Rooftop Package Unit - CHIGOchigo.pl/wp-content/uploads/2017/01/Rooftop-Package... · 2017. 11....

24
Rooftop Package Unit Technical Support Division 2014.11 GD CHIGO HEATING & VENTILATION EQUIPMENT CO., LTD.

Transcript of Rooftop Package Unit - CHIGOchigo.pl/wp-content/uploads/2017/01/Rooftop-Package... · 2017. 11....

Page 1: Rooftop Package Unit - CHIGOchigo.pl/wp-content/uploads/2017/01/Rooftop-Package... · 2017. 11. 28. · Rooftop Package Unit . 15 No. Part Name Quantity No. Part Name Quantity 1 Top

Rooftop Package Unit

Technical Support Division

2014.11

GD CHIGO HEATING & VENTILATION EQUIPMENT CO., LTD.

Page 2: Rooftop Package Unit - CHIGOchigo.pl/wp-content/uploads/2017/01/Rooftop-Package... · 2017. 11. 28. · Rooftop Package Unit . 15 No. Part Name Quantity No. Part Name Quantity 1 Top

1 Rooftop Package Unit

1. Rooftop Package Unit introduction

2. Nomenclature

3. Specifications

4. Dimensions

5. Electric characteristics

6. Wiring diagrams and field wiring

7. Accessories

8.Static pressure and air flow

9.Exploded view

10. Troubleshooting

11. Installation

12.Controller

Content

GD CHIGO HEATING & VENTILATION EQUIPMENT CO., LTD.

Page 3: Rooftop Package Unit - CHIGOchigo.pl/wp-content/uploads/2017/01/Rooftop-Package... · 2017. 11. 28. · Rooftop Package Unit . 15 No. Part Name Quantity No. Part Name Quantity 1 Top

2 Rooftop Package Unit

1. Rooftop packageunit introduction

1.1 Modules Range

4 models: Cooling & Heating: 20 TR, 25TR;

Cooling only: 20 TR, 25TR

20TR, 25TR

1.2 Adopt high reliable Copland compressor

Better Liquid Handling

Radial compliance allows the scroll members to separate in the presence of liquid refrigerant,

thus, providing protection against liquid damage.

Greater Efficiency

With axial compliance, optimized force between two scrolls can be obtained, leading to high

efficiency over the entire operating range.

Word famous scroll compressor with quick reactivity and operation stable. Compressor staging is

controlled directly by the control temperature ,high EER.

1.3 New air inlet is available.

1.4 Provide easy access to system components for maintenance and service.

1.5 Flexible installation, on rooftop or ground are available. Anywhere removable as requirement with

fixed.

GD CHIGO HEATING & VENTILATION EQUIPMENT CO., LTD.

Page 4: Rooftop Package Unit - CHIGOchigo.pl/wp-content/uploads/2017/01/Rooftop-Package... · 2017. 11. 28. · Rooftop Package Unit . 15 No. Part Name Quantity No. Part Name Quantity 1 Top

3 Rooftop Package Unit

2. Nomenclature

Design code B: 2nd generation

Refrigerant type R1: R410a

V: DC inv; -:Fixed speed

- 200 C Z V R1 - B

C:cooling only; H:Heat pump

-:T1 condition; T:T3 condition

Capacity: 20Ton

Power SupplyZ: 380~415V/3N/ 50HZ

C R B T

Chigo Product

Rooftop Unit

Side-discharge or bottom-dischage is optional

W

Control methodW: wired controller

GD CHIGO HEATING & VENTILATION EQUIPMENT CO., LTD.

Page 5: Rooftop Package Unit - CHIGOchigo.pl/wp-content/uploads/2017/01/Rooftop-Package... · 2017. 11. 28. · Rooftop Package Unit . 15 No. Part Name Quantity No. Part Name Quantity 1 Top

4 Rooftop Package Unit

3. Specifications

Nominal ton 20Tons 25Tons

Model type CRB-200CZR1-W CRB-200HZR1-W CRB-250CZR1-W CRB-250HZR1-W

Power voltage/phase/frequency 380-415/3/50 380-415/3/50 380-415/3/50 380-415/3/50

Capacity Cooling(Btu/h) 240000 240000 300000 300000

Heating(Btu/h) / 256000 / 314000

EER(W/W) 2.99 2.99 2.99 2.99

Sound level(sound pressurelevel ) dB(A) 74.1 74.1 74.7 74.7

Dimensions

Length(mm) 2750 2750 2750 2750

Width(mm) 2157 2157 2157 2157

Height(mm) 1245 1245 1245 1245

Net weight(Kg) 950 950 980 980

Gross weight(Kg) 990 990 1020 1020

Packing dimension: LxWxH 2760x2175x1280 2760x2175x1280 2760x2175x1280 2760x2175x1280

Refrigerant type R410A R410A/7500+7500 R410A R410A

Flow control Capillary Capillary Capillary Capillary

Compressor Quantity/Type 2/Scroll 2/Scroll 2/Scroll 2/Scroll

Outdoor coil

Rows 3 3 3.5 3.5

Fins per inch 16 16 16 16

Tube diameter(in.) 5/16 5/16 5/16 5/16

Indoor coil

Rows 3 3 4 4

Fins per inch 16 16 16 16

Tube diameter(in.) 5/16 5/16 5/16 5/16

Outdoor fan

Quantity used/diameter(mm) 2/750 2/750 2/800 2/800

Type Propeller Propeller Propeller Propeller

Drive type Direct Direct Direct Direct

Quantity speeds 1 1 1 1

Quantity motors/power(kW) 2/1.1 2/1.1 2/1.5 2/1.5

Motor RPM 835 835 1130 1130

Total nominal CFM 14000 14000 16765 16765

Indoor fan

Quantity used/diameter(mm) 1/18*18 1/18*18 1/18*18 1/18*18

Type FC centrifugal FC centrifugal FC centrifugal FC centrifugal

Drive type Belt Belt Belt Belt

Quantity speeds Variable sheave Variable sheave Variable sheave Variable sheave

Quantity motors/power(kW) 1/5.5 1/5.5 1/7.5 1/7.5

Motor RPM 1670 1670 1670 1670

Total nominal CFM 7800 7800 10200 10200

Filters Quantity size recommended(mm) (1)1916*977*12.5 (1)1916*977*12.5 (1)1916*977*12.5 (1)1916*977*12.5

GD CHIGO HEATING & VENTILATION EQUIPMENT CO., LTD.

Page 6: Rooftop Package Unit - CHIGOchigo.pl/wp-content/uploads/2017/01/Rooftop-Package... · 2017. 11. 28. · Rooftop Package Unit . 15 No. Part Name Quantity No. Part Name Quantity 1 Top

5 Rooftop Package Unit

4. Dimensions

4.1 20 TR, 25TR unit dimension

GD CHIGO HEATING & VENTILATION EQUIPMENT CO., LTD.

Page 7: Rooftop Package Unit - CHIGOchigo.pl/wp-content/uploads/2017/01/Rooftop-Package... · 2017. 11. 28. · Rooftop Package Unit . 15 No. Part Name Quantity No. Part Name Quantity 1 Top

6 Rooftop Package Unit

4.2 Installation base dimension

GD CHIGO HEATING & VENTILATION EQUIPMENT CO., LTD.

Page 8: Rooftop Package Unit - CHIGOchigo.pl/wp-content/uploads/2017/01/Rooftop-Package... · 2017. 11. 28. · Rooftop Package Unit . 15 No. Part Name Quantity No. Part Name Quantity 1 Top

7 Rooftop Package Unit

5. Electric characteristics

VOL: Unit Power Supply Rated Voltage (V)

HZ: Frequency (HZ)

STC: Starting Current (A)

RNC: Running Current (A)

IPT: Input (kw)

Main Power Supply

GD CHIGO HEATING & VENTILATION EQUIPMENT CO., LTD.

Page 9: Rooftop Package Unit - CHIGOchigo.pl/wp-content/uploads/2017/01/Rooftop-Package... · 2017. 11. 28. · Rooftop Package Unit . 15 No. Part Name Quantity No. Part Name Quantity 1 Top

8 Rooftop Package Unit

6. Wiring diagrams and field wiring

CRB-200CZR1-W

CRB-200HZR1-W

GD CHIGO HEATING & VENTILATION EQUIPMENT CO., LTD.

Page 10: Rooftop Package Unit - CHIGOchigo.pl/wp-content/uploads/2017/01/Rooftop-Package... · 2017. 11. 28. · Rooftop Package Unit . 15 No. Part Name Quantity No. Part Name Quantity 1 Top

9 Rooftop Package Unit

Field wiring

7. Accessories

GD CHIGO HEATING & VENTILATION EQUIPMENT CO., LTD.

Page 11: Rooftop Package Unit - CHIGOchigo.pl/wp-content/uploads/2017/01/Rooftop-Package... · 2017. 11. 28. · Rooftop Package Unit . 15 No. Part Name Quantity No. Part Name Quantity 1 Top

10 Rooftop Package Unit

8. Static pressure and air flow Air flow

Curve diagram of static pressure, air flow volume

GD CHIGO HEATING & VENTILATION EQUIPMENT CO., LTD.

Page 12: Rooftop Package Unit - CHIGOchigo.pl/wp-content/uploads/2017/01/Rooftop-Package... · 2017. 11. 28. · Rooftop Package Unit . 15 No. Part Name Quantity No. Part Name Quantity 1 Top

11 Rooftop Package Unit

9. Exploded view

CRB-200CZR1-W

GD CHIGO HEATING & VENTILATION EQUIPMENT CO., LTD.

Page 13: Rooftop Package Unit - CHIGOchigo.pl/wp-content/uploads/2017/01/Rooftop-Package... · 2017. 11. 28. · Rooftop Package Unit . 15 No. Part Name Quantity No. Part Name Quantity 1 Top

12 Rooftop Package Unit

No. Part Name Quantity No. Part Name Quantity

1 Top net 2 26 Suction pipe assy 2

2 Wind inlet guide 2 26.1 Pressure switch 1

3 Motor support 2 26.3 Needle valve 1

4 Fan motor 2 27 Discharge pipe assy 1 1

5 Propeller fan 2 27.1 Needle valve 1

6 Middle top cover components 1 27.2 Copper tube for probe 1

7 top cover components of Fan 1 27.3 Pressure switch 1

8 support assy for fan 2 28 Discharge pipe assy 2 1

9 Right and rear support Ⅱ 1 28.1 Needle valve

1

10 Protection grill 3 1 28.2 Copper tube for probe 1

11 condenser assy 2 1 28.3 Pressure switch 1

12 Protection grill 2

1 29 Connecting pipe assy for

Vapour-liquid separator 1 1

13 Right support

1 30 Connecting pipe for

Vapour-liquid separator 2 1

14 Protection grill 1

1 31 Receiver gas welding connecting

pipe assy of condenser 2 1

15 condenser assy 1

1 32 Discharge connecting pipe

assy of condenser 2 1

16 E-parts assy

1 33 Discharge connecting

pipe assy of condenser 1 1

16.1 PCB 1 34 Low-pressure connecting pipe assy 2

16.2 Transformer 1 35 High-pressure connecting pipe assy 2

16.3 Terminal 1 35.1 Filter 1

16.4 Alternating contactor 2 36 throttle assy 2

16.5 Relay 1 37 Panel cover for under air inlet 1

16.6 Alternating contactor 1 38 Middle bottom panel assy 1

16.7 Alternating contactor 2 39 Left bottom panel assy 1

16.8 Sequence protector 1 40 Front and middle side board 1

16.9 Terminal

1 41 Left and front support Ⅱ 1

16.11 Terminal 2 42 Front and left side board 1

16.12 Relay

2 43 Left and front support Ⅰ 1

16.13 Transformer 1 44 Septum plate assy 1

16.14 PCB 1 45 Air out board assy 1

16.15 Wire CONTROLLER 1 46 Water pan assy 1

16.16 Temperature Sensor 1 47 Indoor fan assy 1

16.17 Temperature Sensor 1 48 Evaporator assy 1

16.18 Temperature Sensor

1 48.1 Condenser exhaust receiver

welding assy 1 1

16.19 Temperature Sensor

1 48.2 Condenser exhaust receiver

1

GD CHIGO HEATING & VENTILATION EQUIPMENT CO., LTD.

Page 14: Rooftop Package Unit - CHIGOchigo.pl/wp-content/uploads/2017/01/Rooftop-Package... · 2017. 11. 28. · Rooftop Package Unit . 15 No. Part Name Quantity No. Part Name Quantity 1 Top

13 Rooftop Package Unit

welding assy 2

16.20 Temperature Sensor

1 48.3 Current dividing capillary

assy of condenser 1

16.21 Current Transformer

4 48.4 Current dividing capillary assy

of condenser 1

16.22 E-parts box assy 1 49 Left and front side board 1

16.23 E-parts box panel cover 1 50 Right support 1

17 Vapour-liquid separator 2 51 Evaporator filter 1

18 Compressor 2 52 Left and rear side board 1

19 Compressor base 1 53 Strengthening board for evaporator 1

20 Right and front support Ⅱ 1 54 Left board of air inlet

1

21 Right and front support Ⅰ 1 55 Left and rear support Ⅰ 1

22 Front and right side board 1 56 Outdoor top cover components 1

23 Bottom assy of compressor side 1 57 Panel cover for air inlet 1

24 Bottom beam assy 1 58 Panel cover for air outlet 1

25 panel cover for under air out 1

GD CHIGO HEATING & VENTILATION EQUIPMENT CO., LTD.

Page 15: Rooftop Package Unit - CHIGOchigo.pl/wp-content/uploads/2017/01/Rooftop-Package... · 2017. 11. 28. · Rooftop Package Unit . 15 No. Part Name Quantity No. Part Name Quantity 1 Top

14 Rooftop Package Unit

CRB-200HZR1-W

GD CHIGO HEATING & VENTILATION EQUIPMENT CO., LTD.

Page 16: Rooftop Package Unit - CHIGOchigo.pl/wp-content/uploads/2017/01/Rooftop-Package... · 2017. 11. 28. · Rooftop Package Unit . 15 No. Part Name Quantity No. Part Name Quantity 1 Top

15 Rooftop Package Unit

No. Part Name Quantity No. Part Name Quantity

1 Top net 2 25 panel cover for under air out 1

2 Wind inlet guide 2 26 Suction pipe assy 2

3 Motor support 2 26.1 Pressure switch 1

4 Fan motor 2 26.3 Needle valve 1

5 Propeller fan 2 27 Discharge pipe assy 2

6 Middle top cover components 1 27.1 Needle valve 1

7 top cover components of Fan 1 27.2 Copper tube for probe 1

8 support assy for fan 2 27.3 Pressure switch 1

9 Right and rear support Ⅱ 1 28 4-way reversing valve assy 1 1

10 Protection grill 3 1 28.1 4-way reversing valve 1

11 condenser assy 2 1 28.2 Control wire for 4-Ways valve 1

12 Protection grill 2 1 29 4-way reversing valve assy 2 1

13 Right support 1 29.1 4-way reversing valve 1

14 Protection grill 1 1 29.2 Control wire for 4-Ways valve 1

15 condenser assy 1 1 30 Receiver gas welding connecting

pipe assy of condenser 2 1

16 E-parts assy 1 31 Discharge connecting pipe

assy of condenser 2 1

16.1 PCB 1 32 Discharge connecting

pipe assy of condenser 1 1

16.2 Transformer 1 33 Low-pressure connecting pipe assy 2

16.3 Terminal 1 34 High-pressure connecting pipe assy 2

16.4 Alternating contactor 2 34.1 Filter 1

16.5 E-parts box 1 35 throttle assy 2

16.6 Alternating contactor 1 36 Panel cover for under air inlet 1

16.7 Alternating contactor 2 37 Middle bottom panel assy 1

16.8 Sequence protector 1 38 Left bottom panel assy 1

16.9 Terminal 1 39 Front and middle side board 1

16.1 Heater Band 2 40 Left and front support Ⅱ 1

16.11 Terminal 2 41 Front and left side board 1

16.12 Relay 2 42 Left and front support Ⅰ 1

16.13 Transformer 1 43 Septum plate assy 1

16.14 PCB 1 44 Air out board assy 1

16.15 Wire CONTROLLER 1 45 Water pan assy 1

16.16 Temperature Sensor 1 46 Indoor fan assy 1

16.17 Temperature Sensor 1 47 Evaporator assy 1

16.18 Temperature Sensor 1 47.1 Condenser exhaust receiver

welding assy 1 1

16.19 Temperature Sensor 1 47.2 Condenser exhaust receiver

welding assy 2 1

GD CHIGO HEATING & VENTILATION EQUIPMENT CO., LTD.

Page 17: Rooftop Package Unit - CHIGOchigo.pl/wp-content/uploads/2017/01/Rooftop-Package... · 2017. 11. 28. · Rooftop Package Unit . 15 No. Part Name Quantity No. Part Name Quantity 1 Top

16 Rooftop Package Unit

16.2 Temperature Sensor 1 47.3 Current dividing capillary

assy of condenser 1

16.21 Current Transformer 4 47.4 Current dividing capillary assy

of condenser 1

16.22 E-parts box assy 1 48 Left and front side board 1

16.23 E-parts box panel cover 1 49 Right support 1

17 Vapour-liquid separator 2 50 Evaporator filter 1

18 Compressor 2 51 Left and rear side board 1

18.1 Crankcase heater 2 52 Strengthening board for evaporator 1

19 Compressor base 1 53 Left board of air inlet 1

20 Right and front support Ⅱ 1 54 Left and rear support Ⅰ 1

21 Right and front support Ⅰ 1 55 Outdoor top cover components 1

22 Front and right side board 1 56 Panel cover for air inlet 1

23 Bottom assy of compressor side 1 57 Panel cover for air outlet 1

24 Bottom beam assy 1

GD CHIGO HEATING & VENTILATION EQUIPMENT CO., LTD.

Page 18: Rooftop Package Unit - CHIGOchigo.pl/wp-content/uploads/2017/01/Rooftop-Package... · 2017. 11. 28. · Rooftop Package Unit . 15 No. Part Name Quantity No. Part Name Quantity 1 Top

17 Rooftop Package Unit

10. Troubleshooting

GD CHIGO HEATING & VENTILATION EQUIPMENT CO., LTD.

Page 19: Rooftop Package Unit - CHIGOchigo.pl/wp-content/uploads/2017/01/Rooftop-Package... · 2017. 11. 28. · Rooftop Package Unit . 15 No. Part Name Quantity No. Part Name Quantity 1 Top

18 Rooftop Package Unit

GD CHIGO HEATING & VENTILATION EQUIPMENT CO., LTD.

Page 20: Rooftop Package Unit - CHIGOchigo.pl/wp-content/uploads/2017/01/Rooftop-Package... · 2017. 11. 28. · Rooftop Package Unit . 15 No. Part Name Quantity No. Part Name Quantity 1 Top

19 Rooftop Package Unit

11. Installation

1. Lifting

2. Rooftop unit

GD CHIGO HEATING & VENTILATION EQUIPMENT CO., LTD.

Page 21: Rooftop Package Unit - CHIGOchigo.pl/wp-content/uploads/2017/01/Rooftop-Package... · 2017. 11. 28. · Rooftop Package Unit . 15 No. Part Name Quantity No. Part Name Quantity 1 Top

20 Rooftop Package Unit

3. Ground level-horizontal unit

4. Condensate drain piping

5. Ductwork

GD CHIGO HEATING & VENTILATION EQUIPMENT CO., LTD.

Page 22: Rooftop Package Unit - CHIGOchigo.pl/wp-content/uploads/2017/01/Rooftop-Package... · 2017. 11. 28. · Rooftop Package Unit . 15 No. Part Name Quantity No. Part Name Quantity 1 Top

21 Rooftop Package Unit

GD CHIGO HEATING & VENTILATION EQUIPMENT CO., LTD.

Page 23: Rooftop Package Unit - CHIGOchigo.pl/wp-content/uploads/2017/01/Rooftop-Package... · 2017. 11. 28. · Rooftop Package Unit . 15 No. Part Name Quantity No. Part Name Quantity 1 Top

22 Rooftop Package Unit

12. Controller

GD CHIGO HEATING & VENTILATION EQUIPMENT CO., LTD.

Page 24: Rooftop Package Unit - CHIGOchigo.pl/wp-content/uploads/2017/01/Rooftop-Package... · 2017. 11. 28. · Rooftop Package Unit . 15 No. Part Name Quantity No. Part Name Quantity 1 Top

23 Rooftop Package Unit

GD CHIGO HEATING & VENTILATION EQUIPMENT CO., LTD.