Rocky Hill Senior/Community Center Addendum #2
04.06.2020
General/Clarifications
BID DEADLINE The Bid Deadline is 2pm April 23, 2020 Rocky Hill Town Managers Office BID FORM Revised per Addenda #1 PRE-BID CONFERENCE The Pre-Bid Conference was 10 am April 3, 2020
Information from the Conference is available. See Attached instructions for retrieval.
PRE-BID CONFERENCE The Pre-Bid Conference Attendance list attached ATTENDANCE LIST RFI All questions are to be submitted in WRITING:
Rocco Petitto at QA+M Architecture email: [email protected]
RFI DEADLINE QA+M will issue any and all addenda per the Instructions.
To Bidders. No questions will be taken after 4:00 pm Monday April 13,2020
ELECTRONIC DOCUMENTS All Electronic documents will be available from the:
Advanced Reprographics Plan Room. Visit https://www.advancedplanroom.com or p. 860-410-1020. All PDF Documents will be available on the DAS website
** Please note: There are other RFI that have been received that require more information and clarification in drawing formats. These are being worked on and will be made available soon **
Changes to the Drawings REVISED Sheet A-1.1A Floor Plan (Dimensions and Room Number) Attached REVISED Sheets A-3 Series (Elevations Shown without Shading) Attached REVISED Sheet A-10.1A Floor Plan (Finish Clarifications) Attached
Changes to the Project Manual MOVE Move Division 2 Sections from the ‘Information to Bidders’ sections to Division 2 in
the specifications 020750 SELECTIVE DEMOLITION FOR HAZARDOUS MATERIALS ABATEMENT
020800 ASBESTOS ABATEMENT 020820 UNIVERSAL WASTE RECLAMATION 020900 LEAD PAINT AWARENESS
REVISED Section 084113 Aluminum Framed Entrances and Storefronts (See Clarifications below)
RFI Clarifications Front End and Bid Documents
1. What is the schedule for the project?
The current Construction Schedule is 1 year from Notice to Proceed
RFI Clarifications Drawings and Specifications
1. What is the size of the opening for the Fire Counter Door?
9’-0”Wide x 4’-0”High
2. Drawing S2.1 have a separate column schedule tagged as C1 thru C5; however no
other drawing identify these column with these tag. Please provide drawing with the column location.
Next to the tag (C1-C5) you will find the type of HSS column the tag pertains to. These relate directly to the sizes given in the Expanded Column Schedule where you will find the location for each one. C4 and C5 are the round tube col. At the back entrance, see dwg. S3.0 for Detailed info.
3. Please provide true view elevations in addition to the skewed elevation is the CD set.
Also, please eliminate shading so that we can clearly identify the materials in elevation.
Some additional elevations maybe provided in future addendum. See attached revised elevations without shadows.
4. Reflected Ceiling plan is showing partial exterior soffit. Example - Area around the
Exercise/Dance Room 209. From the sections the soffit goes around the entire area. Can you revise the drawings to at least show a dashed line & note its the soffit above. Other examples - Entry canopy, Multipurpose room roof & A
All overhanging soffits have the wood look metal system.
5. Please provide Flooring type for Corridors [100], [101], [102] and their Limits on the Drawing
Please refer to revisions on A10.1a. with transitions called out as well.
6. Please provide Flooring type for Vestibule [103] and their Limits on the Drawing
Please refer to revisions on A10.1a. with transitions called out as well.
7. In Finish Plan A10.1B what shall be the floor finish for Alcove Entry of A302 from Corridor A210
That alcove entry will still be the Corridor 210 PTF floor finish, it transitions to Activity/ Arts A302’s LVT finish in the door threshold.
8. What is the existing floor finish of [131] Stage [to repair and refinish] Area
Existing flooring on the stage is a hardwood floor approx. ¾” thick
9. Alternate 3 states to give an alternate for Skyfold in lieu of the manual systems.
The Skyfold Alternate is only for the Main Multi-Purpose rooms 120, 121, &122
10. The question pertains to the flat roof overhang spray foam insulation. It is listed as full
filled with closed cell spray foam (See A5.0,A5.1,A5.7) The closed cell insulation in these areas is a vapor barrier. The steel outriggers are 5” deep, the foam only needs to be 2” and in between the outriggers on the underside of the roof deck.
11. Per drawing S1.1A along Grid line D & Grid line 6 on Section detail F3.5B/S2.4 note
says that Bottom of New Footing Elevation to match bottom of existing footing, Please provide elevation of existing footing.
There is no existing Information for this area, the elevation will need to be verified in the field assume a 5’-0” bottom of footing for pricing.
12. Per Drawing S2.4 section detail of Footing is 26" x 12" while on the drawing S1.1A &
S1.1B Foundation Plan the size of footing is 24" x 12", Please clarify which one to follow.
Use 26”X12”
13. Per drawing A1.1A First Floor Plan on section 1/A5.9 it shows strip footing and foundation wall along Grid line E. While in the Drawing S1.1A Foundation Plan Area A there is no strip footing and foundation wall shown along Grid line E, Please clarify. –
Follow structural plan.
14. Manufacturer change revised Section as Follows: Section 084113 Aluminum Framed Entrances and Storefronts Revise Paragraph 2.4B and C.1 to read as follows:
A. Basis of Design Product: Subject to compliance with requirements, provide Kawneer; 500T Insulpour Thermal Entrance Door or one of the following: 1. EFCO; D502 ThermaStile. 2. Wausau; Therml-Block.
B. Entrance Doors: Manufacturer's standard glazed entrance doors for manual-swing operation. 1. Door Construction: 2-1/4-inch overall thickness, with minimum 0.125-inch- thick,
extruded-aluminum tubular rail and stile members. Mechanically fasten corners with reinforcing brackets that are deeply penetrated and fillet welded or that incorporate concealed tie rods.
End of Addendum #2
ME
ET
ING
SIG
N-I
N S
HE
ET
1
Colli
ers
Pro
ject Le
aders
| T
ow
n o
f R
ocky H
ill,
CT
: S
en
ior/
Co
mm
un
ity C
en
ter
Pro
ject
To
wn
of
Ro
cky H
ill, C
T
Senio
r/C
om
munity C
ente
r P
roje
ct
Pre
-Bid
Meeti
ng
Friday, A
pri
l 3,
202
0
Pre
sen
t (X
) N
AM
E
RE
PR
ES
EN
TIN
G
PH
ON
E N
O.
EM
AIL
AD
DR
ES
S
E
Sum
i O
ldm
an
B
anto
n C
onstr
uction
617-9
32-9
265
sold
man
@ba
nto
nconstr
uction.c
om
Vid
eo O
nly
P
ete
r C
ap
pelli
no
J A
Rosa C
onstr
uction
860-6
37-2
936
pete
@ja
rosa.c
om
E
Debra
Sto
ut
Easte
rn E
nerg
y S
erv
ices
860-9
17-1
867
dsto
ut@
easte
rncos.c
om
E
Ken D
zia
dul
Easte
rn E
nerg
y S
erv
ices
860-9
17-5
551
kdzia
du
l@easte
rncos.c
om
E
Him
anshu T
ailo
r N
ew
field
Co
nstr
uctio
n
860-8
19-1
508
him
anshu
tailo
r@new
fie
ldco
nstr
uction.c
om
E
Alli
so
n A
nnu
lli
Orlando
Annu
lli &
Sons
860-6
44-2
427
alli
son
@a
nnu
lli.c
om
Vid
eo O
nly
C
hris C
yr
Dyna E
lectr
ic
860-8
41-8
501
chris@
dyna
ele
ctr
ic.c
om
Vid
eo O
nly
Jacob G
aw
endo
N
utm
eg C
om
panie
s
860-6
25-2
914
ja
cob@
nutm
egcom
pan
ies.c
om
Vid
eo O
nly
M
ike G
arn
eau
W
.J. M
ountf
ord
860-2
91-9
448
m
garn
eau
@w
jmo
untf
ord
.com
E
Jim
DiP
reta
A
AIS
Corp
. 203-6
72-5
734
jd
ipre
ta@
aais
corp
.co
m
E
Christo
pher
Petr
e
Vik
ing C
onstr
uction
203-3
53-0
260
christo
ph
er.
petr
e@
vik
ingco
nstr
uction.n
et
Vid
eo O
nly
Jonath
an P
oirie
r B
-G M
echa
nic
al C
ontr
acto
rs
860-6
45-1
105
JP
oirie
r@b
gm
echan
ical.co
m
E
Anth
ony M
onta
gn
o
Monta
gn
o C
onstr
uctio
n
203-5
97-9
014
am
on
tag
no
@m
onta
gno.c
om
Vid
eo O
nly
D
an L
ow
ell
Mill
eniu
m B
uild
ers
860-8
36-8
989
dlo
well@
mb
ict.com
E
Mark
Folc
ik
Piz
zito
la E
lectr
ic
?
Mark
.f@
piz
z.c
om
E
Gary
Bro
derick
A.S
econd
ino &
So
n
203-4
81-3
496
gbro
derick@
asecon
din
oa
ndson.c
om
E
Roel Le
gaspi
Nosal B
uild
ers
203-4
39-9
320
ro
el@
nosa
lbuild
ers
.com
ME
ET
ING
SIG
N-I
N S
HE
ET
2
Colli
ers
Pro
ject Le
aders
| T
ow
n o
f R
ocky H
ill,
CT
: S
en
ior/
Co
mm
un
ity C
en
ter
Pro
ject
Pre
sen
t (X
) N
AM
E
RE
PR
ES
EN
TIN
G
PH
ON
E N
O.
EM
AIL
AD
DR
ES
S
E
Om
ar
Tole
ntino
N
osal B
uild
ers
203-4
39-9
320,
Ext.
314
oto
lentino
@n
osalb
uild
ers
.com
E
Ric
hard
Sh
ultz
EN
CO
203-7
54-5
959
richard
shu
ltz@
sbcg
lob
al.n
et
E
Maura
Ric
hard
s
Woh
lsen C
onstr
uction
203-8
26-2
192
m
richard
s@
woh
lsen.c
om
E
Gra
ham
Curt
is
DT
C, In
c.
203-2
39-4
200
G
raham
.curt
is@
team
dtc
.co
m
E
Eric Z
aw
ats
ki
DT
C, In
c.
203-2
39-4
200
E
Am
eili
a T
eap
e
Pro
Shie
ld G
lass T
intin
g
tintw
orld
llc@
gm
ail.
com
E
David
Luchin
i R
Z D
esig
n A
ssocia
tes
dlu
ch
ini@
rzdesig
nassocia
tes.c
om
Vid
eo O
nly
C
hris Z
ajd
a
RZ
Desig
n A
ssocia
tes
Vid
eo O
nly
F
red M
endyk
RZ
Desig
n A
ssocia
tes
E
Mark
Rub
ins
Core
Co
nstr
uctio
n R
eso
urc
es, In
c.
860-6
78-0
663
m
ark
@core
build
s.c
om
E
Joe d
aC
ruz
Core
Co
nstr
uctio
n R
eso
urc
es, In
c.
860-6
78-0
663
jo
e@
core
build
s.c
om
E
Daria
n D
’Am
ato
D
’Am
ato
Co
nstr
uctio
n C
o.,
Inc.
860-5
83-3
489
ddam
ato
@d
am
ato
constr
uction
.com
E
Anth
ony D
’Am
ato
D
’Am
ato
Co
nstr
uctio
n C
o.,
Inc.
860-5
83-3
489
adam
ato
@d
am
ato
constr
uction
.com
E
Edw
ard
D’A
mato
D
’Am
ato
Co
nstr
uctio
n C
o.,
Inc.
860-5
83-3
489
edam
ato
jr@
dam
ato
co
nstr
uction.c
om
E
Tim
Vaill
anco
urt
H
art
ford
Spri
nkle
r
tvaill
anco
urt
@hart
ford
sprin
kle
r.com
E
Dean P
roto
T
he M
erc
ury
Gro
up o
f C
om
pan
ies
203-3
78-9
008,
Ext.
333
D
ean.P
roto
@m
erc
ury
-gro
up.c
om
E
Mic
ha
el F
unaro
T
he M
erc
ury
Gro
up o
f C
om
pan
ies
203-7
27-5
571
M
icha
el.F
unaro
@m
erc
ury
-gro
up.c
om
E
Jesper
Gly
sin
g-J
ense
n
Vik
ing C
onstr
uction, In
c.
203-3
53-0
260
je
sper.
gly
sin
g@
vik
ingco
nstr
uction.n
et
E
Pau
line V
rom
ans
Zlo
tnic
k C
onstr
uction,
Inc.
860-4
56-3
221
P
Vro
mans@
zlo
tnic
kconstr
uction
.com
E
Tom
Pere
ira
Z
lotn
ick C
onstr
uction,
Inc.
860-4
56-3
221
T
Pere
ira@
zlo
tnic
kconstr
uction.c
om
E
Bria
n B
aril
Ente
rprise B
uild
ers
, In
c.
860-7
78-0
910
B
Baril@
ente
rbuild
ers
.com
E
Joe M
art
in
Ric
hard
s C
orp
ora
tion
860-5
83-9
229,
Ext.
124
jm
art
in@
richard
scorp
.co
m
ME
ET
ING
SIG
N-I
N S
HE
ET
3
Colli
ers
Pro
ject Le
aders
| T
ow
n o
f R
ocky H
ill,
CT
: S
en
ior/
Co
mm
un
ity C
en
ter
Pro
ject
Pre
sen
t (X
) N
AM
E
RE
PR
ES
EN
TIN
G
PH
ON
E N
O.
EM
AIL
AD
DR
ES
S
E
Dan C
za
por
Ric
hard
s C
orp
ora
tion
860-5
83-9
229
dczapor@
rich
ard
scorp
.com
E
Jonath
an S
ygro
ve
S
ara
zin
Gen
era
l C
ontr
acto
rs
860-4
56-4
576
js
ygro
ve@
sara
zin
.com
E
Ray G
alv
in
Sara
zin
Gen
era
l C
ontr
acto
rs
860-4
56-4
576
rg
alv
in@
sara
zin
.com
E
Jim
Pin
o J
r.
Oly
mpus C
onstr
uctio
n
203-2
58-8
341
oly
mp
usjim
@ao
l.com
E
Luis
Rosas
CT
Masonry
LLC
ctm
asonry
luis
@g
ma
il.co
m
E
David
Go
ldfa
rb
SW
I G
lass &
Meta
l 860-5
54-4
125
dgo
ldfa
rb@
sw
igla
ss.c
om
E
Ann
a G
od
den
C
arlin
Co
nstr
uctio
n
agod
den
@carl
inco
nstr
uctio
n.c
om
E
Robert
Pe
pin
N
ew
field
Co
nstr
uctio
n
860-5
09-3
048
ro
bert
pe
pin
@new
fie
ldconstr
uction.c
om
Vid
eo O
nly
M
ike H
am
mon
d
B&
G R
esta
ura
nt
Equ
ipm
en
t &
Sup
plie
s
Vid
eo O
nly
C
oady R
eill
y
Sta
mfo
rd W
reckin
g
E
Joanne
Coto
ia
New
field
Co
nstr
uctio
n
860-5
09-3
042
Vid
eo O
nly
M
att F
rantz
N
ew
Eng
lan
d S
erv
ice &
Co
ntr
ols
Vid
eo O
nly
V
ince
nt
Pare
te
LaR
ose B
uild
ing G
rou
p
203-2
35-1
770
vpare
te@
laro
sabg.c
om
Vid
eo O
nly
A
ttili
o D
iLore
to
Pazz C
onstr
uction
Vid
eo O
nly
T
ony C
hia
ravallo
ti
BR
D B
uild
ers
LLC
tonycbrd
@gm
ail.
com
Vid
eo O
nly
B
ryan A
ddy
Rocky H
ill P
ublic
Build
ing C
om
mis
sio
n
Vid
eo O
nly
K
evin
McD
onne
ll P
AC
Gro
up L
LC
860-4
85-9
363
km
cdonn
ell@
PA
CG
roupL
LC
.com
Vid
eo O
nly
B
edri
ch H
aje
k
Gio
rdan
o C
onstr
uctio
n
203-4
88-7
264
beh
@g
iord
ano.b
uild
Vid
eo O
nly
A
nth
ony P
ort
onova
P
DS
En
gin
eeri
ng &
Constr
uction
a.p
ort
onova
@pdsec.c
om
Vid
eo O
nly
Y
uriy S
toly
ar
??
Vid
eo O
nly
R
ay C
arp
entino
??
Vid
eo O
nly
K
atie S
mith
??
ME
ET
ING
SIG
N-I
N S
HE
ET
4
Colli
ers
Pro
ject Le
aders
| T
ow
n o
f R
ocky H
ill,
CT
: S
en
ior/
Co
mm
un
ity C
en
ter
Pro
ject
1
Byrnes-Jacobsen, Matt
From: Byrnes-Jacobsen, Matt
Sent: Monday, April 6, 2020 10:07 AM
To: Matt Byrnes-Jacobsen ([email protected])
Cc: Lavaway, Kurt; Rocco Petitto ([email protected]); John Mehr
Subject: Rocky Hill Senior/Community Center - Pre-Bid Mtg Follow-up
Attachments: 2020 0403_RHSC_Pre-Bid Sign-in_Filled.pdf
Good morning all,
Thank you for joining our Pre-bid meeting this morning for the Rocky Hill Senior/Community Center Project. We
appreciate your patience and adaptability as we navigate current times. I hope all found it useful.
As mentioned during the presentation, all the material presented will be available on the shared OneDrive folder
referenced. This includes a pdf of the presentation and a video file of the presentation. The link to the folder is below.
You should be able to simply click on the link or copy and paste it into your internet browser. If anyone has any issues
accessing the folder, please email me.
Shared OneDrive link:
https://colliers-my.sharepoint.com/personal/matt_byrnes-
jacobsen_colliers_com/_layouts/15/guestaccess.aspx?folderid=06ef46889535d41d2b1ef4f0689685749&authkey=AZYw
Osb8dUeU7yd_eFMG51c&expiration=2020-06-30T04%3A00%3A00.000Z&e=LAYyHg
General Reminders:
- We will do our best to grab all questions from the chat box during the meeting, but please send all RFIs in
writing via email to the Architect, Rocco Pettito ([email protected]) with CC to me, Matt Byrnes-Jacobsen
- The filled out sign-in sheet from the meeting is attached and will be issued in the next addendum.
o There are multiple attendees who did not provide email confirmation, nor email addresses via the chat
window, so we are unable to send this email to them. We will issue a pdf of this email with the next
addendum as well.
- We strongly encourage all to visit the site on their own
Thanks again and stay healthy!
Thanks,
Matt
Matt Byrnes-Jacobsen RA, LEED AP Project Manager Main +1 860 395 0055 x235 | Mobile +1 860 705 0250 [email protected]
COLLIERS PROJECT LEADERS 135 New Road Madison, CT 06443 www.cplusa.com LinkedIn
BRICK VENEER WITHMETAL STUD BACKUP
CORRIDOR
210
MENS
119
A6.101
A6.102
A6.103
A6.104
A6.112
A6.113
A6.111
A2
A2
204
A4
SF300b
209
EXIT
139A1
1a310B
A2
a304
1
A2
A2
A2
a305
a310A
A2
a302B
a302A
a306
1
a209B
SF02
SF02
A2
a301
A2A4
SF02
SF02
SF02.5
SF02.5
300B
STORAGE
a303
STORAGE
a301
ACTIVITY/ ARTS
a302
ARTS/ CRAFTS
a310
A2
a303
A2
A2
K
M
8
3
4
J
z1
7
5'
2
a1
a4
a5
a2
aA'
aC'B'
A'
1' - 1
"
14' -
0"
18' -
6"
1' - 1
"
17' -
9"
24' -
8"
6' - 0
"
14' -
3" .
a3
1' - 1"
1' - 1"
2' - 8"
30' - 10"
5' - 8"
1' - 1"
2' - 8"
STORAGE
a304 STORAGE
a305
TLT
a306
GAMES
300
1A4.0
41' - 4"
34' -
8"
62' -
8" +/-
4' - 0
"
4' - 8
"
3' - 4
"
4' - 8
"
3' - 4
"
14' -
8"
4' - 0
"
3' - 4
"
4' - 8
"
3' - 4
"
4' - 8
"
3' - 4
"
4' - 8
"
3' - 4
"
14' -
0"
3' - 4
"
2' - 8
"
3' - 4
"
2' - 8
"
3' - 4
"
2' - 0
" .
5' - 4"3' - 4"
4' - 8"3' - 4"
4' - 8"3' - 4"
4' - 8"3' - 4"
4' - 8"4' - 0"
4' - 0
"
3' - 1
1/2"
3' - 2
1/2"
14' -
3 1/2"
4' - 0
"
3' - 2
1/2"
3' - 1
1/2"
23' -
8"
8' - 7
"
18' -
11"
18' -
5"
7' - 0
"
6' - 3"
6' - 10"
12' - 10"
7' - 8"1' - 10"
4' - 0 1/2"
16' - 10"
14' - 1"
6' - 3
1/2"
12' -
3"
3' - 6
1/2"
5' - 5
"
5' - 4
"
3' - 6
1/2"
9' - 6
"
6' - 6
"
7' - 8
"
a210
1A5.10
L
2A5.10
SFa01
SFa02
SFa03
SF05
SF05
SF05
SF05
SFa03a
SFa03b
SF05
SF05
SF02.5
SF10
6A5.1
MATCH LINE 'B'MATCH LINE 'A'
A6.41
A6.42
A6.44
A6.31
A6.45
A2
A2A2
A2108C
A2 204
SF30
A2
205A
A4
209
A2
310B
310A
311
1
A2
A4
301
302
A2
300B
A1
A1
ENTRY
201
FITNESS
205
THRIFT STORE
117
WOMENS
118 MENS
119
STORAGE
204
EXERCISE/ DANCE
209
HUMAN SERVICES
108
EXIT
139
COAT
203
CORRIDOR
101
LIBRARY
202
LOBBY
200GAMES
300
D
K
M
8
5
E
E
G
3
4
H J
z1
7
6
5'
c1
c2
2
D'
1
1'
4'
3'
2'
C'
A'
cB
cC
20' -
8"
22' -
6"
1' - 1
"
11' -
1"
14' -
3" +/-
B'
29' - 6"
1' - 4"2' - 0"
10.0
0°
1' - 1" 4' - 6" 27' - 0 1/4" 5' - 8" 1' - 1"
15.0
0°5' - 1
1"18
' - 4"
18' -
0"21
' - 4"
15' - 0
"
8"
24.0
0°12
' - 2 1
/2"
1' - 1
"11
' - 1 1
/2"
STOR.
301
203
SF05
SF05
SF02
SF02
SF02
SF04
SF03
SF05
SF05
SF05
1A5.1
3A5.2
1A4.0
1A4.0
2A4.0
2A4.0
1A5.8
3' - 8
"5'
- 4"
3' - 4
"5'
- 4"
3' - 4
"5'
- 4"
3' - 4
"12
' - 7"
1' - 1
"
3' - 8" 5' - 4" 3' - 4" 5' - 4" 3' - 4" 5' - 4" 3' - 4"11' - 0 1/2" +/-
2' - 1
0 1/2"
3' - 4
"2'
- 8"
3' - 4
"2'
- 8"
3' - 4
"2'
- 8"
3' - 4"3' - 7" 3' - 4" 6' - 0" 3' - 4" 6' - 0" 3' - 4" 6' - 0" 4' - 0"+/- .
8' - 0
"3'
- 4"
6' - 0
"3'
- 4"
6' - 0
"3'
- 4"
6' - 0
"3'
- 4"
6' - 0
"4'
- 0"+/
- .
2' - 0
" 3' -
4"3'
- 4"
3' - 4
"3'
- 4"
3' - 4
"6'
- 8" .
25' -
4" .
49' -
6" +/-
3' - 9 1/2" 27' - 4" 3' - 8"2' - 2" .
20' -
3"43
' - 4"
39' - 4"
31' -
8 1/2"
3' - 2
1/2"
17' - 8" +/-
11' - 10"
10' - 9"
8' - 7"
11' -
5"15
' - 0"
8' - 0
"8'
- 4 1/
2 +/-"
5' - 9
" +/-
33' -
6"
8' - 8
"
SF05
SF02
SF02
SF02
3A5.10
1A5.10
E.1 I.1 L
1'-1"
IT
206
MARVIN MULTI-SLIDE GLAZED DOOR SYSTEM WITH FLOOR AND CEILING TRACK
210
CORRIDOR
210
A6.54
A6.53
A6.52
A6.51
1A5.0
201A
SF24
SF25
SF22
SF02
SF02
SF02
SF02
SF02.5
SF02.5
SF21b
SF21a
SF09a
SF09b
SF02.5
SF29
SF300b
SF300a
206
6'-6"
205B
201B
F F.1 I
6'-8
"
10' -
0" .
1'-1 1
/2"
2'-6"
6'-0"
5'-7"
1'-1 1
/2"
105.00°
12'-2"
16'-4
"
5'-4"
13'-9"
135.00°
135.00°
135.
00°
R 10
'-6".
26'-3
"5'
-2"
12'-7
1/2
" .
1' -3
" .
2'-0
"3'
-8"
3'-8
"2'
-0"
A2
2'-0"
8'-0" 8'-0"
EQ EQ
G.5
LOW
MID
HIGH
LOW
MID
HIGH
12' -
0" .
24.00°
35' - 4" +/-
A6.34
Sim
A6.32
ARTS/CRAFTS
310
10.0
0°
N
195 Scott Swamp RoadFarmington, CT 06032
qamarch.com
Issue Dates:
Project #:
NOT FOR CONSTRUCTION
ISSUED FOR REVIEW ONLY
A
30' - 0 25/32"47' - 6"
B
C:\R
evit
Loca
l\RO
CKY
HIL
L_C
D_r
occo
petit
to.rv
t4/
6/20
20 3
:27:
57 P
M
A1.1B
FIRST FLOOR PLAN - PART B
CONSTRUCTION DOCUMENT SETMARCH 23, 2020
1934
Rocky Hill SeniorCommunity
Center
NEW BUILDING FOR:
ROCKY HILL, CT
1/8" = 1'-0"A1.1B1 FIRST FLOOR - PART B ADD ALT
1/8" = 1'-0"A1.1B2 FIRST FLOOR -PART B
Revisions
ADDENDA 2 APRIL 6, 2020
FIRST FLOOR0"
ARCHITECTURAL BRAKE METAL CLOSURE
SUPPORT BRACKETSMETAL FENCING
4 1/2" ALUMINUM STOREFRONT CLERESTORY
6" ALUMINUM STOREFRONT SYSTEM (LOWER), TYP
NEW AWNING
LOWER FACE 4" BRICK VENEER COLOR 'B'
WOOD LOOK RAINSCREEN SYSTEM
SLOPED EPDM ROOF
D K ME G H JBA C
CLERESTORY14' - 4"
METAL PANEL AT CORNER
METAL PANEL AT CENTER
E.1 I.1 L
SF13aSF14aSF15a
127C
SF16
120B 121B 122BSF02SF02SF02
SF19
103
F F.1 IB.5 C.5
SLOPED BULLNOSE BRICK SILL COLOR 'B' @ CLERESTORY, TYP.
BULLNOSE BRICK SILL COLOR 'B'
G.5
FIRST FLOOR0"
LOWER FACE 4" BRICK VENEER COLOR 'B'
6" ALUMINUM STOREFRONT SYSTEM (LOWER) , TYP.
EPDM ROOFING BEYOND
ARCHITECTURAL METAL CANOPY STRUCTURE
METAL FASCIA
4 1/2" ALUMINUM STOREFRONT CLEARSTORY
BRICK BASE ARCHITECTURAL PLANTER
PRE- FABRICATED LOUVERED ALUMINUM CANOPY
SLOPED EPDM ROOF
LOWER FACE 4" BRICK VENEER COLOR 'B'
CLERESTORY14' - 4"
SLOPED BULLNOSE BRICK SILL COLOR 'B' @ CLERESTORY, TYP.
SF07 SF06
SF05 SF05 SF05
SF09b
SF09a SF05 SF05 SF05
SF21aSF02 SF02 SF02
SF04
SF24
SF26
SF03 SF02 SF02 SF02 SF02 SF02 SF02 SF02 SF02
SF12b
SF01201A
SF27
BULLNOSE BRICK SILL COLOR 'B'
4'-0" HIGH LOUVERED SCREEN WALL
ROOF HATCH
PRE-FABRICATED LOUVERED
CANOPY
FIRST FLOOR0"
TH FIRST FLR1' - 0"
D EBA C
CLERESTORY14' - 4"
METAL WOOD LOOK RAIN SCREEN SYSTEM
NEW PRE FABRICATED ALUMINUM CANOPY SYSTEM (EXTRUDEK OR SIMILAR)
REPAIR OR REPLACE CONCRETE IMPRESSION BOTH DOORS
ALUMINUM EDGE
NEW ALUMINUM WINDOW SYSTEM
NEW ALUMINUM STOREFRONT SYSTEM
E.1
LOWER FACE 4" BRICK VENEER COLOR 'B'
4 1/2" ALUMINUM STOREFRONT CLERESTORY
103
SF19SF02 SF02 SF02
127C
SF16
120B
SF15b
SF15a
B.5 C.5
SLOPED BULLNOSE BRICK SILL COLOR 'B' @ CLERESTORY, TYP.
BULLNOSE BRICK SILL COLOR 'B'
BRAKE METAL CLOSURE AT STRUCTURE
NOTES:
• EXPOSED STRUCTURAL STEEL TO BE FINISHED TO AESS LEVEL 3. REFER TO SPECS
• HIGH PERFORMANCE COATING @ ALL EXPOSED STRUCTURE, TYP. REFER TO SPECS
• HIGH PERFORMANCE THERMAL COATING @ ALL THERMAL TRANSITIONS. REFER TO SPECS.
195 Scott Swamp RoadFarmington, CT 06032
qamarch.com
Issue Dates:
Project #:
NOT FOR CONSTRUCTION
ISSUED FOR REVIEW ONLY
A
30' - 0 25/32"47' - 6"
B
C:\R
evit
Loca
l\RO
CKY
HIL
L_C
D_r
occo
petit
to.rv
t4/
3/20
20 1
:52:
44 P
M
A3.1
EXTERIOR ELEVATIONS
CONSTRUCTION DOCUMENT SETMARCH 23, 2020
1934
Rocky Hill SeniorCommunity
Center
NEW BUILDING FOR:
ROCKY HILL, CT
1/8" = 1'-0"A3.12 OLD MAIN STREET BASE BID
1/8" = 1'-0"A3.13 MAIN ENTRY
1/8" = 1'-0"A3.11 OLD MAIN STREET
Revisions
ADDENDA 2 APRIL 6, 2020
FIRST FLOOR0"
12 8 5 347 691011 2 113
CLERESTORY14' - 4"
LOWER FACE 4" BRICK VENEER
COLOR 'B'6" ALUMINUM STOREFRONT SYSTEM (LOWER), TYP.
EPDM ROOFING BEYOND
ARCHITECTURAL METAL CANOPY STRUCTURE
METAL FASCIA
4 1/2" ALUMINUM STOREFRONT CLERESTORY
BULLNOSE BRICK SILL COLOR 'B'
SLOPED EPDM ROOF
LOWER FACE 4" BRICK VENEER COLOR 'B'
WOOD LOOK RAINSCREEN SYSTEM
6" ALUMINUM STOREFRONT SYSTEM (LOWER), TYP.
TOWN HALL BEYOND
SF17125A
SF11 SF11
SF12a
SF10 SF02.5 SF02.5 SF02.5 SF02 SF02
SF28
SF02 SF02SF21b SF02
SF02
SF02
SF21a
SF08SF07
SF05
SF05
SF05
SF09b
SF22
210
SLOPED BULLNOSE BRICK SILL COLOR 'B' @ CLERESTORY, TYP.
METAL PANEL
FIRST FLOOR0"
CLERESTORY14' - 4"
LOWER FACE 4" BRICK VENEER COLOR 'B'
ARCHITECTURAL METAL CANOPY STRUCTURE
METAL FASCIA4 1/2" ALUMINUM STOREFRONT @ CLERESTORY
BRICK BASE ARCHITECTURAL PLANTER
BULLNOSE BRICK SILL COLOR 'B'
SLOPED EPDM ROOF
LOWER FACE 4" BRICK VENEER COLOR 'B'WOOD LOOK RAINSCREEN SYSTEM
6" ALUMINUM STOREFRONT SYSTEM (LOWER), TYP
SF02SF02SF02SF02SF02SF02SF24
201A
SF26
SF09bSF05SF05SF05
SF07SF08
210
SF22SF02SF02SF02SF21a
SF12a
SLOPED BULLNOSE BRICK SILL COLOR 'B' @ CLERESTORY, TYP.
4'-0" HIGH LOUVERED ROOF SCREEN
FIRST FLOOR0"
TH FIRST FLR1' - 0"
DEGH B AC
CLERESTORY14' - 4"
LOWER FACE 4" BRICK VENEER COLOR 'B'
6" ALUMINUM STOREFRONT SYSTEM (LOWER), TYP.
EPDM ROOFING BEYOND ARCHITECTURAL METAL CANOPY STRUCTURE
METAL FASCIA4 1/2" ALUMINUM STOREFRONT CLERESTORY
BRICK BASE ARCHITECTURAL PLANTER
BULLNOSE BRICK SILL COLOR 'B'
PRE-FABRICATED ALUMINUM LOUVERED CANOPY
SLOPED EPDM ROOF
LOWER FACE 4" BRICK VENEER COLOR 'B'
6" ALUMINUM STOREFRONT SYSTEM (LOWER) , TYP.
E.1I.1
100A
SF01
SF02SF02SF02SF02SF02SF02SF02SF02
201A
SF24
SF26SF28
SF04
SF09bSF05SF05SF05
SF07
FF.1I B.5
SLOPED BULLNOSE BRICK SILL COLOR 'B' @ CLERESTORY, TYP.
BULLNOSE BRICK SILL COLOR 'B'
PRE-FABRICATED ALUMINUM CANOPY
G.5
NOTES:
• EXPOSED STRUCTURAL STEEL TO BE FINISHED TO AESS LEVEL 3. REFER TO SPECS
• HIGH PERFORMANCE COATING @ ALL EXPOSED STRUCTURE, TYP. REFER TO SPECS
• HIGH PERFORMANCE THERMAL COATING @ ALL THERMAL TRANSITIONS. REFER TO SPECS. 195 Scott Swamp Road
Farmington, CT 06032qamarch.com
Issue Dates:
Project #:
NOT FOR CONSTRUCTION
ISSUED FOR REVIEW ONLY
A
30' - 0 25/32"47' - 6"
B
C:\R
evit
Loca
l\RO
CKY
HIL
L_C
D_r
occo
petit
to.rv
t4/
3/20
20 1
:53:
09 P
M
A3.2
EXTERIOR ELEVATIONS
CONSTRUCTION DOCUMENT SETMARCH 23, 2020
1934
Rocky Hill SeniorCommunity
Center
NEW BUILDING FOR:
ROCKY HILL, CT
1/8" = 1'-0"A3.23 NORTH ELEVATION
1/8" = 1'-0"A3.22 CHURCH STREET
1/8" = 1'-0"A3.21 CHURCH STREET ENTRY
Revisions
ADDENDA 2 APRIL 6, 2020
FIRST FLOOR0"
LOWER FACE 4" BRICK VENEER COLOR 'B'
BULLNOSE BRICK SILL COLOR 'B'
SLOPED EPDM ROOF
METAL FASCIA
6" ALUMINUM STOREFRONT SYSTEM,
ALUMINUM STOREFRONT CLERESTORY
LIGHT FIXTURES
CLERESTORY14' - 4"
LOWER FACE 4" BRICK VENEER COLOR 'B'
10' -
8"3'
- 8"
4' - 0
"
SFa05
SFa03a SF05 SF05 SF05 SF05 SFa02
a310B
SF19
SFa04
a210
SF08
SFa01
a209B
SF07
SF05 SF05 SF05 SF09b
SF26
201A
SF02 SF02 SF02 SF02
SLOPED BULLNOSE BRICK SILL COLOR 'B' @ CLERESTORY, TYP.
LOWER FACE 4" BRICK VENEER COLOR 'B' LOWER BRICK SHELF TO -48" AT CORNER
FIRST FLOOR0"
12 8 5 347 691011 2 1
CLERESTORY14' - 4"
LOWER FACE 4" BRICK VENEER
COLOR 'B
6" ALUMINUM STOREFRONT SYSTEM, TYP.
EPDM ROOFING BEYOND ARCHITECTURAL METAL CANOPY STRUCTURE
METAL FASCIAALUMINUM STOREFRONT CLEARSTORY
BULLNOSE BRICK SILL COLOR 'B'
SLOPED EPDM ROOF
LOWER FACE 4" BRICK VENEER COLOR 'B
ROOF TOP EQUIPMENT WITH SCREENING
SF07
SF05
SF05
SF05
SF09b
SFa01
SF08 SF06
SF05SF05SF05SF05SFa03aSFa03bSF05SF05
SFa07
SF28
SF02SF02SF02SF02SF02.5SF02.5SF02.5SF10
SF11SF11
SF12a
a209B
SLOPED BULLNOSE BRICK SILL COLOR 'B' @ CLERESTORY, TYP.
LOWER FACE 4" BRICK VENEER COLOR 'B' LOWER
BRICK SHELF TO -48" AT THE CORNER
NOTES:
• EXPOSED STRUCTURAL STEEL TO BE FINISHED TO AESS LEVEL 3. REFER TO SPECS
• HIGH PERFORMANCE COATING @ ALL EXPOSED STRUCTURE, TYP. REFER TO SPECS
• HIGH PERFORMANCE THERMAL COATING @ ALL THERMAL TRANSITIONS. REFER TO SPECS. 195 Scott Swamp Road
Farmington, CT 06032qamarch.com
Issue Dates:
Project #:
NOT FOR CONSTRUCTION
ISSUED FOR REVIEW ONLY
A
30' - 0 25/32"47' - 6"
B
C:\R
evit
Loca
l\RO
CKY
HIL
L_C
D_r
occo
petit
to.rv
t4/
3/20
20 1
:53:
22 P
M
A3.5
EXTERIOR ELEVATIONS
CONSTRUCTION DOCUMENT SETMARCH 23, 2020
1934
Rocky Hill SeniorCommunity
Center
NEW BUILDING FOR:
ROCKY HILL, CT
1/8" = 1'-0"A3.51 ART/FITNESS ADD ALTERNATE
1/8" = 1'-0"A3.52 NORTH ELEVATION w/ALTERNATE
Revisions
ADDENDA 2 APRIL 6, 2020
DN
UP
UPUP
DN
FR FR RF
A7.31
A7.0
6
16
1121A7.0 12
7
22
17
MATCH LINE 'B'MATCH LINE 'A'
STAGE
131
GYMNASIUM
130
OFFICE
110
MECH
136
KITCHEN
127
STOR.
116
WOMENS
137
ENTRY
201
STOR.
123
CUST. LCKR
135
KITCHEN STOR.
128
ELEC.
138
THRIFT STORE
117WOMENS
118
MENS
119
OFFICE
115
OFFICE
112
OFFICE
111
MENS
107
OFFICE
109
CORR.
102
PATIO
MULTI PURPOSE A
120
MULTIPURPOSE C
122MULTIPURPOSE B
121
EXIT
139
COAT
203CORRIDOR
210
CORRIDOR
101CORRIDOR
100
LIBRARY
202
LOBBY
200
MULTI-PURPOSE
125
GAMES
300
TLT
106
OFFICE
113
MULTI-PURPOSE
124
TLT
126
VEST
103
STOR.
301
HUMAN SERVICES
108
CPT- CARPET TILE, R.T.F.S,INSTALLATION: TBD
LVT- VINYL TILE, R.T.F.S,INSTALLATION: TBD
PTF- PORCELAIN TILE,INSTALLATION: TBD,
R.T.F.S
PTF- PORCELAIN TILE,INSTALLATION: TBD,
R.T.F.S
LVT- VINYL TILE,INSTALLATION: TBD
R.T.F.S
OFFICE
114
A7.4
1
2
4
3
A7.3
7
12
A7.3 11
6
15
2
A7.3
5
A7.316
3
8
13
A7.5 5
1
2
6
A7.3
14
17
4
9
A7.04
A7.02
A7.01
A7.05
A7.024
9
14
19
A7.0 15
10
25
20
A7.48
5
6
7
PTF- PORCELAIN TILE, R.T.F.S,INSTALLATION: TBD
CWT- CERAMIC TILE,FULL HT. & WIDTH OFDESK FRONT, R.T.F.S
CPT- CARPET TILE,INSTALLATION: TBD
R.T.F.S
CPT- CARPET TILE,INSTALLATION: TBD
R.T.F.S
CPT- CARPET TILE,INSTALLATION: TBD
R.T.F.S
CPT- CARPET TILE,INSTALLATION: TBD
R.T.F.S
CPT- CARPET TILE,INSTALLATION: TBD
R.T.F.S
CPT- CARPET TILE,INSTALLATION: TBD
R.T.F.S
CPT- CARPET TILE,INSTALLATION: TBD
R.T.F.S
CPT- CARPET TILE,INSTALLATION: TBD
R.T.F.S
CPT- CARPET TILE,INSTALLATION: TBD
R.T.F.S
LVT- VINYL TILE, R.T.F.SINSTALLATION: TBD
LVT- VINYL TILE, R.T.F.SINSTALLATION: TBD
PTF- TILE FLOOR, R.T.F.SINSTALLATION: TBD
EXISTING TO REMAIN
EXISTING STAGE FLOOR TO BE REPAIRED & REFINISHED
QTF- QUARRY TILE,INSTALLATION: TBD
R.T.F.S
SC- SEALED CONCRETE,
R.T.F.SQTF- QUARRY TILE,INSTALLATION: TBD
R.T.F.S
EXISTING TO REMAIN
PTF- PORCELAIN TILE,INSTALLATION: TBD
R.T.F.S
EXISTING TO REMAIN
EXISTING TO REMAIN
SC- SEALED CONCRETE,
R.T.F.S
PTF- PORCELAIN TILE,INSTALLATION: TBD
R.T.F.S
PTF- TILE FLOOR,INSTALLATION: TBD,
R.T.F.S
A7.3
10
QZ- QUARTZ TRANSACTION COUNTERTOP, R.T.F.S
PL- PLASTIC LAMINATE COUNTERTOP, R.T.F.S
A7.4 9
WORK RM
133
SC- SEALED CONCRETE,R.T.F.S
PL- PLASTIC LAMINATECASEWORK, R.T.F.S
HEALTH
144
A7.6
1
A7.62 A7.6 3A7.6
4
REFER TO FFE SCOPE REFER TO FFE SCOPE REFER TO FFE SCOPE
EXISTING FLOOR TO REMAIN
2
TRANSITION IN DOORWAYFROM PTF TO EXISTING
2
PTF-PORCELAIN
TILE,INSTALLATION:
TBDR.T.F.S
2
EM1- ENTRANCE MAT,INSTALLATION: TBD
2
N
195 Scott Swamp RoadFarmington, CT 06032
qamarch.com
Issue Dates:
Project #:
NOT FOR CONSTRUCTION
ISSUED FOR REVIEW ONLY
A
30' - 0 25/32"47' - 6"
B
C:\R
evit
Loca
l\RO
CKY
HIL
L_C
D_r
occo
petit
to.rv
t4/
6/20
20 3
:45:
35 P
M
A10.1A
ENLARGED FINISH PLANS-PART A
CONSTRUCTION DOCUMENT SETMARCH 23, 2020
1934
Rocky Hill SeniorCommunity
Center
NEW BUILDING FOR:
ROCKY HILL, CT
1/8" = 1'-0"A10.1A1 FIRST FLOOR FINISH PLAN- PLAN A
Revisions
ADDENDA 2 APRIL 6, 2020