1 QUARRYING PLAN AND PROGRESSIVE CLOSURE PLAN For BUILDING STONE QUARRY LEASE Granted to SMT. ROOPA R. SHETTY Over an area of 0.8094 Ha. in Sy. No.215 of NELLIKARU VILLAGE, MANGALORE TALUK DAKSHNAKANNADA DISTRICT (Government Land) Prepared by: DR. P. VIRUPAKSHI. and SRI. SUBBAN H.V. M.Sc., M. Phil., Ph.D., RQP/BNG/284/2011/ A Valid up to 04.12.2021

Transcript of Roopa R Shetty Quarry Plan -...

Page 1: Roopa R Shetty Quarry Plan - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/District/... · SMT. ROOPA R. SHETTY OVER AN EXTENT OF 0.8094 Ha. IN SURVEY NO. 215

1

QUARRYING PLAN

AND

PROGRESSIVE CLOSURE PLAN

For

BUILDING STONE QUARRY LEASE

Granted to

SMT. ROOPA R. SHETTY

Over an area of 0.8094 Ha. in Sy. No.215 of

NELLIKARU VILLAGE, MANGALORE TALUK

DAKSHNAKANNADA DISTRICT

(Government Land)

Prepared by:

DR. P. VIRUPAKSHI. and SRI. SUBBAN H.V. M.Sc., M. Phil., Ph.D., RQP/BNG/284/2011/ A

Valid up to 04.12.2021

Page 2: Roopa R Shetty Quarry Plan - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/District/... · SMT. ROOPA R. SHETTY OVER AN EXTENT OF 0.8094 Ha. IN SURVEY NO. 215

2

Page 3: Roopa R Shetty Quarry Plan - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/District/... · SMT. ROOPA R. SHETTY OVER AN EXTENT OF 0.8094 Ha. IN SURVEY NO. 215

3

Page 4: Roopa R Shetty Quarry Plan - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/District/... · SMT. ROOPA R. SHETTY OVER AN EXTENT OF 0.8094 Ha. IN SURVEY NO. 215

4

DECLARATION BY THE OWNER

I hereby certify that the Quarrying for Building Stone over an extent of 0.8094 Ha.

(2.00 Acres), Government Land in survey No. 215 of Nellikaru Village, Mangalore

Taluk, Dakshina Kannada District granted in favor of SMT. ROOPA R.

SHETTY has been prepared by DR. P. VIRUPAKSHI AND SRI. SUBBAN H.V

(RQP/BNG/ 284/2011/A) in full consultation with me. I have understood the

contents and agreed to implement the same in accordance with the provisions under

KMMC Rules 1994 and amendment rules of 2013, also guidelines of Director of

Mines and Geology, Government of Karnataka, in full knowledge and full

consultation with me / us and understood its contents and agree to implement the

same in accordance with law.

I hereby undertake that all the implementation so made in the quarrying Plan by the

RQP, is deemed to have made with my knowledge and consult shall be acceptable

to me and binding on me in all respects.

Place: Mangalore

Date: Signature of Applicant

Page 5: Roopa R Shetty Quarry Plan - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/District/... · SMT. ROOPA R. SHETTY OVER AN EXTENT OF 0.8094 Ha. IN SURVEY NO. 215

5

Contents

Sl. No. Particulars Page No.

Introduction 1

1.0 General 3

2.0 Location and Accessibility 4

PART-A

3.0 Geology and Exploration 7

4.0 Quarrying 10

5.0 Blasting 15

6.0 Mine Drainage 16

7.0 Stoking of Mineral rejects and Disposal of Waste 17

8.0 Use of Mineral 18

9.0 Others 18

10.0 Mineral Processing 19

Part –B

11.0 Environment Management Plan 21

Page 6: Roopa R Shetty Quarry Plan - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/District/... · SMT. ROOPA R. SHETTY OVER AN EXTENT OF 0.8094 Ha. IN SURVEY NO. 215

6

LIST OF PLATES

Plate No. Details Scale 1 KEY PLAN 1: 50,000

2 CADASTRAL PLAN 1: 7920

3 GEOLOGICAL PLAN 1: 1000

4 GEOLOGICAL CROSS SECTIONS 1Cm : 10

5 5 YEARS PRODUCTION AND DEVELOPMENT

PLAN

1: 1000

6 5 YEARS DEVELOPMENT CROSS SECTION 1Cm : 10

7 CONCEPTUAL PLAN 1: 1000

8 CONCEPTUAL CROSS SECTION 1Cm : 10

9 ENVIRONMENT MANAGEMENT PLAN 1: 1000

LIST OF TABLES

Sl. No. Particulars Table No

1 Calculations of Geological Reserves 1

Calculation of Minable reserves 2

2 Calculations of Five years production 3

LIST OF ANNEXURES

Sl. No. Particulars Annexure No.

1 Notification of Department of Mines & Geology No. DMG/DD

(M)/ Notification No. 23/2018-19 /157-19161 dated 4th

April,

2018.

1

2 NOC from Forest Department, Kundapur Division No.

Sl.No./D.M.N/ Details/ 68/ Quarry Lease/ 2015-16 dated

01.01.2016.

2

3 NOC from Thasildar, Mangalore Taluk, Dakshina Kannada

District No. MMCR: 33/2015-16 dated 10.08.2016.

3

4 RTC of Survey No. 215 of Nellikaru Village, Mangalore

Taluk, Dakshina Kannada District

4

5 ID Proof 5

PHOTOGRAPHS OF THE LEASE AREA

Page 7: Roopa R Shetty Quarry Plan - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/District/... · SMT. ROOPA R. SHETTY OVER AN EXTENT OF 0.8094 Ha. IN SURVEY NO. 215

7

PART– I

MINING PLAN FOR BUILDING STONE

Granted to

SMT. ROOPA R. SHETTY

OVER AN EXTENT OF 0.8094 Ha. IN SURVEY NO. 215 OF NELLIKARU

VILLAGE, MANGALORE TALUK

DAKSHINA KANNADA DISTRICT

(Government Land)

INTRODUCTION:

Smt. Roopa R. Shetty W/o Ravindra Shetty, S.P. Garden, Mudar, Bajegoli, Udupi

District - 574122, has applied for building stone lease over an extent of 0.4047 Ha.

(2-00 Acre) at survey No. 215, Nellukaru Village, Mangalore Taluk. The

Department of Mines and Geology, Dakshina Kannada notified the area for

building stone quarry vide No. DMG/ DD (M)/ Notification: 23/2018-19 /157-

19161 dated 4th

April, 2018 for a period of 20 years. As per the notification the

applicant has to submit and get approval of quarry plan and Environmental

clearance for starting of quarrying activity. The applicant is seeking approval of

quarry plan from the Department of Mines & Geology, Dakshina Kannada District

and Environmental Clearance from the District Environmental Impact Assessment

Authority to proceed with quarrying activity. (Copy of the Notification from

Department of Mines and Geology, NOC from Thasildar, Mangalorel Taluk and

Forest Department, RTC, ID Address proof are enclosed in Annexure 1- 5).

The applicant has approached the RQP for preparation of quarry Plan for first five

years, the quarrying plan is being prepared as per KMMCR 1994 and Chapter II A,

8 (C & D) of amendment rules of 2013 and Rule of 17 of Granite Conservation &

Development Rules 1999. The applicant is intended to supply the building material

to the domestic and construction purposes to the surrounding areas of Bajpe,

Page 8: Roopa R Shetty Quarry Plan - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/District/... · SMT. ROOPA R. SHETTY OVER AN EXTENT OF 0.8094 Ha. IN SURVEY NO. 215

8

Suratkal, Udupi and Mangalore City areas. The area is found to have prominent

exposure of Granitic Gneiss exposures suitable for building stone material covering

the lease area. Detailed study of the area has been done by the RQP along with

applicant to assess the quality and quantity of the building material available in the

area. The exposure of building material i.e granitic gneiss in the area indicates the

persistence of deposit to the depth. In view of the proposed development and

production of building stone, the applicant intend to go for production of 156598

Tons per annum by carrying out medium scale of quarrying by engaging both

manual and machineries i.e. semi-mechanized open cast method. The quarrying

plan is prepared for the quarry area through systematic mining, with an aim to

ensure systematic development, production and conservation of building stone

deposit with eco-friendly quarry operations and providing employment to the local

people. The applicant is submitting this quarry plan for a period of first five years

and revival of production as pre-requisite to getting approval from the Departments

to proceed with quarrying.

The quarry area is moderately sloping surface towards north with surface boulders

on top followed by sheetrock; the area has to be worked by semi-mechanized open

cast method. The quarry plan is prepared with specific aims as given below:

1. To minimize the environmental degradation due to quarrying.

2. Conserve and maximum utilization of reserves by minimizing the wastage.

3. Planned dumping and storage of waste.

4. Conservation and utilization of the top soil, if any in the area to be worked.

5. The quarrying operations will be conducted by scientifically through semi-

mechanized method and by reducing the wastage and optimum utilization of

utilization of the mineral using controlled blasting in the lease area.

Page 9: Roopa R Shetty Quarry Plan - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/District/... · SMT. ROOPA R. SHETTY OVER AN EXTENT OF 0.8094 Ha. IN SURVEY NO. 215

9

1.0 GENERAL:

The lessee has established Stone Crusher and supplying building stone and other

building materials to the surrounding area is having good business experience.

a. Name and address of

the applicant

: Smt. Roopa R. Shetty

W/o Ravindra Shetty

S.P. Garden, Mudar, Bajegoli

Udupi District - 574122

Ph: 9164982718

b. Status of the applicant : Individual

c. Minerals/ Which are occurring in the area and which intends to mine:

Granitic Gneiss - Building stone

d. Period for which the quarry lease is proposed to be applied: 10 Years.

e. Name and address of

RQP

DR.P.VIRUPAKSHI,

M.Sc. M.Phil., Ph.D

M/s. Spoorthy Services, No.273

8th

Main, BCC Layout, Chandra Layout

Vijayamagata, Bengaluru-560 040

Phone: +91 9986749095

SRI. SUUBBAN. H.V.,

RQP/BNG/284/2011/A

# 58, 26th

Main

Behind BHEL Colony

Nandini Layout

Bengaluru- 560 096

f. Reference No. and Date of consent letter from the State Govt. :

The Deputy Director, Department of Mines & Geology, Dakshina

Kannada District was Notified the area for quarrying of building stone for

a period of 20 years over an extent of 0.8094 Ha. (2.00 Acres) of

Government Land in Survey No. 215 of Nellikaru village, Mangalore

Taluk, Dakshina Kannada District vide No. Notification of Department of

Mines & Geology No. DMG/DD (M)/ Notification 23/2018-19 /157-

19161 dated 4th April, 2018. (Annexure-6).

Page 10: Roopa R Shetty Quarry Plan - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/District/... · SMT. ROOPA R. SHETTY OVER AN EXTENT OF 0.8094 Ha. IN SURVEY NO. 215

10

2.0 LOCATION AND ACCESSIBILITY:

Details of the Area (with Location Map)

Details of the Area (with location map)

a. District and State

: Dakshina Kannada District

Karnataka State

Taluk : Mangalore

Village : Nellikaru

Survey. No : 215

Lease Area (Acres) : 0.8094 Ha. ( 2.00 Acres)

b. Whether the area is recorded to be in the forest

(Please specify whether protected, reserved etc.) : No

c. Ownership occupancy : Government Land

d. Existence of public road/ railway line, if any nearby & approximate

distance:

The area is situated at 3.30 Km. South West of Nellikara Village, about

1.85 Km. East of Borugadde villages, about 1.80 Km. West of Hosamaru,

about 2.8 Km. North East of Aliyur Village, about 1.20 Km. North of

Mantradi village and towards north of Road connecting to Mudubidre and

Hosamar Road and 14.00 Km North West of Mudubidre Town and 50.00

Km North West of Mangalore city which is District headquarter where all

the welfare amenities are available.

The nearest railway station is Mangalore at a distance of 50.00 Km. The

nearest airport is Mangalore Airport which is 50 Kms. From lease area the

Quarry area can be reached Nellikar village road in all seasons. The lease

area is surrounded by waste lands and agricultural fields.

Water is available from the drilled bore well in the survey No.215. Power

connections are available at adjacent to quarry area. Telecommunication

facility is available at Borugadde, Mantradi and Hosamar Village and

Page 11: Roopa R Shetty Quarry Plan - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/District/... · SMT. ROOPA R. SHETTY OVER AN EXTENT OF 0.8094 Ha. IN SURVEY NO. 215

11

Mudubidre Town. Dispensary is located at Hosamar Village 1.80 Km. by

road.

e. Toposheet No. with Latitude and Longitude: The quarry area falls part of

Survey of India Toposheet No. 48 K/16 of 1:50, 000 Scale (Plate No.1)

GPS Readings (Datum: WGS 84)

Point No. Latitude Longitude

A N 130 08’ 00.0” E 75

0 06’ 37.9”

B N 130 07’ 59.8” E 75

0 06’ 35.2”

C N 130 07’ 57.0” E 75

0 06’ 34.4”

D N 130 07’ 57.3” E 75

0 06’ 38.8”

Page 12: Roopa R Shetty Quarry Plan - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/District/... · SMT. ROOPA R. SHETTY OVER AN EXTENT OF 0.8094 Ha. IN SURVEY NO. 215

12

f. Land use Pattern (Forest, Agricultural, Grazing and Barren etc.):

The quarrying area is Government land. It is rocky hillock and underlined by sheet

rock visible in the neighboring surface quarry workings and open pits. The present

Land Use pattern of the quarry Area is as follows

Sl. No. Land use Category Present Land

Use

(Ha.)

1 Quarry workings -

2 Waste dumps -

3 Roads -

4 Rock boulder storage -

5 Buffer zone/Green belt -

6 Infrastructure -

7 Untouched Area/ Reserved

for future activity

0.8094

Total 0.8094

g. Attach a general location and vicinity map showing area boundaries and

existing and proposed access routes. It is preferred that the area to be marked

on a Survey of India Topographical map or a cadastral map or forest map as

the case may be. However if none of the these area available, the area should

be shown on an accurate map of 1:5000 Scale

Location of Quarry Lease area is marked on 1:50,000 scale Survey India Toposheet

48 O/4 (Plate-1) and 1”: 660 Cadastral map (Plate No. 2)

Page 13: Roopa R Shetty Quarry Plan - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/District/... · SMT. ROOPA R. SHETTY OVER AN EXTENT OF 0.8094 Ha. IN SURVEY NO. 215

13

PART-A

3.0 GEOLOGY AND EXPLORATION:

a. Briefly describe the topography and general geology and local / mine

geology of the mineral deposit including drainage pattern:

b. Topography: Mangalore Taluk of Dakshnina Kananda District coming

under western slopes, highly undulating topography covered by hillocks and

mounds overlaid by lateritic soil followed by Peninsular Gneiss. The area is

underlined by peninsular gneiss and the ground sloping towards west. The

altitude of the area is 106 to 126 Meters above mean sea level. The general

slope of the area is towards south. Topography is both structurally and

lithologically controlled. The quarry area is moderately sloping terrain

towards south with gneissic rock exposures trending North- South direction.

The area drains towards South and joins Palguni River.

c. General Geology: Stratigraphycally the Peninsular gneisses belongs to

Dharwar Super group. The Granitic Gneisses are the most widespread

lithological unit in Karnataka State , charnokites are dominant towards

south, Gneisses are polyphase granitic gneiss with tonalite-trondhjemite-

granodiorite composition. The Gneisses are foliated, finely banded intensely

folded. The soil cover exists with a thickness of 0.30 Meters in the lease area.

d. Local Mine Geology: The area forms part of rocks formed through

metamorphism of granites and other supracrustals. The lease area is

moderately sloping towards north; the lease area covered by soil to a depth of

0.30 meters. The area is located at an altitude of 106 to 126 meters MSL.

The hardness of granites is varying from 5 to 6 and is having specific gravity

of 2.6. The Geological sequence is as sown below.

Page 14: Roopa R Shetty Quarry Plan - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/District/... · SMT. ROOPA R. SHETTY OVER AN EXTENT OF 0.8094 Ha. IN SURVEY NO. 215

14

Achaean Ramanagaram / Kolar

Granites

Granites

Peninsular Gneissic

complex

Granites and Gniesses

Dharwar super Group Amphibolites and

hornblende Schist

b. The Topographic plan of the lease area prepared on a scale of 1:1000 or

1:2000 with contour interval of 3 to 10 meters. Depending on upon the

topography of the area should taken as the base plan for preparation of

geological plan. The details of exploration already carried out including

evidences of mineral existence should be shown on the geological plan:

The surface geological map is prepared on a scale 1:2000 and enclosed as Plate

No.3

c. Geological Section should be prepared at suitable intervals on scale of

1:1000 : Based on the Geological plan and the data collected from the quarry

area, open workings the geological cross sections were drawn and prepared. The

cross section are prepared on scale 1: 10 meters is enclosed as Plate No. 4

d. Broadly indicate the year wise future program of exploration, taking into

consideration the future production program planned in next five years as

in the table below:

Years No. of Bore

Holes

Total

Meterage

No. of Pits Die

mention

(M2) Cross

section x

Strike

influence

No. of

trenches

and

dimensions

First - - 1 5 x 4 -

Second - - 1 6 x 3 -

Third - - 1 5 x 4 -

Fourth - - 1 7 x 3 -

Fifth - - 1 3 x 3 -

Page 15: Roopa R Shetty Quarry Plan - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/District/... · SMT. ROOPA R. SHETTY OVER AN EXTENT OF 0.8094 Ha. IN SURVEY NO. 215

15

Present Status of the Area:

The quarry area is operating quarry. The quarry will be worked from eastern

portion of the area shown in the quarry plan Plate No. 3. The soil mixed with

boulders present at the top portion of the lease area. Since the area is moderately

sloping surface. It is suggested to clear the thin little soil cover present on the

surface of the granitic rock. It is proposed establish a stone crushing unit near to

the quarry area and part of the camp services also provided there.

e. Reserves-Indicate geological and recoverable reserves and grade, duly

supported by standard method of estimation and calculations along with

required sections (give split of various categories i.e proved and probable)

Indicate cut-off grade. Availability of resource should also be indicated for

the entire leasehold.

Based on the study and survey carried out and the geological plan has been

prepared along with the size and shape of reserves in the quarry location. The

reserves have been calculated for 0.8094 Ha. of the notified area by using the

standard norms.

The reserves have been estimated in two different categories 1). Proved and

2).Probable (See Table-1).

(i). Proved Reserves: The reserves have been estimated up to a depth of 48 meters

where massive sheet rock exists. The recovery percentage is 95% and the mineral

reject is 5%.

(ii). Probable Reserves: The reserves have been estimated from the sheet rock to a

depth of 10 meters below the proved formation depth and the mineral recovery and

reject is same as above.

The detail of Geological reserves for the lease area is given below.

Page 16: Roopa R Shetty Quarry Plan - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/District/... · SMT. ROOPA R. SHETTY OVER AN EXTENT OF 0.8094 Ha. IN SURVEY NO. 215

16

Category

of

reserves

Sectio

n

Mineral

in Cum

(ROM)

Recov

ery

Factor

Buildin

g stone

in Cum.

Bulk

density Salable

Mineral

in Tons

Mineral

Waste

in Cum.

(@2%)

Soil

Waste

in

Cum.

Proved A – A’ 392832

98%

384975

2.6

1000936 7857 1339

Probable A – A’ 81840 80203 208528 1637

Total 474672 465179 1209464 9493 1339

The detail of Mineable reserves for the lease area is given below.

Category

of

reserves

Sectio

n

Mineral

in Cum

(ROM)

Recov

ery

Factor

Buildin

g stone

in Cum.

Bulk

density Salable

Mineral

in Tons

Mineral

Waste

in Cum.

(@2%)

Soil

Waste

in

Cum.

Proved A – A’ 370744

98%

363329

2.6

944656 7415 1264

Probable A – A’ 66968 65629 170634 1339

Total 437712 428958 1115290 8754 1264

f. Indicate Mineable reserves by slice plan / level plan method, as applicable as

per the proposed mining parameters: No slice plan / Level plan is required as

per the proposed mining parameters and quarrying / mining is medium scale

semi mechanized to mechanized open cast method.

4.0 QUARRYING /MINING METHOD:

a. Briefly describe the existing / proposed method for developing / working

the deposit with all design parameters:

The Granitic Gneisses are in the form of massive sheets with sheet joints in

nature. The quarrying in the lease area is semi-mechanized open cast method.

The technical parameters like surface topography, quality variations, and

geotechnical aspects are considered for production and extraction of building

material in the area. It is proposed to work the deposit by adopting benches

formation with ultimate pit slope of 600.

Jack hammer is required for

Page 17: Roopa R Shetty Quarry Plan - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/District/... · SMT. ROOPA R. SHETTY OVER AN EXTENT OF 0.8094 Ha. IN SURVEY NO. 215

17

controlled blasting to break the hard sheet rock. The bench height and the

width will be maintained as specified by D.G.M.S. The width of the working

benches shall not be less than the height. Year wise production and

development plan indicate the areas of workings site, disposal of waste, site

for afforestration are shown in the Plate No. 5. The plan also showing position

of the working pit proposed for extension etc. due care has to be taken to

maintain and advancing the benches for production. The ground water

problem does not arise the existing and proposed levels is much above ground

water table.

b. Indicate quantum of development and tonnage and grade of production pit

wise as in table below:

The present the quarrying activity will be confined to 0.5921 Ha. out of the

total area of 0.8094 Ha. The remaining area is used for safety zone and future

mining activity. The development and production program for five years is

shown in the (Plate 6). The proposed year-wise working area is demarcated in

the map. As a result of systematic development program in the area the

anticipated production is 782990 tons of saleable quantity for the five years as

shown in Table 2 and Plate No. 6.

Category Mineral

ROM

(in Cum.)

Saleable

Mineral

in Tons

Mineral Waste

(in Cum.)

Soil Waste

(in Cum.)

1st Year 80784 205838 1616 275

2nd

Year 81312 207183 1626 277

3rd

Year 83248 212116 1665 284

4th

Year 30272 77133 605 103

5th

Year 31680 80721 634 108

Total 307296 782990 6146 1048

c. Attach – Individual year wise plans and section (in case of A class mines)

Page 18: Roopa R Shetty Quarry Plan - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/District/... · SMT. ROOPA R. SHETTY OVER AN EXTENT OF 0.8094 Ha. IN SURVEY NO. 215

18

A geological cross section of the area(Plate 4) and the section for year wise for

5 years production and development plan is enclosed in Plate No. 5, 6 and

conceptual plan and cross section is enclosed in Plate 7 and 8.

d. Attach supporting composite plan and section showing pit layouts, dumps,

stacks of subgrade mineral, if any etc.: Year wise production and

development plan / land use and afforestration plan is prepared on 1:1000 scale

and pit layout, position of dumps stacking of mineral, site services, ultimate pit

limit etc. are shown in Environmental Management plan Plate No. 9.

e. Indicate proposed rate of production when the mine is fully developed, and

the expected life of the mine and the year from which effected:

(i). Proposed rate of production when the mine is fully developed: It is proposed

to produce an average 156598 tons / annum when the quarry is fully developed

(ii). Mineable reserves: Though the reserves are quite attractive, the Mineable

reserves will be reduced due to formation of benches towards boundary line, this

can be solved by having suitable arrangements with adjacent land owner for full

exploitation of the reserves, meanwhile the reserves have been blocked in 7.5

meters safety barrier below the ground level.

Total Mineable reserves:

Total Geological Reserves - Mineable reserves= Non Mineable Reserves (in

Cum).

474672 – 437712 = 36960 Cum.

(iii) Anticipated life of the Mine: the quantities of Mineable reserves estimated are

total reserves minus non Mineable reserves and already extracted, considered as

(economical) marketable reserves. The Mineable reserves of 1115290 Tons are

available in the lease area. The average annual production is 156598 Tons and thus

the life of the mine is 7 years.

Page 19: Roopa R Shetty Quarry Plan - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/District/... · SMT. ROOPA R. SHETTY OVER AN EXTENT OF 0.8094 Ha. IN SURVEY NO. 215

19

f. Attach a note furnishing a conceptual mining plan for the entire lease

period (for “B” category mines) and up to the life of the (for “A”

category mines) based on the geological, mining and environmental

considerations: The Granitic gneiss as building stone deposit in the quarry

area is envisaged to be worked by forming mining benches of 6 meters height

from the ground level and the width shall me more than the height of the

benches with a general pit slope of 60o. The ultimate pit limit is marked as

shown on the quarry Closure Plan (Plate- 9). However, when the granitic

gneiss deposit is proved to full depth, the closure plan will be modified. The

quarrying is proposed to be taken with the full capacity of development and

production of on an average of about 156598 Tons per annum, during the

proposed closure plan period. Any modifications in the in the quantity of

production will be intimated to Department of Mines and Geology. The

mined out pits after extraction of the building material, will be reclaimed by

suitable reclamation and afforestration techniques and also by back filling the

pits by the overburden. The design and layout of the quarry benches is shown

on the above referred plan. During the closure plan period, the anticipated

production for the next 5 years period shall be 782990 Tons.

g. Open Cast Mines:

(i). Describe briefly giving salient features of the mode of working

(mechanized, semi-mechanized, manual): The extraction of building

material proposed to be worked by semi-mechanized method of working. In

view of the prepared quarry plan production of granite, it is planned to

operate by deploying machineries for development and production, the

separation of granite based on physical parameters manually with

conventional tools like crowbars, hammers, pickaxe etc. and mechanically

using drilling equipment’s, tippers will be used for quarrying work. The

parameters will thus the bench height of about 3 m and width is more than

height of bench and jackhammer drilling carried with dust proof drilling

Page 20: Roopa R Shetty Quarry Plan - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/District/... · SMT. ROOPA R. SHETTY OVER AN EXTENT OF 0.8094 Ha. IN SURVEY NO. 215

20

machineries. As proposed above, the development of latest mechanization

plays a very important role in the development quarry and production

program. The quarrying operation in notified area planned to be of open cast

and semi-mechanized. The recovery of building stone is generally high i.e.

more than 95%. It requires machinery for increased production.

(ii) Describe briefly the layout of the mine workings, the layout of the

faces and sites for disposal of overburden/ waste: A reference to the plan

enclosed under 4 (b) and 4 (d) will suffice: During the plan period the

development and production will be carried out as shown in the 5 years

production and development plan Plate 5. The quarrying is done manually

and semi-mechanized (open cast method). During the development and

production program for the plan period it is proposed to produce 782990 tons

of saleable quantity.

Years Pit

Nos.

Over

burd

en

ROM

in Cum

Saleable

quantity in

Tons (ROM x

(bulk density

2.6) RF 95%

Mineral

Reject(

@5%)+

+Soil in

Tons

Over

burden/

waste ratio

1st - - 80784 205838 4917

1: 0.023887

2nd

- - 81312 207183 4949 1: 0.023887

3rd

- - 83248 212116 5067 1: 0.023887

4th

- - 30272 77133 1842 1: 0.023887

5th - - 31680 80721 1928 1: 0.023887

Total 307296 782990 18703 1 : 0.023887

h. Underground mines: Not Applicable

(i) Extent of Mechanization

Page 21: Roopa R Shetty Quarry Plan - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/District/... · SMT. ROOPA R. SHETTY OVER AN EXTENT OF 0.8094 Ha. IN SURVEY NO. 215

21

Describe briefly including the calculations for adequacy and type

of machinery and equipment proposed to be used in different

mining operations:

1. The quarrying will be worked with semi-mechanized method by

deploying following machinery and manpower.

Sl. No. Name of the Machinery Nos.

1 Tractor mounted compressor 1 No.

2 Atlas Compressor 1 Nos

3 Jack Hammer 2 Nos.

4 Tippers 2 No.

5 Water Tanker 1 No.

The transportation will be made by own / hired trucks to the dispatching points.

2. Drilling Machine: Drilling will be done by compressor operated jack-

hammer drills.

3. Loading Equipment: Loading of the building stone material will be

done mechanically by tippers of 10 ton capacity and transported from

the quarry to the required site. The rejected material will be dumped

separately. All other safety measures were observed as per D.G.M.S.

specifications.

4. Haluage and Transport: Hauling and transportation will be done by

using excavators, cranes, tippers etc. The waste and the other

overburden will be transported to the waste dumping yard by using

trucks / tippers.

i. Transport from the mine head to the destination:

Describe briefly the transport system (Please specify). The material

extracted will be transported by trucks to the crushing point and also needs of

the local people. The mode of transport will be road. The transportation is by

tippers/ trucks depending on the requirement.

Page 22: Roopa R Shetty Quarry Plan - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/District/... · SMT. ROOPA R. SHETTY OVER AN EXTENT OF 0.8094 Ha. IN SURVEY NO. 215

22

5.0 BLASTING: A mild blasting will be done for the purpose of removing

weathered rock and over burden for this purpose whenever it is required the

services of the licensed blasting agencies will be engaged.

a. Broadly blasting parameters like charge per hole, blasting pattern

charge per delay, maximum number of holes blasted in a round manner

and sequence of firing, etc: Since the quarrying is going to be operate

manually, jackhammer drilling will be used for the holes will be fired with

ordinary detonators and safety fuse.

The parameters for blasting:

Diameter of the hole : 32 mm

Depth : 1.5 m

Spacing : 0.9 m

Burden : 0.6 m

Charge per hole : 3 cartridge of 104 gm each

= 0.42 Kg.

Yield of the explosive : Spacing x Burden x depth

Explosive in Kg Charge

: 0.9 x 0.6 x 1.5 x 2.6

0.42

: 5 Tons of ROM

Storage of explosives: Authorized explosive dealers as per the requirement

will supply the explosive material as and when required.

6.0 MINE DRAINAGE:

The area receives an average rainfall of 3400 mm. There are no water canals in the

area. The collection of water even during the rainy season is drained out from the

area naturally, during the remaining year the area remains dry in the rest of the

year. The hydrogeological investigation of the bore well drilled in the nearby

Page 23: Roopa R Shetty Quarry Plan - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/District/... · SMT. ROOPA R. SHETTY OVER AN EXTENT OF 0.8094 Ha. IN SURVEY NO. 215

23

vicinity indicated that the ground water strikes at depth of 38 meters which is 70

meters MSL. The ultimate pit level is 80 meters including soil cover and the ground

level of the working area is 80 to 84 M expected to be above 70 M MSL which is

above water table. No water is likely to be encountered during the course of

quarrying.

7.0 STACKING OF MINERAL REJECTS AND DISPOSAL OF WASTE:

a). Indicate briefly the nature & quantity of top soil, overburden / waste and

mineral rejects likely to be generated during the next five years: The

average generation is during the proposed quarrying will be shown in the

below.

Year Top Soil

(in Cum)

Over Burden /

Waste

Mineral Reject

(In Cum.)

1st 275 - 1616

2nd

277 - 1626

3rd

284 - 1665

4th

103 - 605

5th

108 - 634

Total 1048 - 6146

b).Land chosen for disposal of waste with proposed Justification: The place

selected for dumping of top soil, overburden, waste material / non saleable

granite is away from the working quarry. The site selected for disposal by

following the rules 18 (3) of GC & DR 1999. The area selected is as shown in 5

years production and development plan Plate 5.

c). Attach Note indicating the manner of disposal and configuration sequence

of buildup of dumps along with the proposals for the stacking of sub grade

ore, to be indicated item wise: The area selected for dump is a near/ along the

Page 24: Roopa R Shetty Quarry Plan - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/District/... · SMT. ROOPA R. SHETTY OVER AN EXTENT OF 0.8094 Ha. IN SURVEY NO. 215

24

buffer area, when the step wise dumping will be carried out for a maximum

height of 12 m with 280 dump slope. Proper terracing will be done along dump

slopes to provide better slope stability. The total waste likely to be generated is

about 6146 Cum. is being used as replacement of sand. The location of waste

dump yard, mineral stock yard, afforestration etc. are shown in the Environment

Management plan Plate 9.

8.0 USE OF MINERAL:

a).Describe briefly the end use of mineral (Sale to intermediatery parties,

captive consumption, export, industrial use: The granite produced from the

quarry will be used for building stone, road metal, different grades of jelly for road

and construction purposes. Major produce will be utilized for ready mix concrete

industry.

b). Indicate physical and chemical specifications stipulated by buyers: The raw

material as well as finished granite different sizes demanded by the buyers as per

their requirement.

c). Give details incase blending of different grades of ores is being practiced or

is to be practiced at the mine to meet specifications stipulated by users: Not

Applicable

9.0 OTHERS

Describe briefly the following:

a. Site Services: The following services are located in a separate area

demarcated.

1. Quarry Office room/ First Aid room

2. Drinking water

3. Rest Shelter

4. Toilets

Page 25: Roopa R Shetty Quarry Plan - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/District/... · SMT. ROOPA R. SHETTY OVER AN EXTENT OF 0.8094 Ha. IN SURVEY NO. 215

25

All other required site services are proposed and fulfilled during the first five Year

plan period.

Employment potential: Manpower chart of the building stone Quarry:

Sl. No. Description No. of Posts

1 Quarry Supervisor 1

2 Operator 2

3 Tipper Drivers 4

4 Drillers 3

5 Skilled Labors 4

6 Labors/ Security 6

7 Total 20

10.0 MINERAL PROCESSING:

a. If the processing / beneficiation of the ore or minerals mined is planned to

be conducted on site or adjacent to the extraction area, briefly describe the

nature of the processing / beneficiation. This should indicate size and grade

of feed material and concentrate (finished marketable predicted), recovery

rate.

b. Explain the disposal method for tailings or waste from the processing plant

(quantity and quality of tailings proposed to be discharged, size and

capacity of tailing pond, toxic effects of such tailings, if any with proves

adopted to neutralize any such effect before their disposal and dealing of

excess water from the tailing dam)

c. A flow sheet or schematic diagram of the processing procedure should be

attached.

d. Specify quantity and type of chemicals to be used in the processing plant.

e. Specify quantity and type of chemicals to be stored on site / plant.

Page 26: Roopa R Shetty Quarry Plan - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/District/... · SMT. ROOPA R. SHETTY OVER AN EXTENT OF 0.8094 Ha. IN SURVEY NO. 215

26

f. Indicate quantity (Cum./ per day ) of water required for mining and

processing and sources of supply of water. Disposal of water and extent of

recycling.

As there is no beneficiation or processing plant is required for this

quarrying, hence the above said item in the Sl. No. 10 are not

applicable.

Page 27: Roopa R Shetty Quarry Plan - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/District/... · SMT. ROOPA R. SHETTY OVER AN EXTENT OF 0.8094 Ha. IN SURVEY NO. 215

27

PART-B

11.0 ENVIRONMENTAL MANAGEMENT PLAN

a. Base line Information:

i. Existing land use pattern indicating the area already degraded due to

quarrying, pitting/ mining, dumping, road, processing plant, workshops,

township etc, in tabular form.

The details of area utilization proposed for the next five years as follows:

Sl. No. Purpose Extent

In Ha.

Buffer zone

outside the lease

area in already

granted lease

1 Area under mining - 0.5921

2 For Waste Dump Yard (WDY) - 0.0100

3 Mineral Stock yard - 0.0100

4 Infrastructure - 0.0050

5 Roads - 0.0050

6 Green Belt - 0.1873

7 Tailing ponds - -

8 Railways - -

9 Mineral Separation plant - -

10 Untouched Area - -

Total 0.8094 0.8094

ii. Water regime: There are no perennial water sources in around the applied

area within 500 meters radius. Since the lease area is moderate to steeply

sloping, the rain water drains through the surface area and joins to seasonal

water course outside the lease area.

iii. Flora and fauna: There are bushy thorny plants in the surrounding area. This

area is surrounded by villages and quarries hence there are no chances of wild

animals in the area. Only few species of thorny bushes, shrubs and few trees

are grown in the area. Pigeons, sparrows, Crows and Minas found in the area,

Page 28: Roopa R Shetty Quarry Plan - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/District/... · SMT. ROOPA R. SHETTY OVER AN EXTENT OF 0.8094 Ha. IN SURVEY NO. 215

28

rarely deer’s, rabbits fox etc. are seen which are highly mobile. Apart from

this no other faunal habitat is observed in the area.

iv. Quality of Ambient Air, Noise level and Water: The quality of air and

water has not been studied in the area or around the area. Presently there are

no quarries surrounding this area under quarrying operations and there are no

other industries. As there are no other activities, generation of dust /noise at

present is within the limits prescribed by CPCB.

v. Climatic conditions: The area has a tropical climate. The peak summer will

be in the month of April and May, highest temperature will be about 390 C

will be during this season and the lowest temperature was recorded of about

140 C during the months of November and December. During previous years

the rainfall in this area was recorded about 3400 mm.

iv. Human Settlements: The area is situated at 3.30 Km. South West of

Nellikara Village, about 1.85 Km. East of Borugadde villages, about 1.80

Km. West of Hosamaru, about 2.8 Km. North East of Aliyur Village, about

1.20 Km. North of Mantradi village and towards north of Road connecting to

Mudubidre and Hosamar Road and 14.00 Km North West of Mudubidre Town

and 50.00 Km North West of Mangalore city which is District headquarter

where all the welfare amenities are available.

vii. Public Buildings, places of Worship and Monument: There are no public

Buildings, places of Monuments within or nearby the area.

viii. Does area (partly or fully) fall under notified area under water

(prevention and control of pollution) Act. 1974: Yes the applied area falls

under Water Act 1974. The applicant will take up necessary precautions for

control of pollution of water sources.

Page 29: Roopa R Shetty Quarry Plan - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/District/... · SMT. ROOPA R. SHETTY OVER AN EXTENT OF 0.8094 Ha. IN SURVEY NO. 215

29

(b). ATTACH AN ENVIRONMENTAL IMPACT ASSESSMENT

STATEMENT DESCRIBING THE IMPACT OF MINING AND

BENEFICATION ON ENVIRONMENT ON THE FOLLOWING OVEER

THE NEXT 5 YEARS.

i. Land area indicating the area likely to be degraded due to quarrying /

pitting, dumping, roads, workshops, townships etc.,

Sl. No Purpose Extent

in Ha.

1 1st 5 years surface area 0.5921

2 For waste dump yard 0.0100

3 Mineral Stock Yard 0.0100

4 Infrastructure 0.0050

5 Roads 0.0050

6 Green belt 0.1873

7 Untouched Area

Total 0.8094

ii. Air Quality: The mining operations will be by the manual method. The

workforce will expose to the air is due to dust which gets air borne due to

vehicular movements and dumping only.

iii. Water Quality: During rainy season silt is likely to get mixed with rain

water and flow to the seasonal nala flowing through the area. There are no

toxic elements discharges into the drains from the mining operations.

iv. Noise level: The area is more than 150 M. from the village roads where the

traffic is very low. The mining digging and traffic are the causes of

increasing noise level.

Page 30: Roopa R Shetty Quarry Plan - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/District/... · SMT. ROOPA R. SHETTY OVER AN EXTENT OF 0.8094 Ha. IN SURVEY NO. 215

30

v. Water regime: As the area is a raising ground, there is no danger envisaged

to water regime by this quarry area.

vi. Socio Economics: The main occupation of the surrounding people is

agriculture and allied activities, the mining activity in this belt will benefit

to the local people both directly and indirectly. The direct beneficiaries will

be those who get employed in the quarry as skilled and un-skilled workers.

The indirect beneficiaries will be those who open small business to sell

goods required by the residents whose “per capita” income will be enhance

by the mining activity, and thereby their purchasing power. In the long run a

lot of social goods is expected in the comparatively backward area when the

inhabitant will be sent their children to school.

vii. Historical Monuments: There are no historical monuments in or around

the area and hence there will be no impact due to mining. Because of small

scale mining there will be no effect.

C. ATTACH AN ENVIRONMENT MANAGEMENT PLAN (SUPPORTED

BY APPROPRIATE PLANS AND SECTIONS) DEFINING THE TIME

BOUND ACTION PROPOSED TO BE TAKEN WITH SEQUENCE AND

TIMING IN THE FOLLOWING AREAS (OR DIAGRAMS SHOULD BE

USED)

i. Temporary storage and utilization of top soil: The soil generated is mixed

with pebbles etc. can be used for road maintenance. The soil useful for

agriculture, afforestration, trenches, whenever excavated will be stored

separately in the yard identified within the lease hold to height of maximum

of 0.06 M to keep their microbial activities safe.

Page 31: Roopa R Shetty Quarry Plan - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/District/... · SMT. ROOPA R. SHETTY OVER AN EXTENT OF 0.8094 Ha. IN SURVEY NO. 215

31

ii. Year wise proposal for reclamation of land affected by mining activities

during the 1st to 5 years: No reclamation is proposed in this plan period

because the mining will be continued further depths from present pit bottom.

iii. Program of afforestration. Year wise for the initial five years: It is

proposed to develop a green belt in proportion of the non-mineralized area

and 7.5 m. buffer zone of the lease boundary. In addition, the place around

the haul road and backfilling area shall have plantation at the conceptual

period. Every year it is proposed to carry out afforestration over 0.037 Ha.

by planting 200 saplings per annum around the quarry area. The species

chosen for green belt are fast growing good canopy and dense leaf density,

eco-friendly commercial/ species and some ornamental plants to give good

aesthetic.

iv. Stabilization and Vegetation of dumps: There is no generation of

overburden / waste in the proposal plan period. Hence, there is no need of

stabilization of the dumps.

v. Measures to control erosion/ sedimentation of water courses: There is no

surface erosion in the subject area because the surface area is exposed by the

granite.

vi. Treatment and disposal of water from mine: Since there are no mine

waters or ground waters, the proposal of pumping out or any sort of treatment

and disposal of water from the quarry does not arise.

vii. Measures for minimizing adverse effects on water regime: No adverse

effects are anticipated on water regime.

viii. Protective measures from ground vibrations / air blast caused by

blasting: There will be drilling and blasting is proposed in this area.

ix. Measures for protecting historical monuments and rehabilitation of

human settlements: There are no historical monuments are located close by

and hence need for protection does not arise.

Page 32: Roopa R Shetty Quarry Plan - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/District/... · SMT. ROOPA R. SHETTY OVER AN EXTENT OF 0.8094 Ha. IN SURVEY NO. 215

32

x. Socioeconomic benefits arising out of mining: Few labors will get

employment and the state Government and Village Panchayath will get

royalty due to mining activity.

i. FISCAL ESTIMATE:

ii. The details of investment for procuring the equipment for

successful environmental parameters and implementation of control

measures are presented in the below table.

iii. Annual cost of monitoring and implementation of control measures

is presented below table:

iv. Environmental protection Investment Cost

Sl. No. Activity Recurring

cost/ annum

in Rs.

Non

Recurring

Cost

1 Afforestration works 2,00,000.00

2 Dust control and suppression 50,000.00

3 Environmental Monitoring 50,000.00

4 CSR Activities 4,00,000.00

5 Fencing 2,00,000.00

6 Miscellaneous 1,00,000.00

Sub Total Estimate 7,00,000.00 3,00,000.00

Total Estimate 10,00,000.00

Page 33: Roopa R Shetty Quarry Plan - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/District/... · SMT. ROOPA R. SHETTY OVER AN EXTENT OF 0.8094 Ha. IN SURVEY NO. 215

33

PROGRESSIVE MINE CLOSURE PLAN

1.0 INTRODUCTION:

a. Name of the Applicant : Smti. Roopa R. Shetty

b. Extent of the lease : 0.8094 Ha. (2.00 Acres)

c. Type of Lease area : Government Land

d. Present Land use pattern : Details are presented below

Type of Land Used Area put on use at

the start of the plan

At the end of plan

period of 5th

Year (in

Ha.)

Area under mining - 0.5921

Waste Dump Yard - 0.0100

Mineral Stock Yard - 0.0100

Infrastructure - 0.0050

Roads - 0.0050

Railways - -

Green Belt - 0.1873

Tailing Pond - -

Effluent Treatment Plant - -

Mineral Separation Plant - -

Untouched area 0.8094 -

Total 0.8094 0.8094

e. Details of the area with location map :

Survey No : 215

Village : Nellikaru

Taluk : Mangalore

District : Dakshina Kannada

State : Karnataka

f. Method of Mining : Open cast manual method

g. Mineral processing : The area which is applied for building stone

Page 34: Roopa R Shetty Quarry Plan - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/District/... · SMT. ROOPA R. SHETTY OVER AN EXTENT OF 0.8094 Ha. IN SURVEY NO. 215

34

and the granite material will be extracted in

the shape of regular /irregular small boulders

for the required size.

1.1 Reasons for closure: The area is under progress of quarrying and hence

regarding closure of mine is not applicable in the present context. However

the mine may be closed due to exhaust of mineral, decretive from the

statutory organization or court.

1.2 Statutory Obligations: The Progressive quarry plan is prepared as per the

directives of draft guidelines of Minor Mineral Conservation and

Development Rules 2010 as a component of the quarrying plan. The lease

will abide by the terms and conditions imposed in the lease deed, comply

with the statutory directions of the State Department of Mines and Geology,

DGMS, MOEF and Forest Department and other State / Central Govt.

agencies from time to time for small scale mining operations.

1.3 Closure plan preparation:

a. Name and Address of Applicant : Smt. Roopa R. Shetty W/o Ravindra Shetty

S.P. Garden, Mudar, Bajegoli

Udupi District - 574122

Ph: 9164982718

b. Name of the recognized : Dr. P. VIRUPAKSHI

Qualified Person Sri. SUBBAN H.V.

a. Name of the executing Agency : Smt. Roopa R. Shetty

Page 35: Roopa R Shetty Quarry Plan - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/District/... · SMT. ROOPA R. SHETTY OVER AN EXTENT OF 0.8094 Ha. IN SURVEY NO. 215

35

2.0 MINE DESCRIPTION

Please refer Para 4 a Page no. 10

3.0 RESERVES: Please refer para No. 3 e (i) (ii) (iii) page No. 9 to 10

3.1 Mining Method: Please refer para No. 4 (b) page No. 12 to 14.

3.2 Mineral beneficiation: There is no mineral beneficiation. Man power will be

used for producing material. The question of tailing from the tailing ponds

does not arise. Only the material removed from the quarry will be transported

from the quarry to the respective stock yard, destination.

3.3 Review of Implementation of Mining Plan/ Scheme including five years

progressive closure Plan up to the final closure of the mine: The various

proposals made in the approved mining plan for the 5 years period has been

carried out to avoid environmental problems in the area.

3.4 Abstract of the proposals for Protecting of Environment:

Temporary storage and Utilization of Top soil: The soil generated is mixed

with pebbles etc., can be used for road maintenance. The soil useful for

agriculture, afforestration and trenches, whenever excavated will be stored

separately in the yard identified within the leasehold to a height of Maximum

0.5 M to keep their microbial activities safe.

3.5 Quarrying and allied activities: As per the proposed production and

development plan for plan period area for quarrying 0.5921 Ha, Mineral

storage area is 0.0100 Ha. The Green belt around the lease area is about

0.1873 Ha.

3.6 Year wise proposal for Reclamation: Since Granite deposits are likely to

continue, concurrent reclamation is not feasible and after working pits are

Page 36: Roopa R Shetty Quarry Plan - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/District/... · SMT. ROOPA R. SHETTY OVER AN EXTENT OF 0.8094 Ha. IN SURVEY NO. 215

36

exhausted, than concurrent backfilling will be proposed. The mined out areas

as shown in the relevant year wise production and development plans will be

not matured enough for reclamation. Hence, the backfilling on worked out pits

for reclamation program is not envisaged presently. Suitable afforestration

technique will be adopted for reclamation after winning of the mineral. Proper

fencing will be provided all round in order to prevent accidental falling of

animals and human trespassing in to the working areas.

3.7 Afforestration program: It is proposed to develop a green belt in portion of

the non-mineralized area and 7.5 M buffer zone of the lease boundary. In

addition, the place around haul road and backfilling area shall have plantation

at the conceptual period. Every year it is proposed to carryout afforestration

over 0.037 Ha. For planting 200 saplings per annum. The species chosen from

green belt are fast growing with good canopy and dense leaf density, eco-

friendly commercial species and some ornamental plants to give good

aesthetic look are shown on Environment Management Plan Plate No.9.

3.8 Stabilization of dumps: There is no generation of overburden / waste in the

proposal plan period. Hence, no need of stabilization of the dumps.

Measures to control erosion / sedimentation of water courses: There is no

surface erosion in the lease area because; the surface area is exposed by the

granite.

Treatment and disposal of water from mine: Since there is no mine water or

ground water, the proposal of pumping out or any sort of treatment and

disposal of water from the quarry does not arise.

Measures for minimizing adverse effects on water regime: No adverse effects

are anticipated on water regime.

Page 37: Roopa R Shetty Quarry Plan - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/District/... · SMT. ROOPA R. SHETTY OVER AN EXTENT OF 0.8094 Ha. IN SURVEY NO. 215

37

Measures for protecting historical monuments and for rehabilitation of the

habitat: There are no historical monuments are located close by and hence

need of protection does not arise.

4.0 CLOSURE PLAN:

4.1 Mined – Out Land:

Reclamation of the area will not be considered during the planned period of 5

years program. In view of the above, reclamation proposed concurrent to

mining and at the end of 5 years without complete extraction of ore available

in the area becomes violation of MCDR. As such the program of reclamation

of mine is not envisaged at this stage.

After complete extraction of estimated reserves the reclamation of area of land

affected by mining activities will be taken up in order to restore to its original

use to the possible extent. The reclamation measures proposed will be back

filling in phased program wherever it is necessary. The deep pits after

completion of mining which could be serving as water ponds will not be

considered for backfilling and will be left as it is after taking necessary

landscaping and providing protective measures in the aspects of safety by

consuming retention wall all along the lease boundary.

The details of the proposed land use are given below:

Type of Land used Extent in Ha.

Existing Quarry area 0.5921

Waste dump yard 0.0100

Mineral Stock yard 0.0100

Infrastructure 0.0050

Road 0.0050

Green belt 0.1873

Untouched area -

Total 0.8094

Page 38: Roopa R Shetty Quarry Plan - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/District/... · SMT. ROOPA R. SHETTY OVER AN EXTENT OF 0.8094 Ha. IN SURVEY NO. 215

38

4.2 Water Quality Management: Water quality is good because there is no

source of pollution due to extraction of Pink Granite.

4.3 Air Quality Management: Dust generated by this quarry activity is quite

less. The major source of air pollution is due to Wagon Drill drilling activity

and loading of overburden / waste. The management of air quality shall be

by suppression of dust by water sprinkling on haulage roads and wet drilling

methods. Also in the vicinity of the area no major industries are seen and

the deposit is worked on very small scale.

4.4 Noise Level and vibration: No deep drilling and blasting activity involved in

quarrying operations. Only small diameter Wagon drilling is proposed for

wire saw cutting. Protective ear muffs, nose masks and hand glows, safety

shoes etc. are provided to reduce the effect of sound / noise and vibrations

for the drill operations.

4.5 Waste Management: The generation of waste material is very less from the

quarry and the same is utilized for afforestration / backfilling.

4.6 Top Soil Management: The soil likely to be generated will be pebbly soil.

This will be heaped in a maximum height of 0.6 M and used in

afforestration trenches. Grass will be planted to arrest erosion due to wind

action.

4.7 Infrastructure: The applicant will construct temporary structure required to

be maintained under statutory obligations which can be removed once the

work is completed. The approach road to the mine will be made and will be

maintained to meet the requirements of transportation. These are required

for utilization till the end of lease period.

4.8 Disposal of quarrying machinery: There is no proposal of disposal of

mining machineries during the present plan period.

Page 39: Roopa R Shetty Quarry Plan - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/District/... · SMT. ROOPA R. SHETTY OVER AN EXTENT OF 0.8094 Ha. IN SURVEY NO. 215

39

5.0 SAFETY AND SECURITY:

The lessee will follow prevailing Mines Act., Karnataka Mines Minerals

Concession Rules & Regulations etc., as well as other directions given to him

time to time by the Directorate General of Mines safety. The lessee will

securely fence the excavated area by barbed wire of 1.5 M height to prevent the

free access and unauthorized people to the quarrying area. The lessee will

appoint security persons to ensure to prevent unauthorized entry on weekly off

days and during the time of discontinuation of quarrying operation.

6.0 DISASTER MANAGEMENT AND RISK ASSESSMENT:

All the safety measures during the quarrying will be taken as per the norms of

DGM’s. Safety of the men and machine are most important during this

quarrying activity. No danger to public life and property arises as only trucks

ply from quarry site through public road. There are no water impoundments at

higher levels or at lower contours.

7.0 CARE AND MAINTENANCE DUE TO TEMPORARY

DISCONTINUANCE:

The requisite care and maintenance procedures shall be followed during

temporary discontinuance of the quarry. The notice of temporary

discontinuance in prescribe forms shall be submitted to the appropriate

authorities concerned in this regard with details of protection measures being

taken up. Security of the working areas fencing and suitable display boards

shall be put up during the temporary period of discontinuance.

8.0 ECONOMIC REPERCUSSIONS OF CLOSURE OF MINE

AND MAN POWER RETRECHMENTS:

8.1 Number of local residents employed in the mine, status of the

continuation family occupation and scope of joining the occupation

back: The locals employed are about 50%. Those who are directly

Page 40: Roopa R Shetty Quarry Plan - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/District/... · SMT. ROOPA R. SHETTY OVER AN EXTENT OF 0.8094 Ha. IN SURVEY NO. 215

40

employed, they are basically from agriculture back ground, they will be put

back to their original occupation. Necessary counseling will be taken care.

8.2 Compensation given to be given to the employee connecting with

sustenance of him and their family members: Compensation as provided

in the statue will be given, at the time of final mine / quarry closure to the

eligible persons.

8.3 Satellite occupations connected to the quarrying industry-number of

persons engaged therein-continuation of such business after quarry

closes: Most of the satellite occupations are not fully depending up on the

quarrying activity or closure of mines and the quarrying operations is small

scale. So the occupations like workshops hotel and tea shops will not affect

continuance their business.

8.4 Continued engagement of employees in the rehabilitated status of

mining lease area and any other remnant activities: Security and

essential service to the people will continue to be employed for purely

shorter term / temporary basis, where operations are discontinued for longer

period, it is not continue with employment and so there will be reduced to

minimum, counseling will be extended for their rehabilitation.

8.5 Envisaged repercussions on the expectation of the society around due to

closure of the mine / quarry: There will be effect on their economy,

communication, transportation to some extent, but still these difficulties will

be manageable to large extent. The details will be given in the final mine /

quarry closure plan.

9.0 ABANDONMENT / REHABILITATION COST AND COST

ESTIMATION:

The cost based estimation on the activities required for implementing the

protective and rehabilitation measures including their maintenance and

monitoring program.

Page 41: Roopa R Shetty Quarry Plan - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/District/... · SMT. ROOPA R. SHETTY OVER AN EXTENT OF 0.8094 Ha. IN SURVEY NO. 215

41

10.0 TIME SCHEDULE FOR ABANDONMENT:

The present plan prepared is a progressive quarry / Mine Closure Plan

indicating the reclamation and rehabilitation measures being taken up

simultaneously with the quarrying operations. No abandonment of quarrying

activities is envisaged. The man power and other resources for implementing

the protective and rehabilitation measures will be dealt in detail in the quarry

closure plan to be prepared for approval before abandonment of the quarry.

The details of afforestration inside and outside the quarrying lease area,

reclamation and rehabilitation, environmental monitoring details, machinery

performance and socioeconomic impact of quarrying shall be regularly

monitored and furnished to DMG records of the same shall also be maintained.

Page 42: Roopa R Shetty Quarry Plan - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/District/... · SMT. ROOPA R. SHETTY OVER AN EXTENT OF 0.8094 Ha. IN SURVEY NO. 215

42

Page 43: Roopa R Shetty Quarry Plan - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/District/... · SMT. ROOPA R. SHETTY OVER AN EXTENT OF 0.8094 Ha. IN SURVEY NO. 215

43

LIST OF PLATES

Page 44: Roopa R Shetty Quarry Plan - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/District/... · SMT. ROOPA R. SHETTY OVER AN EXTENT OF 0.8094 Ha. IN SURVEY NO. 215

44

Page 45: Roopa R Shetty Quarry Plan - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/District/... · SMT. ROOPA R. SHETTY OVER AN EXTENT OF 0.8094 Ha. IN SURVEY NO. 215

45

Page 46: Roopa R Shetty Quarry Plan - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/District/... · SMT. ROOPA R. SHETTY OVER AN EXTENT OF 0.8094 Ha. IN SURVEY NO. 215

46

Page 47: Roopa R Shetty Quarry Plan - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/District/... · SMT. ROOPA R. SHETTY OVER AN EXTENT OF 0.8094 Ha. IN SURVEY NO. 215

47

Page 48: Roopa R Shetty Quarry Plan - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/District/... · SMT. ROOPA R. SHETTY OVER AN EXTENT OF 0.8094 Ha. IN SURVEY NO. 215

48

Page 49: Roopa R Shetty Quarry Plan - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/District/... · SMT. ROOPA R. SHETTY OVER AN EXTENT OF 0.8094 Ha. IN SURVEY NO. 215

49

Page 50: Roopa R Shetty Quarry Plan - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/District/... · SMT. ROOPA R. SHETTY OVER AN EXTENT OF 0.8094 Ha. IN SURVEY NO. 215

50

LIST OF TABLES

Page 51: Roopa R Shetty Quarry Plan - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/District/... · SMT. ROOPA R. SHETTY OVER AN EXTENT OF 0.8094 Ha. IN SURVEY NO. 215

1

Statement of Geological Reserves Table – 1

Type of

Reserve

Section Area

in Sq.

M.

Strike

Influence

in M

Volume in

Cum

(ROM)

Recovery

Factor

Reserves Mineral

Reject

@ 2%

(Cum)

Soil

Waste

(Cum)

Total

Waste

In Cum

Total

Waste

in

Tons

Building

Stone in

Cum

Bulk

Density

Saleable

Mineral

in Tons

Proved A - A’

4464 88 392832

98%

384975

2.6

1000936 7857 1339 9196 23909

Probable A - A’

930 88 81840 80203 208528 1637 1637 4256

Total 474672 465179 1209464 9493 1339 10833 28165

Abstract of the Geological Reserves

Category ROM

Minerals

(Cum.)

Building

Stone

in Cum (RF

98%)

Salable

Mineral

Reserve

in Tons

Mineral

Reject @

2%

(in Cum.)

Soil

Waste

in

(Cum.)

Total

Waste

In Cum

Total

Waste in

Tons

Proved Reserves 392832 384975 1000936 7857 1339 9196 23909

Probable Reserves 81840 80203 208528 1637 1637 4256

Total 474672 465179 1209464 9493 1339 10833 28165

Page 52: Roopa R Shetty Quarry Plan - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/District/... · SMT. ROOPA R. SHETTY OVER AN EXTENT OF 0.8094 Ha. IN SURVEY NO. 215

2

Abstract of the Mineable and Non Mineable Reserves

Category ROM

Minerals

(Cum.)

Salable

Mineral in Tons

(RF 98%)

Reserve

in Tons

Mineral

Reject @

2%

(in Cum.)

Soil

Waste

in

(Cum.)

Total

Waste

In Cum

Total

Waste in

Tons

Geological Reserves 474672 465179 1209464 9493 1339 10833 28165

Mineable Reserves 437712 428958 1115290 8754 1264 10018 26047

Non Mineable Reserves 36960 36221 94174 739 75 815 2118

Statement of Mineable Reserves Table – 2

Type of

Reserve

Section Area

in Sq.

M.

Influen

ce in M

Volume

(in

Cum)

ROM

Recove

ry

Factor

Reserves Mineral

Reject

@2%

(Cum.)

Soil

(Cum.)

Total

Waste

In Cum

Total

Waste in

Tons Building

Stone

(Cum.)

Bulk

Density In Tons

Proved A - A’

4213 88 370744

98%

363329

2.6

944656 7415 1264 8679 22565

Probable A - A’

761 88 66968 65629 170634 1339 1339 3482

Total 437712 428958 1115290 8754 1264 10018 26047

Page 53: Roopa R Shetty Quarry Plan - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/District/... · SMT. ROOPA R. SHETTY OVER AN EXTENT OF 0.8094 Ha. IN SURVEY NO. 215

3

Statement of Five Years Production Table -3 :

Type of

Reserve

Gross

Section

Area of

cross

Section

(Sq. M.)

Strike

Influence

(M)

Volume

(Cum.)

ROM

RF

Reserves Mineral

reject

@ 2%

(Cum)

Soil

Waste

(Cum)

Total

Waste

In

Cum

Total

Waste in

Tons

Building

Stone

(RF 98%

in Cum.)

Bulk

Density

Net

Recovery

In Tons

1 Year A - A' 918 88 80784

98%

80784

2.6

205838 1616 275 1891 4917

2 Year A - A' 924 88 81312 81312 207183 1626 277 1903 4949

3 Year A - A' 946 88 83248 83248 212116 1665 284 1949 5067

4 Year A – A’ 344 88 30272 30272 77133 605 103 709 1842

5 Year A – A’ 360 88 31680 31680 80721 634 108 742 1928

Total 307296 307296 782990 6146 1048 7194 18703

Abstract of the Five years production

Years Minerals in Cum. ROM

Mineral in Tons

Mineral Reject in Cum

Soil Waste in Cum

Total Waste In Cum

Total Waste in

Tons

1 Year 80784 205838 1616 275 1891 4917

2 Year 81312 207183 1626 277 1903 4949

3 Year 83248 212116 1665 284 1949 5067

4 Year 30272 77133 605 103 709 1842

5 Year 31680 80721 634 108 742 1928

Total 307296 782990 6146 1048 7194 18703

Page 54: Roopa R Shetty Quarry Plan - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/District/... · SMT. ROOPA R. SHETTY OVER AN EXTENT OF 0.8094 Ha. IN SURVEY NO. 215

0

Photographs of the Lease Area

Surface Area and Granitic Gneiss rock exposed at Survey No. 215 (View 1)

Surface Area and Granitic Gneiss rock exposed at Survey No. 215 (View 2)

Page 55: Roopa R Shetty Quarry Plan - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/District/... · SMT. ROOPA R. SHETTY OVER AN EXTENT OF 0.8094 Ha. IN SURVEY NO. 215

1

Granitic Gneiss rock Exposures in Survey No. 215