Introduction
How to choose the right ROBUS
ROBUS Straight Sided
ROBUS 2.3
ROBUS 2.7
Optional Extras
Cover Options
Technical Specifications
Contents
Planning ServicesSince 1992 most horticultural structures have required planning permission. We recommend that advice on planning permission is sought from your local planning authority, before ordering.
If help with this is required we can assist with CAD planning permission drawings.
These drawings show existing site plan and proposed site plan and include the structure
elevations. Prior to an order these services will be subject to a standard charge which
will be credited when an official order is received.
• Elevation drawings only• Full planning application drawings
Ask your sales representative for more information.
N.B. Building regulations shouldn’t be required but we advise you check with your local planning office.
Two Tier Drawing Service Available
03
04- 09
10 - 11
12 - 13
14 - 17
18 - 21
22 - 24
25
26 - 27
We are able to provide you and your insurers with framework calculations and proofs of structural integrity.
Can other polytunnel manufacturers provide you with the same?
Call. 01282 873120
Visit. npstructures.co.uk
4 5Introduction
An increasing number of classic polytunnels are falling victim to the UK’s worsening, harsh weather.Polytunnels are not subject to building regulations, nor do they have to be compliant to any British or European standards.We believe that Farmers and Growers need a product that can be proven to stand up under wind and snow loads as directed by the British Standards Institute and The European Committee for Standardisation.
Our Research and Development Department undertook the comprehensive task of designing such a product.
We found that construction of the classic multi span polytunnels can be very time consuming, complex and costly. Our aim was to reduce the amount of construction time needed, cut down on complicated assemblies and standardise on fittings and fasteners.
Introduction
Call. 01282 873120
Visit. npstructures.co.uk
6 7Introduction
We are the only polytunnel manufacturer in the UK that offers a multi span polytunnel designed and manufactured to British and European Standards.Current polytunnel design has evolved over time since its inception in the early 70s, mainly based on experience and cost, without any specific loadings or calculations being applied.Each manufacturer claims his structure is stronger, and better by design and price, but from a customer point of view there has been no way of measuring or checking the quality of the product they have been receiving.
We used computer based stress analysis packages tooptimise every member within the new structure.We developed new fittings to aid easier manufacturing and construction.Pre-galvanised steel is used throughout the mainframework, reducing the need for hot dip galvanising.
* Not applicable on the ROBUS Straight Sided Range
We are an extremely safety conscious company, therefore when designing a new product, Health & Safety is also part of the critical design path. ROBUS structures have been designed to negate the health and safety issues associated with working at heights. The main framework can be built at ground level and lifted into position*. When covering or maintaining the structure we have designed a fall arrest protection system which fits directly to the gutter.We constantly strive to improve our own standards to ensure they are in line with, and exceed, HSE guidelines.
The ROBUS structure has been designed in line with the codes of practice as listed on the opposite page.
Introduction
BS EN1990: Basis of structural design UK National Annex to BS EN1990BS EN1991-1-1: Actions on structures – General actions – Densities, self-weight, imposed loads for buildingsBS EN1991-1-3: Actions on structures – General actions – Snow Loads UK National Annex to BS EN1991-1-3BS EN1991-1-4: Actions on structures – General actions – Wind Loads UK National Annex to BS EN1991-1-4BS EN1993-1-1: Design of steel structures – General rules and rules for buildingsBS EN1993-1-8: Design of steel structures – Design of jointsBS EN13031-1: Greenhouses – Design and construction - Commercial production greenhouses
Call. 01282 873120
Visit. npstructures.co.uk
8 9Introduction
What are the benefits of using a British Standard compliant Structure?Possible lower Insurance premiums
Legislation does not currently exist to compelmanufacturers to comply with relevant British/ENStandards. However due to the increase in the number of growers suffering snow damage over the last couple of years, and the claims that have been brought to the insurance companies, we foresee an hardening of the stance taken by insurance companies, to the point where they may ultimately refuse to in-sure polytunnels unless they are BS/EN compliant.
Safer Structures for you & your staff
We can give assurances that the structures will resist the dead and live loads imposed upon them, as specified in the relevant standards. The dead loads being the self weight of the structure and supplied equipment. The live loads being wind, snow and crop loading. These loadings will be site specific.
Piece of mind in adverse weather
Over the last couple of years we have all seen thedevastating consequences of the forces of nature and their effects on polythene clad structures. With the ROBUS structure you can be assured that you have a structure that is capable of resisting the wind and snow loads as stated in the relevant BS/EN standards.
Introduction
Call. 01282 873120
Visit. npstructures.co.uk
10 11
Call. 01282 873120
Visit. npstructures.co.uk
1010
6.5m span 8m span
ROBUS Straight Sided
ROBUS Straight Sided
ROBUS SS
Model: ROBUS 100
Through continuous development and engineering research, our straight-sided ROBUS has all the benefits of our original Multi-Span but with the value added features of being de-signed to allow for the influences of the weather in your area.Air movement can be increased with the addition of side or gable ventilation up to 1.6m high. This can be controlled manually or by auto-matic systems.
In addition to model: ROBUS 100
• Snow bracings to valley hoops - For increased snow protection in areas of higher snow loadings.
• Option of timber or aluminium end frames
In addition to model: ROBUS 100
• 2 piece crop bar• Inverted V hanger crop bar supports - For
increased wind protection in areas of higher wind speeds.
• Option of timber or aluminium end frames
In addition to model: ROBUS 100
• 2 piece crop bar• W hanger crop bar supports - For increased
wind & snow protection.• Snow bracings to valley hoops• Option of timber or aluminium end frames
ROBUS Straight Sided
ROBUS SS
ROBUS SS
ROBUS SS
Model: ROBUS 200
Model: ROBUS 300
Model: ROBUS 500
For full material specification of the ROBUS range see pages 26-27
• Straight sided outer hoop• Singular, square valley post• Gable roof bracings• Single ridge tube• End lintel struts• Side wall bracing• Aluminum gutter to valley• Split link brackets to valley columns• Option of timber or aluminium end frames
For full material specification of the ROBUS range see pages 26-27
How to choose the right ROBUSHow to choose the right ROBUS
How to choose the right ROBUS model for your site.
Beaufortwind scale
Limits of wind speed
M/S
Limits of wind speed
MPH
Winddescriptive
terms0 <1 <1.15 Calm
1 1-3 1.15-3.45 Light air2 4-6 4.6-6.9 Light breeze3 7-10 8-11.5 Gentle
breeze4 11-16 12.65-18.4 Moderate
breeze5 17-21 19.5-24 Fresh breeze6 22-27 25.3-31 Strong breeze7 28-33 32-38 Near gale8 34-40 39-46 Gale9 41-47 47-54 Severe gale
10 48-55 55-63 Storm11 56-63 64-72 Violent
Storm12 64+ 74+ Hurricane
The characteristics of snow can vary depending on the length of time the snow has come to rest on your structure.
Snow which has just fallen (Fresh Snow) will be lighter than snow which has melted slightly, of the same depth.
Choose your structure based on the characteristics of snow for your location. i.e If snow is likely to remain days after falling, a loading from the ‘Old Snow’ graph should be taken.
Our sales team will be able to advisethe snow loadings for your site.Contact our sales team for more information.
The Beaufort Wind Force Scale is an empirical measure that relates wind speed to observed conditions at sea or on land.
Our sales team will be able to advisethe wind loadings for your site.Contact our sales team for more information.
Beaufort Wind Force Scale
Characteristics of Snow
Information sourcewww.metoffice.gov.uk
Fresh SnowSettled Snow
(Several Hours after falling)
Old Snow(Several weeks/months after falling) Wet Snow
Information sourceTable E.1 of BS EN 1991-1-3:2003Actions on Structures -General Actions - Snow Loads
All structures from the ROBUS range are designed and manufacturered to BS/EN standards.
For a ROBUS multi span polytunnel to be classed as a BS/EN structure, the correct model must be selected for that particular site and must be constructed, to standard, by our team of constructors.
This means the snow and wind loads for your site must be within the perimeters of the graphs shown, either for the 6.5 metre or 8 metre wide structures.It is not compulsory for you to select the structure which covers your site specification. However, if you select a structure which is outside these perimeters, your structure will not conform to BS/EN standards and we are unable to guarantee it. We will advise a structure which will be best suited to your site and to conform to BS/EN standards.
A typical crop loading, has been used to design our crop bars as described in; BS EN13031-1: Greenhouses - Design and construction - Commercial production greenhouses
Depthof Snow
(mm)
Design Load of Snow (kN/m) Design Load of Snow (kN/m)
Design Load of Snow (kN/m)Design Load of Snow (kN/m)
Depthof Snow
(mm)
Depthof Snow
(mm)
Depthof Snow
(mm)
Depthof Snow
(mm)
Design Load of Snow (kN/m) Design Load of Snow (kN/m)
Design Load of Snow (kN/m)Design Load of Snow (kN/m)
Depthof Snow
(mm)
Depthof Snow
(mm)
Depthof Snow
(mm)
Depthof Snow
(mm)
Design Load of Snow (kN/m) Design Load of Snow (kN/m)
Design Load of Snow (kN/m)Design Load of Snow (kN/m)
Depthof Snow
(mm)
Depthof Snow
(mm)
Depthof Snow
(mm)
Depthof Snow
(mm)
Design Load of Snow (kN/m) Design Load of Snow (kN/m)
Design Load of Snow (kN/m)Design Load of Snow (kN/m)
Depthof Snow
(mm)
Depthof Snow
(mm)
Depthof Snow
(mm)
Model NumberEnsure you quote this number when enquiring about a ROBUS structure.
Green Shaded AreaShows snow and wind loadings for the 8 metre wide ROBUS
Combined Wind & Snow Loadings for the 6.5m and
8m span structures
Red Shaded AreaShows snow and wind loadings for the 6.5 metre wide ROBUS
Wind & Snow Loading for the 8 metre wide structures.
Wind & Snow Loading for the 6.5 metre wide structures.
The green shaded area shows the snow & wind loadings for the 8m span model.Your site must be within these restrictions to qualify as a EN standard compliant structure.Refer to opposite.
The red shaded area shows the snow & wind loadings for the 6.5m span model.Your site must be within these restrictions to be qualify as a EN standard compliant structure.Refer to opposite.
Model DrawingTypical cross section through the structures. Showing positions of included members.
Model DescriptionSpecification list of the model.For full material specification see pages 26-27.
Weeks
Months
Graphs show combined loadings for both 6.5m and 8m span structures.
Call. 01282 873120
Visit. npstructures.co.uk
1312
6.5m span 8m span
ROBUS Straight Sided
ROBUS Straight Sided
ROBUS SS
Model: ROBUS 100
Through continuous development and engineering research, our straight-sided ROBUS has all the benefits of our original Multi Span but with the value added features of being designed to allow for the influences of the weather in your area.Air movement can be increased with the addition of side or gable ventilation up to 1.6m high. This can be controlled manually or by automatic systems.
In addition to model: ROBUS 100
• Snow bracings to valley hoops - For increased snow protection in areas of higher snow loadings.
• Option of timber or aluminium end frames
In addition to model: ROBUS 100
• 2 piece crop bar• Inverted V hanger crop bar supports - For
increased wind protection in areas of higher wind speeds.
• Option of timber or aluminium end frames
In addition to model: ROBUS 100
• 2 piece crop bar• W hanger crop bar supports - For increased
wind & snow protection.• Snow bracings to valley hoops• Option of timber or aluminium end frames
ROBUS Straight Sided
ROBUS SS
ROBUS SS
ROBUS SS
Model: ROBUS 200
Model: ROBUS 300
Model: ROBUS 500
For full material specification of the ROBUS range see pages 26-27
• Straight sided outer hoops• Singular, square valley posts• Gable roof bracings• Single ridge tube• End lintel struts• Side wall bracings• Aluminium gutter to valleys• Split link brackets to valley columns• Option of timber or aluminium end frames
For full material specification of the ROBUS range see pages 26-27
Call. 01282 873120
Visit. npstructures.co.uk
14 15
6.5m span 8m span
ROBUS 2.3 ROBUS 2.3
ROBUS 2.3m High
ROBUS 2.3 & 2.7
Model: ROBUS 123
Our brand new polyclad unit has the benefit of side gutters set at 2.3m on the outer walls, which can be left open, netted or closed. With an ever changing environment and costly water bills, the facility to harvest water is becoming more imperative. The structure can be utilised for a multitude of growing conditions and a wide variety of crops.
• 2.3m high sides to under eaves• Singular, square valley posts• Aluminium gutter to valleys• Aluminium gutter to sides• Side wall bracings• End lintel struts• Gable roof struts• Single ridge tube• Split link brackets throughout• Option of timber or aluminium end frames.
For full material specification of the ROBUS range see pages 26-27
6.5m span 8m span
Graphs show combined loadings for both 6.5m and 8m span structures.
Call. 01282 873120
Visit. npstructures.co.uk
1716
ROBUS 2.3 & 2.7
ROBUS 2.3 & 2.7
ROBUS 2.3 & 2.7
ROBUS 2.3
Model: ROBUS 223
Model: ROBUS 323
Model: ROBUS 423
ROBUS 2.3 & 2.7
ROBUS 2.3 & 2.7
ROBUS 2.3
Model: ROBUS 523
Model: ROBUS 623
In addition to model: ROBUS 123• Snow bracings to valley hoops - For
increased snow protection in areas of higher snow loadings.• Option of timber or aluminium end frames.
In addition to model: ROBUS 123• 2 piece crop bar• W hanger formation supports - For
increased wind & snow protection in areas of higher loadings.
• Option of timber or aluminium end frames.
Our ROBUS 623 is the premium polytunnel in the ROBUS 2.3 Range. This structure has been designed specially for high risk areas. The end frames are used as structural members. Extra bracing and increased material sections make the ROBUS 623 the strongest polytunnel on the market.
In addition to model: ROBUS 123• 1 piece crop bar• W hanger formation supports.• Aluminium end frames as standard.• Increased outer columns• Increased Sway bracings• Extra gable roof bracings
In addition to model: ROBUS 123• 2 piece crop bar• Inverted V hanger crop bar supports - For increased wind protection in areas of higher wind speeds.• Option of timber or aluminium end frames.
In addition to model: ROBUS 123• 2 piece crop bar• Inverted V hanger crop bar supports - For • increased wind protection.• Snow bracings to valley hoops - For
increased snow protection.• Option of timber or aluminium end frames.
For full material specification of the ROBUS range see pages 26-27
Call. 01282 873120
Visit. npstructures.co.uk
18 19
6.5m span 8m span
Graphs show combined loadings for both 6.5m and 8m span structures.
ROBUS 2.3 & 2.7
Model: ROBUS 227
ROBUS 2.3 & 2.7
Model: ROBUS 327
ROBUS 2.75
ROBUS 2.3 & 2.7
ROBUS 2.75
ROBUS 2.75m High Model: ROBUS 127
Built to the same exacting standards as the other models but with additional eaves height. This vast volume of air allows the grower to have a protected growing environment with air movement unparalleled by our competitors. From bedding plants through to 4 metre high date palms, this structure has been created around your requirements which, to date, have not been met by a structure of this quality.
• 2.75m high sides to under eaves• Singular, square valley posts• Aluminium gutter to valleys• Aluminium gutter to sides• Side wall bracings• End lintel struts• Gable roof struts• Single ridge tube• Split link brackets throughout• Option of timber or aluminium end frames.
In addition to model: ROBUS 127
• Snow bracings to valley hoops - For increased snow protection in areas of higher snow loadings.
• Option of timber or aluminium end frames.
In addition to model: ROBUS 127
• 2 piece crop bar• Inverted V hanger crop bar supports - For increased wind protection.• Option of timber or aluminium end frames.
For full material specification of the ROBUS range see pages 26-27
For full material specification of the ROBUS range see pages 26-27
Call. 01282 873120
Visit. npstructures.co.uk
20 21
6.5m span 8m span
Graphs show combined loadings for both 6.5m and 8m span structures.
ROBUS 2.3 & 2.7
Model: ROBUS 527
ROBUS 2.3 & 2.7
Model: ROBUS 427
ROBUS 2.75
ROBUS 2.3 & 2.7
ROBUS 2.75
Model: ROBUS 627
In addition to model: ROBUS 127
• 2 piece crop bar• Inverted V hanger crop bar supports - For • increased wind protection.• Snow bracings to valley hoops - For
increased snow protection.• Option of timber or aluminium end frames.
Our ROBUS 627 is the premium tunnel in the ROBUS 2.75 Range. This structure has been designed for high risk areas where a larger volume is required in a polytunnel.The end frames are used as structural members. Extra bracing & material section give you a strong and spacious structure.
In addition to model: ROBUS 127
• 1 piece crop bar• W hanger formation supports.• Aluminium end frames as standard.• Increased outer columns• Increased Sway bracings• Extra gable roof bracings
In addition to model: ROBUS 127
• 2 piece crop bar• W hanger formation supports - For
increased wind & snow protection in areas of higher loadings.
• Option of timber or aluminium end frames. For full material specification of the ROBUS range see pages 26-27
Call. 01282 873120
Visit. npstructures.co.uk
22 23Optional Extras Optional Extras
Optional ExtrasSide Furniture Options
Timber Base Rail
Timber Side Rail & Net
Alibox Base Rail
Alibox Side Rail & Net
100mm x 50mm (4” x 2”) tanalised
timber base rail inclusive of all brackets
and fixings. Attached to the structure
at ground level, this rail provides an
alternative fixing method to burying the
polythene cover into the ground.
A skirt to ground can be provded for
unlevel ground.
100mm x 50mm (4” x 2”) timber side rail.
Inclusive of all fittings, battens and nails.
Green 40% shade netting fixed between
the side rail and base
rail provides excellent lower level
side ventilation.
Structural aluminium box-section
extrusion - the most rigid rail ever!
Alibox incorporates a fixing rail with a
P.V.C. infill which fit into the aluminium
profile. This system allows you to fit your
sheets under tension without scoring
or cutting the cover. It is attached to the
structure at ground level to provide an
alternative fixing method to burying the
cover into the ground.
Same specification as the Alibox base rail
but attached to the side of the structure
rather than at ground level. This double
rail enables the main cover and shade
netting to be fitted into separate grooves
on one rail. The shade netting is fixed
between the side rail and base rail to
provide lower level side ventilation.
Ventilation Options
Manual Single Roll-Up Curtain
Manual Double Roll-Up Curtain
Motorised Roll-Up Curtains
Top Vent Louvres - 3 Position
Top Vent Louvres - Multi Stage
Roll-up curtains provide a neat and
reliable side ventilation system.
A 50mm diameter aluminium drive tube
is operated by a manual gearbox, simply
turn the handle to raise or lower the
polythene curtain. To eliminate ground
level draughts we have a PVC skirt
stitched to the side ventilation netting,
a feature only available from Northern
Polytunnels. Roll up curtains over 1.5m
use a reinforced polythene for the
curtain material.
Single Roll-up curtain is used with ROBUS
Straight Sided Structures.
Double tube roll-up curtains are used
on structures with higher sides. Double
roll-up vents with aluminium central
drive tube and bottom edge weight tubes
are also used as it provides additional
stability.
Double Roll-up curtain is used with
ROBUS 2.3 and ROBUS 2.75 structures.
We can supply a motorised version of our
roll-up curtain, for aluminium, which can
be connected to a control box.
Call our sales team for more information
about NP CONTROLS.
Top ventilation louvres fit in the D panel
above the doors to create an effective
solution for ventilation. Louvres feature
our unique 3 positional hinge which locks
the louvre in place.
These louvres feature a rack and pinion
system for opening, controlled by a
gearbox with winding handle.
The rack and pinion louvres are
not limited to 3 positions but are
fully adjustable.
N.B Roll-up curtains systems can be fitted to the sides only when used on a ROBUS Straight Sided structures. The ROBUS 2.3 and ROBUS 2.75 can accept roll-up curtains to both sides and gable ends.
Call. 01282 873120
Visit. npstructures.co.uk
24 25Optional Extras
Cover OptionsThe type of covering material can have a major effect on the growth and development of plants and crops within the structure.
(Lumisol AF - U.V Transparent)
(Opaque White)
(Luminance THB-AF)
(Luminol)
(Shade Net)
Cover Options
Lumisol AF- U.V TransparentUnlike normal greenhouse films that prevent short wavelength UV light (UVB) from reaching plants, our UV transparent films allow UVB to enter the greenhouse thus enhancing the fragrance, taste and colour of the crops. In addition, UV transparent films promote plant anti-oxidants, which are good for health, and encourage stronger plants. This greatly
benefits plant raisers and young plant growers as stronger plants can be easier to plant out thus saving time and raising productivity.
Thickness: 800g (200mu)Light Transmission: 87%Thermic Effect: 90%Light Diffusion: 90%
Luminol AFThermic films that are further enhanced by long-lasting condensation control properties. When properly installed, water will condense uniformly on the film rather than as droplets. This, in turn, improves light transmission and reduces the risk of water falling on to the
plants below, reducing the risk of damage and disease.
Thickness: 720g (180mu)Light Transmission: 90%Thermic Effect: 82%Light Diffusion: 22%
Luminance THB-AFThis new generation film combines great thermic and light transmission properties. Its high diffusion characteristics make more light available for plant growth and can help to control peak temperatures and reduce plant scorching. Trials have demonstrated the
production of high yields of excellent quality produce.
Thickness: 800g (200mu)Light Transmission: 87%Thermic Effect: 90%Light Diffusion: 90%
Opaque White
Shade Net
A thermic film developed to help keep the growing environment warmer by reducing the heat lost through long wavelength infra-red radiation. Higher overnight temperatures encourage plant growth, can reduce plant losses and allow savings to be made on
heating.
Thickness: 720g (180mu)Light Transmission: 67-68%Thermic Effect: 55%Light Diffusion: 32-33%
Shade netting manufactured from a knitted polyethylene monofilament to give a 40% or 50% shade value. Dark green netting provides
protection against sun and wind. Net covers are sewn to size to fit any size polytunnel.
Aluminium Doors
A variety of door arrangements are available for our structures. Doors are manufactured using a structural aluminium box-section extrusion.
We have chosen to only supply aluminium doors. We think timber doors have a lower
life-span and are a lower quality product in comparison. At NP Structures, we will not
compromise quality and functionality over price.
Doors
Sliding Door Kits
Welded Aluminium Doors
The sliding doors can be fitted as a single
door or a double door. These can be fitted
to the end gable and on the side of the
ROBUS 2.3 and the ROBUS 2.75.
Our sliding doors have a heavy duty
aluminium door track incorporating a
rain pelmet. This is supplied in a full,
single length for easy and fast fitting.
Double sliding door sets have a central
drop bolt to secure the doors in the
closed position. Inclusive of all sliding
door gear, aluminium tracking, fittings
and bolts.
As with the sliding door kits, welded
doors can be fitted as a single or double
door. A welded door is ideal when fitting
to a tunnel in a high risk area or when a
larger door is required.
With little difference between the prices of the various polythenes, careful consideration
should be given to the choice of cover. We use bpi.visqueen films for all of our structures.
We feel bpi.visqueen are the best manufacturer of polytunnel films. They offer
quality, consistency and reliability. They invest heavily in film technology and product
development. We will not compromise quality over price. bpi.visqueen are at the forefront
of cutting edge scientific research and film production.
Five Season Guarantee against prematureUV degradation, on all polythenes.
26 Technical Specifications
Technical Specifications
Aluminium profiles are extruded from grade 6063T06. All our profiles are hot extruded.
All bracings are manufactured from 50.8mm diameter ERW tube. Gable leg levelling braces are upgraded to 60.3mm diameter for Models: ROBUS 623 and ROBUS 627.
Columns are manufactured from either 60mm square ERW tube for ROBUS 2.3m and 60 square heavy gauge galvanised steel for ROBUS 2.75 . Select columns are upgraded to 80mm square heavy gauge galvanised steel for models; ROBUS 623 and ROBUS 627.
Crop bars are manufactured from 50mm diameter ERW tube and crop bar hangers from 38mm ERW tube.
All fasteners are bright zinc plated. All nails are hot dip galvanised.
All fittings are either zinc plated to J5 500 for outdoor use, or hot dip galvanised.
Heavy galvanised profile, designed to fit into the main framework.Concreting bars used to provide stability when setting into wet concrete, as well as providing structural strength.
ERW tube used - Z35 and heavy gauge steel hot dip galvanised to BS EN ISO 1461:2009
Gutters are designed to BS EN 12056-3 and manufactured from extruded aluminium with NP Structures unique sheet trapping profile. The number of outlets can be calculated for your site location.
All hoops are manufactured from 60.3mm diameter ERW tube. The hoops are rolled on a state of the art, specialist NC rolling machine to predefined profiles ensuring a high tolerance is achIeved.
All ridge tubes are manufactured from 50.8mm diameter ERW tube.
All timber supplied by NP Structures is pressure treated tanalised timber (Note: once cut, the raw edge will need treating)
Material Specifications
The
RO
BU
S ra
nge
Construction & Site Conditions
Aluminium
Bracings
Columns
Crop Bars
Fastenings
Fittings
Foundation Tubes
Galvanising
Gutters
Hoops
Ridge Tubes
Timber
ROBUS Structures are designed to be built on a site with a fall no steeper than 1:100 (1m drop over 100m) and level across the spans.
The construction site may require some degree of preparation before it is suitable for
building on. A sideways slope will generally cause problems, as will undulations in the
site. It is in the clients interest to start with a levelled site produced by a professional.
For our construction team, we have brought together talented and experienced experts.
They’ve been involved with a number of technical projects. Each team is lead by a
construction manager, who will ensure quality control and time manage your project.
For more information about our construction services contact our sales team
1:100 Fall (MAX)For example
1m fall over 100m
ROB
US
Str
aigh
t Sid
ed R
ange
ROB
US
2.3
Ran
ge R
OB
US
2.7
5 Ra
nge
ROB
US
100
ROB
US
200
ROB
US
300
ROB
US
500
ROB
US
123
ROB
US
223
ROB
US
323
ROB
US
423
ROB
US
523
ROB
US
623
ROB
US
127
ROB
US
227
ROB
US
327
ROB
US
427
ROB
US
527
ROB
US
627
End
Fram
es
T
imbe
ro
oo
oo
oo
oo
- o
oo
oo
-
A
lum
iniu
m o
oo
o o
oo
oo
o o
oo
oo
o
Bas
e Ra
ils
T
imbe
ro
oo
oo
oo
oo
oo
oo
oo
o
A
lum
iniu
mo
oo
o o
oo
oo
o o
oo
oo
o
Sid
e Ra
il &
Net
s
T
imbe
ro
oo
oo
oo
oo
oo
oo
oo
o
A
lum
iniu
mo
oo
o o
oo
oo
o o
oo
oo
o
Sid
e V
enti
lati
on
S
ingl
e M
anua
l Ro
ll-up
Cur
tain
oo
oo
--
--
--
--
--
--
D
oub
le M
anua
l Ro
ll-up
Cur
tain
--
--
oo
oo
oo
oo
oo
oo
S
ingl
e M
oto
rise
d Ro
ll-up
Cur
tain
oo
oo
--
--
--
--
--
--
D
oub
le M
oto
rise
d Ro
ll-up
Cur
tain
--
--
oo
oo
oo
oo
oo
oo
Gab
le V
enti
lati
on
D
oub
le M
anua
l Ro
ll-up
Cur
tain
--
--
oo
oo
oo
oo
oo
oo
D
oub
le M
oto
rise
d Ro
ll-up
Cur
tain
--
--
oo
oo
oo
oo
oo
oo
T
op
Louv
res
- 3
posi
tio
n
oo
oo
oo
oo
o-
oo
oo
o-
T
op
Louv
res
- M
ulti
Sta
geo
oo
oo
oo
oo
-o
oo
oo
-
Do
ors
S
tand
ard
Gab
le D
oo
rso
oo
oo
oo
oo
oo
oo
oo
o
W
elde
d G
able
Do
ors
oo
oo
oo
oo
oo
oo
oo
oo
E
xten
ded
Wel
ded
Gab
le D
oo
rso
oo
oo
oo
oo
oo
oo
oo
o
S
tand
ard
Sid
e D
oo
rs-
--
-o
oo
oo
oo
oo
oo
o
W
elde
d S
ide
Do
ors
--
--
oo
oo
oo
oo
oo
oo
E
xten
ded
Wel
ded
Sid
e D
oo
rs-
--
-o
oo
oo
oo
oo
oo
o
Cov
erin
g
L
imin
ol A
Fo
oo
oo
oo
oo
oo
oo
oo
o
L
umin
ance
TH
B -
AF
oo
oo
oo
oo
oo
oo
oo
oo
L
umis
ol A
F- U
V. T
rans
pare
nto
oo
oo
oo
oo
oo
oo
oo
o
O
paqu
e W
hite
oo
oo
oo
oo
oo
oo
oo
oo
S
hade
Net
oo
oo
oo
oo
oo
oo
oo
oo
O
Opt
iona
l Ext
raO
St
anda
rd-
Not
App
licab
le
See what else we do.
NP Structures LtdMill GreenWaterside RoadColneLancashireBB8 0TA
Tel: 01282 873120Fax: 01282 871733