Fabio Mazzolini Elettra-Sincrotrone Trieste S.C.p.A. THE CASE OF FERMI@Elettra ¨Symposium on European Funding Instruments for the development of Research Infrastructures¨ Madrid - April 19th, 2016

Transcript of RICH | Rich 2020 - THE CASE OF FERMI@Elettra · 2019-10-01 · (November 2003). Due diligence with...

Page 1: RICH | Rich 2020 - THE CASE OF FERMI@Elettra · 2019-10-01 · (November 2003). Due diligence with site visits in 2004 and 2010. FIRST FINANCE CONTRACT (2004) • A fixed interest

Fabio MazzoliniElettra-Sincrotrone Trieste S.C.p.A.

THE CASE OF FERMI@Elettra

¨Symposium on European Funding Instruments for the development of Research Infrastructures¨

Madrid - April 19th, 2016

Page 2: RICH | Rich 2020 - THE CASE OF FERMI@Elettra · 2019-10-01 · (November 2003). Due diligence with site visits in 2004 and 2010. FIRST FINANCE CONTRACT (2004) • A fixed interest

1

The Elettra complex as of today

Elettra & Booster

FERMI@Elettra

Page 3: RICH | Rich 2020 - THE CASE OF FERMI@Elettra · 2019-10-01 · (November 2003). Due diligence with site visits in 2004 and 2010. FIRST FINANCE CONTRACT (2004) • A fixed interest

2

Elettra-Sincrotrone Trieste S.C.p.A.

• A nonprofit shareholder company of national

• interest: AREA Science Park 53.7%FVG Regional Government 37.6%CNR 4.9%Invitalia Partecipazioni S.p.A. 3.8%

• Established in 1987 to construct and manage synchrotron light sources – international facility

-> Promote cultural and socioeconomic growth at the regional, national and international level

-> State-of-the art research facilities, technical leadership, skill development and transfer

Page 4: RICH | Rich 2020 - THE CASE OF FERMI@Elettra · 2019-10-01 · (November 2003). Due diligence with site visits in 2004 and 2010. FIRST FINANCE CONTRACT (2004) • A fixed interest

3

In danger of loosing our competitive edge:

• New top-up operating sources coming on line

• Major infrastructure upgrades needed

• Insufficient national resources available

Enter the EIB and the FERMI @ Elettra Project

A major project for the construction of:

Fourth generation free-electron laser source

Full-energy injector for Elettra

New cogeneration power plant

Site infrastructure improvements

Page 5: RICH | Rich 2020 - THE CASE OF FERMI@Elettra · 2019-10-01 · (November 2003). Due diligence with site visits in 2004 and 2010. FIRST FINANCE CONTRACT (2004) • A fixed interest

4

Project budget 2005-2011

Total project cost: 164.0 M€

Funding:

• Italian MIUR 36.0

• Friuli-Venezia-Giulia Region 13.0

• Internal resources & partners 16.0

• EU and other projects: 19.0

Partial total: 84.0 M€

• EIB loan - State guarantee 60.0

EIB loan - RSFF – ERCF 20.0

Total: 164.0 M€

Page 6: RICH | Rich 2020 - THE CASE OF FERMI@Elettra · 2019-10-01 · (November 2003). Due diligence with site visits in 2004 and 2010. FIRST FINANCE CONTRACT (2004) • A fixed interest

5

The role of the EIB

FIRST CONTACT: INFRAERA Conference organized by ESFRI in Trieste (November 2003). Due diligence with site visits in 2004 and 2010.

FIRST FINANCE CONTRACT (2004)• A fixed interest rate, 20-years, 60 million euro loan• Guaranteed by the Italian Treasury ministry• 5-year preamortization period (interest only)• Interest fixed at 3.77% (40 M€) and 4.46% (20 M€)

SECOND FINANCE CONTRACT (2010)• A floating rate, 20-years, 20 million euro loan to enhance performance• Issued under the Risk Sharing Financial Facility (RSFF) Instrument• Similar to what is expected for EFSI • 5-year preamortization period (interest only)EFSI DEFINITELY THE WAY TO GO!

Page 7: RICH | Rich 2020 - THE CASE OF FERMI@Elettra · 2019-10-01 · (November 2003). Due diligence with site visits in 2004 and 2010. FIRST FINANCE CONTRACT (2004) • A fixed interest

6

1991

Page 8: RICH | Rich 2020 - THE CASE OF FERMI@Elettra · 2019-10-01 · (November 2003). Due diligence with site visits in 2004 and 2010. FIRST FINANCE CONTRACT (2004) • A fixed interest

7

Synchrotron light source

2004

Page 9: RICH | Rich 2020 - THE CASE OF FERMI@Elettra · 2019-10-01 · (November 2003). Due diligence with site visits in 2004 and 2010. FIRST FINANCE CONTRACT (2004) • A fixed interest

8

2010Booster

Free Electron Laser - FEL

Synchrotron light source

Page 10: RICH | Rich 2020 - THE CASE OF FERMI@Elettra · 2019-10-01 · (November 2003). Due diligence with site visits in 2004 and 2010. FIRST FINANCE CONTRACT (2004) • A fixed interest

9

New international partners

Page 11: RICH | Rich 2020 - THE CASE OF FERMI@Elettra · 2019-10-01 · (November 2003). Due diligence with site visits in 2004 and 2010. FIRST FINANCE CONTRACT (2004) • A fixed interest

10

The first seeded free-electron laser facility

Page 12: RICH | Rich 2020 - THE CASE OF FERMI@Elettra · 2019-10-01 · (November 2003). Due diligence with site visits in 2004 and 2010. FIRST FINANCE CONTRACT (2004) • A fixed interest

11

The Kyma commercial outfit

KYMA born in 2007 as Sincrotrone Trieste spin off to produce

undulators for Synchrotron and FEL light sources

10 employees

4 million Revenues

More than 50 Undulators already supplied in

worldwide Synchrotrons/FEL:

• Elettra for FERMI (Italy)

• Brookhaven National Laboratory for NLSL-II (USA)

• Pohang Accelerator Laboratory for PLS2 (Korea)

• Max Plank Postech for PLS2 (Korea)

• Uppsala University for XFEL (Germany)

• ENEA for SPARC-FEL (Italy)

• Huazhang University for THz-FEL (China)

Page 13: RICH | Rich 2020 - THE CASE OF FERMI@Elettra · 2019-10-01 · (November 2003). Due diligence with site visits in 2004 and 2010. FIRST FINANCE CONTRACT (2004) • A fixed interest

12

Evolution of industrial income

870

1.345

1.153

640

2.097

2.418

751

466

2.666

2.990

2.792

3.765

€ 0

€ 500

€ 1.000

€ 1.500

€ 2.000

€ 2.500

€ 3.000

€ 3.500

€ 4.000

2010 2011 2012 2013 2014 2015

ELETTRA

KYMA

Page 14: RICH | Rich 2020 - THE CASE OF FERMI@Elettra · 2019-10-01 · (November 2003). Due diligence with site visits in 2004 and 2010. FIRST FINANCE CONTRACT (2004) • A fixed interest

13

In summary

• The loans have been a determining factor for success: no cash flow limitations, better negotiation with providers, flexibility in planning and design changes

• A major advantage has been flexibility and speed in the EIB –Elettra relationship (compared to other banks)

• RSFF or EFSI the way to go as compared to traditional loans

Increased number of international users at ElettraA first-of-a-kind free-electron laser facility: FERMIA new reputation of Elettra for project implementation

-> Participation in new international projects (ESS, ELI, etc.)-> Increase in commercial income-> New successful industrial initiatives (Kyma)