Roma 2 Febbraio 2006
Paolo Checchia Road Map INFN 1
ECAL: Riepilogo costi (M€)
Tesla
TDR
Stima 10-11-05
Ba.Ca.Bi
SiW 13230 MCh 3000m2 Si
80-200 228
Convenzionale 20
Ibrido <40
Roma 2 Febbraio 2006
Paolo Checchia Road Map INFN 2
ECAL: nuove valutazioni (M€)
1) the today cost of the silicon is in fact smaller than 8$ (about 6)2) A reasonable prediction is about 3$ for the time of the LC (=TDR)3) optimist price could be 2$4) The today version (LDC01) include only 30 layers and a radius smaller and barrel lenght smaller leading to about 1800 m2. A reduction to 1200 m2 seems possible (20 layers and smaller length and radius)5) cost of the electronics , I don't know. The cost only sligthly depend on the channels numbers. The overall cost of the readout at about 10M$ seems a reasonable estimation
Oltre alle altre stime fornisco quella del diretto interessato (J.C. Brient)
Da discussione con vari esperti (non esistendo caso analogo per tipologia e dimensione): improbabile scendere sotto 1 €/can cui va inevitabilmente aggiunto altrettanto per connessioni, cavi, alimentazioni, raffreddamento ecc.
Roma 2 Febbraio 2006
Paolo Checchia Road Map INFN 3
ECAL: Rivalutazione costi SiW (M€)*
3000m2
30 Mcan1800m2
18 Mcan1200m2
12 Mcan
W (100$/kg)
+ meccanica (5)20 17 13
Si (3$/cm2) 90 54 36Elettronica 1€/can x 2(contatti…)
60 36 24!
Contingency (25%)
42 27 18
Totale 212 134 91
*Assunzione 1$=1€ !Assunzione: scala con numero canali
NB: valutazioni in assenza di un progetto dettagliato e di certezza costi materie prime puramente indicative