1 Roundabout Design Project PUBLIC HEARING For more information about the project, go to www.cflroads.com, enter 441210‐1 in the search box and then click on “Go” PUBLIC HEARING for State Road (S.R.) 5/U.S. 1 Roundabout at Old Dixie Highway Flagler County, Florida Financial Project ID No.: 441210-1-32-0

Transcript of Roundabout Design Project PUBLIC HEARING

1

Roundabout Design Project PUBLIC HEARING

For more information about the project, go to www.cflroads.com, enter 441210‐1 in the search box and then click on “Go”    

PUBLIC HEARINGfor State Road (S.R.) 5/U.S. 1 Roundabout

at Old Dixie Highway

Flagler County, Florida

Financial Project ID No.: 441210-1-32-0

2

Roundabout Design Project PUBLIC HEARING

For more information about the project, go to www.cflroads.com, enter 441210‐1 in the search box and then click on “Go”    

Welcometo the Public Hearing

for State Road (S.R.) 5/U.S. 1 Roundabout

at Old Dixie Highway

Flagler County, FloridaFinancial Project ID No.: 441210-1-32-01

3

Roundabout Design Project PUBLIC HEARING

For more information about the project, go to www.cflroads.com, enter 441210‐1 in the search box and then click on “Go”    

Public participation is solicited without regard to race, color, national origin, age, sex, religion, disabilityor family status. Persons wishing to express their concerns relative to FDOT compliance with Title VI maydo so by contacting either:

DeLand Office Tallahassee OfficeFlorida Department of Transportation  Florida Department of TransportationDistrict Five Title VI Coordinator  State Title VI Coordinator Jennifer Smith  Jacqueline Paramore 719 South Woodland Boulevard 605 Suwannee Street, Mail Station 65DeLand, Florida 32720  Tallahassee, Florida 32399‐0450(386) 943‐5367  (850) 414‐[email protected] [email protected]

All inquiries or complaints will be handled according to FDOT procedure and in an expeditious manner.

Title VI

4

Roundabout Design Project PUBLIC HEARING

For more information about the project, go to www.cflroads.com, enter 441210‐1 in the search box and then click on “Go”    

The environmental review, consultation, and other actions required byapplicable federal environmental laws for this project are being, or havebeen, carried out by the Florida Department of Transportation (FDOT)pursuant to 23 U.S.C. §327 and a Memorandum of Understanding datedDecember 14, 2016 and executed by the Federal Highway Administrationand FDOT.

5

Roundabout Design Project PUBLIC HEARING

For more information about the project, go to www.cflroads.com, enter 441210‐1 in the search box and then click on “Go”    

Governing Legislation:• Section 120.525, F.S. – Meetings, Hearings, and Workshops

• Section 286.011, F.S. – Government in the Sunshine Law

• Section 335.199, F.S. – Transportation Projects Modifying Access to Adjacent Property

• Section 399.155 F.S. – Transportation Planning

• Americans with Disabilities Act (ADA) of 1990

• Title VI of the Civil Rights Act of 1986 and other Nondiscrimination Laws

• 49 CFR Part 24, Uniform Relocation Assistance and Real Property Acquisition for Federal and Federally –Assisted Programs.

6

Roundabout Design Project PUBLIC HEARING

For more information about the project, go to www.cflroads.com, enter 441210‐1 in the search box and then click on “Go”    

Public Hearing Purpose:

• Pursuant to Florida Statute 355.199, the Florida Department of Transportation is conducting this public hearing regarding the proposed design of a roundabout at the intersection of S.R. 5/U.S. 1 and Old Dixie Highway. The department is designing this project to improve safety and mobility at the intersection. 

• To present the proposed roundabout and to receive public input.

7

Roundabout Design Project PUBLIC HEARING

For more information about the project, go to www.cflroads.com, enter 441210‐1 in the search box and then click on “Go”    

Project Limits

The project limits along U.S. 1 extend from south of Old Dixie Highway to north of Old Dixie Highway.

A distance of approximately one‐half mile. 

8

Roundabout Design Project PUBLIC HEARING

For more information about the project, go to www.cflroads.com, enter 441210‐1 in the search box and then click on “Go”    

Existing Conditions• History of angle crashes • Crashes resulting in fatalities• Flagler County and residents requesting safety 

improvements

Proposed Roundabout• Improves safety• Maintains traffic flow on U.S. 1• Provides better operation and safety performance

9

Roundabout Design Project PUBLIC HEARING

For more information about the project, go to www.cflroads.com, enter 441210‐1 in the search box and then click on “Go”    

What is a Modern Roundabout?• Accommodates vehicles of all sizes (including trucks and buses)

• Yields to circulating traffic at entry• Raised center island controls traffic flow• Reduces speed• There is no parking within the circular intersection

10

Roundabout Design Project PUBLIC HEARING

For more information about the project, go to www.cflroads.com, enter 441210‐1 in the search box and then click on “Go”    

Traffic Operations at the Roundabout ‐ Year 2040

11

Roundabout Design Project PUBLIC HEARING

For more information about the project, go to www.cflroads.com, enter 441210‐1 in the search box and then click on “Go”    

Benefits of a Roundabout:• Reduction in severe angle crashes

• 90% reduction in fatalities

• 68% reduction in injuries

• Slower speed allows increased reaction time

• Reduces delay and improves traffic flow

• Cost efficient – no additional right of way will be required

12

Roundabout Design Project PUBLIC HEARING

For more information about the project, go to www.cflroads.com, enter 441210‐1 in the search box and then click on “Go”    

Safety Benefits

Roundabout• 8 conflict points• No crossing points

Traffic Signal• 32 conflict points• 16 crossing points

Vehicle Conflict Point Comparison

13

Roundabout Design Project PUBLIC HEARING

For more information about the project, go to www.cflroads.com, enter 441210‐1 in the search box and then click on “Go”    

How do Bicyclists use a Roundabout?• Proceed as a motorist by continuing with traffic through the roundabout.

• When bicyclists continue with traffic, the same laws apply to them that apply to motor vehicles; yielding to currently circulating traffic.

14

Roundabout Design Project PUBLIC HEARING

For more information about the project, go to www.cflroads.com, enter 441210‐1 in the search box and then click on “Go”    

More information about roundabouts is available online on the FDOT website at:

www.fdot.gov/agencyresources/roundabouts

15

Roundabout Design Project PUBLIC HEARING

For more information about the project, go to www.cflroads.com, enter 441210‐1 in the search box and then click on “Go”    

Proposed MedianModifications:

• Full median opening 600 feet south of the central island to remain‐ Includes a southbound left‐turn lane

• Northbound right‐turn lane and northbound auxiliary lane serving Old Dixie Highway and S.R. 325 will be removed

16

Roundabout Design Project PUBLIC HEARING

For more information about the project, go to www.cflroads.com, enter 441210‐1 in the search box and then click on “Go”    

ProposedMedian Modifications:• Median openings to Old Dixie Highway, County Road 325 and Trojan Road will be closed‐ Southbound left‐turn lane and median auxiliary lane will be removed

• Full Median Opening 900 feet north of the central island will be modified to allow for U‐Turns‐ Add northbound left‐turn lane

17

Roundabout Design Project PUBLIC HEARING

For more information about the project, go to www.cflroads.com, enter 441210‐1 in the search box and then click on “Go”    

Access Management

Full Median Opening• 18 conflict points

Closed Median Opening• No conflict points

18

Roundabout Design Project PUBLIC HEARING

For more information about the project, go to www.cflroads.com, enter 441210‐1 in the search box and then click on “Go”    

U‐Turns• Safer than direct left turns

• Reduces the potential for accidents‐ Fatalities reduced by 27%‐ Crash rates reduced by 18%

19

Roundabout Design Project PUBLIC HEARING

For more information about the project, go to www.cflroads.com, enter 441210‐1 in the search box and then click on “Go”    

Drainage Improvements:• Improve stormwater drainage system

• Maintain existing drainage patterns

• Add new inlets to accommodate additional pavement area

• Comply with local jurisdictions and the St. Johns River Water Management District (SJRWMD) 

20

Roundabout Design Project PUBLIC HEARING

For more information about the project, go to www.cflroads.com, enter 441210‐1 in the search box and then click on “Go”    

Landscaping:• Provides a focal point to reduce headlight glare, improve safety, and enhance traffic calming

• Meets all FDOT Roundabout guidelines for sight lines and clear zones

• Low maintenance design and seasonal interest for commuters

• Water truck irrigation with hook‐up points to provide a safe alternative for watering plant material throughout the establishment period

21

Roundabout Design Project PUBLIC HEARING

For more information about the project, go to www.cflroads.com, enter 441210‐1 in the search box and then click on “Go”    

Lighting Improvements:• New LED lighting within the proposed

roundabout• All roadway approaches will have lighting for vehicular traffic 

• FDOT maintains lighting within the county and FDOT right of way• Coordination with utility agency owners ‐ Minimize construction impacts‐ Power company for service connections‐ Ensure existing lighting to adjacent properties is maintained

22

Roundabout Design Project PUBLIC HEARING

For more information about the project, go to www.cflroads.com, enter 441210‐1 in the search box and then click on “Go”    

23

Roundabout Design Project PUBLIC HEARING

For more information about the project, go to www.cflroads.com, enter 441210‐1 in the search box and then click on “Go”    

1. Go to the project website on www.cflroads.com

2. Enter the project number “441210‐1” in the search box at the top right

3. Then click on  “go”

Finding  more information about this project online is as easy as 1 ‐2 ‐ 3

441210‐1 Go

24

Roundabout Design Project PUBLIC HEARING

For more information about the project, go to www.cflroads.com, enter 441210‐1 in the search box and then click on “Go”    

How can you participate?• Provide your comments verbally during the public comment period.

• Fill out a comment form and drop it in the comments box at the comments table.

• Take a comment form with you and mail it to the address shown on the form.

• Email your comments to Ms. Heidi Trivett at [email protected]

• Make a comment to the court reporter.

• Use the “Ask a Question” button on the CFL Roads website, on the S.R. 5 web page.All comments received by January 29, 2018 will become part of the official public hearing record.

25

Roundabout Design Project PUBLIC HEARING

For more information about the project, go to www.cflroads.com, enter 441210‐1 in the search box and then click on “Go”    

To make a verbal public statement after the presentation:

1) Ask for a speaker request card at the sign‐in table

2) Fill out the card with your name, address and phone number, and who you are representing

3) Give the card back to a member of the project team

4) You will be called to give your verbal statements into a microphone

5) Please limit your comments to two minutes.

Speaker Request Card NumberTo be completed prior to making a recorded StatementPUBLIC HEARING – January 18, 2018

State Road (S.R.) 5/U.S. 1 Roundaboutat Old Dixie Highway, Flagler County, Florida

Financial Project ID No.: 441210-1-32-01

PLEASE PRINT:Name:

Last First Middle Initial

Address:Street

City State Zip Code

Telephone: ( )Area Code

Representing: Self FirmGovernment AgencyCivic OrganizationHomeowners AssociationOther

26

Roundabout Design Project PUBLIC HEARING

For more information about the project, go to www.cflroads.com, enter 441210‐1 in the search box and then click on “Go”    

Written Comments:• Comment forms are available at the sign‐in table.

• You may fill them out and hand them in tonight, or

• Take them with you and mail them to the address provided on the form.

27

Roundabout Design Project PUBLIC HEARING

For more information about the project, go to www.cflroads.com, enter 441210‐1 in the search box and then click on “Go”    

If you have questions or would like more information,you may also contact one of the following:

Ms. Heidi TrivettFDOT Project Manager

719 South Woodland BoulevardDeLand, Florida 32720‐6800Telephone: 386‐943‐[email protected]

Mr. Roman Blanco, P.E.Consultant Project Manager

1650 Prudential Drive, Suite 400Jacksonville, Florida 32207Telephone: 904‐861‐2884

[email protected]

28

Roundabout Design Project PUBLIC HEARING

For more information about the project, go to www.cflroads.com, enter 441210‐1 in the search box and then click on “Go”    

THANK YOUFOR YOUR INTEREST IN THIS PROJECT!