Municipality of Amsterdam
Green Municipal Buildings
By: Ronald van Warmerdam
![Page 2: Ronald van Warmerdam - Municipality of Amsterdam - Green Municipal Buildings](https://reader033.fdocuments.net/reader033/viewer/2022042813/548697b75806b5b8588b497c/html5/thumbnails/2.jpg)
![Page 3: Ronald van Warmerdam - Municipality of Amsterdam - Green Municipal Buildings](https://reader033.fdocuments.net/reader033/viewer/2022042813/548697b75806b5b8588b497c/html5/thumbnails/3.jpg)
Structure
Goal: Green municipal buildingsIs this possible? 4 solutionsConclusionQuestions
![Page 4: Ronald van Warmerdam - Municipality of Amsterdam - Green Municipal Buildings](https://reader033.fdocuments.net/reader033/viewer/2022042813/548697b75806b5b8588b497c/html5/thumbnails/4.jpg)
GoalCO2 neutral municipal buildings
1. Reduce energy consumption2. Use alternative energy sources3. Use fossil energy as efficient as possible
![Page 5: Ronald van Warmerdam - Municipality of Amsterdam - Green Municipal Buildings](https://reader033.fdocuments.net/reader033/viewer/2022042813/548697b75806b5b8588b497c/html5/thumbnails/5.jpg)
CO2 neutral buildings – possible now?
With all the technical solutions available
New buildings: up to 80%In the near future: 100%
Old buildings: up to 30% -70%
3 examples
![Page 6: Ronald van Warmerdam - Municipality of Amsterdam - Green Municipal Buildings](https://reader033.fdocuments.net/reader033/viewer/2022042813/548697b75806b5b8588b497c/html5/thumbnails/6.jpg)
Municipal office: “ZuiderAmstel”
![Page 7: Ronald van Warmerdam - Municipality of Amsterdam - Green Municipal Buildings](https://reader033.fdocuments.net/reader033/viewer/2022042813/548697b75806b5b8588b497c/html5/thumbnails/7.jpg)
Municipal building: “Oost Watergraafsmeer”
![Page 8: Ronald van Warmerdam - Municipality of Amsterdam - Green Municipal Buildings](https://reader033.fdocuments.net/reader033/viewer/2022042813/548697b75806b5b8588b497c/html5/thumbnails/8.jpg)
Municipal building: “City Archives”
![Page 9: Ronald van Warmerdam - Municipality of Amsterdam - Green Municipal Buildings](https://reader033.fdocuments.net/reader033/viewer/2022042813/548697b75806b5b8588b497c/html5/thumbnails/9.jpg)
![Page 10: Ronald van Warmerdam - Municipality of Amsterdam - Green Municipal Buildings](https://reader033.fdocuments.net/reader033/viewer/2022042813/548697b75806b5b8588b497c/html5/thumbnails/10.jpg)
Neutral buildings possible?In the old city?No…Not on the site of a single building
But: 4 steps to reach our goal: 100%
To solve the last 20%: new buildingsTo solve the last 60% - 30% : old buildings
![Page 11: Ronald van Warmerdam - Municipality of Amsterdam - Green Municipal Buildings](https://reader033.fdocuments.net/reader033/viewer/2022042813/548697b75806b5b8588b497c/html5/thumbnails/11.jpg)
Solution / step 1 Flex working and remote working
Rethink the way we work
Reduce on floor spaceReduce on building costsEnergy consumption
![Page 12: Ronald van Warmerdam - Municipality of Amsterdam - Green Municipal Buildings](https://reader033.fdocuments.net/reader033/viewer/2022042813/548697b75806b5b8588b497c/html5/thumbnails/12.jpg)
Solution / step 2 Renew your design process
Set new goals and new principlesUse all technical solutions availableChange the design processWork with experienced people
Architects, technical engineers etc. Use aids to control the design process
Braeem, Leed, Green Calc, People Planet Profit, Cradle to cradle, Eco efficient, passive building etc.
![Page 13: Ronald van Warmerdam - Municipality of Amsterdam - Green Municipal Buildings](https://reader033.fdocuments.net/reader033/viewer/2022042813/548697b75806b5b8588b497c/html5/thumbnails/13.jpg)
Solution / step 3 Alternative energy!
Sun: PV cells and sun boilersHumans: use human warmthClimate: wind and waterEarth:
–Heat and cold storage –Geothermic energy
On site or remote
![Page 14: Ronald van Warmerdam - Municipality of Amsterdam - Green Municipal Buildings](https://reader033.fdocuments.net/reader033/viewer/2022042813/548697b75806b5b8588b497c/html5/thumbnails/14.jpg)
Solution / step 4 Alternative energy on a larger scale
Neighbours (current / green challenge)NeighbourhoodAreaCityState Country
![Page 15: Ronald van Warmerdam - Municipality of Amsterdam - Green Municipal Buildings](https://reader033.fdocuments.net/reader033/viewer/2022042813/548697b75806b5b8588b497c/html5/thumbnails/15.jpg)
Qurrent
Qurrent has in fact developed computer controlled energy management for entire streets, through which the available energy can be optimized between all houses. That's a break-through.
![Page 16: Ronald van Warmerdam - Municipality of Amsterdam - Green Municipal Buildings](https://reader033.fdocuments.net/reader033/viewer/2022042813/548697b75806b5b8588b497c/html5/thumbnails/16.jpg)
Conclusion
Co2 neutral (100%):
Flex working and remote workingRenew your design process
Alternative energy!Alternative energy on a larger scale
![Page 17: Ronald van Warmerdam - Municipality of Amsterdam - Green Municipal Buildings](https://reader033.fdocuments.net/reader033/viewer/2022042813/548697b75806b5b8588b497c/html5/thumbnails/17.jpg)
Return to the energy of the sun