YELLOWKNIFE, NORTHWEST file · Web viewYELLOWKNIFE, NORTHWEST TERRITORIES
Roadmap for Real Time Control Transmission Reliability Program Peer Review Washington DC, 27 January...
-
Upload
miles-willis -
Category
Documents
-
view
215 -
download
2
Transcript of Roadmap for Real Time Control Transmission Reliability Program Peer Review Washington DC, 27 January...
Roadmap for Real Time Control
Transmission Reliability Program Peer Review
Washington DC, 27 January 2004
Jeff Dagle, Pacific Northwest National Laboratory
Carlos Martinez, Electric Power Group
Anjan Bose, Washington State University
Pete Sauer, University of Illinois-Urbana Champaign
Page 2
RTGRM Roadmap Status
Activity builds from the real-time grid reliability and management (RTGRM) multiyear plan (2001)
November 20, 2002 workshop in Portland, Oregon with participation from– CERTS performers,
– ISOs,
– Vendors
Identified 12 major issues facing industry; recommendations for R&D agenda framed to be responsive within general RTGRM framework
Draft report issued June 2003 Progress delayed by August 14 blackout Outstanding items:
– Develop final roadmap incorporating comments received
Page 3
Roadmap Elements
Operational Decision Support Tools and Visualization
System Security Management Tools
Advanced Measurement and Monitoring Tools
Real Time Control
Page 4
Roadmap Conceptual Framework
RTO/ISO FUNCTIONS
REAL-TIME PERFORMANCE
MONITORINGTECHNOLOGIES
Probabilistic Analysis & Risk
Assessment
ContingencySelection
PerformanceMetrics
Data & InformationManagement
VisualizationTechnologies
Grid-3PPlatform
MONITORING
OPERATIONS
MARKETS
SECURITY
REAL-TIME SOFWARE
ANALYSIS
STATE
EST
IMATOR
SCADA andADVANCE
MEASUREMENTS
GENEART I ON
&
TRANSM I SS I ON
REAL- TIMELOCAL CONTROL
WIDE-AREAAUTOMATICCONTROL
AUTOMATIC
SWICHABLE
NETWORK
A
B
C
D
RTO/ISO FUNCTIONS
REAL-TIME PERFORMANCE
MONITORINGTECHNOLOGIES
Probabilistic Analysis & Risk
Assessment
Probabilistic Analysis & Risk
Assessment
ContingencySelection
ContingencySelection
PerformanceMetrics
PerformanceMetrics
Data & InformationManagement
Data & InformationManagement
VisualizationTechnologiesVisualizationTechnologies
Grid-3PPlatformGrid-3PPlatform
MONITORING
OPERATIONSOPERATIONS
MARKETSMARKETS
SECURITY
REAL-TIME SOFWARE
ANALYSIS
STATE
EST
IMATOR
SCADA andADVANCE
MEASUREMENTS
GENE
RAT I ON
&
TRANSM I SS I ON
REAL- TIMELOCAL CONTROL
WIDE-AREAAUTOMATICCONTROL
AUTOMATIC
SWICHABLE
NETWORK
A
B
C
D
A. Operational Decision Support Tools and VisualizationB. System Security Management ToolsC. Advanced Measurement and Monitoring ToolsD. Real Time Control
Page 5
Operational Decision Support Tools and Visualization
State estimation technologies
Probabilistic short- and long-term prediction and risk assessment
Visualization including human factors
Performance monitoring metrics
Page 6
System Security Management Tools
Security analysis with uncertainty
Avoidance of cascading outages
Dynamic security analysis (DSA)
High-speed available transfer capability (ATC) analysis
Page 7
Advanced Measurement and Monitoring Tools
Accuracy of planning and operating models
Quality of dynamic information technology
Infrastructure for integration and management of multi-source data
Supervisory coordination for protective relays
Page 8
Real Time Control
Frequency and voltage control
Coordinating control with markets
Soft-wired remedial action schemes
Transient stability control
Page 9
Research Activities TimeframeCERTS RTGRM Research Roadmap 2004 2005 2006 2007 2008
Operational Decision Support Tools and Visualization
State Estimation TechnologiesProbabilistic Short and Long Term Prediction and Risk AssessmentVisualization Including Human FactorsPerformance Monitoring Metrics
System Security Management Tools
Security Analysis with UncertaintyAvoidance of Cascading OutagesDynamic Security AnalysisHigh-Speed Available Transfer Capability (ATC) Analysis
Advanced Measurement and Monitoring Tools
Accuracy of planning and operating models Quality of dynamic information technologyInfrastructure for integration and management of multi-source dataSupervisory Coordination for Protective relays
Real Time Control
Frequency and Voltage ControlCoordinating Control with Markets‘Soft-Wired’ Remedial Action SchemesTransient Stability Control
Page 10
Path Forward
Incorporate lessons learned and recommendations associated with the August 14, 2003 blackout
Integrate with other elements of the transmission reliability program
Develop plan for integrating with other R&D programs
Circulate revised roadmap for review
Incorporate review comments