Route from Chelmsley Wood to Dunton - drawing number...

1
www.arup.com T +44(0)121 213 3000 F +44(0)121 213 3001 Solihull, West Midlands B90 8AE The Arup Campus, Blythe Gate, Blythe Valley Park Feasibility Study High Speed 2 Sheet 26 of 33 Plan and Profile Rail 209742-00 HS2-ARP-00-DR-RW-05026 3.0 As Shown / / 22 12 11 CO For Coordination 2.0 CL MP / / 05 01 12 CO MP CL 3.0 Post Consultation Route J :\ 209000 \ 209742 - 00 \ 4 I n t e r n a l Pr o j ec t Da t a \ 4 - 10 Po s t Con s u lt a ti on Dr a wi ng s \ 0_ Dr a wi ng s \ HS2 - ARP- 00 - DR- RW - 05026 . dgn Approved Approved 80 80 80 80 80 80 80 80 8 0 80 80 80 80 80 80 80 80 80 80 80 80 80 8 0 80 80 80 80 80 80 80 80 80 8 0 80 80 80 80 80 80 80 80 80 80 80 80 80 80 80 8 0 80 80 80 80 80 80 80 80 80 80 80 80 80 80 8 0 80 80 80 80 80 80 80 80 80 80 8 0 80 80 80 80 80 80 80 80 80 80 80 80 80 80 80 80 80 80 80 80 80 80 80 8 0 80 80 80 80 8 0 8 0 80 80 80 80 80 80 80 80 80 80 8 0 8 0 80 8 0 80 8 0 80 80 80 80 80 8 0 80 80 80 80 80 80 80 80 80 8 0 80 80 80 80 80 80 8 0 80 80 80 80 80 80 80 8 0 8 0 80 80 80 80 80 80 80 80 100 10 0 100 10 0 100 100 1 0 0 100 100 1 00 100 100 100 1 00 100 100 10 0 100 100 10 0 10 0 10 0 100 100 100 100 100 10 0 100 1 0 0 100 100 100 1 00 100 100 100 100 100 100 1 00 100 100 100 100 100 100 100 100 100 100 100 1 00 100 100 1 00 1 0 0 10 0 1 00 100 1 0 0 10 0 100 100 1 0 0 100 160 + 000 1 62 + 00 0 163 + 000 164 + 000 165 + 000 166 + 000 167 + 000 1 6 0 + 7 0 6 1 61 + 00 0 16 2 + 000 163 + 000 40.0 50.0 60.0 70.0 80.0 90.0 100.0 110.0 120.0 130.0 140.0 150.0 160.0 160.0 40.0 50.0 60.0 70.0 80.0 90.0 100.0 110.0 120.0 130.0 140.0 150.0 160.0 160.0 Chainage 160 + 000 160 + 100 160 + 200 160 + 300 160 + 400 160 + 500 160 + 600 160 + 700 160 + 800 160 + 900 161 + 000 161 + 100 161 + 200 161 + 300 161 + 400 161 + 500 161 + 600 161 + 700 161 + 800 161 + 900 162 + 000 162 + 100 162 + 200 162 + 300 162 + 400 162 + 500 162 + 600 162 + 700 162 + 800 162 + 900 163 + 000 163 + 100 163 + 200 163 + 300 163 + 400 163 + 500 163 + 600 163 + 700 163 + 800 163 + 900 164 + 000 164 + 100 164 + 200 164 + 300 164 + 400 164 + 500 164 + 600 164 + 700 164 + 800 164 + 900 165 + 000 165 + 100 165 + 200 165 + 300 165 + 400 165 + 500 165 + 600 165 + 700 165 + 800 165 + 900 166 + 000 166 + 100 166 + 200 166 + 300 166 + 400 Horizontal Alignment R=4509.1 L=1282.0 L = 32 0 . 3 L=950.5 L = 350 . 0 R=5264.5 L=250.0 L = 350 . 0 L=4830.0 Vertical Alignment L = 1 7 8 5 . 6 G= - 0 . 04 % L=215.4 R=56000.0 L = 2925 . 0 G = - 0 . 42 % L=286.5 R=-56000.0 L = 36 6 5 . 9 G = 0 . 09 % Existing Level 100 . 5 94 . 8 93 . 4 91 . 1 85 . 8 86 . 0 87 . 1 86 . 4 84 . 3 82 . 1 78 . 7 78 . 2 77 . 8 79 . 1 80 . 2 79 . 8 80 . 0 84 . 3 85 . 1 82 . 4 78 . 2 74 . 8 75 . 3 75 . 3 75 . 7 78 . 2 78 . 8 80 . 3 77 . 7 76 . 8 77 . 7 80 . 6 83 . 6 89 . 9 91 . 5 92 . 4 93 . 8 94 . 4 85 . 2 80 . 9 78 . 1 76 . 9 76 . 7 76 . 1 75 . 3 76 . 9 73 . 7 74 . 7 73 . 7 74 . 3 76 . 6 77 . 6 79 . 1 81 . 5 82 . 9 83 . 2 83 . 0 84 . 1 86 . 8 89 . 8 93 . 9 98 . 4 101 . 5 102 . 8 102 . 9 Proposed Level 97 . 6 97 . 6 97 . 4 97 . 0 96 . 6 96 . 2 95 . 8 95 . 3 94 . 9 94 . 5 94 . 1 93 . 6 93 . 2 92 . 8 92 . 4 91 . 9 91 . 5 91 . 1 90 . 7 90 . 2 89 . 8 89 . 4 89 . 0 88 . 5 88 . 1 87 . 7 87 . 3 86 . 8 86 . 4 86 . 0 85 . 6 85 . 1 84 . 7 84 . 4 84 . 2 84 . 2 84 . 2 84 . 3 84 . 4 84 . 5 84 . 6 84 . 7 84 . 8 84 . 9 84 . 9 85 . 0 85 . 1 85 . 2 85 . 3 85 . 4 85 . 5 85 . 5 85 . 6 85 . 7 85 . 8 85 . 9 86 . 0 86 . 1 86 . 2 86 . 2 86 . 3 86 . 4 86 . 5 86 . 6 86 . 7 + 2 . 8 + 4 . 0 + 5 . 9 + 10 . 8 + 10 . 2 + 8 . 7 + 8 . 9 + 10 . 6 + 12 . 4 + 15 . 4 + 15 . 4 + 15 . 4 + 13 . 7 + 12 . 2 + 12 . 1 + 11 . 5 + 6 . 8 + 5 . 6 + 7 . 8 + 11 . 6 + 14 . 6 + 13 . 7 + 13 . 2 + 12 . 4 + 9 . 5 + 8 . 5 + 6 . 5 + 8 . 7 + 9 . 2 + 7 . 9 + 4 . 5 + 1 . 1 + 3 . 6 + 6 . 5 + 7 . 8 + 8 . 1 + 8 . 8 + 9 . 6 + 8 . 1 + 11 . 4 + 10 . 5 + 11 . 6 + 11 . 1 + 8 . 9 + 7 . 9 + 6 . 5 + 4 . 2 + 2 . 9 + 2 . 7 + 3 . 0 + 2 . 0 Cut and Fill - 2 . 9 - 5 . 5 - 7 . 3 - 8 . 2 - 9 . 6 - 10 . 1 - 0 . 8 - 0 . 6 - 3 . 6 - 7 . 6 - 12 . 0 - 15 . 0 - 16 . 2 - 16 . 2 Design Speed 315km/h 320km/h 400km/h Ch . 160075 . 814 T P. 97 . 580 Ch . 160291 . 247 T P. 97 . 079 Ch . 163216 . 253 T P. 84 . 648 Ch . 163502 . 712 T P. 84 . 163 N e wH S 2 B r i dg e ov e r E x i s ti ng R a il w a y 20 m N e wH S 2 V i a du c t ov e r Flood Plain 110m New HS2 Bridge over A446 N e wH S 2 V i a du c t ov e r F l ood P l a i n a nd E x i s ti ng R a il w a y 325 m New HS2 Viaduct over Flood Plain and Existing Railway New HS2 Viaduct over Floodplain New HS2 Viaduct over Flood Plain New HS2 Viaduct over Flood Plains, M42 and new Up Birmingham Line 2030m New HS2 Viaduct over M42 205m M42 New Possible Permanent Roundabout Possible Road Closure N e wP o ss i b l e P e r m a n e n t M a no r D r i v e D i v e r s i on und e r H S 2 Birmingham Road N e wP o ss i b l e P e r m a n e n t F a r a d a y A v e nu e D i v e r s i on over HS2 N e wP o ss i b l e P e r m a n e n t G il s on R o a d D i v e r s i on over HS2 New Possible Permanent Green Lane Diversion New Possible Permanent Gilson Drive Diversion New HS2 Viaduct over Flood Plains, M42 and New Up Birmingham Line New Permanent Manor Drive Diversion under HS2 New Possible Permanent Attleborough Lane Diversion under HS2 New HS2 Viaducts over Flood Plain New Possible Permanent Gilson Road Diversion over HS2 New Possible Permanent Faraday Avenue Diversion over HS2 New HS2 Bridges to carry New Birmingham Lines over M42 / M6 Slip Roads New HS2 Viaduct to carry Down Spur Line over M42, A446 & Existing Railway New HS2 Viaduct over M42 New HS2 Bridge over A446 Plan Scale 1:10000 Profile Scale H 1:10000 V 1:1000 N F o r Co n ti n u a t i on Re f e r T o HS 2 - ARP - DR- RW - 05025 F o r Con ti nu a ti on Re f e r T o HS 2 - ARP - DR- RW - 05027 F o r Con ti nu a ti o n Re f e r T o HS 2 - ARP - DR- RW - 050 31 For Continuation Refer To H S 2 - A R P - 0 0 - D R - R W - 05 03 1 Legend National Parks Flood Risk Zones Special Areas of Conservation Special Protection Areas National Nature Reserves Parks and Gardens Scheduled Ancient Monuments Historical Battlefields Listed buildings Area of Outstanding Natural Beauty RAMSAR World Heritage Site SSSI A1 A 9 B C D E F G H I J K L M N O P Drawing No Drawing Status Discipline Scale at A1 Job No Issue Drawing Title Issue Date By Chkd Appd Job Title Client 10 8 7 6 5 4 2 1 3 ' Arup ' Crown copyright and database rights 2011 Ordnance Survey 10049190 0.04 0.02 0.03 0 0.01 0.05 Metres at 1:1 (Scale with caution as distortion can occur) Railway Embankment Highway Embankment Highway Cutting Railway Cutting

Transcript of Route from Chelmsley Wood to Dunton - drawing number...

www.arup.com

T +44(0)121 213 3000 F +44(0)121 213 3001

Solihull, West Midlands B90 8AE

The Arup Campus, Blythe Gate, Blythe Valley Park

Feasibility Study

High Speed 2

Sheet 26 of 33

Plan and Profile

Rail

209742-00

HS2-ARP-00-DR-RW-05026 3.0

As Shown

/ /2212 11 CO

For Coordination

2.0 CLMP

/ /05 0112 CO MP CL

3.0

Post Consultation Route

J:\209000\2

09742-0

0\4 Intern

al Project

Data\4-1

0 P

ost

Consultation Dra

win

gs\0

_Dra

win

gs\H

S2-A

RP-0

0-D

R-R

W-0

5026.d

gn

Approved

Approved

80

80

80

80

80

8080

80

80

80

80

80

80

80

80

80

80

80

80

80

80

80

80

80

80

80

80

80

80

80

80

80

80

80

80

80

80

80

80

80

80

80

80

80 80

80

80

80

80

80 80

80

80

80

80

80

8080

80

80

80

80

80

80

80 8

0

80

80

80

80

80

808

0

80

80

80

80

80

80

80

80

80

80

80

8080

80

80

80

80

80

80

80

80

80

80

80

80

80

80

80

80

80

80

80

80

80

80

80

80

80

80

80

80

80

80

80

80

80

80

80

80

80

80

8080

80

80

80

80

80

8080

80

80

80

80

80

80

80

80

80

80

80

8080

80

80

80

80

80

80

80

80

80

80

8080

80

80

80

100

100

100

100

100

100

100

100

100

100

100

100

100

100

100

100

100

100

100

100

100

100

100100

100

100

100100100

100

100

100

100 100

100

100

100

100

100

100 100

100

100

100

100

100

100

100100

100

100

100

100

100

100

100

100

100

100

100

100

100

100

100

100

100

160+000

162+000

163+000

164+000

165+000

166+000

167+000

160+706

161+000

162+000

163+000

40.0

50.0

60.0

70.0

80.0

90.0

100.0

110.0

120.0

130.0

140.0

150.0

160.0160.0

40.0

50.0

60.0

70.0

80.0

90.0

100.0

110.0

120.0

130.0

140.0

150.0

160.0160.0

Chainage

160+000

160+100

160+200

160+300

160+400

160+500

160+600

160+700

160+800

160+900

161+000

161+100

161+200

161+300

161+400

161+500

161+600

161+700

161+800

161+900

162+000

162+100

162+200

162+300

162+400

162+500

162+600

162+700

162+800

162+900

163+000

163+100

163+200

163+300

163+400

163+500

163+600

163+700

163+800

163+900

164+000

164+100

164+200

164+300

164+400

164+500

164+600

164+700

164+800

164+900

165+000

165+100

165+200

165+300

165+400

165+500

165+600

165+700

165+800

165+900

166+000

166+100

166+200

166+300

166+400

Horizontal Alignment

R=4509.1

L=1282.0L=320.3L=950.5

L=350.0R=5264.5

L=250.0L=350.0L=4830.0

Vertical Alignment

L=1785.6

G=-0.04

%L=215.4

R=56000.0

L=2925.0

G=-0.42%

L=286.5

R=-56000.0

L=3665.9

G=0.09%

Existing Level 100.5

94.8

93.4

91.1

85.8

86.0

87.1

86.4

84.3

82.1

78.7

78.2

77.8

79.1

80.2

79.8

80.0

84.3

85.1

82.4

78.2

74.8

75.3

75.3

75.7

78.2

78.8

80.3

77.7

76.8

77.7

80.6

83.6

89.9

91.5

92.4

93.8

94.4

85.2

80.9

78.1

76.9

76.7

76.1

75.3

76.9

73.7

74.7

73.7

74.3

76.6

77.6

79.1

81.5

82.9

83.2

83.0

84.1

86.8

89.8

93.9

98.4

101.5

102.8

102.9

Proposed Level 97.6

97.6

97.4

97.0

96.6

96.2

95.8

95.3

94.9

94.5

94.1

93.6

93.2

92.8

92.4

91.9

91.5

91.1

90.7

90.2

89.8

89.4

89.0

88.5

88.1

87.7

87.3

86.8

86.4

86.0

85.6

85.1

84.7

84.4

84.2

84.2

84.2

84.3

84.4

84.5

84.6

84.7

84.8

84.9

84.9

85.0

85.1

85.2

85.3

85.4

85.5

85.5

85.6

85.7

85.8

85.9

86.0

86.1

86.2

86.2

86.3

86.4

86.5

86.6

86.7

+2.8

+4.0

+5.9

+10.8

+10.2

+8.7

+8.9

+10.6

+12.4

+15.4

+15.4

+15.4

+13.7

+12.2

+12.1

+11.5

+6.8

+5.6

+7.8

+11.6

+14.6

+13.7

+13.2

+12.4

+9.5

+8.5

+6.5

+8.7

+9.2

+7.9

+4.5

+1.1

+3.6

+6.5

+7.8

+8.1

+8.8

+9.6

+8.1

+11.4

+10.5

+11.6

+11.1

+8.9

+7.9

+6.5

+4.2

+2.9

+2.7

+3.0

+2.0

Cut and Fill -2.9

-5.5

-7.3

-8.2

-9.6

-10.1

-0.8

-0.6

-3.6

-7.6

-12.0

-15.0

-16.2

-16.2

Design Speed 315km/h320km/h400km/h

Ch.1

60075.8

14

TP.9

7.5

80

Ch.1

60291.2

47

TP.9

7.0

79

Ch.1

63216.2

53

TP.8

4.6

48

Ch.1

63502.7

12

TP.8

4.1

63

New HS2 Bridge over Existing Railway 20m

New HS2 Viaduct over Flood Plain 110m

New HS2 Bridge

over A446

New HS2 Viaduct over Flood Plain and Existing Railway 325m

New HS2 Viaduct over Flood Plain and Existing Railway

New HS2 Viaduct overFloodplain

New HS2 Viaduct

over Flood Plain

New HS2 Viaduct over Flood Plains, M42 and new Up Birmingham Line 2030mNew HS2 Viaductover M42 205m

M42

New PossiblePermanentRoundabout

Possible Road Closure

New Possible Permanent Manor Drive

Diversion under HS2

Birmingham Road

New Possible Permanent

Faraday Avenue Diversion

over HS2

New Possible Permanent

Gilson Road Diversion

over HS2

New Possible Permanent Green Lane Diversion

New Possible Permanent

Gilson Drive Diversion

New HS2 Viaduct over Flood Plains,

M42 and New Up Birmingham Line

New Permanent Manor Drive

Diversion under HS2

New Possible Permanent

Attleborough Lane

Diversion under HS2

New HS2 Viaducts over Flood Plain

New Possible Permanent

Gilson Road Diversion

over HS2

New Possible Permanent

Faraday Avenue Diversion

over HS2

New HS2 Bridges to carry New Birmingham Lines over M42 / M6 Slip Roads

New HS2 Viaduct

to carry Down Spur

Line over M42, A446

& Existing Railway

New HS2

Viaduct

over M42

New HS2 Bridge over A446

PlanScale 1:10000

ProfileScale H 1:10000 V 1:1000

N

For C

ontin

uatio

n R

efer T

o H

S2-A

RP-D

R-R

W-0

5025

For

Continuation R

efer

To H

S2-A

RP-D

R-R

W-0

5027

For

Continuation R

efer

To

HS2-A

RP-D

R-R

W-0

5031

For Continuation Refer To HS2-ARP-00-DR-RW-05031

Legend National Parks

Flood Risk Zones

Special Areas of Conservation

Special Protection Areas

National Nature Reserves

Parks and Gardens

Scheduled Ancient Monuments

Historical Battlefields

Listed buildings

Area of Outstanding Natural Beauty

RAMSAR

World Heritage Site

SSSI

A1 A

9

B C D E F G H I J K L M N O P

Drawing No

Drawing Status

Discipline

Scale at A1

Job No

Issue

Drawing Title

Issue Date By Chkd Appd

Job TitleClient

10

8

7

6

5

4

2

1

3

' Arup

' Crown copyright and database rights 2011 Ordnance Survey 10049190

0.040.02 0.030 0.01 0.05 Metres at 1:1 (Scale with caution as distortion can occur)

Railway

Embankment

Highway

Embankment

Highway

Cutting

Railway

Cutting