SPE 4th European Well Abandonment Seminar Rigless – Cutting the Cost of Well Abandonments Date: Thursday 18th April 2013 Richard Innes, Decommissioning Engineer

Transcript of Rigless – Cutting the Cost of Well Abandonments Innes Perenco.pdf · Rigless – Cutting the Cost...

Page 1: Rigless – Cutting the Cost of Well Abandonments Innes Perenco.pdf · Rigless – Cutting the Cost of Well Abandonment Phase III, Remove tree and top of tubing 0 Seabed 1000 Triassic

SPE 4th European Well Abandonment Seminar

Rigless – Cutting the Cost of Well Abandonments

Date: Thursday 18th April 2013

Richard Innes, Decommissioning Engineer

Page 2: Rigless – Cutting the Cost of Well Abandonments Innes Perenco.pdf · Rigless – Cutting the Cost of Well Abandonment Phase III, Remove tree and top of tubing 0 Seabed 1000 Triassic

Rigless – Cutting the Cost of Well Abandonment

• Objective

• What Does “Rigless” Mean

• Basic Requirements

• Case Study

• Comparisons

• Conclusions

Page 3: Rigless – Cutting the Cost of Well Abandonments Innes Perenco.pdf · Rigless – Cutting the Cost of Well Abandonment Phase III, Remove tree and top of tubing 0 Seabed 1000 Triassic

Rigless – Cutting the Cost of Well Abandonment

Objective

• Permanently Abandon the well safely (in compliance with O&GUK guidelines)

Page 4: Rigless – Cutting the Cost of Well Abandonments Innes Perenco.pdf · Rigless – Cutting the Cost of Well Abandonment Phase III, Remove tree and top of tubing 0 Seabed 1000 Triassic

What Does “Rigless” Mean

Rigless – Cutting the Cost of Well Abandonment

Page 5: Rigless – Cutting the Cost of Well Abandonments Innes Perenco.pdf · Rigless – Cutting the Cost of Well Abandonment Phase III, Remove tree and top of tubing 0 Seabed 1000 Triassic

“Rigless” ?

Do you need

to pay for

this?

Rigless – Cutting the Cost of Well Abandonment

Page 6: Rigless – Cutting the Cost of Well Abandonments Innes Perenco.pdf · Rigless – Cutting the Cost of Well Abandonment Phase III, Remove tree and top of tubing 0 Seabed 1000 Triassic

“Rigless” ?

When you

can just use

this?

Rigless – Cutting the Cost of Well Abandonment

Page 7: Rigless – Cutting the Cost of Well Abandonments Innes Perenco.pdf · Rigless – Cutting the Cost of Well Abandonment Phase III, Remove tree and top of tubing 0 Seabed 1000 Triassic

Rigless – Cutting the Cost of Well Abandonment

• Only mobilise what you need • Where possible use existing structure/deck • Use existing well tubulars for conveying barriers (cement) • Create a tailored spread suitable for platform and job • Tubular removal, use Jacks, cut into sections to meet crane capacity

Page 8: Rigless – Cutting the Cost of Well Abandonments Innes Perenco.pdf · Rigless – Cutting the Cost of Well Abandonment Phase III, Remove tree and top of tubing 0 Seabed 1000 Triassic

Rigless – Cutting the Cost of Well Abandonment

Basic Requirements

Page 9: Rigless – Cutting the Cost of Well Abandonments Innes Perenco.pdf · Rigless – Cutting the Cost of Well Abandonment Phase III, Remove tree and top of tubing 0 Seabed 1000 Triassic

Rigless – Cutting the Cost of Well Abandonment

• Suitable wells • 400+ sq m of available deck space (load capacity ?) • 10+ tonne crane • Crew changing (helideck or walk to work) • Standby vessel • Flushed liquid disposal • Multi-well campaign

Page 10: Rigless – Cutting the Cost of Well Abandonments Innes Perenco.pdf · Rigless – Cutting the Cost of Well Abandonment Phase III, Remove tree and top of tubing 0 Seabed 1000 Triassic

Rigless – Cutting the Cost of Well Abandonment

Phases

I. Preparation II. Place barriers III. Remove tree and top of tubing IV. a) Cut conductor and casings b) Remove steel to 10’ below sea bed

Page 11: Rigless – Cutting the Cost of Well Abandonments Innes Perenco.pdf · Rigless – Cutting the Cost of Well Abandonment Phase III, Remove tree and top of tubing 0 Seabed 1000 Triassic

Rigless – Cutting the Cost of Well Abandonment

Phase II, Typical Suitable well

0 Seabed

1000 Triassic

2000

Upr Bunter shale3000

Bunter Sand

4000Lwr Bunter Shale

5000Zechstein

Legend

6000

Leman

7000

LimestoneSandstoneShale

AnhydriteClaystoneDolomiteHalite

gasProductionZone

SSSV nipple

Packer

Page 12: Rigless – Cutting the Cost of Well Abandonments Innes Perenco.pdf · Rigless – Cutting the Cost of Well Abandonment Phase III, Remove tree and top of tubing 0 Seabed 1000 Triassic

Rigless – Cutting the Cost of Well Abandonment

Phase II, Placing barriers 1

0 Seabed

1000 Triassic

2000

Upr Bunter shale3000

Bunter Sand

4000Lwr Bunter Shale

5000Zechstein

Legend

6000

Leman

7000

LimestoneSandstoneShale

AnhydriteClaystoneDolomiteHalite

gasProductionZone

SSSV nipple

Packer

INSTALLBRIDGE PLUG

Page 13: Rigless – Cutting the Cost of Well Abandonments Innes Perenco.pdf · Rigless – Cutting the Cost of Well Abandonment Phase III, Remove tree and top of tubing 0 Seabed 1000 Triassic

Rigless – Cutting the Cost of Well Abandonment

0 Seabed

1000 Triassic

2000

Upr Bunter shale3000

Bunter Sand

4000Lwr Bunter Shale

5000Zechstein

Legend

6000

Leman

7000

LimestoneSandstoneShale

AnhydriteClaystoneDolomiteHalite

gasProductionZone

SSSV nipple

Packer

PERFORATE TUBING, CIRCULATE & FLUSH CLEAN

Phase II, Placing barriers 2

Page 14: Rigless – Cutting the Cost of Well Abandonments Innes Perenco.pdf · Rigless – Cutting the Cost of Well Abandonment Phase III, Remove tree and top of tubing 0 Seabed 1000 Triassic

Rigless – Cutting the Cost of Well Abandonment

0 Seabed

1000 Triassic

2000

Upr Bunter shale3000

Bunter Sand

4000Lwr Bunter Shale

5000Zechstein

Legend

6000

Leman

7000

LimestoneSandstoneShale

AnhydriteClaystoneDolomiteHalite

gasProductionZone

SSSV nipple

Packer

PUMP BALANCED CEMENT PLUG (800 FT)

Plug no 1

Phase II, Placing barriers 3

Page 15: Rigless – Cutting the Cost of Well Abandonments Innes Perenco.pdf · Rigless – Cutting the Cost of Well Abandonment Phase III, Remove tree and top of tubing 0 Seabed 1000 Triassic

Rigless – Cutting the Cost of Well Abandonment

0 Seabed

1000 Triassic

2000

Upr Bunter shale3000

Bunter Sand

4000Lwr Bunter Shale

5000Zechstein

Legend

6000

Leman

7000

LimestoneSandstoneShale

AnhydriteClaystoneDolomiteHalite

gasProductionZone

SSSV nipple

Packer

PERFORATE THROUGH TO B-ANNULUS, CIRCUALATE & FLUSH TO CLEAN UP

Plug no 1

Phase II, Placing barriers 4

Page 16: Rigless – Cutting the Cost of Well Abandonments Innes Perenco.pdf · Rigless – Cutting the Cost of Well Abandonment Phase III, Remove tree and top of tubing 0 Seabed 1000 Triassic

Rigless – Cutting the Cost of Well Abandonment

0 Seabed

1000 Triassic

2000

Upr Bunter shale3000

Bunter Sand

4000Lwr Bunter Shale

5000Zechstein

Legend

6000

Leman

7000

LimestoneSandstoneShale

AnhydriteClaystoneDolomiteHalite

gasProductionZone

SSSV nipple

Packer

PUMP BALANCED CEMENT PLUG (500 FT)

Plug no 1

Plug no 2

Phase II, Placing barriers 5

Page 17: Rigless – Cutting the Cost of Well Abandonments Innes Perenco.pdf · Rigless – Cutting the Cost of Well Abandonment Phase III, Remove tree and top of tubing 0 Seabed 1000 Triassic

Rigless – Cutting the Cost of Well Abandonment

Phase III, Remove tree and top of tubing

0 Seabed

1000 Triassic

2000

Upr Bunter shale3000

Bunter Sand

4000Lwr Bunter Shale

5000Zechstein

Legend

6000

Leman

7000

LimestoneSandstoneShale

AnhydriteClaystoneDolomiteHalite

gasProductionZone

SSSV nipple

Packer

Plug no 1

Plug no 2

REMOVE TREE AND 250 FT TUBING

Page 18: Rigless – Cutting the Cost of Well Abandonments Innes Perenco.pdf · Rigless – Cutting the Cost of Well Abandonment Phase III, Remove tree and top of tubing 0 Seabed 1000 Triassic

Rigless – Cutting the Cost of Well Abandonment

Phase IV, Cut & recover casings and conductor

0 Seabed

1000 Triassic

2000

Upr Bunter shale3000

Bunter Sand

4000Lwr Bunter Shale

5000Zechstein

Legend

6000

Leman

7000

LimestoneSandstoneShale

AnhydriteClaystoneDolomiteHalite

gasProductionZone

SSSV nipple

Packer

Plug no 1

Plug no 2

CUT & RECOVER CASING STRINGS AND CONDUCTOR 10 FT BELOW MUD LINE

Page 19: Rigless – Cutting the Cost of Well Abandonments Innes Perenco.pdf · Rigless – Cutting the Cost of Well Abandonment Phase III, Remove tree and top of tubing 0 Seabed 1000 Triassic

Rigless – Cutting the Cost of Well Abandonment

Case Study

Leman Field Well Abandonments

2013 & 2004

Page 20: Rigless – Cutting the Cost of Well Abandonments Innes Perenco.pdf · Rigless – Cutting the Cost of Well Abandonment Phase III, Remove tree and top of tubing 0 Seabed 1000 Triassic

Rigless – Cutting the Cost of Well Abandonment

Leman Field, 27C Platform

Production - Drilling

27C Drilling

Page 21: Rigless – Cutting the Cost of Well Abandonments Innes Perenco.pdf · Rigless – Cutting the Cost of Well Abandonment Phase III, Remove tree and top of tubing 0 Seabed 1000 Triassic

Rigless – Cutting the Cost of Well Abandonment

Phase II Place Barriers

2013

Page 22: Rigless – Cutting the Cost of Well Abandonments Innes Perenco.pdf · Rigless – Cutting the Cost of Well Abandonment Phase III, Remove tree and top of tubing 0 Seabed 1000 Triassic

Rigless – Cutting the Cost of Well Abandonment

Cementing Spread

Page 23: Rigless – Cutting the Cost of Well Abandonments Innes Perenco.pdf · Rigless – Cutting the Cost of Well Abandonment Phase III, Remove tree and top of tubing 0 Seabed 1000 Triassic

Rigless – Cutting the Cost of Well Abandonment

Top deck working area

Page 24: Rigless – Cutting the Cost of Well Abandonments Innes Perenco.pdf · Rigless – Cutting the Cost of Well Abandonment Phase III, Remove tree and top of tubing 0 Seabed 1000 Triassic

Rigless – Cutting the Cost of Well Abandonment

Case Study

Phase III Tree and Tubing

Removal (2004)

Page 25: Rigless – Cutting the Cost of Well Abandonments Innes Perenco.pdf · Rigless – Cutting the Cost of Well Abandonment Phase III, Remove tree and top of tubing 0 Seabed 1000 Triassic

Rigless – Cutting the Cost of Well Abandonment

Tree and wellhead

Page 26: Rigless – Cutting the Cost of Well Abandonments Innes Perenco.pdf · Rigless – Cutting the Cost of Well Abandonment Phase III, Remove tree and top of tubing 0 Seabed 1000 Triassic

Rigless – Cutting the Cost of Well Abandonment

Wellhead and tubing removal

Page 27: Rigless – Cutting the Cost of Well Abandonments Innes Perenco.pdf · Rigless – Cutting the Cost of Well Abandonment Phase III, Remove tree and top of tubing 0 Seabed 1000 Triassic

Rigless – Cutting the Cost of Well Abandonment

Case Study

Phase IV Conductor and Casing Cutting and Removal

(2004)

Page 28: Rigless – Cutting the Cost of Well Abandonments Innes Perenco.pdf · Rigless – Cutting the Cost of Well Abandonment Phase III, Remove tree and top of tubing 0 Seabed 1000 Triassic

Rigless – Cutting the Cost of Well Abandonment

Conductor cutting and removal

Spreader beams

Abrasive cutting spread 27A platform

Page 29: Rigless – Cutting the Cost of Well Abandonments Innes Perenco.pdf · Rigless – Cutting the Cost of Well Abandonment Phase III, Remove tree and top of tubing 0 Seabed 1000 Triassic

Rigless – Cutting the Cost of Well Abandonment

Conductor removal

Page 30: Rigless – Cutting the Cost of Well Abandonments Innes Perenco.pdf · Rigless – Cutting the Cost of Well Abandonment Phase III, Remove tree and top of tubing 0 Seabed 1000 Triassic

Rigless – Cutting the Cost of Well Abandonment

Comparisons

Page 31: Rigless – Cutting the Cost of Well Abandonments Innes Perenco.pdf · Rigless – Cutting the Cost of Well Abandonment Phase III, Remove tree and top of tubing 0 Seabed 1000 Triassic

Rigless – Cutting the Cost of Well Abandonment

Platform Well Abandonments SNS

Time per well

0.00

2.00

4.00

6.00

8.00

10.00

12.00

14.00

16.00

18.00

Rig Lift barge

Platform rigless

Day

s

Cut & recover conductor

Place cement barriers

Suspend and Remove tree

Page 32: Rigless – Cutting the Cost of Well Abandonments Innes Perenco.pdf · Rigless – Cutting the Cost of Well Abandonment Phase III, Remove tree and top of tubing 0 Seabed 1000 Triassic

Rigless – Cutting the Cost of Well Abandonment

Platform Well Abandonments SNS

Cost per well

0

500

1000

1500

2000

2500

3000

Rig SNS Benchmark Platform Rigless

Cos

t per

wel

l £k

Page 33: Rigless – Cutting the Cost of Well Abandonments Innes Perenco.pdf · Rigless – Cutting the Cost of Well Abandonment Phase III, Remove tree and top of tubing 0 Seabed 1000 Triassic

Rigless – Cutting the Cost of Well Abandonment

Conclusions

Page 34: Rigless – Cutting the Cost of Well Abandonments Innes Perenco.pdf · Rigless – Cutting the Cost of Well Abandonment Phase III, Remove tree and top of tubing 0 Seabed 1000 Triassic

Rigless – Cutting the Cost of Well Abandonment

Conclusions • A rig is not necessarily required for complete and safe abandonment • Existing structures already in place can be used • Significant cost savings have been demonstrated • Multi-well campaigns - share mobilisation

- efficient equipment utilisation - team building/learning

• Benefits in doing some wells while field infrastructure is still available

Page 35: Rigless – Cutting the Cost of Well Abandonments Innes Perenco.pdf · Rigless – Cutting the Cost of Well Abandonment Phase III, Remove tree and top of tubing 0 Seabed 1000 Triassic