Roosevelt High School Modernization Community Meeting

25
Roosevelt High School ModernizaƟon Concept Design November 2013

description

We enjoyed last night's meeting with the Ward 4 Roosevelt High School community. If you happened to have missed the meeting or simply wish to share the update and new proposed work hours with your neighbors, friends and family feel free to share! Thanks.

Transcript of Roosevelt High School Modernization Community Meeting

Page 1: Roosevelt High School Modernization Community Meeting

Roosevelt High School Moderniza on Concept DesignNovember 2013

Page 2: Roosevelt High School Modernization Community Meeting

Roosevelt High School Moderniza on Concept DesignNovember 2013

Perkins Eastman DC Team

PERKINS EASTMAN DC TEAM

Sean O’Donnell, AIA, LEED AP Principal-In–Charge

Matt Bell, FAIADesign Principal

Mary Rankin, AIA, LEED AP BD + CProject Manager

William Griffin, AIA, LEED APProject Designer

Abbie CroninProject Architect

Tatiana Bendeck, LEED APArchitect

Page 3: Roosevelt High School Modernization Community Meeting

Roosevelt High School Moderniza on Concept DesignNovember 2013

Smoot/Gilbane Team

SMOOT/GILBANE TEAM

Page 4: Roosevelt High School Modernization Community Meeting

Roosevelt High School Moderniza on Concept DesignNovember 2013

ScheduleDesign Submissions• Concept Design October 2013• Schematic Design December 2013• Early Release Packages December 2013• Design Development/GMP March 2014• Construction Documents June 2014

Construction Milestones• Demolition January 2014 - March 2014• GMP finalized May 2014• Substantial Completion July 2015• School starts August 2015

Upcoming Meetings• CFA Concept Level Review November 21, 2013• CFA Final Submission January/February 2014

SCHEDULE

Page 5: Roosevelt High School Modernization Community Meeting

Roosevelt High School Moderniza on Concept DesignNovember 2013

VICINITY MAP

10 min w

alk

Petworth MetroBus Stops

MacFarland (RHS swing space)

Sharpe Health Greater Campus

RooseveltPetworth LibraryP

R

M

S

M

P

RS

Page 6: Roosevelt High School Modernization Community Meeting

Roosevelt High School Moderniza on Concept DesignNovember 2013

CONSTRUCTION PHASES

Construc on Phases

1932

1976

1932 SITE PLAN

Page 7: Roosevelt High School Modernization Community Meeting

Roosevelt High School Moderniza on Concept DesignNovember 2013

Restoring the Historic Par

RESTORING THE HISTORIC PARTI

DEMO INFILL TO RESTORE COURTYARDADD CLEARSTORY WINDOWS

RESTORE FRONT DOOR1932 SITE PLAN

Page 8: Roosevelt High School Modernization Community Meeting

Roosevelt High School Moderniza on Concept DesignNovember 2013

CAMPUS PLAN

Georgia Ave

Iowa Ave

13th Street NW

Allis

on S

tree

t NW

Ups

hur S

tree

t

Campus Plan

“The Heart”

“The Media Center”“The Waterworks”“The Gallery”“The School Garden”

“The Outdoor Classroom”“The Pavilion”

“The Terrace”+ “The Por co”

T

H

H

M

W

WG

G SS

M

T

P

P

C

C

Page 9: Roosevelt High School Modernization Community Meeting

Roosevelt High School Moderniza on Concept DesignNovember 2013

195.17

195.17 195.17

195.17

195.16

195.16

BUILDING ORGANIZATION

ARTS AUDITORIUM ACADEMICS

RHS ENTRY

STAY/COMMUNITY ENTRY

COMMUNITY + ATHLETICS

T

HW

G S

M P

C

“The Heart”

“The Media Center”“The Waterworks”“The Gallery”“The School Garden”

“The Outdoor Classroom”“The Pavilion”

“The Terrace”+ “The Por co”

H

M

W

G

S

T

P

C

Page 10: Roosevelt High School Modernization Community Meeting

Roosevelt High School Moderniza on Concept DesignNovember 2013

“THE TERRACE”

ENHANCED ENTRY STAIR

• Visibility• Iden ty• Access

“The Terrace”

Page 11: Roosevelt High School Modernization Community Meeting

Roosevelt High School Moderniza on Concept DesignNovember 2013

“THE PORTICO”

“The Por co “

Page 12: Roosevelt High School Modernization Community Meeting

Roosevelt High School Moderniza on Concept DesignNovember 2013

“THE PAVILION”

“The Pavilion”

• Community entrance• STAY entrance• Iden ty

Page 13: Roosevelt High School Modernization Community Meeting

Roosevelt High School Moderniza on Concept DesignNovember 2013

“THE OUTDOOR CLASSROOM” AND “THE PAVILION”

“The Outdoor Classroom” and “The Pavilion”

Page 14: Roosevelt High School Modernization Community Meeting

Roosevelt High School Moderniza on Concept DesignNovember 2013

195.17

195.16

“The Pavilion”

“THE PAVILION”

STAY/COMMUNITY ENTRY

STAY

GYM

POOL

Page 15: Roosevelt High School Modernization Community Meeting

Roosevelt High School Moderniza on Concept DesignNovember 2013

“THE HEART”

“The Heart”

Cafeteria

CulinaryArts

Career Center

13th Street

“The Terrace”

“The Steps”

MediaCenter

“O u td o o r Classroom”

“The Heart”

C o s m e -tology

Page 16: Roosevelt High School Modernization Community Meeting

Roosevelt High School Moderniza on Concept DesignNovember 2013

“THE HEART”

“The Heart”

gathering

learningcommunity building

sharing

179.37

179.37

Page 17: Roosevelt High School Modernization Community Meeting

Roosevelt High School Moderniza on Concept DesignNovember 2013

“THE HEART”

“The Heart”

Page 18: Roosevelt High School Modernization Community Meeting

Roosevelt High School Moderniza on Concept DesignNovember 2013

MEDIA CENTER

“The Media Center”

179.37

Page 19: Roosevelt High School Modernization Community Meeting

Roosevelt High School Moderniza on Concept DesignNovember 2013

“THE OUTDOOR CLASSROOM”

“The Outdoor Classroom”

EXISTING AREAWAY

Page 20: Roosevelt High School Modernization Community Meeting

Roosevelt High School Moderniza on Concept DesignNovember 2013

“The Waterworks”

“THE WATERWORKS”

Page 21: Roosevelt High School Modernization Community Meeting

Roosevelt High School Moderniza on Concept DesignNovember 2013

“THE GALLERY”

“The Gallery”

195.17

3D/2D Studio

Instrumental

Choral

Mul -purpose Studio

Page 22: Roosevelt High School Modernization Community Meeting

Roosevelt High School Moderniza on Concept DesignNovember 2013

“The School Garden”

“THE SCHOOL GARDEN”

Page 23: Roosevelt High School Modernization Community Meeting

Roosevelt High School Moderniza on Concept DesignNovember 2013

NORTHCOURTYARD

EAST ENTRANCEINTERPRETIVE

GREEN COURTYARD

PARKING LOT BIORETENTION -SEE SWM EXHIBIT FOR

ADDITIONAL SUSTAINABLE MEASURES

RENOVATEDRECREATION AREA,

(SOFTBALL FIELD,2 TENNIS COURTS AND

BASKETBALL COURT)

WEST ENTRANCELANDSCAPING

SOUTHSCIENCECOURTYARD

LANDSCAPE TO STABILIZESTEEP EMBANKMENT

PROTECT EXISTINGSPECIMEN TREE

ROOSEVELTHIGH SCHOOL

MACFA

RLAND

MID

DLE S

CHOOL

PROPOSED LANDSCAPE PLAN

Landscape

Page 24: Roosevelt High School Modernization Community Meeting

Roosevelt High School Moderniza on Concept DesignNovember 2013

CUPOLA RESTORATION

EXISTING CUPOLA

Historic Elements

Page 25: Roosevelt High School Modernization Community Meeting

Roosevelt High School Moderniza on Concept DesignNovember 2013