RMS - Pavement Standard Drawings - Bicycle Path Design
description
Transcript of RMS - Pavement Standard Drawings - Bicycle Path Design
-
1GENERAL NOTES
SLAB PLAN AND DETAILS
12.
11.
10.
9.
8.
7.
6.
5.
4.
3.
2.
1.
ED 1 REV 0
BICYCLE PATH DESIGN - 2.5 m WIDE
ENSURE REINFORCING STEEL IS PLACED TO PROVIDE 30 mm MINIMUM COVER BELOW THE SAWCUT.
DEBOND TYPE B7 JOINTS TO PREVENT CHEMICAL BONDING.
COMPACTED IN ACCORDANCE WITH RMS R173. MOISTEN THE SUBBASE WITH WATER BEFORE PLACING THE CONCRETE.
SUBBASE MUST BE 150 mm THICK TRAFFIC CATEGORY D MATERIAL IN ACCORDANCE WITH RMS SPECIFICATION 3051,
MATERIALS.
SELF-EXPANDING CORK SEALANTS MUST FILL THE FULL JOINT CAVITY TO PREVENT THE INGRESS OF INCOMPRESSIBLE
WITH A MINIMUM COMPRESSIVE STRENGTH OF 32.0 MPa.
COMPLY WITH RMS SPECIFICATIONS R53 AND R173. CONCRETE MUST BE IN ACCORDANCE WITH RMS R53 BUT
PAVING MAY BE TERMINATED AT A TYPE B15 JOINT.(II)OF A B17 JOINT. THEY MUST NOT BE USED IN LIEU OF A B15 JOINT.
TYPE B7 JOINTS MAY BE USED. THEY MUST BE LOCATED EITHER MIDWAY BETWEEN B17 JOINTS OR IN LIEU(I)THE OPTIONS FOR END-OF-DAY CONSTRUCTION JOINTS ARE AS FOLLOWS:
POWER POLES, KERBS.
PLACE A FULL-DEPTH TYPE B15 JOINT AROUND ALL ABUTTING STRUCTURES SUCH AS PITS, UTILITY SERVICES,
BY FULL-DEPTH SAWCUT.
TYPE B15 JOINTS CAN BE CONSTRUCTED AS FORMED JOINTS (BY CHEQUERBOARD PAVING SEQUENCE) ORFLEXIBLE PAVEMENTS AND STRUCTURES, AND AT INTERMEDIATE CENTRES OF 18.0 m.
TYPE B15 ISOLATION JOINTS MUST BE PROVIDED AT THE FIRST JOINT AWAY FROM JUNCTIONS WITH
TRANSVERSE JOINTS MUST BE ALIGNED SQUARE TO THE LONGITUDINAL EDGE, WITH A TOLERANCE OF 6.TOLERANCES ARE MARKED OTHERWISE.
SLAB LENGTHS MAY BE VARIED BY 5% AS REQUIRED TO SUIT LOCAL CONDITIONS EXCEPT WHEREPATH WILL BE USED BY OTHER VEHICLES SUCH AS MAINTENANCE TRUCKS.
THE DESIGN INDICATED IS FOR BICYCLE PATH LOADING ONLY. THE DESIGN MUST BE MODIFIED IF THE BICYCLE
G.AYTON G.VOROBIEFF8/07/2013 9/07/2013
8/07/2013
PenTable :
PlotDriver :
File
Path :
Printe
d by
10:3
8:3
7 A
Mat
9/0
7/2
013
on
PA
V_
BL
AC
K_
GR
EY.tbl
PA
V_P
DF.pltcfg
G:\
Ops\P
ave
ments\J
obs\Rigid Pave
ments\Bic
ycle Paths P1217\1. W
ork\C
AD Dra
win
gs\P
1217
BP2_5
M.dgn
tetlerob
SHEET No
No OF SHEETS
COPYRIGHT ROADS AND MARITIME SERVICESTHIS SHEET MAY BE PREPARED USING COLOUR AND MAY BE INCOMPLETE IF COPIED
A3 ORIGINALOR AS NOTED.NOT TO SCALE,SCALES: REGISTRATION No OF PLANS
3ISSUE
P1217PRINTED DATE
ISSUE DATE AMENDMENT DESCRIPTION AUTHPREP CHCK
REFERENCE No
DS 2012 / 000293TECHNOLOGY SERVICES BRANCH, ASSET MAINTENANCE DIVISIONPREPARED BY: PAVEMENT STRUCTURES SECTION, ENGINEERING
RECOMMENDED FOR APPROVAL APPROVED FOR USE
ENGINEER (RIGID PAVEMENTS)SUPERVISING PAVEMENTSIGNED
AND GEOTECHNICAL ENGINEERPRINCIPAL ROAD PAVEMENT
DATE SIGNED DATE
RIGID PAVEMENTPAVEMENT STANDARD DRAWINGS
MIN
1 300
MIN
1 300
SEE NOTE 4
SEE NOTE 7
NOT TO SCALE
B15 B17 B17 B17B7 B15 B17 B17PAVEMENTFLEXIBLE
B15B17B17
STRUCTUREOR
PAVEMENTCONCRETE
1500 200 1500 200
SEE NOTE 4
B15 B17
TERMINAL SLAB SEE DETAILS
+200
0 C/CTYPE B17 JOINTS AT 3 000
+500
0 C/CTYPE B15 JOINTS AT 18 000
B17
3 500 +200
0 C/CTYPE B17 JOINTS AT 3 000
+500
0 C/CTYPE B15 JOINTS AT 18 000
3 500
2 500
TERMINAL SLAB SEE DETAILS
B17
1
-
2
-
BICYCLE PATH TYPICAL PLAN LAYOUT
B17 B17
+200
0 C/CTYPE B17 JOINTS AT 3 000
+500
0 C/CTYPE B15 JOINTS AT 18 000
150
150
150
150
SL82 MESH
TRANSVERSE HINGE / TIED / SAWNB17
A
-
150
B15 ISOLATION JOINT
2 500
CONCRETE SLAB
GRAVEL SUBBASE
LAPPED SPLICE FOR MESHNOT TO SCALE
OVERLAP AT LEAST 2 TRANSVERSE BARS
SL82 MESH
B7 TRANSVERSE CONSTRUCTION / FORMED / TIED
300
150
150
120
500150500
NOT TO SCALE
NOT TO SCALE
NOT TO SCALE
NOT TO SCALE
SL82 MESH
COVER
50 MIN
BAR SHAPE G3
4 N16
TERMINAL SLAB C
AT START AND END OF DAILY PAVING OPERATIONS. SEE NOTE 7
SEE NOTE 12
30 MIN
COVER
50 MIN
COVER
50 MIN
COVER
50 MIN
COVER
50 MIN
COVER
50 MIN
COVER
50 MIN
G3-N12-@-400 C/C
SL82 MESHSL82 MESH
PAVEMENT OR STRUCTURE
EXISTING CONCRETE
COVER TYP
80 20
COVER
50 MIN
COVER
80 20
COVER
80 20
COVER
50 MIN
COVER
50 MIN
BICYCLE PATH TYPICAL CROSS SECTION
SECTIONNOT TO SCALE
-
2SECTIONNOT TO SCALE
-
1
TYPICAL TERMINAL SLAB
GRAVEL SUBBASE
DEBONDING IS REQUIRED SEE NOTE 11BUTT JOINT SCABBLING NOT REQUIRED.
SL82 MESH
B
-
NOMINAL, TYPICAL
CHAMFER 50 50
MUST BE LAPPED
G3 STIRRUPS AND MESH
SAWCUT
3 1
3 3
40
05+
20 05+
3 3
B-
DETAILNOT TO SCALE
A-
DETAILNOT TO SCALE
SELF-EXPANDING CORK
SELF-EXPANDING CORK
-
2GENERAL NOTES
SLAB PLAN AND DETAILS
BICYCLE PATH DESIGN - 3 m WIDE
12.
11.
10.
9.
8.
7.
6.
5.
4.
3.
2.
1.
ENSURE REINFORCING STEEL IS PLACED TO PROVIDE 30 mm MINIMUM COVER BELOW THE SAWCUT.
DEBOND TYPE B7 JOINTS TO PREVENT CHEMICAL BONDING.
COMPACTED IN ACCORDANCE WITH RMS R173. MOISTEN THE SUBBASE WITH WATER BEFORE PLACING THE CONCRETE.
SUBBASE MUST BE 150 mm THICK TRAFFIC CATEGORY D MATERIAL IN ACCORDANCE WITH RMS SPECIFICATION 3051,
MATERIALS.
SELF-EXPANDING CORK SEALANTS MUST FILL THE FULL JOINT CAVITY TO PREVENT THE INGRESS OF INCOMPRESSIBLE
WITH A MINIMUM COMPRESSIVE STRENGTH OF 32.0 MPa.
COMPLY WITH RMS SPECIFICATIONS R53 AND R173. CONCRETE MUST BE IN ACCORDANCE WITH RMS R53 BUT
PAVING MAY BE TERMINATED AT A TYPE B15 JOINT.(II)OF A B17 JOINT. THEY MUST NOT BE USED IN LIEU OF A B15 JOINT.
TYPE B7 JOINTS MAY BE USED. THEY MUST BE LOCATED EITHER MIDWAY BETWEEN B17 JOINTS OR IN LIEU(I)THE OPTIONS FOR END-OF-DAY CONSTRUCTION JOINTS ARE AS FOLLOWS:
POWER POLES, KERBS.
PLACE A FULL-DEPTH TYPE B15 JOINT AROUND ALL ABUTTING STRUCTURES SUCH AS PITS, UTILITY SERVICES,
BY FULL-DEPTH SAWCUT.
TYPE B15 JOINTS CAN BE CONSTRUCTED AS FORMED JOINTS (BY CHEQUERBOARD PAVING SEQUENCE) ORSHEETS OF 6 m LENGTH MESH, LESS LAPS).FLEXIBLE PAVEMENTS AND STRUCTURES, AND AT INTERMEDIATE CENTRES OF 17.5 m (FOR EXAMPLE, THREETYPE B15 ISOLATION JOINTS MUST BE PROVIDED AT THE FIRST JOINT AWAY FROM JUNCTIONS WITH
TRANSVERSE JOINTS MUST BE ALIGNED SQUARE TO THE LONGITUDINAL EDGE, WITH A TOLERANCE OF 6.TOLERANCES ARE MARKED OTHERWISE.
SLAB LENGTHS MAY BE VARIED BY 5% AS REQUIRED TO SUIT LOCAL CONDITIONS EXCEPT WHEREPATH WILL BE USED BY OTHER VEHICLES SUCH AS MAINTENANCE TRUCKS.
THE DESIGN INDICATED IS FOR BICYCLE PATH LOADING ONLY. THE DESIGN MUST BE MODIFIED IF THE BICYCLE
G.AYTON G.VOROBIEFF2/07/2013 2/07/2013
ED 1 REV 1REV 1 8/07/13 NUMBER OF SHEETS AMENDED BT
2/07/2013GA GV
PenTable :
PlotDriver :
File
Path :
Printe
d by
10:3
8:3
9 A
Mat
9/0
7/2
013
on
PA
V_
BL
AC
K_
GR
EY.tbl
PA
V_P
DF.pltcfg
G:\
Ops\P
ave
ments\J
obs\Rigid Pave
ments\Bic
ycle Paths P1217\1. W
ork\C
AD Dra
win
gs\P
1217
BP3
M.dgn
tetlerob
SHEET No
No OF SHEETS
COPYRIGHT ROADS AND MARITIME SERVICESTHIS SHEET MAY BE PREPARED USING COLOUR AND MAY BE INCOMPLETE IF COPIED
A3 ORIGINALOR AS NOTED.NOT TO SCALE,SCALES: REGISTRATION No OF PLANS
3ISSUE
P1217PRINTED DATE
ISSUE DATE AMENDMENT DESCRIPTION AUTHPREP CHCK
REFERENCE No
DS 2012 / 000293TECHNOLOGY SERVICES BRANCH, ASSET MAINTENANCE DIVISIONPREPARED BY: PAVEMENT STRUCTURES SECTION, ENGINEERING
RECOMMENDED FOR APPROVAL APPROVED FOR USE
ENGINEER (RIGID PAVEMENTS)SUPERVISING PAVEMENTSIGNED
AND GEOTECHNICAL ENGINEERPRINCIPAL ROAD PAVEMENT
DATE SIGNED DATE
RIGID PAVEMENTPAVEMENT STANDARD DRAWINGS
MIN
1 300
MIN
1 300
SEE NOTE 4
SEE NOTE 7
NOT TO SCALE
B15 B17 B17 B17B7 B15 B17 B17PAVEMENTFLEXIBLE
B15B17B17
STRUCTUREOR
PAVEMENTCONCRETE
1500 200 1500 200
SEE NOTE 4
B15 B17
TERMINAL SLAB SEE DETAILS
+200
0 C/CTYPE B17 JOINTS AT 3 500
+500
0 C/CTYPE B15 JOINTS AT 17 500
B17
3 500 +200
0 C/CTYPE B17 JOINTS AT 3 500
+500
0 C/CTYPE B15 JOINTS AT 17 500
3 500+200
0 C/CTYPE B17 JOINTS AT 3 500
+500
0 C/CTYPE B15 JOINTS AT 17 500
3 000
TERMINAL SLAB SEE DETAILS
B17
1
-
2
-
BICYCLE PATH TYPICAL PLAN LAYOUT
150
150
150
150
SL82 MESH
TRANSVERSE HINGE / TIED / SAWNB17
A
-
150
B15 ISOLATION JOINT
3 000
CONCRETE SLAB
GRAVEL SUBBASE
LAPPED SPLICE FOR MESHNOT TO SCALE
OVERLAP AT LEAST 2 TRANSVERSE BARS
SL82 MESH
B7 TRANSVERSE CONSTRUCTION / FORMED / TIED
300
150
150
120
500150500
NOT TO SCALE
NOT TO SCALE
NOT TO SCALE
NOT TO SCALE
SL82 MESH
COVER
50 MIN
BAR SHAPE G3
4 N16
TERMINAL SLAB C
AT START AND END OF DAILY PAVING OPERATIONS. SEE NOTE 7
SEE NOTE 12
30 MIN
COVER
50 MIN
COVER
50 MIN
COVER
50 MIN
COVER
50 MIN
COVER
50 MIN
COVER
50 MIN
G3-N12-@-400 C/C
SL82 MESHSL82 MESH
PAVEMENT OR STRUCTURE
EXISTING CONCRETE
COVER TYP
80 20
COVER
50 MIN
COVER
80 20
COVER
80 20
COVER
50 MIN
COVER
50 MIN
BICYCLE PATH TYPICAL CROSS SECTION
SECTIONNOT TO SCALE
-
2SECTIONNOT TO SCALE
-
1
TYPICAL TERMINAL SLAB
GRAVEL SUBBASE
DEBONDING IS REQUIRED SEE NOTE 11BUTT JOINT SCABBLING NOT REQUIRED.
SL82 MESH
B
-
NOMINAL, TYPICAL
CHAMFER 50 50
MUST BE LAPPED
G3 STIRRUPS AND MESH
SAWCUT
3 1
3 3
40
05+
20 05+
3 3
B-
DETAILNOT TO SCALE
A-
DETAILNOT TO SCALE
SELF-EXPANDING CORK
SELF-EXPANDING CORK
-
3GENERAL NOTES
SLAB PLAN AND DETAILS
BICYCLE PATH DESIGN - 4 m WIDE
12.
11.
10.
9.
8.
7.
6.
5.
4.
3.
2.
1.
ED 1 REV 0
ENSURE REINFORCING STEEL IS PLACED TO PROVIDE 30 mm MINIMUM COVER BELOW THE SAWCUT.
DEBOND TYPE B7 JOINTS TO PREVENT CHEMICAL BONDING.
COMPACTED IN ACCORDANCE WITH RMS R173. MOISTEN THE SUBBASE WITH WATER BEFORE PLACING THE CONCRETE.
SUBBASE MUST BE 150 mm THICK TRAFFIC CATEGORY D MATERIAL IN ACCORDANCE WITH RMS SPECIFICATION 3051,
MATERIALS.
SELF-EXPANDING CORK SEALANTS MUST FILL THE FULL JOINT CAVITY TO PREVENT THE INGRESS OF INCOMPRESSIBLE
WITH A MINIMUM COMPRESSIVE STRENGTH OF 32.0 MPa.
COMPLY WITH RMS SPECIFICATIONS R53 AND R173. CONCRETE MUST BE IN ACCORDANCE WITH RMS R53 BUT
PAVING MAY BE TERMINATED AT A TYPE B15 JOINT.(II)OF A B17 JOINT. THEY MUST NOT BE USED IN LIEU OF A B15 JOINT.
TYPE B7 JOINTS MAY BE USED. THEY MUST BE LOCATED EITHER MIDWAY BETWEEN B17 JOINTS OR IN LIEU(I)THE OPTIONS FOR END-OF-DAY CONSTRUCTION JOINTS ARE AS FOLLOWS:
POWER POLES, KERBS.
PLACE A FULL-DEPTH TYPE B15 JOINT AROUND ALL ABUTTING STRUCTURES SUCH AS PITS, UTILITY SERVICES,
BY FULL-DEPTH SAWCUT.
TYPE B15 JOINTS CAN BE CONSTRUCTED AS FORMED JOINTS (BY CHEQUERBOARD PAVING SEQUENCE) ORFLEXIBLE PAVEMENTS AND STRUCTURES, AND AT INTERMEDIATE CENTRES OF 16.0 m.
TYPE B15 ISOLATION JOINTS MUST BE PROVIDED AT THE FIRST JOINT AWAY FROM JUNCTIONS WITH
TRANSVERSE JOINTS MUST BE ALIGNED SQUARE TO THE LONGITUDINAL EDGE, WITH A TOLERANCE OF 6.TOLERANCES ARE MARKED OTHERWISE.
SLAB LENGTHS MAY BE VARIED BY 5% AS REQUIRED TO SUIT LOCAL CONDITIONS EXCEPT WHEREPATH WILL BE USED BY OTHER VEHICLES SUCH AS MAINTENANCE TRUCKS.
THE DESIGN INDICATED IS FOR BICYCLE PATH LOADING ONLY. THE DESIGN MUST BE MODIFIED IF THE BICYCLE
G.AYTON G.VOROBIEFF8/07/2013 9/07/2013
8/07/2013
PenTable :
PlotDriver :
File
Path :
Printe
d by
10:3
8:4
0 A
Mat
9/0
7/2
013
on
PA
V_
BL
AC
K_
GR
EY.tbl
PA
V_P
DF.pltcfg
G:\
Ops\P
ave
ments\J
obs\Rigid Pave
ments\Bic
ycle Paths P1217\1. W
ork\C
AD Dra
win
gs\P
1217
BP4
M.dgn
tetlerob
SHEET No
No OF SHEETS
COPYRIGHT ROADS AND MARITIME SERVICESTHIS SHEET MAY BE PREPARED USING COLOUR AND MAY BE INCOMPLETE IF COPIED
A3 ORIGINALOR AS NOTED.NOT TO SCALE,SCALES: REGISTRATION No OF PLANS
3ISSUE
P1217PRINTED DATE
ISSUE DATE AMENDMENT DESCRIPTION AUTHPREP CHCK
REFERENCE No
DS 2012 / 000293TECHNOLOGY SERVICES BRANCH, ASSET MAINTENANCE DIVISIONPREPARED BY: PAVEMENT STRUCTURES SECTION, ENGINEERING
RECOMMENDED FOR APPROVAL APPROVED FOR USE
ENGINEER (RIGID PAVEMENTS)SUPERVISING PAVEMENTSIGNED
AND GEOTECHNICAL ENGINEERPRINCIPAL ROAD PAVEMENT
DATE SIGNED DATE
RIGID PAVEMENTPAVEMENT STANDARD DRAWINGS
MIN
1 300
MIN
1 300
SEE NOTE 4
NOT TO SCALE
B15 B17 B17B7 B15 B17 B17 PAVEMENTFLEXIBLE
B15B17
STRUCTUREOR
PAVEMENTCONCRETE
1500 200 1500 200
SEE NOTE 4
B15 B17
+200
0 C/CTYPE B17 JOINTS AT 4 000
+500
0 C/CTYPE B15 JOINTS AT 16 000
B17
3 500 +200
0 C/CTYPE B17 JOINTS AT 4 000
+500
0 C/CTYPE B15 JOINTS AT 16 000
3 500+200
0 C/CTYPE B17 JOINTS AT 4 000
+500
0 C/CTYPE B15 JOINTS AT 16 000
4 000
TERMINAL SLAB SEE DETAILS
B17
1
-
2
-
BICYCLE PATH TYPICAL PLAN LAYOUT
SEE DETAILS
TERMINAL SLAB
SEE NOTE 7
150
150
150
150
SL82 MESH
TRANSVERSE HINGE / TIED / SAWNB17
A
-
150
B15 ISOLATION JOINT
4 000
CONCRETE SLAB
GRAVEL SUBBASE
LAPPED SPLICE FOR MESHNOT TO SCALE
OVERLAP AT LEAST 2 TRANSVERSE BARS
SL82 MESH
B7 TRANSVERSE CONSTRUCTION / FORMED / TIED
300
150
150
120
500150500
NOT TO SCALE
NOT TO SCALE
NOT TO SCALE
NOT TO SCALE
SL82 MESH
COVER
50 MIN
BAR SHAPE G3
4 N16
TERMINAL SLAB C
AT START AND END OF DAILY PAVING OPERATIONS. SEE NOTE 7
SEE NOTE 12
30 MIN
COVER
50 MIN
COVER
50 MIN
COVER
50 MIN
COVER
50 MIN
COVER
50 MIN
COVER
50 MIN
G3-N12-@-400 C/C
SL82 MESHSL82 MESH
PAVEMENT OR STRUCTURE
EXISTING CONCRETE
COVER TYP
80 20
COVER
50 MIN
COVER
80 20
COVER
80 20
COVER
50 MIN
COVER
50 MIN
BICYCLE PATH TYPICAL CROSS SECTION
SECTIONNOT TO SCALE
-
2SECTIONNOT TO SCALE
-
1
TYPICAL TERMINAL SLAB
GRAVEL SUBBASE
DEBONDING IS REQUIRED SEE NOTE 11BUTT JOINT SCABBLING NOT REQUIRED.
SL82 MESH
B
-
NOMINAL, TYPICAL
CHAMFER 50 50
MUST BE LAPPED
G3 STIRRUPS AND MESH
SAWCUT
3 1
3 3
40
05+
20 05+
3 3
B-
DETAILNOT TO SCALE
A-
DETAILNOT TO SCALE
SELF-EXPANDING CORK
SELF-EXPANDING CORK
P1217BP2_5MP1217BP3MP1217BP4M