Road Safety Audit Stage 1 / 2 - Lambeth · 1.1 This report details the results of a Stage 1 / 2...

14
Created by Jatindra Chana [email protected] Road Safety Audit Stage 1 / 2 Baylis Road and Waterloo Road, Cycle Grid Improvements Client: London Borough of Lambeth Document Reference: 1000004381/RSA 1-2 Date: January 2018

Transcript of Road Safety Audit Stage 1 / 2 - Lambeth · 1.1 This report details the results of a Stage 1 / 2...

Page 1: Road Safety Audit Stage 1 / 2 - Lambeth · 1.1 This report details the results of a Stage 1 / 2 Road Safety Audit undertaken in January 2018 on proposed cycling improvements (forming

Created by

Jatindra Chana

[email protected]

Road Safety Audit Stage 1 / 2

Baylis Road and Waterloo Road,

Cycle Grid Improvements

Client: London Borough of Lambeth

Document Reference: 1000004381/RSA 1-2

Date: January 2018

Page 2: Road Safety Audit Stage 1 / 2 - Lambeth · 1.1 This report details the results of a Stage 1 / 2 Road Safety Audit undertaken in January 2018 on proposed cycling improvements (forming

© Project Centre 2018 Road Safety Audit Stage 1 / 2 1

CONTENTS PAGE PAGE NO.

1. INTRODUCTION 1

2. ITEMS RAISED AT PREVIOUS ROAD SAFETY AUDIT(S) 2

3. STAGE 1/2 ROAD SAFETY AUDIT 3

3.1 GENERAL 3

3.2 LOCAL ALIGNMENT 3

3.3 JUNCTIONS 3

3.4 NON MOTORISED USERS 3

3.5 ROAD SIGNS, CARRIAGEWAY MARKING AND LIGHTING 3

4. ISSUES OUTSIDE THE TERMS OF REFERENCE 3

5. AUDIT TEAM STATEMENT 5

APPENDIX A

APPENDIX B

QUALITY

Page 3: Road Safety Audit Stage 1 / 2 - Lambeth · 1.1 This report details the results of a Stage 1 / 2 Road Safety Audit undertaken in January 2018 on proposed cycling improvements (forming

© Project Centre 2018 Road Safety Audit Stage 1 / 2 1

1. INTRODUCTION

1.1 This report details the results of a Stage 1 / 2 Road Safety Audit undertaken in

January 2018 on proposed cycling improvements (forming part of the Central

London Cycle Grid) to Baylis Road and Waterloo Road, in the London Borough

of Lambeth.

1.2 The Road Safety Audit Team consists of:

Darren Gotch (PC) Team Leader

Jatindra Chana BSc(Hons) MIHE (PC) Team Member

1.3 The Client Organisation details are:

Jamila Barrett

London Borough of Lambeth

Blue Star House

1.4 The Design Team details are:

Project Centre

Unit 2 Holford Yard

London

WC1X 9HD

1.5 The report has been prepared in response to a brief provided by the Client

organisation in November 2017.

1.6 The Audit took place at the Slough office of Project Centre in January 2018

and comprised of an examination of the drawings and documents as listed in

Appendix A of this report. The Audit Team visited the site on Thursday 5th

January between 11:30am – 12:30pm. The weather was cold and clear.

1.7 The terms of reference of the Road Safety Audit are generally as described in

HD 19/15. The Road Safety Audit Team has examined and reported only on

the road safety implications of the scheme as presented and has not

examined or verified the compliance of the designs to any other criteria.

1.8 Personal Injury Collision Data was obtained from Transport for London. A

review of the data indicated that there has been 21 personal injury collisions

recorded at this location in the last 5 years which resulted in one fatal, four

serious and 16 slight injuries.

1.9 No details of any departures from standards have been provided.

1.10 All comments and recommendations are referenced to the design drawings

and A3 location plans in Appendix B of this report.

Page 4: Road Safety Audit Stage 1 / 2 - Lambeth · 1.1 This report details the results of a Stage 1 / 2 Road Safety Audit undertaken in January 2018 on proposed cycling improvements (forming

© Project Centre 2018 Road Safety Audit Stage 1 / 2 2

2. ITEMS RAISED AT PREVIOUS ROAD SAFETY AUDIT(S)

2.1 No previous Road Safety Audits were provided to the Audit Team

Page 5: Road Safety Audit Stage 1 / 2 - Lambeth · 1.1 This report details the results of a Stage 1 / 2 Road Safety Audit undertaken in January 2018 on proposed cycling improvements (forming

© Project Centre 2018 Road Safety Audit Stage 1 / 2 3

3. STAGE 1/2 ROAD SAFETY AUDIT

3.1 GENERAL

3.1.1 No issues identified at this stage.

3.2 LOCAL ALIGNMENT

3.2.1 PROBLEM:

Location: Various approaches into the junction of Baylis Road and Waterloo

Road

Summary: Risk of side-swipe or shunt type collisions due to inadequate lane

widths on approach to the junction.

Detail: Lane widths of between 3.0m and 3.18m have been proposed on some

of the approaches to the junction. The Audit Team is concerned that this is

below the minimum 3.25m recommended by Transport for London for a bus

route. The high frequency bus movements through the junction increases the

likelihood of side-swipe or shunt type collisions.

Recommendation: Revisit the design to ensure lane widths are adequate on all

approaches to the junction.

3.3 JUNCTIONS

3.3.1 No issues identified at this stage.

3.4 NON MOTORISED USERS

3.4.1 PROBLEM:

Location: Baylis Road

Summary: Risk of collisions due to road users ‘seeing through’ a red signal at the

vehicle stopline and only noticing a green signal at the reservoir stopline.

Detail: The Audit Team is concerned the distance between the vehicle stopline

and the reservoir stopline is not sufficient enough, which could result in road

users ‘seeing through’ a red signal at the vehicle stopline , and only noticing a

green signal at the reservoir stopline.

Recommendation: Ensure the two stoplines are separated to the recommended

minimum distance and signals are clearly associated with each stopline.

3.5 ROAD SIGNS, CARRIAGEWAY MARKING AND LIGHTING

3.5.1 No issues identified at this stage.

Page 6: Road Safety Audit Stage 1 / 2 - Lambeth · 1.1 This report details the results of a Stage 1 / 2 Road Safety Audit undertaken in January 2018 on proposed cycling improvements (forming

© Project Centre 2018 Road Safety Audit Stage 1 / 2 4

4. ISSUES OUTSIDE THE TERMS OF REFERENCE

4.1 Any issues that the Audit Team wish to bring to the attention of the Client

Officer which are not covered by the road safety implications of this audit

have been included in the following section. These issues could include

maintenance items, operational issues or poor existing provision. It should be

understood however, that in raising these issues, the Audit Team do not

warrant that a full review of the existing highway environment has been

undertaken beyond the scope of the Audit.

4.2 No issues were noted.

Page 7: Road Safety Audit Stage 1 / 2 - Lambeth · 1.1 This report details the results of a Stage 1 / 2 Road Safety Audit undertaken in January 2018 on proposed cycling improvements (forming

© Project Centre 2018 Road Safety Audit Stage 1 / 2 5

5. AUDIT TEAM STATEMENT

The Audit has been carried out with the sole purpose of identifying any features

of the design that could be removed or modified in order to improve the safety

of the scheme. The problems identified have been noted in this report together

with suggestions for safety improvements, which we recommend should be

studied for implementation.

No member of the Road Safety Audit Team has been involved with the design of

the measures

Audit Team Leader

Darren Gotch Signed:

Traffic Engineer

Traffic and Transportation Date: 05/01/2018

Project Centre

Audit Team Member

Jatindra Chana (BSc Hons MIHE) Signed:

Traffic Engineer

Traffic and Transportation Date: 05/01/2018

Project Centre

Page 8: Road Safety Audit Stage 1 / 2 - Lambeth · 1.1 This report details the results of a Stage 1 / 2 Road Safety Audit undertaken in January 2018 on proposed cycling improvements (forming

© Project Centre 2018 Road Safety Audit Stage 1 / 2

Appendix A

Page 9: Road Safety Audit Stage 1 / 2 - Lambeth · 1.1 This report details the results of a Stage 1 / 2 Road Safety Audit undertaken in January 2018 on proposed cycling improvements (forming

© Project Centre 2018 Road Safety Audit Stage 1 / 2

SCHEDULE OF DOCUMENTS EXAMINED

(Documents Forming the Audit Brief)

Drawing Title Drawing Numbers (s)

General Arrangement 1000004381-010-3-01

Signal Plan – Waterloo Road / Baylis Road

(SLD Plan) PRO/09/000070 & 000402

Other documents:

Page 10: Road Safety Audit Stage 1 / 2 - Lambeth · 1.1 This report details the results of a Stage 1 / 2 Road Safety Audit undertaken in January 2018 on proposed cycling improvements (forming

© Project Centre 2018 Road Safety Audit Stage 1 / 2

Appendix B

Page 11: Road Safety Audit Stage 1 / 2 - Lambeth · 1.1 This report details the results of a Stage 1 / 2 Road Safety Audit undertaken in January 2018 on proposed cycling improvements (forming

© Project Centre 2018 Road Safety Audit Stage 1 / 2

3.2.1

3.4.1

Page 12: Road Safety Audit Stage 1 / 2 - Lambeth · 1.1 This report details the results of a Stage 1 / 2 Road Safety Audit undertaken in January 2018 on proposed cycling improvements (forming

© Project Centre 2018 Road Safety Audit Stage 1 / 2

Quality

It is the policy of Project Centre to supply Services that meet or exceed our clients’

expectations of Quality and Service. To this end, the Company's Quality

Management System (QMS) has been structured to encompass all aspects of the

Company's activities including such areas as Sales, Design and Client Service.

By adopting our QMS on all aspects of the Company, Project Centre aims to achieve

the following objectives:

Ensure a clear understanding of customer requirements;

Ensure projects are completed to programme and within budget;

Improve productivity by having consistent procedures;

Increase flexibility of staff and systems through the adoption of a common

approach to staff appraisal and training;

Continually improve the standard of service we provide internally and

externally;

Achieve continuous and appropriate improvement in all aspects of the

company;

Our Quality Management Manual is supported by detailed operational

documentation. These relate to codes of practice, technical specifications, work

instructions, Key Performance Indicators, and other relevant documentation to form a

working set of documents governing the required work practices throughout the

Company.

All employees are trained to understand and discharge their individual responsibilities

to ensure the effective operation of the Quality Management System.

Page 13: Road Safety Audit Stage 1 / 2 - Lambeth · 1.1 This report details the results of a Stage 1 / 2 Road Safety Audit undertaken in January 2018 on proposed cycling improvements (forming

© Project Centre 2018 Road Safety Audit Stage 1 / 2

DOCUMENT CONTROL

Project Centre has prepared this report in accordance with the instructions from

London Borough of Lambeth. Project Centre shall not be liable for the use of any

information contained herein for any purpose other than the sole and specific use for

which it was prepared.

Job Number Issue Description Originator Checked Authorised

1000004381 01 Road Safety Audit

Stage 1-2

J.Chana

05.01.18

D.Gotch

05.01.18

Tim Mantle

10.01.18

G:\Project Centre\Project-BST\1000004381 - LBL Baylis Rd Waterloo Rd\2 Project

Delivery\3 Reports\1 Draft Reports\RSA 1-2\20180110 Baylis Road and Waterloo

Road FINAL RSA1-2.docx

Page 14: Road Safety Audit Stage 1 / 2 - Lambeth · 1.1 This report details the results of a Stage 1 / 2 Road Safety Audit undertaken in January 2018 on proposed cycling improvements (forming

A