The RISING Project2nd Advisory Committee Meeting, BrusselsArne Gehlhaar, ISL
09/02/2010
Agenda
page 109/02/2010 1st Advisory Committee Meeting
• Background
• The RISING Project
• RISING at Work
• Summary & Outlook
Agenda
page 209/02/2010 1st Advisory Committee Meeting
• Background
– River Information Services in Europe
– Future Development
– RIS Services
– RIS Road Map
• The RISING Project
• RISING at Work
• Summary & Outlook
• Introduced by the EU (RIS Directive 2005/44/EC)
• Today focuses on traffic & safety
• Typical users– Authorities
– Calamity centres
– Skippers
• Use of ICT to– Improve reliability &
efficiency
– Increase safety
– Optimise economic capabilities
in Europe
09/02/2010 page 31st Advisory Committee Meeting
in Europe
09/02/2010 page 41st Advisory Committee Meeting
• Traffic-related services:
– Fairway Information Services
– Traffic information
– Traffic management
– Calamity abatement
• Transport-related services:
– Voyage planning
– Fleet Management
– Event Management
– Ports and Terminal Management
• Increase exploitation of RIS services for logistics purposes
• Extend types of users
– Fleet Managers
– Ports & Terminals
– Logistic Service Providers
• Enhance existing services
• Develop new services
Future Development
09/02/2010 page 51st Advisory Committee Meeting
Systems, Applications, Services
and FunctionsRelevant RIS standards(Project standards)
Vessel Tracking & Tracing (Inland) AIS Standard
Electronic Navigation Charts (Inland) ECDIS Standard
Electronic Reporting ERI Standard
Notices to Skippers NtS Standard
Fairway Information (FIS) (ECDIS, NtS)
International data exchange Int. RIS data exchange
Traffic management, i.e. lock management (AIS, RAINWAT, ERI)
Transport management, i.e. calculation of ETA (AIS, ERI, NtS)
Services
09/02/2010 page 61st Advisory Committee Meeting
EU RIS
Directive
(2005/44/EC)
“what”• Applicability
• Responsibilities of Member States
• Minimum requirements for RIS
• Services to be provided
• Technical specifications to be applied
Commission Regulation 415/2007
concerning the technical specifications for
vessel tracking & tracing system (Inland AIS)
Commission Regulation
414/2007
concerning the technical guidelines
for the planning, implementation
and operational use of RIS
(RIS Guidelines)
Draft Commission Regulation
defining the technical specifications for
Inland ECDIS
Commission Regulation 416/2007
concerning the technical specifications
for Notices to Skippers (NtS)
Published
2005 - 2007
“how” “who”
Expert Group
Notices to Skippers
Expert Group
Tracking & Tracing
Expert Group
Electronic Reporting
International
Expert Group
Inland ECDIS
RIS Road Map
page 809/02/2010 1st Advisory Committee Meeting
Draft Commission Regulation
defining the technical specifications for
electronic ship reporting (ERI)
RIS Evolution
page 909/02/2010 1st Advisory Committee Meeting
R&
DIm
ple
me
nta
tio
n
2014ff2007-20131996-2006
FP4-5
Projects
INDRIS
COMPRIS
ALSO
DANUBEE
U R
IS D
ire
cti
ve
(EC
/20
05/4
4)
IRIS
Master
Plan
IRIS
EU
DoRISRIS
HU
FP7
Projects
RISING
Galileo
IWT
projects
NAIADES
PLATINA
SWP 2.3/
5.2
TE
N-T
MA
P
Project Proposals
RIS CSRIS RO RIS BGRIS HR ...
IRIS
Master
Plan
IRIS
EU
DoRISRIS
HURIS
DE
RIS
NL
RIS
BE
IRIS Europe II ...
...
Co-
ordin-
ation
FP7
Projects
RISING
Galileo
IWT
projects
NAIADES
PLATINA
SWP 2.3/
5.2
Trans-
European
Transport
Network
EU
Framework
Programme
for RTD
Structural/
Cohesion
Funds,
IPA, et.al.
Agenda
page 1009/02/2010 1st Advisory Committee Meeting
• Background
• The RISING Project
– Key Facts
– Project Mission
– Project Scope
– Project Partners
• RISING at Work
• Summary & Outlook
• Project acronym: RISING
• Name: RIS Services for Improving the Integration ofInland Waterway Transport into Intermodal Chains
• EU-Programme: FP7-2007
• Project budget: approx. 7.5 MEUR
• EC grants: approx. 5.3 MEUR
• Project duration: 36 months
• Project start: 1 February 2009
• Project end: 31 January 2012
Key Facts
09/02/2010 page 111st Advisory Committee Meeting
Project Mission
09/02/2010 page 121st Advisory Committee Meeting
The use of traffic information for transport-related services is of utmost importance and has the potential to streamline IWT processes and multimodal transport chains.
Project Partners
page 1409/02/2010 1st Advisory Committee Meeting
The RISING partners are:
→ Transport operators
→ Logistics service providers
→ Port and terminal operators
→ Port information service providers
→ RIS providers
→ Research institutions
→ Software developers
→ Promotion agencies
Partner Background
09/02/2010 page 151st Advisory Committee Meeting
Agenda
page 1609/02/2010 1st Advisory Committee Meeting
• Background
• The RISING Project
• RISING at Work
– Work Packages
– Demonstration Cases
– Status
• Summary & Outlook
WP Lead
WP0 ISL (DE)
WP1 ISL (DE)
WP2 ISL (DE)
WP3 CETLE (NL)
WP4 VIA DONAU(AT)
WP5 MARLO (NOR)
WP6 MOBYCON (NL)
WP7 PBV (BE)
WP8 MARLO (NOR)
Work Packages
09/02/2010 page 171st Advisory Committee Meeting
WP1: Requirement Analysis
WP2: Devel. Event Management
WP3: Devel. Voyage Plan
WP4: Devel. RIS-TLS
WP5: Demonstration
WP6: Evaluation & Validation
WP8: Exploitation
WP
0: M
anag
emen
t
WP
7: D
isse
min
atio
n
Three types of services will be developed within RISING
Workpackage Results
09/02/2010 page 181st Advisory Committee Meeting
• Elbe / Weser
• Danube
• Rhine / Scheldt
Geographical areas
page 1909/02/2010 1st Advisory Committee Meeting
Area Operator Commodity Objectives
Elbe / Weser
DBR & SBO High & Heavy Pre planning of project cargotransports
NWL Container Improved planning and monitoring processes
Danube ILL Steel coils & plates
Improvement of the process performance
Helogistics& others
Ore Better transport chain transparency
Rhine / Scheldt
Portbase Container Improved port management
<tbd> Voyage planning & fleet management
CTS Container Improved terminal planning
Demonstration cases
page 2009/02/2010 1st Advisory Committee Meeting
• User Requirements have been collected
• Specification of Services and Messages nearly completed
• Implementation Phase has started
• Evaluation Phase in parallel
• Start of Demonstration Phase in April 2011
Project Status
page 2909/02/2010 1st Advisory Committee Meeting
Agenda
page 3009/02/2010 1st Advisory Committee Meeting
• Background
• The RISING Project
• RISING at Work
• Summary & Outlook
• Spread the benefits of RIS into the transport & logistics world
• Increase reliability and accountability of IWT
• Close existing information gaps
• Remove barriers hindering the integration of IWT in intermodal transport chains
Summary & Outlook
09/02/2010 page 311st Advisory Committee Meeting
Project website:
www.rising.eu
Project coordinator:
Institute of Shipping Economics and Logistics (ISL)
Project manager: Mr. Arne GehlhaarPhone: +49.421.22096-49
Email: [email protected]
Contact Details
09/02/2010 page 321st Advisory Committee Meeting
Thank you for your attentionThank you for your attention
09/02/2010 page 331st Advisory Committee Meeting
Arne Gehlhaar
Institute of Shipping Economics and LogisticsUniversitätsallee 11-13
D-28359 Bremen