GEORGE W. HAYS PK-8CINCINNATI, OH
Mechanical FocusSenior Thesis
The Pennsylvania State University
Architectural Engineering
Ice Storage System Implementation
Rendering Courtesy MoodyNolan, Inc.
![Page 2: Rodrick A. Crousey April 18, 2007](https://reader030.fdocuments.net/reader030/viewer/2022012922/56816799550346895ddcd5ba/html5/thumbnails/2.jpg)
Presentation Topics Building Overview Ice Storage System Design and Analysis Location of Ice Storage Tanks Electrical Equipment Downsizing Cost Payback Analysis Conclusion
![Page 3: Rodrick A. Crousey April 18, 2007](https://reader030.fdocuments.net/reader030/viewer/2022012922/56816799550346895ddcd5ba/html5/thumbnails/3.jpg)
Criteria for Evaluation Cost
Higher First Cost vs. Annual Energy Savings
Effect on Building Function Effect on Surrounding Community
On-Peak Energy UsageEnergy Consumption
Educational
![Page 4: Rodrick A. Crousey April 18, 2007](https://reader030.fdocuments.net/reader030/viewer/2022012922/56816799550346895ddcd5ba/html5/thumbnails/4.jpg)
Presentation Topics Building Overview
Ice Storage System Design and Analysis Location of Ice Storage Tanks Electrical Equipment Downsizing Cost Payback Analysis Conclusion
![Page 5: Rodrick A. Crousey April 18, 2007](https://reader030.fdocuments.net/reader030/viewer/2022012922/56816799550346895ddcd5ba/html5/thumbnails/5.jpg)
Project TeamMoody-Nolan, Inc. – Architect & Civil
EngineerThermalTech Engineering, Inc. – MEP
EngineerGOP Limited – Structural Engineer
Turner/DAG/TYS – Construction Manager
![Page 6: Rodrick A. Crousey April 18, 2007](https://reader030.fdocuments.net/reader030/viewer/2022012922/56816799550346895ddcd5ba/html5/thumbnails/6.jpg)
Building Overview Pre-Kindergarten Through 8th Grade
Classrooms, Offices, Cafeteria, and Gym 500 Students 66,000 ft2 Owned by Cincinnati Public Schools
![Page 7: Rodrick A. Crousey April 18, 2007](https://reader030.fdocuments.net/reader030/viewer/2022012922/56816799550346895ddcd5ba/html5/thumbnails/7.jpg)
Building Overview $11,149,342 Construction Costs Construction 2006 - 2007 Concrete Slabs on Metal Decking Brick Veneer, CMU Back Up EPDM Membrane Roof System
![Page 8: Rodrick A. Crousey April 18, 2007](https://reader030.fdocuments.net/reader030/viewer/2022012922/56816799550346895ddcd5ba/html5/thumbnails/8.jpg)
Building Overview Main Switch Board
2000a, 480Y/277, 3P, 4W Primary Service
480Y/277, 3P, 4W Secondary Service
208Y/277, 3P, 4W
![Page 9: Rodrick A. Crousey April 18, 2007](https://reader030.fdocuments.net/reader030/viewer/2022012922/56816799550346895ddcd5ba/html5/thumbnails/9.jpg)
AHU-1 Classrooms AHU-2 Offices/ Cafeteria AHU-3 Gymnasium
One 170 ton ChillerTwo 1500 Mbtu/hrNatural Gas Boilers
![Page 10: Rodrick A. Crousey April 18, 2007](https://reader030.fdocuments.net/reader030/viewer/2022012922/56816799550346895ddcd5ba/html5/thumbnails/10.jpg)
Presentation Topics Building Overview
Ice Storage System Design and Analysis
Location of Ice Storage Tanks Electrical Equipment Downsizing Cost Payback AnalysisConclusion
![Page 11: Rodrick A. Crousey April 18, 2007](https://reader030.fdocuments.net/reader030/viewer/2022012922/56816799550346895ddcd5ba/html5/thumbnails/11.jpg)
Ice System Research Building Engineer
CALMAC Representative
ASHRAE Design Guide
![Page 12: Rodrick A. Crousey April 18, 2007](https://reader030.fdocuments.net/reader030/viewer/2022012922/56816799550346895ddcd5ba/html5/thumbnails/12.jpg)
Ice System Strategy Chiller Priority
Chiller Upstream
Internal Freeze – Internal Melt
Ice Tanks in Parallel
Primary/Secondary
![Page 13: Rodrick A. Crousey April 18, 2007](https://reader030.fdocuments.net/reader030/viewer/2022012922/56816799550346895ddcd5ba/html5/thumbnails/13.jpg)
158 Ton Max Load
22 Ton Base Load
1910 Ton-Hrs
Design Day Profile
0
20
40
60
80
100
120
140
160
180
5094 5099 5104 5109 5114Hour
Bui
ldin
g Lo
ad [T
ons]
Similar Electric and Thermal Load Peak
Design Day Profile
0
20
40
60
80
100
120
140
160
180
5094 5099 5104 5109 5114Hour of Year
Bui
ldin
g Lo
ad [T
ons]
0
50
100
150
200
250
300
Bui
ldin
g Lo
ad [k
W]
Design Day Load Profile
Base Case Building kW
![Page 14: Rodrick A. Crousey April 18, 2007](https://reader030.fdocuments.net/reader030/viewer/2022012922/56816799550346895ddcd5ba/html5/thumbnails/14.jpg)
3 Cases Analyzed85 ton90 ton100 ton
90 ton Quickest Return
![Page 15: Rodrick A. Crousey April 18, 2007](https://reader030.fdocuments.net/reader030/viewer/2022012922/56816799550346895ddcd5ba/html5/thumbnails/15.jpg)
486 ton-hrs Ice Storage
90 ton Chiller
57 ton/hr Max Discharge Rate
36 ton/hr MaxCharge Rate
![Page 16: Rodrick A. Crousey April 18, 2007](https://reader030.fdocuments.net/reader030/viewer/2022012922/56816799550346895ddcd5ba/html5/thumbnails/16.jpg)
From 271 kW to 238 kW
Lower On-Peak EnergyUsage
Higher Off-Peak EnergyUsage
Higher Overall EnergyUsage
![Page 17: Rodrick A. Crousey April 18, 2007](https://reader030.fdocuments.net/reader030/viewer/2022012922/56816799550346895ddcd5ba/html5/thumbnails/17.jpg)
Reduced Electrical Demand
Drastically Reduced Billed Demand
![Page 18: Rodrick A. Crousey April 18, 2007](https://reader030.fdocuments.net/reader030/viewer/2022012922/56816799550346895ddcd5ba/html5/thumbnails/18.jpg)
3% Higher kW-hr
12% Lower kW
8% Annual Savings
85 90 100 Base Case535795 530902 539144 513111
85 90 100 Base Case241 248 261 281
85 90 100 Base Case35507 36162 37911 39486 Annual Bill ($)10% 8% 4% 0% % Annual Savings0.066 0.068 0.070 0.077 $/kW
Annual Electric Bill
Annual kW-h
Demand Peak kW
![Page 19: Rodrick A. Crousey April 18, 2007](https://reader030.fdocuments.net/reader030/viewer/2022012922/56816799550346895ddcd5ba/html5/thumbnails/19.jpg)
Ice Storage System Piping Diagram Charging Cycle
CHILLER
Air Handlers
Regulating Valve
V2
P1
P2
V1
ICEBANK
ICEBANK
440F
310F
250F 60 tons 277 gpm
486 Ton Hrs
![Page 20: Rodrick A. Crousey April 18, 2007](https://reader030.fdocuments.net/reader030/viewer/2022012922/56816799550346895ddcd5ba/html5/thumbnails/20.jpg)
Lower supply temperature means higher kW/ton
Smaller chiller means higher kW/ton
Increased IPLV
Chiller Conditions 90 tons IPLVLow T High T tons kW COP COPcarnot η Carnot kW/ton kW/ton
Reference 499.7 544.7 89.9 88.9 3.6 11.1 0.3 1.1Charging 484.7 544.7 60.0 81.5 2.6 8.1 0.3 1.4 1.3
Discharging 503.7 554.7 90.8 99.8 3.2 1.1 0.9As Designed 509.7 554.7 1.1 0.8
![Page 21: Rodrick A. Crousey April 18, 2007](https://reader030.fdocuments.net/reader030/viewer/2022012922/56816799550346895ddcd5ba/html5/thumbnails/21.jpg)
Ice Storage System Piping Diagram Discharge Cycle
CHILLER
Air Handlers
Regulating Valve
V2
P1
P2
V1
ICETANK
ICETANK
158 tonPeak Load
277 gpm 440F
430F
580F 580F 490F 90 tons 277 gpm
486 ton-hrs
![Page 22: Rodrick A. Crousey April 18, 2007](https://reader030.fdocuments.net/reader030/viewer/2022012922/56816799550346895ddcd5ba/html5/thumbnails/22.jpg)
Floating Chiller Leaving TOnly if chiller load capacity is
exceeded.
Increased Chiller Tonnage
Increased Chiller kW
Decreased kW / ton
![Page 23: Rodrick A. Crousey April 18, 2007](https://reader030.fdocuments.net/reader030/viewer/2022012922/56816799550346895ddcd5ba/html5/thumbnails/23.jpg)
Reliability Base Case One Chiller, Has No Redundancy
Ice Storage Has Non-Design Day Redundancy
Maintain System During Maintenance or Breakdown
Up to 486 ton-hrs
![Page 24: Rodrick A. Crousey April 18, 2007](https://reader030.fdocuments.net/reader030/viewer/2022012922/56816799550346895ddcd5ba/html5/thumbnails/24.jpg)
Presentation Topics Building Overview Ice Storage System Design and Analysis
Location of Ice Storage Tanks Electrical Equipment Downsizing Cost Payback AnalysisConclusion
![Page 25: Rodrick A. Crousey April 18, 2007](https://reader030.fdocuments.net/reader030/viewer/2022012922/56816799550346895ddcd5ba/html5/thumbnails/25.jpg)
Next to Chiller
Away from Child PlayAreas
8’-5” x 26’-6”
Minimal Architecturalor Landscaping Effect
Ice Storage Location
![Page 26: Rodrick A. Crousey April 18, 2007](https://reader030.fdocuments.net/reader030/viewer/2022012922/56816799550346895ddcd5ba/html5/thumbnails/26.jpg)
Presentation Topics Building Overview Ice Storage System Design and Analysis Location of Ice Storage Tanks
Electrical Equipment Downsizing
Cost Payback AnalysisConclusion
![Page 27: Rodrick A. Crousey April 18, 2007](https://reader030.fdocuments.net/reader030/viewer/2022012922/56816799550346895ddcd5ba/html5/thumbnails/27.jpg)
Reduced Over-CurrentDevice
Reduced ConductorSize
Reduced Conduit Size
$6,000 Reduced First Cost
Chiller MCA MOP Time Delay Qty Wire Gauge Ground Conduit80 164 200 225 1 4/0 #2 2"90 194 250 250 1 250 #2 2-1/2"
100 218 250 300 1 300 #2 2-1/2"170 333 450 2 350 #1 2-1/2"
![Page 28: Rodrick A. Crousey April 18, 2007](https://reader030.fdocuments.net/reader030/viewer/2022012922/56816799550346895ddcd5ba/html5/thumbnails/28.jpg)
Presentation Topics Building Overview Ice Storage System Design and Analysis Location of Ice Storage Tanks Electrical Equipment Downsizing
Cost Payback Analysis Conclusion
![Page 29: Rodrick A. Crousey April 18, 2007](https://reader030.fdocuments.net/reader030/viewer/2022012922/56816799550346895ddcd5ba/html5/thumbnails/29.jpg)
6.0 % Interest
$3,324/yr Savings
2.91 Year Payback
100 ton 90 ton 85 tonExtra First Cost 7876 8633 25046Annual Savings 1575 3324 3979
i 0.060 0.060 0.060n 6.12 2.91 8.14
PV 7876 8633 25046
Case
![Page 30: Rodrick A. Crousey April 18, 2007](https://reader030.fdocuments.net/reader030/viewer/2022012922/56816799550346895ddcd5ba/html5/thumbnails/30.jpg)
Presentation Topics Building Overview Ice Storage System Design and Analysis Structural Slab Addition to Building Electrical Equipment Downsizing Cost Payback Analysis
Conclusion
![Page 31: Rodrick A. Crousey April 18, 2007](https://reader030.fdocuments.net/reader030/viewer/2022012922/56816799550346895ddcd5ba/html5/thumbnails/31.jpg)
Conclusion Cost Payback Analysis 2.91 Year Payback
Increased Reliability Effect on Surrounding Community
On-Peak Energy UsageEnergy Consumption
Ice Storage System Would be Beneficial
![Page 32: Rodrick A. Crousey April 18, 2007](https://reader030.fdocuments.net/reader030/viewer/2022012922/56816799550346895ddcd5ba/html5/thumbnails/32.jpg)
Presentation Topics Building Overview Ice Storage System Design and Analysis Location of Ice Storage Tanks Electrical Equipment DownsizingCost Payback Analysis Conclusion
![Page 33: Rodrick A. Crousey April 18, 2007](https://reader030.fdocuments.net/reader030/viewer/2022012922/56816799550346895ddcd5ba/html5/thumbnails/33.jpg)
AcknowledgmentsWilliam Bahnfleth, PhD, PE The Pennsylvania State University,
Architectural Engineering FacultyGary Davies, PE ThermalTech Engineering ConsultantsJames Freihaut, PhD The Pennsylvania State University,
Architectural Engineering FacultyRyan Halvorsen Cincinnati Trane, Sales EngineerTim Jones, PE ThermalTech Engineering ConsultantsJames O’Kelly Pittsburgh Trane, Sales EngineerMike Sheedy CALMAC Manufacturing CorporationJelena Srebric, PhD The Pennsylvania State University,
Architectural Engineering FacultyLynn Treiss, PE ThermalTech Engineering ConsultantsJamie White LLI Engineering
![Page 34: Rodrick A. Crousey April 18, 2007](https://reader030.fdocuments.net/reader030/viewer/2022012922/56816799550346895ddcd5ba/html5/thumbnails/34.jpg)
SummaryCompared with 170 ton Base Case
Greater ReliabilityOver Life Cycle Cost
ReductionLoad Leveling System