Robot Quick Build Session 2009
description
Transcript of Robot Quick Build Session 2009
![Page 1: Robot Quick Build Session 2009](https://reader030.fdocuments.net/reader030/viewer/2022020417/56814eca550346895dbc6873/html5/thumbnails/1.jpg)
Robot Quick Build Session 2009
FRC Control System &Electrical Assembly
Produced byKen York, Team 476
Ed Latimer, Team 476Ron Markum, Team 1750
Special Thanks to
Oklahoma State University
![Page 2: Robot Quick Build Session 2009](https://reader030.fdocuments.net/reader030/viewer/2022020417/56814eca550346895dbc6873/html5/thumbnails/2.jpg)
Overview
During the next two and a half hours students will assemble and test the control system.During the first hour the layout and installation of the components and wiring on to the base plate should be completed.At hour two you should be joined by someone from the programming group who will install the software upgrades and set up the tethered and wireless communications.You should have the required components of the KOP and RQBS parts with you an ready to assemble.After completion, the electrical assembly will be taken to the frame area and mounted onto the robot chassis.
![Page 3: Robot Quick Build Session 2009](https://reader030.fdocuments.net/reader030/viewer/2022020417/56814eca550346895dbc6873/html5/thumbnails/3.jpg)
The Goal
![Page 4: Robot Quick Build Session 2009](https://reader030.fdocuments.net/reader030/viewer/2022020417/56814eca550346895dbc6873/html5/thumbnails/4.jpg)
Check the Parts•Locate the Control System Box.•Inventory the contents. Report any missing components.
•Locate the 120 amp circuit breaker. *
•Locate the QD battery connectors.*
•Locate the wiring terminals.*
•Locate the RQBS base plate and bag.*Located in one of the tote boxes. Refer to KOP inventory sheets.
![Page 5: Robot Quick Build Session 2009](https://reader030.fdocuments.net/reader030/viewer/2022020417/56814eca550346895dbc6873/html5/thumbnails/5.jpg)
Required ToolsSafety Glasses, put them on now.Wire strippers Wire cuttersWire crimpers Phillips screwdriver - #2Flat ScrewdriverSupplied Wago flat screwdriver7/16” combination wrench3/8” combination wrench 10mm combination wrenchTape measure¼” and 3/8” DrillsCordless drill
![Page 6: Robot Quick Build Session 2009](https://reader030.fdocuments.net/reader030/viewer/2022020417/56814eca550346895dbc6873/html5/thumbnails/6.jpg)
Required Control System Items (robot)
Place the following items on a clear workspace.
cRIO and modules, power distribution board, Jaguar controllers, digital sidecars, 120 amp breaker, 2 PWM cables, 2 CIM motors, Ethernet cable, connector bag, 2 DB37 cables, and extra 10 and14 gauge wire.
![Page 7: Robot Quick Build Session 2009](https://reader030.fdocuments.net/reader030/viewer/2022020417/56814eca550346895dbc6873/html5/thumbnails/7.jpg)
Read Instructions!
Peruse sections 1-5 of the 2009 Control System Manual.
Read section 2 carefully.
Do not connect battery until instructed.
Make all electrical connections and ensure CIM motors are secured and safe to operate before powering any part of the control system.
Refer to the large 2009 FRC Control System layout included in the control system box.
![Page 8: Robot Quick Build Session 2009](https://reader030.fdocuments.net/reader030/viewer/2022020417/56814eca550346895dbc6873/html5/thumbnails/8.jpg)
Layout
Use the provided drilling templates, drill ¼” and 3/8” holes as indicated. Accurately place templates on the base plate and tape in place. Verify the 32” spacing dimension between the two template holes.
See the pictures in the next two slides.
![Page 9: Robot Quick Build Session 2009](https://reader030.fdocuments.net/reader030/viewer/2022020417/56814eca550346895dbc6873/html5/thumbnails/9.jpg)
Drill Holes inBase Plate
Front Drill Template
Rear Drill Template
![Page 10: Robot Quick Build Session 2009](https://reader030.fdocuments.net/reader030/viewer/2022020417/56814eca550346895dbc6873/html5/thumbnails/10.jpg)
Drill Holes in Base Plate
Base Plate Rear Drill Template
Tape Several Places to hold Template in
Place
Make Sure Holes on Both Edges are Spaced 32”
Apart Before Taping
![Page 11: Robot Quick Build Session 2009](https://reader030.fdocuments.net/reader030/viewer/2022020417/56814eca550346895dbc6873/html5/thumbnails/11.jpg)
Layout
These Holes will be Matched Drilled After
Installing on the Frame
Layout the items similar to the picture.
Leave 1-1/4” margin around all edges. This is the frame mounting area.
Velcro
Use 10-32 screw and nut to mount the
cRIO
![Page 12: Robot Quick Build Session 2009](https://reader030.fdocuments.net/reader030/viewer/2022020417/56814eca550346895dbc6873/html5/thumbnails/12.jpg)
Wiring
Wire the large battery wires. The black wire is connected directly from the half connector to the PD (power Distribution) board.The red wire from the half connector is attached to the 120 amp circuit breaker and then on to the PD board.Note: the 120 amp breaker uses SAE threads while the PD board uses Metric threads. Do not swap the nuts!
![Page 13: Robot Quick Build Session 2009](https://reader030.fdocuments.net/reader030/viewer/2022020417/56814eca550346895dbc6873/html5/thumbnails/13.jpg)
Wiring
Make the connections as shown below.
Use the large terminals. Make good crimps.
Use ¼-20 screws and nuts to
mount
![Page 14: Robot Quick Build Session 2009](https://reader030.fdocuments.net/reader030/viewer/2022020417/56814eca550346895dbc6873/html5/thumbnails/14.jpg)
Wiring
Locate and install the DB37 cables.
Install Analog Bumper
![Page 15: Robot Quick Build Session 2009](https://reader030.fdocuments.net/reader030/viewer/2022020417/56814eca550346895dbc6873/html5/thumbnails/15.jpg)
Wiring
Assemble the power cable for the cRIO. (#16 AWG)
![Page 16: Robot Quick Build Session 2009](https://reader030.fdocuments.net/reader030/viewer/2022020417/56814eca550346895dbc6873/html5/thumbnails/16.jpg)
Wiring
Install cRIO power cable. Assemble DSC (Digital SideCar) power cables. (#14 AWG)
![Page 17: Robot Quick Build Session 2009](https://reader030.fdocuments.net/reader030/viewer/2022020417/56814eca550346895dbc6873/html5/thumbnails/17.jpg)
Wiring
Attach DSC cables to PD board.
![Page 18: Robot Quick Build Session 2009](https://reader030.fdocuments.net/reader030/viewer/2022020417/56814eca550346895dbc6873/html5/thumbnails/18.jpg)
WiringMake power wires for Jaguar, 2 sets. (#10 AWG)
Crimp supplied connectors to one end.
Connect Terminals Here
Connect Ends Here
![Page 19: Robot Quick Build Session 2009](https://reader030.fdocuments.net/reader030/viewer/2022020417/56814eca550346895dbc6873/html5/thumbnails/19.jpg)
Wiring
Prepare 2 PWM Wires. The protective casing must be removed from one end.
Refer to official PWM cable modification document.
![Page 20: Robot Quick Build Session 2009](https://reader030.fdocuments.net/reader030/viewer/2022020417/56814eca550346895dbc6873/html5/thumbnails/20.jpg)
Wiring
Install PWM cables as indicated.
Connect Here, 1 & 2,White Wire to Inside
Connect Here,White to Outside
![Page 21: Robot Quick Build Session 2009](https://reader030.fdocuments.net/reader030/viewer/2022020417/56814eca550346895dbc6873/html5/thumbnails/21.jpg)
Wiring
The wiring of the control system bench test is complete. The final step is connecting 2 CIM motors to the Jaguars.
Connect CIMs Here
![Page 22: Robot Quick Build Session 2009](https://reader030.fdocuments.net/reader030/viewer/2022020417/56814eca550346895dbc6873/html5/thumbnails/22.jpg)
Wiring Drivers Station (DS)
Connect the DS as shown below. Joysticks plug into USB 1 & 2.
Dongle
![Page 23: Robot Quick Build Session 2009](https://reader030.fdocuments.net/reader030/viewer/2022020417/56814eca550346895dbc6873/html5/thumbnails/23.jpg)
Wiring Drivers Station (DS)
Mount Drivers Station components to base using hook and loop dots.
![Page 24: Robot Quick Build Session 2009](https://reader030.fdocuments.net/reader030/viewer/2022020417/56814eca550346895dbc6873/html5/thumbnails/24.jpg)
Tethered Wiring
Connect the blue Ethernet cable from the DS to the cRIO port.
Connect DS Ethernet Here
Put 120 amp breaker in off position.
Connect battery. Leave main breaker off.
Plug in wall wart for DS and power DS.
![Page 25: Robot Quick Build Session 2009](https://reader030.fdocuments.net/reader030/viewer/2022020417/56814eca550346895dbc6873/html5/thumbnails/25.jpg)
Wireless Wiring?
Follow section 2.3.2 of the FRC Control System Manual.
The power wires to the wireless bridge need to be modified.
Cut Wire Here and Add Terminal
Black w/ white stripe
![Page 26: Robot Quick Build Session 2009](https://reader030.fdocuments.net/reader030/viewer/2022020417/56814eca550346895dbc6873/html5/thumbnails/26.jpg)
Wireless Setup
Mount wireless bridge and install modified power wire. (Frame included for reference.)
![Page 27: Robot Quick Build Session 2009](https://reader030.fdocuments.net/reader030/viewer/2022020417/56814eca550346895dbc6873/html5/thumbnails/27.jpg)
Bench Test
You are now ready to proceed with section 2.2.4 of the 2009 FRC control system manual.Test the DS as per section 2.2.4Test tethered operation as per section 2.3. You will not have motors at this point but can watch the lights on the Jaguar controllers to verify operation. You should be joined at this point by members of the programming team with the laptop.After successful tethered test, set up system for wireless operation.
![Page 28: Robot Quick Build Session 2009](https://reader030.fdocuments.net/reader030/viewer/2022020417/56814eca550346895dbc6873/html5/thumbnails/28.jpg)
Wireless Setup
At this point you are ready to configure your wireless system. You must follow the instruction carefully.Refer to the FRC Checklist by Benjamin Heaivilin and the FRC 2009 Control System Manual. (This will take about an Hour)After completion your system should operate wirelessly.
![Page 29: Robot Quick Build Session 2009](https://reader030.fdocuments.net/reader030/viewer/2022020417/56814eca550346895dbc6873/html5/thumbnails/29.jpg)
Install Base Plate onto Kitbot Frame
Report back to the frame assembly area to verify they are ready for the base plate installation.
![Page 30: Robot Quick Build Session 2009](https://reader030.fdocuments.net/reader030/viewer/2022020417/56814eca550346895dbc6873/html5/thumbnails/30.jpg)
Install Base Plate onto Kitbot Frame
Match drill three ¼” holes and install 1-3/4” long bolts and nuts. Match drill base
plate at these locations and install
the 3 bolts
![Page 31: Robot Quick Build Session 2009](https://reader030.fdocuments.net/reader030/viewer/2022020417/56814eca550346895dbc6873/html5/thumbnails/31.jpg)
Complete Tests
Complete any remaining bench test not finished in the previous slides.AT THIS POINT, THINGS CAN MOVE! BLOCK THE WHEELS OFF THE TABLE.
MAKE SURE NOTHING IS IN THE CHAIN AREA OR CAN GET CAUGHT IN THE CHAIN.
KEEP ALL PERSONNEL CLEAR OF THE CHAIN!
![Page 32: Robot Quick Build Session 2009](https://reader030.fdocuments.net/reader030/viewer/2022020417/56814eca550346895dbc6873/html5/thumbnails/32.jpg)
Programming
Download the supplied default program to the cRIO.
Bench test the program.
Go to drive area.
CONGRATULATIONS!!!