MEASURES TO IMPROVE ROAD SAFETY
AT JUNCTIONS AND GRADE SEPARATORS
D. SanyalManaging Director
CRAPHTS Consultants (I) Pvt. Ltd.
-
8/7/2019 Road Safety Audit for Junctions and grade separators
2/34
Recognizing Hazard Potentials
Potentials of Facility User conflicts (Facility is an expression of the designer that
must communicate well with all categories of users,short comings in design making the
decision making process a complex task conflict
areas, failure to recognize human factors in design,
failure to anticipate the expectations
of the Design Driver, what is the likely punishment
for human error?)
Potentials of inter - user conflicts (user goals, user behaviour, user skills,
enforcement and education)
Extraneous factors with hazard potentials (lack of effective Municipal
interventions,
lack of inter departmental co-ordination)
For existing intersections one will have to consider past data on accidents
besides the traffic characteristics and physical features.
-
8/7/2019 Road Safety Audit for Junctions and grade separators
3/34
Improvement Plan for L B S Marg through Defence Colony
-
8/7/2019 Road Safety Audit for Junctions and grade separators
4/34
Improvement Plan for Delhi Gate intersection area
-
8/7/2019 Road Safety Audit for Junctions and grade separators
5/34
-
8/7/2019 Road Safety Audit for Junctions and grade separators
6/34
-
8/7/2019 Road Safety Audit for Junctions and grade separators
7/34
LAJPAT NAGAR
- Layout Plan & Signage Plan
-
8/7/2019 Road Safety Audit for Junctions and grade separators
8/34
-
8/7/2019 Road Safety Audit for Junctions and grade separators
9/34
-
8/7/2019 Road Safety Audit for Junctions and grade separators
10/34
AZADPUR
- Layout Plan & Signage Plan
-
8/7/2019 Road Safety Audit for Junctions and grade separators
11/34
-
8/7/2019 Road Safety Audit for Junctions and grade separators
12/34
-
8/7/2019 Road Safety Audit for Junctions and grade separators
13/34
APSARA BORDER
- Layout Plan & Signage Plan
-
8/7/2019 Road Safety Audit for Junctions and grade separators
14/34
-
8/7/2019 Road Safety Audit for Junctions and grade separators
15/34
-
8/7/2019 Road Safety Audit for Junctions and grade separators
16/34
Total Corridor Length 6238.50m
Length of Underpass 585mLength of Elevated portion 2147.50m
No. of Structures affected - 62
-
8/7/2019 Road Safety Audit for Junctions and grade separators
17/34
-
8/7/2019 Road Safety Audit for Junctions and grade separators
18/34
-
8/7/2019 Road Safety Audit for Junctions and grade separators
19/34
-
8/7/2019 Road Safety Audit for Junctions and grade separators
20/34
TURNING RADII AT SOME OF THE IMPORTANT INTERCHANGES IN DELHI
-
8/7/2019 Road Safety Audit for Junctions and grade separators
21/34
Link Road to Dwarka (Curve H 1)
Loop Ramp connecting DND Flyway to Ring Road Loop Ramps at AIIMS Interchange
TURNING RADII AT SOME OF THE IMPORTANT INTERCHANGES IN DELHI
-
8/7/2019 Road Safety Audit for Junctions and grade separators
22/34
-
8/7/2019 Road Safety Audit for Junctions and grade separators
23/34
Proposed Bridge Rotary without Service RoadArea - 104938.73 Sq.m
-
8/7/2019 Road Safety Audit for Junctions and grade separators
24/34
Proposed Bridge Rotary With Service RoadArea - 114098.48 Sq.m
-
8/7/2019 Road Safety Audit for Junctions and grade separators
25/34
Proposed Diamond Interchange without Service RoadArea - 226203.58 Sq. m
-
8/7/2019 Road Safety Audit for Junctions and grade separators
26/34
Proposed Diamond Interchange with Service RoadArea - 226203.58 Sq. m
-
8/7/2019 Road Safety Audit for Junctions and grade separators
27/34
DULT Proposal at
Anandrao Circle
BBMP Proposal at
Anandrao Circle
ImpactThe link towards K G Circle will comeunder distress. Space for surface leveltraffic will be drastically reduced.
l
-
8/7/2019 Road Safety Audit for Junctions and grade separators
28/34
DULT Proposal at
Mysore Bank Circle
BBMP Proposal at
Mysore Bank Circle
ImpactTwo way operation along Palace RoadShall have to be attempted aftercomprehensive evaluation. Surfacelevel traffic will have no space along theLink towards the K. G. Circle.
-
8/7/2019 Road Safety Audit for Junctions and grade separators
29/34
DULT Proposal at
Shantala Circle
BBMP Proposal at
Shantala Circle
ImpactThere is scope for geometricimprovement
DULT P l
-
8/7/2019 Road Safety Audit for Junctions and grade separators
30/34
DULT Proposal at
Khodai Circle
BBMP Proposal at
Khodai Circle
ImpactStructural changes aroundintersection areas must be attemptedon a comprehensive basis assuch changes are mostly irreversibleIn nature.
-
8/7/2019 Road Safety Audit for Junctions and grade separators
31/34
9/17/2010 CRAPHTS Consultants (I) Pvt.Ltd. 31
Kancheepuram Wallajahpet (NH4) Km 71.50
Improper signage with poor glance legibility
-
8/7/2019 Road Safety Audit for Junctions and grade separators
32/34
9/17/2010 CRAPHTS Consultants (I) Pvt.Ltd. 32
Wallajahpet Pallikonda (NH4) Km 142.00
Cattle menace a common feature
-
8/7/2019 Road Safety Audit for Junctions and grade separators
33/34
9/17/2010 CRAPHTS Consultants (I) Pvt.Ltd. 33
Wallajahpet Pallikonda (NH4) Km 143.10
Traveled way interfered by construction activity
-
8/7/2019 Road Safety Audit for Junctions and grade separators
34/34
9/17/2010 CRAPHTS Consultants (I) PvtLtd 34
Thank you