNIT / SATUA

N

HARGA SATUAN

(Rp)

JUMLAH (Rp)

KEBUTUHAN PENGAJUAN TAHAP LALU

PENGAJUAN SAAT INI

JUMLAH S.D SAAT

INI

III BRONJONGA BAHAN

1 Batu Belah 132 90 90 42 M3 120,000 - 2 Bronjong Dia. (2X1X0,5) 110 110 110 - Bh 135,000 -

SUB TOTAL ( III.A ) - B ALAT

1 Benang 2 2 2 - roll 5,000 - 2 Bambu 30 30 30 - btg 8,000 -

SUB TOTAL ( III.B ) - C UPAH

1 Pekerja Konstruksi 134 - - 134 HOK 24,000 - 2 Tukang 27 - - 27 HOK 33,000 -

SUB TOTAL ( III.C ) - JUMLAH SUB TOTAL III -

JUMLAH TOTAL A -

I RABAT BETON (BANJARWANGI-TALAGASARI)A BAHAN

1 Semen 50 kg 2,638 - - 2,638 Zak 69,500 - 2 Pasir beton 236 92 92.0 144.0 m³ 315,000 - 3 Pasir urug 263 52 52.000 211.000 m³ 100,000 - 4 Batu split 2/3 400 69 69.0 331.0 m³ 265,000 - 5 Kayu u/bekisting 6 - - 6 m³ 600,000 - 6 Paku 47 - - 47.0 m³ 12,000 - 7 Plastik Cor (lebar 1,5cm) 4,628 500 500 4,128 m2 2,500 - 8 Aspal Pen 60/70, 155 Kg 2 - - 2 drum 1,700,000 -

SUB TOTAL ( I.A ) - B A L A T

1 Biaya Transparansi : 2 a. Papan Proyek 100 x 120 cm 1 1 1 - Ls 100,000 - 3 b. Papan Informasi 100 x 180 cm 1 1 1 - Ls 120,000 - 4 c. Prasasti 60 x 40 cm 1 - - 1 Ls 450,000 - 5 d. Spanduk/umbul2 1 1 1 - Ls 120,000 - 6 Concrete Mixer 47 - - 47 hari 350,000 - 7 Mobilisasi / Demob 1 - - 1.0 Ls 500,000 - 9 Sewa Bak Mobil 45 11 11 34 hari 250,000 - 10 Meteran 5 M 2 2 2 - buah 20,000 - 11 Sekop 2 2 2 - buah 70,000 - 12 Ember 100 - - 100 buah 8,000 - 13 Arco/dolag 2 2 2 - buah 250,000 - 14 Benang Kasur 4 - - 4 Roll 5,000 -

SUB TOTAL ( I.B ) - C UPAH

1 Pekerja Konstruksi 1,441 - - 1,441 HOK 24,000 - 2 Tukang 301 - - 301 HOK 33,000 -

SUB TOTAL ( I.C ) - JUMLAH SUB TOTAL I -

II TPT (BANJARWANGI-TALAGASARI)A BAHAN

1 Semen 50 kg 121 110 110 11 Zak 69,500 - 2 Pasir Pasang 24 24 24 - m³ 160,000 - 3 Batu Belah 47 47 47 - m³ 120,000 -

SUB TOTAL ( II.A ) - B ALAT

1 Ember 20 20 20 - bh 8,000 - 2 Cat Tembok 4 - - 4 bh 30,000 - 3 Benang kasur 1 1 1 - btg 5,000 -

SUB TOTAL ( II.B ) -

Page 75: Rpd 2014 Mp3ki - Penguatan

NO URAIAN

VOLUME

SISA

a b c d e = c + d f = b - e g h i = d * h

UNIT / SATUA

N

HARGA SATUAN

(Rp)

JUMLAH (Rp)

KEBUTUHAN PENGAJUAN TAHAP LALU

PENGAJUAN SAAT INI

JUMLAH S.D SAAT

INI

C UPAH1 Pekerja Konstruksi 94 - - 94 HOK 24,000 - 2 Tukang 45 - - 45 HOK 33,000 -

SUB TOTAL ( II.C ) - JUMLAH SUB TOTAL II -

III GG Plat (BANJARWANGI-TALAGASARI)A BAHAN

1 Semen 50 kg 17 17 17 - Zak 69,500 - 2 Batu Belah 5 5 5 - m³ 120,000 - 3 Pasir Pasang 2 2 2 - m³ 160,000 - 4 Pasir beton 1 1 1 - m³ 315,000 - 5 Batu Pecah 2/3 Cm 1 1 1 - m³ 265,000 - 6 Kayu u/bekisting 1 1 1 - m³ 600,000 - 7 Kawat beton 1 1 1 - kg 16,000 - 8 Paku 1 1 1 - kg 12,000 - 9 Besi D 10 14 14 14 - btg 47,000 -

SUB TOTAL ( III.A ) - B A L A T

1 Benang 1 1 1 - Roll 5,000 - 2 Ember 6 6 6 - buah 8,000 -

SUB TOTAL ( III.B ) - C UPAH

1 Pekerja Konstruksi 18 - - 18 HOK 24,000 - 2 Tukang 11 - - 11 HOK 33,000 -

SUB TOTAL ( III.C ) - JUMLAH SUB TOTAL III -

JUMLAH TOTAL B -

I RABAT BETON (KADONGDONG-WANGUNJAYA)A BAHAN

1 Semen 50 kg 1,008 - - 1,008 Zak 69,500 - 2 Pasir beton 90 65 25 90 - m³ 315,000 7,875,000 3 Pasir urug 101 - - 101 m³ 100,000 - 4 Batu split 2/3 153 6 6 147 m³ 265,000 - 5 Kayu u/bekisting 2 1 0.5 2 m³ 600,000 - 6 Paku 18 2 2.0 16 m³ 12,000 - 7 Plastik Cor (lebar 1,5cm) 1,828.52 - - 1,828.52 m2 2,500 - 8 Aspal Pen 60/70, 155 Kg 2 2 2 - drum 1,700,000 -

SUB TOTAL ( I.A ) 7,875,000 B A L A T

1 Biaya Transparansi : 2 a. Papan Proyek 100 x 120 cm 1 1 1 - Ls 100,000 - 3 b. Papan Informasi 100 x 180 cm 1 1 1 - Ls 120,000 - 4 c. Prasasti 60 x 40 cm 1 - - 1 Ls 450,000 - 5 d. Spanduk/umbul2 2 2 2 - Ls 120,000 - 6 Concrete Mixer 18 - - 18 hari 350,000 - 7 Mobilisasi / Demob 1 - - 1 Ls 500,000 - 8 Sekop 2 2 2 - hari 70,000 - 9 Ember 90 - - 90 hari 8,000 - 10 Arco/dolag 2 2 2 - Ls 250,000 - 11 Sapu Lidi 2 - - 2 buah 6,000 - 12 Benang Kasur 5 2 2 3 buah 5,000 -

SUB TOTAL ( I.B ) - C UPAH

1 Pekerja Konstruksi 398 - - 398 HOK 24,000 - 2 Tukang 115 - - 115 HOK 33,000 -

SUB TOTAL ( I.C ) - JUMLAH SUB TOTAL I 7,875,000

Page 76: Rpd 2014 Mp3ki - Penguatan

NO URAIAN

VOLUME

SISA

a b c d e = c + d f = b - e g h i = d * h

UNIT / SATUA

N

HARGA SATUAN

(Rp)

JUMLAH (Rp)

KEBUTUHAN PENGAJUAN TAHAP LALU

PENGAJUAN SAAT INI

JUMLAH S.D SAAT

INI

II TPT (KADONGDONG-WANGUNJAYA)A BAHAN

1 Semen 50 kg 472 150 11 161 311 Zak 69,500 764,500 2 Pasir Pasang 95 64 64 31 m³ 160,000 - 3 Batu Belah 186 153 153 33 m³ 120,000 -

SUB TOTAL ( II.A ) 764,500 B ALAT

1 Ember 30 - - 30 buah 8,000 - 2 Cat Tembok 6 - - 6 kg 30,000 - 3 Pralon 1/2 inch 2 - 2 2 - buah 24,000 48,000 4 Bambu 10 - - 10 btg 8,000 - 5 Benang kasur 3 - - 3 buah 5,000 -

SUB TOTAL ( II.B ) 48,000 C UPAH

1 Pekerja Konstruksi 344 - - 344 HOK 24,000 - 2 Tukang 165 - - 165 HOK 33,000 -

SUB TOTAL ( II.C ) - JUMLAH SUB TOTAL II 812,500

III JEMBATAN BAJAA BAHAN

1 bouwplank 1 - - 1 Ls 1,200,000 - 2 Besi WF 500.200 6,592 6,592 6,592 - kg 16,700 - 3 Besi WF 200.100 379 379 379 - kg 16,700 - 4 Besi L.100.100.10 1,775 1,775 1,775 - kg 16,700 - 5 Besi L.70.70.7 245 245 245 - kg 16,700 - 6 Besi L.60.60.6 590 590 590 - kg 16,700 - 7 Baud 1/2" x 4 cm 154 154 154 - buah 8,000 - 8 Baud 5/8" x 6 cm 184 184 184 - buah 10,000 - 9 Lantai Kayu 8/20 6 - - 6 m3 3,000,000 - 10 Baut kokot 5/8' x 25 cm 192 192 192 - buah 18,000 - 11 Baut kokot 5/8' x 16 cm 736 736 736 - buah 23,000 - 12 Plat sambungan gelagar utama A 78 78 78 - kg 16,700 - 13 Plat sambungan tipe B 20 20 20 - kg 16,700 - 14 Plat sambungan tipe C 37 37 37 - kg 16,700 - 15 Baut sambungan gelagar utama 384 384 384 - buah 24,000 - 16 Plat Klem Lantai 736 736 736 - buah 15,000 - 17 Karet Peredam Lantai 64 64 64 - m 10,000 - 18 Elastomer 8 8 8 - buah 250,000 - 19 Kayu Bekisting 6 6 6 - m3 600,000 - 20 Paku 15 8 8 7 kg 12,000 - 21 Besi beton polos 1,069 - 974 974 95 kg 7,000 6,818,000 22 Kawat beton 24 - 24 24 - kg 16,000 384,000 23 Semen 529 - 529 529 - zak 69,500 36,765,500 24 Pasir beton 5 - 5 5 - m3 315,000 1,575,000 25 Split 5 - 5 5 - m3 265,000 1,325,000 26 Batu Belah 162 - - 162 m3 120,000 - 27 Pabrikasi Ereksion 10,650 3,650 3,650 7,000 kg 3,000 - 28 Cat tembok 12 - - 12 kg 30,000 - 29 Cat finishing besi 1 - - 1 ls 2,000,000 - 30 Pasir pasang 80 - 24 24 56 m3 160,000 3,840,000

SUB TOTAL ( III.A ) 50,707,500 B ALAT

1 Papan Kegiatan 1 - 1 1 - Unit 120,000 120,000 2 Cangkul 1 1 1 - Buah 50,000 - 3 Linggis 1 - 1 1 - Buah 25,000 25,000 4 Sekop 1 - 1 1 - Buah 70,000 70,000 5 Bambu 50 40 10 50 - Buah 8,000 80,000

Page 77: Rpd 2014 Mp3ki - Penguatan

NO URAIAN

VOLUME

SISA

a b c d e = c + d f = b - e g h i = d * h

UNIT / SATUA

N

HARGA SATUAN

(Rp)

JUMLAH (Rp)

KEBUTUHAN PENGAJUAN TAHAP LALU

PENGAJUAN SAAT INI

JUMLAH S.D SAAT

INI

6 Benang nilon 2 - 2 2 - Buah 5,000 10,000 7 Selang waterpass 15 15 15 - m 1,500 - 8 Ember Aduk Kecil 40 22 18 40 - Buah 8,000 144,000 9 Sewa molen 3 - - 3 Hari 350,000 - 10 Mobilisasi Molen 1 - - 1 Ls 500,000 - 11 Kuas 3 inch 4 - - 4 bh 10,000 - 12 Kunci besi 1 - - 1 Buah 10,000 - 13 Karung Tanggul 125 50 50 75 Buah 1,000 - 14 Sewa Pompa Sedot 6 - - 6 Hari 50,000 - 15 Prasasti 1 - - 1 Buah 450,000 -

SUB TOTAL ( III.B ) 449,000 C UPAH

1 Pekerja 319 141 141 178 HOK 24,000 - 2 Tukang 105 - - 105 HOK 33,000 -

SUB TOTAL ( III.C ) - JUMLAH SUB TOTAL III 51,156,500

JUMLAH TOTAL C 59,844,000

I PENGASPALAN (TALAGAJAYA-TANJUNGJAYA)A BAHAN

1 Batu Pecah 3/5 Cm 130 112 112 18 m2 235,000 - 2 Batu Pecah 2/3 Cm 137 53 53 84 m3 255,000 - 3 Batu Pecah 1/2 Cm 69 48 48 21 m3 295,000 - 4 Pasir Aspal / Abu batu 37 37 37 - m3 245,000 - 5 Aspal Pen 60/70, 155 Kg 139 139 139 - Drum 1,700,000 - 6 Aspal Emulsi @ 200 kg 16 16 16 - Drum 1,850,000 - 7 Ban Bekas Mobil 25 25 25 - Buah 20,000 - 8 Kayu bakar 2 2 2 - m3 100,000 -

SUB TOTAL ( I.A ) - B A L A T

1 Papan proyek ( Uk.1,20 cm x 1.00 cm 1 1 1 - Unit 100,000 - 2 Papan Informasi ( Uk.120 cm x 100 c 1 1 1 - Unit 120,000 - 3 Prasasti ( Uk. 60 cm x 40 cm ) 1 - - 1 Unit 450,000 - 4 Spanduk/umbul2 2 2 2 - paket 200,000 - 5 Meteran 7,5 m 2 2 2 - bh 20,000 - 6 Sapu Lidi 4 - - 4 bh 12,125 - 7 meteran 50 m 1 1 1 - bh 60,000 - 8 Kamera Dokumentasi 1 1 1 - paket 1,500,000 - 9 Mesin Gilas 12 - - 12 Hari 800,000 - 10 Mob./Demob. Mesin Gilas 1 1 0.5 0.5 Ls 2,500,000 -

SUB TOTAL ( I.B ) - C UPAH

1 Pekerja Konstruksi (Aspal ) 281 281 281 - HOK 30,000 - 2 Pekerja Galian Saluran 220 220 220 - HOK 24,000 - 3 Tukang ( Aspal) 42 42 42 - HOK 45,000 -

SUB TOTAL ( I.C ) - JUMLAH SUB TOTAL I -

II TPT (TALAGAJAYA-TANJUNGJAYA)

A BAHAN1 Semen 50 kg 288 15 15 273 Zak 69,500 - 2 Pasir Pasang 58 12 12 46 m³ 150,000 - 3 Batu Belah 115 28 27.5 87.5 m³ 120,000 -

SUB TOTAL ( II.A ) - B ALAT

1 Bambu 18 - - 18 btg 8,000 - 2 Benang Kasur 3 - - 3 bh 5,000 - 3 Pralon 1/2 inch 4 - - 4 btg 20,000 - 4 Ember 20 - - 20 bh 8,000 -

Page 78: Rpd 2014 Mp3ki - Penguatan

NO URAIAN

VOLUME

SISA

a b c d e = c + d f = b - e g h i = d * h

UNIT / SATUA

N

HARGA SATUAN

(Rp)

JUMLAH (Rp)

KEBUTUHAN PENGAJUAN TAHAP LALU

PENGAJUAN SAAT INI

JUMLAH S.D SAAT

INI

5 Cat Tembok 6 - - 6 kg 30,000 - SUB TOTAL ( II.B ) -

C UPAH1 Pekerja Konstruksi 232 200 200 32 HOK 24,000 - 2 Tukang 93 88 88 5 HOK 33,000 -

SUB TOTAL ( II.C ) - JUMLAH SUB TOTAL II -

III TPT JEMBATAN (TALAGAJAYA-TANJUNGJAYA)A BAHAN

1 Semen 50 kg 197 145 145 52 Zak 69,500 - 2 Pasir Pasang 40 30 30 10 m³ 150,000 - 3 Batu Belah 80 74 74 6 m³ 120,000 - 4 Besi dia 12 7 7 7 - btg 110,000 - 5 Pasir Beton 1 1 1 - m3 295,000 - 6 Kawat beton 1 1 1 - kg 16,000 -

SUB TOTAL ( III.A ) - B ALAT

1 Bambu 28 28 28 - btg 8,000 - 2 Benang Kasur 3 3 3 - bh 5,000 - 3 Pralon 1/2 inch 3 3 3 - btg 20,000 - 4 Ember 26 26 26 - bh 8,000 - 5 Cat Tembok 6 - - 6 kg 30,000 -

SUB TOTAL ( III.B ) - C UPAH

1 Pekerja Konstruksi 135 - - 135 HOK 24,000 - 2 Tukang 61 - - 61 HOK 33,000 -

SUB TOTAL ( III.C ) - JUMLAH SUB TOTAL III -

IV GG PLAT BETON (TALAGAJAYA-TANJUNGJAYA)A BAHAN

1 Semen 90 - - 90 zak 69,500 - 2 Batu belah 26 - - 26 M3 120,000 - 3 Pasir Pasang 8 - - 8 m3 150,000 - 4 Pasir Beton 2 - - 2 m3 295,000 - 5 Batu Pecah 2-3 cm 4 - - 4 m3 255,000 - 6 Kayu Begisting 1.2 - - 1 m3 600,000 - 7 Kawat Beton 4 - - 4 Kg 16,000 - 8 Paku 4 - - 4 kg 12,000 - 9 Besi dia. 10 64 - - 64 Buah 47,000 -

SUB TOTAL ( IV.A ) - B ALAT

1 Ember 25 - - 25 buah 8,000 - 2 Benang Kasur 3 - - 3 roll 5,000 - 3 Bambu 17 - - 17 Btg 8,000 -

SUB TOTAL ( IV.B ) - C UPAH

1 Pekerja Konstruksi 98 - - 98 HOK 24,000 - 2 Tukang 58 - - 58 HOK 33,000 -

SUB TOTAL ( IV.C ) - JUMLAH SUB TOTAL IV -

JUMLAH TOTAL D -

I RABAT BETON (WANGUNJAYA-MULYAJAYA)

A BAHAN1 Semen 50 kg 1,241 - 500 500 741 Zak 69,500 34,750,000 2 Pasir beton 111 55 56 111 - m³ 315,000 17,640,000 3 Pasir urug 124 88 36.0 124.0 - m³ 100,000 3,600,000

Page 79: Rpd 2014 Mp3ki - Penguatan

NO URAIAN

VOLUME

SISA

a b c d e = c + d f = b - e g h i = d * h

UNIT / SATUA

N

HARGA SATUAN

(Rp)

JUMLAH (Rp)

KEBUTUHAN PENGAJUAN TAHAP LALU

PENGAJUAN SAAT INI

JUMLAH S.D SAAT

INI

4 Batu split 2/3 188 188 188.0 - m³ 265,000 - 5 Kayu u/bekisting 3 - 3 3 - m³ 600,000 1,800,000 6 Paku 22 - 22 22 - m³ 12,000 264,000 7 Plastik Cor (lebar 1,5cm) 2,171 - - 2,171 m2 2,500 - 8 Aspal Pen 60/70, 155 Kg 1 1 1 - drum 1,700,000 -

SUB TOTAL ( I.A ) 58,054,000 B A L A T

1 Biaya Transparansi : 2 a. Papan Proyek 100 x 120 cm 1 1 1 - Ls 100,000 - 3 b. Papan Informasi 100 x 180 cm 1 1 1 - Ls 120,000 - 4 c. Prasasti 60 x 40 cm 1 - - 1 Ls 450,000 - 5 d. Spanduk Program 2 2 2 - Ls 120,000 - 6 Concrete Mixer 22 - - 22 hari 350,000 - 7 Mobilisasi / Demob 1 - - 1 Ls 500,000 - 8 Meteran 5 M 1 1 1 - buah 10,000 - 9 Pipa Railing/Pilar Jembatan 8 - - 8 btg 250,000 - 10 Sekop 2 2 2 - buah 70,000 - 11 Ember 77 - - 77 buah 8,000 - 12 Arco/dolag 2 2 2 - buah 250,000 - 13 Benang Kasur 4 - - 4 Roll 5,000 -

SUB TOTAL ( I.B ) - C UPAH

1 Pekerja Konstruksi 544 - - 544 HOK 24,000 - 2 Tukang 142 - - 142 HOK 33,000 -

SUB TOTAL ( I.C ) - JUMLAH SUB TOTAL I 58,054,000

II TPT (WANGUNJAYA-MULYAJAYA)A BAHAN

1 Semen 50 kg 1,480 150.0 800 950 530 Zak 69,500 55,600,000 2 Pasir Pasang 297 71.5 150.0 221.5 75.5 m³ 160,000 24,000,000 3 Batu Belah 593 403.5 80.00 483.50 110 m³ 120,000 9,600,000

SUB TOTAL ( II.A ) 89,200,000 B ALAT

1 Ember 50 25 25 50 - buah 8,000 200,000 2 Cat Tembok 4 - 4 4 - kg 30,000 120,000 3 Pipa pralon 5 5 5 - btg 24,000 - 4 Bambu 20 20 20 - bh 8,000 - 5 Benang kasur 3 3 3 - btg 5,000 -

SUB TOTAL ( II.B ) 320,000 C UPAH

1 Pekerja Konstruksi 957 417 417 540 HOK 24,000 - 2 Tukang 411 - - 411 HOK 33,000 -

SUB TOTAL ( II.C ) - JUMLAH SUB TOTAL II 89,520,000

III BRONJONG

A BAHAN1 Batu Belah 231 77 154 231 - M3 120,000 18,480,000 2 Bronjong Dia. (2X1X0,5) 192 192 192 - Bh 135,000 -

SUB TOTAL ( III.A ) 18,480,000 B ALAT

1 Benang 2 - 2 2 - roll 5,000 10,000 2 Bambu 20 - 20 20 - btg 8,000 160,000

SUB TOTAL ( III.B ) 170,000 C UPAH

1 Pekerja Konstruksi 256 256 256 - HOK 24,000 - 2 Tukang 52 52 52 - HOK 33,000 -

SUB TOTAL ( III.C ) -

Page 80: Rpd 2014 Mp3ki - Penguatan

NO URAIAN

VOLUME

SISA

a b c d e = c + d f = b - e g h i = d * h

UNIT / SATUA

N

HARGA SATUAN

(Rp)

JUMLAH (Rp)

KEBUTUHAN PENGAJUAN TAHAP LALU

PENGAJUAN SAAT INI

JUMLAH S.D SAAT

INI

JUMLAH SUB TOTAL III 18,650,000

IV GG PLAT BETONA BAHAN

1 Semen 34 - - 34 zak 69,500 - 2 Batu belah 10 - - 10 M3 120,000 - 3 Pasir Pasang 4 - - 4 M3 160,000 - 4 Pasir Beton 2 - - 2 M3 315,000 - 5 Batu Pecah 2-3 cm 2 - - 2 M3 265,000 - 6 Kayu Begisting 2 - - 2 M3 600,000 - 7 Kawat Beton 2 - - 2 Kg 16,000 - 8 Paku 2 - - 2 Kg 12,000 - 9 Besi dia. 10 28 - - 28 Btg 47,000 -

SUB TOTAL ( IV.A ) - B ALAT

1 Benang 3 - - 3 roll 5,000 - 2 Ember 8 - - 8 buah 8,000 -

SUB TOTAL ( IV.B ) - C UPAH

1 Pekerja Konstruksi 36 - - 36 HOK 24,000 - 2 Tukang 22 - - 22 HOK 33,000 -

SUB TOTAL ( IV.C ) - JUMLAH SUB TOTAL IV -

JUMLAH TOTAL E 166,224,000

JUMLAH TOTAL 226,068,000

Terbilang (dengan huruf) : #VALUE!

Banjarwangi, …......…………

Disetujui Oleh : Dibuat Oleh :Ketua TPK Bendahara TPK

Kecamatan Banjarwangi Kecamatan Banjarwangi

Endjang Komara Ahmad Hayun,S.Pd.IMengetahui :

FK / FT Kecamatan Banjarwangi PjOK Kecamatan Banjarwangi

MIFTAH FARID Ujang Suryana.S.SosFasilitator Kecamatan Fasilitator Teknik NIP. 19671201 198703 1 004

Sebagai Catatan :

TAHAP ALOKASI BOP TAHAP LALU KUMULATIF

1 DANA 40% TAHAP 1 1,132,128,000 1,140,090,200 - 1,140,090,200

2 DANA 40% TAHAP 2 1,132,128,000 10,008,000 226,068,000 236,076,000

3 DANA 20% 566,064,000 - -

JUMLAH 2,830,320,000 1,140,090,200 226,068,000 1,376,166,200

DEFIK GUNAWAN,ST AHMAD FAUZI,ST

NO

TAHAP SEKARANG

Page 81: Rpd 2014 Mp3ki - Penguatan

PNPM - Mandiri Perdesaan Pola Khusus MP3KI Form.36.

RENCANA PENGGUNAAN DANAMP3KI PENGUATAN

RPD KE : 2 C Kecamatan : Banjarwangi Kabupaten : Garut

Jumlah BLM : Rp 2,830,320,000

NO URAIAN

VOLUME

SISA

a b c d e = c + d f = b - e g h i = d * h

I RABAT BETON (BANJARWANGI-BOJONG-JAYABAKTI)A BAHAN

1 Semen 50 kg 2,890 400 170 570 2,320 Zak 70,000 11,900,000 2 Pasir beton 258 173 84.60 258.00 - m³ 310,000 26,226,000 3 Pasir urug 288 - 84.2 84.2 203.8 m³ 100,000 8,420,000 4 Batu split 2/3 439 188 67.5 255.0 184.0 m³ 270,000 18,225,000 5 Kayu u/bekisting 6 - - 6 m³ 600,000 - 6 Paku 52 - - 52 m³ 12,000 - 7 Plastik Cor (lebar 1,5cm) 5,078 500 500 4,578 m2 2,500 - 8 Aspal Pen 60/70, 155 Kg 5 5 5 - drum 1,700,000 -

SUB TOTAL ( I.A ) 64,771,000 B A L A T

1 Biaya Transparansi : 2 a. Papan Proyek 100 x 120 cm 1 - - 1 Ls 100,000 - 3 b. Papan Informasi 100 x 180 cm 1 - 1 1 - Ls 120,000 120,000 4 c. Prasasti 60 x 40 cm 1 - - 1 Ls 450,000 - 5 c. Spanduk/umbul umbul 3 - 3 3 - Ls 120,000 360,000 6 d. Kamera Digital 1 - 1 1 - hari 2,000,000 2,000,000 7 Concrete Mixer 52 - - 52 Ls 350,000 - 8 Mobilisasi / Demob 1 - - 1 hari 500,000 - 9 Gor. Buis Beton 30 cm 8 - - 8 hari 80,000 - 10 Sekop 2 - - 2 Ls 70,000 - 11 Ember 100 - - 100 buah 8,000 - 12 Arco/dolag 3 - - 3 buah 250,000 - 13 Benang Kasur 4 - - 4 buah 5,000 -

SUB TOTAL ( I.B ) 2,480,000 C UPAH

1 Pekerja Konstruksi 1,300 - - 1,300 HOK 24,000 - 2 Tukang 330 - - 330 HOK 33,000 -

SUB TOTAL ( I.C ) - JUMLAH SUB TOTAL I 67,251,000

II TPT (BANJARWANGI-BOJONG-JAYABAKTI)A BAHAN

1 Semen 50 kg 474 84 286 370 104 Zak 70,000 20,020,000 2 Pasir Pasang 95 6 79.0 85 10 m³ 160,000 12,640,000 3 Batu Belah 188 114 63 177 11 m³ 120,000 7,560,000

SUB TOTAL ( II.A ) 40,220,000 B ALAT

1 Ember 45 45 45 - buah 8,000 - 2 Cat Tembok 5 - - 5 kg 30,000 - 3 Pralon 1/2 inch 4 3 3 1 btg 20,000 - 4 Kuas 1/2 inch 2 - - 2 bh 20,000 - 5 Bambu 6 6 6 - btg 8,000 - 6 Benang kasur 4 4 4 - buah 5,000 -

SUB TOTAL ( II.B ) - C UPAH

1 Pekerja Konstruksi 311 - 256 256 55 HOK 24,000 6,144,000 2 Tukang 157 - 104 104 53 HOK 33,000 3,432,000

SUB TOTAL ( II.C ) 9,576,000 JUMLAH SUB TOTAL II 49,796,000

UNIT / SATUA

N

HARGA SATUAN

(Rp)

JUMLAH (Rp)

KEBUTUHAN PENGAJUAN TAHAP LALU

PENGAJUAN SAAT INI

JUMLAH S.D SAAT

INI

Page 82: Rpd 2014 Mp3ki - Penguatan

NO URAIAN

VOLUME

SISA

a b c d e = c + d f = b - e g h i = d * h

UNIT / SATUA

N

HARGA SATUAN

(Rp)

JUMLAH (Rp)

KEBUTUHAN PENGAJUAN TAHAP LALU

PENGAJUAN SAAT INI

JUMLAH S.D SAAT

INI

III BRONJONGA BAHAN

1 Batu Belah 132 90 90 42 M3 120,000 - 2 Bronjong Dia. (2X1X0,5) 110 110 110 - Bh 135,000 -

SUB TOTAL ( III.A ) - B ALAT

1 Benang 2 2 2 - roll 5,000 - 2 Bambu 30 30 30 - btg 8,000 -

SUB TOTAL ( III.B ) - C UPAH

1 Pekerja Konstruksi 134 - - 134 HOK 24,000 - 2 Tukang 27 - - 27 HOK 33,000 -

SUB TOTAL ( III.C ) - JUMLAH SUB TOTAL III -

JUMLAH TOTAL A 117,047,000

I RABAT BETON (BANJARWANGI-TALAGASARI)A BAHAN

1 Semen 50 kg 2,638 - 515 515 2,123 Zak 69,500 35,792,500 2 Pasir beton 236 92 137.5 229.5 6.5 m³ 315,000 43,312,500 3 Pasir urug 263 52 72.481 124.481 138.519 m³ 100,000 7,248,100 4 Batu split 2/3 400 69 100.9 169.9 230.1 m³ 265,000 26,738,500 5 Kayu u/bekisting 6 - 4 4 2 m³ 600,000 2,400,000 6 Paku 47 - 18.5 18.5 28.5 m³ 12,000 222,000 7 Plastik Cor (lebar 1,5cm) 4,628 500 500 4,128 m2 2,500 - 8 Aspal Pen 60/70, 155 Kg 2 - - 2 drum 1,700,000 -

SUB TOTAL ( I.A ) 115,713,600 B A L A T

1 Biaya Transparansi : 2 a. Papan Proyek 100 x 120 cm 1 1 1 - Ls 100,000 - 3 b. Papan Informasi 100 x 180 cm 1 1 1 - Ls 120,000 - 4 c. Prasasti 60 x 40 cm 1 - - 1 Ls 450,000 - 5 d. Spanduk/umbul2 1 1 1 - Ls 120,000 - 6 Concrete Mixer 47 - - 47 hari 350,000 - 7 Mobilisasi / Demob 1 - 0.5 0.5 0.5 Ls 500,000 250,000 9 Sewa Bak Mobil 45 11 21 32 13 hari 250,000 5,250,000 10 Meteran 5 M 2 2 2 - buah 20,000 - 11 Sekop 2 2 2 - buah 70,000 - 12 Ember 100 - 100 100 - buah 8,000 800,000 13 Arco/dolag 2 2 2 - buah 250,000 - 14 Benang Kasur 4 - - 4 Roll 5,000 -

SUB TOTAL ( I.B ) 6,300,000 C UPAH

1 Pekerja Konstruksi 1,441 - - 1,441 HOK 24,000 - 2 Tukang 301 - - 301 HOK 33,000 -

SUB TOTAL ( I.C ) - JUMLAH SUB TOTAL I 122,013,600

II TPT (BANJARWANGI-TALAGASARI)A BAHAN

1 Semen 50 kg 121 110 11 121 - Zak 69,500 764,500 2 Pasir Pasang 24 24 24 - m³ 160,000 - 3 Batu Belah 47 47 47 - m³ 120,000 -

SUB TOTAL ( II.A ) 764,500 B ALAT

1 Ember 20 20 20 - bh 8,000 - 2 Cat Tembok 4 - 4 4 - bh 30,000 120,000 3 Benang kasur 1 1 1 - btg 5,000 -

SUB TOTAL ( II.B ) 120,000

Page 83: Rpd 2014 Mp3ki - Penguatan

NO URAIAN

VOLUME

SISA

a b c d e = c + d f = b - e g h i = d * h

UNIT / SATUA

N

HARGA SATUAN

(Rp)

JUMLAH (Rp)

KEBUTUHAN PENGAJUAN TAHAP LALU

PENGAJUAN SAAT INI

JUMLAH S.D SAAT

INI

C UPAH1 Pekerja Konstruksi 94 - 94 94 - HOK 24,000 2,256,000 2 Tukang 45 - 45 45 - HOK 33,000 1,485,000

SUB TOTAL ( II.C ) 3,741,000 JUMLAH SUB TOTAL II 4,625,500

III GG Plat (BANJARWANGI-TALAGASARI)A BAHAN

1 Semen 50 kg 17 17 17 - Zak 69,500 - 2 Batu Belah 5 5 5 - m³ 120,000 - 3 Pasir Pasang 2 2 2 - m³ 160,000 - 4 Pasir beton 1 1 1 - m³ 315,000 - 5 Batu Pecah 2/3 Cm 1 1 1 - m³ 265,000 - 6 Kayu u/bekisting 1 1 1 - m³ 600,000 - 7 Kawat beton 1 1 1 - kg 16,000 - 8 Paku 1 1 1 - kg 12,000 - 9 Besi D 10 14 14 14 - btg 47,000 -

SUB TOTAL ( III.A ) - B A L A T

1 Benang 1 1 1 - Roll 5,000 - 2 Ember 6 6 6 - buah 8,000 -

SUB TOTAL ( III.B ) - C UPAH

1 Pekerja Konstruksi 18 - 18 18 - HOK 24,000 432,000 2 Tukang 11 - 11 11 - HOK 33,000 363,000

SUB TOTAL ( III.C ) 795,000 JUMLAH SUB TOTAL III 795,000

JUMLAH TOTAL B 127,434,100

I RABAT BETON (KADONGDONG-WANGUNJAYA)A BAHAN

1 Semen 50 kg 1,008 - - 1,008 Zak 69,500 - 2 Pasir beton 90 90 90 - m³ 315,000 - 3 Pasir urug 101 - - 101 m³ 100,000 - 4 Batu split 2/3 153 6 6 147 m³ 265,000 - 5 Kayu u/bekisting 2 1 0.5 2 m³ 600,000 - 6 Paku 18 2 2.0 16 m³ 12,000 - 7 Plastik Cor (lebar 1,5cm) 1,828.52 - - 1,828.52 m2 2,500 - 8 Aspal Pen 60/70, 155 Kg 2 2 2 - drum 1,700,000 -

SUB TOTAL ( I.A ) - B A L A T

1 Biaya Transparansi : 2 a. Papan Proyek 100 x 120 cm 1 1 1 - Ls 100,000 - 3 b. Papan Informasi 100 x 180 cm 1 1 1 - Ls 120,000 - 4 c. Prasasti 60 x 40 cm 1 - - 1 Ls 450,000 - 5 d. Spanduk/umbul2 2 2 2 - Ls 120,000 - 6 Concrete Mixer 18 - - 18 hari 350,000 - 7 Mobilisasi / Demob 1 - - 1 Ls 500,000 - 8 Sekop 2 2 2 - hari 70,000 - 9 Ember 90 - - 90 hari 8,000 - 10 Arco/dolag 2 2 2 - Ls 250,000 - 11 Sapu Lidi 2 - - 2 buah 6,000 - 12 Benang Kasur 5 2 2 3 buah 5,000 -

SUB TOTAL ( I.B ) - C UPAH

1 Pekerja Konstruksi 398 - - 398 HOK 24,000 - 2 Tukang 115 - - 115 HOK 33,000 -

SUB TOTAL ( I.C ) - JUMLAH SUB TOTAL I -

Page 84: Rpd 2014 Mp3ki - Penguatan

NO URAIAN

VOLUME

SISA

a b c d e = c + d f = b - e g h i = d * h

UNIT / SATUA

N

HARGA SATUAN

(Rp)

JUMLAH (Rp)

KEBUTUHAN PENGAJUAN TAHAP LALU

PENGAJUAN SAAT INI

JUMLAH S.D SAAT

INI

II TPT (KADONGDONG-WANGUNJAYA)A BAHAN

1 Semen 50 kg 472 161 161 311 Zak 69,500 - 2 Pasir Pasang 95 64 64 31 m³ 160,000 - 3 Batu Belah 186 153 153 33 m³ 120,000 -

SUB TOTAL ( II.A ) - B ALAT

1 Ember 30 - - 30 buah 8,000 - 2 Cat Tembok 6 - - 6 kg 30,000 - 3 Pralon 1/2 inch 2 2 2 - buah 24,000 - 4 Bambu 10 - - 10 btg 8,000 - 5 Benang kasur 3 - - 3 buah 5,000 -

SUB TOTAL ( II.B ) - C UPAH

1 Pekerja Konstruksi 344 - - 344 HOK 24,000 - 2 Tukang 165 - - 165 HOK 33,000 -

SUB TOTAL ( II.C ) - JUMLAH SUB TOTAL II -

III JEMBATAN BAJAA BAHAN

1 bouwplank 1 - - 1 Ls 1,200,000 - 2 Besi WF 500.200 6,592 6,592 6,592 - kg 16,700 - 3 Besi WF 200.100 379 379 379 - kg 16,700 - 4 Besi L.100.100.10 1,775 1,775 1,775 - kg 16,700 - 5 Besi L.70.70.7 245 245 245 - kg 16,700 - 6 Besi L.60.60.6 590 590 590 - kg 16,700 - 7 Baud 1/2" x 4 cm 154 154 154 - buah 8,000 - 8 Baud 5/8" x 6 cm 184 184 184 - buah 10,000 - 9 Lantai Kayu 8/20 6 - - 6 m3 3,000,000 - 10 Baut kokot 5/8' x 25 cm 192 192 192 - buah 18,000 - 11 Baut kokot 5/8' x 16 cm 736 736 736 - buah 23,000 - 12 Plat sambungan gelagar utama A 78 78 78 - kg 16,700 - 13 Plat sambungan tipe B 20 20 20 - kg 16,700 - 14 Plat sambungan tipe C 37 37 37 - kg 16,700 - 15 Baut sambungan gelagar utama 384 384 384 - buah 24,000 - 16 Plat Klem Lantai 736 736 736 - buah 15,000 - 17 Karet Peredam Lantai 64 64 64 - m 10,000 - 18 Elastomer 8 8 8 - buah 250,000 - 19 Kayu Bekisting 6 6 6 - m3 600,000 - 20 Paku 15 8 8 7 kg 12,000 - 21 Besi beton polos 1,069 974 974 95 kg 7,000 - 22 Kawat beton 24 24 24 - kg 16,000 - 23 Semen 529 529 529 - zak 69,500 - 24 Pasir beton 5 5 5 - m3 315,000 - 25 Split 5 5 5 - m3 265,000 - 26 Batu Belah 162 - - 162 m3 120,000 - 27 Pabrikasi Ereksion 10,650 3,650 3,650 7,000 kg 3,000 - 28 Cat tembok 12 - - 12 kg 30,000 - 29 Cat finishing besi 1 - - 1 ls 2,000,000 - 30 Pasir pasang 80 24 24 56 m3 160,000 -

SUB TOTAL ( III.A ) - B ALAT

1 Papan Kegiatan 1 1 1 - Unit 120,000 - 2 Cangkul 1 1 1 - Buah 50,000 - 3 Linggis 1 1 1 - Buah 25,000 - 4 Sekop 1 1 1 - Buah 70,000 - 5 Bambu 50 50 50 - Buah 8,000 -

Page 85: Rpd 2014 Mp3ki - Penguatan

NO URAIAN

VOLUME

SISA

a b c d e = c + d f = b - e g h i = d * h

UNIT / SATUA

N

HARGA SATUAN

(Rp)

JUMLAH (Rp)

KEBUTUHAN PENGAJUAN TAHAP LALU

PENGAJUAN SAAT INI

JUMLAH S.D SAAT

INI

6 Benang nilon 2 2 2 - Buah 5,000 - 7 Selang waterpass 15 15 15 - m 1,500 - 8 Ember Aduk Kecil 40 40 40 - Buah 8,000 - 9 Sewa molen 3 - - 3 Hari 350,000 - 10 Mobilisasi Molen 1 - - 1 Ls 500,000 - 11 Kuas 3 inch 4 - - 4 bh 10,000 - 12 Kunci besi 1 - - 1 Buah 10,000 - 13 Karung Tanggul 125 50 50 75 Buah 1,000 - 14 Sewa Pompa Sedot 6 - - 6 Hari 50,000 - 15 Prasasti 1 - - 1 Buah 450,000 -

SUB TOTAL ( III.B ) - C UPAH

1 Pekerja 319 141 141 178 HOK 24,000 - 2 Tukang 105 - - 105 HOK 33,000 -

SUB TOTAL ( III.C ) - JUMLAH SUB TOTAL III -

JUMLAH TOTAL C -

I PENGASPALAN (TALAGAJAYA-TANJUNGJAYA)A BAHAN

1 Batu Pecah 3/5 Cm 130 112 112 18 m2 235,000 - 2 Batu Pecah 2/3 Cm 137 53 53 84 m3 255,000 - 3 Batu Pecah 1/2 Cm 69 48 48 21 m3 295,000 - 4 Pasir Aspal / Abu batu 37 37 37 - m3 245,000 - 5 Aspal Pen 60/70, 155 Kg 139 139 139 - Drum 1,700,000 - 6 Aspal Emulsi @ 200 kg 16 16 16 - Drum 1,850,000 - 7 Ban Bekas Mobil 25 25 25 - Buah 20,000 - 8 Kayu bakar 2 2 2 - m3 100,000 -

SUB TOTAL ( I.A ) - B A L A T

1 Papan proyek ( Uk.1,20 cm x 1.00 cm 1 1 1 - Unit 100,000 - 2 Papan Informasi ( Uk.120 cm x 100 c 1 1 1 - Unit 120,000 - 3 Prasasti ( Uk. 60 cm x 40 cm ) 1 - - 1 Unit 450,000 - 4 Spanduk/umbul2 2 2 2 - paket 200,000 - 5 Meteran 7,5 m 2 2 2 - bh 20,000 - 6 Sapu Lidi 4 - - 4 bh 12,125 - 7 meteran 50 m 1 1 1 - bh 60,000 - 8 Kamera Dokumentasi 1 1 1 - paket 1,500,000 - 9 Mesin Gilas 12 - - 12 Hari 800,000 - 10 Mob./Demob. Mesin Gilas 1 1 0.5 0.5 Ls 2,500,000 -

SUB TOTAL ( I.B ) - C UPAH

1 Pekerja Konstruksi (Aspal ) 281 281 281 - HOK 30,000 - 2 Pekerja Galian Saluran 220 220 220 - HOK 24,000 - 3 Tukang ( Aspal) 42 42 42 - HOK 45,000 -

SUB TOTAL ( I.C ) - JUMLAH SUB TOTAL I -

II TPT (TALAGAJAYA-TANJUNGJAYA)

A BAHAN1 Semen 50 kg 288 15 15 273 Zak 69,500 - 2 Pasir Pasang 58 12 12 46 m³ 150,000 - 3 Batu Belah 115 28 27.5 87.5 m³ 120,000 -

SUB TOTAL ( II.A ) - B ALAT

1 Bambu 18 - - 18 btg 8,000 - 2 Benang Kasur 3 - - 3 bh 5,000 - 3 Pralon 1/2 inch 4 - - 4 btg 20,000 - 4 Ember 20 - - 20 bh 8,000 -

Page 86: Rpd 2014 Mp3ki - Penguatan

NO URAIAN

VOLUME

SISA

a b c d e = c + d f = b - e g h i = d * h

UNIT / SATUA

N

HARGA SATUAN

(Rp)

JUMLAH (Rp)

KEBUTUHAN PENGAJUAN TAHAP LALU

PENGAJUAN SAAT INI

JUMLAH S.D SAAT

INI

5 Cat Tembok 6 - - 6 kg 30,000 - SUB TOTAL ( II.B ) -

C UPAH1 Pekerja Konstruksi 232 200 200 32 HOK 24,000 - 2 Tukang 93 88 88 5 HOK 33,000 -

SUB TOTAL ( II.C ) - JUMLAH SUB TOTAL II -

III TPT JEMBATAN (TALAGAJAYA-TANJUNGJAYA)A BAHAN

1 Semen 50 kg 197 145 145 52 Zak 69,500 - 2 Pasir Pasang 40 30 30 10 m³ 150,000 - 3 Batu Belah 80 74 74 6 m³ 120,000 - 4 Besi dia 12 7 7 7 - btg 110,000 - 5 Pasir Beton 1 1 1 - m3 295,000 - 6 Kawat beton 1 1 1 - kg 16,000 -

SUB TOTAL ( III.A ) - B ALAT

1 Bambu 28 28 28 - btg 8,000 - 2 Benang Kasur 3 3 3 - bh 5,000 - 3 Pralon 1/2 inch 3 3 3 - btg 20,000 - 4 Ember 26 26 26 - bh 8,000 - 5 Cat Tembok 6 - - 6 kg 30,000 -

SUB TOTAL ( III.B ) - C UPAH

1 Pekerja Konstruksi 135 - - 135 HOK 24,000 - 2 Tukang 61 - - 61 HOK 33,000 -

SUB TOTAL ( III.C ) - JUMLAH SUB TOTAL III -

IV GG PLAT BETON (TALAGAJAYA-TANJUNGJAYA)A BAHAN

1 Semen 90 - - 90 zak 69,500 - 2 Batu belah 26 - - 26 M3 120,000 - 3 Pasir Pasang 8 - - 8 m3 150,000 - 4 Pasir Beton 2 - - 2 m3 295,000 - 5 Batu Pecah 2-3 cm 4 - - 4 m3 255,000 - 6 Kayu Begisting 1.2 - - 1 m3 600,000 - 7 Kawat Beton 4 - - 4 Kg 16,000 - 8 Paku 4 - - 4 kg 12,000 - 9 Besi dia. 10 64 - - 64 Buah 47,000 -

SUB TOTAL ( IV.A ) - B ALAT

1 Ember 25 - - 25 buah 8,000 - 2 Benang Kasur 3 - - 3 roll 5,000 - 3 Bambu 17 - - 17 Btg 8,000 -

SUB TOTAL ( IV.B ) - C UPAH

1 Pekerja Konstruksi 98 - - 98 HOK 24,000 - 2 Tukang 58 - - 58 HOK 33,000 -

SUB TOTAL ( IV.C ) - JUMLAH SUB TOTAL IV -

JUMLAH TOTAL D -

I RABAT BETON (WANGUNJAYA-MULYAJAYA)

A BAHAN1 Semen 50 kg 1,241 500 500 741 Zak 69,500 - 2 Pasir beton 111 111 111 - m³ 315,000 - 3 Pasir urug 124 124 124.0 - m³ 100,000 -

Page 87: Rpd 2014 Mp3ki - Penguatan

NO URAIAN

VOLUME

SISA

a b c d e = c + d f = b - e g h i = d * h

UNIT / SATUA

N

HARGA SATUAN

(Rp)

JUMLAH (Rp)

KEBUTUHAN PENGAJUAN TAHAP LALU

PENGAJUAN SAAT INI

JUMLAH S.D SAAT

INI

4 Batu split 2/3 188 188 188.0 - m³ 265,000 - 5 Kayu u/bekisting 3 3 3 - m³ 600,000 - 6 Paku 22 22 22 - m³ 12,000 - 7 Plastik Cor (lebar 1,5cm) 2,171 - - 2,171 m2 2,500 - 8 Aspal Pen 60/70, 155 Kg 1 1 1 - drum 1,700,000 -

SUB TOTAL ( I.A ) - B A L A T

1 Biaya Transparansi : 2 a. Papan Proyek 100 x 120 cm 1 1 1 - Ls 100,000 - 3 b. Papan Informasi 100 x 180 cm 1 1 1 - Ls 120,000 - 4 c. Prasasti 60 x 40 cm 1 - - 1 Ls 450,000 - 5 d. Spanduk Program 2 2 2 - Ls 120,000 - 6 Concrete Mixer 22 - - 22 hari 350,000 - 7 Mobilisasi / Demob 1 - - 1 Ls 500,000 - 8 Meteran 5 M 1 1 1 - buah 10,000 - 9 Pipa Railing/Pilar Jembatan 8 - - 8 btg 250,000 - 10 Sekop 2 2 2 - buah 70,000 - 11 Ember 77 - - 77 buah 8,000 - 12 Arco/dolag 2 2 2 - buah 250,000 - 13 Benang Kasur 4 - - 4 Roll 5,000 -

SUB TOTAL ( I.B ) - C UPAH

1 Pekerja Konstruksi 544 - - 544 HOK 24,000 - 2 Tukang 142 - - 142 HOK 33,000 -

SUB TOTAL ( I.C ) - JUMLAH SUB TOTAL I -

II TPT (WANGUNJAYA-MULYAJAYA)A BAHAN

1 Semen 50 kg 1,480 950.0 950 530 Zak 69,500 - 2 Pasir Pasang 297 221.5 221.5 75.5 m³ 160,000 - 3 Batu Belah 593 483.5 483.50 110 m³ 120,000 -

SUB TOTAL ( II.A ) - B ALAT

1 Ember 50 50 50 - buah 8,000 - 2 Cat Tembok 4 4 4 - kg 30,000 - 3 Pipa pralon 5 5 5 - btg 24,000 - 4 Bambu 20 20 20 - bh 8,000 - 5 Benang kasur 3 3 3 - btg 5,000 -

SUB TOTAL ( II.B ) - C UPAH

1 Pekerja Konstruksi 957 417 417 540 HOK 24,000 - 2 Tukang 411 - - 411 HOK 33,000 -

SUB TOTAL ( II.C ) - JUMLAH SUB TOTAL II -

III BRONJONG

A BAHAN1 Batu Belah 231 231 231 - M3 120,000 - 2 Bronjong Dia. (2X1X0,5) 192 192 192 - Bh 135,000 -

SUB TOTAL ( III.A ) - B ALAT

1 Benang 2 2 2 - roll 5,000 - 2 Bambu 20 20 20 - btg 8,000 -

SUB TOTAL ( III.B ) - C UPAH

1 Pekerja Konstruksi 256 256 256 - HOK 24,000 - 2 Tukang 52 52 52 - HOK 33,000 -

SUB TOTAL ( III.C ) -

Page 88: Rpd 2014 Mp3ki - Penguatan

NO URAIAN

VOLUME

SISA

a b c d e = c + d f = b - e g h i = d * h

UNIT / SATUA

N

HARGA SATUAN

(Rp)

JUMLAH (Rp)

KEBUTUHAN PENGAJUAN TAHAP LALU

PENGAJUAN SAAT INI

JUMLAH S.D SAAT

INI

JUMLAH SUB TOTAL III -

IV GG PLAT BETONA BAHAN

1 Semen 34 - - 34 zak 69,500 - 2 Batu belah 10 - - 10 M3 120,000 - 3 Pasir Pasang 4 - - 4 M3 160,000 - 4 Pasir Beton 2 - - 2 M3 315,000 - 5 Batu Pecah 2-3 cm 2 - - 2 M3 265,000 - 6 Kayu Begisting 2 - - 2 M3 600,000 - 7 Kawat Beton 2 - - 2 Kg 16,000 - 8 Paku 2 - - 2 Kg 12,000 - 9 Besi dia. 10 28 - - 28 Btg 47,000 -

SUB TOTAL ( IV.A ) - B ALAT

1 Benang 3 - - 3 roll 5,000 - 2 Ember 8 - - 8 buah 8,000 -

SUB TOTAL ( IV.B ) - C UPAH

1 Pekerja Konstruksi 36 - - 36 HOK 24,000 - 2 Tukang 22 - - 22 HOK 33,000 -

SUB TOTAL ( IV.C ) - JUMLAH SUB TOTAL IV -

JUMLAH TOTAL E -

JUMLAH TOTAL 244,481,100

Terbilang (dengan huruf) : #VALUE!

Banjarwangi, …......…………

Disetujui Oleh : Dibuat Oleh :Ketua TPK Bendahara TPK

Kecamatan Banjarwangi Kecamatan Banjarwangi

Endjang Komara Ahmad Hayun,S.Pd.IMengetahui :

FK / FT Kecamatan Banjarwangi PjOK Kecamatan Banjarwangi

MIFTAH FARID Ujang Suryana.S.SosFasilitator Kecamatan Fasilitator Teknik NIP. 19671201 198703 1 004

Sebagai Catatan :

TAHAP ALOKASI BOP TAHAP LALU KUMULATIF

1 DANA 40% TAHAP 1 1,132,128,000 1,140,090,200 - 1,140,090,200

2 DANA 40% TAHAP 2 1,132,128,000 236,076,000 244,481,100 480,557,100

3 DANA 20% 566,064,000 - -

JUMLAH 2,830,320,000 1,140,090,200 244,481,100 1,620,647,300

DEFIK GUNAWAN,ST AHMAD FAUZI,ST

NO

TAHAP SEKARANG

Page 89: Rpd 2014 Mp3ki - Penguatan

PNPM - Mandiri Perdesaan Pola Khusus MP3KI Form.36.

RENCANA PENGGUNAAN DANAMP3KI PENGUATAN

RPD KE : 2 D Kecamatan : Banjarwangi Kabupaten : Garut

Jumlah BLM : Rp 2,830,320,000

NO URAIAN

VOLUME

SISA

a b c d e = c + d f = b - e g h i = d * h

I RABAT BETON (BANJARWANGI-BOJONG-JAYABAKTI)A BAHAN

1 Semen 50 kg 2,890 570 570 2,320 Zak 70,000 - 2 Pasir beton 258 258 258.00 - m³ 310,000 - 3 Pasir urug 288 84 84.2 203.8 m³ 100,000 - 4 Batu split 2/3 439 255 255.0 184.0 m³ 270,000 - 5 Kayu u/bekisting 6 - - 6 m³ 600,000 - 6 Paku 52 - - 52 m³ 12,000 - 7 Plastik Cor (lebar 1,5cm) 5,078 500 500 4,578 m2 2,500 - 8 Aspal Pen 60/70, 155 Kg 5 5 5 - drum 1,700,000 -

SUB TOTAL ( I.A ) - B A L A T

1 Biaya Transparansi : 2 a. Papan Proyek 100 x 120 cm 1 - - 1 Ls 100,000 - 3 b. Papan Informasi 100 x 180 cm 1 1 1 - Ls 120,000 - 4 c. Prasasti 60 x 40 cm 1 - - 1 Ls 450,000 - 5 c. Spanduk/umbul umbul 3 3 3 - Ls 120,000 - 6 d. Kamera Digital 1 1 1 - hari 2,000,000 - 7 Concrete Mixer 52 - - 52 Ls 350,000 - 8 Mobilisasi / Demob 1 - - 1 hari 500,000 - 9 Gor. Buis Beton 30 cm 8 - - 8 hari 80,000 - 10 Sekop 2 - - 2 Ls 70,000 - 11 Ember 100 - - 100 buah 8,000 - 12 Arco/dolag 3 - - 3 buah 250,000 - 13 Benang Kasur 4 - - 4 buah 5,000 -

SUB TOTAL ( I.B ) - C UPAH

1 Pekerja Konstruksi 1,300 - - 1,300 HOK 24,000 - 2 Tukang 330 - - 330 HOK 33,000 -

SUB TOTAL ( I.C ) - JUMLAH SUB TOTAL I -

II TPT (BANJARWANGI-BOJONG-JAYABAKTI)A BAHAN

1 Semen 50 kg 474 370 370 104 Zak 70,000 - 2 Pasir Pasang 95 85 85 10 m³ 160,000 - 3 Batu Belah 188 177 177 11 m³ 120,000 -

SUB TOTAL ( II.A ) - B ALAT

1 Ember 45 45 45 - buah 8,000 - 2 Cat Tembok 5 - - 5 kg 30,000 - 3 Pralon 1/2 inch 4 3 3 1 btg 20,000 - 4 Kuas 1/2 inch 2 - - 2 bh 20,000 - 5 Bambu 6 6 6 - btg 8,000 - 6 Benang kasur 4 4 4 - buah 5,000 -

SUB TOTAL ( II.B ) - C UPAH

1 Pekerja Konstruksi 311 256 256 55 HOK 24,000 - 2 Tukang 157 104 104 53 HOK 33,000 -

SUB TOTAL ( II.C ) - JUMLAH SUB TOTAL II -

UNIT / SATUA

N

HARGA SATUAN

(Rp)

JUMLAH (Rp)

KEBUTUHAN PENGAJUAN TAHAP LALU

PENGAJUAN SAAT INI

JUMLAH S.D SAAT

INI

Page 90: Rpd 2014 Mp3ki - Penguatan

NO URAIAN

VOLUME

SISA

a b c d e = c + d f = b - e g h i = d * h

UNIT / SATUA

N

HARGA SATUAN

(Rp)

JUMLAH (Rp)

KEBUTUHAN PENGAJUAN TAHAP LALU

PENGAJUAN SAAT INI

JUMLAH S.D SAAT

INI

III BRONJONGA BAHAN

1 Batu Belah 132 90 90 42 M3 120,000 - 2 Bronjong Dia. (2X1X0,5) 110 110 110 - Bh 135,000 -

SUB TOTAL ( III.A ) - B ALAT

1 Benang 2 2 2 - roll 5,000 - 2 Bambu 30 30 30 - btg 8,000 -

SUB TOTAL ( III.B ) - C UPAH

1 Pekerja Konstruksi 134 - - 134 HOK 24,000 - 2 Tukang 27 - - 27 HOK 33,000 -

SUB TOTAL ( III.C ) - JUMLAH SUB TOTAL III -

JUMLAH TOTAL A -

I RABAT BETON (BANJARWANGI-TALAGASARI)A BAHAN

1 Semen 50 kg 2,638 515 515 2,123 Zak 69,500 - 2 Pasir beton 236 230 229.5 6.5 m³ 315,000 - 3 Pasir urug 263 124 124.481 138.519 m³ 100,000 - 4 Batu split 2/3 400 170 169.9 230.1 m³ 265,000 - 5 Kayu u/bekisting 6 4 4 2 m³ 600,000 - 6 Paku 47 19 18.5 28.5 m³ 12,000 - 7 Plastik Cor (lebar 1,5cm) 4,628 500 500 4,128 m2 2,500 - 8 Aspal Pen 60/70, 155 Kg 2 - - 2 drum 1,700,000 -

SUB TOTAL ( I.A ) - B A L A T

1 Biaya Transparansi : 2 a. Papan Proyek 100 x 120 cm 1 1 1 - Ls 100,000 - 3 b. Papan Informasi 100 x 180 cm 1 1 1 - Ls 120,000 - 4 c. Prasasti 60 x 40 cm 1 - - 1 Ls 450,000 - 5 d. Spanduk/umbul2 1 1 1 - Ls 120,000 - 6 Concrete Mixer 47 - - 47 hari 350,000 - 7 Mobilisasi / Demob 1 1 0.5 0.5 Ls 500,000 - 9 Sewa Bak Mobil 45 32 32 13 hari 250,000 - 10 Meteran 5 M 2 2 2 - buah 20,000 - 11 Sekop 2 2 2 - buah 70,000 - 12 Ember 100 100 100 - buah 8,000 - 13 Arco/dolag 2 2 2 - buah 250,000 - 14 Benang Kasur 4 - - 4 Roll 5,000 -

SUB TOTAL ( I.B ) - C UPAH

1 Pekerja Konstruksi 1,441 - - 1,441 HOK 24,000 - 2 Tukang 301 - - 301 HOK 33,000 -

SUB TOTAL ( I.C ) - JUMLAH SUB TOTAL I -

II TPT (BANJARWANGI-TALAGASARI)A BAHAN

1 Semen 50 kg 121 121 121 - Zak 69,500 - 2 Pasir Pasang 24 24 24 - m³ 160,000 - 3 Batu Belah 47 47 47 - m³ 120,000 -

SUB TOTAL ( II.A ) - B ALAT

1 Ember 20 20 20 - bh 8,000 - 2 Cat Tembok 4 4 4 - bh 30,000 - 3 Benang kasur 1 1 1 - btg 5,000 -

SUB TOTAL ( II.B ) -

Page 91: Rpd 2014 Mp3ki - Penguatan

NO URAIAN

VOLUME

SISA

a b c d e = c + d f = b - e g h i = d * h

UNIT / SATUA

N

HARGA SATUAN

(Rp)

JUMLAH (Rp)

KEBUTUHAN PENGAJUAN TAHAP LALU

PENGAJUAN SAAT INI

JUMLAH S.D SAAT

INI

C UPAH1 Pekerja Konstruksi 94 94 94 - HOK 24,000 - 2 Tukang 45 45 45 - HOK 33,000 -

SUB TOTAL ( II.C ) - JUMLAH SUB TOTAL II -

III GG Plat (BANJARWANGI-TALAGASARI)A BAHAN

1 Semen 50 kg 17 17 17 - Zak 69,500 - 2 Batu Belah 5 5 5 - m³ 120,000 - 3 Pasir Pasang 2 2 2 - m³ 160,000 - 4 Pasir beton 1 1 1 - m³ 315,000 - 5 Batu Pecah 2/3 Cm 1 1 1 - m³ 265,000 - 6 Kayu u/bekisting 1 1 1 - m³ 600,000 - 7 Kawat beton 1 1 1 - kg 16,000 - 8 Paku 1 1 1 - kg 12,000 - 9 Besi D 10 14 14 14 - btg 47,000 -

SUB TOTAL ( III.A ) - B A L A T

1 Benang 1 1 1 - Roll 5,000 - 2 Ember 6 6 6 - buah 8,000 -

SUB TOTAL ( III.B ) - C UPAH

1 Pekerja Konstruksi 18 18 18 - HOK 24,000 - 2 Tukang 11 11 11 - HOK 33,000 -

SUB TOTAL ( III.C ) - JUMLAH SUB TOTAL III -

JUMLAH TOTAL B -

I RABAT BETON (KADONGDONG-WANGUNJAYA)A BAHAN

1 Semen 50 kg 1,008 - - 1,008 Zak 69,500 - 2 Pasir beton 90 90 90 - m³ 315,000 - 3 Pasir urug 101 - - 101 m³ 100,000 - 4 Batu split 2/3 153 6 6 147 m³ 265,000 - 5 Kayu u/bekisting 2 1 0.5 2 m³ 600,000 - 6 Paku 18 2 2.0 16 m³ 12,000 - 7 Plastik Cor (lebar 1,5cm) 1,828.52 - - 1,828.52 m2 2,500 - 8 Aspal Pen 60/70, 155 Kg 2 2 2 - drum 1,700,000 -

SUB TOTAL ( I.A ) - B A L A T

1 Biaya Transparansi : 2 a. Papan Proyek 100 x 120 cm 1 1 1 - Ls 100,000 - 3 b. Papan Informasi 100 x 180 cm 1 1 1 - Ls 120,000 - 4 c. Prasasti 60 x 40 cm 1 - - 1 Ls 450,000 - 5 d. Spanduk/umbul2 2 2 2 - Ls 120,000 - 6 Concrete Mixer 18 - - 18 hari 350,000 - 7 Mobilisasi / Demob 1 - - 1 Ls 500,000 - 8 Sekop 2 2 2 - hari 70,000 - 9 Ember 90 - - 90 hari 8,000 - 10 Arco/dolag 2 2 2 - Ls 250,000 - 11 Sapu Lidi 2 - - 2 buah 6,000 - 12 Benang Kasur 5 2 2 3 buah 5,000 -

SUB TOTAL ( I.B ) - C UPAH

1 Pekerja Konstruksi 398 - - 398 HOK 24,000 - 2 Tukang 115 - - 115 HOK 33,000 -

SUB TOTAL ( I.C ) - JUMLAH SUB TOTAL I -

Page 92: Rpd 2014 Mp3ki - Penguatan

NO URAIAN

VOLUME

SISA

a b c d e = c + d f = b - e g h i = d * h

UNIT / SATUA

N

HARGA SATUAN

(Rp)

JUMLAH (Rp)

KEBUTUHAN PENGAJUAN TAHAP LALU

PENGAJUAN SAAT INI

JUMLAH S.D SAAT

INI

II TPT (KADONGDONG-WANGUNJAYA)A BAHAN

1 Semen 50 kg 472 161 161 311 Zak 69,500 - 2 Pasir Pasang 95 64 64 31 m³ 160,000 - 3 Batu Belah 186 153 153 33 m³ 120,000 -

SUB TOTAL ( II.A ) - B ALAT

1 Ember 30 - - 30 buah 8,000 - 2 Cat Tembok 6 - - 6 kg 30,000 - 3 Pralon 1/2 inch 2 2 2 - buah 24,000 - 4 Bambu 10 - - 10 btg 8,000 - 5 Benang kasur 3 - - 3 buah 5,000 -

SUB TOTAL ( II.B ) - C UPAH

1 Pekerja Konstruksi 344 - - 344 HOK 24,000 - 2 Tukang 165 - - 165 HOK 33,000 -

SUB TOTAL ( II.C ) - JUMLAH SUB TOTAL II -

III JEMBATAN BAJAA BAHAN

1 bouwplank 1 - - 1 Ls 1,200,000 - 2 Besi WF 500.200 6,592 6,592 6,592 - kg 16,700 - 3 Besi WF 200.100 379 379 379 - kg 16,700 - 4 Besi L.100.100.10 1,775 1,775 1,775 - kg 16,700 - 5 Besi L.70.70.7 245 245 245 - kg 16,700 - 6 Besi L.60.60.6 590 590 590 - kg 16,700 - 7 Baud 1/2" x 4 cm 154 154 154 - buah 8,000 - 8 Baud 5/8" x 6 cm 184 184 184 - buah 10,000 - 9 Lantai Kayu 8/20 6 - - 6 m3 3,000,000 - 10 Baut kokot 5/8' x 25 cm 192 192 192 - buah 18,000 - 11 Baut kokot 5/8' x 16 cm 736 736 736 - buah 23,000 - 12 Plat sambungan gelagar utama A 78 78 78 - kg 16,700 - 13 Plat sambungan tipe B 20 20 20 - kg 16,700 - 14 Plat sambungan tipe C 37 37 37 - kg 16,700 - 15 Baut sambungan gelagar utama 384 384 384 - buah 24,000 - 16 Plat Klem Lantai 736 736 736 - buah 15,000 - 17 Karet Peredam Lantai 64 64 64 - m 10,000 - 18 Elastomer 8 8 8 - buah 250,000 - 19 Kayu Bekisting 6 6 6 - m3 600,000 - 20 Paku 15 8 8 7 kg 12,000 - 21 Besi beton polos 1,069 974 974 95 kg 7,000 - 22 Kawat beton 24 24 24 - kg 16,000 - 23 Semen 529 529 529 - zak 69,500 - 24 Pasir beton 5 5 5 - m3 315,000 - 25 Split 5 5 5 - m3 265,000 - 26 Batu Belah 162 - - 162 m3 120,000 - 27 Pabrikasi Ereksion 10,650 3,650 3,650 7,000 kg 3,000 - 28 Cat tembok 12 - - 12 kg 30,000 - 29 Cat finishing besi 1 - - 1 ls 2,000,000 - 30 Pasir pasang 80 24 24 56 m3 160,000 -

SUB TOTAL ( III.A ) - B ALAT

1 Papan Kegiatan 1 1 1 - Unit 120,000 - 2 Cangkul 1 1 1 - Buah 50,000 - 3 Linggis 1 1 1 - Buah 25,000 - 4 Sekop 1 1 1 - Buah 70,000 - 5 Bambu 50 50 50 - Buah 8,000 -

Page 93: Rpd 2014 Mp3ki - Penguatan

NO URAIAN

VOLUME

SISA

a b c d e = c + d f = b - e g h i = d * h

UNIT / SATUA

N

HARGA SATUAN

(Rp)

JUMLAH (Rp)

KEBUTUHAN PENGAJUAN TAHAP LALU

PENGAJUAN SAAT INI

JUMLAH S.D SAAT

INI

6 Benang nilon 2 2 2 - Buah 5,000 - 7 Selang waterpass 15 15 15 - m 1,500 - 8 Ember Aduk Kecil 40 40 40 - Buah 8,000 - 9 Sewa molen 3 - - 3 Hari 350,000 - 10 Mobilisasi Molen 1 - - 1 Ls 500,000 - 11 Kuas 3 inch 4 - - 4 bh 10,000 - 12 Kunci besi 1 - - 1 Buah 10,000 - 13 Karung Tanggul 125 50 50 75 Buah 1,000 - 14 Sewa Pompa Sedot 6 - - 6 Hari 50,000 - 15 Prasasti 1 - - 1 Buah 450,000 -

SUB TOTAL ( III.B ) - C UPAH

1 Pekerja 319 141 141 178 HOK 24,000 - 2 Tukang 105 - - 105 HOK 33,000 -

SUB TOTAL ( III.C ) - JUMLAH SUB TOTAL III -

JUMLAH TOTAL C -

I PENGASPALAN (TALAGAJAYA-TANJUNGJAYA)A BAHAN

1 Batu Pecah 3/5 Cm 130 112 18 130 - m2 235,000 4,230,000 2 Batu Pecah 2/3 Cm 137 53 84 137 - m3 255,000 21,420,000 3 Batu Pecah 1/2 Cm 69 48 21 69 - m3 295,000 6,195,000 4 Pasir Aspal / Abu batu 37 37 37 - m3 245,000 - 5 Aspal Pen 60/70, 155 Kg 139 139 139 - Drum 1,700,000 - 6 Aspal Emulsi @ 200 kg 16 16 16 - Drum 1,850,000 - 7 Ban Bekas Mobil 25 25 25 - Buah 20,000 - 8 Kayu bakar 2 2 2 - m3 100,000 -

SUB TOTAL ( I.A ) 31,845,000 B A L A T

1 Papan proyek ( Uk.1,20 cm x 1.00 cm 1 1 1 - Unit 100,000 - 2 Papan Informasi ( Uk.120 cm x 100 c 1 1 1 - Unit 120,000 - 3 Prasasti ( Uk. 60 cm x 40 cm ) 1 - - 1 Unit 450,000 - 4 Spanduk/umbul2 2 2 2 - paket 200,000 - 5 Meteran 7,5 m 2 2 2 - bh 20,000 - 6 Sapu Lidi 4 - 4 4 - bh 12,125 48,500 7 meteran 50 m 1 1 1 - bh 60,000 - 8 Kamera Dokumentasi 1 1 1 - paket 1,500,000 - 9 Mesin Gilas 12 - 12 12 - Hari 800,000 9,600,000 10 Mob./Demob. Mesin Gilas 1 1 0.5 1.0 - Ls 2,500,000 1,250,000

SUB TOTAL ( I.B ) 10,898,500 C UPAH

1 Pekerja Konstruksi (Aspal ) 281 281 281 - HOK 30,000 - 2 Pekerja Galian Saluran 220 220 220 - HOK 24,000 - 3 Tukang ( Aspal) 42 42 42 - HOK 45,000 -

SUB TOTAL ( I.C ) - JUMLAH SUB TOTAL I 42,743,500

II TPT (TALAGAJAYA-TANJUNGJAYA)

A BAHAN1 Semen 50 kg 288 15 95 110 178 Zak 69,500 6,602,500 2 Pasir Pasang 58 12 32.0 44 14 m³ 150,000 4,800,000 3 Batu Belah 115 28 54.0 81.5 33.5 m³ 120,000 6,480,000

SUB TOTAL ( II.A ) 17,882,500 B ALAT

1 Bambu 18 - 18 18 - btg 8,000 144,000 2 Benang Kasur 3 - 3 3 - bh 5,000 15,000 3 Pralon 1/2 inch 4 - 4 4 - btg 20,000 80,000 4 Ember 20 - 20 20 - bh 8,000 160,000

Page 94: Rpd 2014 Mp3ki - Penguatan

NO URAIAN

VOLUME

SISA

a b c d e = c + d f = b - e g h i = d * h

UNIT / SATUA

N

HARGA SATUAN

(Rp)

JUMLAH (Rp)

KEBUTUHAN PENGAJUAN TAHAP LALU

PENGAJUAN SAAT INI

JUMLAH S.D SAAT

INI

5 Cat Tembok 6 - - 6 kg 30,000 - SUB TOTAL ( II.B ) 399,000

C UPAH1 Pekerja Konstruksi 232 200 200 32 HOK 24,000 - 2 Tukang 93 88 88 5 HOK 33,000 -

SUB TOTAL ( II.C ) - JUMLAH SUB TOTAL II 18,281,500

III TPT JEMBATAN (TALAGAJAYA-TANJUNGJAYA)A BAHAN

1 Semen 50 kg 197 145 25 170 27 Zak 69,500 1,737,500 2 Pasir Pasang 40 30 30 10 m³ 150,000 - 3 Batu Belah 80 74 3 77 3 m³ 120,000 360,000 4 Besi dia 12 7 7 7 - btg 110,000 - 5 Pasir Beton 1 1 1 - m3 295,000 - 6 Kawat beton 1 1 1 - kg 16,000 -

SUB TOTAL ( III.A ) 2,097,500 B ALAT

1 Bambu 28 28 28 - btg 8,000 - 2 Benang Kasur 3 3 3 - bh 5,000 - 3 Pralon 1/2 inch 3 3 3 - btg 20,000 - 4 Ember 26 26 26 - bh 8,000 - 5 Cat Tembok 6 - 6 6 - kg 30,000 180,000

SUB TOTAL ( III.B ) 180,000 C UPAH

1 Pekerja Konstruksi 135 - 80 80 55 HOK 24,000 1,920,000 2 Tukang 61 - 45 45 16 HOK 33,000 1,485,000

SUB TOTAL ( III.C ) 3,405,000 JUMLAH SUB TOTAL III 5,682,500

IV GG PLAT BETON (TALAGAJAYA-TANJUNGJAYA)A BAHAN

1 Semen 90 - 70 70 20 zak 69,500 4,865,000 2 Batu belah 26 - 20 20 6 M3 120,000 2,400,000 3 Pasir Pasang 8 - 6 6 2 m3 150,000 900,000 4 Pasir Beton 2 - 2 2 - m3 295,000 590,000 5 Batu Pecah 2-3 cm 4 - 2 2 2 m3 255,000 510,000 6 Kayu Begisting 1.2 - 1.2 1.2 - m3 600,000 720,000 7 Kawat Beton 4 - 4 4 - Kg 16,000 64,000 8 Paku 4 - 4 4 - kg 12,000 48,000 9 Besi dia. 10 64 - 64 64 - Buah 47,000 3,008,000

SUB TOTAL ( IV.A ) 13,105,000 B ALAT

1 Ember 25 - 25 25 - buah 8,000 200,000 2 Benang Kasur 3 - 3 3 - roll 5,000 15,000 3 Bambu 17 - 17 17 - Btg 8,000 136,000

SUB TOTAL ( IV.B ) 351,000 C UPAH

1 Pekerja Konstruksi 98 - 50 50 48 HOK 24,000 1,200,000 2 Tukang 58 - 35 35 23 HOK 33,000 1,155,000

SUB TOTAL ( IV.C ) 2,355,000 JUMLAH SUB TOTAL IV 15,811,000

JUMLAH TOTAL D 82,518,500

I RABAT BETON (WANGUNJAYA-MULYAJAYA)

A BAHAN1 Semen 50 kg 1,241 500 500 741 Zak 69,500 - 2 Pasir beton 111 111 111 - m³ 315,000 - 3 Pasir urug 124 124 124.0 - m³ 100,000 -

Page 95: Rpd 2014 Mp3ki - Penguatan

NO URAIAN

VOLUME

SISA

a b c d e = c + d f = b - e g h i = d * h

UNIT / SATUA

N

HARGA SATUAN

(Rp)

JUMLAH (Rp)

KEBUTUHAN PENGAJUAN TAHAP LALU

PENGAJUAN SAAT INI

JUMLAH S.D SAAT

INI

4 Batu split 2/3 188 188 188.0 - m³ 265,000 - 5 Kayu u/bekisting 3 3 3 - m³ 600,000 - 6 Paku 22 22 22 - m³ 12,000 - 7 Plastik Cor (lebar 1,5cm) 2,171 - - 2,171 m2 2,500 - 8 Aspal Pen 60/70, 155 Kg 1 1 1 - drum 1,700,000 -

SUB TOTAL ( I.A ) - B A L A T

1 Biaya Transparansi : 2 a. Papan Proyek 100 x 120 cm 1 1 1 - Ls 100,000 - 3 b. Papan Informasi 100 x 180 cm 1 1 1 - Ls 120,000 - 4 c. Prasasti 60 x 40 cm 1 - - 1 Ls 450,000 - 5 d. Spanduk Program 2 2 2 - Ls 120,000 - 6 Concrete Mixer 22 - - 22 hari 350,000 - 7 Mobilisasi / Demob 1 - - 1 Ls 500,000 - 8 Meteran 5 M 1 1 1 - buah 10,000 - 9 Pipa Railing/Pilar Jembatan 8 - - 8 btg 250,000 - 10 Sekop 2 2 2 - buah 70,000 - 11 Ember 77 - - 77 buah 8,000 - 12 Arco/dolag 2 2 2 - buah 250,000 - 13 Benang Kasur 4 - - 4 Roll 5,000 -

SUB TOTAL ( I.B ) - C UPAH

1 Pekerja Konstruksi 544 - - 544 HOK 24,000 - 2 Tukang 142 - - 142 HOK 33,000 -

SUB TOTAL ( I.C ) - JUMLAH SUB TOTAL I -

II TPT (WANGUNJAYA-MULYAJAYA)A BAHAN

1 Semen 50 kg 1,480 950.0 950 530 Zak 69,500 - 2 Pasir Pasang 297 221.5 221.5 75.5 m³ 160,000 - 3 Batu Belah 593 483.5 483.50 110 m³ 120,000 -

SUB TOTAL ( II.A ) - B ALAT

1 Ember 50 50 50 - buah 8,000 - 2 Cat Tembok 4 4 4 - kg 30,000 - 3 Pipa pralon 5 5 5 - btg 24,000 - 4 Bambu 20 20 20 - bh 8,000 - 5 Benang kasur 3 3 3 - btg 5,000 -

SUB TOTAL ( II.B ) - C UPAH

1 Pekerja Konstruksi 957 417 417 540 HOK 24,000 - 2 Tukang 411 - - 411 HOK 33,000 -

SUB TOTAL ( II.C ) - JUMLAH SUB TOTAL II -

III BRONJONG

A BAHAN1 Batu Belah 231 231 231 - M3 120,000 - 2 Bronjong Dia. (2X1X0,5) 192 192 192 - Bh 135,000 -

SUB TOTAL ( III.A ) - B ALAT

1 Benang 2 2 2 - roll 5,000 - 2 Bambu 20 20 20 - btg 8,000 -

SUB TOTAL ( III.B ) - C UPAH

1 Pekerja Konstruksi 256 256 256 - HOK 24,000 - 2 Tukang 52 52 52 - HOK 33,000 -

SUB TOTAL ( III.C ) -

Page 96: Rpd 2014 Mp3ki - Penguatan

NO URAIAN

VOLUME

SISA

a b c d e = c + d f = b - e g h i = d * h

UNIT / SATUA

N

HARGA SATUAN

(Rp)

JUMLAH (Rp)

KEBUTUHAN PENGAJUAN TAHAP LALU

PENGAJUAN SAAT INI

JUMLAH S.D SAAT

INI

JUMLAH SUB TOTAL III -

IV GG PLAT BETONA BAHAN

1 Semen 34 - - 34 zak 69,500 - 2 Batu belah 10 - - 10 M3 120,000 - 3 Pasir Pasang 4 - - 4 M3 160,000 - 4 Pasir Beton 2 - - 2 M3 315,000 - 5 Batu Pecah 2-3 cm 2 - - 2 M3 265,000 - 6 Kayu Begisting 2 - - 2 M3 600,000 - 7 Kawat Beton 2 - - 2 Kg 16,000 - 8 Paku 2 - - 2 Kg 12,000 - 9 Besi dia. 10 28 - - 28 Btg 47,000 -

SUB TOTAL ( IV.A ) - B ALAT

1 Benang 3 - - 3 roll 5,000 - 2 Ember 8 - - 8 buah 8,000 -

SUB TOTAL ( IV.B ) - C UPAH

1 Pekerja Konstruksi 36 - - 36 HOK 24,000 - 2 Tukang 22 - - 22 HOK 33,000 -

SUB TOTAL ( IV.C ) - JUMLAH SUB TOTAL IV -

JUMLAH TOTAL E -

JUMLAH TOTAL 82,518,500

Terbilang (dengan huruf) : #VALUE!

Banjarwangi, 8 November 2014

Disetujui Oleh : Dibuat Oleh :Ketua TPK Bendahara TPK

Kecamatan Banjarwangi Kecamatan Banjarwangi

Endjang Komara Ahmad Hayun,S.Pd.IMengetahui :

FK / FT Kecamatan Banjarwangi PjOK Kecamatan Banjarwangi

MIFTAH FARID Ujang Suryana.S.SosFasilitator Kecamatan Fasilitator Teknik NIP. 19671201 198703 1 004

Sebagai Catatan :

TAHAP ALOKASI BOP TAHAP LALU KUMULATIF

1 DANA 40% TAHAP 1 1,132,128,000 1,140,090,200 - 1,140,090,200

2 DANA 40% TAHAP 2 1,132,128,000 480,557,100 82,518,500 563,075,600

3 DANA 20% 566,064,000 - -

JUMLAH 2,830,320,000 1,140,090,200 82,518,500 1,703,165,800

DEFIK GUNAWAN,ST AHMAD FAUZI,ST

NO

TAHAP SEKARANG

Page 97: Rpd 2014 Mp3ki - Penguatan

Page 97

PNPM - Mandiri Perdesaan Pola Khusus MP3KI Form.36.

RENCANA PENGGUNAAN DANAMP3KI PENGUATAN

RPD KE : 2 E Kecamatan : Banjarwangi Kabupaten : Garut

Jumlah BLM : Rp 2,830,320,000

NO URAIAN

VOLUME

SISA

a b c d e = c + d f = b - e g h i = d * h

I RABAT BETON (BANJARWANGI-BOJONG-JAYABAKTI)A BAHAN

1 Semen 50 kg 2,890 570 570 2,320 Zak 70,000 - 2 Pasir beton 258 258 258.00 - m³ 310,000 - 3 Pasir urug 288 84 84.2 203.8 m³ 100,000 - 4 Batu split 2/3 439 255 255.0 184.0 m³ 270,000 - 5 Kayu u/bekisting 6 - - 6 m³ 600,000 - 6 Paku 52 - - 52 m³ 12,000 - 7 Plastik Cor (lebar 1,5cm) 5,078 500 2,400 2,900 2,178 m2 2,500 6,000,000 8 Aspal Pen 60/70, 155 Kg 5 5 5 - drum 1,700,000 -

SUB TOTAL ( I.A ) 6,000,000 B A L A T

1 Biaya Transparansi : 2 a. Papan Proyek 100 x 120 cm 1 - - 1 Ls 100,000 - 3 b. Papan Informasi 100 x 180 cm 1 1 1 - Ls 120,000 - 4 c. Prasasti 60 x 40 cm 1 - - 1 Ls 450,000 - 5 c. Spanduk/umbul umbul 3 3 3 - Ls 120,000 - 6 d. Kamera Digital 1 1 1 - hari 2,000,000 - 7 Concrete Mixer 52 - - 52 Ls 350,000 - 8 Mobilisasi / Demob 1 - - 1 hari 500,000 - 9 Gor. Buis Beton 30 cm 8 - - 8 hari 80,000 - 10 Sekop 2 - - 2 Ls 70,000 - 11 Ember 100 - - 100 buah 8,000 - 12 Arco/dolag 3 - - 3 buah 250,000 - 13 Benang Kasur 4 - - 4 buah 5,000 -

SUB TOTAL ( I.B ) - C UPAH

1 Pekerja Konstruksi 1,300 - - 1,300 HOK 24,000 - 2 Tukang 330 - - 330 HOK 33,000 -

SUB TOTAL ( I.C ) - JUMLAH SUB TOTAL I 6,000,000

II TPT (BANJARWANGI-BOJONG-JAYABAKTI)A BAHAN

1 Semen 50 kg 475 370 370 105 Zak 70,000 - 2 Pasir Pasang 95 85 85 10 m³ 160,000 - 3 Batu Belah 190 177 177 13 m³ 120,000 -

SUB TOTAL ( II.A ) - B ALAT

1 Ember 45 45 45 - buah 8,000 - 2 Cat Tembok 5.4 - 5.4 5.4 - kg 30,000 162,000 3 Pralon 1/2 inch 3 3 3 - btg 20,000 - 4 Kuas 1/2 inch 2 - 2 2 - bh 20,000 40,000 5 Bambu 10 6 4 10 - btg 8,000 32,000 6 Benang kasur 4 4 4 - buah 5,000 -

SUB TOTAL ( II.B ) 234,000 C UPAH

1 Pekerja Konstruksi 307 256 51 307 - HOK 24,000 1,224,000 2 Tukang 151 104 47 151 - HOK 33,000 1,551,000

SUB TOTAL ( II.C ) 2,775,000 JUMLAH SUB TOTAL II 3,009,000

UNIT / SATUA

N

HARGA SATUAN

(Rp)

JUMLAH (Rp)

KEBUTUHAN PENGAJUAN TAHAP LALU

PENGAJUAN SAAT INI

JUMLAH S.D SAAT

INI

Page 98: Rpd 2014 Mp3ki - Penguatan

Page 98

NO URAIAN

VOLUME

SISA

a b c d e = c + d f = b - e g h i = d * h

UNIT / SATUA

N

HARGA SATUAN

(Rp)

JUMLAH (Rp)

KEBUTUHAN PENGAJUAN TAHAP LALU

PENGAJUAN SAAT INI

JUMLAH S.D SAAT

INI

III BRONJONGA BAHAN

1 Batu Belah 132 90 90 42 M3 120,000 - 2 Bronjong Dia. (2X1X0,5) 110 110 110 - Bh 135,000 -

SUB TOTAL ( III.A ) - B ALAT

1 Benang 2 2 2 - roll 5,000 - 2 Bambu 30 30 30 - btg 8,000 -

SUB TOTAL ( III.B ) - C UPAH

1 Pekerja Konstruksi 134 - - 134 HOK 24,000 - 2 Tukang 27 - - 27 HOK 33,000 -

SUB TOTAL ( III.C ) - JUMLAH SUB TOTAL III -

JUMLAH TOTAL A 9,009,000

I RABAT BETON (BANJARWANGI-TALAGASARI)A BAHAN

1 Semen 50 kg 2,638 515 479 994 1,644 Zak 69,500 33,290,500 2 Pasir beton 236 230 229.5 6.5 m³ 315,000 - 3 Pasir urug 263 124 124.481 138.519 m³ 100,000 - 4 Batu split 2/3 400 170 125.4 295.3 104.7 m³ 265,000 33,231,000 5 Kayu u/bekisting 6 4 4 2 m³ 600,000 - 6 Paku 47 19 18.5 28.5 m³ 12,000 - 7 Plastik Cor (lebar 1,5cm) 4,628 500 500 4,128 m2 2,500 - 8 Aspal Pen 60/70, 155 Kg 2 - - 2 drum 1,700,000 -

SUB TOTAL ( I.A ) 66,521,500 B A L A T

1 Biaya Transparansi : 2 a. Papan Proyek 100 x 120 cm 1 1 1 - Ls 100,000 - 3 b. Papan Informasi 100 x 180 cm 1 1 1 - Ls 120,000 - 4 c. Prasasti 60 x 40 cm 1 - - 1 Ls 450,000 - 5 d. Spanduk/umbul2 1 1 1 - Ls 120,000 - 6 Concrete Mixer 47 - 8 8 39 hari 350,000 2,800,000 7 Mobilisasi / Demob 1 1 0.5 0.5 Ls 500,000 - 9 Sewa Bak Mobil 45 32 32 13 hari 250,000 - 10 Meteran 5 M 2 2 2 - buah 20,000 - 11 Sekop 2 2 2 - buah 70,000 - 12 Ember 100 100 100 - buah 8,000 - 13 Arco/dolag 2 2 2 - buah 250,000 - 14 Benang Kasur 4 - 4 4 - Roll 5,000 20,000

SUB TOTAL ( I.B ) 2,820,000 C UPAH

1 Pekerja Konstruksi 1,441 - 190 190 1,251 HOK 24,000 4,560,000 2 Tukang 301 - 40 40 261 HOK 33,000 1,320,000

SUB TOTAL ( I.C ) 5,880,000 JUMLAH SUB TOTAL I 75,221,500

II TPT (BANJARWANGI-TALAGASARI)A BAHAN

1 Semen 50 kg 121 121 121 - Zak 69,500 - 2 Pasir Pasang 24 24 24 - m³ 160,000 - 3 Batu Belah 47 47 47 - m³ 120,000 -

SUB TOTAL ( II.A ) - B ALAT

1 Ember 20 20 20 - bh 8,000 - 2 Cat Tembok 4 4 4 - bh 30,000 - 3 Benang kasur 1 1 1 - btg 5,000 -

SUB TOTAL ( II.B ) -

Page 99: Rpd 2014 Mp3ki - Penguatan

Page 99

NO URAIAN

VOLUME

SISA

a b c d e = c + d f = b - e g h i = d * h

UNIT / SATUA

N

HARGA SATUAN

(Rp)

JUMLAH (Rp)

KEBUTUHAN PENGAJUAN TAHAP LALU

PENGAJUAN SAAT INI

JUMLAH S.D SAAT

INI

C UPAH1 Pekerja Konstruksi 94 94 94 - HOK 24,000 - 2 Tukang 45 45 45 - HOK 33,000 -

SUB TOTAL ( II.C ) - JUMLAH SUB TOTAL II -

III GG Plat (BANJARWANGI-TALAGASARI)A BAHAN

1 Semen 50 kg 17 17 17 - Zak 69,500 - 2 Batu Belah 5 5 5 - m³ 120,000 - 3 Pasir Pasang 2 2 2 - m³ 160,000 - 4 Pasir beton 1 1 1 - m³ 315,000 - 5 Batu Pecah 2/3 Cm 1 1 1 - m³ 265,000 - 6 Kayu u/bekisting 1 1 1 - m³ 600,000 - 7 Kawat beton 1 1 1 - kg 16,000 - 8 Paku 1 1 1 - kg 12,000 - 9 Besi D 10 14 14 14 - btg 47,000 -

SUB TOTAL ( III.A ) - B A L A T

1 Benang 1 1 1 - Roll 5,000 - 2 Ember 6 6 6 - buah 8,000 -

SUB TOTAL ( III.B ) - C UPAH

1 Pekerja Konstruksi 18 18 18 - HOK 24,000 - 2 Tukang 11 11 11 - HOK 33,000 -

SUB TOTAL ( III.C ) - JUMLAH SUB TOTAL III -

JUMLAH TOTAL B 75,221,500

I RABAT BETON (KADONGDONG-WANGUNJAYA)A BAHAN

1 Semen 50 kg 1,008 - - 1,008 Zak 69,500 - 2 Pasir beton 90 90 90 - m³ 315,000 - 3 Pasir urug 101 - 30.5 30.5 70.5 m³ 100,000 3,050,000 4 Batu split 2/3 153 6 60.0 66 87 m³ 265,000 15,900,000 5 Kayu u/bekisting 2 1 0.5 2 m³ 600,000 - 6 Paku 18 2 2.0 16 m³ 12,000 - 7 Plastik Cor (lebar 1,5cm) 1,828.52 - - 1,828.52 m2 2,500 - 8 Aspal Pen 60/70, 155 Kg 2 2 2 - drum 1,700,000 -

SUB TOTAL ( I.A ) 18,950,000 B A L A T

1 Biaya Transparansi : 2 a. Papan Proyek 100 x 120 cm 1 1 1 - Ls 100,000 - 3 b. Papan Informasi 100 x 180 cm 1 1 1 - Ls 120,000 - 4 c. Prasasti 60 x 40 cm 1 - - 1 Ls 450,000 - 5 d. Spanduk/umbul2 2 2 2 - Ls 120,000 - 6 Concrete Mixer 18 - - 18 hari 350,000 - 7 Mobilisasi / Demob 1 - - 1 Ls 500,000 - 8 Sekop 2 2 2 - hari 70,000 - 9 Ember 90 - - 90 hari 8,000 - 10 Arco/dolag 2 2 2 - Ls 250,000 - 11 Sapu Lidi 2 - - 2 buah 6,000 - 12 Benang Kasur 5 2 2 3 buah 5,000 -

SUB TOTAL ( I.B ) - C UPAH

1 Pekerja Konstruksi 398 - - 398 HOK 24,000 - 2 Tukang 115 - - 115 HOK 33,000 -

SUB TOTAL ( I.C ) - JUMLAH SUB TOTAL I 18,950,000

Page 100: Rpd 2014 Mp3ki - Penguatan

Page 100

NO URAIAN

VOLUME

SISA

a b c d e = c + d f = b - e g h i = d * h

UNIT / SATUA

N

HARGA SATUAN

(Rp)

JUMLAH (Rp)

KEBUTUHAN PENGAJUAN TAHAP LALU

PENGAJUAN SAAT INI

JUMLAH S.D SAAT

INI

II TPT (KADONGDONG-WANGUNJAYA)A BAHAN

1 Semen 50 kg 472 161 300 461 11 Zak 69,500 20,850,000 2 Pasir Pasang 95 64 20.0 84 11 m³ 160,000 3,200,000 3 Batu Belah 186 153 33 186 - m³ 120,000 3,960,000

SUB TOTAL ( II.A ) 28,010,000 B ALAT

1 Ember 30 - 30 30 - buah 8,000 240,000 2 Cat Tembok 6 - 6 6 - kg 30,000 180,000 3 Pralon 1/2 inch 2 2 2 - buah 24,000 - 4 Bambu 10 - 10 10 - btg 8,000 80,000 5 Benang kasur 3 - 3 3 - buah 5,000 15,000

SUB TOTAL ( II.B ) 515,000 C UPAH

1 Pekerja Konstruksi 344 - 220 220 124 HOK 24,000 5,280,000 2 Tukang 165 - 120 120 45 HOK 33,000 3,960,000

SUB TOTAL ( II.C ) 9,240,000 JUMLAH SUB TOTAL II 37,765,000

III JEMBATAN BAJAA BAHAN

1 bouwplank 1 - 1 1 - Ls 1,200,000 1,200,000 2 Besi WF 500.200 6,592 6,592 6,592 - kg 16,700 - 3 Besi WF 200.100 379 379 379 - kg 16,700 - 4 Besi L.100.100.10 1,775 1,775 1,775 - kg 16,700 - 5 Besi L.70.70.7 245 245 245 - kg 16,700 - 6 Besi L.60.60.6 590 590 590 - kg 16,700 - 7 Baud 1/2" x 4 cm 154 154 154 - buah 8,000 - 8 Baud 5/8" x 6 cm 184 184 184 - buah 10,000 - 9 Lantai Kayu 8/20 5.88 - 4.00 4.00 1.88 m3 3,000,000 12,000,000 10 Baut kokot 5/8' x 25 cm 192 192 192 - buah 18,000 - 11 Baut kokot 5/8' x 16 cm 736 736 736 - buah 23,000 - 12 Plat sambungan gelagar utama A 78 78 78 - kg 16,700 - 13 Plat sambungan tipe B 20 20 20 - kg 16,700 - 14 Plat sambungan tipe C 37 37 37 - kg 16,700 - 15 Baut sambungan gelagar utama 384 384 384 - buah 24,000 - 16 Plat Klem Lantai 736 736 736 - buah 15,000 - 17 Karet Peredam Lantai 64 64 64 - m 10,000 - 18 Elastomer 8 8 8 - buah 250,000 - 19 Kayu Bekisting 6 6 6 - m3 600,000 - 20 Paku 15 8 7 15 - kg 12,000 84,000 21 Besi beton polos 1,069 974 95 1,069 - kg 7,000 665,000 22 Kawat beton 24 24 24 - kg 16,000 - 23 Semen 529 529 529 - zak 69,500 - 24 Pasir beton 5 5 5 - m3 315,000 - 25 Split 5 5 5 - m3 265,000 - 26 Batu Belah 162 - 162 162 - m3 120,000 19,440,000 27 Pabrikasi Ereksion 10,650 3,650 7,000 10,650 - kg 3,000 21,000,000 28 Cat tembok 12 - 12 12 - kg 30,000 360,000 29 Cat finishing besi 1 - - 1 ls 2,000,000 - 30 Pasir pasang 80 24 56 80 - m3 160,000 8,960,000

SUB TOTAL ( III.A ) 63,709,000 B ALAT

1 Papan Kegiatan 1 1 1 - Unit 120,000 - 2 Cangkul 1 1 1 - Buah 50,000 - 3 Linggis 1 1 1 - Buah 25,000 - 4 Sekop 1 1 1 - Buah 70,000 - 5 Bambu 50 50 50 - Buah 8,000 -

Page 101: Rpd 2014 Mp3ki - Penguatan

Page 101

NO URAIAN

VOLUME

SISA

a b c d e = c + d f = b - e g h i = d * h

UNIT / SATUA

N

HARGA SATUAN

(Rp)

JUMLAH (Rp)

KEBUTUHAN PENGAJUAN TAHAP LALU

PENGAJUAN SAAT INI

JUMLAH S.D SAAT

INI

6 Benang nilon 2 2 2 - Buah 5,000 - 7 Selang waterpass 15 15 15 - m 1,500 - 8 Ember Aduk Kecil 40 40 40 - Buah 8,000 - 9 Sewa molen 3 - 3 3 - Hari 350,000 1,050,000 10 Mobilisasi Molen 1 - 1 1 - Ls 500,000 500,000 11 Kuas 3 inch 4 - 4 4 - bh 10,000 40,000 12 Kunci besi 1 - 1 1 - Buah 10,000 10,000 13 Karung Tanggul 125 50 75 125 - Buah 1,000 75,000 14 Sewa Pompa Sedot 6 - 6 6 - Hari 50,000 300,000 15 Prasasti 1 - - 1 Buah 450,000 -

SUB TOTAL ( III.B ) 1,975,000 C UPAH

1 Pekerja 319 141 155 296 23 HOK 24,000 3,720,000 2 Tukang 105 - 58 58 47 HOK 33,000 1,914,000

SUB TOTAL ( III.C ) 5,634,000 JUMLAH SUB TOTAL III 71,318,000

JUMLAH TOTAL C 128,033,000

I PENGASPALAN (TALAGAJAYA-TANJUNGJAYA)A BAHAN

1 Batu Pecah 3/5 Cm 130 130 130 - m2 235,000 - 2 Batu Pecah 2/3 Cm 137 137 137 - m3 255,000 - 3 Batu Pecah 1/2 Cm 69 69 69 - m3 295,000 - 4 Pasir Aspal / Abu batu 37 37 37 - m3 245,000 - 5 Aspal Pen 60/70, 155 Kg 139 139 139 - Drum 1,700,000 - 6 Aspal Emulsi @ 200 kg 16 16 16 - Drum 1,850,000 - 7 Ban Bekas Mobil 25 25 25 - Buah 20,000 - 8 Kayu bakar 2 2 2 - m3 100,000 -

SUB TOTAL ( I.A ) - B A L A T

1 Papan proyek ( Uk.1,20 cm x 1.00 cm 1 1 1 - Unit 100,000 - 2 Papan Informasi ( Uk.120 cm x 100 c 1 1 1 - Unit 120,000 - 3 Prasasti ( Uk. 60 cm x 40 cm ) 1 - - 1 Unit 450,000 - 4 Spanduk/umbul2 2 2 2 - paket 200,000 - 5 Meteran 7,5 m 2 2 2 - bh 20,000 - 6 Sapu Lidi 4 4 4 - bh 12,125 - 7 meteran 50 m 1 1 1 - bh 60,000 - 8 Kamera Dokumentasi 1 1 1 - paket 1,500,000 - 9 Mesin Gilas 12 12 12 - Hari 800,000 - 10 Mob./Demob. Mesin Gilas 1 1 1.0 - Ls 2,500,000 -

SUB TOTAL ( I.B ) - C UPAH

1 Pekerja Konstruksi (Aspal ) 281 281 281 - HOK 30,000 - 2 Pekerja Galian Saluran 220 220 220 - HOK 24,000 - 3 Tukang ( Aspal) 42 42 42 - HOK 45,000 -

SUB TOTAL ( I.C ) - JUMLAH SUB TOTAL I -

II TPT (TALAGAJAYA-TANJUNGJAYA)

A BAHAN1 Semen 50 kg 288 110 110 178 Zak 69,500 - 2 Pasir Pasang 58 44 44 14 m³ 150,000 - 3 Batu Belah 115 81.5 81.5 33.5 m³ 120,000 -

SUB TOTAL ( II.A ) - B ALAT

1 Bambu 18 18 18 - btg 8,000 - 2 Benang Kasur 3 3 3 - bh 5,000 - 3 Pralon 1/2 inch 4 4 4 - btg 20,000 - 4 Ember 20 20 20 - bh 8,000 -

Page 102: Rpd 2014 Mp3ki - Penguatan

Page 102

NO URAIAN

VOLUME

SISA

a b c d e = c + d f = b - e g h i = d * h

UNIT / SATUA

N

HARGA SATUAN

(Rp)

JUMLAH (Rp)

KEBUTUHAN PENGAJUAN TAHAP LALU

PENGAJUAN SAAT INI

JUMLAH S.D SAAT

INI

5 Cat Tembok 6 - - 6 kg 30,000 - SUB TOTAL ( II.B ) -

C UPAH1 Pekerja Konstruksi 232 200 200 32 HOK 24,000 - 2 Tukang 93 88 88 5 HOK 33,000 -

SUB TOTAL ( II.C ) - JUMLAH SUB TOTAL II -

III TPT JEMBATAN (TALAGAJAYA-TANJUNGJAYA)A BAHAN

1 Semen 50 kg 197 170 170 27 Zak 69,500 - 2 Pasir Pasang 40 30 30 10 m³ 150,000 - 3 Batu Belah 80 77 77 3 m³ 120,000 - 4 Besi dia 12 7 7 7 - btg 110,000 - 5 Pasir Beton 1 1 1 - m3 295,000 - 6 Kawat beton 1 1 1 - kg 16,000 -

SUB TOTAL ( III.A ) - B ALAT

1 Bambu 28 28 28 - btg 8,000 - 2 Benang Kasur 3 3 3 - bh 5,000 - 3 Pralon 1/2 inch 3 3 3 - btg 20,000 - 4 Ember 26 26 26 - bh 8,000 - 5 Cat Tembok 6 6 6 - kg 30,000 -

SUB TOTAL ( III.B ) - C UPAH

1 Pekerja Konstruksi 135 80 80 55 HOK 24,000 - 2 Tukang 61 45 45 16 HOK 33,000 -

SUB TOTAL ( III.C ) - JUMLAH SUB TOTAL III -

IV GG PLAT BETON (TALAGAJAYA-TANJUNGJAYA)A BAHAN

1 Semen 90 70 70 20 zak 69,500 - 2 Batu belah 26 20 20 6 M3 120,000 - 3 Pasir Pasang 8 6 6 2 m3 150,000 - 4 Pasir Beton 2 2 2 - m3 295,000 - 5 Batu Pecah 2-3 cm 4 2 2 2 m3 255,000 - 6 Kayu Begisting 1.2 1 1.2 - m3 600,000 - 7 Kawat Beton 4 4 4 - Kg 16,000 - 8 Paku 4 4 4 - kg 12,000 - 9 Besi dia. 10 64 64 64 - Buah 47,000 -

SUB TOTAL ( IV.A ) - B ALAT

1 Ember 25 25 25 - buah 8,000 - 2 Benang Kasur 3 3 3 - roll 5,000 - 3 Bambu 17 17 17 - Btg 8,000 -

SUB TOTAL ( IV.B ) - C UPAH

1 Pekerja Konstruksi 98 50 50 48 HOK 24,000 - 2 Tukang 58 35 35 23 HOK 33,000 -

SUB TOTAL ( IV.C ) - JUMLAH SUB TOTAL IV -

JUMLAH TOTAL D -

I RABAT BETON (WANGUNJAYA-MULYAJAYA)

A BAHAN1 Semen 50 kg 1,241 500 500 741 Zak 69,500 - 2 Pasir beton 111 111 111 - m³ 315,000 - 3 Pasir urug 124 124 124.0 - m³ 100,000 -

Page 103: Rpd 2014 Mp3ki - Penguatan

Page 103

NO URAIAN

VOLUME

SISA

a b c d e = c + d f = b - e g h i = d * h

UNIT / SATUA

N

HARGA SATUAN

(Rp)

JUMLAH (Rp)

KEBUTUHAN PENGAJUAN TAHAP LALU

PENGAJUAN SAAT INI

JUMLAH S.D SAAT

INI

4 Batu split 2/3 188 188 188.0 - m³ 265,000 - 5 Kayu u/bekisting 3 3 3 - m³ 600,000 - 6 Paku 22 22 22 - m³ 12,000 - 7 Plastik Cor (lebar 1,5cm) 2,171 - - 2,171 m2 2,500 - 8 Aspal Pen 60/70, 155 Kg 1 1 1 - drum 1,700,000 -

SUB TOTAL ( I.A ) - B A L A T

1 Biaya Transparansi : 2 a. Papan Proyek 100 x 120 cm 1 1 1 - Ls 100,000 - 3 b. Papan Informasi 100 x 180 cm 1 1 1 - Ls 120,000 - 4 c. Prasasti 60 x 40 cm 1 - - 1 Ls 450,000 - 5 d. Spanduk Program 2 2 2 - Ls 120,000 - 6 Concrete Mixer 22 - - 22 hari 350,000 - 7 Mobilisasi / Demob 1 - - 1 Ls 500,000 - 8 Meteran 5 M 1 1 1 - buah 10,000 - 9 Pipa Railing/Pilar Jembatan 8 - - 8 btg 250,000 - 10 Sekop 2 2 2 - buah 70,000 - 11 Ember 77 - - 77 buah 8,000 - 12 Arco/dolag 2 2 2 - buah 250,000 - 13 Benang Kasur 4 - - 4 Roll 5,000 -

SUB TOTAL ( I.B ) - C UPAH

1 Pekerja Konstruksi 544 - - 544 HOK 24,000 - 2 Tukang 142 - - 142 HOK 33,000 -

SUB TOTAL ( I.C ) - JUMLAH SUB TOTAL I -

II TPT (WANGUNJAYA-MULYAJAYA)A BAHAN -

1 Semen 50 kg 1,480 950.0 150 1,100 380 Zak 69,500 10,425,000 2 Pasir Pasang 297 221.5 75.5 297.0 - m³ 160,000 12,080,000 3 Batu Belah 593 483.5 109.50 593.00 - m³ 120,000 13,140,000

SUB TOTAL ( II.A ) 35,645,000 B ALAT

1 Ember 50 50 50 - buah 8,000 - 2 Cat Tembok 4 4 4 - kg 30,000 - 3 Pipa pralon 5 5 5 - btg 24,000 - 4 Bambu 20 20 20 - bh 8,000 - 5 Benang kasur 3 3 3 - btg 5,000 -

SUB TOTAL ( II.B ) - C UPAH

1 Pekerja Konstruksi 957 417 417 540 HOK 24,000 - 2 Tukang 411 - - 411 HOK 33,000 -

SUB TOTAL ( II.C ) - JUMLAH SUB TOTAL II 35,645,000

III BRONJONG

A BAHAN1 Batu Belah 231 231 231 - M3 120,000 - 2 Bronjong Dia. (2X1X0,5) 192 192 192 - Bh 135,000 -

SUB TOTAL ( III.A ) - B ALAT

1 Benang 2 2 2 - roll 5,000 - 2 Bambu 20 20 20 - btg 8,000 -

SUB TOTAL ( III.B ) - C UPAH

1 Pekerja Konstruksi 256 256 256 - HOK 24,000 - 2 Tukang 52 52 52 - HOK 33,000 -

SUB TOTAL ( III.C ) -

Page 104: Rpd 2014 Mp3ki - Penguatan

Page 104

NO URAIAN

VOLUME

SISA

a b c d e = c + d f = b - e g h i = d * h

UNIT / SATUA

N

HARGA SATUAN

(Rp)

JUMLAH (Rp)

KEBUTUHAN PENGAJUAN TAHAP LALU

PENGAJUAN SAAT INI

JUMLAH S.D SAAT

INI

JUMLAH SUB TOTAL III -

IV GG PLAT BETONA BAHAN

1 Semen 34 - - 34 zak 69,500 - 2 Batu belah 10 - - 10 M3 120,000 - 3 Pasir Pasang 4 - - 4 M3 160,000 - 4 Pasir Beton 2 - - 2 M3 315,000 - 5 Batu Pecah 2-3 cm 2 - - 2 M3 265,000 - 6 Kayu Begisting 2 - - 2 M3 600,000 - 7 Kawat Beton 2 - - 2 Kg 16,000 - 8 Paku 2 - - 2 Kg 12,000 - 9 Besi dia. 10 28 - - 28 Btg 47,000 -

SUB TOTAL ( IV.A ) - B ALAT

1 Benang 3 - - 3 roll 5,000 - 2 Ember 8 - - 8 buah 8,000 -

SUB TOTAL ( IV.B ) - C UPAH

1 Pekerja Konstruksi 36 - - 36 HOK 24,000 - 2 Tukang 22 - - 22 HOK 33,000 -

SUB TOTAL ( IV.C ) - JUMLAH SUB TOTAL IV -

JUMLAH TOTAL E 35,645,000

JUMLAH TOTAL 247,908,500

Terbilang (dengan huruf) : #VALUE!

Banjarwangi, …......…………

Disetujui Oleh : Dibuat Oleh :Ketua TPK Bendahara TPK

Kecamatan Banjarwangi Kecamatan Banjarwangi

Endjang Komara Ahmad Hayun,S.Pd.IMengetahui :

FK / FT Kecamatan Banjarwangi PjOK Kecamatan Banjarwangi

MIFTAH FARID Ujang Suryana.S.SosFasilitator Kecamatan Fasilitator Teknik NIP. 19671201 198703 1 004

Sebagai Catatan :

TAHAP ALOKASI BOP TAHAP LALU KUMULATIF

1 DANA 40% TAHAP 1 1,132,128,000 1,140,090,200 - 1,140,090,200

2 DANA 40% TAHAP 2 1,132,128,000 563,075,600 247,908,500 810,984,100

3 DANA 20% 566,064,000 - -

JUMLAH 2,830,320,000 1,140,090,200 247,908,500 1,951,074,300

DEFIK GUNAWAN,ST AHMAD FAUZI,ST

NO

TAHAP SEKARANG

Page 105: Rpd 2014 Mp3ki - Penguatan

Page 105

PNPM - Mandiri Perdesaan Pola Khusus MP3KI Form.36.

RENCANA PENGGUNAAN DANAMP3KI PENGUATAN

RPD KE : 2 F Kecamatan : Banjarwangi Kabupaten : Garut

Jumlah BLM : Rp 2,830,320,000

NO URAIAN

VOLUME

SISA

a b c d e = c + d f = b - e g h i = d * h

I RABAT BETON (BANJARWANGI-BOJONG-JAYABAKTI)A BAHAN

1 Semen 50 kg 2,890 570 360 930 1,960 Zak 70,000 25,200,000 2 Pasir beton 258 258 258 - m³ 310,000 - 3 Pasir urug 288 84.2 24.0 108.2 179.8 m³ 100,000 2,400,000 4 Batu split 2/3 439 255 22 277 162 m³ 270,000 5,940,000 5 Kayu u/bekisting 6 - 4.0 4.0 2 m³ 600,000 2,400,000 6 Paku 52 - - 52 m³ 12,000 - 7 Plastik Cor (lebar 1,5cm) 5,078 2,900 2,178 5,078 (0) m2 2,500 5,445,000 8 Aspal Pen 60/70, 155 Kg 5 5.0 5.0 - drum 1,700,000 -

SUB TOTAL ( I.A ) 41,385,000 B A L A T

1 Biaya Transparansi : 2 a. Papan Proyek 100 x 120 cm 1 - - 1 Ls 100,000 - 3 b. Papan Informasi 100 x 180 cm 1 1 1 - Ls 120,000 - 4 c. Prasasti 60 x 40 cm 1 - - 1 Ls 450,000 - 5 c. Spanduk/umbul umbul 3 3 3 - Ls 120,000 - 6 d. Kamera Digital 1 1 1 - hari 2,000,000 - 7 Concrete Mixer 52 - - 52 Ls 350,000 - 8 Mobilisasi / Demob 1 - - 1 hari 500,000 - 9 Gor. Buis Beton 30 cm 8 - - 8 hari 80,000 - 10 Sekop 2 - - 2 Ls 70,000 - 11 Ember 100 - - 100 buah 8,000 - 12 Arco/dolag 3 - - 3 buah 250,000 - 13 Benang Kasur 4 - - 4 buah 5,000 -

SUB TOTAL ( I.B ) - C UPAH

1 Pekerja Konstruksi 1,300 - - 1,300 HOK 24,000 - 2 Tukang 330 - - 330 HOK 33,000 -

SUB TOTAL ( I.C ) - JUMLAH SUB TOTAL I 41,385,000

II TPT (BANJARWANGI-BOJONG-JAYABAKTI)A BAHAN

1 Semen 50 kg 475 370 105 475 - Zak 70,000 7,350,000 2 Pasir Pasang 95 85 10 95 0 m³ 160,000 1,600,000 3 Batu Belah 190 177 13 190 - m³ 120,000 1,560,000

SUB TOTAL ( II.A ) 10,510,000 B ALAT

1 Ember 45 45 45 - buah 8,000 - 2 Cat Tembok 5.4 5 5 - kg 30,000 - 3 Pralon 1/2 inch 3 3 3 - btg 20,000 - 4 Kuas 1/2 inch 2 2 2 - bh 20,000 - 5 Bambu 10 10 10 - btg 8,000 - 6 Benang kasur 4 4 4 - buah 5,000 -

SUB TOTAL ( II.B ) - C UPAH

1 Pekerja Konstruksi 307 307 307 - HOK 24,000 - 2 Tukang 151 151 151 - HOK 33,000 -

SUB TOTAL ( II.C ) - JUMLAH SUB TOTAL II 10,510,000

UNIT / SATUA

N

HARGA SATUAN

(Rp)

JUMLAH (Rp)

KEBUTUHAN PENGAJUAN TAHAP LALU

PENGAJUAN SAAT INI

JUMLAH S.D SAAT

INI

Page 106: Rpd 2014 Mp3ki - Penguatan

Page 106

NO URAIAN

VOLUME

SISA

a b c d e = c + d f = b - e g h i = d * h

UNIT / SATUA

N

HARGA SATUAN

(Rp)

JUMLAH (Rp)

KEBUTUHAN PENGAJUAN TAHAP LALU

PENGAJUAN SAAT INI

JUMLAH S.D SAAT

INI

III BRONJONGA BAHAN

1 Batu Belah 132 90 42 132 - M3 120,000 5,040,000 2 Bronjong Dia. (2X1X0,5) 110 110 110 - Bh 135,000 -

SUB TOTAL ( III.A ) 5,040,000 B ALAT

1 Benang 2 2 2 - roll 5,000 - 2 Bambu 30 30 30 - btg 8,000 -

SUB TOTAL ( III.B ) - C UPAH

1 Pekerja Konstruksi 134 - 134 134 - HOK 24,000 3,216,000 2 Tukang 27 - 27 27 - HOK 33,000 891,000

SUB TOTAL ( III.C ) 4,107,000 JUMLAH SUB TOTAL III 9,147,000

JUMLAH TOTAL A 61,042,000

I RABAT BETON (BANJARWANGI-TALAGASARI)A BAHAN

1 Semen 50 kg 2,638 994 994 1,644 Zak 69,500 - 2 Pasir beton 236 229.5 229.5 6.5 m³ 315,000 - 3 Pasir urug 263 124.481 124.481 138.519 m³ 100,000 - 4 Batu split 2/3 400 295.3 295.3 104.7 m³ 265,000 - 5 Kayu u/bekisting 6 4.0 4.0 2.0 m³ 600,000 - 6 Paku 47 18.5 18.5 28.5 m³ 12,000 - 7 Plastik Cor (lebar 1,5cm) 4,628 500 500 4,128 m2 2,500 - 8 Aspal Pen 60/70, 155 Kg 2 - - 2 drum 1,700,000 -

SUB TOTAL ( I.A ) - B A L A T

1 Biaya Transparansi : 2 a. Papan Proyek 100 x 120 cm 1 1 1 - Ls 100,000 - 3 b. Papan Informasi 100 x 180 cm 1 1 1 - Ls 120,000 - 4 c. Prasasti 60 x 40 cm 1 - - 1 Ls 450,000 - 5 d. Spanduk/umbul2 1 1 1 - Ls 120,000 - 6 Concrete Mixer 47 8 8 39 hari 350,000 - 7 Mobilisasi / Demob 1 1 1 1 Ls 500,000 - 9 Sewa Bak Mobil 45 32 32 13 hari 250,000 - 10 Meteran 5 M 2 2 2 - buah 20,000 - 11 Sekop 2 2 2 - buah 70,000 - 12 Ember 100 100 100 - buah 8,000 - 13 Arco/dolag 2 2 2 - buah 250,000 - 14 Benang Kasur 4 4 4 - Roll 5,000 -

SUB TOTAL ( I.B ) - C UPAH

1 Pekerja Konstruksi 1,441 190 190 1,251 HOK 24,000 - 2 Tukang 301 40 40 261 HOK 33,000 -

SUB TOTAL ( I.C ) - JUMLAH SUB TOTAL I -

II TPT (BANJARWANGI-TALAGASARI)A BAHAN

1 Semen 50 kg 121 121 121 - Zak 69,500 - 2 Pasir Pasang 24 24 24 - m³ 160,000 - 3 Batu Belah 47 47 47 - m³ 120,000 -

SUB TOTAL ( II.A ) - B ALAT

1 Ember 20 20 20 - bh 8,000 - 2 Cat Tembok 4 4 4 - bh 30,000 - 3 Benang kasur 1 1 1 - btg 5,000 -

SUB TOTAL ( II.B ) -

Page 107: Rpd 2014 Mp3ki - Penguatan

Page 107

NO URAIAN

VOLUME

SISA

a b c d e = c + d f = b - e g h i = d * h

UNIT / SATUA

N

HARGA SATUAN

(Rp)

JUMLAH (Rp)

KEBUTUHAN PENGAJUAN TAHAP LALU

PENGAJUAN SAAT INI

JUMLAH S.D SAAT

INI

C UPAH1 Pekerja Konstruksi 94 94 94 - HOK 24,000 - 2 Tukang 45 45 45 - HOK 33,000 -

SUB TOTAL ( II.C ) - JUMLAH SUB TOTAL II -

III GG Plat (BANJARWANGI-TALAGASARI)A BAHAN

1 Semen 50 kg 17 17 17 - Zak 69,500 - 2 Batu Belah 5 5 5 - m³ 120,000 - 3 Pasir Pasang 2 2 2 - m³ 160,000 - 4 Pasir beton 1 1 1 - m³ 315,000 - 5 Batu Pecah 2/3 Cm 1 1 1 - m³ 265,000 - 6 Kayu u/bekisting 1 1 1 - m³ 600,000 - 7 Kawat beton 1 1 1 - kg 16,000 - 8 Paku 1 1 1 - kg 12,000 - 9 Besi D 10 14 14 14 - btg 47,000 -

SUB TOTAL ( III.A ) - B A L A T

1 Benang 1 1 1 - Roll 5,000 - 2 Ember 6 6 6 - buah 8,000 -

SUB TOTAL ( III.B ) - C UPAH

1 Pekerja Konstruksi 18 18 18 - HOK 24,000 - 2 Tukang 11 11 11 - HOK 33,000 -

SUB TOTAL ( III.C ) - JUMLAH SUB TOTAL III -

JUMLAH TOTAL B -

I RABAT BETON (KADONGDONG-WANGUNJAYA)A BAHAN

1 Semen 50 kg 1,008 - - 1,008 Zak 69,500 - 2 Pasir beton 90 90 90 - m³ 315,000 - 3 Pasir urug 101 31 30.50 70.50 m³ 100,000 - 4 Batu split 2/3 153 66 66 87 m³ 265,000 - 5 Kayu u/bekisting 2 1 1 2 m³ 600,000 - 6 Paku 18 2 2 16 m³ 12,000 - 7 Plastik Cor (lebar 1,5cm) 1,828.52 - - 1,829 m2 2,500 - 8 Aspal Pen 60/70, 155 Kg 2 2 2 - drum 1,700,000 -

SUB TOTAL ( I.A ) - B A L A T

1 Biaya Transparansi : 2 a. Papan Proyek 100 x 120 cm 1 1 1 - Ls 100,000 - 3 b. Papan Informasi 100 x 180 cm 1 1 1 - Ls 120,000 - 4 c. Prasasti 60 x 40 cm 1 - - 1 Ls 450,000 - 5 d. Spanduk/umbul2 2 2 2 - Ls 120,000 - 6 Concrete Mixer 18 - - 18 hari 350,000 - 7 Mobilisasi / Demob 1 - - 1 Ls 500,000 - 8 Sekop 2 2 2 - hari 70,000 - 9 Ember 90 - - 90 buah 8,000 - 10 Arco/dolag 2 2 2 - Ls 250,000 - 11 Sapu Lidi 2 - - 2 buah 6,000 - 12 Benang Kasur 5 2 2 3 buah 5,000 -

SUB TOTAL ( I.B ) - C UPAH

1 Pekerja Konstruksi 398 - - 398 HOK 24,000 - 2 Tukang 115 - - 115 HOK 33,000 -

SUB TOTAL ( I.C ) - JUMLAH SUB TOTAL I -

Page 108: Rpd 2014 Mp3ki - Penguatan

Page 108

NO URAIAN

VOLUME

SISA

a b c d e = c + d f = b - e g h i = d * h

UNIT / SATUA

N

HARGA SATUAN

(Rp)

JUMLAH (Rp)

KEBUTUHAN PENGAJUAN TAHAP LALU

PENGAJUAN SAAT INI

JUMLAH S.D SAAT

INI

II TPT (KADONGDONG-WANGUNJAYA)A BAHAN

1 Semen 50 kg 472 461 461 11 Zak 69,500 - 2 Pasir Pasang 95 84 84 11 m³ 160,000 - 3 Batu Belah 186 186 186 - m³ 120,000 -

SUB TOTAL ( II.A ) - B ALAT

1 Ember 30 30 30 - buah 8,000 - 2 Cat Tembok 6 6 6 - kg 30,000 - 3 Pralon 1/2 inch 2 2 2 - buah 24,000 - 4 Bambu 10 10 10 - btg 8,000 - 5 Benang kasur 3 3 3 - buah 5,000 -

SUB TOTAL ( II.B ) - C UPAH

1 Pekerja Konstruksi 344 220 220 124 HOK 24,000 - 2 Tukang 165 120 120 45 HOK 33,000 -

SUB TOTAL ( II.C ) - JUMLAH SUB TOTAL II -

III JEMBATAN BAJAA BAHAN

1 bouwplank 1 1 1 - Ls 1,200,000 - 2 Besi WF 500.200 6,592 6,592 6,592 - kg 16,700 - 3 Besi WF 200.100 379 379 379 - kg 16,700 - 4 Besi L.100.100.10 1,775 1,775 1,775 - kg 16,700 - 5 Besi L.70.70.7 245 245 245 - kg 16,700 - 6 Besi L.60.60.6 590 590 590 - kg 16,700 - 7 Baud 1/2" x 4 cm 154 154 154 - buah 8,000 - 8 Baud 5/8" x 6 cm 184 184 184 - buah 10,000 - 9 Lantai Kayu 8/20 5.88 4 4 2 m3 3,000,000 - 10 Baut kokot 5/8' x 25 cm 192 192 192 - buah 18,000 - 11 Baut kokot 5/8' x 16 cm 736 736 736 - buah 23,000 - 12 Plat sambungan gelagar utama A 78 78 78 - kg 16,700 - 13 Plat sambungan tipe B 20 20 20 - kg 16,700 - 14 Plat sambungan tipe C 37 37 37 - kg 16,700 - 15 Baut sambungan gelagar utama 384 384 384 - buah 24,000 - 16 Plat Klem Lantai 736 736 736 - buah 15,000 - 17 Karet Peredam Lantai 64 64 64 - m 10,000 - 18 Elastomer 8 8 8 - buah 250,000 - 19 Kayu Bekisting 6 6 6 - m3 600,000 - 20 Paku 15 15 15 - kg 12,000 - 21 Besi beton polos 1,069 1,069 1,069 - kg 7,000 - 22 Kawat beton 24 24 24 - kg 16,000 - 23 Semen 529 529 529 - zak 69,500 - 24 Pasir beton 5 5 5 - m3 315,000 - 25 Split 5 5 5 - m3 265,000 - 26 Batu Belah 162 162 162 - m3 120,000 - 27 Pabrikasi Ereksion 10,650 10,650 10,650 - kg 3,000 - 28 Cat tembok 12 12 12 - kg 30,000 - 29 Cat finishing besi 1 - - 1 ls 2,000,000 - 30 Pasir pasang 80 80 80 - m3 160,000 -

SUB TOTAL ( III.A ) - B ALAT

1 Papan Kegiatan 1 1 1 - Unit 120,000 - 2 Cangkul 1 1 1 - Buah 50,000 - 3 Linggis 1 1 1 - Buah 25,000 - 4 Sekop 1 1 1 - Buah 70,000 - 5 Bambu 50 50 50 - Buah 8,000 -

Page 109: Rpd 2014 Mp3ki - Penguatan

Page 109

NO URAIAN

VOLUME

SISA

a b c d e = c + d f = b - e g h i = d * h

UNIT / SATUA

N

HARGA SATUAN

(Rp)

JUMLAH (Rp)

KEBUTUHAN PENGAJUAN TAHAP LALU

PENGAJUAN SAAT INI

JUMLAH S.D SAAT

INI

6 Benang nilon 2 2 2 - Buah 5,000 - 7 Selang waterpass 15 15 15 - m 1,500 - 8 Ember Aduk Kecil 40 40 40 - Buah 8,000 - 9 Sewa molen 3 3 3 - Hari 350,000 - 10 Mobilisasi Molen 1 1 1 - Ls 500,000 - 11 Kuas 3 inch 4 4 4 - bh 10,000 - 12 Kunci besi 1 1 1 - Buah 10,000 - 13 Karung Tanggul 125 125 125 - Buah 1,000 - 14 Sewa Pompa Sedot 6 6 6 - Hari 50,000 - 15 Prasasti 1 - - 1 Buah 450,000 -

SUB TOTAL ( III.B ) - C UPAH

1 Pekerja 319 296 296 23 HOK 24,000 - 2 Tukang 105 58 58 47 HOK 33,000 -

SUB TOTAL ( III.C ) - JUMLAH SUB TOTAL III -

JUMLAH TOTAL C -

I PENGASPALAN (TALAGAJAYA-TANJUNGJAYA)A BAHAN

1 Batu Pecah 3/5 Cm 130 130 130 - m2 235,000 - 2 Batu Pecah 2/3 Cm 137 137 137 - m3 255,000 - 3 Batu Pecah 1/2 Cm 69 69 69 - m3 295,000 - 4 Pasir Aspal / Abu batu 37 37 37 - m3 245,000 - 5 Aspal Pen 60/70, 155 Kg 139 139 139 - Drum 1,700,000 - 6 Aspal Emulsi @ 200 kg 16 16 16 - Drum 1,850,000 - 7 Ban Bekas Mobil 25 25 25 - Buah 20,000 - 8 Kayu bakar 2 2 2 - m3 100,000 -

SUB TOTAL ( I.A ) - B A L A T

1 Papan proyek ( Uk.1,20 cm x 1.00 cm 1 1 1 - Unit 100,000 - 2 Papan Informasi ( Uk.120 cm x 100 c 1 1 1 - Unit 120,000 - 3 Prasasti ( Uk. 60 cm x 40 cm ) 1 - - 1 Unit 450,000 - 4 Spanduk/umbul2 2 2 2 - paket 200,000 - 5 Meteran 7,5 m 2 2 2 - bh 20,000 - 6 Sapu Lidi 4 4 4 - bh 12,125 - 7 meteran 50 m 1 1 1 - bh 60,000 - 8 Kamera Dokumentasi 1 1 1 - paket 1,500,000 - 9 Mesin Gilas 12 12 12 - Hari 800,000 - 10 Mob./Demob. Mesin Gilas 1 1 1 - Ls 2,500,000 -

SUB TOTAL ( I.B ) - C UPAH

1 Pekerja Konstruksi (Aspal ) 281 281 281 - HOK 30,000 - 2 Pekerja Galian Saluran 220 220 220 - HOK 24,000 - 3 Tukang ( Aspal) 42 42 42 - HOK 45,000 -

SUB TOTAL ( I.C ) - JUMLAH SUB TOTAL I -

II TPT (TALAGAJAYA-TANJUNGJAYA)

A BAHAN1 Semen 50 kg 288 110 178 288 - Zak 69,500 12,371,000 2 Pasir Pasang 58 44 14 58 - m³ 150,000 2,100,000 3 Batu Belah 115 81.5 33.5 115.0 - m³ 120,000 4,020,000

SUB TOTAL ( II.A ) 18,491,000 B ALAT

1 Bambu 18 18 18 - btg 8,000 - 2 Benang Kasur 3 3 3 - bh 5,000 - 3 Pralon 1/2 inch 4 4 4 - btg 20,000 - 4 Ember 20 20 20 - bh 8,000 -

Page 110: Rpd 2014 Mp3ki - Penguatan

Page 110

NO URAIAN

VOLUME

SISA

a b c d e = c + d f = b - e g h i = d * h

UNIT / SATUA

N

HARGA SATUAN

(Rp)

JUMLAH (Rp)

KEBUTUHAN PENGAJUAN TAHAP LALU

PENGAJUAN SAAT INI

JUMLAH S.D SAAT

INI

5 Cat Tembok 6 - 6 6 - kg 30,000 180,000 SUB TOTAL ( II.B ) 180,000

C UPAH1 Pekerja Konstruksi 232 200 32 232 - HOK 24,000 768,000 2 Tukang 93 88 5 93 - HOK 33,000 165,000

SUB TOTAL ( II.C ) 933,000 JUMLAH SUB TOTAL II 19,604,000

III TPT JEMBATAN (TALAGAJAYA-TANJUNGJAYA)A BAHAN

1 Semen 50 kg 197 170 27 197 - Zak 69,500 1,876,500 2 Pasir Pasang 40 30 10 40 - m³ 150,000 1,500,000 3 Batu Belah 80 77 3 80 - m³ 120,000 360,000 4 Besi dia 12 7 7 7 - btg 110,000 - 5 Pasir Beton 1 1 1 - m3 295,000 - 6 Kawat beton 1 1 1 - kg 16,000 -

SUB TOTAL ( III.A ) 3,736,500 B ALAT

1 Bambu 28 28 28 - btg 8,000 - 2 Benang Kasur 3 3 3 - bh 5,000 - 3 Pralon 1/2 inch 3 3 3 - btg 20,000 - 4 Ember 26 26 26 - bh 8,000 - 5 Cat Tembok 6 6 6 - kg 30,000 -

SUB TOTAL ( III.B ) - C UPAH

1 Pekerja Konstruksi 135 80 55 135 - HOK 24,000 1,320,000 2 Tukang 61 45 16 61 - HOK 33,000 528,000

SUB TOTAL ( III.C ) 1,848,000 JUMLAH SUB TOTAL III 5,584,500

IV GG PLAT BETON (TALAGAJAYA-TANJUNGJAYA)A BAHAN

1 Semen 90 70 20 90 - zak 69,500 1,390,000 2 Batu belah 26 20 6 26 - M3 120,000 720,000 3 Pasir Pasang 8 6 2 8 - m3 150,000 300,000 4 Pasir Beton 2 2 2 - m3 295,000 - 5 Batu Pecah 2-3 cm 4 2 2 4 - m3 255,000 510,000 6 Kayu Begisting 1.2 1 1 - m3 600,000 - 7 Kawat Beton 4 4 4 - Kg 16,000 - 8 Paku 4 4 4 - kg 12,000 - 9 Besi dia. 10 64 64 64 - Buah 47,000 -

SUB TOTAL ( IV.A ) 2,920,000 B ALAT

1 Ember 25 25 25 - buah 8,000 - 2 Benang Kasur 3 3 3 - roll 5,000 - 3 Bambu 17 17 17 - Btg 8,000 -

SUB TOTAL ( IV.B ) - C UPAH

1 Pekerja Konstruksi 98 50 48 98 - HOK 24,000 1,152,000 2 Tukang 58 35 23 58 - HOK 33,000 759,000

SUB TOTAL ( IV.C ) 1,911,000 JUMLAH SUB TOTAL IV 4,831,000

JUMLAH TOTAL D 30,019,500

I RABAT BETON (WANGUNJAYA-MULYAJAYA)

A BAHAN1 Semen 50 kg 1,241 500 500 741 Zak 69,500 - 2 Pasir beton 111 111 111 - m³ 315,000 - 3 Pasir urug 124 124 124 - m³ 100,000 -

Page 111: Rpd 2014 Mp3ki - Penguatan

Page 111

NO URAIAN

VOLUME

SISA

a b c d e = c + d f = b - e g h i = d * h

UNIT / SATUA

N

HARGA SATUAN

(Rp)

JUMLAH (Rp)

KEBUTUHAN PENGAJUAN TAHAP LALU

PENGAJUAN SAAT INI

JUMLAH S.D SAAT

INI

4 Batu split 2/3 188 188 188 - m³ 265,000 - 5 Kayu u/bekisting 3 3 3 - m³ 600,000 - 6 Paku 22 22 22 - m³ 12,000 - 7 Plastik Cor (lebar 1,5cm) 2,171 - - 2,171 m2 2,500 - 8 Aspal Pen 60/70, 155 Kg 1 1 1 - drum 1,700,000 -

SUB TOTAL ( I.A ) - B A L A T

1 Biaya Transparansi : 2 a. Papan Proyek 100 x 120 cm 1 1 1 - Ls 100,000 - 3 b. Papan Informasi 100 x 180 cm 1 1 1 - Ls 120,000 - 4 c. Prasasti 60 x 40 cm 1 - - 1 Ls 450,000 - 5 d. Spanduk Program 2 2 2 - Ls 120,000 - 6 Concrete Mixer 22 - - 22 hari 350,000 - 7 Mobilisasi / Demob 1 - - 1 Ls 500,000 - 8 Meteran 5 M 1 1 1 - buah 10,000 - 9 Pipa Railing/Pilar Jembatan 8 - - 8 btg 250,000 - 10 Sekop 2 2 2 - buah 70,000 - 11 Ember 77 - - 77 buah 8,000 - 12 Arco/dolag 2 2 2 - buah 250,000 - 13 Benang Kasur 4 - - 4 Roll 5,000 -

SUB TOTAL ( I.B ) - C UPAH

1 Pekerja Konstruksi 544 - - 544 HOK 24,000 - 2 Tukang 142 - - 142 HOK 33,000 -

SUB TOTAL ( I.C ) - JUMLAH SUB TOTAL I -

II TPT (WANGUNJAYA-MULYAJAYA)A BAHAN -

1 Semen 50 kg 1,480 1,100 1,100 380 Zak 69,500 - 2 Pasir Pasang 297 297 297 - m³ 160,000 - 3 Batu Belah 593 593 593 - m³ 120,000 -

SUB TOTAL ( II.A ) - B ALAT

1 Ember 50 50 50 - buah 8,000 - 2 Cat Tembok 4 4 4 - kg 30,000 - 3 Pipa pralon 5 5 5 - btg 24,000 - 4 Bambu 20 20 20 - bh 8,000 - 5 Benang kasur 3 3 3 - btg 5,000 -

SUB TOTAL ( II.B ) - C UPAH

1 Pekerja Konstruksi 957 417 417 540 HOK 24,000 - 2 Tukang 411 - - 411 HOK 33,000 -

SUB TOTAL ( II.C ) - JUMLAH SUB TOTAL II -

III BRONJONG

A BAHAN1 Batu Belah 231 231 231 - M3 120,000 - 2 Bronjong Dia. (2X1X0,5) 192 192 192 - Bh 135,000 -

SUB TOTAL ( III.A ) - B ALAT

1 Benang 2 2 2 - roll 5,000 - 2 Bambu 20 20 20 - btg 8,000 -

SUB TOTAL ( III.B ) - C UPAH

1 Pekerja Konstruksi 256 256 256 - HOK 24,000 - 2 Tukang 52 52 52 - HOK 33,000 -

SUB TOTAL ( III.C ) -

Page 112: Rpd 2014 Mp3ki - Penguatan

Page 112

NO URAIAN

VOLUME

SISA

a b c d e = c + d f = b - e g h i = d * h

UNIT / SATUA

N

HARGA SATUAN

(Rp)

JUMLAH (Rp)

KEBUTUHAN PENGAJUAN TAHAP LALU

PENGAJUAN SAAT INI

JUMLAH S.D SAAT

INI

JUMLAH SUB TOTAL III -

IV GG PLAT BETONA BAHAN

1 Semen 34 - - 34 zak 69,500 - 2 Batu belah 10 - - 10 M3 120,000 - 3 Pasir Pasang 4 - - 4 M3 160,000 - 4 Pasir Beton 2 - - 2 M3 315,000 - 5 Batu Pecah 2-3 cm 2 - - 2 M3 265,000 - 6 Kayu Begisting 2 - - 2 M3 600,000 - 7 Kawat Beton 2 - - 2 Kg 16,000 - 8 Paku 2 - - 2 Kg 12,000 - 9 Besi dia. 10 28 - - 28 Btg 47,000 -

SUB TOTAL ( IV.A ) - B ALAT

1 Benang 3 - - 3 roll 5,000 - 2 Ember 8 - - 8 buah 8,000 -

SUB TOTAL ( IV.B ) - C UPAH

1 Pekerja Konstruksi 36 - - 36 HOK 24,000 - 2 Tukang 22 - - 22 HOK 33,000 -

SUB TOTAL ( IV.C ) - JUMLAH SUB TOTAL IV -

JUMLAH TOTAL E -

JUMLAH TOTAL 91,061,500

Terbilang (dengan huruf) : #VALUE!

Banjarwangi, …......…………

Disetujui Oleh : Dibuat Oleh :Ketua TPK Bendahara TPK

Kecamatan Banjarwangi Kecamatan Banjarwangi

Endjang Komara Ahmad Hayun,S.Pd.IMengetahui :

FK / FT Kecamatan Banjarwangi PjOK Kecamatan Banjarwangi

MIFTAH FARID Ujang Suryana.S.SosFasilitator Kecamatan Fasilitator Teknik NIP. 19671201 198703 1 004

Sebagai Catatan :

TAHAP ALOKASI BOP TAHAP LALU KUMULATIF

1 DANA 40% TAHAP 1 1,132,128,000 1,140,090,200 - 1,140,090,200

2 DANA 40% TAHAP 2 1,132,128,000 810,984,100 91,061,500 902,045,600

3 DANA 20% 566,064,000 - -

JUMLAH 2,830,320,000 1,140,090,200 91,061,500 2,042,135,800

DEFIK GUNAWAN,ST AHMAD FAUZI,ST

NO

TAHAP SEKARANG

Page 113: Rpd 2014 Mp3ki - Penguatan

PNPM - Mandiri Perdesaan Pola Khusus MP3KI Form.36.

RENCANA PENGGUNAAN DANAMP3KI PENGUATAN

RPD KE : Kecamatan : Banjarwangi Kabupaten : Garut

Jumlah BLM : Rp 2,830,320,000

NO URAIAN

VOLUME

SISA

a b c d e = c + d f = b - e g h i = d * h

I RABAT BETON (BANJARWANGI-BOJONG-JAYABAKTI)

A BAHAN1 Semen 50 kg 2,890 2,890 2,890 - Zak 70,000 202,300,000 2 Pasir beton 258 258 258 - m³ 310,000 79,980,000 3 Pasir urug 288 288 288 - m³ 100,000 28,800,000 4 Batu split 2/3 439 439 439 - m³ 270,000 118,530,000 5 Kayu u/bekisting 6 6 6 - m³ 600,000 3,600,000 6 Paku 52 52 52 - m³ 12,000 624,000 7 Plastik Cor (lebar 1,5cm) 5,078 5,078 5,078 - m2 2,500 12,694,000 8 Aspal Pen 60/70, 155 Kg 5 5 5 - drum 1,700,000 8,500,000

SUB TOTAL ( I.A ) 455,028,000 B A L A T

1 Biaya Transparansi : 2 a. Papan Proyek 100 x 120 cm 1 1 1 - Ls 100,000 100,000 3 b. Papan Informasi 100 x 180 cm 1 1 1 - Ls 120,000 120,000 4 c. Prasasti 60 x 40 cm 1 1 1 - Ls 450,000 450,000 5 c. Spanduk/umbul umbul 3 3 3 - Ls 120,000 360,000 6 d. Kamera Digital 1 1 1 - hari 2,000,000 2,000,000 7 Concrete Mixer 52 52 52 - Ls 350,000 18,200,000 8 Mobilisasi / Demob 1 1 1 - hari 500,000 500,000 9 Sekop 2 2 2 - hari 70,000 140,000

10 Ember 100 100 100 - Ls 8,000 800,000 11 Arco/dolag 3 3 3 - buah 250,000 750,000 12 Benang Kasur 4 4 4 - buah 5,000 20,000 13 Gor. Buis Beton 30 cm 8 8 8 - buah 80,000 640,000

SUB TOTAL ( I.B ) 24,080,000 C UPAH

1 Pekerja Konstruksi 1,300 1,300 1,300 - HOK 24,000 31,200,000 2 Tukang 330 330 330 - HOK 33,000 10,890,000

SUB TOTAL ( I.C ) 42,090,000 JUMLAH SUB TOTAL I 521,198,000

II TPT (BANJARWANGI-BOJONG-JAYABAKTI)

A BAHAN1 Semen 50 kg 475 475 475 - Zak 70,000 33,250,000 2 Pasir Pasang 95 95 95 - m³ 160,000 15,200,000 3 Batu Belah 190 190 190 - m³ 120,000 22,800,000

SUB TOTAL ( II.A ) 71,250,000 B ALAT

1 Ember 40 40 40 - buah 8,000 320,000 2 Cat Tembok 5.4 5.4 5.4 - kg 30,000 162,000 3 Pralon 1/2 inch 3 3 3 - btg 20,000 60,000 4 Kuas 1/2 inch 2 2 2 - bh 20,000 40,000 5 Bambu 10 10 10 - btg 8,000 80,000 6 Benang kasur 4 4 4 - buah 5,000 20,000

SUB TOTAL ( II.B ) 682,000 C UPAH

1 Pekerja Konstruksi 307 307 307 - HOK 24,000 7,368,000 2 Tukang 151 151 151 - HOK 33,000 4,983,000

SUB TOTAL ( II.C ) 12,351,000

UNIT / SATUA

N

HARGA SATUAN

(Rp)

JUMLAH (Rp)

KEBUTUHAN PENGAJUAN TAHAP LALU

PENGAJUAN SAAT INI

JUMLAH S.D SAAT

INI

Page 114: Rpd 2014 Mp3ki - Penguatan

NO URAIAN

VOLUME

SISA

a b c d e = c + d f = b - e g h i = d * h

UNIT / SATUA

N

HARGA SATUAN

(Rp)

JUMLAH (Rp)

KEBUTUHAN PENGAJUAN TAHAP LALU

PENGAJUAN SAAT INI

JUMLAH S.D SAAT

INI

JUMLAH SUB TOTAL II 84,283,000

III BRONJONG

A BAHAN1 Batu Belah 132 132 132 - M3 120,000 15,840,000 2 Bronjong Dia. (2X1X0,5) 110 110 110 - Bh 135,000 14,850,000

SUB TOTAL ( III.A ) 30,690,000 B ALAT

1 Benang 2 2 2 - roll 5,000 10,000 2 Bambu 30 30 30 - btg 8,000 240,000

SUB TOTAL ( III.B ) 250,000 C UPAH

1 Pekerja Konstruksi 134 134 134 - HOK 24,000 3,216,000 2 Tukang 27 27 27 - HOK 33,000 891,000

SUB TOTAL ( III.C ) 4,107,000 JUMLAH SUB TOTAL III 35,047,000

JUMLAH TOTAL A 640,528,000

I RABAT BETON (BANJARWANGI-TALAGASARI)

A BAHAN1 Semen 50 kg 2,638 2,638 2,638 - Zak 69,500 183,341,000 2 Pasir beton 236 236 236 - m³ 315,000 74,340,000 3 Pasir urug 263 263 263 - m³ 100,000 26,300,000 4 Batu split 2/3 400 400 400 - m³ 265,000 106,000,000 5 Kayu u/bekisting 6 6 6 - m³ 600,000 3,600,000 6 Paku 47 47 47 - m³ 12,000 564,000 7 Plastik Cor (lebar 1,5cm) 4,628 4,628 4,628 - m2 2,500 11,569,500 8 Aspal Pen 60/70, 155 Kg 2 2 2 - drum 1,700,000 3,400,000

SUB TOTAL ( I.A ) 409,114,500 B A L A T

1 Biaya Transparansi : 2 a. Papan Proyek 100 x 120 cm 1 1 1 - Ls 100,000 100,000 3 b. Papan Informasi 100 x 180 cm 1 1 1 - Ls 120,000 120,000 4 c. Prasasti 60 x 40 cm 1 1 1 - Ls 450,000 450,000

d. Spanduk/umbul2 1 1 1 - Ls 120,000 120,000 5 Concrete Mixer 47 47 47 - hari 350,000 16,450,000 6 Mobilisasi / Demob 1 1 1 - Ls 500,000 500,000 7 Sewa Bak Mobil 45 45 45 - hari 250,000 11,250,000 8 Meteran 5 M 2 2 2 - buah 20,000 40,000 9 Sekop 2 2 2 - buah 70,000 140,000

10 Ember 100 100 100 - buah 8,000 800,000 11 Arco/dolag 2 2 2 - buah 250,000 500,000 12 Benang Kasur 4 4 4 - Roll 5,000 20,000

SUB TOTAL ( I.B ) 30,490,000 C UPAH

1 Pekerja Konstruksi 1,441 1,441 1,441 - HOK 24,000 34,584,000 2 Tukang 301 301 301 - HOK 33,000 9,933,000

SUB TOTAL ( I.C ) 44,517,000 JUMLAH SUB TOTAL I 484,121,500

II TPT (BANJARWANGI-TALAGASARI)

A BAHAN1 Semen 50 kg 121 121 121 - Zak 69,500 8,409,500 2 Pasir Pasang 24 24 24 - m³ 160,000 3,840,000 3 Batu Belah 47 47 47 - m³ 120,000 5,640,000

SUB TOTAL ( II.A ) 17,889,500 B ALAT

1 Ember 20 20 20 - kg 8,000 160,000 2 Cat Tembok 4 4 4 - bh 30,000 120,000

Page 115: Rpd 2014 Mp3ki - Penguatan

NO URAIAN

VOLUME

SISA

a b c d e = c + d f = b - e g h i = d * h

UNIT / SATUA

N

HARGA SATUAN

(Rp)

JUMLAH (Rp)

KEBUTUHAN PENGAJUAN TAHAP LALU

PENGAJUAN SAAT INI

JUMLAH S.D SAAT

INI

3 Benang kasur 1 1 1 - btg 5,000 5,000 SUB TOTAL ( II.B ) 285,000

C UPAH1 Pekerja Konstruksi 94 94 94 - HOK 24,000 2,256,000 2 Tukang 45 45 45 - HOK 33,000 1,485,000

SUB TOTAL ( II.C ) 3,741,000 JUMLAH SUB TOTAL II 21,915,500

III GG Plat (BANJARWANGI-TALAGASARI)

A BAHAN1 Semen 50 kg 17 17 17 - Zak 69,500 1,181,500 2 Batu Belah 5 5 5 - m³ 120,000 600,000 3 Pasir Pasang 2 2 2 - m³ 160,000 320,000 4 Pasir beton 1 1 1 - m³ 315,000 315,000 5 Batu Pecah 2/3 Cm 1 1 1 - m³ 265,000 265,000 6 Kayu u/bekisting 1 1 1 - m³ 600,000 600,000 7 Kawat beton 1 1 1 - kg 16,000 16,000 8 Paku 1 1 1 - kg 12,000 12,000 9 Besi D 10 14 14 14 - btg 47,000 658,000

SUB TOTAL ( III.A ) 3,967,500 B A L A T

1 Benang 1 1 1 - Roll 5,000 5,000 2 EMber 6 6 6 - buah 8,000 48,000

SUB TOTAL ( III.B ) 53,000 C UPAH

1 Pekerja Konstruksi 18 18 18 - HOK 24,000 432,000 2 Tukang 11 11 11 - HOK 33,000 363,000

SUB TOTAL ( III.C ) 795,000 JUMLAH SUB TOTAL III 4,815,500

JUMLAH TOTAL B 510,852,500

I RABAT BETON (KADONGDONG-WANGUNJAYA)

A BAHAN1 Semen 50 kg 1,008 1,008 1,008 - Zak 69,500 70,056,000 2 Pasir beton 90 90 90 - m³ 315,000 28,350,000 3 Pasir urug 101 101 101 - m³ 100,000 10,100,000 4 Batu split 2/3 153 153.0 153 - m³ 265,000 40,545,000 5 Kayu u/bekisting 2 2 2 - m³ 600,000 1,200,000 6 Paku 18 18 18 - m³ 12,000 216,000 7 Plastik Cor (lebar 1,5cm) 1,828.52 1,828.52 1,828.52 - m2 2,500 4,571,300 8 Aspal Pen 60/70, 155 Kg 2 2 2 - drum 1,700,000 3,400,000

SUB TOTAL ( I.A ) 158,438,300 B A L A T

1 Biaya Transparansi : 2 a. Papan Proyek 100 x 120 cm 1 1 1 - Ls 100,000 100,000 3 b. Papan Informasi 100 x 180 cm 1 1 1 - Ls 120,000 120,000 4 c. Prasasti 60 x 40 cm 1 1 1 - Ls 450,000 450,000 5 d. Spanduk/umbul2 2 2 2 - Ls 120,000 240,000 6 Concrete Mixer 18 18 18 - hari 350,000 6,300,000 7 Mobilisasi / Demob 1 1 1 - Ls 500,000 500,000 8 Sekop 2 2 2 - hari 70,000 140,000 9 Ember 90 90 90 - hari 8,000 720,000

10 Arco/dolag 2 2 2 - Ls 250,000 500,000 11 Sapu Lidi 2 2 2 - buah 6,000 12,000 12 Benang Kasur 5 5 5 - buah 5,000 25,000

SUB TOTAL ( I.B ) 9,107,000 C UPAH

1 Pekerja Konstruksi 398 398 398 - HOK 24,000 9,552,000 2 Tukang 115 115 115 - HOK 33,000 3,795,000

Page 116: Rpd 2014 Mp3ki - Penguatan

NO URAIAN

VOLUME

SISA

a b c d e = c + d f = b - e g h i = d * h

UNIT / SATUA

N

HARGA SATUAN

(Rp)

JUMLAH (Rp)

KEBUTUHAN PENGAJUAN TAHAP LALU

PENGAJUAN SAAT INI

JUMLAH S.D SAAT

INI

SUB TOTAL ( I.C ) 13,347,000 JUMLAH SUB TOTAL I 180,892,300

II TPT (KADONGDONG-WANGUNJAYA)

A BAHAN1 Semen 50 kg 472 472 472 - Zak 69,500 32,804,000 2 Pasir Pasang 95 95 95 - m³ 160,000 15,200,000 3 Batu Belah 186 186 186 - m³ 120,000 22,320,000

SUB TOTAL ( II.A ) 70,324,000 B ALAT

1 Ember 30 30 30 - buah 8,000 240,000 2 Cat Tembok 6 6 6 - kg 30,000 180,000 3 Pralon 1/2 inch 2 2 2 - buah 24,000 48,000 4 Bambu 10 10 10 - btg 8,000 80,000 5 Benang kasur 3 3 3 - buah 5,000 15,000

SUB TOTAL ( II.B ) 563,000 C UPAH

1 Pekerja Konstruksi 344 344 344 - HOK 24,000 8,256,000 2 Tukang 165 165 165 - HOK 33,000 5,445,000

SUB TOTAL ( II.C ) 13,701,000 JUMLAH SUB TOTAL II 84,588,000

Page 117: Rpd 2014 Mp3ki - Penguatan

NO URAIAN

VOLUME

SISA

a b c d e = c + d f = b - e g h i = d * h

UNIT / SATUA

N

HARGA SATUAN

(Rp)

JUMLAH (Rp)

KEBUTUHAN PENGAJUAN TAHAP LALU

PENGAJUAN SAAT INI

JUMLAH S.D SAAT

INI

III JEMBATAN BAJA

A BAHAN1 bouwplank 1 1 1 - Ls 1,200,000 1,200,000 2 Besi WF 500.200 6,592 6,592 6,592 - kg 16,700 110,086,400 3 Besi WF 200.100 379 379 379 - kg 16,700 6,329,300 4 Besi L.100.100.10 1,775 1,775 1,775 - kg 16,700 29,642,500 5 Besi L.70.70.7 245 245 245 - kg 16,700 4,091,500 6 Besi L.60.60.6 590 590 590 - kg 16,700 9,853,000 7 Baud 1/2" x 4 cm 154 154 154 - buah 8,000 1,232,000 8 Baud 5/8" x 6 cm 184 184 184 - buah 10,000 1,840,000 9 Lantai Kayu 8/20 5.88 5.88 5.88 - m3 3,000,000 17,640,000

10 Baut kokot 5/8' x 25 cm 192 192 192 - buah 18,000 3,456,000 11 Baut kokot 5/8' x 16 cm 736 736 736 - buah 23,000 16,928,000 12 Plat sambungan gelagar utama A 78 78 78 - kg 16,700 1,302,600 13 Plat sambungan tipe B 20 20 20 - kg 16,700 334,000 14 Plat sambungan tipe C 37 37 37 - kg 16,700 617,900 15 Baut sambungan gelagar utama 384 384 384 - buah 24,000 9,216,000 16 Plat Klem Lantai 736 736 736 - buah 15,000 11,040,000 17 Karet Peredam Lantai 64 64 64 - m 10,000 640,000 18 Elastomer 8 8 8 - buah 250,000 2,000,000 19 Kayu Bekisting 6 6 6 - m3 600,000 3,600,000 20 Paku 15 15 15 - kg 12,000 180,000 21 Besi beton polos 1,069 1,069 1,069 - kg 7,000 7,483,000 22 Kawat beton 24 24 24 - kg 16,000 384,000 23 Semen 529 529 529 - zak 69,500 36,765,500 24 Pasir beton 5 5 5 - m3 315,000 1,575,000 25 Split 5 5 5 - m3 265,000 1,325,000 26 Batu Belah 162 162 162 - m3 120,000 19,440,000 27 Pabrikasi Ereksion 10,650 10,650 10,650 - kg 3,000 31,950,000 28 Cat tembok 12 12 12 - kg 30,000 360,000 29 Cat finishing besi 1 1 1 - ls 2,000,000 2,000,000 30 Pasir pasang 80 80 80 - m3 160,000 12,800,000

SUB TOTAL ( III.A ) 345,311,700 B ALAT

1 Papan Kegiatan 1 1 1 - Unit 120,000 120,000 2 Cangkul 1 1 1 - Buah 50,000 50,000 3 Linggis 1 1 1 - Buah 25,000 25,000 4 Sekop 1 1 1 - Buah 70,000 70,000 5 Bambu 50 50 50 - Buah 8,000 400,000 6 Benang nilon 2 2 2 - Buah 5,000 10,000 7 Selang waterpass 15 15 15 - m 1,500 22,500 8 Ember Aduk Kecil 40 40 40 - Buah 8,000 320,000 9 Sewa molen 3 3 3 - Hari 350,000 1,050,000

10 Mobilisasi Molen 1 1 1 - Ls 500,000 500,000 11 Kuas 3 inch 4 4 4 - bh 10,000 40,000 12 Kunci besi 1 1 1 - Buah 10,000 10,000 13 Karung Tanggul 125 125 125 - Buah 1,000 125,000 14 Sewa Pompa Sedot 6 6 6 - Hari 50,000 300,000 15 Prasasti 1 1 1 - Buah 450,000 450,000

SUB TOTAL ( III.B ) 3,492,500 C UPAH

1 Pekerja 319 319 319 - HOK 24,000 7,656,000 2 Tukang 105 105 105 - HOK 33,000 3,465,000

SUB TOTAL ( III.C ) 11,121,000 JUMLAH SUB TOTAL III 359,925,200

JUMLAH TOTAL C 625,405,500

Page 118: Rpd 2014 Mp3ki - Penguatan

NO URAIAN

VOLUME

SISA

a b c d e = c + d f = b - e g h i = d * h

UNIT / SATUA

N

HARGA SATUAN

(Rp)

JUMLAH (Rp)

KEBUTUHAN PENGAJUAN TAHAP LALU

PENGAJUAN SAAT INI

JUMLAH S.D SAAT

INI

I PENGASPALAN (TALAGAJAYA-TANJUNGJAYA)

A BAHAN1 Batu Pecah 3/5 Cm 130 130 130 - m2 235,000 30,550,000 2 Batu Pecah 2/3 Cm 137 137 137 - m3 255,000 34,935,000 3 Batu Pecah 1/2 Cm 69 69 69 - m3 295,000 20,355,000 4 Pasir Aspal / Abu batu 37 37 37 - m3 245,000 9,065,000 5 Aspal Pen 60/70, 155 Kg 139 139 139 - Drum 1,700,000 236,300,000 6 Aspal Emulsi @ 200 kg 16 16 16 - Drum 1,850,000 29,600,000 7 Ban Bekas Mobil 25 25 25 - Buah 20,000 500,000 8 Kayu bakar 2 2 2 - m3 100,000 200,000

SUB TOTAL ( I.A ) 361,505,000 B A L A T

1 Papan proyek ( Uk.1,20 cm x 1.00 cm 1 1 1 - Unit 100,000 100,000 2 Papan Informasi ( Uk.120 cm x 100 c 1 1 1 - Unit 120,000 120,000 3 Prasasti ( Uk. 60 cm x 40 cm ) 1 1 1 - Unit 450,000 450,000 4 Spanduk/umbul2 2 2 2 - paket 200,000 400,000 5 Meteran 7,5 m 2 2 2 - bh 20,000 40,000 6 Sapu Lidi 4 4 4 - bh 12,125 48,500 7 meteran 50 m 1 1 1 - bh 60,000 60,000 8 Kamera Dokumentasi 1 1 1 - paket 1,500,000 1,500,000 9 Mesin Gilas 12 12 12 - Hari 800,000 9,600,000

10 Mob./Demob. Mesin Gilas 1 1 1 - Ls 2,500,000 2,500,000 SUB TOTAL ( I.B ) 14,818,500

C UPAH1 Pekerja Konstruksi (Aspal ) 281 281 281 - HOK 30,000 8,430,000 2 Pekerja Galian Saluran 220 220 220 - HOK 24,000 5,280,000 3 Tukang ( Aspal) 42 42 42 - HOK 45,000 1,890,000

SUB TOTAL ( I.C ) 15,600,000 JUMLAH SUB TOTAL I 391,923,500

II TPT (TALAGAJAYA-TANJUNGJAYA)

A BAHAN1 Semen 50 kg 288 288 288 - Zak 69,500 20,016,000 2 Pasir Pasang 58 58 58 - m³ 150,000 8,700,000 3 Batu Belah 115 115 115 - m³ 120,000 13,800,000

SUB TOTAL ( II.A ) 42,516,000 B ALAT

1 Bambu 18 18 18 - btg 8,000 144,000 2 Benang Kasur 3 3 3 - bh 5,000 15,000 3 Pralon 1/2 inch 4 4 4 - btg 20,000 80,000 4 Ember 20 20 20 - bh 8,000 160,000 5 Cat Tembok 6 6 6 - kg 30,000 180,000

SUB TOTAL ( II.B ) 579,000 C UPAH

1 Pekerja Konstruksi 232 232 232 - HOK 24,000 5,568,000 2 Tukang 93 93 93 - HOK 33,000 3,069,000

SUB TOTAL ( II.C ) 8,637,000 JUMLAH SUB TOTAL II 51,732,000

III TPT JEMBATAN (TALAGAJAYA-TANJUNGJAYA)

A BAHAN1 Semen 50 kg 197 197 197 - Zak 69,500 13,691,500 2 Pasir Pasang 40 40 40 - m³ 150,000 6,000,000 3 Batu Belah 80 80 80 - m³ 120,000 9,600,000 4 Besi dia 12 7 7 7 - btg 110,000 770,000 5 Pasir Beton 1 1 1 - m3 295,000 295,000 6 Kawat beton 1 1 1 - kg 16,000 16,000

SUB TOTAL ( III.A ) 30,372,500

Page 119: Rpd 2014 Mp3ki - Penguatan

NO URAIAN

VOLUME

SISA

a b c d e = c + d f = b - e g h i = d * h

UNIT / SATUA

N

HARGA SATUAN

(Rp)

JUMLAH (Rp)

KEBUTUHAN PENGAJUAN TAHAP LALU

PENGAJUAN SAAT INI

JUMLAH S.D SAAT

INI

B ALAT1 Bambu 28 28 28 - btg 8,000 224,000 2 Benang Kasur 3 3 3 - bh 5,000 15,000 3 Pralon 1/2 inch 3 3 3 - btg 20,000 60,000 4 Ember 26 26 26 - bh 8,000 208,000 5 Cat Tembok 6 6 6 - kg 30,000 180,000

SUB TOTAL ( III.B ) 687,000 C UPAH

1 Pekerja Konstruksi 135 135 135 - HOK 24,000 3,240,000 2 Tukang 61 61 61 - HOK 33,000 2,013,000

SUB TOTAL ( III.C ) 5,253,000 JUMLAH SUB TOTAL III 36,312,500

IV GG PLAT BETON (TALAGAJAYA-TANJUNGJAYA)

A BAHAN1 Semen 90 90 90 - zak 69,500 6,255,000 2 Batu belah 26 26 26 - M3 120,000 3,120,000 3 Pasir Pasang 8 8 8 - m3 150,000 1,200,000 4 Pasir Beton 2 2 2 - m3 295,000 590,000 5 Batu Pecah 2-3 cm 4 4 4 - m3 255,000 1,020,000 6 Kayu Begisting 1.2 1.2 1.2 - m3 600,000 720,000 7 Kawat Beton 4 4 4 - Kg 16,000 64,000 8 Paku 4 4 4 - kg 12,000 48,000 9 Besi dia. 10 64 64 64 - Buah 47,000 3,008,000

SUB TOTAL ( IV.A ) 16,025,000 B ALAT

1 Ember 25 25 25 - buah 8,000 200,000 2 Benang Kasur 3 3 3 - roll 5,000 15,000 3 Bambu 17 17 17 - Btg 8,000 136,000

SUB TOTAL ( IV.B ) 351,000 C UPAH

1 Pekerja Konstruksi 98 98 98 - HOK 24,000 2,352,000 2 Tukang 58 58 58 - HOK 33,000 1,914,000

SUB TOTAL ( IV.C ) 4,266,000 JUMLAH SUB TOTAL IV 20,642,000

JUMLAH TOTAL D 500,610,000

I RABAT BETON (WANGUNJAYA-MULYAJAYA)

A BAHAN1 Semen 50 kg 1,241 1,241 1,241 - Zak 69,500 86,249,500 2 Pasir beton 111 111 111 - m³ 315,000 34,965,000 3 Pasir urug 124 124 124 - m³ 100,000 12,400,000 4 Batu split 2/3 188 188 188 - m³ 265,000 49,820,000 5 Kayu u/bekisting 3 3 3 - m³ 600,000 1,800,000 6 Paku 22 22 22 - m³ 12,000 264,000 7 Plastik Cor (lebar 1,5cm) 2,171 2,171 2,171 - m2 2,500 5,427,500 8 Aspal Pen 60/70, 155 Kg 1 1 1 - drum 1,700,000 1,700,000

SUB TOTAL ( I.A ) 192,626,000

Page 120: Rpd 2014 Mp3ki - Penguatan

NO URAIAN

VOLUME

SISA

a b c d e = c + d f = b - e g h i = d * h

UNIT / SATUA

N

HARGA SATUAN

(Rp)

JUMLAH (Rp)

KEBUTUHAN PENGAJUAN TAHAP LALU

PENGAJUAN SAAT INI

JUMLAH S.D SAAT

INI

B A L A T 1 Biaya Transparansi : 2 a. Papan Proyek 100 x 120 cm 1 1 1 - Ls 100,000 100,000 3 b. Papan Informasi 100 x 180 cm 1 1 1 - Ls 120,000 120,000 4 c. Prasasti 60 x 40 cm 1 1 1 - Ls 450,000 450,000 5 d. Spanduk Program 2 2 2 - Ls 120,000 240,000 6 Concrete Mixer 22 22 22 - hari 350,000 7,700,000 7 Mobilisasi / Demob 1 1 1 - Ls 500,000 500,000 8 Meteran 5 M 1 1 1 - buah 10,000 10,000 9 Pipa Railing/Pilar Jembatan 8 8 8 - btg 250,000 2,000,000

10 Sekop 2 2 2 - buah 70,000 140,000 11 Ember 77 77 77 - buah 8,000 616,000 12 Arco/dolag 2 2 2 - buah 250,000 500,000 13 Benang Kasur 4 4 4 - Roll 5,000 20,000

SUB TOTAL ( I.B ) 12,396,000 C UPAH

1 Pekerja Konstruksi 544 544 544 - HOK 24,000 13,056,000 2 Tukang 142 142 142 - HOK 33,000 4,686,000

SUB TOTAL ( I.C ) 17,742,000 JUMLAH SUB TOTAL I 222,764,000

II TPT (WANGUNJAYA-MULYAJAYA)

A BAHAN1 Semen 50 kg 1,480 1,480 1,480 - Zak 69,500 102,860,000 2 Pasir Pasang 297 297 297 - m³ 160,000 47,520,000 3 Batu Belah 593 593 593 - m³ 120,000 71,160,000

SUB TOTAL ( II.A ) 221,540,000 B ALAT

1 Ember 50 50 50 - buah 8,000 400,000 2 Cat Tembok 4 4 4 - kg 30,000 120,000 3 Pipa pralon 5 5 5 - btg 24,000 120,000 4 Bambu 20 20 20 - bh 8,000 160,000 5 Benang kasur 3 3 3 - btg 5,000 15,000

SUB TOTAL ( II.B ) 815,000 C UPAH

1 Pekerja Konstruksi 957 957 957 - HOK 24,000 22,968,000 2 Tukang 411 411 411 - HOK 33,000 13,563,000

SUB TOTAL ( II.C ) 36,531,000 JUMLAH SUB TOTAL II 258,886,000

III BRONJONG

A BAHAN1 Batu Belah 231 231 231 - M3 120,000 27,720,000 2 Bronjong Dia. (2X1X0,5) 192 192 192 - Bh 135,000 25,920,000

SUB TOTAL ( III.A ) 53,640,000 B ALAT

1 Benang 2 2 2 - roll 5,000 10,000 2 Bambu 20 20 20 - btg 8,000 160,000

SUB TOTAL ( III.B ) 170,000 C UPAH

1 Pekerja Konstruksi 256 256 256 - HOK 24,000 6,144,000 2 Tukang 52 52 52 - HOK 33,000 1,716,000

SUB TOTAL ( III.C ) 7,860,000 JUMLAH SUB TOTAL III 61,670,000

Page 121: Rpd 2014 Mp3ki - Penguatan

NO URAIAN

VOLUME

SISA

a b c d e = c + d f = b - e g h i = d * h

UNIT / SATUA

N

HARGA SATUAN

(Rp)

JUMLAH (Rp)

KEBUTUHAN PENGAJUAN TAHAP LALU

PENGAJUAN SAAT INI

JUMLAH S.D SAAT

INI

IV GG PLAT BETON

A BAHAN1 Semen 34 34 34 - zak 69,500 2,363,000 2 Batu belah 10 10 10 - M3 120,000 1,200,000 3 Pasir Pasang 4 4 4 - M3 160,000 640,000 4 Pasir Beton 2 2 2 - M3 315,000 630,000 5 Batu Pecah 2-3 cm 2 2 2 - M3 265,000 530,000 6 Kayu Begisting 2 2 2 - M3 600,000 1,200,000 7 Kawat Beton 2 2 2 - Kg 16,000 32,000 8 Paku 2 2 2 - Kg 12,000 24,000 9 Besi dia. 10 28 28 28 - Btg 47,000 1,316,000

SUB TOTAL ( IV.A ) 7,935,000 B ALAT

1 Benang 3 3 3 - roll 5,000 15,000 2 Ember 8 8 8 - buah 8,000 64,000

SUB TOTAL ( IV.B ) 79,000 C UPAH

1 Pekerja Konstruksi 36 36 36 - HOK 24,000 864,000 2 Tukang 22 22 22 - HOK 33,000 726,000

SUB TOTAL ( IV.C ) 1,590,000 JUMLAH SUB TOTAL IV 9,604,000

JUMLAH TOTAL E 552,924,000

JUMLAH TOTAL (A+B+C+D+E) 2,830,320,000

Terbilang (dengan huruf) : #VALUE!

Banjarwangi, …......…………

Disetujui Oleh : Dibuat Oleh :Ketua TPK Bendahara TPK

Kecamatan Banjarwangi Kecamatan Banjarwangi

Endjang Komara Ahmad Hayun,S.Pd.IMengetahui :

FK / FT Kecamatan Banjarwangi PjOK Kecamatan Banjarwangi

MIFTAH FARID Ujang Suryana.S.SosFasilitator Kecamatan Fasilitator Teknik NIP. 19671201 198703 1 004

Sebagai Catatan :

TAHAP ALOKASI BOP TAHAP LALU KUMULATIF

1 DANA 40% TAHAP 1 1,132,128,000 2,830,320,000 2,830,320,000

2 DANA 40% TAHAP 2 1,132,128,000 - -

3 DANA 20% 566,064,000 - -

JUMLAH 2,830,320,000 - 2,830,320,000 2,830,320,000

DEFIK GUNAWAN. ST AHMAD FAUZI, ST

NO

TAHAP SEKARANG

Page 122: Rpd 2014 Mp3ki - Penguatan

PNPM - Mandiri Perdesaan Pola Khusus MP3KI

RENCANA PENGGUNAAN DANAMP3KI PERCEPATAN

Kecamatan : Banjarwangi Kabupaten : Garut

NO URAIAN

I RABAT BETON (BANJARWANGI-BOJONG-JAYABAKTI)A BAHAN

1 Semen 50 kg 2,890 2 Pasir beton 258 3 Pasir urug 288 4 Batu split 2/3 439

II TPT (BANJARWANGI-BOJONG-JAYABAKTI)A BAHAN

1 Semen 50 kg 474 2 Pasir Pasang 95 3 Batu Belah 188

III BRONJONGA BAHAN

1 Batu Belah 132 2 Bronjong Dia. (2X1X0, 110

KEBUTU

HAN

PENGAJUAN KE 1

PENGAJUAN KE 2

PENGAJUAN KE 3

PENGAJUAN KE 4

PENGAJUAN KE 5

PENGAJUAN KE 6

PENGAJUAN KE 7

SUPLI

ER

MASYARAK

AT

SUPLI

ER

MASYARAK

AT

SUPLI

ER

MASYARAK

AT

SUPLI

ER

MASYARAK

AT

SUPLI

ER

MASYARAK

AT

SUPLI

ER

MASYARAK

AT

SUPLI

ER

MASYARAK

AT

Page 123: Rpd 2014 Mp3ki - Penguatan

PENGUATAN TarikPercepatan

TRANSFER : Penguatan 91,061,500 Raja NiagaRabat 41,385,000 RajaNiaga 31,915,000 TPT 10,510,000 Qurotul 25,147,500 Bronjong 5,040,000

QurrotulTPT 18,491,000 TPT Jembatan 3,736,500 148,124,000 GG Plat 2,920,000

82,082,500

Sisa 66,041,500

PercepatanDayareksaRabat 20,547,500 SulungbungsuRabat 11,130,000 tpt 16,257,000 gg plat 11,081,000

223,180,500 Sisa (75,056,500)