Rio Alto Corporate Presentation-November 2013 v2

29
Corporate Presentation November 2013 “Inspiration and  Innovation” 

Transcript of Rio Alto Corporate Presentation-November 2013 v2

Page 1: Rio Alto Corporate Presentation-November 2013 v2

8/11/2019 Rio Alto Corporate Presentation-November 2013 v2

http://slidepdf.com/reader/full/rio-alto-corporate-presentation-november-2013-v2 1/29

Corporate PresentationNovember 2013

“Inspiration and  Innovation” 

Page 2: Rio Alto Corporate Presentation-November 2013 v2

8/11/2019 Rio Alto Corporate Presentation-November 2013 v2

http://slidepdf.com/reader/full/rio-alto-corporate-presentation-november-2013-v2 2/29

Page 3: Rio Alto Corporate Presentation-November 2013 v2

8/11/2019 Rio Alto Corporate Presentation-November 2013 v2

http://slidepdf.com/reader/full/rio-alto-corporate-presentation-november-2013-v2 3/29

TSX: RIO  BVL: RIO  NYSE: RIOM  FSE: MS2

Capital Structure

3

TSX:  RIO

BVL: RIO

NYSE: RIOM

Frankfurt FSE:

 MS2

Shares Issued (Nov. 1, 2013):  176.7 million

Warrants Outstanding  Nil

Options Outstanding: (Av. Exercise Price  – C$ 2.03)  7.9 million

Fully Diluted:  184.6  million

Share Price:

 C$1.74

as at  06/11/2013

Market Cap (issued capital):  approx. C$ 307.5 million 

16% ‐ Sentry  Capital  

9% ‐ Management 

+16% ‐ Peruvian Investors

Page 4: Rio Alto Corporate Presentation-November 2013 v2

8/11/2019 Rio Alto Corporate Presentation-November 2013 v2

http://slidepdf.com/reader/full/rio-alto-corporate-presentation-november-2013-v2 4/29

TSX: RIO  BVL: RIO  NYSE: RIOM  FSE: MS2

Dr. Klaus Zeitler | Non Exec Chairman

Alex Black | President, CEO

Anthony Hawkshaw

 | CFO

Victor Gobitz Colchado | Director 

Drago Kisic Wagner | Director

Sidney Robinson | Director

Ram Ramachandran | Director

Dr. Roger Norwich | Director

Board of  Directors

4

Commitment?..........Percentage of  company held by Chairman, President, CEO, CFO, COO

AUQ  : 0.1% AEM : 0.2% AGI : 0.7% AR : 1.9%

BTO : 1.6% P : 0.7% TMM : 3.7%   RIO : 4.2%

Share Ownership of  RIO Directors  – 7%

Page 5: Rio Alto Corporate Presentation-November 2013 v2

8/11/2019 Rio Alto Corporate Presentation-November 2013 v2

http://slidepdf.com/reader/full/rio-alto-corporate-presentation-november-2013-v2 5/29

TSX: RIO  BVL: RIO  NYSE: RIOM  FSE: MS2

Share Price Performance & Analysts 

5

ANALYST COVERAGE

GMP Securities George Albino +1 416 943 6187

BMO Nesbitt Burns Inc Brian Quast +1 416 359 6824

Scotia Capital Mark Turner +1 416 863 7484

Clarus Securities Inc Mike

 Bandrowski +1

 416

 343

 3352

Stonecap Securities Inc Christos Doulis +1 416 342 9992

Desjardins Capital Markets Adam Melnyk +1 416 607 3081

Raymond James Adam Low +1 416 777 4943 

Euro Pacific Capital Inc Heiko Ihle +1 800 727 7922

Kallpa Securities SAB Humberto Leon +51 1 630 7500

Larrain Vial Vicente Rodriguez +56 (2) 2616 5546

Page 6: Rio Alto Corporate Presentation-November 2013 v2

8/11/2019 Rio Alto Corporate Presentation-November 2013 v2

http://slidepdf.com/reader/full/rio-alto-corporate-presentation-november-2013-v2 6/29

TSX: RIO  BVL: RIO  NYSE: RIOM  FSE: MS2

•   Startup 2011:   10 month build, $50M capex, 10,000 tpd

•   Mine 

Expansions   24,000 tpd

 2011,

 36,000

 tpd

 2012

•   Production 2012:  201,113 ounces of  gold

•   Guidance 2013:  190  – 210,000 ounces of  gold

•   Production Upside   Consistent Positive Grade Reconciliation

•   Re‐optimization   Oxide mining @ $1,200  – lowering costs & strip ratio

•   Reserve Growth   Q1 reserve update and exploration plan

•   Feas. Study Phase 2   Estimated completion Q2 2014

•   Extensive exploration program on 27,000 ha property  – ongoing

•  Proactive

 exploration

 strategy

  – regional

 and

 rest

 of 

 Peru

Strong Progress

6

“A record  of  execution and  delivery” 

Page 7: Rio Alto Corporate Presentation-November 2013 v2

8/11/2019 Rio Alto Corporate Presentation-November 2013 v2

http://slidepdf.com/reader/full/rio-alto-corporate-presentation-november-2013-v2 7/29

TSX: RIO  BVL: RIO  NYSE: RIOM  FSE: MS2

Minimal Debt  – Gold Loan

7

Amount   US$ 50 million

Total Obligation   61,312 “notional” ozs   Min. o z s 5 2 , 1 1 5

Max. 

o z s 7 0 , 5 0 9

Price Range $1,450 repay 85% of  ozs   BASE $1,150   $950 repay 115% of  ozs

Status (as at 1 October 2013)

44,144 “notional”

 ozs repaid   Min.

 o zs o w in g

 14,593

17,593 “notional” ozs owing   Max. o z s o w i n g 19,743

Due Date   October 2014

Payments to

 Date   Made

 through

 to

 February

 2014

Plus  $3M debt facility ‐ matures October 2014

Total Debt   approx $25M

Page 8: Rio Alto Corporate Presentation-November 2013 v2

8/11/2019 Rio Alto Corporate Presentation-November 2013 v2

http://slidepdf.com/reader/full/rio-alto-corporate-presentation-november-2013-v2 8/29

TSX: RIO  BVL: RIO  NYSE: RIOM  FSE: MS2

La Arena ‐ Location

8

•   Located in a gold mining district   in north 

central Peru

•   3.5 hour drive from Trujillo, on mostly 

paved 

road•   Land package  – approx 27,000 ha

•   Altitude 3,400m above sea level

•   18 km east of  Barrick´s Lagunas Norte Gold 

Mine

•  10km

 north

 of 

 La

 Virgen

 Gold

 Mine

 owned

 by Cia Minera San Simon 

•   Strong community support

•   No agriculture

•   Excellent infrastructure

Page 9: Rio Alto Corporate Presentation-November 2013 v2

8/11/2019 Rio Alto Corporate Presentation-November 2013 v2

http://slidepdf.com/reader/full/rio-alto-corporate-presentation-november-2013-v2 9/29

TSX: RIO  BVL: RIO  NYSE: RIOM  FSE: MS2

Reserves (as at Jan 1, 2013)

9

Material ClassificationOxide Ore Sulphide Ore  Metal Mined 

Tonnes (Mt) Au (g/t) Tonnes (Mt) Au

 (g/t) Cu

 (%) Au

 (oz) Cu

 (lbs)

Like ly Oxide PitSe dime nts Prove d 5.6  0.47  84,000

Pr obable 47.9  0.52  803,000

Final pit e xcluding 

oxide pit

Se dime nts Prove d   ‐

Probable 8.0  0.39  100,000

Por phyr y Prove d 0.1  0.32  0.29  1 ,500 942, 000

Pr obable 268.7 

0.24 

0.33 

2 ,0 91 ,0 00 1 ,9 45 ,9 29 ,0 00

Pit De sign* 61.5  0.50  268.9  0.24  0.33  3 ,0 80 ,0 00 1 ,9 46 ,8 71 ,0 00

Mineral Reserve  – Oxide & Sulphide

Within Pit Design, block cut‐off  NSR calculation ($1,400 Au, $3.00 Cu)

* Rounded numbers may not sum exactly

Allows 

for 

98% 

mining 

recoveryMined surface at 1 January 2013.

Resources and Reserves are included in a NI 43‐101 technical report filed 

on 

SEDAR

Updated oxide reserve estimate  – Q1, 2014

based on

 $1,200

 gold

 price

 &

 3rd iteration

 of 

 block

 model

Page 10: Rio Alto Corporate Presentation-November 2013 v2

8/11/2019 Rio Alto Corporate Presentation-November 2013 v2

http://slidepdf.com/reader/full/rio-alto-corporate-presentation-november-2013-v2 10/29

TSX: RIO  BVL: RIO  NYSE: RIOM  FSE: MS2

Near Term Reserve Upside Opportunity

10

Oxide (Epithermal)

Oxide (Porphyry)

RESERVE PIT

SEDIMENTARY   INTRUSIVESE

NW

Potential to add approx 1 year to oxide reserves(subject to technical work to be completed by Q1 2014)

Calaorco Colluvial Zone

Page 11: Rio Alto Corporate Presentation-November 2013 v2

8/11/2019 Rio Alto Corporate Presentation-November 2013 v2

http://slidepdf.com/reader/full/rio-alto-corporate-presentation-november-2013-v2 11/29

TSX: RIO  BVL: RIO  NYSE: RIOM  FSE: MS2

Medium Term Reserve Upside Opportunity

11

Potential to add approx 1 to 2 years to oxide reserves

(subject 

to 

technical 

work 

still 

to 

be 

completed)

Lack of  drilling

Page 12: Rio Alto Corporate Presentation-November 2013 v2

8/11/2019 Rio Alto Corporate Presentation-November 2013 v2

http://slidepdf.com/reader/full/rio-alto-corporate-presentation-november-2013-v2 12/29

TSX: RIO  BVL: RIO  NYSE: RIOM  FSE: MS2

Positive Grade Reconciliation Continues

12

PORPHYRY

HIGH GRADE ZONE

(Approx. 1g/t Au)

CALAORCO 

PIT 

HIGH GRADE NW STRUCTURES 

(Upwards of  100g/t over 

10‐20cm widths)

DEPTH POTENTIAL

 

WEST WALL

Looking SE

Page 13: Rio Alto Corporate Presentation-November 2013 v2

8/11/2019 Rio Alto Corporate Presentation-November 2013 v2

http://slidepdf.com/reader/full/rio-alto-corporate-presentation-november-2013-v2 13/29

TSX: RIO  BVL: RIO  NYSE: RIOM  FSE: MS2

2013 Performance to date

13

Highlights  for  the three months ended  September  30, 2013 

Adjusted net income ‐ $17.0 million ($0.10 per share)

  Net income ‐ $15.9 million ($0.09 per share) 

Cash provided by operations ‐ $35.5 million

  Gold produced and sold ‐ 59,157 ozs   at average realized price of  $1,310 per oz

  Capital investments ‐ $19.4 million ; exploration spending ‐ $2.0 million

Highlights  for  the nine months ended  September  30, 2013 

Adjusted net income ‐ $34.9 million ($0.20 per share) 

Net 

income ‐

 $20.8 

million 

($0.12 

per 

share) 

Cash flow from operations ‐ $57.3 million

  Gold produced and sold ‐ 144,092 ozs   at average realized price of  $1,384 per oz

  Capital investments ‐ $55.2 million ; exploration spending ‐ $5.8 million

Page 14: Rio Alto Corporate Presentation-November 2013 v2

8/11/2019 Rio Alto Corporate Presentation-November 2013 v2

http://slidepdf.com/reader/full/rio-alto-corporate-presentation-november-2013-v2 14/29

TSX: RIO  BVL: RIO  NYSE: RIOM  FSE: MS2

Gold Production & Guidance

14

Production & Sales

Production 2012   201,113 ozs

Production Guidance 2013   190  – 210,000 ozs

 ____________________________________ _____________________________________ _____________________________________ ___________________________________

Cost Guidance  for  2013 Q3  Actual Guidance (13 Nov)

Adjusted Operating Cost   US$ 675 to US$ 725 / oz   $569 approx $650

All‐in sustaining costs   US$ 900 to US$ 1,000 / oz   $808 approx $900

All‐

in 

costs   US$ 1,200

 to

 US$

 1,300

 / oz   $961

 approx $1,200

 ________________________________________________________________________________________________________________________________________________

Mine Plan Re‐Optimization (in  progress)

$1,200 pit

 (excl.

 upside) LOM

 (from

 July

 2013)

 After

 Tax

 Cash

 Flow

 (incl.

 Sustaining

 Capital)

@ US$ 1,000 : approx $155M

@ US$ 1,500 : approx $340M

All‐in sustaining costs  Reducing on annualized basis due to mining fleet reduction

and diminishing pad construction

Page 15: Rio Alto Corporate Presentation-November 2013 v2

8/11/2019 Rio Alto Corporate Presentation-November 2013 v2

http://slidepdf.com/reader/full/rio-alto-corporate-presentation-november-2013-v2 15/29

TSX: RIO  BVL: RIO  NYSE: RIOM  FSE: MS2

La Arena  – Social & Community

15

Page 16: Rio Alto Corporate Presentation-November 2013 v2

8/11/2019 Rio Alto Corporate Presentation-November 2013 v2

http://slidepdf.com/reader/full/rio-alto-corporate-presentation-november-2013-v2 16/29

TSX: RIO  BVL: RIO  NYSE: RIOM  FSE: MS2

La Arena  – Environment

16

Reclamation work on 

waste dump No. 1

Reclamation work on 

waste dump No. 1

Page 17: Rio Alto Corporate Presentation-November 2013 v2

8/11/2019 Rio Alto Corporate Presentation-November 2013 v2

http://slidepdf.com/reader/full/rio-alto-corporate-presentation-november-2013-v2 17/29

TSX: RIO  BVL: RIO  NYSE: RIOM  FSE: MS2

La Arena  – Gold Oxide Mine Layout

17

L a y o u t f r o m J u l y 2 0 1 0 

Re port

Pad Space available by end 2013

Current Leach Pad

Page 18: Rio Alto Corporate Presentation-November 2013 v2

8/11/2019 Rio Alto Corporate Presentation-November 2013 v2

http://slidepdf.com/reader/full/rio-alto-corporate-presentation-november-2013-v2 18/29

TSX: RIO  BVL: RIO  NYSE: RIOM  FSE: MS2

Ore Production ‐ 36,000 tonnes per day

La Arena  – Gold Oxide Mine (cont.)

18

Calaorco Pit

Leach Pad

Ethel Pit

PLS Pond

Process Plant

Major Events Pond

Page 19: Rio Alto Corporate Presentation-November 2013 v2

8/11/2019 Rio Alto Corporate Presentation-November 2013 v2

http://slidepdf.com/reader/full/rio-alto-corporate-presentation-november-2013-v2 19/29

TSX: RIO  BVL: RIO  NYSE: RIOM  FSE: MS2

La Arena  – Gold Oxide Mine (cont.)

19

Ore Production : + 36,000 tonnes per day

CAT777 Dump TruckRH90 Excavator

Mining Fleet  Reduction

2013 – 4  fleets

2014 – 3  fleets

2015 – 2  fleets

2016 – 2  fleets 

1  fleet  = 1 exc  + 7  trucks

Page 20: Rio Alto Corporate Presentation-November 2013 v2

8/11/2019 Rio Alto Corporate Presentation-November 2013 v2

http://slidepdf.com/reader/full/rio-alto-corporate-presentation-november-2013-v2 20/29

TSX: RIO  BVL: RIO  NYSE: RIOM  FSE: MS2

La Arena  – Gold Oxide Mine (cont.)

20

Calaorco Pit Panorama  – July 2013

Calaorco Pit  – June 2013

Page 21: Rio Alto Corporate Presentation-November 2013 v2

8/11/2019 Rio Alto Corporate Presentation-November 2013 v2

http://slidepdf.com/reader/full/rio-alto-corporate-presentation-november-2013-v2 21/29

TSX: RIO  BVL: RIO  NYSE: RIOM  FSE: MS2

•   Feasibility study (bankable)   – 18,000 tpd

•   Target Phase 2 capex   ‐ $ 200M to $ 250M

•   30Mt to 60Mt starter pit  – target grades approx 0.4 % Cu, 0.3 g/t Au

•   Target : +20% IRR (post taxes) 

•   Current timing for FS completion  – Q2 2014

•   Locate all of  Phase 2 project within current oxide mine EIA boundary

•   Permitting process started in May 2013  –   EIA approval prior to end 2013

•  Clean

 copper

 concentrates   with

 gold

 credit

  – FS

 met

 tes two rk o ngo i ng

 

•   Projected Start‐up Production  – approx 50M lbs Cu and 40,000 oz Au pa

•   Phase 3  – scoping level work  :  open pit v underground

La Arena  – Phase 2 (feasibility study underway)

21

Page 22: Rio Alto Corporate Presentation-November 2013 v2

8/11/2019 Rio Alto Corporate Presentation-November 2013 v2

http://slidepdf.com/reader/full/rio-alto-corporate-presentation-november-2013-v2 22/29

TSX: RIO  BVL: RIO  NYSE: RIOM  FSE: MS2   22

40Mt pit   150Mt pit

Long term sulphide plan  – Phase 3

SECTION 9126500 N

approx 115Mt @ 0.7% Cu , 0.53g/t Au

at 0.5% Cu cutoff 

Open Pit or Underground?

drillholes ended in mineralization @ 1000m

Cu, Au, Mo grades increase with depth

Page 23: Rio Alto Corporate Presentation-November 2013 v2

8/11/2019 Rio Alto Corporate Presentation-November 2013 v2

http://slidepdf.com/reader/full/rio-alto-corporate-presentation-november-2013-v2 23/29

TSX: RIO  BVL: RIO  NYSE: RIOM  FSE: MS2

La Arena  – Phase 2 & Phase 3

23

La Ramada LOM Waste Dump

Phase 3

Current EIA Boundary

Freylones LOM Tailings Site

Phase 3

La Ramada Electrical Substation

Phase 2 Starter

 Pit

Sulphide Plant Site 

Phase 3 Pit

 Outline

 

Road Deviation 

1 km

Land owned by 

La Arena SA

Land to be purchased 

by La Arena SA

Page 24: Rio Alto Corporate Presentation-November 2013 v2

8/11/2019 Rio Alto Corporate Presentation-November 2013 v2

http://slidepdf.com/reader/full/rio-alto-corporate-presentation-november-2013-v2 24/29

TSX: RIO  BVL: RIO  NYSE: RIOM  FSE: MS2

Feasibility study activities

Permitting of  Phase 2 :  Phase 2 EIA approval expected Q4, 2013

Phase 

Construction 

Permit 

expected 

Q2, 

2014

Mine Plan :   Optimize mine schedule for Phase 2 and timing of  Phase 3 project

Ore & Waste Handling:   Detail the option of  in‐pit crushing and conveying of  ore and waste for Phases 

2 and 3

Met. Testwork :   Testing and trade‐off  work to improve Au recovery from 40%

Waste & Tailings Options :   Review alternatives for tailings and waste deposition (Phase 3)

Phase 2 Capex (next 12 months)

Study Costs   US$  3M  (committed  – est completion Q2, 2014)

Substation and Transmission Line  US$  16M   (committed  – est completion Q3, 2014)

Surface Rights Acquisitions (Phase 3)  US$  12M  (planned to be completed in 2014)

Plant Long Lead Items   US$  ?  (subject to feasibility study detail)

La Arena  – Phase 2 (feasibility study underway)

24

Page 25: Rio Alto Corporate Presentation-November 2013 v2

8/11/2019 Rio Alto Corporate Presentation-November 2013 v2

http://slidepdf.com/reader/full/rio-alto-corporate-presentation-november-2013-v2 25/29

TSX: RIO  BVL: RIO  NYSE: RIOM  FSE: MS2

La Arena  – Geology

25

July 2010 Report – Reserve Pit Shell

Page 26: Rio Alto Corporate Presentation-November 2013 v2

8/11/2019 Rio Alto Corporate Presentation-November 2013 v2

http://slidepdf.com/reader/full/rio-alto-corporate-presentation-november-2013-v2 26/29

TSX: RIO  BVL: RIO  NYSE: RIOM  FSE: MS2

27,000 ha ‐ multiple gold and copper exploration targets

La Arena ‐ Au Oxide Exploration

26

Page 27: Rio Alto Corporate Presentation-November 2013 v2

8/11/2019 Rio Alto Corporate Presentation-November 2013 v2

http://slidepdf.com/reader/full/rio-alto-corporate-presentation-november-2013-v2 27/29

TSX: RIO  BVL: RIO  NYSE: RIOM  FSE: MS2   27

Regional and Peru Exploration

10,000 ha within 30km 

of  La

 Arena

La Libertad Department 

Santa Barbara Resources

Earn‐inAyacucho Department

Duran Ventures 

Earn‐inHuancavelica Department

Page 28: Rio Alto Corporate Presentation-November 2013 v2

8/11/2019 Rio Alto Corporate Presentation-November 2013 v2

http://slidepdf.com/reader/full/rio-alto-corporate-presentation-november-2013-v2 28/29

TSX: RIO  BVL: RIO  NYSE: RIOM  FSE: MS2   28

Sancos Prospect  – Santa Barbara Resources

Hol e ID From To Interval Au g/t

SARC 001 0 14 14 0.35

SARC 003 0 22 22 0.46

SARC 005 0 22 22 0.27

SARC 

005 30 38 8 0.30

SARC 006 8 98 90 0.29

SARC 011  0 154 154 0.45

SARC 012 82 100 18 0.47

SARC 019 0 94 94 0.47

SARC 020 38 56 18 0.29

SARC 021 52 82 30 0.40

Highlights ‐   Previous Drilling 

Page 29: Rio Alto Corporate Presentation-November 2013 v2

8/11/2019 Rio Alto Corporate Presentation-November 2013 v2

http://slidepdf.com/reader/full/rio-alto-corporate-presentation-november-2013-v2 29/29

TSX: RIO  BVL: RIO  NYSE: RIOM  FSE: MS2   29

Minasnoic Prospect  – Duran Ventures Inc.

Hole ID FROM TO Interval Au g/t Ag g/t

M NB‐

03 110.5 146.85 36.35 0.20 

16.21M NP‐02 0 57.15 57.15 0 .55  3.66

M NP‐03 10 60 50 0.33  13.63

Incl uding 30 50 20 0.51  28.29

M NP‐06 40 78 38 0.14  53.02

M NP‐07 5.65 69.1 63.45 0.53  8.18

M NP‐10 10.55 1 00.2 8 9.65 0.23  13.72

M NP‐14 0 62 62 0.34  20.74

Incl uding 34 52.3 18. 3 0.48  30.37

M NP‐16 12 83.4 71.4 0.44  5.48

Incl uding 28.55 46.25 17.7 1.38 

11.49

M NP‐23 74.05 300.23 226.18 0.45  5.31

Incl uding 146 176.9 30.9 1.86  21.06

M NP‐28 68 78 10 0.57  1.26

Highlights ‐   Previous Drilling