GUJARAT MARITIME BOARDGUJARAT MARITIME BOARD
GUJARAT MARITIME BOARDGUJARAT MARITIME BOARD
25 km/25 min43 km/45 min
284 km/ 6 hrs
Total Distance by Road340 km (7 hrs 10 min)
Total Distance by Sea30 km (1 hrs 30 min)
GUJARAT MARITIME BOARDGUJARAT MARITIME BOARD
GUJARAT MARITIME BOARDGUJARAT MARITIME BOARD
GUJARAT MARITIME BOARDGUJARAT MARITIME BOARD
5
DAHEJ TERMINAL
GUJARAT MARITIME BOARDGUJARAT MARITIME BOARD
GOGHA TERMINAL
GUJARAT MARITIME BOARDGUJARAT MARITIME BOARD
LINK SPAN-PONTOON INTERFACE
GUJARAT MARITIME BOARDGUJARAT MARITIME BOARD
GUJARAT MARITIME BOARDGUJARAT MARITIME BOARD
PROJECT COSTSR NO DETAILS TEMAINALS COST (IN RS CRORES) REMARKS
1 CIVIL GOGHA258.54
BID COST
DAHEJ
2 DREDGING GOGHA51.20
ESTIMATED COST
DAHEJ
3 ROAD CONSTRUCTION GOGHA 23.40 ESTIMATED COST
SUB TOTAL 333.14
3 CONTINGENCIES 7.69
4 CONSULTANCY 1.5
5 EIA STUDY 0.15
grand total 342.48
say342.50 crores
GUJARAT MARITIME BOARDGUJARAT MARITIME BOARD
Traffic surveys location plan
GUJARAT MARITIME BOARDGUJARAT MARITIME BOARD
Relevant traffic moving eastbound
(via Bagodra)
Relevant traffic moving eastbound
(non-Bagodra traffic)*
Relevant traffic moving westbound
(via Vataman)
1,350 vehicles/day 936 vehicles/day 2,379 vehicles/dayRelevant to Gogha
terminalRelevant to Gogha terminal Relevant to Dahej terminal
Relevant traffic to the RoRo/Ferry services to both directions
GUJARAT MARITIME BOARDGUJARAT MARITIME BOARD
Schematic flow model for traffic moving eastbound through Bagodra
GUJARAT MARITIME BOARDGUJARAT MARITIME BOARD
Schematic flow model for traffic moving westbound through Vataman
GUJARAT MARITIME BOARDGUJARAT MARITIME BOARD
Per day Traffic
14/51
NOV. 2008
GUJARAT MARITIME BOARDGUJARAT MARITIME BOARD
C omparis on of T raffi c at B ag odara (2005 and 2008)
272
504
1909
349
11441322
2337
224356 379
2070
262
0
500
1000
1500
2000
2500
C ar G ovt. B us P vt. B us L C V Truc k Multi-Axle
T ype of vehic le
No
. of
veh
icle
T otal T raffic-2005 T otal T raffic-2008
GUJARAT MARITIME BOARDGUJARAT MARITIME BOARD
Traffic Volume
Potential Traffic
Total Volume Cars/Trucks Proportion
Gogha Terminal
600 Vehicles60% Trucks , 10 % bus 30% Cars
Dahej Terminal
600 Vehicles60% Trucks , 10 % bus 30% Cars
Traffic Volume
GUJARAT MARITIME BOARDGUJARAT MARITIME BOARD
Description ParticularsType of Vessel Ropax FerryCarrying capacity
500 Passengers and
100-150 Vehicles Max. Draft 4.50mService Speed 22 knots (40
km/h)The distance between Gogha and Dahej
is around 17 Nautical miles (32km).
Indicative Vessel Particulars
Indicative route of RoRo/Ferry crossing between Gogha and Dahej
GUJARAT MARITIME BOARDGUJARAT MARITIME BOARD
Sailing time 90 minutes
Berthing/Unberthing 10 minutes
Loading/Unloading time
40 minutes
Turnaround time 280 Minutes
A schematic descriptions of turnaround time computation
GUJARAT MARITIME BOARDGUJARAT MARITIME BOARD
Traffic VolumeVessel
Carrying Capacity
Frequency of Service Required
600 vehicles /day 100 Vehicles 6 departures per day
120 Vehicles 5 departures per day
150 Vehicles 4 departures per day
Required frequency of service for different vessel sizes
GUJARAT MARITIME BOARDGUJARAT MARITIME BOARD
Dahej tidal cycle
Gogha tidal cycle – Maximum and
minimum daily tidal levels
GUJARAT MARITIME BOARDGUJARAT MARITIME BOARD
Max. Draft of design vessel
Required Water depth of approach
channel
4.5m 5.0m
Channel’s dredged depth
Number of roundtrips service
allowed
5.0 m 4 per day
Channel dredged depths and the number of roundtrips
service allowed
Required water depth of approach channel
GUJARAT MARITIME BOARDGUJARAT MARITIME BOARD
GUJARAT MARITIME BOARDGUJARAT MARITIME BOARD
GUJARAT MARITIME BOARDGUJARAT MARITIME BOARD
Thank You…