RFP 40313 Addendum #1 - Grand River Dam Authority 40313 Addendum #1 ... Quotation Fill-In...

157
RFP 40313 Addendum #1 CLARIFICATION: 1. The pre-bid meeting is scheduled for 9:00 am Wednesday, November 6, 2013. 2. The below documents are to be replace Sections A, B, C, and D respectively.

Transcript of RFP 40313 Addendum #1 - Grand River Dam Authority 40313 Addendum #1 ... Quotation Fill-In...

Page 1: RFP 40313 Addendum #1 - Grand River Dam Authority 40313 Addendum #1 ... Quotation Fill-In Information for Steam Turbine Generator ... 00300A.5.1 Attendance at the Purchaser's DCS Factory

RFP 40313 Addendum #1 CLARIFICATION:

1. The pre-bid meeting is scheduled for 9:00 am Wednesday, November 6, 2013. 2. The below documents are to be replace Sections A, B, C, and D respectively.

Page 2: RFP 40313 Addendum #1 - Grand River Dam Authority 40313 Addendum #1 ... Quotation Fill-In Information for Steam Turbine Generator ... 00300A.5.1 Attendance at the Purchaser's DCS Factory

GRDA Unit 3 Combined Cycle Project178592.67.9120

Combustion Turbine Generator/Steam Turbine Generator

Bid Issue25Oct2013

Source: 00300, 2009, v1.2

Section ASteam Turbine GeneratorQuotation Fill-In Information Page 1 of 34

Received and Incorporated

00300A.1 Not Used

00300A.2 General Quotation Parameters

Bidder's Quotation Date

00300A.2.1 Bidder's Contact InformationBidder's Quotation Number

00300A - Quotation Fill-In Information for Steam Turbine Generator - 416.7 MW Net Plant Output

Corporate InformationCompany Name

Technical Contact NameTitle

Purchase Order AddresseeAddress/Number, StreetAddress/State, Zip Code

Taxpayer ID Number (or EIN)Technical Contact

Phone NumberFax Number

Address/Number, StreetAddress/City

Address/State, Zip CodeEmail Address

00300A.2.2 AddendaNumber Date Description

00300A.2.3 Quotation Validity Period, through January 31, 2014 per RFQ - Yes/No - If no, advise number of days

00300A.2.5.4 Not Used00300A.2.6.1 All Exceptions are declared on Form 00300A.2.6.1 - Yes/No00300A.2.6.2 All Clarifications are declared on Form 00300A.2.6.2 - Yes/No

00300A.2.4 Quotation includes/excludes taxes - Included/Excluded00300A.2.5.1 Quotation Pricing firm through Quotation Validity Period - Yes/No00300A.2.5.2 Adjustment Pricing firm through End of Warranty - Yes/No00300A.2.5.3 Option Pricing firm through Quotation Validity Period - Yes/No

Page 3: RFP 40313 Addendum #1 - Grand River Dam Authority 40313 Addendum #1 ... Quotation Fill-In Information for Steam Turbine Generator ... 00300A.5.1 Attendance at the Purchaser's DCS Factory

GRDA Unit 3 Combined Cycle Project178592.67.9120

Combustion Turbine Generator/Steam Turbine Generator

Bid Issue25Oct2013

Source: 00300, 2009, v1.2

Section ASteam Turbine GeneratorQuotation Fill-In Information Page 2 of 34

00300A.2.6.1.2 Technical Exceptions

Count Reference Stated Technical Exception123456789

10

00300A.2.6.1.1 Not Used

Form 00300A.2.6.1 Declared Exceptions to the RFQ Requirements

Page 4: RFP 40313 Addendum #1 - Grand River Dam Authority 40313 Addendum #1 ... Quotation Fill-In Information for Steam Turbine Generator ... 00300A.5.1 Attendance at the Purchaser's DCS Factory

GRDA Unit 3 Combined Cycle Project178592.67.9120

Combustion Turbine Generator/Steam Turbine Generator

Bid Issue25Oct2013

Source: 00300, 2009, v1.2

Section ASteam Turbine GeneratorQuotation Fill-In Information Page 3 of 34

00300A.2.6.2.2 Technical Clarifications

Count Reference Stated Technical Clarification123456789

10

00300A.2.6.2.1 Not Used

Form 00300A.2.6.2 Declared Clarifications to the RFQ Requirements

Page 5: RFP 40313 Addendum #1 - Grand River Dam Authority 40313 Addendum #1 ... Quotation Fill-In Information for Steam Turbine Generator ... 00300A.5.1 Attendance at the Purchaser's DCS Factory

GRDA Unit 3 Combined Cycle Project178592.67.9120

Combustion Turbine Generator/Steam Turbine Generator

Bid Issue25Oct2013

Source: 00300, 2009, v1.2

Section ASteam Turbine GeneratorQuotation Fill-In Information Page 4 of 34

$ -

$ - $ - $ - $ - $ - $ -

$ -

$ - $ - $ - $ - $ - $ -

$ -

00300A.3.2.2 NOT USED

00300A.3.2.5 Shipping/Transportation (from Table 3.2.5)

00300A.3 Quotation Pricing

Total Base Quotation Pricing - DDP/CIP Jobsite Location

00300A.3.1 Product Pricing (FCA-Factory Location)Price Breakdown

00300A.3.2.4.1 Field Service Representative (from Table 3.2.4.1)

Sum of Subtotals (Should Equal Base Quotation Price Above)

Subtotal 00300A.3.2 Supplemental Product Pricing00300A.3.2.6 Instruction Manuals (from Table 3.2.6)

00300A.3.2.3 Special Tools and Lift Fixtures (from Table 3.2.3)

00300A.3.2.4.2 Training Service (from Table 3.2.4.2)

00300A.3.2.1 Startup and Commissioning Spare Parts (from Table 3.2.1)00300A.3.2 Supplemental Product Pricing

Subtotal 00300A.3.1 Product Pricing (FCA-Factory Location)

00300A.3.1.1 Steam Turbine Generator(Supplier to provide breakdown as required)

Page 6: RFP 40313 Addendum #1 - Grand River Dam Authority 40313 Addendum #1 ... Quotation Fill-In Information for Steam Turbine Generator ... 00300A.5.1 Attendance at the Purchaser's DCS Factory

GRDA Unit 3 Combined Cycle Project178592.67.9120

Combustion Turbine Generator/Steam Turbine Generator

Bid Issue25Oct2013

Source: 00300, 2009, v1.2

Section ASteam Turbine GeneratorQuotation Fill-In Information Page 5 of 34

Extended Price $ - $ - $ - $ -

Extended Price $ - $ - $ - $ -

Extended Price $ -

$ -

$ -

Extended Price $ -

$ -

$ -

00300A.3.2.3 Special Tools and Lift Fixtures

Bidder has included field service time in base quotation per RFP requirements Yes/NoIf Yes, Bidder shall provide an itemized breakout of priced services included in the quote in Table 3.2.4.1

Unit of MeasureQuantity Included

in POItem Description

Yes/No

Subtotal: Table 00300A.3.2.4.1 Field Service Pricing

Bidder has included Training time in base quotation per RFP requirements

Table 3.2.4.1 Technical Field Services, Per Diem Rates and Expenses

Unit of Measure

00300A.3.2.4.2 Training Service Bidder Response Column

STG Round trips included in the firm fixed lump sum price

All-inclusive FIELD SERVICE shall include all salary and overhead, local lodging, travel between the jobsite and local lodging, meals, and miscellaneous expenses. A week of service shall be defined as six (6), ten (10) hour onsite workdays, Monday - Saturday:

Round trips included in the firm fixed lump sum price Trips $ - 2

Training weeks included in the firm fixed lump sum price Week $ - 5

If Yes, Bidder shall provide an itemized breakout of priced services included in the quote in Table 3.2.4.2

All-inclusive TRAINING shall include all salary and overhead, local lodging, travel between the jobsite and local lodging, meals, and miscellaneous expenses. A week of service shall be defined as five (5), eight (8) hour onsite workdays, Monday - Friday:

Unit of Measure Unit Price

Subtotal: Table 00300A.3.2.3 Special Tools and Lift Fixtures Pricing $ -

$ - $ -

If Yes, Bidder shall provide a priced list of special tools included in the quote in Table 3.2.3.

$ -

Bidder Response Column

If Yes, Bidder has included special tools and lift fixtures in base quotation per RFP

00300A.3.2.2 NOT USED

Yes/NoAre startup spare or commissioining spare parts required?

Manufacturer's Part Identification

Subtotal: Table 00300A.3.2.1 Startup Spare Parts Pricing

$ -

If Yes, Bidder has included Spare Parts in base quotation per RFP requirements Yes/No

00300A.3.2 Supplemental Product Pricing TablesBidder to note that pricing included in these tables is for product scope that will be included in the initial Purchase Order with the successful Bidder. Pricing for Work deferred to a later date, such as adjustment pricing, option pricing and alternative scope pricing is not included in these tables.

Table 3.2.1: Startup and Commissioning Spare Parts

00300A.3.2.1 Startup and Commissioning Spare Parts Bidder Response Column

Unit Price

If Yes, Bidder shall provide a priced list of construction/erection spare parts included in the quote in Table 3.2.1.

Unit of Measure Unit Price

Are special tools and/or lift fixtures required? Yes/No

Quantity Included in PO

Table 3.2.3: Special Tools and Lift Fixtures

Item Description Manufacturer's Part Identification

Yes/No

Unit Price

Trips $ - 40

Week

Table 3.2.4.2 Technical Field Services, Per Diem Rates and Expenses

Quantity Included in PO

Table 3.2.4: Technical ServicesBidder Response Column

Quantity Included in PO

$ - STG Field service weeks included in the firm fixed lump sum price 120

00300A.3.2.4.1 Field Service Representative

Page 7: RFP 40313 Addendum #1 - Grand River Dam Authority 40313 Addendum #1 ... Quotation Fill-In Information for Steam Turbine Generator ... 00300A.5.1 Attendance at the Purchaser's DCS Factory

GRDA Unit 3 Combined Cycle Project178592.67.9120

Combustion Turbine Generator/Steam Turbine Generator

Bid Issue25Oct2013

Source: 00300, 2009, v1.2

Section ASteam Turbine GeneratorQuotation Fill-In Information Page 6 of 34

00300A.3.2 Supplemental Product Pricing Tables

$ -

Extended Price $ - $ - $ - $ - $ - $ -

Extended Price $ -

$ -

$ -

00300A.3.2.5 Shipping/Transportation

Subtotal: Table 00300A.3.2.5 Transportation Pricing

Bidder has included transportation in base quotation per RFP requirements

Bidder Response Column

$ - 1

Subtotal: Table 00300A.3.2.6 Instruction Manuals Pricing

Final Copy of Instruction Manuals Electronic EA

1

Table 3.2.6: Instruction ManualsUnit of

Measure Unit PriceQuantity Included

in POItem Description MediaProof Copy of Instruction Manuals Electronic

If Yes, Bidder shall provided an itemized breakout Instruction Manual pricing included in the quote in Table 3.2.6.

$ - EA

Yes/NoBidder has included pricing for Instruction Manuals in base quotation per Article Q501

00300A.3.2.6 Instruction Manuals

Steam Turbine Generator(Supplier to provide breakdown as required)

Point of OriginItem Description

1 LotCarrier Type

Quantity Included in PO

Subtotal: Table 00300A.3.2.4.1 Training Pricing

If Yes, Bidder shall provide an itemized breakout of transportation included in the quote in Table 3.2.5.

All-inclusive ROUND TRIP shall include all expenses traveling to and returning from the lodging local to the jobsite, from the Manufacturer's Field Service home base of operations. It shall include all transportation (air and/or ground), parking, tolls, meals, travel per diem, any salary/overhead while traveling, and other miscellaneous expenses associated with one round trip.

Yes/No

Bidder Response Column

Table 3.2.5: Shipping/Transportation

Page 8: RFP 40313 Addendum #1 - Grand River Dam Authority 40313 Addendum #1 ... Quotation Fill-In Information for Steam Turbine Generator ... 00300A.5.1 Attendance at the Purchaser's DCS Factory

GRDA Unit 3 Combined Cycle Project178592.67.9120

Combustion Turbine Generator/Steam Turbine Generator

Bid Issue25Oct2013

Source: 00300, 2009, v1.2

Section ASteam Turbine GeneratorQuotation Fill-In Information Page 7 of 34

Unit Price(to Add)

Unit Price (to Delete)

Delivery ARO (WKS)

$ - $ - $ - $ - $ - $ - $ - $ -

Unit Price(to Add)

Unit Price (to Delete)

Delivery ARO (WKS)

$ - $ - $ - $ - $ - $ - $ - $ -

Unit Price(to Add)

Unit Price (to Delete)

Delivery ARO (WKS)

$ - $ - $ - $ - $ - $ - $ - $ -

Unit of Measure Unit Price

$/Day $ - $/Day $ - $/Day $ -

$/h $ - $/h $ - $/h $ -

$/rt $ -

Adjustment Rate Sunday / Holiday (beyond 8 hours)

Per diem Rate

All-inclusive DAILY PER DIEM RATE shall include all salary and overhead, local lodging, travel between the jobsite and local lodging, meals, and miscellaneous expenses. A day of service shall be defined as one, eight (8) hour onsite workday in which all project construction and management personnel are working normal shifts:

Per diem Rate Monday through Friday (up to 8 hours)

Adjustment Rate Monday through Friday beyond 8 hours)

Table 4.4: Special Tools and Lift Fixtures

Item Number Unit of Measure

Table 4.3: NOT USED

Table 4.1: Equipment Pricing

Table 4.2: Startup and Commissioning Spare Parts

Item Description

Item Description Unit of Measure

Item Number Item Description Unit of Measure

00300A.4 Unit Adjustment Pricing Tables

Item Number

All-inclusive ROUND TRIP RATE shall include all expenses traveling to and returning from the lodging local to the jobsite, from the Manufacturer's Field Service home base of operations. It shall include all transportation (air and/or ground), parking, tolls, meals, travel per diem, any salary/overhead while traveling, and other miscellaneous expenses associated with one round trip.

Round Trip Rate

Table 4.5: Supplemental "Out-of-Base-Scope" Technical Assistance

Per diem Rate Sunday / Holiday (up to 8 hours)

All-inclusive RATE TO ADJUST above per diem rates for hours worked beyond an eight (8) hour onsite workday:

Adjustment Rate Saturday (beyond 8 hours)

Saturday (up to 8 hours)

Page 9: RFP 40313 Addendum #1 - Grand River Dam Authority 40313 Addendum #1 ... Quotation Fill-In Information for Steam Turbine Generator ... 00300A.5.1 Attendance at the Purchaser's DCS Factory

GRDA Unit 3 Combined Cycle Project178592.67.9120

Combustion Turbine Generator/Steam Turbine Generator

Bid Issue25Oct2013

Source: 00300, 2009, v1.2

Section ASteam Turbine GeneratorQuotation Fill-In Information Page 8 of 34

Bidder Response Column

$ -

$ -

Bidder Response Column

Bidder Response Column

Origin CountryStateCity

If yes, list of other locations included with the quotation Yes/No

cu ft

Total Weight per Shipmentcu ft

Total Weight of Largest Single Component

lbTotal Volume per Shipment

Bidder proposes subcontracting any major portions of the Work Yes/NoIf Yes, Sub-supplier List is included with the quotation Yes/No

00300A.8 Subcontracting

Number of Shipments CountTotal Number of Pieces per Shipment Count

Total Volume of Largest Single Component

Bidder's product included in the quotation has special storage requirements Yes/No

lb

00300A.7.2 ShipmentsManufactured in Bidder's own facility? Yes/NoManufactured in facilities of others? If so list. Yes/No

If Yes, special storage requirements are included with the quotation Yes/No

00300A.5 Option Pricing

00300A.6 Not Used

00300A.5.1 Attendance at the Purchaser's DCS Factory Acceptance Test per Article 01500.1, STG Scope Matrix Item 99

00300A.5.2 Recommended STG Scope Spare Parts List per Article 01500.1.9 (Pricing Valid Up To One Year After The Contract Award Date))

00300A.7 Logistics00300A.7.1 Jobsite Storage Requirements

Page 10: RFP 40313 Addendum #1 - Grand River Dam Authority 40313 Addendum #1 ... Quotation Fill-In Information for Steam Turbine Generator ... 00300A.5.1 Attendance at the Purchaser's DCS Factory

GRDA Unit 3 Combined Cycle Project178592.67.9120

Combustion Turbine Generator/Steam Turbine Generator

Bid Issue25Oct2013

Source: 00300, 2009, v1.2

Section ASteam Turbine GeneratorQuotation Fill-In Information Page 9 of 34

LD*

LD

Bidder confirms ability and commitment to meet all the required submittal dates. Yes/NoIf No, Bidder has for each submittal to which the “No” applies stated the best possible submittal date as an exception.

Yes/No

00300A.9.2 Schedule of Submittals and Applicable Liquidated Damages

* "LD" indicates that delivery of the Goods after the "Required Delivery" date is subject to liquidated damages in accordance with applicable articles of the RFP.

** Purchaser will not accept delivery of Goods at the Jobsite prior to the "Early Delivery" date unless previously agreed by Purchaser in writing. Delivery in the period between the "Early Delivery" and "Required Delivery" date is at the discretion of Supplier.

Steam Turbine Generator

Yes/No00300A.9.1.1 Bidder will make single consolidated shipment.

00300A.9.1.2 Bidder has provided a preliminary milestone schedule. Yes/NoIf No, Bidder has included a proposed staggered shipping schedule. Yes/No

18-Jan-16

00300A.9 Delivery and Schedule

Bidder Response ColumnRequired Delivery

00300A.9.1 Delivery DAP Jobsite (originating in US), DDP Jobsite (originating outside US) Early Delivery**

120 Days Maximum Prior to Required Delivery

(Supplier to provide breakdown as required)

00300A.9.1.3 Bidder has provided a Standard Delivery/Completion schedule. Yes/No

Yes/No

Page 11: RFP 40313 Addendum #1 - Grand River Dam Authority 40313 Addendum #1 ... Quotation Fill-In Information for Steam Turbine Generator ... 00300A.5.1 Attendance at the Purchaser's DCS Factory

RFP 40313

Source: 00300, 2009, v1.2

Section ASteam Turbine GeneratorQuotation Fill-In Information Page 10 of 34

TBD TBD

Calendar Event Due Date301 Engineering/Procurement/

Production/Testing and Inspection/Shipping Schedule and Status Report

30 After Effective Date with Monthly Updates

No

302 Preshipment Inspection Notice 30 Before Shipment of Equipment No

303 Electronic Material List 30 Before Shipment of Equipment No304 Shipping Notice 2 Full Work Days Notice No305 Detailed Final Packing List of

Shipment of Equipment, corresponding with Electronic Material List data

Upon each Shipment and With Electronic Materials List

No

306 Hazardous materials documentation

With Each Shipment No

701 Proof Copy of Instruction Manuals

90 Before Shipment of Equipment No

702 Final Copy of Instruction Manuals

15 Before Shipment of Equipment No

703 Recommended Spare Parts List, with Unit Prices and Names of Suppliers, Necessary to Cover a Full Maintenance Cycle (3 years)

90 After Effective Date No

704 Startup and Commissioning Spare Parts List, Priced

90 Before Shipment of Equipment No

15561 Steam Turbine .0601 15561 Final heat balances for load

conditions specified in Article 15561.1.3

30 After Effective Date No

0602 15561 Expansion lines for the heat balances furnished for load conditions specified in Article 15561.1.3

30 After Effective Date No

0603 15561 HP turbine end points versus throttle flow

30 After Effective Date No

0604 15561 Expansion line end points versus reheater flow (throttle flow for nonreheat units) curves for exhaust pressures for 1 inch (25 mm) Hg absolute to the turbine maximum allowable continuous operating exhaust pressure

30 After Effective Date No

0605 15561 Leakage flow and leakage enthalpy versus throttle flow curves

30 After Effective Date No

0606 15561 Turbine section efficiency versus inlet volumetric flow

30 After Effective Date No

Project Delivery Date: January 18, 2016

00300.9.2 Schedule of Submittals and Applicable Penalty

Effective Date:

Bid

der C

ompl

ies

Yes

/No

Penaltyapply?

The list is not all-inclusive. There are more requirements for Supplier to "provide notice," to "advise," to "update," to "inform," etc., or to “submit” should a condition precedent occur. These have not been included in the list. It will however remain Supplier's responsibility to comply with the submittal requirements whether or not the submittal is actually included on the following:Item No.

Reference Document

Submittal DatesSubmittals Item

Estimated First Shipment Date:

Page 12: RFP 40313 Addendum #1 - Grand River Dam Authority 40313 Addendum #1 ... Quotation Fill-In Information for Steam Turbine Generator ... 00300A.5.1 Attendance at the Purchaser's DCS Factory

RFP 40313

Source: 00300, 2009, v1.2

Section ASteam Turbine GeneratorQuotation Fill-In Information Page 11 of 34

0607 15561 Combined efficiency of IP and LP turbines as a function of reheat temperature and intercept valve pressure

30 After Effective Date No

0608 15561 Turbine exhaust loss curve 30 After Effective Date No0609 15561 Turbine exhaust pressure

correction30 After Effective Date No

0610 15561 First-stage pressure versus flow to the following stage curve

30 After Effective Date No

0611 15561 Reheat bowl pressure versus flow to the following stage curve

30 After Effective Date No

0612 15561 Correction curves for kilowatts and heat rate for the following

After Effective Date No

0613 15561 Throttle pressure rated +5 percent, -50 percent

30 After Effective Date No

0614 15561 Throttle temperature rated +57.2° F to -18.4° F (+14° C to -28° C)

30 After Effective Date No

0615 15561 Reheat temperature rated +57.2° F to -18.4° F (+14° C to -28° C)

30 After Effective Date No

0616 15561 Reheater pressure drop 5 percent to 15 percent of HP turbine exhaust pressure

30 After Effective Date No

0617 15561 Exhaust pressure from 1 inch (25 mm) Hg abs to the turbine maximum allowable continuous operating exhaust pressure

30 After Effective Date No

0618 15561 All other correction curves for ASME PTC 6.2 Acceptance Test

30 After Effective Date No

0619 15561 Valve loop correction to heat rate curve

30 After Effective Date No

0620 15561 Turbine heat rate versus gross turbine output for governing control and hybrid mode of operation

30 After Effective Date No

0621 15561 The following variable pressure performance curves

After Effective Date No

0622 15561 HP turbine exhaust pressure versus percent maximum expected throttle flow

30 After Effective Date No

0623 15561 Main turbine throttle pressure versus percent maximum expected throttle flow

30 After Effective Date No

0624 15561 HP turbine exhaust temperature versus percent maximum expected throttle flow

30 After Effective Date No

0625 15561 IP turbine exhaust pressure versus percent maximum expected throttle flow

30 After Effective Date No

0626 15561 All curves in the Supplier's standard thermal kits

30 After Effective Date No

Page 13: RFP 40313 Addendum #1 - Grand River Dam Authority 40313 Addendum #1 ... Quotation Fill-In Information for Steam Turbine Generator ... 00300A.5.1 Attendance at the Purchaser's DCS Factory

RFP 40313

Source: 00300, 2009, v1.2

Section ASteam Turbine GeneratorQuotation Fill-In Information Page 12 of 34

0627 15561 Final list of motors including voltage, full load current, locked-rotor current, phase, horsepower, enclosure type for each motor, and space heater watts and volts

90 After Effective Date No

0628 15561 Final list of closed cycle cooling water requirements including flow and pressure drop and flow diagram

45 After Effective Date No

0629 15561 Final list of all instrument/service air users and consumption

90 After Effective Date No

0501 15561 Steam seal system diagram indicating flows, pressures, and temperatures (steam seal system P&ID)

60 After Effective Date No

0630 15561 Lube oil system data including volumetric and flow back

60 After Effective Date No

0502 15561 Lube oil diagrams (lube oil system P&ID)

60 After Effective Date No

0503 15561 Drawings and procedure for cleaning of lube oil system showing all temporary pipe and equipment required

After Effective Date No

0631 15561 Preliminary air consumption 40 After Effective Date No

0504 15561 DEHC fluid diagrams (control and protection P&ID)

60 After Effective Date No

0505 15561 Drawings indicating the location of all turbine generator junction boxes and electrical accessories requiring embedded conduit in the turbine generator pedestal, including recommended quantities and sizes of conduits into accessory

90 After Effective Date No

0506 15561 Detailed schematic and wiring drawings of all electrical control wiring

120 After Effective Date No

0507 15561 Drawings indicating the size and location of all turbine generator ground pads

90 After Effective Date No

0508 15561 All drawings required to indicate miscellaneous piping and wiring connections and any other piping and wiring connections not indicated on previous drawings

120 After Effective Date No

0509 15561 Arrangement drawings of all piping and accessories furnished, as required for the Purchaser's check of the layout of these items

150 After Effective Date No

Page 14: RFP 40313 Addendum #1 - Grand River Dam Authority 40313 Addendum #1 ... Quotation Fill-In Information for Steam Turbine Generator ... 00300A.5.1 Attendance at the Purchaser's DCS Factory

RFP 40313

Source: 00300, 2009, v1.2

Section ASteam Turbine GeneratorQuotation Fill-In Information Page 13 of 34

0510 15561 Drawings as required to indicate the details of construction and internal wiring of all equipment and equipment components furnished. Detail drawings of standard gauges, instruments, valves, and similar miscellaneous items

60 Before Shipment of Equipment No

0632 15561 Lateral and torsional analysis report and critical speeds of turbine generator rotor

60 After Effective Date No

0511 15561 A block diagram with significant transfer functions representing the generator, excitation, and regulator satisfactory for computer studies

30 After Effective Date No

0633 15561 Complete listing of all accessory equipment with instrument ranges and recommended contact set points

150 After Effective Date No

0634 15561 Listing of accessory equipment to be shipped loose to jobsite

30 Before Shipment of Equipment No

0512 15561 Drawings of all separately mounted equipment indicating information required for setting, piping, and wiring the items. This includes outline drawings of the supervisory instruments and accessory electrical equipment.

120 After Effective Date No

0201 15561 Supplier to participate in design conference

15 After Effective Date No

0635 15561 Equipment startup schedule duration requirements

90 After Effective Date No

0636 15561 Specification data pages updated and resubmitted

60 After Effective Date No

0637 15561 Preservative coating data 60 After Effective Date No

0638 15561 Detailed drawing submittal schedule list and submittal schedule

30 After Effective Date No

0639 15561 Detailed data to describe the capability of the unit to operate at speeds above and below rated speed, including minimum and maximum allowable speed versus cumulative time duration of off normal speed operation

60 After Effective Date No

Page 15: RFP 40313 Addendum #1 - Grand River Dam Authority 40313 Addendum #1 ... Quotation Fill-In Information for Steam Turbine Generator ... 00300A.5.1 Attendance at the Purchaser's DCS Factory

RFP 40313

Source: 00300, 2009, v1.2

Section ASteam Turbine GeneratorQuotation Fill-In Information Page 14 of 34

0640 15561 Detailed information as to the capability of the turbine generator to respond to a system upset situation, where a large portion of the system load is applied to the unit and load shedding is required

60 After Effective Date No

0641 15561 All control devices and/or process set points, ranges, and flow quantities

60 After Effective Date No

0642 15561 Complete I/O list for signals to/from Subsupplier's systems from/to Supplier's DCS

120 After Effective Date No

0643 15561 I/O counts 120 After Effective Date No

0513 15561 Detailed logic diagrams, operations procedures, and operator interface screens to implement control of Supplier's equipment via Purchaser's DCS

120 After Effective Date No

0644 15561 Electrical load list including MOVs

60 After Effective Date No

0514 15561 Turbine generator general arrangement drawings. These drawings shall indicate all major equipment locations, access doors, maintenance or equipment removal space, and provide sufficient detail to allow for plan layout.

30 After Effective Date No

0515 15561 All main steam, reheat steam, and large bore piping connection drawings including type, allowable movements, and loads

60 After Effective Date No

0516 15561 All main steam, reheat steam, and large bore piping connection drawings end prep details

60 After Effective Date No

0517 15561 Details of temporary steam blow connections

60 After Effective Date No

0518 15561 Condenser interface details including loading flange connections and loading conditions

60 After Effective Date No

0519 15561 Drawings to assist Supplier in bus duct design/layout interface with generator ("bus duct" includes isophase bus duct and bus duct from generator neutral enclosure to the generator NGR enclosure)

60 After Effective Date No

Page 16: RFP 40313 Addendum #1 - Grand River Dam Authority 40313 Addendum #1 ... Quotation Fill-In Information for Steam Turbine Generator ... 00300A.5.1 Attendance at the Purchaser's DCS Factory

RFP 40313

Source: 00300, 2009, v1.2

Section ASteam Turbine GeneratorQuotation Fill-In Information Page 15 of 34

0645 15561 Flow charts detailing on-line monitoring programs for startup and on-line monitoring of critical parameters

120 After Effective Date No

0520 15561 Preliminary drawings and detailed assembly instructions for erection bid solicitation

120 After Effective Date No

0521 15561 Final erection drawings and detailed assembly instructions

360 After Effective Date No

0646 15561 Detailed drawing submittal list and submittal schedule

60 After Effective Date No

15565 Lube Oil Conditioner .

0538 15565 Drawings of layout and overall dimensions of the lube oil conditioner skid package

30 After Effective Date No

0539 15565 Detailed drawings of all electrical/control wiring

30 After Effective Date No

0540 15565 Piping and instrument diagrams 30 After Effective Date No

0541 15565 All drawings required to locate all piping and wiring connections

30 After Effective Date No

16031 Cylindrical Rotor Generators .

0202 16031 Supplier to participate in design conference

15 After Effective Date No

0650 16031 Generator hydrogen pressure correction curves for ASME PTC 6.2 acceptance test

Upon Submittal of Proposal No

0651 16031 Generator power factor correction curves for ASME PTC 6.2 acceptance test

Upon Submittal of Proposal No

0652 16031 Critical speeds of generator 30 After Effective Date No

0653 16031 Generator loss curve and excitation power requirement curve including total electrical losses for generation capability at minimum hydrogen pressure and at 1 bar (14.5 psi) including up to the maximum hydrogen pressure for rated and unity power factors. Curve shall include the total mechanical or fixed losses.

30 After Effective Date No

0654 16031 Water requirements for the air or hydrogen coolers indicated as a curve for varying load conditions, hydrogen pressures, and cooling water temperatures

30 After Effective Date No

Page 17: RFP 40313 Addendum #1 - Grand River Dam Authority 40313 Addendum #1 ... Quotation Fill-In Information for Steam Turbine Generator ... 00300A.5.1 Attendance at the Purchaser's DCS Factory

RFP 40313

Source: 00300, 2009, v1.2

Section ASteam Turbine GeneratorQuotation Fill-In Information Page 16 of 34

0655 16031 Detailed data describing capability of the unit to operate above and below rated speed, including minimum and maximum allowable speed versus cumulative time duration of off-normal speed operation

30 After Effective Date No

0656 16031 Detailed information on the capability of the generator to respond to a system upset situation, where a large portion of the system load is applied to the unit and load shedding is required

30 After Effective Date No

0657 16031 Reactive power capability versus real power capability curve at minimum and maximum hydrogen pressure(s)

30 After Effective Date No

0658 16031 Generator "Vee" curves 30 After Effective Date No

0659 16031 Zero and rated power factor current saturation curves

30 After Effective Date No

0660 16031 No load saturation curves 30 After Effective Date No

0661 16031 Generator allowable negative sequence versus time curve

30 After Effective Date No

0662 16031 Generator current decrement curves for 3-phase, line-to-line, and line-to-neutral short-circuit conditions at the generator terminals

30 After Effective Date No

0663 16031 Generator current decrement curves for 3-phase, line-to-line, and line-to-neutral short-circuit conditions at terminals of transformers connected to generator terminals. Electrical system parameters will be furnished by the Purchaser.

30 After Effective Date No

0664 16031 Generator current transformer secondary excitation characteristic curve

30 After Effective Date No

0665 16031 Generator current transformer ratio correction factor curve

30 After Effective Date No

0666 16031 Generator current transformer thermal rating

30 After Effective Date No

0667 16031 Generator current transformer mechanical rating

30 After Effective Date No

0668 16031 Generator current transformer IEC or ANSI metering and relaying accuracy class

30 After Effective Date No

Page 18: RFP 40313 Addendum #1 - Grand River Dam Authority 40313 Addendum #1 ... Quotation Fill-In Information for Steam Turbine Generator ... 00300A.5.1 Attendance at the Purchaser's DCS Factory

RFP 40313

Source: 00300, 2009, v1.2

Section ASteam Turbine GeneratorQuotation Fill-In Information Page 17 of 34

0669 16031 Generator current transformer secondary resistance at 77.0° F (25° C)

30 After Effective Date No

0670 16031 Generator current transformer phase angle correction factor curves

30 After Effective Date No

0671 16031 Generator current transformer correction factor curves

30 After Effective Date No

0672 16031 All generator, exciter, and regulator data required to complete a mathematical model study of system stability

30 After Effective Date No

0542 16031 A block diagram with significant transfer functions representing the generator, exciter, and regulator satisfactory for computer studies

30 After Effective Date No

0543 16031 Hydrogen seal oil diagrams 90 After Effective Date No

0544 16031 Stator cooling water diagrams 90 After Effective Date No

0673 16031 Complete listing of all accessory equipment with instrument ranges and recommended contact set points

90 After Effective Date No

0674 16031 List of all control devices and/or process set points, ranges, and flow quantities

90 After Effective Date No

0675 16031 Listing of accessory equipment to be shipped loose to jobsite

120 After Effective Date No

0545 16031 Air-to-water cooling diagrams or hydrogen-to-water cooling diagrams

90 After Effective Date No

0546 16031 Drawings of all separately mounted equipment indicating information required for setting, piping, and wiring the items

60 After Effective Date No

0547 16031 Drawings indicating location of all generator junction boxes and electrical accessories requiring embedded conduit in the turbine generator pedestal, including recommended quantities and sizes of conduits into each junction box or piece of equipment

90 After Effective Date No

0548 16031 Drawings indicating the size and location of all generator ground pads

90 After Effective Date No

Page 19: RFP 40313 Addendum #1 - Grand River Dam Authority 40313 Addendum #1 ... Quotation Fill-In Information for Steam Turbine Generator ... 00300A.5.1 Attendance at the Purchaser's DCS Factory

RFP 40313

Source: 00300, 2009, v1.2

Section ASteam Turbine GeneratorQuotation Fill-In Information Page 18 of 34

0549 16031 Drawings indicating electrical connection details to the generator terminals, generator neutral enclosure, and generator current transformers

90 After Effective Date No

0550 16031 Detailed schematic drawings of all electrical control wiring

90 After Effective Date No

0551 16031 All certified drawings required to indicate miscellaneous piping and wiring connections and any other piping and wiring connections not indicated on previous drawings. This shall include piping diagrams as required to indicate manufacturer's requirements for the Purchaser's piping systems.

90 After Effective Date No

0552 16031 Arrangement drawings of all piping and accessories furnished, as required for the Engineer's check of the layout of these items

90 After Effective Date No

0553 16031 Drawings as required to indicate the details of construction and internal wiring of all equipment and equipment components furnished. Detail drawings of standard gauges, instruments, valves, and similar miscellaneous items.

180 After Effective Date No

0676 16031 Generator terminal enclosure outline and loading data

90 After Effective Date No

0554 16031 Provide a block diagram and parameter values for the significant transfer functions (representing the generator, excitation and governor) satisfactory for transient and dynamic computer studies

30 After Effective Date No

16051 Electrical Design and Equipment

.

0677 16051 Certified design data and performance curves

70 Before Shipment Yes

0555 16051 Arrangement and fabrication/ erection drawings

90 After Effective Date Yes

Page 20: RFP 40313 Addendum #1 - Grand River Dam Authority 40313 Addendum #1 ... Quotation Fill-In Information for Steam Turbine Generator ... 00300A.5.1 Attendance at the Purchaser's DCS Factory

RFP 40313

Source: 00300, 2009, v1.2

Section ASteam Turbine GeneratorQuotation Fill-In Information Page 19 of 34

0556 16051 Detailed set of drawings to include arrangement drawings, one-line and three-line diagrams, metering and relaying diagrams, schematics, instrument door details, nameplate schedule, and bill of materials

60 After Effective Date Yes

0557 16051 Final set of above drawings in addition to interconnection wiring diagrams

21 After Purchaser comments on initial drawings

Yes

0558 16051 Final submittal of as-built drawings

30 After Shipment Yes

0559 16051 Relay instruction and service manual including relay curve information

90 After Effective Date Yes

0678 16051 Current transformer ratio correction factor and excitation curves

90 After Effective Date Yes

0679 16051 Time overcurrent curves for each overload, molded case circuit breaker, and solid-state protective device used

30 After Effective Date Yes

0560 16051 I/O database and I/O wiring diagrams

Upon Shipment Yes

16142 Generator Neutral Grounding .

0680 16142 Bill of Material, Including Quantity, Description, and Part Number

Upon Effective Date Yes

0681 16142 Certified design calculations 30 After Effective Date Yes

0561 16142 Preliminary outline drawings 15 After Effective Date Yes

0562 16142 Final drawings 60 After Effective Date Yes

0563 16142 Schematic and wiring diagrams 60 After Effective Date Yes

16201 Protective Relaying Panels .

0564 16201 Outline drawings showing dimensions, weight, and mounting requirements

15 After Effective Date Yes

0565 16201 Schematic diagrams 30 After Effective Date Yes

0566 16201 Connection and wiring diagrams 30 After Effective Date Yes

0567 16201 Erection drawing 30 After Shipment Yes

0568 16201 Relay installation and wiring information

30 After Effective Date Yes

0569 16201 Nameplate drawings 45 After Effective Date Yes

E645 Electric Actuators .

0570 E645 Actuator outline diagrams 30 After Effective Date No

0571 E645 Wiring diagrams 30 After Effective Date No

K100 Instrumentation .

0572 K100 Instrument Location Plan Drawings

90 After Effective Date Yes

Page 21: RFP 40313 Addendum #1 - Grand River Dam Authority 40313 Addendum #1 ... Quotation Fill-In Information for Steam Turbine Generator ... 00300A.5.1 Attendance at the Purchaser's DCS Factory

RFP 40313

Source: 00300, 2009, v1.2

Section ASteam Turbine GeneratorQuotation Fill-In Information Page 20 of 34

0573 K100 Instrument factory calibration sheets

Upon Shipment of Instruments Yes

0574 K100 Flow element calculation data sheets showing beta ratio, dP, flow

120 After Effective Date Yes

0575 K100 ISA-format datasheets for all Instruments

120 After Effective Date Yes

0682 K100 PTC 19.3 calculations for steam line TW's vib failure analysis confirming thermowells will not fail in service or during steam blow conditions.

120 After Effective Date Yes

M200 Piping .

0683 M200 Calculations to verify suitability of integrally reinforced fittings for dissimilar branch/header materials.

Q002 General Quality System Requirements

.

0401 Q002 Quality Manual, controlled copy 30 After Effective Date

0402 Q002 Certification Letter or Certificate of Authorization (copy), if certified by a registered agency, e.g., ASME Certificate of Authorization, ISO Certificate

30 After Effective Date

0403 Q002 Subsupplier listing 5 Before Issue of Subsupplier Purchase Order

0404 Q002 Inspection and test plan 30 After Effective Date

0405 Q002 Notification of inspection/test (for B&V hold/witness points)

14 Before Test/Inspection

Q100 General Welding Requirements

.

0406 Q100 Nonconformance reports 5 After Discovery of Nonconf.

0407 Q100 ASME/NBIC Data Reports 60 After Fabrication Completion

0407 Q100 Radiographs 14 After Fabrication Completion

Q110 Welding of 9Cr-1Mo-V (Grade 91) Materials

.

0408 Q110 ASME B31.1 shop fabricated piping spools P91 documentation records

21 Before Shipment

Q301 Manufacturer's Standard Coating

.

0683 Q301 Shop drawings that identify shop-applied coating systems

30 Before Start of Fabrication No

0684 Q301 Manufacturer's product data sheets

30 After Release to Proceed No

Q400 General Equipment Requirements

.

Page 22: RFP 40313 Addendum #1 - Grand River Dam Authority 40313 Addendum #1 ... Quotation Fill-In Information for Steam Turbine Generator ... 00300A.5.1 Attendance at the Purchaser's DCS Factory

RFP 40313

Source: 00300, 2009, v1.2

Section ASteam Turbine GeneratorQuotation Fill-In Information Page 21 of 34

0301 Q400 Shipment Plan providing details of field assembly work required as described in the Supplier's proposal.

30 After Effective Date No

Q502 Electrical Data

0576 Q502 Completed motor information sheets

60 After Effective Date Yes

0577 Q502 Completed electric actuator information sheet

60 After Effective Date Yes

Page 23: RFP 40313 Addendum #1 - Grand River Dam Authority 40313 Addendum #1 ... Quotation Fill-In Information for Steam Turbine Generator ... 00300A.5.1 Attendance at the Purchaser's DCS Factory

GRDA Unit 3 Combined Cycle Project178592.67.9120

Combustion Turbine Generator/Steam Turbine Generator

Bid Issue25Oct2013

Source: 00300, 2009, v1.2

Section ASteam Turbine GeneratorQuotation Fill-In Information Page 22 of 34

Bidder Response Column

Reference Document Submittal Item Yes/No

15561 Steam Turbine .15561 Heat balance diagrams for each load condition.15561 Exhaust pressure correction curves for heat rate and output.15561 Startup curves for hot, warm, and cold startups indicating flow, temperature,

time, and other parameters for normal startups and loading rate curve.

15561 Lube oil pump characteristic curves.15561 Turbine overall length, width, height, and shaft center line to floor line

dimension.15561 Valve restraint forces imposed on turbine foundation and any other

information that should be incorporated in the turbine foundation design.15561 Bearing spans.15561 Turbine control panels and control cabinets overall length, width, and height.

15561 EHC insert panels and/or CRT overall length, width, and height.15561 Table of weights and dimensions indicating assembled weights and

dimensions of major components, weights to be handled during erection, and weights to be handled during overhaul.

15561 Complete list of necessary special tools. The listing shall provide a complete description and quantity of each item including a discussion or designation of particular items required for erection and/or maintenance.

15561 Complete list of recommended spare parts.15561 Description of required sectional shipments if equipment cannot be

completely factory assembled.15561 Information describing coating systems for equipment.15561 Complete information on the EHC system including a list of major

components, description of the principles of operation, and available options.

15561 Complete information on the TSI system including a list of major components, description of the principles of operation, and available options.

15561 Description of instrumentation furnished.15561 Power consumption of EHC and supervisory system in kVA, normal and

peak, inverter power.15561 Complete description of cable requirements, including the cable

constructions, for all equipment furnished and applicable flame tests.15561 Complete description of any voltage level separation requirements for

raceway or special cable shielding requirements for all equipment furnished.

15561 Complete description of any separate cooling air requirements for logic and control cabinets.

15561 Description and indication of the number of grounding pads or devices for each casing and shaft.

15561 Description of any special equipment grounding requirements that would not allow the equipment to be grounded (connected) to the station ground grid.

Document submitted with Quotation Package

00300A.10 Technical Documents Required with Quotation (completed tables are required for the Base Scope and Elective Option [if proposed])

Page 24: RFP 40313 Addendum #1 - Grand River Dam Authority 40313 Addendum #1 ... Quotation Fill-In Information for Steam Turbine Generator ... 00300A.5.1 Attendance at the Purchaser's DCS Factory

GRDA Unit 3 Combined Cycle Project178592.67.9120

Combustion Turbine Generator/Steam Turbine Generator

Bid Issue25Oct2013

Source: 00300, 2009, v1.2

Section ASteam Turbine GeneratorQuotation Fill-In Information Page 23 of 34

Reference Document Submittal Item Yes/No

15561 Complete description of provisions made in pressure parts and other equipment to permit the proposed turbine generator unit to withstand numerous cold, warm, and hot starts per year over the design life of the unit without fatigue failure.

15561 Complete description of provisions in the equipment design to ensure meeting the stated loading time from minimum load to maximum load.

15561 Complete description of manufacturer's lagging design.15561 Complete description of the lube oil piping arrangement.15561 Complete data on steam purity requirements.15561 Complete list of other plants where the manufacturer has duplicate, or near

duplicate, turbines under construction or in operation.15561 Listing of suppliers and their manufacturing locations.15561 Bidder's preliminary engineering schedule.15561 Bidder's preliminary procurement/production/shipping schedule.15561 Description of data link provided to Purchaser's DCS.15561 Detailed description of automation equipment for automatic run-up of turbine.

15561 Description of turbine rotor stress monitoring system.15561 Description of turning gear.15561 Description of field assembly work required and estimated manpower

requirements for erection of equipment.15561 Description of shaft couplings.15561 Description of startup of the unit.15565 Lube Oil Conditioner .15565 Dimensional drawings of proposed components.16031 Cylindrical Rotor Generators .16031 Reactive capability curve to indicate generator capability at various power

factors.16031 Generator saturation curve.16031 Generator "Vee" curves.16031 Drawings of recommended method of stator erection.16031 Generator drawing with overall length, width, and height.16031 Generator drawing with exciter or collector's overall length, width, and height.

16031 Generator drawing with excitation cubicle's overall length, width, and height.

16031 Generator drawing with rotor removal clearance (straight and askew).16031 Generator drawing with control cabinet's overall length, width, and height.

16031 Generator drawing with supervisory cabinet's overall length, width, and height.

16031 Complete list of required maintenance tools. The listing shall include a complete description and quantity of each item.

16031 Equipment storage requirements, including inside or outside requirements, requirements for controlled temperature or humidity, etc.

16031 Complete list of necessary special tools. The listing shall provide a complete description and quantity of each item, including a discussion or designation of particular items required for erection and/or maintenance.

16031 Complete list of recommended spare parts.16031 Description and listing of major generator assemblies for shipment.16031 Information describing coating systems for equipment.

Page 25: RFP 40313 Addendum #1 - Grand River Dam Authority 40313 Addendum #1 ... Quotation Fill-In Information for Steam Turbine Generator ... 00300A.5.1 Attendance at the Purchaser's DCS Factory

GRDA Unit 3 Combined Cycle Project178592.67.9120

Combustion Turbine Generator/Steam Turbine Generator

Bid Issue25Oct2013

Source: 00300, 2009, v1.2

Section ASteam Turbine GeneratorQuotation Fill-In Information Page 24 of 34

Reference Document Submittal Item Yes/No

16031 One uncontrolled copy of bidder's Quality Assurance Program.16031 Complete information on the generator supervisory instrumentation system,

including a bill of material.16031 Detailed listing of alarm contacts available and recommended alarms for

connection to DCS, including unit prices for additions or deductions.16031 Detailed listing of instrumentation furnished.16031 Complete description of cable requirements, including the cable

constructions, for all equipment furnished.16031 Complete description of any voltage level separation requirements for

raceway or special cable shielding requirements for all equipment furnished.

16031 Complete description of the lube oil piping arrangement.16031 Complete list of other plants where the manufacturer has duplicate, or near

duplicate, generators under construction or in operation.16031 Listing of Work subcontracted to other Suppliers.16031 Listing of Subsuppliers and Suppliers used.16031 Bidder's preliminary engineering schedule.16031 Bidder's procurement/production/shipping schedule.16031 Complete description of excitation system.16031 Complete description of generator core monitor system (if specified).16031 Generator maximum allowable temperature of cold coolant generator

temperature rise of gas and liquid.16031 Generator maximum allowable temperature for armature winding, field

winding, core, and mechanical parts in contact with or adjacent to armature winding insulation; and collector rings, brushes, and brush holders.

16031 Detailed description of the brushless exciter (if specified).16031 Maximum allowable temperature of cooling air and temperature rise of

cooling air.

Page 26: RFP 40313 Addendum #1 - Grand River Dam Authority 40313 Addendum #1 ... Quotation Fill-In Information for Steam Turbine Generator ... 00300A.5.1 Attendance at the Purchaser's DCS Factory

GRDA Unit 3 Combined Cycle Project178592.67.9120

Combustion Turbine Generator/Steam Turbine Generator

Bid Issue25Oct2013

Source: 00300, 2009, v1.2

Section ASteam Turbine GeneratorQuotation Fill-In Information Page 25 of 34

Reference Document Submittal Item Tech Fill-In Data

15561 Steam Turbine .15561 Bidder's name15561 Turbine name15561 Identification number15561 Turbine manufacturer15561 Component Weights15561 Weights, ton (long)

15561Assembled turbine complete without external accessories

15561Assembled weight of turbine oil reservoir including coolers, pumps, and piping

15561 Dry15561 Operating

15561Assembled weight of EHC system fluid reservoir including coolers, pumps, and piping

15561 Dry15561 Operating15561 Heaviest piece to be handled during erection15561 Name15561 Weight, ton (long)15561 Length, ft (m)15561 Heaviest piece to be handled during erection15561 Name15561 Weight, ton (long)15561 Length, ft (m)15561 Performance15561 Guarantee Load Condition: 15561 Guaranteed/Predicted15561 Throttle Flow, lb/h (kg/h)15561 Net Turbine Output, kW15561 Net Turbine Heat Rate, Btu/kWh15561 Steam Turbine Operational Data

15561Approximate minimum load at which unit can operate satisfactorily for continuous period, percent

15561 Expected no-load throttle flow, lb/h (kg/h)

15561Maximum exhaust temperature at no-load throttle flow, °F (°C)

15561Minimum time required for pickup from minimum load to maximum load, minutes

15561Allowable rate of load change, 25 percent load to rated load (submit as plotted data, if necessary)

15561Supplementary steam requirements for sealing turbine at low load operation during startup and shutdown

15561 Flow, lb/h (kg/h)15561 Temperature, °F (°C)15561 Pressure, psi (kPa)15561 Steam Turbine Physical Data15561 Length of last stage blading, in. (mm)

00300A.11 Technical Fill-In Data Required with Quotation (completed tables are required for the Base Scope and Elective Option [if proposed])

Page 27: RFP 40313 Addendum #1 - Grand River Dam Authority 40313 Addendum #1 ... Quotation Fill-In Information for Steam Turbine Generator ... 00300A.5.1 Attendance at the Purchaser's DCS Factory

GRDA Unit 3 Combined Cycle Project178592.67.9120

Combustion Turbine Generator/Steam Turbine Generator

Bid Issue25Oct2013

Source: 00300, 2009, v1.2

Section ASteam Turbine GeneratorQuotation Fill-In Information Page 26 of 34

Reference Document Submittal Item Tech Fill-In Data

15561 Diameter of last stage wheel, in. (mm)15561 Velocity at tip of longest row of blades, ft/s (m/s)

15561Exhaust annulus area, per each last stage wheel, ft2 (m2)

15561Maximum allowable turbine back pressure for stable operation, in. (mm) Hg

15561Steam loading on last row of blades for maximum exhaust flow, lb/h/ft2 (kg/h/m2)

15561 Total turbine generator moment of inertia, WK2 (MR2)15561 Pitch diameter of governor stage, in. (mm)15561 Length of governor stage blades, in. (mm)15561 Governor stage efficiency at VWO-NP, percent

15561 First-stage bowl pressure at VWO-NP, psi(a) (kPa[a])

15561 First-stage exit pressure at VWO-NP, psi(a) (kPa[a])15561 Number of governor controlled inlet valves15561 Throttle flow ratio at each admission, 1st, 2nd, etc.15561 Governor stage efficiency at first admission, percent

15561First-stage bowl pressure at first admission, psi(a) (kPa[a])

15561First-stage exit pressure at first admission, psi(a) (kPa[a])

15561 Bearing data15561 Thrust bearing15561 Type15561 Design capacity, lb (kg)15561 Maximum force at worst operating condition, lbf15561 Main bearings15561 Number15561 Type15561 Design load, ton (long)

15561 Maximum allowable bearing temperature, °F (°C)

15561Maximum allowable vibration for each bearing for continued operation, peak-to-peak, mils

15561 Steam Turbine Blade Data15561 Number and type of stages (Quantity/Type)15561 HP turbine /15561 IP turbine /15561 LP turbine /15561 Allowable frequency variation15561 Limited time, ±Hz/total time15561 Continually, ±Hz15561 Method of fastening shrouding and lashing15561 Stage blading fitted with Stellite shields15561 Number15561 Location15561 Shaft Coupling Data15561 Number15561 Type

Page 28: RFP 40313 Addendum #1 - Grand River Dam Authority 40313 Addendum #1 ... Quotation Fill-In Information for Steam Turbine Generator ... 00300A.5.1 Attendance at the Purchaser's DCS Factory

GRDA Unit 3 Combined Cycle Project178592.67.9120

Combustion Turbine Generator/Steam Turbine Generator

Bid Issue25Oct2013

Source: 00300, 2009, v1.2

Section ASteam Turbine GeneratorQuotation Fill-In Information Page 27 of 34

Reference Document Submittal Item Tech Fill-In Data

15561 Location15561 Lubricating Oil System15561 Quantity of oil to completely fill system, gal (L)

15561Quantity of oil flow back on shutting down machine, gal (L)

15561 Capacity of reservoir, gal (L)15561 Quantity of cooling water required to each cooler at

design inlet temperature, gpm (L/min)15561 Maximum cooling water temperature for unrestricted

operation with design water flow to both coolers (simultaneous operation), °F (°C)

15561 Supply piping material15561 Drain piping material15561 Guard piping material15561 Oil Coolers15561 Heat duty at maximum load, MBtu/h15561 Cooling surface, each cooler, ft2 (m2)15561 Waterside pressure loss, psi at gpm (kPa at L/min)15561 Design pressure, waterside, psig (kPag)15561 Design pressure, oil side, psig (kPag)15561 Cleanliness factor15561 Tube size, in. (mm)15561 Tube wall thickness, AWG15561 Tube material15561 Tubesheet material15561 Gland Condenser15561 Manufacturer15561 Tube size, in. (mm)15561 Tube wall thickness, AWG15561 Tube material15561 Tubesheet material15561 Cooling surface, ft2 (m2)15561 Maximum water flow, gpm (L/min)15561 Friction loss at maximum water flow, psi (kPa)15561 Tube side design conditions15561 Pressure, psig (kPag)15561 Temperature, °F (°C)

15561Minimum condensate flow at low load conditions, gpm (L/min)

15561 Heat duty at maximum load, MBtu/h15561 EHC Data15561 Reservoir capacity, gal (L)15561 EHC coolers15561 Number/type of coolers15561 Tube size, in. (mm)15561 Tube wall thickness, AWG15561 Tube material15561 Tubesheet material15561 Are double tubesheets provided? Yes or No15561 Heat duty at maximum load, MBtu/h15561 Cooling water required by each cooler, at design inlet

temperature, maximum gpm (L/min)

Page 29: RFP 40313 Addendum #1 - Grand River Dam Authority 40313 Addendum #1 ... Quotation Fill-In Information for Steam Turbine Generator ... 00300A.5.1 Attendance at the Purchaser's DCS Factory

GRDA Unit 3 Combined Cycle Project178592.67.9120

Combustion Turbine Generator/Steam Turbine Generator

Bid Issue25Oct2013

Source: 00300, 2009, v1.2

Section ASteam Turbine GeneratorQuotation Fill-In Information Page 28 of 34

Reference Document Submittal Item Tech Fill-In Data

15561Pressure drop through the coolers, psi at gpm (kPa at L/min)

15561 Number of pumps15561 Capacity of pumps, gpm (L/min)15561 Motors Data15561 Emergency lube oil pump15561 kW15561 Volts15561 Full Load Current, Amps15561 Maximum Current During Starting, Amps15561 Enclosure15561 Quantity15561 Emergency hydrogen seal oil pump15561 kW15561 Volts15561 Full Load Current, Amps15561 Maximum Current During Starting, Amps15561 Enclosure15561 Quantity15561 Miscellaneous Equipment (Manufacturer/Type)15561 Annunciators /15561 Valve motor operators /15561 Prefabricated cables /15561 Limit switches /15561 Pressure switches /15561 Pressure transmitters /15561 Temperature switches /15561 Level switches /15561 Solenoid valves /15561 Thermocouples /15561 Temperature detectors /15561 Control relays /15561 Control switches /15561 Push buttons /15561 Selector switches /15561 Indicating lights /15561 Dc motor starters /15561 Light fixtures /15561 Convenience outlets /15561 Valves /15561 Turbine Auxiliary Power15561

Guaranteed total electric load during normal operation for auxiliaries furnished with turbine, ac load, kW

15561 Total electric load during peak operation for auxiliaries furnished with turbine, ac load, kW

15561Emergency dc electric load for auxiliaries furnished with turbine, kW

15561 Estimated Construction Power Requirements15561 Peak demand, kW15561 Average demand, kW

Page 30: RFP 40313 Addendum #1 - Grand River Dam Authority 40313 Addendum #1 ... Quotation Fill-In Information for Steam Turbine Generator ... 00300A.5.1 Attendance at the Purchaser's DCS Factory

GRDA Unit 3 Combined Cycle Project178592.67.9120

Combustion Turbine Generator/Steam Turbine Generator

Bid Issue25Oct2013

Source: 00300, 2009, v1.2

Section ASteam Turbine GeneratorQuotation Fill-In Information Page 29 of 34

Reference Document Submittal Item Tech Fill-In Data

15561Supplier Furnished Materials and Associated Installation Quantities

15561 Hydraulic System Tubing, lf15561 Large Bore Pipe (>=2 ½” in Diameter), lf15561 Large Bore Pipe Spools, each15561 Large Bore Field Welds, each

15561Large Bore Field Welds (average dia), inches (Note 1)

15561 Small Bore Pipe, lf15561 Small Bore Pipe Spools, each15561 Small Bore Field Welds, each

15561Large Bore Pipe Requiring Purchaser-Provided Heat Trace, lf

15561Small Bore Pipe Requiring Purchaser-Provided Heat Trace, lf

15561 Turbine Generator Enclosure, pieces15561 Turbine Generator Enclosure, sf15561 Off Base Skids & Misc. Equipment, each15561 Power Cable, lf15561 Control Cable, lf15561 Thermocouple Cable, lf15561 Power Conductor Terminations, each (Note 2)15561 Control Conductor Terminations, each (Note 2)

15561Thermocouple Conductor Terminations, each (Note 2)

15561 Conduit, lf15561 Instruments, each15561 Pipe Insulation, lf15561 Insulation Blankets, sf15561 Technical Assistance Time, hours15561 Notes

15561

1. Average Diameter for large bore pipe welds is the sum of the diameters for each individual large bore weld divided by the total number of large bore welds.

15561

2. Conductor is the number of wires contained in a cable that must be terminated, count both ends.

15565 Lube Oil Conditioner .15565 Bidder's name15565 Equipment name15565 Equipment identification number15565 Manufacturer15565 Model No.15565 Centrifuge capacity, actual15565 At 100 SSU, gpm (L/min)15565 At 1,000 SSU, gpm (L/min)

15565Maximum particle size that will pass through the system, micron(s)

15565Maximum total water contaminant level maintained with influent water level of 5,000 gpm (___ L/min), ppm

Page 31: RFP 40313 Addendum #1 - Grand River Dam Authority 40313 Addendum #1 ... Quotation Fill-In Information for Steam Turbine Generator ... 00300A.5.1 Attendance at the Purchaser's DCS Factory

GRDA Unit 3 Combined Cycle Project178592.67.9120

Combustion Turbine Generator/Steam Turbine Generator

Bid Issue25Oct2013

Source: 00300, 2009, v1.2

Section ASteam Turbine GeneratorQuotation Fill-In Information Page 30 of 34

Reference Document Submittal Item Tech Fill-In Data

15565 Skid assembly15565 Connections15565 Inlet / Outlet15565 Size, in. (mm)

15565 TypeFlanged or Threaded or Welded / Flanged or Threaded or Welded

15565 Overall dimensions (W x L x H), in. (mm)15565 Weight, empty, lb (kg)15565 Weight, full, lb (kg)15565 Power required15565 Power, kW15565 Voltage, volts15565 Phase 3-phase or Single-phase15565 Current at rated voltage, amperes16031 Cylindrical Rotor Generators .16031 Bidder's Name16031 Auxiliary Power16031

Guaranteed total electric load during normal operation for auxiliaries furnished with generator, ac load (kW)

16031 Total electric load during peak operation, ac load (kW)16031 Emergency dc electric load (kW)16031 Technical Data16031 Weight of generator stator, lb (kg)16031 Excitation system weight, lb (kg)16031 Shipping weight of generator, lb (kg)

16031Weight of generator stator winding water cooling unit (if required), lb (kg)

16031 Weight of generator rotor, lb (kg)16031 Continuous rating at maximum hydrogen pressure (if

applicable), rated power factor, and specified cooling water temperature, based on maximum shaft power developed by the prime mover, MVA

16031 Nominal rpm16031 Nominal frequency, hertz

16031Voltages at continuous operation and nominal frequency

16031 Nominal voltage, kV16031 Maximum voltage, kV16031 Minimum voltage, kV16031 Generator rated power factor (leading/lagging)

16031

Generator direct axis subtransient reactance in per unit value based on generator continuous kVA rating and nominal frequency (saturated at rated voltage) X"dv

16031 Estimated16031 Percent tolerance16031 Plus16031 Minus16031 Short-time capability expressed in terms of I22t

Page 32: RFP 40313 Addendum #1 - Grand River Dam Authority 40313 Addendum #1 ... Quotation Fill-In Information for Steam Turbine Generator ... 00300A.5.1 Attendance at the Purchaser's DCS Factory

GRDA Unit 3 Combined Cycle Project178592.67.9120

Combustion Turbine Generator/Steam Turbine Generator

Bid Issue25Oct2013

Source: 00300, 2009, v1.2

Section ASteam Turbine GeneratorQuotation Fill-In Information Page 31 of 34

Reference Document Submittal Item Tech Fill-In Data

16031Short-circuit ratio at rated voltage and rated stator current

16031Continuous current unbalance expressed in terms of I2, percent

16031Generator winding capacitance to ground, all phases tied together, mfd

16031 Current transformers16031 Application16031 Relaying16031 ANSI C57.13 Accuracy Class16031 IEC 185 Accuracy Class16031 Metering16031 ANSI C57.13 Accuracy Class16031 IEC 185 Accuracy Class16031 Location16031 Line side16031 Quantity16031 Secondary current rating16031 Application Relaying16031 Laboratory calibration required16031 Yes or No16031 Line side16031 Quantity16031 Secondary current rating16031 Application Metering16031 Laboratory calibration required16031 Yes or No16031 Neutral side16031 Quantity16031 Secondary current rating16031 Application Relaying16031 Laboratory calibration required16031 Yes or No16031 Neutral side16031 Quantity16031 Secondary current rating16031 Application Metering16031 Laboratory calibration required16031 Yes or No

16031 Generator field voltage at maximum kVA output, volts

16031Generator field current at maximum excitation, amperes

16031Maximum temperature rise above 104° F (40° C) gas temperature

16031 Generator armature winding temperature rise, °F (°C)16031 Generator field winding temperature rise, °F (°C)16031 Generator core and mechanical parts adjacent to the

insulation temperature rise, °F (°C)

16031Maximum temperature rise above ambient air temperature of 104° F (40° C)

Page 33: RFP 40313 Addendum #1 - Grand River Dam Authority 40313 Addendum #1 ... Quotation Fill-In Information for Steam Turbine Generator ... 00300A.5.1 Attendance at the Purchaser's DCS Factory

GRDA Unit 3 Combined Cycle Project178592.67.9120

Combustion Turbine Generator/Steam Turbine Generator

Bid Issue25Oct2013

Source: 00300, 2009, v1.2

Section ASteam Turbine GeneratorQuotation Fill-In Information Page 32 of 34

Reference Document Submittal Item Tech Fill-In Data

16031 Generator armature winding temperature rise, °F (°C)16031 Generator field winding temperature rise, °F (°C)16031 Collector rings temperature rise, °F (°C)16031 Telephone influence factor (IEEE Std. 115)16031 Calculated16031 Balanced16031 Residual16031 Guaranteed16031 Balanced16031 Residual16031 Wave form deviation factor (IEEE Std. 115)16031 Calculated16031 Balanced16031 Residual16031 Guaranteed16031 Balanced16031 Residual16031 Temperature detectors16031 Armature16031 Number16031 Type16031 Rotating exciter16031 Number16031 Type16031 Generator cold gas16031 Number16031 Type16031 Generator hot gas16031 Number16031 Type16031 Generator Loss Data

16031Generator calculated losses at continuous nameplate MVA, voltage, and frequency

16031 Total iron loss, kW16031 Generator stator I2R loss, kW16031 Generator rotor I2R loss, kW16031 Generator stray load loss, kW16031 Generator windage loss, kW

16031Total generator loss excluding bearings and excitation system, kW

16031 Static exciter losses, kW16031 Excitation transformer losses, kW16031 Generator efficiency, percent

16031Generator friction loss in bearings, seals, and collector rings, kW

16031 Heat Exchanger Data

16031Complete the following for each type of cooler required by the design

16031 Heat exchanger16031 Cooler description16031 Number of coolers

Page 34: RFP 40313 Addendum #1 - Grand River Dam Authority 40313 Addendum #1 ... Quotation Fill-In Information for Steam Turbine Generator ... 00300A.5.1 Attendance at the Purchaser's DCS Factory

GRDA Unit 3 Combined Cycle Project178592.67.9120

Combustion Turbine Generator/Steam Turbine Generator

Bid Issue25Oct2013

Source: 00300, 2009, v1.2

Section ASteam Turbine GeneratorQuotation Fill-In Information Page 33 of 34

Reference Document Submittal Item Tech Fill-In Data

16031 Number of sections per cooler

16031Generator kVA capability with one cooler section out of service, percent

16031 Cooling water required by each cooler16031 Inlet temperature, °F (°C)16031 Maximum flow, gpm (L/min)16031 Cleanliness factor16031 Heat duty at maximum load, each cooler

16031Tube side (waterside) pressure loss at maximum flow, gpm (L/min)

16031 Tube side (waterside) design conditions16031 Pressure, psi (kPa)16031 Temperature, °F (°C)16031 Tube size, in. (mm)16031 Tube wall thickness, in. (mm)16031 Tube material16031 Tubesheet material16031 Hydrogen Cooling System Data16031 Complete for hydrogen cooled generators16031 Hydrogen required to purge carbon dioxide, ft3 (m3)16031 Hydrogen required to fill system to maximum hydrogen

pressure after purging, ft3 (m3)

16031Guaranteed hydrogen consumption in 24 hours, ft3 (m3)

16031 Hydrogen seal oil flow, gpm (L/min)16031 Hydrogen seal oil pressure, psi (kPa)16031 Stator Winding Cooling Water System16031 Number of circulating pumps16031 Full- or half-capacity pumps16031 Stator cooling water demineralizer description16031 Excitation System16031 Excitation system description16031 Excitation system control system16031 Make and type of excitation system16031 Make and type of voltage regulator16031 Communication method to operator interface16031 Description of operator interface equipment16031 Rated output of excitation system, kW16031 Rated voltage, volts dc16031 Rated current, amperes dc16031 Excitation system response ratio, per unit16031 Ceiling voltage, percent minimum16031

Does the excitation system meet the definition of high initial response as defined in IEEE Standard 421.1?

1603116031 Yes or No16031 Protective Relaying16031 Generator protection relay type/model16031 Out-of-step (78) relay type/model16031 Dc Motors16031 Motors

Page 35: RFP 40313 Addendum #1 - Grand River Dam Authority 40313 Addendum #1 ... Quotation Fill-In Information for Steam Turbine Generator ... 00300A.5.1 Attendance at the Purchaser's DCS Factory

GRDA Unit 3 Combined Cycle Project178592.67.9120

Combustion Turbine Generator/Steam Turbine Generator

Bid Issue25Oct2013

Source: 00300, 2009, v1.2

Section ASteam Turbine GeneratorQuotation Fill-In Information Page 34 of 34

Reference Document Submittal Item Tech Fill-In Data

16031 Airside seal oil backup pump (dc)16031 kW16031 Volts16031 Enclosure16031 Quantity16031 Other dc motors16031 (Name of motor)16031 kW16031 Volts16031 Enclosure16031 Quantity

Page 36: RFP 40313 Addendum #1 - Grand River Dam Authority 40313 Addendum #1 ... Quotation Fill-In Information for Steam Turbine Generator ... 00300A.5.1 Attendance at the Purchaser's DCS Factory

GRDA Unit 3 Combined Cycle Project178592.67.9120

Combustion Turbine Generator/Steam Turbine Generator

Bid Issue25Oct2013

Source: 00300, 2009, v1.2

Section BCombustion Turbine Generator

Quotation Fill-In Information Page 1 of 44

Received and Incorporated

00300B.1 Not Used

00300B.2 General Quotation Parameters

Bidder's Quotation Date

00300B.2.1 Bidder's Contact InformationBidder's Quotation Number

00300B - Quotation Fill-In Information for Combustion Turbine Generator - 416.7 MW Net Plant Output

Corporate InformationCompany Name

Technical Contact NameTitle

Purchase Order AddresseeAddress/Number, StreetAddress/State, Zip Code

Taxpayer ID Number (or EIN)Technical Contact

Phone NumberFax Number

Address/Number, StreetAddress/City

Address/State, Zip CodeEmail Address

00300B.2.2 AddendaNumber Date Description

00300B.2.3 Quotation Validity Period, through January 31, 2014 per RFQ - Yes/No - If no, advise number of days

00300B.2.5.4 Alternate Scope Pricing firm through Quotation Validity Period - 00300B.2.6.1 All Exceptions are declared on Form 00300B.2.6.1 - Yes/No00300B.2.6.2 All Clarifications are declared on Form 00300B.2.6.2 - Yes/No

00300B.2.4 Quotation includes/excludes taxes - Included/Excluded00300B.2.5.1 Quotation Pricing firm through Quotation Validity Period - Yes/No00300B.2.5.2 Adjustment Pricing firm through End of Warranty - Yes/No00300B.2.5.3 Option Pricing firm through Quotation Validity Period - Yes/No

Page 37: RFP 40313 Addendum #1 - Grand River Dam Authority 40313 Addendum #1 ... Quotation Fill-In Information for Steam Turbine Generator ... 00300A.5.1 Attendance at the Purchaser's DCS Factory

GRDA Unit 3 Combined Cycle Project178592.67.9120

Combustion Turbine Generator/Steam Turbine Generator

Bid Issue25Oct2013

Source: 00300, 2009, v1.2

Section BCombustion Turbine Generator

Quotation Fill-In Information Page 2 of 44

00300B.2.6.1.2 Technical Exceptions

Count Reference Stated Technical Exception123456789

10

00300B.2.6.1.1 Not Used

Form 00300B.2.6.1 Declared Exceptions to the RFQ Requirements

Page 38: RFP 40313 Addendum #1 - Grand River Dam Authority 40313 Addendum #1 ... Quotation Fill-In Information for Steam Turbine Generator ... 00300A.5.1 Attendance at the Purchaser's DCS Factory

GRDA Unit 3 Combined Cycle Project178592.67.9120

Combustion Turbine Generator/Steam Turbine Generator

Bid Issue25Oct2013

Source: 00300, 2009, v1.2

Section BCombustion Turbine Generator

Quotation Fill-In Information Page 3 of 44

00300B.2.6.2.2 Technical Clarifications

Count Reference Stated Technical Clarification123456789

10

00300B.2.6.2.1 Not Used

Form 00300B.2.6.2 Declared Clarifications to the RFQ Requirements

Page 39: RFP 40313 Addendum #1 - Grand River Dam Authority 40313 Addendum #1 ... Quotation Fill-In Information for Steam Turbine Generator ... 00300A.5.1 Attendance at the Purchaser's DCS Factory

GRDA Unit 3 Combined Cycle Project178592.67.9120

Combustion Turbine Generator/Steam Turbine Generator

Bid Issue25Oct2013

Source: 00300, 2009, v1.2

Section BCombustion Turbine Generator

Quotation Fill-In Information Page 4 of 44

$ -

$ - $ - $ - $ - $ - $ -

$ -

$ - $ - $ - $ - $ - $ -

$ -

00300B.3.2.2 NOT USED

00300B.3.2.5 Shipping/Transportation (from Table 3.2.5)

00300B.3 Quotation Pricing

Total Base Quotation Pricing - DDP/CIP Jobsite Location

00300B.3.1 Product Pricing (FCA-Factory Location)Price Breakdown

00300B.3.2.4.1 Field Service Representative (from Table 3.2.4.1)

Sum of Subtotals (Should Equal Base Quotation Price Above)

Subtotal 00300B.3.2 Supplemental Product Pricing00300B.3.2.6 Instruction Manuals (from Table 3.2.6)

00300B.3.2.3 Special Tools and Lift Fixtures (from Table 3.2.3)

00300B.3.2.4.2 Training Service (from Table 3.2.4.2)

00300B.3.2.1 Startup and Commissioning Spare Parts (from Table 3.2.1)00300B.3.2 Supplemental Product Pricing

Subtotal 00300B.3.1 Product Pricing (FCA-Factory Location)

00300B.3.1.1 Combustion Turbine Generator(Supplier to provide breakdown as required)

Page 40: RFP 40313 Addendum #1 - Grand River Dam Authority 40313 Addendum #1 ... Quotation Fill-In Information for Steam Turbine Generator ... 00300A.5.1 Attendance at the Purchaser's DCS Factory

GRDA Unit 3 Combined Cycle Project178592.67.9120

Combustion Turbine Generator/Steam Turbine Generator

Bid Issue25Oct2013

Source: 00300, 2009, v1.2

Section BCombustion Turbine Generator

Quotation Fill-In Information Page 5 of 44

Extended Price $ - $ - $ - $ -

Extended Price $ - $ - $ - $ -

Extended Price $ -

$ -

$ -

Extended Price $ -

$ -

$ -

00300B.3.2.3 Special Tools and Lift Fixtures

Bidder has included field service time in base quotation per RFP requirements Yes/NoIf Yes, Bidder shall provide an itemized breakout of priced services included in the quote in Table 3.2.4.1

Unit of MeasureQuantity Included

in POItem Description

Yes/No

Subtotal: Table 00300B.3.2.4.1 Field Service Pricing

Bidder has included Training time in base quotation per RFP requirements

Table 3.2.4.1 Technical Field Services, Per Diem Rates and Expenses

Unit of Measure

00300B.3.2.4.2 Training Service Bidder Response Column

CTG Round trips included in the firm fixed lump sum price

All-inclusive FIELD SERVICE shall include all salary and overhead, local lodging, travel between the jobsite and local lodging, meals, and miscellaneous expenses. A week of service shall be defined as six (6), ten (10) hour onsite workdays, Monday - Saturday:

Round trips included in the firm fixed lump sum price Trips $ - 2

Training weeks included in the firm fixed lump sum price Week $ - 5

If Yes, Bidder shall provide an itemized breakout of priced services included in the quote in Table 3.2.4.2

All-inclusive TRAINING shall include all salary and overhead, local lodging, travel between the jobsite and local lodging, meals, and miscellaneous expenses. A week of service shall be defined as five (5), eight (8) hour onsite workdays, Monday - Friday:

Unit of Measure Unit Price

Subtotal: Table 00300B.3.2.3 Special Tools and Lift Fixtures Pricing $ -

$ - $ -

If Yes, Bidder shall provide a priced list of special tools included in the quote in Table 3.2.3.

$ -

Bidder Response Column

If Yes, Bidder has included special tools and lift fixtures in base quotation per RFP

00300B.3.2.2 NOT USED

Yes/NoAre startup spare or commissioining spare parts required?

Manufacturer's Part Identification

Subtotal: Table 00300B.3.2.1 Startup Spare Parts Pricing

$ -

If Yes, Bidder has included Spare Parts in base quotation per RFP requirements Yes/No

00300B.3.2 Supplemental Product Pricing TablesBidder to note that pricing included in these tables is for product scope that will be included in the initial Purchase Order with the successful Bidder. Pricing for Work deferred to a later date, such as adjustment pricing, option pricing and alternative scope pricing is not included in these tables.

Table 3.2.1: Startup and Commissioning Spare Parts

00300B.3.2.1 Startup and Commissioning Spare Parts Bidder Response Column

Unit Price

If Yes, Bidder shall provide a priced list of construction/erection spare parts included in the quote in Table 3.2.1.

Unit of Measure Unit Price

Are special tools and/or lift fixtures required? Yes/No

Quantity Included in PO

Table 3.2.3: Special Tools and Lift Fixtures

Item Description Manufacturer's Part Identification

Yes/No

Unit Price

Trips $ - 60

Week

Table 3.2.4.2 Technical Field Services, Per Diem Rates and Expenses

Quantity Included in PO

Table 3.2.4: Technical ServicesBidder Response Column

Quantity Included in PO

$ - CTG Field service weeks included in the firm fixed lump sum price 180

00300B.3.2.4.1 Field Service Representative

Page 41: RFP 40313 Addendum #1 - Grand River Dam Authority 40313 Addendum #1 ... Quotation Fill-In Information for Steam Turbine Generator ... 00300A.5.1 Attendance at the Purchaser's DCS Factory

GRDA Unit 3 Combined Cycle Project178592.67.9120

Combustion Turbine Generator/Steam Turbine Generator

Bid Issue25Oct2013

Source: 00300, 2009, v1.2

Section BCombustion Turbine Generator

Quotation Fill-In Information Page 6 of 44

00300B.3.2 Supplemental Product Pricing Tables

$ -

Extended Price $ - $ - $ - $ - $ - $ -

Extended Price $ -

$ -

$ -

00300B.3.2.5 Shipping/Transportation

Subtotal: Table 00300B.3.2.5 Transportation Pricing

Bidder has included transportation in base quotation per RFP requirements

Bidder Response Column

$ - 1

Subtotal: Table 00300B.3.2.6 Instruction Manuals Pricing

Final Copy of Instruction Manuals Electronic EA

1

Table 3.2.6: Instruction ManualsUnit of

Measure Unit PriceQuantity Included

in POItem Description MediaProof Copy of Instruction Manuals Electronic

If Yes, Bidder shall provided an itemized breakout Instruction Manual pricing included in the quote in Table 3.2.6.

$ - EA

Yes/NoBidder has included pricing for Instruction Manuals in base quotation per Article Q501

00300B.3.2.6 Instruction Manuals

Combustion Turbine Generator(Supplier to provide breakdown as required)

Point of OriginItem Description

1 LotCarrier Type

Quantity Included in PO

Subtotal: Table 00300B.3.2.4.1 Training Pricing

If Yes, Bidder shall provide an itemized breakout of transportation included in the quote in Table 3.2.5.

All-inclusive ROUND TRIP shall include all expenses traveling to and returning from the lodging local to the jobsite, from the Manufacturer's Field Service home base of operations. It shall include all transportation (air and/or ground), parking, tolls, meals, travel per diem, any salary/overhead while traveling, and other miscellaneous expenses associated with one round trip.

Yes/No

Bidder Response Column

Table 3.2.5: Shipping/Transportation

Page 42: RFP 40313 Addendum #1 - Grand River Dam Authority 40313 Addendum #1 ... Quotation Fill-In Information for Steam Turbine Generator ... 00300A.5.1 Attendance at the Purchaser's DCS Factory

GRDA Unit 3 Combined Cycle Project178592.67.9120

Combustion Turbine Generator/Steam Turbine Generator

Bid Issue25Oct2013

Source: 00300, 2009, v1.2

Section BCombustion Turbine Generator

Quotation Fill-In Information Page 7 of 44

Unit Price(to Add)

Unit Price (to Delete)

Delivery ARO (WKS)

$ - $ - $ - $ - $ - $ - $ - $ -

Unit Price(to Add)

Unit Price (to Delete)

Delivery ARO (WKS)

$ - $ - $ - $ - $ - $ - $ - $ -

Unit Price(to Add)

Unit Price (to Delete)

Delivery ARO (WKS)

$ - $ - $ - $ - $ - $ - $ - $ -

Unit of Measure Unit Price

$/Day $ - $/Day $ - $/Day $ -

$/h $ - $/h $ - $/h $ -

$/rt $ -

Per diem Rate Sunday / Holiday (up to 8 hours)

All-inclusive RATE TO ADJUST above per diem rates for hours worked beyond an eight (8) hour onsite workday:

Adjustment Rate Saturday (beyond 8 hours)Adjustment Rate Sunday / Holiday (beyond 8 hours)

Adjustment Rate Monday through Friday beyond 8 hours)

Table 4.5: Supplemental "Out-of-Base-Scope" Technical Assistance

Saturday (up to 8 hours)Per diem Rate

All-inclusive DAILY PER DIEM RATE shall include all salary and overhead, local lodging, travel between the jobsite and local lodging, meals, and miscellaneous expenses. A day of service shall be defined as one, eight (8) hour onsite workday in which all project construction and management personnel are working normal shifts:

Per diem Rate Monday through Friday (up to 8 hours)

Table 4.3: NOT USED

Table 4.4: Special Tools and Lift Fixtures

Item Number Item Description Unit of Measure

Item Number Item Description Unit of Measure

00300B.4 Unit Adjustment Pricing Tables

Item Number Item Description Unit of Measure

Table 4.1: Equipment Pricing

All-inclusive ROUND TRIP RATE shall include all expenses traveling to and returning from the lodging local to the jobsite, from the Manufacturer's Field Service home base of operations. It shall include all transportation (air and/or ground), parking, tolls, meals, travel per diem, any salary/overhead while traveling, and other miscellaneous expenses associated with one round trip.

Round Trip Rate

Table 4.2: Startup and Commissioning Spare Parts

Page 43: RFP 40313 Addendum #1 - Grand River Dam Authority 40313 Addendum #1 ... Quotation Fill-In Information for Steam Turbine Generator ... 00300A.5.1 Attendance at the Purchaser's DCS Factory

GRDA Unit 3 Combined Cycle Project178592.67.9120

Combustion Turbine Generator/Steam Turbine Generator

Bid Issue25Oct2013

Source: 00300, 2009, v1.2

Section BCombustion Turbine Generator

Quotation Fill-In Information Page 8 of 44

Bidder Response Column

$ -

$ -

$ -

$ -

$ -

Bidder Response Column

$ - $ -

Bidder Response Column

Bidder Response Column

Origin CountryStateCity

If yes, list of other locations included with the quotation Yes/No

cu ft

Total Weight per Shipmentcu ft

Total Weight of Largest Single Component

lbTotal Volume per Shipment

Bidder proposes subcontracting any major portions of the Work Yes/NoIf Yes, Sub-supplier List is included with the quotation Yes/No

00300B.8 Subcontracting

Number of Shipments CountTotal Number of Pieces per Shipment Count

Total Volume of Largest Single Component

Bidder's product included in the quotation has special storage requirements Yes/No

lb

00300B.7.2 ShipmentsManufactured in Bidder's own facility? Yes/NoManufactured in facilities of others? If so list. Yes/No

If Yes, special storage requirements are included with the quotation Yes/No

Price Addition to price for alternative scope proposed

00300B.6.1 Alternative Scope 1Single-Shaft Train (Non-Mandatory Alternative)

Price Deduction from base price for scope removed from base scope

00300B.7 Logistics00300B.7.1 Jobsite Storage Requirements

00300B.5.2 Attendance at the Purchaser's DCS Factory Acceptance Test per Article 01500.1, CTG Scope Matrix Item 99

00300B.5 Option Pricing

00300B.6 Alternative Scope Pricing

00300B.5.1 Pulse Air Compressor Skid per Article 01500.1, CTG Scope Matrix Item 15

00300B.5.3 Recommended CTG Scope Spare Parts List per Article 01500.1.9 (Pricing Valid Up To One Year After The Contract Award Date))

00300B.5.4 LTSA Pricing per Sections 01500.1.6 and 19000 (include Supplier pricing breakdown table separately as required)

00300B.5.5 Clean agent fire protection system (FM-200 or Water Mist), REQUIRED if Supplier offers CO2 system in base offering in exception to RFP clean agent system requirements.

Page 44: RFP 40313 Addendum #1 - Grand River Dam Authority 40313 Addendum #1 ... Quotation Fill-In Information for Steam Turbine Generator ... 00300A.5.1 Attendance at the Purchaser's DCS Factory

GRDA Unit 3 Combined Cycle Project178592.67.9120

Combustion Turbine Generator/Steam Turbine Generator

Bid Issue25Oct2013

Source: 00300, 2009, v1.2

Section BCombustion Turbine Generator

Quotation Fill-In Information Page 9 of 44

LD*

LD

Bidder confirms ability and commitment to meet all the required submittal dates. Yes/NoIf No, Bidder has for each submittal to which the “No” applies stated the best possible submittal date as an exception.

Yes/No

00300B.9.2 Schedule of Submittals and Applicable Liquidated Damages

* "LD" indicates that delivery of the Goods after the "Required Delivery" date is subject to liquidated damages in accordance with applicable articles of the RFP.

** Purchaser will not accept delivery of Goods at the Jobsite prior to the "Early Delivery" date unless previously agreed by Purchaser in writing. Delivery in the period between the "Early Delivery" and "Required Delivery" date is at the discretion of Supplier.

Combustion Turbine Generator

Yes/No00300B.9.1.1 Bidder will make single consolidated shipment.

00300B.9.1.2 Bidder has provided a preliminary milestone schedule. Yes/NoIf No, Bidder has included a proposed staggered shipping schedule. Yes/No

7-Mar-16

00300B.9 Delivery and Schedule

Bidder Response ColumnRequired Delivery

00300B.9.1 Delivery DAP Jobsite (originating in US), DDP Jobsite (originating outside US) Early Delivery**

120 Days Maximum Prior to Required Delivery

(Supplier to provide breakdown as required)

00300B.9.1.3 Bidder has provided a Standard Delivery/Completion schedule. Yes/No

Yes/No

Page 45: RFP 40313 Addendum #1 - Grand River Dam Authority 40313 Addendum #1 ... Quotation Fill-In Information for Steam Turbine Generator ... 00300A.5.1 Attendance at the Purchaser's DCS Factory

RFP 40313

Source: 00300, 2009, v1.2

Section BCombustion Turbine Generator

Quotation Fill-In Information Page 10 of 44

TBD TBD

Calendar Event Due Date301 Engineering/Procurement/

Production/Testing and Inspection/Shipping Schedule and Status Report

30 After Effective Date with Monthly Updates

No

302 Preshipment Inspection Notice 30 Before Shipment of Equipment No

303 Electronic Material List 30 Before Shipment of Equipment No

304 Shipping Notice 2 Full Work Days Notice No

305 Detailed Final Packing List of Shipment of Equipment, corresponding with Electronic Material List data

Upon each Shipment and With Electronic Materials List

No

306 Hazardous materials documentation

With Each Shipment No

701 Proof Copy of Instruction Manuals

90 Before Shipment of Equipment No

702 Final Copy of Instruction Manuals

15 Before Shipment of Equipment No

703 Recommended Spare Parts List, with Unit Prices and Names of Suppliers, Necessary to Cover a Full Maintenance Cycle (3 years)

90 After Effective Date No

704 Startup and Commissioning Spare Parts List, Priced

90 Before Shipment of Equipment No

05135 Steel Stack Designed by Supplier (Optional Scope)

.

0409 05135 Structural Steel Material Certification

Upon request

0410 05135 High Strength Bolts Material Certification

Upon request

0411 05135 Direct Tension Indicators Material Certification

Upon request

0694 05135 Grating Copies of Certified Test and Inspection Reports

14 After Test/Inspection

0583 05135 Arrangement drawings 30 After Effective Date

0695 05135 Foundation design i t

30 After Effective Date

0696 05135 Design calculations 30 After Effective Date

0584 05135 Fabrication and erection detail drawings

30 After Effective Date

0697 05135 Stack, liner, insulation, and lagging materials specifications

30 After Effective Date

0698 05135 Shop and/or field coatings data 30 After Effective Date

00300.9.2 Schedule of Submittals and Applicable Liquidated Damages

Bid

der C

ompl

ies

Yes

/No

Effective Date: Estimated First Shipment Date:Project Delivery Date: March 7, 2016

The list is not all-inclusive. There are more requirements for Supplier to "provide notice," to "advise," to "update," to "inform," etc., or to “submit” should a condition precedent occur. These have not been included in the list. It will however remain Supplier's responsibility to comply with the submittal requirements whether or not the submittal is actually included on the following:Item No.

Reference Document

Submittals Item Submittal Dates LDsapply?

Page 46: RFP 40313 Addendum #1 - Grand River Dam Authority 40313 Addendum #1 ... Quotation Fill-In Information for Steam Turbine Generator ... 00300A.5.1 Attendance at the Purchaser's DCS Factory

RFP 40313

Source: 00300, 2009, v1.2

Section BCombustion Turbine Generator

Quotation Fill-In Information Page 11 of 44

11506 Selective Catalytic Reduction System (Optional Scope)

.

0585 11506 Arrangement drawings 30 After Effective Date No0699 11506 Certified loads for design of

structures and foundations40 After Effective Date No

0586 11506 Arrangement drawings 15 After Effective Date No0587 11506 Piping and instrument diagrams 30 After Effective Date No

0588 11506 Detail drawings required to indicate miscellaneous piping and wiring connections

45 After Effective Date No

0589 11506 Drawings and data on accessory equipment including valves, fittings, and other components

45 After Effective Date No

0590 11506 Control system functional loop and logic diagrams

60 After Effective Date No

6100 11506 Control system instrumentation and I/O lists

30 After Effective Date No

6101 11506 Instrument data sheets (ISA type or equal) and installation details for control system

60 After Effective Date No

0591 11506 Pipe layout drawings 30 After Effective Date No0592 11506 Recommended location for all

pipe supports, recommended type of pipe supports at each location, and loads on each pipe support

30 After Effective Date No

6102 11506 Pipeline list 30 After Effective Date No11507 Catalyst for Selective

Catalytic Reduction (Optional Scope)

.

6103 11507 Catalyst preproduction test results report

90 After Effective Date and prior to catalyst production

No

11508 Ammonia System (Optional Scope)

.

0593 11508 Detailed drawings indicating pipe connection points

30 After Effective Date No

6104 11508 Fan performance curve - final 30 Before Shipment No

6105 11508 Flowmeter certification report 30 Before Shipment No

13125 Pre-Manufactured Metal Equipment Building

.

0685 13125 Bill of Material, Including Quantity, Description, and Part Number

Effective Date No

0578 13125 Plan view outline - General arrangement, center of gravity weight, floor opening size and locations, mounting details, and cable entry area and door swing requirements

30 After Effective Date No

Page 47: RFP 40313 Addendum #1 - Grand River Dam Authority 40313 Addendum #1 ... Quotation Fill-In Information for Steam Turbine Generator ... 00300A.5.1 Attendance at the Purchaser's DCS Factory

RFP 40313

Source: 00300, 2009, v1.2

Section BCombustion Turbine Generator

Quotation Fill-In Information Page 12 of 44

0579 13125 Elevation outline - General arrangement in elevation, recommended pier and tie-down locations, and wall opening sizes and locations

30 After Effective Date No

0580 13125 Legend/design criteria outline - Design criteria and drawing legend

30 After Effective Date No

0581 13125 Electrical interconnection diagram

30 After Effective Date No

0686 13125 Certified design calculations 30 After Effective Date No0687 13125 Certified Air conditioning,

Heating, Pressurization design load calculations with considerations of transmission and solar gain, people, lighting, mechanical and electrical equipment, motors, electronic equipment, computers, miscellaneous appliances, infi

30 After Effective Date No

0688 13125 For HVAC Equipment: Fan curves, motor data, coating data, dimensional data including piping connection sizes and location, weight, performance data, wiring diagrams and sound level data.

60 After Effective Date No

0689 13125 For Filters: filter efficiency, airflow resistance, dust holding capacity, media material, thickness, density and dimensional data.

60 After Effective Date No

0690 13125 For Dampers: AMCA certified pressure drop and leakage data.

60 After Effective Date No

0691 13125 For Terminal Devices: Flow versus pressure drop and flow versus throw.

60 After Effective Date No

0692 13125 For Temperature Controls: Wiring diagrams, control and electrical components data sheets, sequence of operations, control system architecture, and temperature control panel layout drawings.

60 After Effective Date No

0693 13125 Bill of Material, Including Quantity, Description, and Part Number

No

0582 13125 Submit drawings indicating the layout of building

No

15562 Combustion Turbine .0647 15562 Certified design data and

performance curves40 After Effective Date No

Page 48: RFP 40313 Addendum #1 - Grand River Dam Authority 40313 Addendum #1 ... Quotation Fill-In Information for Steam Turbine Generator ... 00300A.5.1 Attendance at the Purchaser's DCS Factory

RFP 40313

Source: 00300, 2009, v1.2

Section BCombustion Turbine Generator

Quotation Fill-In Information Page 13 of 44

0522 15562 Arrangement Drawings required for plant layout indicating physical arrangement and dimensions of equipment furnished

30 After Effective Date No

0523 15562 Arrangement Drawings for all auxiliary equipment indicating physical arrangement and dimensions of equipment furnished

45 After Effective Date No

0524 15562 Foundation interface Drawings for all furnished equipment indicating loads, dimensions, anchor bolt locations, embedded conduit, and other necessary details

45 After Effective Date No

0525 15562 Base combustion turbine generator unit arrangement and outline drawing

30 After Effective Date No

0526 15562 CTG auxiliary enclosures and equipment arrangement and outline drawing

45 After Effective Date No

0527 15562 Duct outline Drawings including movements and clearances for insulation, lagging, stiffeners, and expansion joints

60 After Effective Date No

0528 15562 Detail Drawings indicating all Purchaser's piping and wiring connections including locations, sizes, types, materials, cable type, etc.

60 After Effective Date No

0529 15562 Piping and Instrument Diagrams 60 After Effective Date No

0530 15562 Control panel and operator Work station outline and layout Drawings

90 After Effective Date No

0531 15562 Drawings and data on accessory equipment including valves, fittings, and other components

90 After Effective Date No

0532 15562 Electrical one-line diagrams indicating electrical scope

60 After Effective Date No

0533 15562 Electrical elementaries, schematic, wiring, block and tubing diagrams, cable block diagrams, raceway layout, and cable entry into equipment

120 After Effective Date No

0534 15562 Control system functional loop and logic diagrams

90 After Effective Date No

0535 15562 Control operator CRT graphic display pages with descriptions of operator control actions linked to the graphics

120 After Effective Date No

Page 49: RFP 40313 Addendum #1 - Grand River Dam Authority 40313 Addendum #1 ... Quotation Fill-In Information for Steam Turbine Generator ... 00300A.5.1 Attendance at the Purchaser's DCS Factory

RFP 40313

Source: 00300, 2009, v1.2

Section BCombustion Turbine Generator

Quotation Fill-In Information Page 14 of 44

0536 15562 Control system and instrumentation input/output tabulations with descriptions and interface functions

90 After Effective Date No

0648 15562 Instrument data sheets (ISA type or equal) and installation details for all control system input and output devices such as transmitters and control drives

120 After Effective Date No

0649 15562 Recommended detailed erection sequence and procedure

120 Before Shipment No

0701 15562 Two draft copies of Commissioning Manual

90 Before Start of commissioning No

0702 15562 Four final copies of Commissioning Manual

30 Before Start of commissioning No

0537 15562 As-built Drawings 60 Before Completion of commissioning

No

16031 Cylindrical Rotor Generators .

0202 16031 Supplier to participate in design conference

15 After Effective Date No

0650 16031 Generator hydrogen pressure correction curves for ASME PTC 6.2 acceptance test

Upon Submittal of Proposal No

0651 16031 Generator power factor correction curves for ASME PTC 6.2 acceptance test

Upon Submittal of Proposal No

0652 16031 Critical speeds of generator 30 After Effective Date No

0653 16031 Generator loss curve and excitation power requirement curve including total electrical losses for generation capability at minimum hydrogen pressure and at 1 bar (14.5 psi) including up to the maximum hydrogen pressure for rated and unity power factors. Curve shall include the total mechanical or fixed losses.

30 After Effective Date No

0654 16031 Water requirements for the air or hydrogen coolers indicated as a curve for varying load conditions, hydrogen pressures, and cooling water temperatures

30 After Effective Date No

0655 16031 Detailed data describing capability of the unit to operate above and below rated speed, including minimum and maximum allowable speed versus cumulative time duration of off-normal speed operation

30 After Effective Date No

Page 50: RFP 40313 Addendum #1 - Grand River Dam Authority 40313 Addendum #1 ... Quotation Fill-In Information for Steam Turbine Generator ... 00300A.5.1 Attendance at the Purchaser's DCS Factory

RFP 40313

Source: 00300, 2009, v1.2

Section BCombustion Turbine Generator

Quotation Fill-In Information Page 15 of 44

0656 16031 Detailed information on the capability of the generator to respond to a system upset situation, where a large portion of the system load is applied to the unit and load shedding is required

30 After Effective Date No

0657 16031 Reactive power capability versus real power capability curve at minimum and maximum hydrogen pressure(s)

30 After Effective Date No

0658 16031 Generator "Vee" curves 30 After Effective Date No

0659 16031 Zero and rated power factor current saturation curves

30 After Effective Date No

0660 16031 No load saturation curves 30 After Effective Date No

0661 16031 Generator allowable negative sequence versus time curve

30 After Effective Date No

0662 16031 Generator current decrement curves for 3-phase, line-to-line, and line-to-neutral short-circuit conditions at the generator terminals

30 After Effective Date No

0663 16031 Generator current decrement curves for 3-phase, line-to-line, and line-to-neutral short-circuit conditions at terminals of transformers connected to generator terminals. Electrical system parameters will be furnished by the Purchaser.

30 After Effective Date No

0664 16031 Generator current transformer secondary excitation characteristic curve

30 After Effective Date No

0665 16031 Generator current transformer ratio correction factor curve

30 After Effective Date No

0666 16031 Generator current transformer thermal rating

30 After Effective Date No

0667 16031 Generator current transformer mechanical rating

30 After Effective Date No

0668 16031 Generator current transformer IEC or ANSI metering and relaying accuracy class

30 After Effective Date No

0669 16031 Generator current transformer secondary resistance at 77.0° F (25° C)

30 After Effective Date No

0670 16031 Generator current transformer phase angle correction factor curves

30 After Effective Date No

0671 16031 Generator current transformer correction factor curves

30 After Effective Date No

Page 51: RFP 40313 Addendum #1 - Grand River Dam Authority 40313 Addendum #1 ... Quotation Fill-In Information for Steam Turbine Generator ... 00300A.5.1 Attendance at the Purchaser's DCS Factory

RFP 40313

Source: 00300, 2009, v1.2

Section BCombustion Turbine Generator

Quotation Fill-In Information Page 16 of 44

0672 16031 All generator, exciter, and regulator data required to complete a mathematical model study of system stability

30 After Effective Date No

Page 52: RFP 40313 Addendum #1 - Grand River Dam Authority 40313 Addendum #1 ... Quotation Fill-In Information for Steam Turbine Generator ... 00300A.5.1 Attendance at the Purchaser's DCS Factory

RFP 40313

Source: 00300, 2009, v1.2

Section BCombustion Turbine Generator

Quotation Fill-In Information Page 17 of 44

0542 16031 A block diagram with significant transfer functions representing the generator, exciter, and regulator satisfactory for computer studies

30 After Effective Date No

0543 16031 Hydrogen seal oil diagrams 90 After Effective Date No0544 16031 Stator cooling water diagrams 90 After Effective Date No

0673 16031 Complete listing of all accessory equipment with instrument ranges and recommended contact set points

90 After Effective Date No

0674 16031 List of all control devices and/or process set points, ranges, and flow quantities

90 After Effective Date No

0675 16031 Listing of accessory equipment to be shipped loose to jobsite

120 After Effective Date No

0545 16031 Air-to-water cooling diagrams or hydrogen-to-water cooling diagrams

90 After Effective Date No

0546 16031 Drawings of all separately mounted equipment indicating information required for setting, piping, and wiring the items

60 After Effective Date No

0547 16031 Drawings indicating location of all generator junction boxes and electrical accessories requiring embedded conduit in the turbine generator pedestal, including recommended quantities and sizes of conduits into each junction box or piece of equipment

90 After Effective Date No

0548 16031 Drawings indicating the size and location of all generator ground pads

90 After Effective Date No

0549 16031 Drawings indicating electrical connection details to the generator terminals, generator neutral enclosure, and generator current transformers

90 After Effective Date No

0550 16031 Detailed schematic drawings of all electrical control wiring

90 After Effective Date No

Page 53: RFP 40313 Addendum #1 - Grand River Dam Authority 40313 Addendum #1 ... Quotation Fill-In Information for Steam Turbine Generator ... 00300A.5.1 Attendance at the Purchaser's DCS Factory

RFP 40313

Source: 00300, 2009, v1.2

Section BCombustion Turbine Generator

Quotation Fill-In Information Page 18 of 44

0551 16031 All certified drawings required to indicate miscellaneous piping and wiring connections and any other piping and wiring connections not indicated on previous drawings. This shall include piping diagrams as required to indicate manufacturer's requirements for the Purchaser's piping systems.

90 After Effective Date No

0552 16031 Arrangement drawings of all piping and accessories furnished, as required for the Engineer's check of the layout of these items

90 After Effective Date No

0553 16031 Drawings as required to indicate the details of construction and internal wiring of all equipment and equipment components furnished. Detail drawings of standard gauges, instruments, valves, and similar miscellaneous items.

180 After Effective Date No

0676 16031 Generator terminal enclosure outline and loading data

90 After Effective Date No

0554 16031 Provide a block diagram and parameter values for the significant transfer functions (representing the generator, excitation and governor) satisfactory for transient and dynamic computer studies

30 After Effective Date No

16051 Electrical Design and Equipment

.

0677 16051 Certified design data and performance curves

70 Before Shipment Yes

0555 16051 Arrangement and fabrication/ erection drawings

90 After Effective Date Yes

0556 16051 Detailed set of drawings to include arrangement drawings, one-line and three-line diagrams, metering and relaying diagrams, schematics, instrument door details, nameplate schedule, and bill of materials

60 After Effective Date Yes

0557 16051 Final set of above drawings in addition to interconnection wiring diagrams

21 After Purchaser comments on initial drawings

Yes

0558 16051 Final submittal of as-built drawings

30 After Shipment Yes

0559 16051 Relay instruction and service manual including relay curve information

90 After Effective Date Yes

Page 54: RFP 40313 Addendum #1 - Grand River Dam Authority 40313 Addendum #1 ... Quotation Fill-In Information for Steam Turbine Generator ... 00300A.5.1 Attendance at the Purchaser's DCS Factory

RFP 40313

Source: 00300, 2009, v1.2

Section BCombustion Turbine Generator

Quotation Fill-In Information Page 19 of 44

0678 16051 Current transformer ratio correction factor and excitation curves

90 After Effective Date Yes

0679 16051 Time overcurrent curves for each overload, molded case circuit breaker, and solid-state protective device used

30 After Effective Date Yes

0560 16051 I/O database and I/O wiring diagrams

Upon Shipment Yes

16142 Generator Neutral Grounding .

0680 16142 Bill of Material, Including Quantity, Description, and Part Number

Upon Effective Date Yes

0681 16142 Certified design calculations 30 After Effective Date Yes0561 16142 Preliminary outline drawings 15 After Effective Date Yes0562 16142 Final drawings 60 After Effective Date Yes0563 16142 Schematic and wiring diagrams 60 After Effective Date Yes

16201 Protective Relaying Panels .

0564 16201 Outline drawings showing dimensions, weight, and mounting requirements

15 After Effective Date Yes

0565 16201 Schematic diagrams 30 After Effective Date Yes0566 16201 Connection and wiring diagrams 30 After Effective Date Yes

0567 16201 Erection drawing 30 After Shipment Yes0568 16201 Relay installation and wiring

information30 After Effective Date Yes

0569 16201 Nameplate drawings 45 After Effective Date YesE645 Electric Actuators .

0570 E645 Actuator outline diagrams 30 After Effective Date No0571 E645 Wiring diagrams 30 After Effective Date No

K100 Instrumentation .0572 K100 Instrument Location Plan

Drawings90 After Effective Date Yes

0573 K100 Instrument factory calibration sheets

Upon Shipment of Instruments Yes

0574 K100 Flow element calculation data sheets showing beta ratio, dP, flow

120 After Effective Date Yes

0575 K100 ISA-format datasheets for all Instruments

120 After Effective Date Yes

0682 K100 PTC 19.3 calculations for steam line TW's vib failure analysis confirming thermowells will not fail in service or during steam blow conditions.

120 After Effective Date Yes

M200 Piping .

0683 M200 Calculations to verify suitability of integrally reinforced fittings for dissimilar branch/header materials.

Page 55: RFP 40313 Addendum #1 - Grand River Dam Authority 40313 Addendum #1 ... Quotation Fill-In Information for Steam Turbine Generator ... 00300A.5.1 Attendance at the Purchaser's DCS Factory

RFP 40313

Source: 00300, 2009, v1.2

Section BCombustion Turbine Generator

Quotation Fill-In Information Page 20 of 44

Q100 General Welding Requirements

.

0406 Q100 Nonconformance reports 5 After Discovery of Nonconf.

0407 Q100 ASME/NBIC Data Reports 60 After Fabrication Completion

0407 Q100 Radiographs 14 After Fabrication Completion

Q110 Welding of 9Cr-1Mo-V (Grade 91) Materials

.

0408 Q110 ASME B31.1 shop fabricated piping spools P91 documentation records

21 Before Shipment

Q301 Manufacturer's Standard Coating

.

0683 Q301 Shop drawings that identify shop-applied coating systems

30 Before Start of Fabrication No

0684 Q301 Manufacturer's product data sheets

30 After Release to Proceed No

Q400 General Equipment Requirements

.

0301 Q400 Shipment Plan providing details of field assembly work required as described in the Supplier's proposal.

30 After Effective Date No

Q502 Electrical Data

0576 Q502 Completed motor information sheets

60 After Effective Date Yes

0577 Q502 Completed electric actuator information sheet

60 After Effective Date Yes

Page 56: RFP 40313 Addendum #1 - Grand River Dam Authority 40313 Addendum #1 ... Quotation Fill-In Information for Steam Turbine Generator ... 00300A.5.1 Attendance at the Purchaser's DCS Factory

GRDA Unit 3 Combined Cycle Project178592.67.9120

Combustion Turbine Generator/Steam Turbine Generator

Bid Issue25Oct2013

Source: 00300, 2009, v1.2

Section BCombustion Turbine Generator

Quotation Fill-In Information Page 21 of 44

Bidder Response Column

Reference Document Submittal Item Yes/No

13125 Pre-Manufactured Metal Equipment Building .13125 HVAC Design Engineer13125 HVAC Equipment Vendors15562 Combustion Turbine .15562 Combustion turbine generator performance curves15562 Combustion turbine heat rate, exhaust flow, and exhaust temperature curves

versus load, showing the effect of inlet guide vane (IGV) control15562 Compressor inlet temperature correction curves for heat rate, capacity,

exhaust temperature, and mass flow15562 NOx injection water (or steam) correction curves for effects on heat rate,

capacity, exhaust temperature, mass flow, and emissions for varying amounts of water (or steam) injection for NOx control.

15562 NOx control water (or steam) injection requirement versus combustion turbine load curve for all specified fuels at various compressor inlet temperatures.

15562 Curves indicating the effect of inlet anti-icing on output and heat rate.15562 NOx and CO emission level versus load for all specified fuels.15562 CO, UHC, and VOC emission levels versus water (or steam) injection rate

curve.15562 Inlet pressure drop correction data.15562 Exhaust pressure drop correction data.15562 Humidity correction data.15562 Atmospheric pressure (or altitude) correction curves.15562 Estimated output, heat rate, exhaust flow, and exhaust temperature

degradation versus fired hours curves from initial startup through second major overhaul for firing each specified fuel.

15562 Curves showing recovery effects of compressor washing for output, heat rate, exhaust flow, and exhaust temperature.

15562 Detailed description of starting system.15562 List of Drawings to be provided during project execution and schedule of

drawing submittals.15562 Preliminary/typical general arrangement Drawings showing the combustion

turbine generator unit(s), inlet filter(s), exhaust stack(s), all associated compartments/enclosures/skids, starter unit, transformers, and radiators. A vertical section shall be included showing the complete installed unit including crane minimum hook height and capacity.

15562 Control system configuration drawing identifying all microprocessors, operator interface devices, and interconnecting data highways.

15562 Preliminary/typical one-line diagrams of generator electrical system, including ac and dc auxiliary electric system. One-line diagrams shall include all auxiliary load data and proposed metering and protective relaying.

15562 A complete description of all equipment proposed, together with supportive data.

15562 Preliminary Engineering Schedule.15562 Preliminary Procurement/Production/Shipping Schedule.

Document submitted with Quotation Package

00300B.10 Technical Documents Required with Quotation (completed tables are required for the Base Scope and Elective Option [if proposed])

Page 57: RFP 40313 Addendum #1 - Grand River Dam Authority 40313 Addendum #1 ... Quotation Fill-In Information for Steam Turbine Generator ... 00300A.5.1 Attendance at the Purchaser's DCS Factory

GRDA Unit 3 Combined Cycle Project178592.67.9120

Combustion Turbine Generator/Steam Turbine Generator

Bid Issue25Oct2013

Source: 00300, 2009, v1.2

Section BCombustion Turbine Generator

Quotation Fill-In Information Page 22 of 44

Reference Document Submittal Item Yes/No

15562 Shipping methods and erection criteria and requirements.15562 Description of manufacturer's performance estimating procedure, including

correction procedures for differing altitudes, ambient temperatures, part loads, NOx emissions, water (or steam) injection rates, and IGV control.

15562 Information on technical assistance provided during erection and commissioning.

15562 Description of proposed classroom instruction for operations and maintenance training.

15562 Description and drawing of lay-down space requirements with area defined.

15562 Description and drawing of additional maintenance area required in addition to the lay-down space defined.

15562 Priced lists of recommended spare parts.15562 List of Startup And Commissioning Spare Parts furnished with the

equipment.15562 List of all maintenance tools/special tools furnished with the equipment.15562 Discussion of emission level changes with increasing operating hours.15562 Provide estimated hours to erect proposed combustion turbine generator

unit, broken down by craft.15562 Description of all field assembly/erection required. Any item not described

will be assumed to be fully factory finished.15562 Description of factory testing program for furnished equipment.15562 Description of the extent of nondestructive testing of unit components,

including the casing, rotor forgings, shafts, machine journals, and other major components.

15562 Description of compressor and turbine blade coatings.15562 Description of compressor and turbine blade material and method for

securing to rotor and casing.15562 Description of burners, ignitors, and combustion system for the proposed

combustion system including cross-section Drawings.15562 Description of flame safety and combustion control systems.15562 List of borescope port locations.15562 Description of methods and equipment required for field balancing.15562 Description of gaseous fuel systems and balance-of-plant support/interface

requirements.15562 Gaseous fuel requirements (temperature, pressure, minimum required fuel

superheat, purity, viscosity, minimum heating value, etc.).15562 Description of combustion turbine generator lubricating system, including

lubrication schedules, types, quantities, filters, maintenance intervals, etc.

15562 Description of backup or redundancy features provided in lube oil system and seal oil system.

15562 Description of the combustion turbine generator lube oil cooling system.15562 Description of turning gear system, including statement of effect of long-term

operation of turning gear.15562 Description of manual system for rotating the turbine and generator shafts.

Page 58: RFP 40313 Addendum #1 - Grand River Dam Authority 40313 Addendum #1 ... Quotation Fill-In Information for Steam Turbine Generator ... 00300A.5.1 Attendance at the Purchaser's DCS Factory

GRDA Unit 3 Combined Cycle Project178592.67.9120

Combustion Turbine Generator/Steam Turbine Generator

Bid Issue25Oct2013

Source: 00300, 2009, v1.2

Section BCombustion Turbine Generator

Quotation Fill-In Information Page 23 of 44

Reference Document Submittal Item Yes/No

15562 Descriptive information on the combustion turbine control system, including a description of all local and remote control functions and local and remote operator interface functions, redundancy, and a list of sensors furnished (transducers, vibration detectors, thermocouples, RTDs, etc.).

15562 Description of emergency trip system, including fuel shutoff control.15562 Description of combustion turbine automatic generation control (AGC)

system and capabilities.15562 Description of fire protection and detection equipment with a discussion on

compliance with NFPA requirements.15562 Description of unit enclosures and noise attenuation features.15562 Description of procedure for enclosure disassembly in large sections to

accommodate major maintenance.15562 Description and arrangement Drawings of the acoustical barrier system for

noise attenuation, if required.15562 Description of compressor water wash equipment and cleaning chemical

requirements.15562 Description of inlet air filtration system.15562 Description of inlet anti-icing system, including conditions under which it is

required for operation.15562 Description of starting system with associated detailed drawings.15562 Description of water (or steam) injection/NOx reduction control system,

including the combustion turbine manufacturer's operating experience with water (or steam) injection for the combustion turbine model proposed, pressure, temperature, and purity requirements for injection for NOx control.

15562 Water quality and blowdown information for the evaporative cooler system.

15562 Description of proposed insulation and lagging systems.15562 Description of enclosure/compartment HVAC system, including design

temperatures.15562 Description of overspeed protection system.15562 Detailed description of unit startup event sequence, including times, auxiliary

power requirements, amperage versus time curve, etc. (separately address "normal" and "fast" starts).

15562 Description of proposed shutdown corrosion protection system15562 Description of planned future upgrades (capacity increases) to the unit(s)

proposed and effects these upgrades will have on the electrical equipment specified.

15562 Complete current experience listings for the combustion turbine generator model proposed indicating the following information as a minimum:

15562 Recommended maintenance practices and procedures, including frequency of routine inspection intervals and required parts. Include man-hours required to complete the combustion inspection, hot gas path inspection, and the first major overhaul.

15562 Complete description of the data link hardware, software, and communications protocol for the interface to the Purchaser's DCS.

15562 Complete description of the data link hardware, software, and communications protocol for the interface to the Purchaser's SCADA system.

15562 Description of any special control system grounding requirements.

Page 59: RFP 40313 Addendum #1 - Grand River Dam Authority 40313 Addendum #1 ... Quotation Fill-In Information for Steam Turbine Generator ... 00300A.5.1 Attendance at the Purchaser's DCS Factory

GRDA Unit 3 Combined Cycle Project178592.67.9120

Combustion Turbine Generator/Steam Turbine Generator

Bid Issue25Oct2013

Source: 00300, 2009, v1.2

Section BCombustion Turbine Generator

Quotation Fill-In Information Page 24 of 44

Reference Document Submittal Item Yes/No

15562 Complete description of the proposed Turbine Generator Supervisory System including equipment provided, list of sensors furnished, and operator interface functions.

15562 Complete description of the proposed Vibration Monitoring System including equipment provided, list of sensors furnished, and operator interface functions.

15562 Water quality and blowdown information for the evaporative cooler system.

15562 List of codes and standards used in design of all equipment including version or issue date.

16031 Cylindrical Rotor Generators .16031 Reactive capability curve to indicate generator capability at various power

factors.16031 Generator saturation curve.16031 Generator "Vee" curves.16031 Drawings of recommended method of stator erection.16031 Generator drawing with overall length, width, and height.16031 Generator drawing with exciter or collector's overall length, width, and height.

16031 Generator drawing with excitation cubicle's overall length, width, and height.

16031 Generator drawing with rotor removal clearance (straight and askew).16031 Generator drawing with control cabinet's overall length, width, and height.

16031 Generator drawing with supervisory cabinet's overall length, width, and height.

16031 Complete list of required maintenance tools. The listing shall include a complete description and quantity of each item.

16031 Equipment storage requirements, including inside or outside requirements, requirements for controlled temperature or humidity, etc.

16031 Complete list of necessary special tools. The listing shall provide a complete description and quantity of each item, including a discussion or designation of particular items required for erection and/or maintenance.

16031 Complete list of recommended spare parts.16031 Description and listing of major generator assemblies for shipment.16031 Information describing coating systems for equipment.16031 One uncontrolled copy of bidder's Quality Assurance Program.16031 Complete information on the generator supervisory instrumentation system,

including a bill of material.16031 Detailed listing of alarm contacts available and recommended alarms for

connection to DCS, including unit prices for additions or deductions.16031 Detailed listing of instrumentation furnished.16031 Complete description of cable requirements, including the cable

constructions, for all equipment furnished.16031 Complete description of any voltage level separation requirements for

raceway or special cable shielding requirements for all equipment furnished.

16031 Complete description of the lube oil piping arrangement.16031 Complete list of other plants where the manufacturer has duplicate, or near

duplicate, generators under construction or in operation.16031 Listing of Work subcontracted to other Suppliers.

Page 60: RFP 40313 Addendum #1 - Grand River Dam Authority 40313 Addendum #1 ... Quotation Fill-In Information for Steam Turbine Generator ... 00300A.5.1 Attendance at the Purchaser's DCS Factory

GRDA Unit 3 Combined Cycle Project178592.67.9120

Combustion Turbine Generator/Steam Turbine Generator

Bid Issue25Oct2013

Source: 00300, 2009, v1.2

Section BCombustion Turbine Generator

Quotation Fill-In Information Page 25 of 44

Reference Document Submittal Item Yes/No

16031 Listing of Subsuppliers and Suppliers used.16031 Bidder's preliminary engineering schedule.16031 Bidder's procurement/production/shipping schedule.16031 Complete description of excitation system.16031 Complete description of generator core monitor system (if specified).16031 Generator maximum allowable temperature of cold coolant generator

temperature rise of gas and liquid.16031 Generator maximum allowable temperature for armature winding, field

winding, core, and mechanical parts in contact with or adjacent to armature winding insulation; and collector rings, brushes, and brush holders.

16031 Detailed description of the brushless exciter (if specified).16031 Maximum allowable temperature of cooling air and temperature rise of

cooling air.

Page 61: RFP 40313 Addendum #1 - Grand River Dam Authority 40313 Addendum #1 ... Quotation Fill-In Information for Steam Turbine Generator ... 00300A.5.1 Attendance at the Purchaser's DCS Factory

GRDA Unit 3 Combined Cycle Project178592.67.9120

Combustion Turbine Generator/Steam Turbine Generator

Bid Issue25Oct2013

Source: 00300, 2009, v1.2

Section BCombustion Turbine Generator

Quotation Fill-In Information Page 26 of 44

Reference Document Submittal Item Tech Fill-In Data

13125 Pre-Manufactured Metal Equipment Building .13125 Bidder's Name13125 Electrical/Control Building13125 Item13125 Description13125 Manufacturer13125 Location of manufacturer13125 City13125 State13125 Country13125 Standard for manufacturing and testing13125 Design permissible loading, lb/ft2 (kg/m2)13125 Floor13125 Roof13125 Wind13125 Dimensions, inches (mm)13125 Height13125 Depth13125 Length13125 Total weight, lb (kg)13125 Lighting13125 Item13125 Description13125 Manufacturer13125 Location of manufacturer13125 City13125 State13125 Country13125 Standard for manufacturing and testing13125 Lighting fixture type13125 Switch type13125 Receptacle type13125 Contactor type

Combined Cycle Configuration .Configuration (Single or Multi-Shaft)Single Shaft Configuration

Configuration (CGS or CSG)Clutch

ManufacturerMW Rating

Cooling steam requirements, lb/hr (startup/transient)15562 Combustion Turbine .15562 Bidder's Name15562 Performance Data at Specified Conditions15562 Note: Items marked with an asterisk (*) shall be

guaranteed for all load and ambient conditions designated."Guaranteed," in accordance with Section 15562.

00300B.11 Technical Fill-In Data Required with Quotation (completed tables are required for the Base Scope and Elective Option [if proposed])

Page 62: RFP 40313 Addendum #1 - Grand River Dam Authority 40313 Addendum #1 ... Quotation Fill-In Information for Steam Turbine Generator ... 00300A.5.1 Attendance at the Purchaser's DCS Factory

GRDA Unit 3 Combined Cycle Project178592.67.9120

Combustion Turbine Generator/Steam Turbine Generator

Bid Issue25Oct2013

Source: 00300, 2009, v1.2

Section BCombustion Turbine Generator

Quotation Fill-In Information Page 27 of 44

Reference Document Submittal Item Tech Fill-In Data

15562 Parameter 115562 Guaranteed15562 Gross generator output Btu/h15562 CTG auxiliary power Btu/h15562 CTG heat consumption, LHV Btu/h15562 Net CTG output* Btu/h15562 Net CTG heat rate, LHV* Btu/kwh15562 Fuel flow 15562 Turbine inlet temperature °F (°C)15562 Water or steam injection flow* lb/h15562 Inlet airflow °F (°C)15562 Inlet air pressure drop PSI15562 Exhaust pressure drop PSI15562 Exhaust gas flow lb/h15562 Exhaust gas temperature* °F (°C)15562 Exhaust gas heat* Btu/h15562 Exhaust gas heat reference temperature °F (°C)15562 Auxiliary Power Requirements15562 Fuel

15562Included in Net Output Btu/h / Total Connected Power Btu/h

15562 Turbine cooling air compressor /15562 Control air compressor /15562 Lube oil pumps (ac) /15562 Lube oil pumps (dc) /15562 Space heaters /15562 Lube oil cooler fans /15562 Cooling water pumps /15562 Evaporative cooling system /15562 Generator cooling system /15562 Rotor turning motor /15562 Hydrogen system seal oil pump /15562 Mist eliminator /15562 Control system /15562 Air conditioners /15562 Ventilation fans/blowers /15562 Fin-fan cooler fans /15562 Total at continuous baseload /15562 Total standby power /15562 Note: Auxiliary power data shall be for steady-state

operation at the guaranteed load condition on the indicated fuel.

15562 Startup and Shutdown Performance15562 Primary Fuel

15562Guaranteed normal cycle starting time from cold standby to continuous baseload, min

15562 Guaranteed rate of load change, kW/min15562 Total gross generation per start15562 Normal start, Btu15562 Total auxiliary power required per start15562 Normal start, Btu15562 Peak auxiliary power required per start

Page 63: RFP 40313 Addendum #1 - Grand River Dam Authority 40313 Addendum #1 ... Quotation Fill-In Information for Steam Turbine Generator ... 00300A.5.1 Attendance at the Purchaser's DCS Factory

GRDA Unit 3 Combined Cycle Project178592.67.9120

Combustion Turbine Generator/Steam Turbine Generator

Bid Issue25Oct2013

Source: 00300, 2009, v1.2

Section BCombustion Turbine Generator

Quotation Fill-In Information Page 28 of 44

Reference Document Submittal Item Tech Fill-In Data

15562 Fuel consumed per start (LHV)15562 Normal start, Btu15562 Noise Emissions15562 Guaranteed average near field noise levels at 3 feet

(0.914 meter) from the combustion turbine generator and any associated auxiliary equipment, oper-ating at full load, dBA to a reference of 20 micropascals

15562 Guaranteed far field noise levels at 400 feet (122 meters) from the combustion turbine enclosure boundary, operating at full load, dBA / dBC /

15562 Reference band levels, dBA15562 Octave band center frequency, hertz15562 3115562 6315562 12515562 25015562 50015562 1,00015562 2,00015562 4,00015562 8,00015562 Operational Performance

15562 Maintenance intervalsEquivalent operating hours (EOH) or

Fired hours or Starts15562 Combustion inspection15562 Hot gas path15562 Major overhaul15562 Equivalent operating hours data EOH15562 Each hour at baseload, gas fuel15562 Each hour at peak load, gas fuel15562 Each normal start15562 Each trip from full load15562 Each normal stop15562 Expected degradation data

15562Nonrecoverable degradation in baseload output, percent

15562 1,000 Hours (fixed hours of operation)15562 Gas Fuel Operation

15562Nonrecoverable degradation in baseload heat rate, percent

15562 Gas fuel operation15562 4,000 Hours (fixed hours of operation)15562 Gas Fuel Operation

15562Nonrecoverable degradation in baseload heat rate, percent

15562 Gas fuel operation15562 8,000 Hours (fixed hours of operation)15562 Gas Fuel Operation

15562Nonrecoverable degradation in baseload heat rate, percent

15562 Gas fuel operation

Page 64: RFP 40313 Addendum #1 - Grand River Dam Authority 40313 Addendum #1 ... Quotation Fill-In Information for Steam Turbine Generator ... 00300A.5.1 Attendance at the Purchaser's DCS Factory

GRDA Unit 3 Combined Cycle Project178592.67.9120

Combustion Turbine Generator/Steam Turbine Generator

Bid Issue25Oct2013

Source: 00300, 2009, v1.2

Section BCombustion Turbine Generator

Quotation Fill-In Information Page 29 of 44

Reference Document Submittal Item Tech Fill-In Data

15562 16,000 Hours (fixed hours of operation)15562 Gas Fuel Operation

15562Nonrecoverable degradation in baseload heat rate, percent

15562 Gas fuel operation15562 24,000 Hours (fixed hours of operation)15562 Gas Fuel Operation

15562Nonrecoverable degradation in baseload heat rate, percent

15562 Gas fuel operation15562 Miscellaneous15562 Bidder's definition of baseload15562 Bidder's definition of peak load15562 Has a factory fired operation test been completed for

the size and type of the unit proposed? Yes or No15562 If yes, provide details15562 General Data15562 Manufacturer15562 Location assembled15562 Combustion turbine model number15562 Number of units furnished15562 Gas delivery conditions15562 Minimum required, PSI / °F15562 Maximum allowed, PSI / °F15562 General Design Information15562 Type of combustion turbine15562 Shaft speed, rpm15562 Overspeed trip15562 Electronic, rpm15562 Mechanical bolt, rpm15562 Critical speeds15562 First critical, rpm / mode15562 Second critical, rpm / mode15562 Third critical, rpm / mode15562 Fourth critical, rpm / mode15562 Vibration Amplitude15562 Turbine15562 Nominal / Startup15562 Typical /15562 Alarm /15562 Trip /15562 Generator15562 Nominal / Startup15562 Typical /15562 Alarm /15562 Trip /15562 Unit Weights and Dimensions15562 Turbine engine weight, lbf15562 Generator stator weight, lbf15562 Generator rotor weight, lbf15562 Auxiliary Skid15562 Name

Page 65: RFP 40313 Addendum #1 - Grand River Dam Authority 40313 Addendum #1 ... Quotation Fill-In Information for Steam Turbine Generator ... 00300A.5.1 Attendance at the Purchaser's DCS Factory

GRDA Unit 3 Combined Cycle Project178592.67.9120

Combustion Turbine Generator/Steam Turbine Generator

Bid Issue25Oct2013

Source: 00300, 2009, v1.2

Section BCombustion Turbine Generator

Quotation Fill-In Information Page 30 of 44

Reference Document Submittal Item Tech Fill-In Data

15562 Length, in.15562 Width, in.15562 Height, in.15562 Weight, lb.15562 Shipping weight, entire unit, lbf15562 Heaviest piece handled during erection15562 Weight, lbf15562 Heaviest piece handled during major overhaul15562 Weight, lbf15562 Overall dimensions, including housing, in15562 Length15562 Width15562 Height15562 Component Descriptions15562 Inlet guide vanes15562 Type15562 Material15562 Description of operating limitations15562 Turbine15562 Number of stages: 015562 Stage Identification15562 Blade Material15562 Nozzle Material15562 Blade Coating15562 Nozzle Coating15562 Stage Identification15562 Blade Material15562 Nozzle Material15562 Blade Coating15562 Nozzle Coating

15562Describe how blades are secured to rotor and how nozzle is secured to casing.

15562 Cooling methods15562 Blades15562 Nozzles15562 Disks15562 Shaft15562 Accessory gear15562 Manufacturer15562 Type or model15562 Driven equipment15562 AGMA quality factor15562 Service factor15562 Maximum power rating, Btu/h15562 Compressor15562 Type15562 Number of stages15562 Blade material15562 Nozzle material15562 Coating material

15562Describe how blades are secured to rotor and how nozzle is secured to casing.

Page 66: RFP 40313 Addendum #1 - Grand River Dam Authority 40313 Addendum #1 ... Quotation Fill-In Information for Steam Turbine Generator ... 00300A.5.1 Attendance at the Purchaser's DCS Factory

GRDA Unit 3 Combined Cycle Project178592.67.9120

Combustion Turbine Generator/Steam Turbine Generator

Bid Issue25Oct2013

Source: 00300, 2009, v1.2

Section BCombustion Turbine Generator

Quotation Fill-In Information Page 31 of 44

Reference Document Submittal Item Tech Fill-In Data

15562 Turbine bearings15562 Type15562 Radial15562 Thrust15562 Quantity15562 Radial15562 Thrust15562 Temperature detectors15562 Manufacturer15562 Type/model15562 Description of internal lubrication system15562 Combustors15562 Type15562 Number of cans/silos15562 Expected life min15562 Liners15562 Nozzles15562 Spark plugs15562 Hot gas casing15562 Burner tiles15562 Transition pieces15562 Crossfire tubes15562 Materials15562 Combustor casing15562 Combustor liner15562 Combustor tiles15562 Transition pieces15562 Crossfire tubes15562 Type of ignitors15562 Number of ignitors15562 Type of flame detectors15562 Number of flame detectors15562 Description of nozzle15562 Starting system15562 General description15562 Maximum number of starts allowed in a 1 hour period

at maximum design temperature15562 Time required between start attempts, min

15562Minimum time between controlled shutdown and subsequent start, min

15562Minimum time between unit trip and subsequent start attempt, min

15562 Static start system15562 Manufacturer15562 Description15562 Drive capacity, kVA15562 Transformer size, kVA / Volts / Phase / /

15562Maximum load during combustion turbine starting, kW / kVA /

15562 Lubricating oil system15562 Lube oil type15562 Recommended manufacturer

Page 67: RFP 40313 Addendum #1 - Grand River Dam Authority 40313 Addendum #1 ... Quotation Fill-In Information for Steam Turbine Generator ... 00300A.5.1 Attendance at the Purchaser's DCS Factory

GRDA Unit 3 Combined Cycle Project178592.67.9120

Combustion Turbine Generator/Steam Turbine Generator

Bid Issue25Oct2013

Source: 00300, 2009, v1.2

Section BCombustion Turbine Generator

Quotation Fill-In Information Page 32 of 44

Reference Document Submittal Item Tech Fill-In Data

15562 System fill requirement, gal15562 Quantity of oil flowback on shutdown, gal15562 Retention time at Site load, min15562 Lube oil circulation, gpm15562 Lube oil filters15562 Number15562 Capacity, gpm15562 Mesh size, in15562 Mist eliminators15562 Type15562 Number15562 Lube oil pumps15562 Gear driven15562 Manufacturer15562 Type15562 Number15562 Ac motor driven15562 Manufacturer15562 Type15562 Number15562 Dc motor driven15562 Manufacturer15562 Type15562 Number15562 Lube oil coolers15562 Manufacturer15562 Number15562 Capacity, percent15562 Type (shell and tube or fin-fan)15562 Media (oil-to-water or oil-to-air)15562 Tube material15562 Tube surface area, in215562 Fan diameter, in15562 Fan speed, rpm15562 Radiator materials15562 Mechanical Accessory Equipment15562 Compressor wash system15562 On-Line / Off-Line15562 Flow to combustion turbine, gpm /15562 Water quality required /15562 Type of detergent Not applicable /15562 Quantity of detergent Not applicable /15562 Duration of wash, min /15562 Is resulting discharge a hazardous material? Not applicable / Yes or No15562 Tank capacity, gal /

15562Recommended cleaning frequency, operating hours on primary fuel /

15562 Fire detection and protection15562 Fire protection system15562 Type CO2 or FM200 or Water Mist15562 Detectors15562 Locations

Page 68: RFP 40313 Addendum #1 - Grand River Dam Authority 40313 Addendum #1 ... Quotation Fill-In Information for Steam Turbine Generator ... 00300A.5.1 Attendance at the Purchaser's DCS Factory

GRDA Unit 3 Combined Cycle Project178592.67.9120

Combustion Turbine Generator/Steam Turbine Generator

Bid Issue25Oct2013

Source: 00300, 2009, v1.2

Section BCombustion Turbine Generator

Quotation Fill-In Information Page 33 of 44

Reference Document Submittal Item Tech Fill-In Data

15562 Number15562 Nozzles15562 Locations15562 Number15562 Type15562 Number of releases allowed before recharge15562 Gas protection system15562 Type15562 Detectors15562 Locations15562 Number15562 Limits of detection15562 Inlet air filtration equipment15562 Manufacturer15562 Type15562 Filter media material15562 Efficiency15562 Means of filter support

15562Typical number of hours of operation before replacement of filter

15562 Number of filter modules15562 Number of filters15562 Pressure drop for15562 Clean conditions15562 End of media life15562 Inlet duct15562 Manufacturer15562 Dimensions15562 Length, in.15562 Width, in.15562 Height, in.15562 Material15562 Coating15562 Inlet silencer15562 Manufacturer15562 Dimensions15562 Length, in.15562 Width, in.15562 Height, in.15562 Internal materials15562 Evaporative cooler15562 Manufacturer15562 Type15562 Cooler media15562 Differential pressure drop, PSI15562 Fuel gas filter/separator15562 Type15562 Manufacturer15562 Filter mesh size, in15562 Shell material15562 Turbine blade cooling air booster air compressor15562 Type

Page 69: RFP 40313 Addendum #1 - Grand River Dam Authority 40313 Addendum #1 ... Quotation Fill-In Information for Steam Turbine Generator ... 00300A.5.1 Attendance at the Purchaser's DCS Factory

GRDA Unit 3 Combined Cycle Project178592.67.9120

Combustion Turbine Generator/Steam Turbine Generator

Bid Issue25Oct2013

Source: 00300, 2009, v1.2

Section BCombustion Turbine Generator

Quotation Fill-In Information Page 34 of 44

Reference Document Submittal Item Tech Fill-In Data

15562 Manufacturer15562 Number of stages15562 Speed, rpm15562 Turbine blade cooling air heat exchanger15562 Type15562 Manufacturer15562 Media, air-to-15562 Heat exchange material15562 Number of fans15562 Fan capacity, percent15562 Air temperature in, °F15562 Air temperature out, °F15562 Airflow, lbm/h15562 Combustion Turbine Generator Control System 15562 Local / Remote15562 Microprocessor15562 Manufacturer15562 Model No.15562 Number of processors15562 Quantity of spare I/O digital15562 Quantity of spare I/O analog15562 Quantity of spare alarm points15562 Quantity of spare message capacity15562 Cabinets15562 Number15562 Size15562 LCD monitor15562 Number of monitors15562 Manufacturer15562 Model No.15562 Size (diagonal) in15562 Data logging rate, points/time / /15562 Printer15562 Number of printers15562 Manufacturer15562 Model No.15562 Type15562 Power consumption (kVA)15562 120 volts ac15562 125 volts dc15562 Electrical generator control panels15562 Number15562 Size15562 Standard vibration detectors15562 Manufacturer15562 Model No.15562 Type15562 Quantity15562 Location

15562Supplier Furnished Materials and Associated Installation Quantities

15562 Inlet Filter, tons (Note 1)

Page 70: RFP 40313 Addendum #1 - Grand River Dam Authority 40313 Addendum #1 ... Quotation Fill-In Information for Steam Turbine Generator ... 00300A.5.1 Attendance at the Purchaser's DCS Factory

GRDA Unit 3 Combined Cycle Project178592.67.9120

Combustion Turbine Generator/Steam Turbine Generator

Bid Issue25Oct2013

Source: 00300, 2009, v1.2

Section BCombustion Turbine Generator

Quotation Fill-In Information Page 35 of 44

Reference Document Submittal Item Tech Fill-In Data

15562 Inlet Filter, pieces15562 Inlet Filter Field Seal Welding, lf15562 Exhaust Diffuser, tons15562 Exhaust Diffuser, pieces15562 Exhaust Diffuser, lf15562 Large Bore Pipe (>= 2 ½” in diameter, lf15562 Large Bore Pipe Spools, each15562 Large Bore Field Welds, each

15562Large Bore Field Welds (average dia), inches (Note 3)

15562 Small Bore Pipe, lf15562 Small Bore Pipe Spools, each15562 Small Bore Field Welds, each15562 Turbine Generator Enclosure, pieces15562 Turbine Generator Enclosure, sf15562 Platform and Stairs, tons15562 Platform and Stairs,pieces15562 Off Base Skids & Misc. Equipment, each15562 Pipe Insulation, lf15562 Insulation Blankets, sf15562 Power Cable, lf15562 Control Cable, lf15562 Thermocouple Cable, lf15562 Power Conductor Terminations, each (Note 4)15562 Control Conductor Terminations, each (Note 4)

15562Thermocouple Conductor Terminations, each (Note 4)

15562 Conduit, lf15562 Instruments, each15562 Technical Assistance Time, hours15562 Notes

15562

1. Inlet Filter includes all pieces of structural steel, ductwork, & expansion joints, but not fasteners, shims, gussets, etc.

15562

2. Exhaust Diffuser includes all pieces of structural steel, ductwork, & expansion joint, but not fasteners, shims, gussets, etc.

15562

3. Average Diameter for large bore pipe welds is the sum of the diameters for each individual large bore welds divided by the total number of large bore welds.

15562

4. Conductor is the number of wires contained in a cable that must be terminated, count both ends.

15562

Seal welding is defined as the number of lineal feet of weld placed multiplied by the number of sides from which the weld must be placed. Thus, a seal weld that must be placed from both the inside and outside is equal to the length of the weld multiplied by two (2).

16031 Cylindrical Rotor Generators .16031 Bidder's Name

Page 71: RFP 40313 Addendum #1 - Grand River Dam Authority 40313 Addendum #1 ... Quotation Fill-In Information for Steam Turbine Generator ... 00300A.5.1 Attendance at the Purchaser's DCS Factory

GRDA Unit 3 Combined Cycle Project178592.67.9120

Combustion Turbine Generator/Steam Turbine Generator

Bid Issue25Oct2013

Source: 00300, 2009, v1.2

Section BCombustion Turbine Generator

Quotation Fill-In Information Page 36 of 44

Reference Document Submittal Item Tech Fill-In Data

16031 Auxiliary Power16031

Guaranteed total electric load during normal operation for auxiliaries furnished with generator, ac load (kW)

16031 Total electric load during peak operation, ac load (kW)16031 Emergency dc electric load (kW)16031 Technical Data16031 Weight of generator stator, lb (kg)16031 Excitation system weight, lb (kg)16031 Shipping weight of generator, lb (kg)

16031Weight of generator stator winding water cooling unit (if required), lb (kg)

16031 Weight of generator rotor, lb (kg)16031 Continuous rating at maximum hydrogen pressure (if

applicable), rated power factor, and specified cooling water temperature, based on maximum shaft power developed by the prime mover, MVA

16031 Nominal rpm16031 Nominal frequency, hertz

16031Voltages at continuous operation and nominal frequency

16031 Nominal voltage, kV16031 Maximum voltage, kV16031 Minimum voltage, kV16031 Generator rated power factor (leading/lagging)

16031

Generator direct axis subtransient reactance in per unit value based on generator continuous kVA rating and nominal frequency (saturated at rated voltage) X"dv

16031 Estimated16031 Percent tolerance16031 Plus16031 Minus16031 Short-time capability expressed in terms of I22t

16031Short-circuit ratio at rated voltage and rated stator current

16031Continuous current unbalance expressed in terms of I2, percent

16031Generator winding capacitance to ground, all phases tied together, mfd

16031 Current transformers16031 Application16031 Relaying16031 ANSI C57.13 Accuracy Class16031 IEC 185 Accuracy Class16031 Metering16031 ANSI C57.13 Accuracy Class16031 IEC 185 Accuracy Class16031 Location16031 Line side16031 Quantity

Page 72: RFP 40313 Addendum #1 - Grand River Dam Authority 40313 Addendum #1 ... Quotation Fill-In Information for Steam Turbine Generator ... 00300A.5.1 Attendance at the Purchaser's DCS Factory

GRDA Unit 3 Combined Cycle Project178592.67.9120

Combustion Turbine Generator/Steam Turbine Generator

Bid Issue25Oct2013

Source: 00300, 2009, v1.2

Section BCombustion Turbine Generator

Quotation Fill-In Information Page 37 of 44

Reference Document Submittal Item Tech Fill-In Data

16031 Secondary current rating16031 Application Relaying16031 Laboratory calibration required16031 Yes or No16031 Line side16031 Quantity16031 Secondary current rating16031 Application Metering16031 Laboratory calibration required16031 Yes or No16031 Neutral side16031 Quantity16031 Secondary current rating16031 Application Relaying16031 Laboratory calibration required16031 Yes or No16031 Neutral side16031 Quantity16031 Secondary current rating16031 Application Metering16031 Laboratory calibration required16031 Yes or No

16031 Generator field voltage at maximum kVA output, volts

16031Generator field current at maximum excitation, amperes

16031Maximum temperature rise above 104° F (40° C) gas temperature

16031 Generator armature winding temperature rise, °F (°C)16031 Generator field winding temperature rise, °F (°C)16031 Generator core and mechanical parts adjacent to the

insulation temperature rise, °F (°C)

16031Maximum temperature rise above ambient air temperature of 104° F (40° C)

16031 Generator armature winding temperature rise, °F (°C)16031 Generator field winding temperature rise, °F (°C)16031 Collector rings temperature rise, °F (°C)16031 Telephone influence factor (IEEE Std. 115)16031 Calculated16031 Balanced16031 Residual16031 Guaranteed16031 Balanced16031 Residual16031 Wave form deviation factor (IEEE Std. 115)16031 Calculated16031 Balanced16031 Residual16031 Guaranteed16031 Balanced

Page 73: RFP 40313 Addendum #1 - Grand River Dam Authority 40313 Addendum #1 ... Quotation Fill-In Information for Steam Turbine Generator ... 00300A.5.1 Attendance at the Purchaser's DCS Factory

GRDA Unit 3 Combined Cycle Project178592.67.9120

Combustion Turbine Generator/Steam Turbine Generator

Bid Issue25Oct2013

Source: 00300, 2009, v1.2

Section BCombustion Turbine Generator

Quotation Fill-In Information Page 38 of 44

Reference Document Submittal Item Tech Fill-In Data

16031 Residual16031 Temperature detectors16031 Armature16031 Number16031 Type16031 Rotating exciter16031 Number16031 Type16031 Generator cold gas16031 Number16031 Type16031 Generator hot gas16031 Number16031 Type16031 Generator Loss Data

16031Generator calculated losses at continuous nameplate MVA, voltage, and frequency

16031 Total iron loss, kW16031 Generator stator I2R loss, kW16031 Generator rotor I2R loss, kW16031 Generator stray load loss, kW16031 Generator windage loss, kW

16031Total generator loss excluding bearings and excitation system, kW

16031 Static exciter losses, kW16031 Excitation transformer losses, kW16031 Generator efficiency, percent

16031Generator friction loss in bearings, seals, and collector rings, kW

16031 Heat Exchanger Data

16031Complete the following for each type of cooler required by the design

16031 Heat exchanger16031 Cooler description16031 Number of coolers16031 Number of sections per cooler

16031Generator kVA capability with one cooler section out of service, percent

16031 Cooling water required by each cooler16031 Inlet temperature, °F (°C)16031 Maximum flow, gpm (L/min)16031 Cleanliness factor16031 Heat duty at maximum load, each cooler

16031Tube side (waterside) pressure loss at maximum flow, gpm (L/min)

16031 Tube side (waterside) design conditions16031 Pressure, psi (kPa)16031 Temperature, °F (°C)16031 Tube size, in. (mm)16031 Tube wall thickness, in. (mm)16031 Tube material16031 Tubesheet material

Page 74: RFP 40313 Addendum #1 - Grand River Dam Authority 40313 Addendum #1 ... Quotation Fill-In Information for Steam Turbine Generator ... 00300A.5.1 Attendance at the Purchaser's DCS Factory

GRDA Unit 3 Combined Cycle Project178592.67.9120

Combustion Turbine Generator/Steam Turbine Generator

Bid Issue25Oct2013

Source: 00300, 2009, v1.2

Section BCombustion Turbine Generator

Quotation Fill-In Information Page 39 of 44

Reference Document Submittal Item Tech Fill-In Data

16031 Hydrogen Cooling System Data16031 Complete for hydrogen cooled generators16031 Hydrogen required to purge carbon dioxide, ft3 (m3)16031 Hydrogen required to fill system to maximum hydrogen

pressure after purging, ft3 (m3)

16031Guaranteed hydrogen consumption in 24 hours, ft3 (m3)

16031 Hydrogen seal oil flow, gpm (L/min)16031 Hydrogen seal oil pressure, psi (kPa)16031 Stator Winding Cooling Water System16031 Number of circulating pumps16031 Full- or half-capacity pumps16031 Stator cooling water demineralizer description16031 Excitation System16031 Excitation system description16031 Excitation system control system16031 Make and type of excitation system16031 Make and type of voltage regulator16031 Communication method to operator interface16031 Description of operator interface equipment16031 Rated output of excitation system, kW16031 Rated voltage, volts dc16031 Rated current, amperes dc16031 Excitation system response ratio, per unit16031 Ceiling voltage, percent minimum16031

Does the excitation system meet the definition of high initial response as defined in IEEE Standard 421.1?

1603116031 Yes or No16031 Protective Relaying16031 Generator protection relay type/model16031 Out-of-step (78) relay type/model16031 Dc Motors16031 Motors16031 Airside seal oil backup pump (dc)16031 kW16031 Volts16031 Enclosure16031 Quantity16031 Other dc motors16031 (Name of motor)16031 kW16031 Volts16031 Enclosure16031 Quantity

Page 75: RFP 40313 Addendum #1 - Grand River Dam Authority 40313 Addendum #1 ... Quotation Fill-In Information for Steam Turbine Generator ... 00300A.5.1 Attendance at the Purchaser's DCS Factory

GRDA Unit 3 Combined Cycle Project178592.67.9120

Combustion Turbine Generator/Steam Turbine Generator

Owner Review Issue08Aug2013

Source: 00300, 2009, v1.2

Section BCombustion Turbine Generator

Quotation Fill-In Information Page 40 of 44

Reference Document

Submittal Item Specification Tech Fill-In Data

19000 Combustion Turbine Long Term Services Specification

19000 General19000 Annual Operating Profile19000 Fired Hours per unit per year 600019000 Number of Starts per unit per year 15019000 Contract Term19000 Commencement COD under the EPC Contract19000 Expiration No sooner than at completion of

2nd Major Inspection for each unit

19000 Sunset Clause Not specified19000 Definitions19000 Calculation of FFH/EOH/AOH, etc. By Supplier19000 Planned Maintenance19000 Annual Borescope Inspection All Parts and Services1

19000 Combustion Inspections and Overhauls All Parts and Services1

19000 Combustion Inspection Interval19000 Hours (FFH, EOH, etc.) By Supplier19000 Starts (FS, ES, etc.) By Supplier19000 Hot Gas Path Inspections and Overhauls All Parts and Services1

19000 Hot Gas Path Inspection Interval19000 Hours (FFH, EOH, etc.) By Supplier19000 Starts (FS, ES, etc.) By Supplier19000 Major Inspections and Overhauls All Parts and Services1

19000 Major Inspection Interval19000 Hours (FFH, EOH, etc.) By Supplier19000 Starts (FS, ES, etc.) By Supplier19000 Generator Minor Inspections All Parts and Services1

19000 Generator Minor Inspection Interval19000 Hours (FFH, EOH, etc.) By Supplier19000 Starts (FS, ES, etc.) By Supplier19000 Generator Major Inspections All Parts and Services1

19000 Generator Major Inspection Interval19000 Hours (FFH, EOH, etc.) By Supplier19000 Starts (FS, ES, etc.) By Supplier19000 Technical Advisories affecting Planned Mainte All Parts and Services1

19000 Corrective actions required to maintain/restore expected performance, reliability or safety of any component/part

All Parts and Services1 (excludes Limited Scope Components)

19000 Parts and Services required to maintain emiss All Parts and Services1

19000 Limited Scope Components19000 Inspection Inspection, including removal or

access for inspection, cleaning and inspection services

19000 Replacement Not required19000 Items classified as Limited Scope ComponentsBy Supplier19000 Full Scope Components By Supplier19000 Onsite controls engineer to assist during startu Provided by Supplier

00300B.12 LTSA Technical Fill-In Data Required with Quotation

Page 76: RFP 40313 Addendum #1 - Grand River Dam Authority 40313 Addendum #1 ... Quotation Fill-In Information for Steam Turbine Generator ... 00300A.5.1 Attendance at the Purchaser's DCS Factory

GRDA Unit 3 Combined Cycle Project178592.67.9120

Combustion Turbine Generator/Steam Turbine Generator

Owner Review Issue08Aug2013

Source: 00300, 2009, v1.2

Section BCombustion Turbine Generator

Quotation Fill-In Information Page 41 of 44

Reference Document

Submittal Item Specification Tech Fill-In Data

19000 Disassembly, removal, cleaning and reassembly of enclosures, lagging, equipment and systems supplied under Equipment Purchase Specification necessary to access CTG to perform Planned Maintenance

Service provided by Supplier

19000 Unplanned Maintenance19000 Performance of Unplanned Maintenance Service provided by Supplier19000 All costs and expenses with respect to

Unplanned MaintenanceBy Purchaser, unless Unplanned Maintenance is caused by fault of Supplier scope of work

19000 Provision for Major Maintenance Parts necessary for Unplanned Maintenance

Provided by Supplier, Purchaser cost unless Unplanned Maintenance is caused by fault of Supplier scope of work

19000 Provision to perform Unplanned Maintenance on high-priority, 24/7 basis as required to remedy a condition resulting in a Forced Outage

Service provided by Supplier

19000 Major Maintenance Parts for Unplanned Maintenance

New and unused unless Purchaser elects to negotiate for refurbished parts

19000 Spare Parts; Tools/Tooling; TA19000 Initial Spare Parts19000 Costs incurred for procurement and shipping

to siteAll costs incurred borne by Supplier

19000 Parts condition, initial delivery of Spare Parts Inventory

New and unused

19000 Costs, replacement of Spare Parts used for Planned Maintenance

All costs incurred borne by Supplier

19000 Costs, replacement of Spare Parts used for Unplanned Maintenance

Purchaser cost unless Unplanned Maintenance is caused by fault of Supplier scope of work

19000 Parts condition, replacement of Spare Parts used for Unplanned Maintenance

New and unused, or refurbished consistent with Prudent Operating Practices and in accordance with Purchaser Approved Appendix 3 submittal

19000 Parts condition, replacement of Spare Parts used for Planned Maintenance

New and unused, or refurbished consistent with Prudent Operating Practices

19000 Time frame to replace used Spare Parts <2 months after removal19000 Parts condition, parts used for maintenance

of Limited Scope ComponentsNew and unused

19000 Data provided for refurbished parts proposed for use at Plant

Life history, including serial #'s, drawing or model #'s, factored hours/starts, trips and conditions, date(s) and type of repairs performed

19000 Procurement of all Major Maintenance Parts All costs incurred borne by Supplier, including shipping and inspection

Page 77: RFP 40313 Addendum #1 - Grand River Dam Authority 40313 Addendum #1 ... Quotation Fill-In Information for Steam Turbine Generator ... 00300A.5.1 Attendance at the Purchaser's DCS Factory

GRDA Unit 3 Combined Cycle Project178592.67.9120

Combustion Turbine Generator/Steam Turbine Generator

Owner Review Issue08Aug2013

Source: 00300, 2009, v1.2

Section BCombustion Turbine Generator

Quotation Fill-In Information Page 42 of 44

Reference Document

Submittal Item Specification Tech Fill-In Data

19000 Equivalent parts (to replace obsolete parts) Supplier provides same level or upgrade parts at no more than same cost as original parts

19000 Title to Replaced Parts Supplier19000 Tooling and equipment for all Major

MaintenanceProvided by Supplier at Supplier's sole cost

19000 Tool change scenario with price and part # Proposed by Supplier19000 Personnel19000 Services Director Serves as main Client - Supplier

interface19000 Guarantees19000 Planned Maintenance Components installed

or inspected during a Planned Maintenance event

Planned Maintenance Components shall provide reliable service until the next scheduled outage. All costs associated with a pre-mature failure or "Fall-out" of a Planned Maintenance Component shall be responsibility of Supplier

19000 Delivery time of all replacement parts (within scope) required for Planned Maintenance

At Site not less than 30 days prior to Planned Maintenance

19000 Plant Availability19000 Unplanned Outage, maximum aggregate

days for each CTG, 1st and 2nd years of operation

Proposed by Supplier

19000 Unplanned Outage, maximum aggregate days for each CTG, each year from 3rd year of operation to end of contract term

Proposed by Supplier

19000 Scheduled Outage Durations, Planned Maintenance

19000 Annual Borescope Inspections, each unit Outage duration proposed by Supplier, breaker to breaker or turning gear to turning gear basis

19000 Combustion Inspection and Overhaul, each unit

Outage duration proposed by Supplier, breaker to breaker or turning gear to turning gear basis

19000 Hot Gas Path Inspection and Overhaul, each unit

Outage duration proposed by Supplier, breaker to breaker or turning gear to turning gear basis

19000 Major Inspection and Overhaul, each unit Outage duration proposed by Supplier, breaker to breaker or turning gear to turning gear basis

19000 Generator Minor Inspection, each unit Outage duration proposed by Supplier, breaker to breaker or turning gear to turning gear basis

19000 Generator Major Inspection, each unit Outage duration proposed by Supplier, breaker to breaker or turning gear to turning gear basis

Page 78: RFP 40313 Addendum #1 - Grand River Dam Authority 40313 Addendum #1 ... Quotation Fill-In Information for Steam Turbine Generator ... 00300A.5.1 Attendance at the Purchaser's DCS Factory

GRDA Unit 3 Combined Cycle Project178592.67.9120

Combustion Turbine Generator/Steam Turbine Generator

Owner Review Issue08Aug2013

Source: 00300, 2009, v1.2

Section BCombustion Turbine Generator

Quotation Fill-In Information Page 43 of 44

Reference Document

Submittal Item Specification Tech Fill-In Data

19000 Performance degradation of Gross Electrical Output at 100% of CTG base load in each period of maintenance cycles

Proposed by Supplier

19000 Performance degradation of Gross Heat Rate at 100% of CTG base load in each period of maintenance cycles

Proposed by Supplier

19000 Performance Testing19000 Formulation for obtaining Gross Electrical

Output and Gross Heat Rate figures of "New and Clean" condition

Proposed by Supplier for Purchaser consideration/ acceptance

19000 Testing procedure for obtaining all guaranteed figures including the estimated uncertainty

Proposed by Supplier for Purchaser consideration/ acceptance

19000 Performance tests after each maintenance work

Performed by Purchaser

19000 Specification Appendices19000 LTSA Spec Appendix 1: Combustion Turbine I Mandatory, By Supplier19000 LTSA Spec Appendix 2: Spare Parts Price List Mandatory, By Supplier19000 LTSA Spec Appendix 3: Replacement Scenari Mandatory, By Supplier19000 LTSA Spec Appendix 4: Division of Work comp Mandatory, By Supplier19000 LTSA Spec Appendix 5: Manpower completed Mandatory, By Supplier19000 LTSA Spec Appendix 6: Field Service Rate com Mandatory, By Supplier19000 Remote Monitoring and Diagnostics 19000 All associated hardware, software and

telecom facilities for online monitoring of CTGs

Included

19000 Windows Compatibility Windows 719000 ERP Compatibility SAP ERP19000 Interface Security High security modem link or VPN

19000 Remote system administration services Required19000 Real-time process information by any Intranet

or Internet web browser on any connected PC (including necessary software licensing)

Required

19000 Remote monitoring parameters19000 Speed Required19000 Load Required19000 Fired Starts Required19000 Fired Hours Required19000 Site Barometric Reading Required19000 Temperatures19000 Inlet Ambient Required19000 Compressor Discharge Required19000 Turbine Exhaust Required19000 Turbine Wheelspace Required19000 Lube Oil Header Required19000 Lube Oil Tank Required19000 Bearing Metal Required19000 Bearing Drains Required19000 Exhaust Spread Required19000 Pressures19000 Compressor Discharge Required19000 Lube Pump(s) Required19000 Bearing Header Required19000 Cooling Water Required

Page 79: RFP 40313 Addendum #1 - Grand River Dam Authority 40313 Addendum #1 ... Quotation Fill-In Information for Steam Turbine Generator ... 00300A.5.1 Attendance at the Purchaser's DCS Factory

GRDA Unit 3 Combined Cycle Project178592.67.9120

Combustion Turbine Generator/Steam Turbine Generator

Owner Review Issue08Aug2013

Source: 00300, 2009, v1.2

Section BCombustion Turbine Generator

Quotation Fill-In Information Page 44 of 44

Reference Document

Submittal Item Specification Tech Fill-In Data

19000 Fuel Required19000 Filters (Fuel, Lube, Inlet Air) Required19000 Vibration Data for Power Train Required19000 Generator Required19000 Output Voltage Required19000 Field Voltage Required19000 Phase Current Required19000 Field Current Required19000 VARS Required19000 Stator Temperature Required19000 Load Required19000 Vibration Required19000 Start-Up Time Required19000 Coast-Down Time Required19000 Remote Services19000 Measure Equipment Condition19000 Combustion system performance vibration Required19000 Machine performance Required19000 Starting and shutdown characteristics Required19000 Diagnostics by communication with Plant

CEMRequired

19000 Comparison to baseline, design and fleet experience

Required

19000 Analyze equipment condition19000 Diagnostic and engr. services related to

alarm/error/malfunction that is not an in-service failure

Planned Maintenance

19000 Diagnostic and engr. services related to an in-service failure

Unplanned Maintenance

19000 Archive Plant historical data Required19000 Consultations between Remote Monitoring

Center and Plant O&M staffRequired

19000 Remote combustion tuning system to supervise and give recommendations for CTG tuning events

Provided by Supplier, tuning events warranted as Unplanned Maintenance

19000 Condition reporting Quarterly basis and interim (as required)

19000 RCA assistance Required

Notes1) "All Parts and Services" defined as: all planning, engineering, field repairs, shop repairs, replacement of parts,

Page 80: RFP 40313 Addendum #1 - Grand River Dam Authority 40313 Addendum #1 ... Quotation Fill-In Information for Steam Turbine Generator ... 00300A.5.1 Attendance at the Purchaser's DCS Factory

GRDA Unit 3 Combined Cycle Project178592.67.9120

Combustion Turbine Generator/Steam Turbine Generator

Bid Issue25Oct2013

Source: 00300, 2009, v1.2

Section CCombustion Turbine Generator

Quotation Fill-In Information Page 1 of 34

Received and Incorporated

00300C.2.5.4 Not Used00300C.2.6.1 All Exceptions are declared on Form 00300C.2.6.1 - Yes/No00300C.2.6.2 All Clarifications are declared on Form 00300C.2.6.2 - Yes/No

00300C.2.4 Quotation includes/excludes taxes - Included/Excluded00300C.2.5.1 Quotation Pricing firm through Quotation Validity Period - Yes/No00300C.2.5.2 Adjustment Pricing firm through End of Warranty - Yes/No00300C.2.5.3 Option Pricing firm through Quotation Validity Period - Yes/No

00300C.2.3 Quotation Validity Period, through January 31, 2014 per RFQ - Yes/No - If no, advise number of days

00300C.2.2 AddendaNumber Date Description

Phone NumberFax Number

Address/Number, StreetAddress/City

Address/State, Zip CodeEmail Address

Corporate InformationCompany Name

Technical Contact NameTitle

Purchase Order AddresseeAddress/Number, StreetAddress/State, Zip Code

Taxpayer ID Number (or EIN)Technical Contact

00300C.1 Not Used

00300C.2 General Quotation Parameters

Bidder's Quotation Date

00300C.2.1 Bidder's Contact InformationBidder's Quotation Number

00300C - Quotation Fill-In Information for Steam Turbine Generator - 495 MW Net Plant Output

Page 81: RFP 40313 Addendum #1 - Grand River Dam Authority 40313 Addendum #1 ... Quotation Fill-In Information for Steam Turbine Generator ... 00300A.5.1 Attendance at the Purchaser's DCS Factory

GRDA Unit 3 Combined Cycle Project178592.67.9120

Combustion Turbine Generator/Steam Turbine Generator

Bid Issue25Oct2013

Source: 00300, 2009, v1.2

Section CCombustion Turbine Generator

Quotation Fill-In Information Page 2 of 34

00300C.2.6.1.2 Technical Exceptions

Count Reference Stated Technical Exception123456789

10

00300C.2.6.1.1 Not Used

Form 00300C.2.6.1 Declared Exceptions to the RFQ Requirements

Page 82: RFP 40313 Addendum #1 - Grand River Dam Authority 40313 Addendum #1 ... Quotation Fill-In Information for Steam Turbine Generator ... 00300A.5.1 Attendance at the Purchaser's DCS Factory

GRDA Unit 3 Combined Cycle Project178592.67.9120

Combustion Turbine Generator/Steam Turbine Generator

Bid Issue25Oct2013

Source: 00300, 2009, v1.2

Section CCombustion Turbine Generator

Quotation Fill-In Information Page 3 of 34

00300C.2.6.2.2 Technical Clarifications

Count Reference Stated Technical Clarification123456789

10

00300C.2.6.2.1 Not Used

Form 00300C.2.6.2 Declared Clarifications to the RFQ Requirements

Page 83: RFP 40313 Addendum #1 - Grand River Dam Authority 40313 Addendum #1 ... Quotation Fill-In Information for Steam Turbine Generator ... 00300A.5.1 Attendance at the Purchaser's DCS Factory

GRDA Unit 3 Combined Cycle Project178592.67.9120

Combustion Turbine Generator/Steam Turbine Generator

Bid Issue25Oct2013

Source: 00300, 2009, v1.2

Section CCombustion Turbine Generator

Quotation Fill-In Information Page 4 of 34

$ -

$ - $ - $ - $ - $ - $ -

$ -

$ - $ - $ - $ - $ - $ -

$ -

00300C.3.1.1 Steam Turbine Generator(Supplier to provide breakdown as required)

00300C.3.2.1 Startup and Commissioning Spare Parts (from Table 3.2.1)00300C.3.2 Supplemental Product Pricing

Subtotal 00300C.3.1 Product Pricing (FCA-Factory Location)

Sum of Subtotals (Should Equal Base Quotation Price Above)

Subtotal 00300C.3.2 Supplemental Product Pricing00300C.3.2.6 Instruction Manuals (from Table 3.2.6)

00300C.3.2.3 Special Tools and Lift Fixtures (from Table 3.2.3)

00300C.3.2.4.2 Training Service (from Table 3.2.4.2)

00300C.3.2.2 NOT USED

00300C.3.2.5 Shipping/Transportation (from Table 3.2.5)

00300C.3 Quotation Pricing

Total Base Quotation Pricing - DDP/CIP Jobsite Location

00300C.3.1 Product Pricing (FCA-Factory Location)Price Breakdown

00300C.3.2.4.1 Field Service Representative (from Table 3.2.4.1)

Page 84: RFP 40313 Addendum #1 - Grand River Dam Authority 40313 Addendum #1 ... Quotation Fill-In Information for Steam Turbine Generator ... 00300A.5.1 Attendance at the Purchaser's DCS Factory

GRDA Unit 3 Combined Cycle Project178592.67.9120

Combustion Turbine Generator/Steam Turbine Generator

Bid Issue25Oct2013

Source: 00300, 2009, v1.2

Section CCombustion Turbine Generator

Quotation Fill-In Information Page 5 of 34

Extended Price $ - $ - $ - $ -

Extended Price $ - $ - $ - $ -

Extended Price $ -

$ -

$ -

Extended Price $ -

$ -

Table 3.2.4.2 Technical Field Services, Per Diem Rates and Expenses

Quantity Included in PO

Table 3.2.4: Technical ServicesBidder Response Column

Quantity Included in PO

$ - STG Field service weeks included in the firm fixed lump sum price 120

00300C.3.2.4.1 Field Service Representative

Unit Price

Trips $ - 40

Week

Unit of Measure Unit Price

Are special tools and/or lift fixtures required? Yes/No

Quantity Included in PO

Table 3.2.3: Special Tools and Lift Fixtures

Item Description Manufacturer's Part Identification

Yes/No

00300C.3.2 Supplemental Product Pricing TablesBidder to note that pricing included in these tables is for product scope that will be included in the initial Purchase Order with the successful Bidder. Pricing for Work deferred to a later date, such as adjustment pricing, option pricing and alternative scope pricing is not included in these tables.

Table 3.2.1: Startup and Commissioning Spare Parts

00300C.3.2.1 Startup and Commissioning Spare Parts Bidder Response Column

Unit Price

If Yes, Bidder shall provide a priced list of construction/erection spare parts included in the quote in Table 3.2.1.

00300C.3.2.2 NOT USED

Yes/NoAre startup spare or commissioining spare parts required?

Manufacturer's Part Identification

Subtotal: Table 00300C.3.2.1 Startup Spare Parts Pricing

$ -

If Yes, Bidder has included Spare Parts in base quotation per RFP requirements Yes/No

If Yes, Bidder shall provide a priced list of special tools included in the quote in Table 3.2.3.

$ -

Bidder Response Column

If Yes, Bidder has included special tools and lift fixtures in base quotation per RFP

$ - $ -

Subtotal: Table 00300C.3.2.3 Special Tools and Lift Fixtures Pricing $ -

Training weeks included in the firm fixed lump sum price Week $ - 5

If Yes, Bidder shall provide an itemized breakout of priced services included in the quote in Table 3.2.4.2

All-inclusive TRAINING shall include all salary and overhead, local lodging, travel between the jobsite and local lodging, meals, and miscellaneous expenses. A week of service shall be defined as five (5), eight (8) hour onsite workdays, Monday - Friday:

Unit of Measure Unit Price

Round trips included in the firm fixed lump sum price Trips $ - 2

Yes/No

Subtotal: Table 00300C.3.2.4.1 Field Service Pricing

Bidder has included Training time in base quotation per RFP requirements

Table 3.2.4.1 Technical Field Services, Per Diem Rates and Expenses

Unit of Measure

00300C.3.2.4.2 Training Service Bidder Response Column

STG Round trips included in the firm fixed lump sum price

All-inclusive FIELD SERVICE shall include all salary and overhead, local lodging, travel between the jobsite and local lodging, meals, and miscellaneous expenses. A week of service shall be defined as six (6), ten (10) hour onsite workdays, Monday - Saturday:

Unit of MeasureQuantity Included

in POItem Description

$ -

00300C.3.2.3 Special Tools and Lift Fixtures

Bidder has included field service time in base quotation per RFP requirements Yes/NoIf Yes, Bidder shall provide an itemized breakout of priced services included in the quote in Table 3.2.4.1

Page 85: RFP 40313 Addendum #1 - Grand River Dam Authority 40313 Addendum #1 ... Quotation Fill-In Information for Steam Turbine Generator ... 00300A.5.1 Attendance at the Purchaser's DCS Factory

GRDA Unit 3 Combined Cycle Project178592.67.9120

Combustion Turbine Generator/Steam Turbine Generator

Bid Issue25Oct2013

Source: 00300, 2009, v1.2

Section CCombustion Turbine Generator

Quotation Fill-In Information Page 6 of 34

00300C.3.2 Supplemental Product Pricing Tables

$ -

Extended Price $ - $ - $ - $ - $ - $ -

Extended Price $ -

$ -

$ -

Table 3.2.5: Shipping/Transportation

Subtotal: Table 00300C.3.2.4.1 Training Pricing

If Yes, Bidder shall provide an itemized breakout of transportation included in the quote in Table 3.2.5.

All-inclusive ROUND TRIP shall include all expenses traveling to and returning from the lodging local to the jobsite, from the Manufacturer's Field Service home base of operations. It shall include all transportation (air and/or ground), parking, tolls, meals, travel per diem, any salary/overhead while traveling, and other miscellaneous expenses associated with one round trip.

Yes/No

Bidder Response Column

Point of OriginItem Description

1 LotCarrier Type

Quantity Included in PO

00300C.3.2.6 Instruction Manuals

Steam Turbine Generator(Supplier to provide breakdown as required)

If Yes, Bidder shall provided an itemized breakout Instruction Manual pricing included in the quote in Table 3.2.6.

$ - EA

Yes/NoBidder has included pricing for Instruction Manuals in base quotation per Article Q501

Unit PriceQuantity Included

in POItem Description MediaProof Copy of Instruction Manuals Electronic

$ - 1

Subtotal: Table 00300C.3.2.6 Instruction Manuals Pricing

Final Copy of Instruction Manuals Electronic EA

1

Table 3.2.6: Instruction ManualsUnit of

Measure

Bidder has included transportation in base quotation per RFP requirements

Bidder Response Column

00300C.3.2.5 Shipping/Transportation

Subtotal: Table 00300C.3.2.5 Transportation Pricing

Page 86: RFP 40313 Addendum #1 - Grand River Dam Authority 40313 Addendum #1 ... Quotation Fill-In Information for Steam Turbine Generator ... 00300A.5.1 Attendance at the Purchaser's DCS Factory

GRDA Unit 3 Combined Cycle Project178592.67.9120

Combustion Turbine Generator/Steam Turbine Generator

Bid Issue25Oct2013

Source: 00300, 2009, v1.2

Section CCombustion Turbine Generator

Quotation Fill-In Information Page 7 of 34

Unit Price(to Add)

Unit Price (to Delete)

Delivery ARO (WKS)

$ - $ - $ - $ - $ - $ - $ - $ -

Unit Price(to Add)

Unit Price (to Delete)

Delivery ARO (WKS)

$ - $ - $ - $ - $ - $ - $ - $ -

Unit Price(to Add)

Unit Price (to Delete)

Delivery ARO (WKS)

$ - $ - $ - $ - $ - $ - $ - $ -

Unit of Measure Unit Price

$/Day $ - $/Day $ - $/Day $ -

$/h $ - $/h $ - $/h $ -

$/rt $ -

00300C.4 Unit Adjustment Pricing Tables

Round Trip Rate

Item Number

Item Number Item Description Unit of Measure

Table 4.1: Equipment Pricing

Table 4.2: Startup and Commissioning Spare Parts

Item Description

Item Description Unit of Measure

Table 4.3: NOT USED

Table 4.4: Special Tools and Lift Fixtures

Item Number

Monday through Friday (up to 8 hours)

Unit of Measure

Per diem Rate

Adjustment Rate Monday through Friday beyond 8 hours)

Per diem Rate Sunday / Holiday (up to 8 hours)

Table 4.5: Supplemental "Out-of-Base-Scope" Technical Assistance

Saturday (up to 8 hours)

All-inclusive DAILY PER DIEM RATE shall include all salary and overhead, local lodging, travel between the jobsite and local lodging, meals, and miscellaneous expenses. A day of service shall be defined as one, eight (8) hour onsite workday in which all project construction and management personnel are working normal shifts:

Per diem Rate

All-inclusive RATE TO ADJUST above per diem rates for hours worked beyond an eight (8) hour onsite workday:

Adjustment Rate Saturday (beyond 8 hours)Adjustment Rate Sunday / Holiday (beyond 8 hours)

All-inclusive ROUND TRIP RATE shall include all expenses traveling to and returning from the lodging local to the jobsite, from the Manufacturer's Field Service home base of operations. It shall include all transportation (air and/or ground), parking, tolls, meals, travel per diem, any salary/overhead while traveling, and other miscellaneous expenses associated with one round trip.

Page 87: RFP 40313 Addendum #1 - Grand River Dam Authority 40313 Addendum #1 ... Quotation Fill-In Information for Steam Turbine Generator ... 00300A.5.1 Attendance at the Purchaser's DCS Factory

GRDA Unit 3 Combined Cycle Project178592.67.9120

Combustion Turbine Generator/Steam Turbine Generator

Bid Issue25Oct2013

Source: 00300, 2009, v1.2

Section CCombustion Turbine Generator

Quotation Fill-In Information Page 8 of 34

Bidder Response Column

$ -

$ -

Bidder Response Column

Bidder Response Column

00300C.5 Option Pricing

00300C.6 Not Used

00300C.5.1 Attendance at the Purchaser's DCS Factory Acceptance Test per Article 01500.1, STG Scope Matrix Item 99

00300C.5.2 Recommended STG Scope Spare Parts List per Article 01500.1.9 (Pricing Valid Up To One Year After The Contract Award Date))

00300C.7 Logistics00300C.7.1 Jobsite Storage Requirements

Bidder's product included in the quotation has special storage requirements Yes/No

lb

00300C.7.2 ShipmentsManufactured in Bidder's own facility? Yes/NoManufactured in facilities of others? If so list. Yes/No

If Yes, special storage requirements are included with the quotation Yes/No

Bidder proposes subcontracting any major portions of the Work Yes/NoIf Yes, Sub-supplier List is included with the quotation Yes/No

00300C.8 Subcontracting

Number of Shipments CountTotal Number of Pieces per Shipment Count

Total Volume of Largest Single Component cu ft

Total Weight per Shipmentcu ft

Total Weight of Largest Single Component

lbTotal Volume per Shipment

Origin CountryStateCity

If yes, list of other locations included with the quotation Yes/No

Page 88: RFP 40313 Addendum #1 - Grand River Dam Authority 40313 Addendum #1 ... Quotation Fill-In Information for Steam Turbine Generator ... 00300A.5.1 Attendance at the Purchaser's DCS Factory

GRDA Unit 3 Combined Cycle Project178592.67.9120

Combustion Turbine Generator/Steam Turbine Generator

Bid Issue25Oct2013

Source: 00300, 2009, v1.2

Section CCombustion Turbine Generator

Quotation Fill-In Information Page 9 of 34

LD*

LD(Supplier to provide breakdown as required)

00300C.9.1.3 Bidder has provided a Standard Delivery/Completion schedule. Yes/No

Yes/No18-Jan-16

00300C.9 Delivery and Schedule

Bidder Response ColumnRequired Delivery

00300C.9.1 Delivery DAP Jobsite (originating in US), DDP Jobsite (originating outside US) Early Delivery**

120 Days Maximum Prior to Required Delivery

00300C.9.1.2 Bidder has provided a preliminary milestone schedule. Yes/NoIf No, Bidder has included a proposed staggered shipping schedule. Yes/No

Steam Turbine Generator

Yes/No00300C.9.1.1 Bidder will make single consolidated shipment.

* "LD" indicates that delivery of the Goods after the "Required Delivery" date is subject to liquidated damages in accordance with applicable articles of the RFP.

** Purchaser will not accept delivery of Goods at the Jobsite prior to the "Early Delivery" date unless previously agreed by Purchaser in writing. Delivery in the period between the "Early Delivery" and "Required Delivery" date is at the discretion of Supplier.

Bidder confirms ability and commitment to meet all the required submittal dates. Yes/NoIf No, Bidder has for each submittal to which the “No” applies stated the best possible submittal date as an exception.

Yes/No

00300C.9.2 Schedule of Submittals and Applicable Liquidated Damages

Page 89: RFP 40313 Addendum #1 - Grand River Dam Authority 40313 Addendum #1 ... Quotation Fill-In Information for Steam Turbine Generator ... 00300A.5.1 Attendance at the Purchaser's DCS Factory

RFP 40313

Source: 00300, 2009, v1.2

Section CCombustion Turbine Generator

Quotation Fill-In Information Page 10 of 34

TBD TBD

Calendar Event Due Date301 Engineering/Procurement/

Production/Testing and Inspection/Shipping Schedule and Status Report

30 After Effective Date with Monthly Updates

No

302 Preshipment Inspection Notice 30 Before Shipment of Equipment No

303 Electronic Material List 30 Before Shipment of Equipment No304 Shipping Notice 2 Full Work Days Notice No305 Detailed Final Packing List of

Shipment of Equipment, corresponding with Electronic Material List data

Upon each Shipment and With Electronic Materials List

No

306 Hazardous materials documentation

With Each Shipment No

701 Proof Copy of Instruction Manuals

90 Before Shipment of Equipment No

702 Final Copy of Instruction Manuals

15 Before Shipment of Equipment No

703 Recommended Spare Parts List, with Unit Prices and Names of Suppliers, Necessary to Cover a Full Maintenance Cycle (3 years)

90 After Effective Date No

704 Startup and Commissioning Spare Parts List, Priced

90 Before Shipment of Equipment No

15561 Steam Turbine .0601 15561 Final heat balances for load

conditions specified in Article 15561.1.3

30 After Effective Date No

0602 15561 Expansion lines for the heat balances furnished for load conditions specified in Article 15561.1.3

30 After Effective Date No

0603 15561 HP turbine end points versus throttle flow

30 After Effective Date No

0604 15561 Expansion line end points versus reheater flow (throttle flow for nonreheat units) curves for exhaust pressures for 1 inch (25 mm) Hg absolute to the turbine maximum allowable continuous operating exhaust pressure

30 After Effective Date No

0605 15561 Leakage flow and leakage enthalpy versus throttle flow curves

30 After Effective Date No

0606 15561 Turbine section efficiency versus inlet volumetric flow

30 After Effective Date No

Project Delivery Date: January 18, 2016

00300.9.2 Schedule of Submittals and Applicable Penalty

Effective Date:

Bid

der C

ompl

ies

Yes

/No

Penaltyapply?

The list is not all-inclusive. There are more requirements for Supplier to "provide notice," to "advise," to "update," to "inform," etc., or to “submit” should a condition precedent occur. These have not been included in the list. It will however remain Supplier's responsibility to comply with the submittal requirements whether or not the submittal is actually included on the following:Item No.

Reference Document

Submittal DatesSubmittals Item

Estimated First Shipment Date:

Page 90: RFP 40313 Addendum #1 - Grand River Dam Authority 40313 Addendum #1 ... Quotation Fill-In Information for Steam Turbine Generator ... 00300A.5.1 Attendance at the Purchaser's DCS Factory

RFP 40313

Source: 00300, 2009, v1.2

Section CCombustion Turbine Generator

Quotation Fill-In Information Page 11 of 34

0607 15561 Combined efficiency of IP and LP turbines as a function of reheat temperature and intercept valve pressure

30 After Effective Date No

0608 15561 Turbine exhaust loss curve 30 After Effective Date No0609 15561 Turbine exhaust pressure

correction30 After Effective Date No

0610 15561 First-stage pressure versus flow to the following stage curve

30 After Effective Date No

0611 15561 Reheat bowl pressure versus flow to the following stage curve

30 After Effective Date No

0612 15561 Correction curves for kilowatts and heat rate for the following

After Effective Date No

0613 15561 Throttle pressure rated +5 percent, -50 percent

30 After Effective Date No

0614 15561 Throttle temperature rated +57.2° F to -18.4° F (+14° C to -28° C)

30 After Effective Date No

0615 15561 Reheat temperature rated +57.2° F to -18.4° F (+14° C to -28° C)

30 After Effective Date No

0616 15561 Reheater pressure drop 5 percent to 15 percent of HP turbine exhaust pressure

30 After Effective Date No

0617 15561 Exhaust pressure from 1 inch (25 mm) Hg abs to the turbine maximum allowable continuous operating exhaust pressure

30 After Effective Date No

0618 15561 All other correction curves for ASME PTC 6.2 Acceptance Test

30 After Effective Date No

0619 15561 Valve loop correction to heat rate curve

30 After Effective Date No

0620 15561 Turbine heat rate versus gross turbine output for governing control and hybrid mode of operation

30 After Effective Date No

0621 15561 The following variable pressure performance curves

After Effective Date No

0622 15561 HP turbine exhaust pressure versus percent maximum expected throttle flow

30 After Effective Date No

0623 15561 Main turbine throttle pressure versus percent maximum expected throttle flow

30 After Effective Date No

0624 15561 HP turbine exhaust temperature versus percent maximum expected throttle flow

30 After Effective Date No

0625 15561 IP turbine exhaust pressure versus percent maximum expected throttle flow

30 After Effective Date No

0626 15561 All curves in the Supplier's standard thermal kits

30 After Effective Date No

Page 91: RFP 40313 Addendum #1 - Grand River Dam Authority 40313 Addendum #1 ... Quotation Fill-In Information for Steam Turbine Generator ... 00300A.5.1 Attendance at the Purchaser's DCS Factory

RFP 40313

Source: 00300, 2009, v1.2

Section CCombustion Turbine Generator

Quotation Fill-In Information Page 12 of 34

0627 15561 Final list of motors including voltage, full load current, locked-rotor current, phase, horsepower, enclosure type for each motor, and space heater watts and volts

90 After Effective Date No

0628 15561 Final list of closed cycle cooling water requirements including flow and pressure drop and flow diagram

45 After Effective Date No

0629 15561 Final list of all instrument/service air users and consumption

90 After Effective Date No

0501 15561 Steam seal system diagram indicating flows, pressures, and temperatures (steam seal system P&ID)

60 After Effective Date No

0630 15561 Lube oil system data including volumetric and flow back

60 After Effective Date No

0502 15561 Lube oil diagrams (lube oil system P&ID)

60 After Effective Date No

0503 15561 Drawings and procedure for cleaning of lube oil system showing all temporary pipe and equipment required

After Effective Date No

0631 15561 Preliminary air consumption 40 After Effective Date No

0504 15561 DEHC fluid diagrams (control and protection P&ID)

60 After Effective Date No

0505 15561 Drawings indicating the location of all turbine generator junction boxes and electrical accessories requiring embedded conduit in the turbine generator pedestal, including recommended quantities and sizes of conduits into accessory

90 After Effective Date No

0506 15561 Detailed schematic and wiring drawings of all electrical control wiring

120 After Effective Date No

0507 15561 Drawings indicating the size and location of all turbine generator ground pads

90 After Effective Date No

0508 15561 All drawings required to indicate miscellaneous piping and wiring connections and any other piping and wiring connections not indicated on previous drawings

120 After Effective Date No

0509 15561 Arrangement drawings of all piping and accessories furnished, as required for the Purchaser's check of the layout of these items

150 After Effective Date No

Page 92: RFP 40313 Addendum #1 - Grand River Dam Authority 40313 Addendum #1 ... Quotation Fill-In Information for Steam Turbine Generator ... 00300A.5.1 Attendance at the Purchaser's DCS Factory

RFP 40313

Source: 00300, 2009, v1.2

Section CCombustion Turbine Generator

Quotation Fill-In Information Page 13 of 34

0510 15561 Drawings as required to indicate the details of construction and internal wiring of all equipment and equipment components furnished. Detail drawings of standard gauges, instruments, valves, and similar miscellaneous items

60 Before Shipment of Equipment No

0632 15561 Lateral and torsional analysis report and critical speeds of turbine generator rotor

60 After Effective Date No

0511 15561 A block diagram with significant transfer functions representing the generator, excitation, and regulator satisfactory for computer studies

30 After Effective Date No

0633 15561 Complete listing of all accessory equipment with instrument ranges and recommended contact set points

150 After Effective Date No

0634 15561 Listing of accessory equipment to be shipped loose to jobsite

30 Before Shipment of Equipment No

0512 15561 Drawings of all separately mounted equipment indicating information required for setting, piping, and wiring the items. This includes outline drawings of the supervisory instruments and accessory electrical equipment.

120 After Effective Date No

0201 15561 Supplier to participate in design conference

15 After Effective Date No

0635 15561 Equipment startup schedule duration requirements

90 After Effective Date No

0636 15561 Specification data pages updated and resubmitted

60 After Effective Date No

0637 15561 Preservative coating data 60 After Effective Date No

0638 15561 Detailed drawing submittal schedule list and submittal schedule

30 After Effective Date No

0639 15561 Detailed data to describe the capability of the unit to operate at speeds above and below rated speed, including minimum and maximum allowable speed versus cumulative time duration of off normal speed operation

60 After Effective Date No

Page 93: RFP 40313 Addendum #1 - Grand River Dam Authority 40313 Addendum #1 ... Quotation Fill-In Information for Steam Turbine Generator ... 00300A.5.1 Attendance at the Purchaser's DCS Factory

RFP 40313

Source: 00300, 2009, v1.2

Section CCombustion Turbine Generator

Quotation Fill-In Information Page 14 of 34

0640 15561 Detailed information as to the capability of the turbine generator to respond to a system upset situation, where a large portion of the system load is applied to the unit and load shedding is required

60 After Effective Date No

0641 15561 All control devices and/or process set points, ranges, and flow quantities

60 After Effective Date No

0642 15561 Complete I/O list for signals to/from Subsupplier's systems from/to Supplier's DCS

120 After Effective Date No

0643 15561 I/O counts 120 After Effective Date No

0513 15561 Detailed logic diagrams, operations procedures, and operator interface screens to implement control of Supplier's equipment via Purchaser's DCS

120 After Effective Date No

0644 15561 Electrical load list including MOVs

60 After Effective Date No

0514 15561 Turbine generator general arrangement drawings. These drawings shall indicate all major equipment locations, access doors, maintenance or equipment removal space, and provide sufficient detail to allow for plan layout.

30 After Effective Date No

0515 15561 All main steam, reheat steam, and large bore piping connection drawings including type, allowable movements, and loads

60 After Effective Date No

0516 15561 All main steam, reheat steam, and large bore piping connection drawings end prep details

60 After Effective Date No

0517 15561 Details of temporary steam blow connections

60 After Effective Date No

0518 15561 Condenser interface details including loading flange connections and loading conditions

60 After Effective Date No

0519 15561 Drawings to assist Supplier in bus duct design/layout interface with generator ("bus duct" includes isophase bus duct and bus duct from generator neutral enclosure to the generator NGR enclosure)

60 After Effective Date No

Page 94: RFP 40313 Addendum #1 - Grand River Dam Authority 40313 Addendum #1 ... Quotation Fill-In Information for Steam Turbine Generator ... 00300A.5.1 Attendance at the Purchaser's DCS Factory

RFP 40313

Source: 00300, 2009, v1.2

Section CCombustion Turbine Generator

Quotation Fill-In Information Page 15 of 34

0645 15561 Flow charts detailing on-line monitoring programs for startup and on-line monitoring of critical parameters

120 After Effective Date No

0520 15561 Preliminary drawings and detailed assembly instructions for erection bid solicitation

120 After Effective Date No

0521 15561 Final erection drawings and detailed assembly instructions

360 After Effective Date No

0646 15561 Detailed drawing submittal list and submittal schedule

60 After Effective Date No

15565 Lube Oil Conditioner .

0538 15565 Drawings of layout and overall dimensions of the lube oil conditioner skid package

30 After Effective Date No

0539 15565 Detailed drawings of all electrical/control wiring

30 After Effective Date No

0540 15565 Piping and instrument diagrams 30 After Effective Date No

0541 15565 All drawings required to locate all piping and wiring connections

30 After Effective Date No

16031 Cylindrical Rotor Generators .

0202 16031 Supplier to participate in design conference

15 After Effective Date No

0650 16031 Generator hydrogen pressure correction curves for ASME PTC 6.2 acceptance test

Upon Submittal of Proposal No

0651 16031 Generator power factor correction curves for ASME PTC 6.2 acceptance test

Upon Submittal of Proposal No

0652 16031 Critical speeds of generator 30 After Effective Date No

0653 16031 Generator loss curve and excitation power requirement curve including total electrical losses for generation capability at minimum hydrogen pressure and at 1 bar (14.5 psi) including up to the maximum hydrogen pressure for rated and unity power factors. Curve shall include the total mechanical or fixed losses.

30 After Effective Date No

0654 16031 Water requirements for the air or hydrogen coolers indicated as a curve for varying load conditions, hydrogen pressures, and cooling water temperatures

30 After Effective Date No

Page 95: RFP 40313 Addendum #1 - Grand River Dam Authority 40313 Addendum #1 ... Quotation Fill-In Information for Steam Turbine Generator ... 00300A.5.1 Attendance at the Purchaser's DCS Factory

RFP 40313

Source: 00300, 2009, v1.2

Section CCombustion Turbine Generator

Quotation Fill-In Information Page 16 of 34

0655 16031 Detailed data describing capability of the unit to operate above and below rated speed, including minimum and maximum allowable speed versus cumulative time duration of off-normal speed operation

30 After Effective Date No

0656 16031 Detailed information on the capability of the generator to respond to a system upset situation, where a large portion of the system load is applied to the unit and load shedding is required

30 After Effective Date No

0657 16031 Reactive power capability versus real power capability curve at minimum and maximum hydrogen pressure(s)

30 After Effective Date No

0658 16031 Generator "Vee" curves 30 After Effective Date No

0659 16031 Zero and rated power factor current saturation curves

30 After Effective Date No

0660 16031 No load saturation curves 30 After Effective Date No

0661 16031 Generator allowable negative sequence versus time curve

30 After Effective Date No

0662 16031 Generator current decrement curves for 3-phase, line-to-line, and line-to-neutral short-circuit conditions at the generator terminals

30 After Effective Date No

0663 16031 Generator current decrement curves for 3-phase, line-to-line, and line-to-neutral short-circuit conditions at terminals of transformers connected to generator terminals. Electrical system parameters will be furnished by the Purchaser.

30 After Effective Date No

0664 16031 Generator current transformer secondary excitation characteristic curve

30 After Effective Date No

0665 16031 Generator current transformer ratio correction factor curve

30 After Effective Date No

0666 16031 Generator current transformer thermal rating

30 After Effective Date No

0667 16031 Generator current transformer mechanical rating

30 After Effective Date No

0668 16031 Generator current transformer IEC or ANSI metering and relaying accuracy class

30 After Effective Date No

Page 96: RFP 40313 Addendum #1 - Grand River Dam Authority 40313 Addendum #1 ... Quotation Fill-In Information for Steam Turbine Generator ... 00300A.5.1 Attendance at the Purchaser's DCS Factory

RFP 40313

Source: 00300, 2009, v1.2

Section CCombustion Turbine Generator

Quotation Fill-In Information Page 17 of 34

0669 16031 Generator current transformer secondary resistance at 77.0° F (25° C)

30 After Effective Date No

0670 16031 Generator current transformer phase angle correction factor curves

30 After Effective Date No

0671 16031 Generator current transformer correction factor curves

30 After Effective Date No

0672 16031 All generator, exciter, and regulator data required to complete a mathematical model study of system stability

30 After Effective Date No

0542 16031 A block diagram with significant transfer functions representing the generator, exciter, and regulator satisfactory for computer studies

30 After Effective Date No

0543 16031 Hydrogen seal oil diagrams 90 After Effective Date No

0544 16031 Stator cooling water diagrams 90 After Effective Date No

0673 16031 Complete listing of all accessory equipment with instrument ranges and recommended contact set points

90 After Effective Date No

0674 16031 List of all control devices and/or process set points, ranges, and flow quantities

90 After Effective Date No

0675 16031 Listing of accessory equipment to be shipped loose to jobsite

120 After Effective Date No

0545 16031 Air-to-water cooling diagrams or hydrogen-to-water cooling diagrams

90 After Effective Date No

0546 16031 Drawings of all separately mounted equipment indicating information required for setting, piping, and wiring the items

60 After Effective Date No

0547 16031 Drawings indicating location of all generator junction boxes and electrical accessories requiring embedded conduit in the turbine generator pedestal, including recommended quantities and sizes of conduits into each junction box or piece of equipment

90 After Effective Date No

0548 16031 Drawings indicating the size and location of all generator ground pads

90 After Effective Date No

Page 97: RFP 40313 Addendum #1 - Grand River Dam Authority 40313 Addendum #1 ... Quotation Fill-In Information for Steam Turbine Generator ... 00300A.5.1 Attendance at the Purchaser's DCS Factory

RFP 40313

Source: 00300, 2009, v1.2

Section CCombustion Turbine Generator

Quotation Fill-In Information Page 18 of 34

0549 16031 Drawings indicating electrical connection details to the generator terminals, generator neutral enclosure, and generator current transformers

90 After Effective Date No

0550 16031 Detailed schematic drawings of all electrical control wiring

90 After Effective Date No

0551 16031 All certified drawings required to indicate miscellaneous piping and wiring connections and any other piping and wiring connections not indicated on previous drawings. This shall include piping diagrams as required to indicate manufacturer's requirements for the Purchaser's piping systems.

90 After Effective Date No

0552 16031 Arrangement drawings of all piping and accessories furnished, as required for the Engineer's check of the layout of these items

90 After Effective Date No

0553 16031 Drawings as required to indicate the details of construction and internal wiring of all equipment and equipment components furnished. Detail drawings of standard gauges, instruments, valves, and similar miscellaneous items.

180 After Effective Date No

0676 16031 Generator terminal enclosure outline and loading data

90 After Effective Date No

0554 16031 Provide a block diagram and parameter values for the significant transfer functions (representing the generator, excitation and governor) satisfactory for transient and dynamic computer studies

30 After Effective Date No

16051 Electrical Design and Equipment

.

0677 16051 Certified design data and performance curves

70 Before Shipment Yes

0555 16051 Arrangement and fabrication/ erection drawings

90 After Effective Date Yes

Page 98: RFP 40313 Addendum #1 - Grand River Dam Authority 40313 Addendum #1 ... Quotation Fill-In Information for Steam Turbine Generator ... 00300A.5.1 Attendance at the Purchaser's DCS Factory

RFP 40313

Source: 00300, 2009, v1.2

Section CCombustion Turbine Generator

Quotation Fill-In Information Page 19 of 34

0556 16051 Detailed set of drawings to include arrangement drawings, one-line and three-line diagrams, metering and relaying diagrams, schematics, instrument door details, nameplate schedule, and bill of materials

60 After Effective Date Yes

0557 16051 Final set of above drawings in addition to interconnection wiring diagrams

21 After Purchaser comments on initial drawings

Yes

0558 16051 Final submittal of as-built drawings

30 After Shipment Yes

0559 16051 Relay instruction and service manual including relay curve information

90 After Effective Date Yes

0678 16051 Current transformer ratio correction factor and excitation curves

90 After Effective Date Yes

0679 16051 Time overcurrent curves for each overload, molded case circuit breaker, and solid-state protective device used

30 After Effective Date Yes

0560 16051 I/O database and I/O wiring diagrams

Upon Shipment Yes

16142 Generator Neutral Grounding .

0680 16142 Bill of Material, Including Quantity, Description, and Part Number

Upon Effective Date Yes

0681 16142 Certified design calculations 30 After Effective Date Yes

0561 16142 Preliminary outline drawings 15 After Effective Date Yes

0562 16142 Final drawings 60 After Effective Date Yes

0563 16142 Schematic and wiring diagrams 60 After Effective Date Yes

16201 Protective Relaying Panels .

0564 16201 Outline drawings showing dimensions, weight, and mounting requirements

15 After Effective Date Yes

0565 16201 Schematic diagrams 30 After Effective Date Yes

0566 16201 Connection and wiring diagrams 30 After Effective Date Yes

0567 16201 Erection drawing 30 After Shipment Yes

0568 16201 Relay installation and wiring information

30 After Effective Date Yes

0569 16201 Nameplate drawings 45 After Effective Date Yes

E645 Electric Actuators .

0570 E645 Actuator outline diagrams 30 After Effective Date No

0571 E645 Wiring diagrams 30 After Effective Date No

K100 Instrumentation .

0572 K100 Instrument Location Plan Drawings

90 After Effective Date Yes

Page 99: RFP 40313 Addendum #1 - Grand River Dam Authority 40313 Addendum #1 ... Quotation Fill-In Information for Steam Turbine Generator ... 00300A.5.1 Attendance at the Purchaser's DCS Factory

RFP 40313

Source: 00300, 2009, v1.2

Section CCombustion Turbine Generator

Quotation Fill-In Information Page 20 of 34

0573 K100 Instrument factory calibration sheets

Upon Shipment of Instruments Yes

0574 K100 Flow element calculation data sheets showing beta ratio, dP, flow

120 After Effective Date Yes

0575 K100 ISA-format datasheets for all Instruments

120 After Effective Date Yes

0682 K100 PTC 19.3 calculations for steam line TW's vib failure analysis confirming thermowells will not fail in service or during steam blow conditions.

120 After Effective Date Yes

M200 Piping .

0683 M200 Calculations to verify suitability of integrally reinforced fittings for dissimilar branch/header materials.

Q002 General Quality System Requirements

.

0401 Q002 Quality Manual, controlled copy 30 After Effective Date

0402 Q002 Certification Letter or Certificate of Authorization (copy), if certified by a registered agency, e.g., ASME Certificate of Authorization, ISO Certificate

30 After Effective Date

0403 Q002 Subsupplier listing 5 Before Issue of Subsupplier Purchase Order

0404 Q002 Inspection and test plan 30 After Effective Date

0405 Q002 Notification of inspection/test (for B&V hold/witness points)

14 Before Test/Inspection

Q100 General Welding Requirements

.

0406 Q100 Nonconformance reports 5 After Discovery of Nonconf.

0407 Q100 ASME/NBIC Data Reports 60 After Fabrication Completion

0407 Q100 Radiographs 14 After Fabrication Completion

Q110 Welding of 9Cr-1Mo-V (Grade 91) Materials

.

0408 Q110 ASME B31.1 shop fabricated piping spools P91 documentation records

21 Before Shipment

Q301 Manufacturer's Standard Coating

.

0683 Q301 Shop drawings that identify shop-applied coating systems

30 Before Start of Fabrication No

0684 Q301 Manufacturer's product data sheets

30 After Release to Proceed No

Q400 General Equipment Requirements

.

Page 100: RFP 40313 Addendum #1 - Grand River Dam Authority 40313 Addendum #1 ... Quotation Fill-In Information for Steam Turbine Generator ... 00300A.5.1 Attendance at the Purchaser's DCS Factory

RFP 40313

Source: 00300, 2009, v1.2

Section CCombustion Turbine Generator

Quotation Fill-In Information Page 21 of 34

0301 Q400 Shipment Plan providing details of field assembly work required as described in the Supplier's proposal.

30 After Effective Date No

Q502 Electrical Data

0576 Q502 Completed motor information sheets

60 After Effective Date Yes

0577 Q502 Completed electric actuator information sheet

60 After Effective Date Yes

Page 101: RFP 40313 Addendum #1 - Grand River Dam Authority 40313 Addendum #1 ... Quotation Fill-In Information for Steam Turbine Generator ... 00300A.5.1 Attendance at the Purchaser's DCS Factory

GRDA Unit 3 Combined Cycle Project178592.67.9120

Combustion Turbine Generator/Steam Turbine Generator

Bid Issue25Oct2013

Source: 00300, 2009, v1.2

Section CCombustion Turbine Generator

Quotation Fill-In Information Page 22 of 34

Bidder Response Column

Reference Document Submittal Item Yes/No

15561 Steam Turbine .15561 Heat balance diagrams for each load condition.15561 Exhaust pressure correction curves for heat rate and output.15561 Startup curves for hot, warm, and cold startups indicating flow, temperature,

time, and other parameters for normal startups and loading rate curve.

15561 Lube oil pump characteristic curves.15561 Turbine overall length, width, height, and shaft center line to floor line

dimension.15561 Valve restraint forces imposed on turbine foundation and any other

information that should be incorporated in the turbine foundation design.15561 Bearing spans.15561 Turbine control panels and control cabinets overall length, width, and height.

15561 EHC insert panels and/or CRT overall length, width, and height.15561 Table of weights and dimensions indicating assembled weights and

dimensions of major components, weights to be handled during erection, and weights to be handled during overhaul.

15561 Complete list of necessary special tools. The listing shall provide a complete description and quantity of each item including a discussion or designation of particular items required for erection and/or maintenance.

15561 Complete list of recommended spare parts.15561 Description of required sectional shipments if equipment cannot be

completely factory assembled.15561 Information describing coating systems for equipment.15561 Complete information on the EHC system including a list of major

components, description of the principles of operation, and available options.

15561 Complete information on the TSI system including a list of major components, description of the principles of operation, and available options.

15561 Description of instrumentation furnished.15561 Power consumption of EHC and supervisory system in kVA, normal and

peak, inverter power.15561 Complete description of cable requirements, including the cable

constructions, for all equipment furnished and applicable flame tests.15561 Complete description of any voltage level separation requirements for

raceway or special cable shielding requirements for all equipment furnished.

15561 Complete description of any separate cooling air requirements for logic and control cabinets.

15561 Description and indication of the number of grounding pads or devices for each casing and shaft.

15561 Description of any special equipment grounding requirements that would not allow the equipment to be grounded (connected) to the station ground grid.

Document submitted with Quotation Package

00300C.10 Technical Documents Required with Quotation (completed tables are required for the Base Scope and Elective Option [if proposed])

Page 102: RFP 40313 Addendum #1 - Grand River Dam Authority 40313 Addendum #1 ... Quotation Fill-In Information for Steam Turbine Generator ... 00300A.5.1 Attendance at the Purchaser's DCS Factory

GRDA Unit 3 Combined Cycle Project178592.67.9120

Combustion Turbine Generator/Steam Turbine Generator

Bid Issue25Oct2013

Source: 00300, 2009, v1.2

Section CCombustion Turbine Generator

Quotation Fill-In Information Page 23 of 34

Reference Document Submittal Item Yes/No

15561 Complete description of provisions made in pressure parts and other equipment to permit the proposed turbine generator unit to withstand numerous cold, warm, and hot starts per year over the design life of the unit without fatigue failure.

15561 Complete description of provisions in the equipment design to ensure meeting the stated loading time from minimum load to maximum load.

15561 Complete description of manufacturer's lagging design.15561 Complete description of the lube oil piping arrangement.15561 Complete data on steam purity requirements.15561 Complete list of other plants where the manufacturer has duplicate, or near

duplicate, turbines under construction or in operation.15561 Listing of suppliers and their manufacturing locations.15561 Bidder's preliminary engineering schedule.15561 Bidder's preliminary procurement/production/shipping schedule.15561 Description of data link provided to Purchaser's DCS.15561 Detailed description of automation equipment for automatic run-up of turbine.

15561 Description of turbine rotor stress monitoring system.15561 Description of turning gear.15561 Description of field assembly work required and estimated manpower

requirements for erection of equipment.15561 Description of shaft couplings.15561 Description of startup of the unit.15565 Lube Oil Conditioner .15565 Dimensional drawings of proposed components.16031 Cylindrical Rotor Generators .16031 Reactive capability curve to indicate generator capability at various power

factors.16031 Generator saturation curve.16031 Generator "Vee" curves.16031 Drawings of recommended method of stator erection.16031 Generator drawing with overall length, width, and height.16031 Generator drawing with exciter or collector's overall length, width, and height.

16031 Generator drawing with excitation cubicle's overall length, width, and height.

16031 Generator drawing with rotor removal clearance (straight and askew).16031 Generator drawing with control cabinet's overall length, width, and height.

16031 Generator drawing with supervisory cabinet's overall length, width, and height.

16031 Complete list of required maintenance tools. The listing shall include a complete description and quantity of each item.

16031 Equipment storage requirements, including inside or outside requirements, requirements for controlled temperature or humidity, etc.

16031 Complete list of necessary special tools. The listing shall provide a complete description and quantity of each item, including a discussion or designation of particular items required for erection and/or maintenance.

16031 Complete list of recommended spare parts.16031 Description and listing of major generator assemblies for shipment.16031 Information describing coating systems for equipment.

Page 103: RFP 40313 Addendum #1 - Grand River Dam Authority 40313 Addendum #1 ... Quotation Fill-In Information for Steam Turbine Generator ... 00300A.5.1 Attendance at the Purchaser's DCS Factory

GRDA Unit 3 Combined Cycle Project178592.67.9120

Combustion Turbine Generator/Steam Turbine Generator

Bid Issue25Oct2013

Source: 00300, 2009, v1.2

Section CCombustion Turbine Generator

Quotation Fill-In Information Page 24 of 34

Reference Document Submittal Item Yes/No

16031 One uncontrolled copy of bidder's Quality Assurance Program.16031 Complete information on the generator supervisory instrumentation system,

including a bill of material.16031 Detailed listing of alarm contacts available and recommended alarms for

connection to DCS, including unit prices for additions or deductions.16031 Detailed listing of instrumentation furnished.16031 Complete description of cable requirements, including the cable

constructions, for all equipment furnished.16031 Complete description of any voltage level separation requirements for

raceway or special cable shielding requirements for all equipment furnished.

16031 Complete description of the lube oil piping arrangement.16031 Complete list of other plants where the manufacturer has duplicate, or near

duplicate, generators under construction or in operation.16031 Listing of Work subcontracted to other Suppliers.16031 Listing of Subsuppliers and Suppliers used.16031 Bidder's preliminary engineering schedule.16031 Bidder's procurement/production/shipping schedule.16031 Complete description of excitation system.16031 Complete description of generator core monitor system (if specified).16031 Generator maximum allowable temperature of cold coolant generator

temperature rise of gas and liquid.16031 Generator maximum allowable temperature for armature winding, field

winding, core, and mechanical parts in contact with or adjacent to armature winding insulation; and collector rings, brushes, and brush holders.

16031 Detailed description of the brushless exciter (if specified).16031 Maximum allowable temperature of cooling air and temperature rise of

cooling air.

Page 104: RFP 40313 Addendum #1 - Grand River Dam Authority 40313 Addendum #1 ... Quotation Fill-In Information for Steam Turbine Generator ... 00300A.5.1 Attendance at the Purchaser's DCS Factory

GRDA Unit 3 Combined Cycle Project178592.67.9120

Combustion Turbine Generator/Steam Turbine Generator

Bid Issue25Oct2013

Source: 00300, 2009, v1.2

Section CCombustion Turbine Generator

Quotation Fill-In Information Page 25 of 34

Reference Document Submittal Item Tech Fill-In Data

15561 Steam Turbine .15561 Bidder's name15561 Turbine name15561 Identification number15561 Turbine manufacturer15561 Component Weights15561 Weights, ton (long)

15561Assembled turbine complete without external accessories

15561Assembled weight of turbine oil reservoir including coolers, pumps, and piping

15561 Dry15561 Operating

15561Assembled weight of EHC system fluid reservoir including coolers, pumps, and piping

15561 Dry15561 Operating15561 Heaviest piece to be handled during erection15561 Name15561 Weight, ton (long)15561 Length, ft (m)15561 Heaviest piece to be handled during erection15561 Name15561 Weight, ton (long)15561 Length, ft (m)15561 Performance15561 Guarantee Load Condition: 15561 Guaranteed/Predicted15561 Throttle Flow, lb/h (kg/h)15561 Net Turbine Output, kW15561 Net Turbine Heat Rate, Btu/kWh15561 Steam Turbine Operational Data

15561Approximate minimum load at which unit can operate satisfactorily for continuous period, percent

15561 Expected no-load throttle flow, lb/h (kg/h)

15561Maximum exhaust temperature at no-load throttle flow, °F (°C)

15561Minimum time required for pickup from minimum load to maximum load, minutes

15561Allowable rate of load change, 25 percent load to rated load (submit as plotted data, if necessary)

15561Supplementary steam requirements for sealing turbine at low load operation during startup and shutdown

15561 Flow, lb/h (kg/h)15561 Temperature, °F (°C)15561 Pressure, psi (kPa)15561 Steam Turbine Physical Data15561 Length of last stage blading, in. (mm)

00300C.11 Technical Fill-In Data Required with Quotation (completed tables are required for the Base Scope and Elective Option [if proposed])

Page 105: RFP 40313 Addendum #1 - Grand River Dam Authority 40313 Addendum #1 ... Quotation Fill-In Information for Steam Turbine Generator ... 00300A.5.1 Attendance at the Purchaser's DCS Factory

GRDA Unit 3 Combined Cycle Project178592.67.9120

Combustion Turbine Generator/Steam Turbine Generator

Bid Issue25Oct2013

Source: 00300, 2009, v1.2

Section CCombustion Turbine Generator

Quotation Fill-In Information Page 26 of 34

Reference Document Submittal Item Tech Fill-In Data

15561 Diameter of last stage wheel, in. (mm)15561 Velocity at tip of longest row of blades, ft/s (m/s)

15561Exhaust annulus area, per each last stage wheel, ft2 (m2)

15561Maximum allowable turbine back pressure for stable operation, in. (mm) Hg

15561Steam loading on last row of blades for maximum exhaust flow, lb/h/ft2 (kg/h/m2)

15561 Total turbine generator moment of inertia, WK2 (MR2)15561 Pitch diameter of governor stage, in. (mm)15561 Length of governor stage blades, in. (mm)15561 Governor stage efficiency at VWO-NP, percent

15561 First-stage bowl pressure at VWO-NP, psi(a) (kPa[a])

15561 First-stage exit pressure at VWO-NP, psi(a) (kPa[a])15561 Number of governor controlled inlet valves15561 Throttle flow ratio at each admission, 1st, 2nd, etc.15561 Governor stage efficiency at first admission, percent

15561First-stage bowl pressure at first admission, psi(a) (kPa[a])

15561First-stage exit pressure at first admission, psi(a) (kPa[a])

15561 Bearing data15561 Thrust bearing15561 Type15561 Design capacity, lb (kg)15561 Maximum force at worst operating condition, lbf15561 Main bearings15561 Number15561 Type15561 Design load, ton (long)

15561 Maximum allowable bearing temperature, °F (°C)

15561Maximum allowable vibration for each bearing for continued operation, peak-to-peak, mils

15561 Steam Turbine Blade Data15561 Number and type of stages (Quantity/Type)15561 HP turbine /15561 IP turbine /15561 LP turbine /15561 Allowable frequency variation15561 Limited time, ±Hz/total time15561 Continually, ±Hz15561 Method of fastening shrouding and lashing15561 Stage blading fitted with Stellite shields15561 Number15561 Location15561 Shaft Coupling Data15561 Number15561 Type

Page 106: RFP 40313 Addendum #1 - Grand River Dam Authority 40313 Addendum #1 ... Quotation Fill-In Information for Steam Turbine Generator ... 00300A.5.1 Attendance at the Purchaser's DCS Factory

GRDA Unit 3 Combined Cycle Project178592.67.9120

Combustion Turbine Generator/Steam Turbine Generator

Bid Issue25Oct2013

Source: 00300, 2009, v1.2

Section CCombustion Turbine Generator

Quotation Fill-In Information Page 27 of 34

Reference Document Submittal Item Tech Fill-In Data

15561 Location15561 Lubricating Oil System15561 Quantity of oil to completely fill system, gal (L)

15561Quantity of oil flow back on shutting down machine, gal (L)

15561 Capacity of reservoir, gal (L)15561 Quantity of cooling water required to each cooler at

design inlet temperature, gpm (L/min)15561 Maximum cooling water temperature for unrestricted

operation with design water flow to both coolers (simultaneous operation), °F (°C)

15561 Supply piping material15561 Drain piping material15561 Guard piping material15561 Oil Coolers15561 Heat duty at maximum load, MBtu/h15561 Cooling surface, each cooler, ft2 (m2)15561 Waterside pressure loss, psi at gpm (kPa at L/min)15561 Design pressure, waterside, psig (kPag)15561 Design pressure, oil side, psig (kPag)15561 Cleanliness factor15561 Tube size, in. (mm)15561 Tube wall thickness, AWG15561 Tube material15561 Tubesheet material15561 Gland Condenser15561 Manufacturer15561 Tube size, in. (mm)15561 Tube wall thickness, AWG15561 Tube material15561 Tubesheet material15561 Cooling surface, ft2 (m2)15561 Maximum water flow, gpm (L/min)15561 Friction loss at maximum water flow, psi (kPa)15561 Tube side design conditions15561 Pressure, psig (kPag)15561 Temperature, °F (°C)

15561Minimum condensate flow at low load conditions, gpm (L/min)

15561 Heat duty at maximum load, MBtu/h15561 EHC Data15561 Reservoir capacity, gal (L)15561 EHC coolers15561 Number/type of coolers15561 Tube size, in. (mm)15561 Tube wall thickness, AWG15561 Tube material15561 Tubesheet material15561 Are double tubesheets provided? Yes or No15561 Heat duty at maximum load, MBtu/h15561 Cooling water required by each cooler, at design inlet

temperature, maximum gpm (L/min)

Page 107: RFP 40313 Addendum #1 - Grand River Dam Authority 40313 Addendum #1 ... Quotation Fill-In Information for Steam Turbine Generator ... 00300A.5.1 Attendance at the Purchaser's DCS Factory

GRDA Unit 3 Combined Cycle Project178592.67.9120

Combustion Turbine Generator/Steam Turbine Generator

Bid Issue25Oct2013

Source: 00300, 2009, v1.2

Section CCombustion Turbine Generator

Quotation Fill-In Information Page 28 of 34

Reference Document Submittal Item Tech Fill-In Data

15561Pressure drop through the coolers, psi at gpm (kPa at L/min)

15561 Number of pumps15561 Capacity of pumps, gpm (L/min)15561 Motors Data15561 Emergency lube oil pump15561 kW15561 Volts15561 Full Load Current, Amps15561 Maximum Current During Starting, Amps15561 Enclosure15561 Quantity15561 Emergency hydrogen seal oil pump15561 kW15561 Volts15561 Full Load Current, Amps15561 Maximum Current During Starting, Amps15561 Enclosure15561 Quantity15561 Miscellaneous Equipment (Manufacturer/Type)15561 Annunciators /15561 Valve motor operators /15561 Prefabricated cables /15561 Limit switches /15561 Pressure switches /15561 Pressure transmitters /15561 Temperature switches /15561 Level switches /15561 Solenoid valves /15561 Thermocouples /15561 Temperature detectors /15561 Control relays /15561 Control switches /15561 Push buttons /15561 Selector switches /15561 Indicating lights /15561 Dc motor starters /15561 Light fixtures /15561 Convenience outlets /15561 Valves /15561 Turbine Auxiliary Power15561

Guaranteed total electric load during normal operation for auxiliaries furnished with turbine, ac load, kW

15561 Total electric load during peak operation for auxiliaries furnished with turbine, ac load, kW

15561Emergency dc electric load for auxiliaries furnished with turbine, kW

15561 Estimated Construction Power Requirements15561 Peak demand, kW15561 Average demand, kW

Page 108: RFP 40313 Addendum #1 - Grand River Dam Authority 40313 Addendum #1 ... Quotation Fill-In Information for Steam Turbine Generator ... 00300A.5.1 Attendance at the Purchaser's DCS Factory

GRDA Unit 3 Combined Cycle Project178592.67.9120

Combustion Turbine Generator/Steam Turbine Generator

Bid Issue25Oct2013

Source: 00300, 2009, v1.2

Section CCombustion Turbine Generator

Quotation Fill-In Information Page 29 of 34

Reference Document Submittal Item Tech Fill-In Data

15561Supplier Furnished Materials and Associated Installation Quantities

15561 Hydraulic System Tubing, lf15561 Large Bore Pipe (>=2 ½” in Diameter), lf15561 Large Bore Pipe Spools, each15561 Large Bore Field Welds, each

15561Large Bore Field Welds (average dia), inches (Note 1)

15561 Small Bore Pipe, lf15561 Small Bore Pipe Spools, each15561 Small Bore Field Welds, each

15561Large Bore Pipe Requiring Purchaser-Provided Heat Trace, lf

15561Small Bore Pipe Requiring Purchaser-Provided Heat Trace, lf

15561 Turbine Generator Enclosure, pieces15561 Turbine Generator Enclosure, sf15561 Off Base Skids & Misc. Equipment, each15561 Power Cable, lf15561 Control Cable, lf15561 Thermocouple Cable, lf15561 Power Conductor Terminations, each (Note 2)15561 Control Conductor Terminations, each (Note 2)

15561Thermocouple Conductor Terminations, each (Note 2)

15561 Conduit, lf15561 Instruments, each15561 Pipe Insulation, lf15561 Insulation Blankets, sf15561 Technical Assistance Time, hours15561 Notes

15561

1. Average Diameter for large bore pipe welds is the sum of the diameters for each individual large bore weld divided by the total number of large bore welds.

15561

2. Conductor is the number of wires contained in a cable that must be terminated, count both ends.

15565 Lube Oil Conditioner .15565 Bidder's name15565 Equipment name15565 Equipment identification number15565 Manufacturer15565 Model No.15565 Centrifuge capacity, actual15565 At 100 SSU, gpm (L/min)15565 At 1,000 SSU, gpm (L/min)

15565Maximum particle size that will pass through the system, micron(s)

15565Maximum total water contaminant level maintained with influent water level of 5,000 gpm (___ L/min), ppm

Page 109: RFP 40313 Addendum #1 - Grand River Dam Authority 40313 Addendum #1 ... Quotation Fill-In Information for Steam Turbine Generator ... 00300A.5.1 Attendance at the Purchaser's DCS Factory

GRDA Unit 3 Combined Cycle Project178592.67.9120

Combustion Turbine Generator/Steam Turbine Generator

Bid Issue25Oct2013

Source: 00300, 2009, v1.2

Section CCombustion Turbine Generator

Quotation Fill-In Information Page 30 of 34

Reference Document Submittal Item Tech Fill-In Data

15565 Skid assembly15565 Connections15565 Inlet / Outlet15565 Size, in. (mm)

15565 TypeFlanged or Threaded or Welded / Flanged or Threaded or Welded

15565 Overall dimensions (W x L x H), in. (mm)15565 Weight, empty, lb (kg)15565 Weight, full, lb (kg)15565 Power required15565 Power, kW15565 Voltage, volts15565 Phase 3-phase or Single-phase15565 Current at rated voltage, amperes16031 Cylindrical Rotor Generators .16031 Bidder's Name16031 Auxiliary Power16031

Guaranteed total electric load during normal operation for auxiliaries furnished with generator, ac load (kW)

16031 Total electric load during peak operation, ac load (kW)16031 Emergency dc electric load (kW)16031 Technical Data16031 Weight of generator stator, lb (kg)16031 Excitation system weight, lb (kg)16031 Shipping weight of generator, lb (kg)

16031Weight of generator stator winding water cooling unit (if required), lb (kg)

16031 Weight of generator rotor, lb (kg)16031 Continuous rating at maximum hydrogen pressure (if

applicable), rated power factor, and specified cooling water temperature, based on maximum shaft power developed by the prime mover, MVA

16031 Nominal rpm16031 Nominal frequency, hertz

16031Voltages at continuous operation and nominal frequency

16031 Nominal voltage, kV16031 Maximum voltage, kV16031 Minimum voltage, kV16031 Generator rated power factor (leading/lagging)

16031

Generator direct axis subtransient reactance in per unit value based on generator continuous kVA rating and nominal frequency (saturated at rated voltage) X"dv

16031 Estimated16031 Percent tolerance16031 Plus16031 Minus16031 Short-time capability expressed in terms of I22t

Page 110: RFP 40313 Addendum #1 - Grand River Dam Authority 40313 Addendum #1 ... Quotation Fill-In Information for Steam Turbine Generator ... 00300A.5.1 Attendance at the Purchaser's DCS Factory

GRDA Unit 3 Combined Cycle Project178592.67.9120

Combustion Turbine Generator/Steam Turbine Generator

Bid Issue25Oct2013

Source: 00300, 2009, v1.2

Section CCombustion Turbine Generator

Quotation Fill-In Information Page 31 of 34

Reference Document Submittal Item Tech Fill-In Data

16031Short-circuit ratio at rated voltage and rated stator current

16031Continuous current unbalance expressed in terms of I2, percent

16031Generator winding capacitance to ground, all phases tied together, mfd

16031 Current transformers16031 Application16031 Relaying16031 ANSI C57.13 Accuracy Class16031 IEC 185 Accuracy Class16031 Metering16031 ANSI C57.13 Accuracy Class16031 IEC 185 Accuracy Class16031 Location16031 Line side16031 Quantity16031 Secondary current rating16031 Application Relaying16031 Laboratory calibration required16031 Yes or No16031 Line side16031 Quantity16031 Secondary current rating16031 Application Metering16031 Laboratory calibration required16031 Yes or No16031 Neutral side16031 Quantity16031 Secondary current rating16031 Application Relaying16031 Laboratory calibration required16031 Yes or No16031 Neutral side16031 Quantity16031 Secondary current rating16031 Application Metering16031 Laboratory calibration required16031 Yes or No

16031 Generator field voltage at maximum kVA output, volts

16031Generator field current at maximum excitation, amperes

16031Maximum temperature rise above 104° F (40° C) gas temperature

16031 Generator armature winding temperature rise, °F (°C)16031 Generator field winding temperature rise, °F (°C)16031 Generator core and mechanical parts adjacent to the

insulation temperature rise, °F (°C)

16031Maximum temperature rise above ambient air temperature of 104° F (40° C)

Page 111: RFP 40313 Addendum #1 - Grand River Dam Authority 40313 Addendum #1 ... Quotation Fill-In Information for Steam Turbine Generator ... 00300A.5.1 Attendance at the Purchaser's DCS Factory

GRDA Unit 3 Combined Cycle Project178592.67.9120

Combustion Turbine Generator/Steam Turbine Generator

Bid Issue25Oct2013

Source: 00300, 2009, v1.2

Section CCombustion Turbine Generator

Quotation Fill-In Information Page 32 of 34

Reference Document Submittal Item Tech Fill-In Data

16031 Generator armature winding temperature rise, °F (°C)16031 Generator field winding temperature rise, °F (°C)16031 Collector rings temperature rise, °F (°C)16031 Telephone influence factor (IEEE Std. 115)16031 Calculated16031 Balanced16031 Residual16031 Guaranteed16031 Balanced16031 Residual16031 Wave form deviation factor (IEEE Std. 115)16031 Calculated16031 Balanced16031 Residual16031 Guaranteed16031 Balanced16031 Residual16031 Temperature detectors16031 Armature16031 Number16031 Type16031 Rotating exciter16031 Number16031 Type16031 Generator cold gas16031 Number16031 Type16031 Generator hot gas16031 Number16031 Type16031 Generator Loss Data

16031Generator calculated losses at continuous nameplate MVA, voltage, and frequency

16031 Total iron loss, kW16031 Generator stator I2R loss, kW16031 Generator rotor I2R loss, kW16031 Generator stray load loss, kW16031 Generator windage loss, kW

16031Total generator loss excluding bearings and excitation system, kW

16031 Static exciter losses, kW16031 Excitation transformer losses, kW16031 Generator efficiency, percent

16031Generator friction loss in bearings, seals, and collector rings, kW

16031 Heat Exchanger Data

16031Complete the following for each type of cooler required by the design

16031 Heat exchanger16031 Cooler description16031 Number of coolers

Page 112: RFP 40313 Addendum #1 - Grand River Dam Authority 40313 Addendum #1 ... Quotation Fill-In Information for Steam Turbine Generator ... 00300A.5.1 Attendance at the Purchaser's DCS Factory

GRDA Unit 3 Combined Cycle Project178592.67.9120

Combustion Turbine Generator/Steam Turbine Generator

Bid Issue25Oct2013

Source: 00300, 2009, v1.2

Section CCombustion Turbine Generator

Quotation Fill-In Information Page 33 of 34

Reference Document Submittal Item Tech Fill-In Data

16031 Number of sections per cooler

16031Generator kVA capability with one cooler section out of service, percent

16031 Cooling water required by each cooler16031 Inlet temperature, °F (°C)16031 Maximum flow, gpm (L/min)16031 Cleanliness factor16031 Heat duty at maximum load, each cooler

16031Tube side (waterside) pressure loss at maximum flow, gpm (L/min)

16031 Tube side (waterside) design conditions16031 Pressure, psi (kPa)16031 Temperature, °F (°C)16031 Tube size, in. (mm)16031 Tube wall thickness, in. (mm)16031 Tube material16031 Tubesheet material16031 Hydrogen Cooling System Data16031 Complete for hydrogen cooled generators16031 Hydrogen required to purge carbon dioxide, ft3 (m3)16031 Hydrogen required to fill system to maximum hydrogen

pressure after purging, ft3 (m3)

16031Guaranteed hydrogen consumption in 24 hours, ft3 (m3)

16031 Hydrogen seal oil flow, gpm (L/min)16031 Hydrogen seal oil pressure, psi (kPa)16031 Stator Winding Cooling Water System16031 Number of circulating pumps16031 Full- or half-capacity pumps16031 Stator cooling water demineralizer description16031 Excitation System16031 Excitation system description16031 Excitation system control system16031 Make and type of excitation system16031 Make and type of voltage regulator16031 Communication method to operator interface16031 Description of operator interface equipment16031 Rated output of excitation system, kW16031 Rated voltage, volts dc16031 Rated current, amperes dc16031 Excitation system response ratio, per unit16031 Ceiling voltage, percent minimum16031

Does the excitation system meet the definition of high initial response as defined in IEEE Standard 421.1?

1603116031 Yes or No16031 Protective Relaying16031 Generator protection relay type/model16031 Out-of-step (78) relay type/model16031 Dc Motors16031 Motors

Page 113: RFP 40313 Addendum #1 - Grand River Dam Authority 40313 Addendum #1 ... Quotation Fill-In Information for Steam Turbine Generator ... 00300A.5.1 Attendance at the Purchaser's DCS Factory

GRDA Unit 3 Combined Cycle Project178592.67.9120

Combustion Turbine Generator/Steam Turbine Generator

Bid Issue25Oct2013

Source: 00300, 2009, v1.2

Section CCombustion Turbine Generator

Quotation Fill-In Information Page 34 of 34

Reference Document Submittal Item Tech Fill-In Data

16031 Airside seal oil backup pump (dc)16031 kW16031 Volts16031 Enclosure16031 Quantity16031 Other dc motors16031 (Name of motor)16031 kW16031 Volts16031 Enclosure16031 Quantity

Page 114: RFP 40313 Addendum #1 - Grand River Dam Authority 40313 Addendum #1 ... Quotation Fill-In Information for Steam Turbine Generator ... 00300A.5.1 Attendance at the Purchaser's DCS Factory

GRDA Unit 3 Combined Cycle Project178592.67.9120

Combustion Turbine Generator/Steam Turbine Generator

Bid Issue25Oct2013

Source: 00300, 2009, v1.2

Section DCombustion Turbine Generator

Quotation Fill-In Information Page 1 of 44

Received and Incorporated

00300D.1 Not Used

00300D.2 General Quotation Parameters

Bidder's Quotation Date

00300D.2.1 Bidder's Contact InformationBidder's Quotation Number

00300D - Quotation Fill-In Information for Combustion Turbine Generator - 495 MW Net Plant Output

Corporate InformationCompany Name

Technical Contact NameTitle

Purchase Order AddresseeAddress/Number, StreetAddress/State, Zip Code

Taxpayer ID Number (or EIN)Technical Contact

Phone NumberFax Number

Address/Number, StreetAddress/City

Address/State, Zip CodeEmail Address

00300D.2.2 AddendaNumber Date Description

00300D.2.3 Quotation Validity Period, through January 31, 2014 per RFQ - Yes/No - If no, advise number of days

00300D.2.5.4 Alternate Scope Pricing firm through Quotation Validity Period - 00300D.2.6.1 All Exceptions are declared on Form 00300D.2.6.1 - Yes/No00300D.2.6.2 All Clarifications are declared on Form 00300D.2.6.2 - Yes/No

00300D.2.4 Quotation includes/excludes taxes - Included/Excluded00300D.2.5.1 Quotation Pricing firm through Quotation Validity Period - Yes/No00300D.2.5.2 Adjustment Pricing firm through End of Warranty - Yes/No00300D.2.5.3 Option Pricing firm through Quotation Validity Period - Yes/No

Page 115: RFP 40313 Addendum #1 - Grand River Dam Authority 40313 Addendum #1 ... Quotation Fill-In Information for Steam Turbine Generator ... 00300A.5.1 Attendance at the Purchaser's DCS Factory

GRDA Unit 3 Combined Cycle Project178592.67.9120

Combustion Turbine Generator/Steam Turbine Generator

Bid Issue25Oct2013

Source: 00300, 2009, v1.2

Section DCombustion Turbine Generator

Quotation Fill-In Information Page 2 of 44

00300D.2.6.1.2 Technical Exceptions

Count Reference Stated Technical Exception123456789

10

00300D.2.6.1.1 Not Used

Form 00300D.2.6.1 Declared Exceptions to the RFQ Requirements

Page 116: RFP 40313 Addendum #1 - Grand River Dam Authority 40313 Addendum #1 ... Quotation Fill-In Information for Steam Turbine Generator ... 00300A.5.1 Attendance at the Purchaser's DCS Factory

GRDA Unit 3 Combined Cycle Project178592.67.9120

Combustion Turbine Generator/Steam Turbine Generator

Bid Issue25Oct2013

Source: 00300, 2009, v1.2

Section DCombustion Turbine Generator

Quotation Fill-In Information Page 3 of 44

00300D.2.6.2.2 Technical Clarifications

Count Reference Stated Technical Clarification123456789

10

00300D.2.6.2.1 Not Used

Form 00300D.2.6.2 Declared Clarifications to the RFQ Requirements

Page 117: RFP 40313 Addendum #1 - Grand River Dam Authority 40313 Addendum #1 ... Quotation Fill-In Information for Steam Turbine Generator ... 00300A.5.1 Attendance at the Purchaser's DCS Factory

GRDA Unit 3 Combined Cycle Project178592.67.9120

Combustion Turbine Generator/Steam Turbine Generator

Bid Issue25Oct2013

Source: 00300, 2009, v1.2

Section DCombustion Turbine Generator

Quotation Fill-In Information Page 4 of 44

$ -

$ - $ - $ - $ - $ - $ -

$ -

$ - $ - $ - $ - $ - $ -

$ -

00300D.3.2.2 NOT USED

00300D.3.2.5 Shipping/Transportation (from Table 3.2.5)

00300D.3 Quotation Pricing

Total Base Quotation Pricing - DDP/CIP Jobsite Location

00300D.3.1 Product Pricing (FCA-Factory Location)Price Breakdown

00300D.3.2.4.1 Field Service Representative (from Table 3.2.4.1)

Sum of Subtotals (Should Equal Base Quotation Price Above)

Subtotal 00300D.3.2 Supplemental Product Pricing00300D.3.2.6 Instruction Manuals (from Table 3.2.6)

00300D.3.2.3 Special Tools and Lift Fixtures (from Table 3.2.3)

00300D.3.2.4.2 Training Service (from Table 3.2.4.2)

00300D.3.2.1 Startup and Commissioning Spare Parts (from Table 3.2.1)00300D.3.2 Supplemental Product Pricing

Subtotal 00300D.3.1 Product Pricing (FCA-Factory Location)

00300D.3.1.1 Combustion Turbine Generator(Supplier to provide breakdown as required)

Page 118: RFP 40313 Addendum #1 - Grand River Dam Authority 40313 Addendum #1 ... Quotation Fill-In Information for Steam Turbine Generator ... 00300A.5.1 Attendance at the Purchaser's DCS Factory

GRDA Unit 3 Combined Cycle Project178592.67.9120

Combustion Turbine Generator/Steam Turbine Generator

Bid Issue25Oct2013

Source: 00300, 2009, v1.2

Section DCombustion Turbine Generator

Quotation Fill-In Information Page 5 of 44

Extended Price $ - $ - $ - $ -

Extended Price $ - $ - $ - $ -

Extended Price $ -

$ -

$ -

Extended Price $ -

$ -

$ -

00300D.3.2.3 Special Tools and Lift Fixtures

Bidder has included field service time in base quotation per RFQ requirements Yes/NoIf Yes, Bidder shall provide an itemized breakout of priced services included in the quote in Table 3.2.4.1

Unit of MeasureQuantity Included

in POItem Description

Yes/No

Subtotal: Table 00300D.3.2.4.1 Field Service Pricing

Bidder has included Training time in base quotation per RFP requirements

Table 3.2.4.1 Technical Field Services, Per Diem Rates and Expenses

Unit of Measure

00300D.3.2.4.2 Training Service Bidder Response Column

CTG Round trips included in the firm fixed lump sum price

All-inclusive FIELD SERVICE shall include all salary and overhead, local lodging, travel between the jobsite and local lodging, meals, and miscellaneous expenses. A week of service shall be defined as six (6), ten (10) hour onsite workdays, Monday - Saturday:

Round trips included in the firm fixed lump sum price Trips $ - 2

Training weeks included in the firm fixed lump sum price Week $ - 5

If Yes, Bidder shall provide an itemized breakout of priced services included in the quote in Table 3.2.4.2

All-inclusive TRAINING shall include all salary and overhead, local lodging, travel between the jobsite and local lodging, meals, and miscellaneous expenses. A week of service shall be defined as five (5), eight (8) hour onsite workdays, Monday - Friday:

Unit of Measure Unit Price

Subtotal: Table 00300D.3.2.3 Special Tools and Lift Fixtures Pricing $ -

$ - $ -

If Yes, Bidder shall provide a priced list of special tools included in the quote in Table 3.2.3.

$ -

Bidder Response Column

If Yes, Bidder has included special tools and lift fixtures in base quotation per RFP

00300D.3.2.2 NOT USED

Yes/NoAre startup spare or commissioining spare parts required?

Manufacturer's Part Identification

Subtotal: Table 00300D.3.2.1 Startup Spare Parts Pricing

$ -

If Yes, Bidder has included Spare Parts in base quotation per RFP requirements Yes/No

00300D.3.2 Supplemental Product Pricing TablesBidder to note that pricing included in these tables is for product scope that will be included in the initial Purchase Order with the successful Bidder. Pricing for Work deferred to a later date, such as adjustment pricing, option pricing and alternative scope pricing is not included in these tables.

Table 3.2.1: Startup and Commissioning Spare Parts

00300D.3.2.1 Startup and Commissioning Spare Parts Bidder Response Column

Unit Price

If Yes, Bidder shall provide a priced list of construction/erection spare parts included in the quote in Table 3.2.1.

Unit of Measure Unit Price

Are special tools and/or lift fixtures required? Yes/No

Quantity Included in PO

Table 3.2.3: Special Tools and Lift Fixtures

Item Description Manufacturer's Part Identification

Yes/No

Unit Price

Trips $ - 60

Week

Table 3.2.4.2 Technical Field Services, Per Diem Rates and Expenses

Quantity Included in PO

Table 3.2.4: Technical ServicesBidder Response Column

Quantity Included in PO

$ - CTG Field service weeks included in the firm fixed lump sum price 180

00300D.3.2.4.1 Field Service Representative

Page 119: RFP 40313 Addendum #1 - Grand River Dam Authority 40313 Addendum #1 ... Quotation Fill-In Information for Steam Turbine Generator ... 00300A.5.1 Attendance at the Purchaser's DCS Factory

GRDA Unit 3 Combined Cycle Project178592.67.9120

Combustion Turbine Generator/Steam Turbine Generator

Bid Issue25Oct2013

Source: 00300, 2009, v1.2

Section DCombustion Turbine Generator

Quotation Fill-In Information Page 6 of 44

00300D.3.2 Supplemental Product Pricing Tables

$ -

Extended Price $ - $ - $ - $ - $ - $ -

Extended Price $ -

$ -

$ -

00300D.3.2.5 Shipping/Transportation

Subtotal: Table 00300D.3.2.5 Transportation Pricing

Bidder has included transportation in base quotation per RFP requirements

Bidder Response Column

$ - 1

Subtotal: Table 00300D.3.2.6 Instruction Manuals Pricing

Final Copy of Instruction Manuals Electronic EA

1

Table 3.2.6: Instruction ManualsUnit of

Measure Unit PriceQuantity Included

in POItem Description MediaProof Copy of Instruction Manuals Electronic

If Yes, Bidder shall provided an itemized breakout Instruction Manual pricing included in the quote in Table 3.2.6.

$ - EA

Yes/NoBidder has included pricing for Instruction Manuals in base quotation per Article Q501

00300D.3.2.6 Instruction Manuals

Combustion Turbine Generator(Supplier to provide breakdown as required)

Point of OriginItem Description

1 LotCarrier Type

Quantity Included in PO

Subtotal: Table 00300D.3.2.4.1 Training Pricing

If Yes, Bidder shall provide an itemized breakout of transportation included in the quote in Table 3.2.5.

All-inclusive ROUND TRIP shall include all expenses traveling to and returning from the lodging local to the jobsite, from the Manufacturer's Field Service home base of operations. It shall include all transportation (air and/or ground), parking, tolls, meals, travel per diem, any salary/overhead while traveling, and other miscellaneous expenses associated with one round trip.

Yes/No

Bidder Response Column

Table 3.2.5: Shipping/Transportation

Page 120: RFP 40313 Addendum #1 - Grand River Dam Authority 40313 Addendum #1 ... Quotation Fill-In Information for Steam Turbine Generator ... 00300A.5.1 Attendance at the Purchaser's DCS Factory

GRDA Unit 3 Combined Cycle Project178592.67.9120

Combustion Turbine Generator/Steam Turbine Generator

Bid Issue25Oct2013

Source: 00300, 2009, v1.2

Section DCombustion Turbine Generator

Quotation Fill-In Information Page 7 of 44

Unit Price(to Add)

Unit Price (to Delete)

Delivery ARO (WKS)

$ - $ - $ - $ - $ - $ - $ - $ -

Unit Price(to Add)

Unit Price (to Delete)

Delivery ARO (WKS)

$ - $ - $ - $ - $ - $ - $ - $ -

Unit Price(to Add)

Unit Price (to Delete)

Delivery ARO (WKS)

$ - $ - $ - $ - $ - $ - $ - $ -

Unit of Measure Unit Price

$/Day $ - $/Day $ - $/Day $ -

$/h $ - $/h $ - $/h $ -

$/rt $ -

Per diem Rate Sunday / Holiday (up to 8 hours)

All-inclusive RATE TO ADJUST above per diem rates for hours worked beyond an eight (8) hour onsite workday:

Adjustment Rate Saturday (beyond 8 hours)Adjustment Rate Sunday / Holiday (beyond 8 hours)

Adjustment Rate Monday through Friday beyond 8 hours)

Table 4.5: Supplemental "Out-of-Base-Scope" Technical Assistance

Saturday (up to 8 hours)Per diem Rate

All-inclusive DAILY PER DIEM RATE shall include all salary and overhead, local lodging, travel between the jobsite and local lodging, meals, and miscellaneous expenses. A day of service shall be defined as one, eight (8) hour onsite workday in which all project construction and management personnel are working normal shifts:

Per diem Rate Monday through Friday (up to 8 hours)

Table 4.3: NOT USED

Table 4.4: Special Tools and Lift Fixtures

Item Number Item Description Unit of Measure

Item Number Item Description Unit of Measure

00300D.4 Unit Adjustment Pricing Tables

Item Number Item Description Unit of Measure

Table 4.1: Equipment Pricing

All-inclusive ROUND TRIP RATE shall include all expenses traveling to and returning from the lodging local to the jobsite, from the Manufacturer's Field Service home base of operations. It shall include all transportation (air and/or ground), parking, tolls, meals, travel per diem, any salary/overhead while traveling, and other miscellaneous expenses associated with one round trip.

Round Trip Rate

Table 4.2: Startup and Commissioning Spare Parts

Page 121: RFP 40313 Addendum #1 - Grand River Dam Authority 40313 Addendum #1 ... Quotation Fill-In Information for Steam Turbine Generator ... 00300A.5.1 Attendance at the Purchaser's DCS Factory

GRDA Unit 3 Combined Cycle Project178592.67.9120

Combustion Turbine Generator/Steam Turbine Generator

Bid Issue25Oct2013

Source: 00300, 2009, v1.2

Section DCombustion Turbine Generator

Quotation Fill-In Information Page 8 of 44

Bidder Response Column

$ -

$ -

$ -

$ -

$ -

Bidder Response Column

$ - $ -

Bidder Response Column

Bidder Response Column

Origin CountryStateCity

If yes, list of other locations included with the quotation Yes/No

cu ft

Total Weight per Shipmentcu ft

Total Weight of Largest Single Component

lbTotal Volume per Shipment

Bidder proposes subcontracting any major portions of the Work Yes/NoIf Yes, Sub-supplier List is included with the quotation Yes/No

00300D.8 Subcontracting

Number of Shipments CountTotal Number of Pieces per Shipment Count

Total Volume of Largest Single Component

Bidder's product included in the quotation has special storage requirements Yes/No

lb

00300D.7.2 ShipmentsManufactured in Bidder's own facility? Yes/NoManufactured in facilities of others? If so list. Yes/No

If Yes, special storage requirements are included with the quotation Yes/No

Price Addition to price for alternative scope proposed

00300D.6.1 Alternative Scope 1Single-Shaft Train (Non-Mandatory Alternative)

Price Deduction from base price for scope removed from base scope

00300D.7 Logistics00300D.7.1 Jobsite Storage Requirements

00300D.5.2 Attendance at the Purchaser's DCS Factory Acceptance Test per Article 01500.1, CTG Scope Matrix Item 99

00300D.5 Option Pricing

00300D.6 Alternative Scope Pricing

00300D.5.1 Pulse Air Compressor Skid per Article 01500.1, CTG Scope Matrix Item 15

00300D.5.3 Recommended CTG Scope Spare Parts List per Article 01500.1.9 (Pricing Valid Up To One Year After The Contract Award Date))

00300D.5.4 LTSA Pricing per Sections 01500.1.6 and 19000 (include Supplier pricing breakdown table separately as required)

00300D.5.5 Clean agent fire protection system (FM-200 or Water Mist), REQUIRED if Supplier offers CO2 system in base offering in exception to RFP clean agent system requirements.

Page 122: RFP 40313 Addendum #1 - Grand River Dam Authority 40313 Addendum #1 ... Quotation Fill-In Information for Steam Turbine Generator ... 00300A.5.1 Attendance at the Purchaser's DCS Factory

GRDA Unit 3 Combined Cycle Project178592.67.9120

Combustion Turbine Generator/Steam Turbine Generator

Bid Issue25Oct2013

Source: 00300, 2009, v1.2

Section DCombustion Turbine Generator

Quotation Fill-In Information Page 9 of 44

LD*

LD

Bidder confirms ability and commitment to meet all the required submittal dates. Yes/NoIf No, Bidder has for each submittal to which the “No” applies stated the best possible submittal date as an exception.

Yes/No

00300D.9.2 Schedule of Submittals and Applicable Liquidated Damages

* "LD" indicates that delivery of the Goods after the "Required Delivery" date is subject to liquidated damages in accordance with applicable articles of the RFP.

** Purchaser will not accept delivery of Goods at the Jobsite prior to the "Early Delivery" date unless previously agreed by Purchaser in writing. Delivery in the period between the "Early Delivery" and "Required Delivery" date is at the discretion of Supplier.

Combustion Turbine Generator

Yes/No00300D.9.1.1 Bidder will make single consolidated shipment.

00300D.9.1.2 Bidder has provided a preliminary milestone schedule. Yes/NoIf No, Bidder has included a proposed staggered shipping schedule. Yes/No

7-Mar-16

00300D.9 Delivery and Schedule

Bidder Response ColumnRequired Delivery

00300D.9.1 Delivery DAP Jobsite (originating in US), DDP Jobsite (originating outside US) Early Delivery**

120 Days Maximum Prior to Required Delivery

(Supplier to provide breakdown as required)

00300D.9.1.3 Bidder has provided a Standard Delivery/Completion schedule. Yes/No

Yes/No

Page 123: RFP 40313 Addendum #1 - Grand River Dam Authority 40313 Addendum #1 ... Quotation Fill-In Information for Steam Turbine Generator ... 00300A.5.1 Attendance at the Purchaser's DCS Factory

RFP 40313

Source: 00300, 2009, v1.2

Section DCombustion Turbine Generator

Quotation Fill-In Information Page 10 of 44

TBD TBD

Calendar Event Due Date301 Engineering/Procurement/

Production/Testing and Inspection/Shipping Schedule and Status Report

30 After Effective Date with Monthly Updates

No

302 Preshipment Inspection Notice 30 Before Shipment of Equipment No

303 Electronic Material List 30 Before Shipment of Equipment No

304 Shipping Notice 2 Full Work Days Notice No

305 Detailed Final Packing List of Shipment of Equipment, corresponding with Electronic Material List data

Upon each Shipment and With Electronic Materials List

No

306 Hazardous materials documentation

With Each Shipment No

701 Proof Copy of Instruction Manuals

90 Before Shipment of Equipment No

702 Final Copy of Instruction Manuals

15 Before Shipment of Equipment No

703 Recommended Spare Parts List, with Unit Prices and Names of Suppliers, Necessary to Cover a Full Maintenance Cycle (3 years)

90 After Effective Date No

704 Startup and Commissioning Spare Parts List, Priced

90 Before Shipment of Equipment No

05135 Steel Stack Designed by Supplier (Optional Scope)

.

0409 05135 Structural Steel Material Certification

Upon request

0410 05135 High Strength Bolts Material Certification

Upon request

0411 05135 Direct Tension Indicators Material Certification

Upon request

0694 05135 Grating Copies of Certified Test and Inspection Reports

14 After Test/Inspection

0583 05135 Arrangement drawings 30 After Effective Date

0695 05135 Foundation design i t

30 After Effective Date

0696 05135 Design calculations 30 After Effective Date

0584 05135 Fabrication and erection detail drawings

30 After Effective Date

0697 05135 Stack, liner, insulation, and lagging materials specifications

30 After Effective Date

0698 05135 Shop and/or field coatings data 30 After Effective Date

Submittal Dates LDsapply?

00300.9.2 Schedule of Submittals and Applicable Liquidated Damages

Bid

der C

ompl

ies

Yes

/No

Effective Date: Estimated First Shipment Date:Project Delivery Date: March 7, 2016

The list is not all-inclusive. There are more requirements for Supplier to "provide notice," to "advise," to "update," to "inform," etc., or to “submit” should a condition precedent occur. These have not been included in the list. It will however remain Supplier's responsibility to comply with the submittal requirements whether or not the submittal is actually included on the following:Item No.

Reference Document

Submittals Item

Page 124: RFP 40313 Addendum #1 - Grand River Dam Authority 40313 Addendum #1 ... Quotation Fill-In Information for Steam Turbine Generator ... 00300A.5.1 Attendance at the Purchaser's DCS Factory

RFP 40313

Source: 00300, 2009, v1.2

Section DCombustion Turbine Generator

Quotation Fill-In Information Page 11 of 44

11506 Selective Catalytic Reduction System (Optional Scope)

.

0585 11506 Arrangement drawings 30 After Effective Date No0699 11506 Certified loads for design of

structures and foundations40 After Effective Date No

0586 11506 Arrangement drawings 15 After Effective Date No0587 11506 Piping and instrument diagrams 30 After Effective Date No

0588 11506 Detail drawings required to indicate miscellaneous piping and wiring connections

45 After Effective Date No

0589 11506 Drawings and data on accessory equipment including valves, fittings, and other components

45 After Effective Date No

0590 11506 Control system functional loop and logic diagrams

60 After Effective Date No

6100 11506 Control system instrumentation and I/O lists

30 After Effective Date No

6101 11506 Instrument data sheets (ISA type or equal) and installation details for control system

60 After Effective Date No

0591 11506 Pipe layout drawings 30 After Effective Date No0592 11506 Recommended location for all

pipe supports, recommended type of pipe supports at each location, and loads on each pipe support

30 After Effective Date No

6102 11506 Pipeline list 30 After Effective Date No11507 Catalyst for Selective

Catalytic Reduction (Optional Scope)

.

6103 11507 Catalyst preproduction test results report

90 After Effective Date and prior to catalyst production

No

11508 Ammonia System (Optional Scope)

.

0593 11508 Detailed drawings indicating pipe connection points

30 After Effective Date No

6104 11508 Fan performance curve - final 30 Before Shipment No

6105 11508 Flowmeter certification report 30 Before Shipment No

13125 Pre-Manufactured Metal Equipment Building

.

0685 13125 Bill of Material, Including Quantity, Description, and Part Number

Effective Date No

0578 13125 Plan view outline - General arrangement, center of gravity weight, floor opening size and locations, mounting details, and cable entry area and door swing requirements

30 After Effective Date No

Page 125: RFP 40313 Addendum #1 - Grand River Dam Authority 40313 Addendum #1 ... Quotation Fill-In Information for Steam Turbine Generator ... 00300A.5.1 Attendance at the Purchaser's DCS Factory

RFP 40313

Source: 00300, 2009, v1.2

Section DCombustion Turbine Generator

Quotation Fill-In Information Page 12 of 44

0579 13125 Elevation outline - General arrangement in elevation, recommended pier and tie-down locations, and wall opening sizes and locations

30 After Effective Date No

0580 13125 Legend/design criteria outline - Design criteria and drawing legend

30 After Effective Date No

0581 13125 Electrical interconnection diagram

30 After Effective Date No

0686 13125 Certified design calculations 30 After Effective Date No0687 13125 Certified Air conditioning,

Heating, Pressurization design load calculations with considerations of transmission and solar gain, people, lighting, mechanical and electrical equipment, motors, electronic equipment, computers, miscellaneous appliances, infi

30 After Effective Date No

0688 13125 For HVAC Equipment: Fan curves, motor data, coating data, dimensional data including piping connection sizes and location, weight, performance data, wiring diagrams and sound level data.

60 After Effective Date No

0689 13125 For Filters: filter efficiency, airflow resistance, dust holding capacity, media material, thickness, density and dimensional data.

60 After Effective Date No

0690 13125 For Dampers: AMCA certified pressure drop and leakage data.

60 After Effective Date No

0691 13125 For Terminal Devices: Flow versus pressure drop and flow versus throw.

60 After Effective Date No

0692 13125 For Temperature Controls: Wiring diagrams, control and electrical components data sheets, sequence of operations, control system architecture, and temperature control panel layout drawings.

60 After Effective Date No

0693 13125 Bill of Material, Including Quantity, Description, and Part Number

No

0582 13125 Submit drawings indicating the layout of building

No

15562 Combustion Turbine .0647 15562 Certified design data and

performance curves40 After Effective Date No

Page 126: RFP 40313 Addendum #1 - Grand River Dam Authority 40313 Addendum #1 ... Quotation Fill-In Information for Steam Turbine Generator ... 00300A.5.1 Attendance at the Purchaser's DCS Factory

RFP 40313

Source: 00300, 2009, v1.2

Section DCombustion Turbine Generator

Quotation Fill-In Information Page 13 of 44

0522 15562 Arrangement Drawings required for plant layout indicating physical arrangement and dimensions of equipment furnished

30 After Effective Date No

0523 15562 Arrangement Drawings for all auxiliary equipment indicating physical arrangement and dimensions of equipment furnished

45 After Effective Date No

0524 15562 Foundation interface Drawings for all furnished equipment indicating loads, dimensions, anchor bolt locations, embedded conduit, and other necessary details

45 After Effective Date No

0525 15562 Base combustion turbine generator unit arrangement and outline drawing

30 After Effective Date No

0526 15562 CTG auxiliary enclosures and equipment arrangement and outline drawing

45 After Effective Date No

0527 15562 Duct outline Drawings including movements and clearances for insulation, lagging, stiffeners, and expansion joints

60 After Effective Date No

0528 15562 Detail Drawings indicating all Purchaser's piping and wiring connections including locations, sizes, types, materials, cable type, etc.

60 After Effective Date No

0529 15562 Piping and Instrument Diagrams 60 After Effective Date No

0530 15562 Control panel and operator Work station outline and layout Drawings

90 After Effective Date No

0531 15562 Drawings and data on accessory equipment including valves, fittings, and other components

90 After Effective Date No

0532 15562 Electrical one-line diagrams indicating electrical scope

60 After Effective Date No

0533 15562 Electrical elementaries, schematic, wiring, block and tubing diagrams, cable block diagrams, raceway layout, and cable entry into equipment

120 After Effective Date No

0534 15562 Control system functional loop and logic diagrams

90 After Effective Date No

0535 15562 Control operator CRT graphic display pages with descriptions of operator control actions linked to the graphics

120 After Effective Date No

Page 127: RFP 40313 Addendum #1 - Grand River Dam Authority 40313 Addendum #1 ... Quotation Fill-In Information for Steam Turbine Generator ... 00300A.5.1 Attendance at the Purchaser's DCS Factory

RFP 40313

Source: 00300, 2009, v1.2

Section DCombustion Turbine Generator

Quotation Fill-In Information Page 14 of 44

0536 15562 Control system and instrumentation input/output tabulations with descriptions and interface functions

90 After Effective Date No

0648 15562 Instrument data sheets (ISA type or equal) and installation details for all control system input and output devices such as transmitters and control drives

120 After Effective Date No

0649 15562 Recommended detailed erection sequence and procedure

120 Before Shipment No

0701 15562 Two draft copies of Commissioning Manual

90 Before Start of commissioning No

0702 15562 Four final copies of Commissioning Manual

30 Before Start of commissioning No

0537 15562 As-built Drawings 60 Before Completion of commissioning

No

16031 Cylindrical Rotor Generators .

0202 16031 Supplier to participate in design conference

15 After Effective Date No

0650 16031 Generator hydrogen pressure correction curves for ASME PTC 6.2 acceptance test

Upon Submittal of Proposal No

0651 16031 Generator power factor correction curves for ASME PTC 6.2 acceptance test

Upon Submittal of Proposal No

0652 16031 Critical speeds of generator 30 After Effective Date No

0653 16031 Generator loss curve and excitation power requirement curve including total electrical losses for generation capability at minimum hydrogen pressure and at 1 bar (14.5 psi) including up to the maximum hydrogen pressure for rated and unity power factors. Curve shall include the total mechanical or fixed losses.

30 After Effective Date No

0654 16031 Water requirements for the air or hydrogen coolers indicated as a curve for varying load conditions, hydrogen pressures, and cooling water temperatures

30 After Effective Date No

0655 16031 Detailed data describing capability of the unit to operate above and below rated speed, including minimum and maximum allowable speed versus cumulative time duration of off-normal speed operation

30 After Effective Date No

Page 128: RFP 40313 Addendum #1 - Grand River Dam Authority 40313 Addendum #1 ... Quotation Fill-In Information for Steam Turbine Generator ... 00300A.5.1 Attendance at the Purchaser's DCS Factory

RFP 40313

Source: 00300, 2009, v1.2

Section DCombustion Turbine Generator

Quotation Fill-In Information Page 15 of 44

0656 16031 Detailed information on the capability of the generator to respond to a system upset situation, where a large portion of the system load is applied to the unit and load shedding is required

30 After Effective Date No

0657 16031 Reactive power capability versus real power capability curve at minimum and maximum hydrogen pressure(s)

30 After Effective Date No

0658 16031 Generator "Vee" curves 30 After Effective Date No

0659 16031 Zero and rated power factor current saturation curves

30 After Effective Date No

0660 16031 No load saturation curves 30 After Effective Date No

0661 16031 Generator allowable negative sequence versus time curve

30 After Effective Date No

0662 16031 Generator current decrement curves for 3-phase, line-to-line, and line-to-neutral short-circuit conditions at the generator terminals

30 After Effective Date No

0663 16031 Generator current decrement curves for 3-phase, line-to-line, and line-to-neutral short-circuit conditions at terminals of transformers connected to generator terminals. Electrical system parameters will be furnished by the Purchaser.

30 After Effective Date No

0664 16031 Generator current transformer secondary excitation characteristic curve

30 After Effective Date No

0665 16031 Generator current transformer ratio correction factor curve

30 After Effective Date No

0666 16031 Generator current transformer thermal rating

30 After Effective Date No

0667 16031 Generator current transformer mechanical rating

30 After Effective Date No

0668 16031 Generator current transformer IEC or ANSI metering and relaying accuracy class

30 After Effective Date No

0669 16031 Generator current transformer secondary resistance at 77.0° F (25° C)

30 After Effective Date No

0670 16031 Generator current transformer phase angle correction factor curves

30 After Effective Date No

0671 16031 Generator current transformer correction factor curves

30 After Effective Date No

Page 129: RFP 40313 Addendum #1 - Grand River Dam Authority 40313 Addendum #1 ... Quotation Fill-In Information for Steam Turbine Generator ... 00300A.5.1 Attendance at the Purchaser's DCS Factory

RFP 40313

Source: 00300, 2009, v1.2

Section DCombustion Turbine Generator

Quotation Fill-In Information Page 16 of 44

0672 16031 All generator, exciter, and regulator data required to complete a mathematical model study of system stability

30 After Effective Date No

Page 130: RFP 40313 Addendum #1 - Grand River Dam Authority 40313 Addendum #1 ... Quotation Fill-In Information for Steam Turbine Generator ... 00300A.5.1 Attendance at the Purchaser's DCS Factory

RFP 40313

Source: 00300, 2009, v1.2

Section DCombustion Turbine Generator

Quotation Fill-In Information Page 17 of 44

0542 16031 A block diagram with significant transfer functions representing the generator, exciter, and regulator satisfactory for computer studies

30 After Effective Date No

0543 16031 Hydrogen seal oil diagrams 90 After Effective Date No0544 16031 Stator cooling water diagrams 90 After Effective Date No

0673 16031 Complete listing of all accessory equipment with instrument ranges and recommended contact set points

90 After Effective Date No

0674 16031 List of all control devices and/or process set points, ranges, and flow quantities

90 After Effective Date No

0675 16031 Listing of accessory equipment to be shipped loose to jobsite

120 After Effective Date No

0545 16031 Air-to-water cooling diagrams or hydrogen-to-water cooling diagrams

90 After Effective Date No

0546 16031 Drawings of all separately mounted equipment indicating information required for setting, piping, and wiring the items

60 After Effective Date No

0547 16031 Drawings indicating location of all generator junction boxes and electrical accessories requiring embedded conduit in the turbine generator pedestal, including recommended quantities and sizes of conduits into each junction box or piece of equipment

90 After Effective Date No

0548 16031 Drawings indicating the size and location of all generator ground pads

90 After Effective Date No

0549 16031 Drawings indicating electrical connection details to the generator terminals, generator neutral enclosure, and generator current transformers

90 After Effective Date No

0550 16031 Detailed schematic drawings of all electrical control wiring

90 After Effective Date No

Page 131: RFP 40313 Addendum #1 - Grand River Dam Authority 40313 Addendum #1 ... Quotation Fill-In Information for Steam Turbine Generator ... 00300A.5.1 Attendance at the Purchaser's DCS Factory

RFP 40313

Source: 00300, 2009, v1.2

Section DCombustion Turbine Generator

Quotation Fill-In Information Page 18 of 44

0551 16031 All certified drawings required to indicate miscellaneous piping and wiring connections and any other piping and wiring connections not indicated on previous drawings. This shall include piping diagrams as required to indicate manufacturer's requirements for the Purchaser's piping systems.

90 After Effective Date No

0552 16031 Arrangement drawings of all piping and accessories furnished, as required for the Engineer's check of the layout of these items

90 After Effective Date No

0553 16031 Drawings as required to indicate the details of construction and internal wiring of all equipment and equipment components furnished. Detail drawings of standard gauges, instruments, valves, and similar miscellaneous items.

180 After Effective Date No

0676 16031 Generator terminal enclosure outline and loading data

90 After Effective Date No

0554 16031 Provide a block diagram and parameter values for the significant transfer functions (representing the generator, excitation and governor) satisfactory for transient and dynamic computer studies

30 After Effective Date No

16051 Electrical Design and Equipment

.

0677 16051 Certified design data and performance curves

70 Before Shipment Yes

0555 16051 Arrangement and fabrication/ erection drawings

90 After Effective Date Yes

0556 16051 Detailed set of drawings to include arrangement drawings, one-line and three-line diagrams, metering and relaying diagrams, schematics, instrument door details, nameplate schedule, and bill of materials

60 After Effective Date Yes

0557 16051 Final set of above drawings in addition to interconnection wiring diagrams

21 After Purchaser comments on initial drawings

Yes

0558 16051 Final submittal of as-built drawings

30 After Shipment Yes

0559 16051 Relay instruction and service manual including relay curve information

90 After Effective Date Yes

Page 132: RFP 40313 Addendum #1 - Grand River Dam Authority 40313 Addendum #1 ... Quotation Fill-In Information for Steam Turbine Generator ... 00300A.5.1 Attendance at the Purchaser's DCS Factory

RFP 40313

Source: 00300, 2009, v1.2

Section DCombustion Turbine Generator

Quotation Fill-In Information Page 19 of 44

0678 16051 Current transformer ratio correction factor and excitation curves

90 After Effective Date Yes

0679 16051 Time overcurrent curves for each overload, molded case circuit breaker, and solid-state protective device used

30 After Effective Date Yes

0560 16051 I/O database and I/O wiring diagrams

Upon Shipment Yes

16142 Generator Neutral Grounding .

0680 16142 Bill of Material, Including Quantity, Description, and Part Number

Upon Effective Date Yes

0681 16142 Certified design calculations 30 After Effective Date Yes0561 16142 Preliminary outline drawings 15 After Effective Date Yes0562 16142 Final drawings 60 After Effective Date Yes0563 16142 Schematic and wiring diagrams 60 After Effective Date Yes

16201 Protective Relaying Panels .

0564 16201 Outline drawings showing dimensions, weight, and mounting requirements

15 After Effective Date Yes

0565 16201 Schematic diagrams 30 After Effective Date Yes0566 16201 Connection and wiring diagrams 30 After Effective Date Yes

0567 16201 Erection drawing 30 After Shipment Yes0568 16201 Relay installation and wiring

information30 After Effective Date Yes

0569 16201 Nameplate drawings 45 After Effective Date YesE645 Electric Actuators .

0570 E645 Actuator outline diagrams 30 After Effective Date No0571 E645 Wiring diagrams 30 After Effective Date No

K100 Instrumentation .0572 K100 Instrument Location Plan

Drawings90 After Effective Date Yes

0573 K100 Instrument factory calibration sheets

Upon Shipment of Instruments Yes

0574 K100 Flow element calculation data sheets showing beta ratio, dP, flow

120 After Effective Date Yes

0575 K100 ISA-format datasheets for all Instruments

120 After Effective Date Yes

0682 K100 PTC 19.3 calculations for steam line TW's vib failure analysis confirming thermowells will not fail in service or during steam blow conditions.

120 After Effective Date Yes

M200 Piping .

0683 M200 Calculations to verify suitability of integrally reinforced fittings for dissimilar branch/header materials.

Page 133: RFP 40313 Addendum #1 - Grand River Dam Authority 40313 Addendum #1 ... Quotation Fill-In Information for Steam Turbine Generator ... 00300A.5.1 Attendance at the Purchaser's DCS Factory

RFP 40313

Source: 00300, 2009, v1.2

Section DCombustion Turbine Generator

Quotation Fill-In Information Page 20 of 44

Q100 General Welding Requirements

.

0406 Q100 Nonconformance reports 5 After Discovery of Nonconf.

0407 Q100 ASME/NBIC Data Reports 60 After Fabrication Completion

0407 Q100 Radiographs 14 After Fabrication Completion

Q110 Welding of 9Cr-1Mo-V (Grade 91) Materials

.

0408 Q110 ASME B31.1 shop fabricated piping spools P91 documentation records

21 Before Shipment

Q301 Manufacturer's Standard Coating

.

0683 Q301 Shop drawings that identify shop-applied coating systems

30 Before Start of Fabrication No

0684 Q301 Manufacturer's product data sheets

30 After Release to Proceed No

Q400 General Equipment Requirements

.

0301 Q400 Shipment Plan providing details of field assembly work required as described in the Supplier's proposal.

30 After Effective Date No

Q502 Electrical Data

0576 Q502 Completed motor information sheets

60 After Effective Date Yes

0577 Q502 Completed electric actuator information sheet

60 After Effective Date Yes

Page 134: RFP 40313 Addendum #1 - Grand River Dam Authority 40313 Addendum #1 ... Quotation Fill-In Information for Steam Turbine Generator ... 00300A.5.1 Attendance at the Purchaser's DCS Factory

GRDA Unit 3 Combined Cycle Project178592.67.9120

Combustion Turbine Generator/Steam Turbine Generator

Bid Issue25Oct2013

Source: 00300, 2009, v1.2

Section DCombustion Turbine Generator

Quotation Fill-In Information Page 21 of 44

Bidder Response Column

Reference Document Submittal Item Yes/No

13125 Pre-Manufactured Metal Equipment Building .13125 HVAC Design Engineer13125 HVAC Equipment Vendors15562 Combustion Turbine .15562 Combustion turbine generator performance curves15562 Combustion turbine heat rate, exhaust flow, and exhaust temperature curves

versus load, showing the effect of inlet guide vane (IGV) control15562 Compressor inlet temperature correction curves for heat rate, capacity,

exhaust temperature, and mass flow15562 NOx injection water (or steam) correction curves for effects on heat rate,

capacity, exhaust temperature, mass flow, and emissions for varying amounts of water (or steam) injection for NOx control.

15562 NOx control water (or steam) injection requirement versus combustion turbine load curve for all specified fuels at various compressor inlet temperatures.

15562 Curves indicating the effect of inlet anti-icing on output and heat rate.15562 NOx and CO emission level versus load for all specified fuels.15562 CO, UHC, and VOC emission levels versus water (or steam) injection rate

curve.15562 Inlet pressure drop correction data.15562 Exhaust pressure drop correction data.15562 Humidity correction data.15562 Atmospheric pressure (or altitude) correction curves.15562 Estimated output, heat rate, exhaust flow, and exhaust temperature

degradation versus fired hours curves from initial startup through second major overhaul for firing each specified fuel.

15562 Curves showing recovery effects of compressor washing for output, heat rate, exhaust flow, and exhaust temperature.

15562 Detailed description of starting system.15562 List of Drawings to be provided during project execution and schedule of

drawing submittals.15562 Preliminary/typical general arrangement Drawings showing the combustion

turbine generator unit(s), inlet filter(s), exhaust stack(s), all associated compartments/enclosures/skids, starter unit, transformers, and radiators. A vertical section shall be included showing the complete installed unit including crane minimum hook height and capacity.

15562 Control system configuration drawing identifying all microprocessors, operator interface devices, and interconnecting data highways.

15562 Preliminary/typical one-line diagrams of generator electrical system, including ac and dc auxiliary electric system. One-line diagrams shall include all auxiliary load data and proposed metering and protective relaying.

15562 A complete description of all equipment proposed, together with supportive data.

15562 Preliminary Engineering Schedule.15562 Preliminary Procurement/Production/Shipping Schedule.

Document submitted with Quotation Package

00300D.10 Technical Documents Required with Quotation (completed tables are required for the Base Scope and Elective Option [if proposed])

Page 135: RFP 40313 Addendum #1 - Grand River Dam Authority 40313 Addendum #1 ... Quotation Fill-In Information for Steam Turbine Generator ... 00300A.5.1 Attendance at the Purchaser's DCS Factory

GRDA Unit 3 Combined Cycle Project178592.67.9120

Combustion Turbine Generator/Steam Turbine Generator

Bid Issue25Oct2013

Source: 00300, 2009, v1.2

Section DCombustion Turbine Generator

Quotation Fill-In Information Page 22 of 44

Reference Document Submittal Item Yes/No

15562 Shipping methods and erection criteria and requirements.15562 Description of manufacturer's performance estimating procedure, including

correction procedures for differing altitudes, ambient temperatures, part loads, NOx emissions, water (or steam) injection rates, and IGV control.

15562 Information on technical assistance provided during erection and commissioning.

15562 Description of proposed classroom instruction for operations and maintenance training.

15562 Description and drawing of lay-down space requirements with area defined.

15562 Description and drawing of additional maintenance area required in addition to the lay-down space defined.

15562 Priced lists of recommended spare parts.15562 List of Startup And Commissioning Spare Parts furnished with the

equipment.15562 List of all maintenance tools/special tools furnished with the equipment.15562 Discussion of emission level changes with increasing operating hours.15562 Provide estimated hours to erect proposed combustion turbine generator

unit, broken down by craft.15562 Description of all field assembly/erection required. Any item not described

will be assumed to be fully factory finished.15562 Description of factory testing program for furnished equipment.15562 Description of the extent of nondestructive testing of unit components,

including the casing, rotor forgings, shafts, machine journals, and other major components.

15562 Description of compressor and turbine blade coatings.15562 Description of compressor and turbine blade material and method for

securing to rotor and casing.15562 Description of burners, ignitors, and combustion system for the proposed

combustion system including cross-section Drawings.15562 Description of flame safety and combustion control systems.15562 List of borescope port locations.15562 Description of methods and equipment required for field balancing.15562 Description of gaseous fuel systems and balance-of-plant support/interface

requirements.15562 Gaseous fuel requirements (temperature, pressure, minimum required fuel

superheat, purity, viscosity, minimum heating value, etc.).15562 Description of combustion turbine generator lubricating system, including

lubrication schedules, types, quantities, filters, maintenance intervals, etc.

15562 Description of backup or redundancy features provided in lube oil system and seal oil system.

15562 Description of the combustion turbine generator lube oil cooling system.15562 Description of turning gear system, including statement of effect of long-term

operation of turning gear.15562 Description of manual system for rotating the turbine and generator shafts.

Page 136: RFP 40313 Addendum #1 - Grand River Dam Authority 40313 Addendum #1 ... Quotation Fill-In Information for Steam Turbine Generator ... 00300A.5.1 Attendance at the Purchaser's DCS Factory

GRDA Unit 3 Combined Cycle Project178592.67.9120

Combustion Turbine Generator/Steam Turbine Generator

Bid Issue25Oct2013

Source: 00300, 2009, v1.2

Section DCombustion Turbine Generator

Quotation Fill-In Information Page 23 of 44

Reference Document Submittal Item Yes/No

15562 Descriptive information on the combustion turbine control system, including a description of all local and remote control functions and local and remote operator interface functions, redundancy, and a list of sensors furnished (transducers, vibration detectors, thermocouples, RTDs, etc.).

15562 Description of emergency trip system, including fuel shutoff control.15562 Description of combustion turbine automatic generation control (AGC)

system and capabilities.15562 Description of fire protection and detection equipment with a discussion on

compliance with NFPA requirements.15562 Description of unit enclosures and noise attenuation features.15562 Description of procedure for enclosure disassembly in large sections to

accommodate major maintenance.15562 Description and arrangement Drawings of the acoustical barrier system for

noise attenuation, if required.15562 Description of compressor water wash equipment and cleaning chemical

requirements.15562 Description of inlet air filtration system.15562 Description of inlet anti-icing system, including conditions under which it is

required for operation.15562 Description of starting system with associated detailed drawings.15562 Description of water (or steam) injection/NOx reduction control system,

including the combustion turbine manufacturer's operating experience with water (or steam) injection for the combustion turbine model proposed, pressure, temperature, and purity requirements for injection for NOx control.

15562 Water quality and blowdown information for the evaporative cooler system.

15562 Description of proposed insulation and lagging systems.15562 Description of enclosure/compartment HVAC system, including design

temperatures.15562 Description of overspeed protection system.15562 Detailed description of unit startup event sequence, including times, auxiliary

power requirements, amperage versus time curve, etc. (separately address "normal" and "fast" starts).

15562 Description of proposed shutdown corrosion protection system15562 Description of planned future upgrades (capacity increases) to the unit(s)

proposed and effects these upgrades will have on the electrical equipment specified.

15562 Complete current experience listings for the combustion turbine generator model proposed indicating the following information as a minimum:

15562 Recommended maintenance practices and procedures, including frequency of routine inspection intervals and required parts. Include man-hours required to complete the combustion inspection, hot gas path inspection, and the first major overhaul.

15562 Complete description of the data link hardware, software, and communications protocol for the interface to the Purchaser's DCS.

15562 Complete description of the data link hardware, software, and communications protocol for the interface to the Purchaser's SCADA system.

15562 Description of any special control system grounding requirements.

Page 137: RFP 40313 Addendum #1 - Grand River Dam Authority 40313 Addendum #1 ... Quotation Fill-In Information for Steam Turbine Generator ... 00300A.5.1 Attendance at the Purchaser's DCS Factory

GRDA Unit 3 Combined Cycle Project178592.67.9120

Combustion Turbine Generator/Steam Turbine Generator

Bid Issue25Oct2013

Source: 00300, 2009, v1.2

Section DCombustion Turbine Generator

Quotation Fill-In Information Page 24 of 44

Reference Document Submittal Item Yes/No

15562 Complete description of the proposed Turbine Generator Supervisory System including equipment provided, list of sensors furnished, and operator interface functions.

15562 Complete description of the proposed Vibration Monitoring System including equipment provided, list of sensors furnished, and operator interface functions.

15562 Water quality and blowdown information for the evaporative cooler system.

15562 List of codes and standards used in design of all equipment including version or issue date.

16031 Cylindrical Rotor Generators .16031 Reactive capability curve to indicate generator capability at various power

factors.16031 Generator saturation curve.16031 Generator "Vee" curves.16031 Drawings of recommended method of stator erection.16031 Generator drawing with overall length, width, and height.16031 Generator drawing with exciter or collector's overall length, width, and height.

16031 Generator drawing with excitation cubicle's overall length, width, and height.

16031 Generator drawing with rotor removal clearance (straight and askew).16031 Generator drawing with control cabinet's overall length, width, and height.

16031 Generator drawing with supervisory cabinet's overall length, width, and height.

16031 Complete list of required maintenance tools. The listing shall include a complete description and quantity of each item.

16031 Equipment storage requirements, including inside or outside requirements, requirements for controlled temperature or humidity, etc.

16031 Complete list of necessary special tools. The listing shall provide a complete description and quantity of each item, including a discussion or designation of particular items required for erection and/or maintenance.

16031 Complete list of recommended spare parts.16031 Description and listing of major generator assemblies for shipment.16031 Information describing coating systems for equipment.16031 One uncontrolled copy of bidder's Quality Assurance Program.16031 Complete information on the generator supervisory instrumentation system,

including a bill of material.16031 Detailed listing of alarm contacts available and recommended alarms for

connection to DCS, including unit prices for additions or deductions.16031 Detailed listing of instrumentation furnished.16031 Complete description of cable requirements, including the cable

constructions, for all equipment furnished.16031 Complete description of any voltage level separation requirements for

raceway or special cable shielding requirements for all equipment furnished.

16031 Complete description of the lube oil piping arrangement.16031 Complete list of other plants where the manufacturer has duplicate, or near

duplicate, generators under construction or in operation.16031 Listing of Work subcontracted to other Suppliers.

Page 138: RFP 40313 Addendum #1 - Grand River Dam Authority 40313 Addendum #1 ... Quotation Fill-In Information for Steam Turbine Generator ... 00300A.5.1 Attendance at the Purchaser's DCS Factory

GRDA Unit 3 Combined Cycle Project178592.67.9120

Combustion Turbine Generator/Steam Turbine Generator

Bid Issue25Oct2013

Source: 00300, 2009, v1.2

Section DCombustion Turbine Generator

Quotation Fill-In Information Page 25 of 44

Reference Document Submittal Item Yes/No

16031 Listing of Subsuppliers and Suppliers used.16031 Bidder's preliminary engineering schedule.16031 Bidder's procurement/production/shipping schedule.16031 Complete description of excitation system.16031 Complete description of generator core monitor system (if specified).16031 Generator maximum allowable temperature of cold coolant generator

temperature rise of gas and liquid.16031 Generator maximum allowable temperature for armature winding, field

winding, core, and mechanical parts in contact with or adjacent to armature winding insulation; and collector rings, brushes, and brush holders.

16031 Detailed description of the brushless exciter (if specified).16031 Maximum allowable temperature of cooling air and temperature rise of

cooling air.

Page 139: RFP 40313 Addendum #1 - Grand River Dam Authority 40313 Addendum #1 ... Quotation Fill-In Information for Steam Turbine Generator ... 00300A.5.1 Attendance at the Purchaser's DCS Factory

GRDA Unit 3 Combined Cycle Project178592.67.9120

Combustion Turbine Generator/Steam Turbine Generator

Bid Issue25Oct2013

Source: 00300, 2009, v1.2

Section DCombustion Turbine Generator

Quotation Fill-In Information Page 26 of 44

Reference Document Submittal Item Tech Fill-In Data

13125 Pre-Manufactured Metal Equipment Building .13125 Bidder's Name13125 Electrical/Control Building13125 Item13125 Description13125 Manufacturer13125 Location of manufacturer13125 City13125 State13125 Country13125 Standard for manufacturing and testing13125 Design permissible loading, lb/ft2 (kg/m2)13125 Floor13125 Roof13125 Wind13125 Dimensions, inches (mm)13125 Height13125 Depth13125 Length13125 Total weight, lb (kg)13125 Lighting13125 Item13125 Description13125 Manufacturer13125 Location of manufacturer13125 City13125 State13125 Country13125 Standard for manufacturing and testing13125 Lighting fixture type13125 Switch type13125 Receptacle type13125 Contactor type

Combined Cycle Configuration .Configuration (Single or Multi-Shaft)Single Shaft Configuration

Configuration (CGS or CSG)Clutch

ManufacturerMW Rating

Cooling steam requirements, lb/hr (startup/transient)15562 Combustion Turbine .15562 Bidder's Name15562 Performance Data at Specified Conditions15562 Note: Items marked with an asterisk (*) shall be

guaranteed for all load and ambient conditions designated."Guaranteed," in accordance with Section 15562.

00300D.11 Technical Fill-In Data Required with Quotation (completed tables are required for the Base Scope and Elective Option [if proposed])

Page 140: RFP 40313 Addendum #1 - Grand River Dam Authority 40313 Addendum #1 ... Quotation Fill-In Information for Steam Turbine Generator ... 00300A.5.1 Attendance at the Purchaser's DCS Factory

GRDA Unit 3 Combined Cycle Project178592.67.9120

Combustion Turbine Generator/Steam Turbine Generator

Bid Issue25Oct2013

Source: 00300, 2009, v1.2

Section DCombustion Turbine Generator

Quotation Fill-In Information Page 27 of 44

Reference Document Submittal Item Tech Fill-In Data

15562 Parameter 115562 Guaranteed15562 Gross generator output Btu/h15562 CTG auxiliary power Btu/h15562 CTG heat consumption, LHV Btu/h15562 Net CTG output* Btu/h15562 Net CTG heat rate, LHV* Btu/kwh15562 Fuel flow 15562 Turbine inlet temperature °F (°C)15562 Water or steam injection flow* lb/h15562 Inlet airflow °F (°C)15562 Inlet air pressure drop PSI15562 Exhaust pressure drop PSI15562 Exhaust gas flow lb/h15562 Exhaust gas temperature* °F (°C)15562 Exhaust gas heat* Btu/h15562 Exhaust gas heat reference temperature °F (°C)15562 Auxiliary Power Requirements15562 Fuel

15562Included in Net Output Btu/h / Total Connected Power Btu/h

15562 Turbine cooling air compressor /15562 Control air compressor /15562 Lube oil pumps (ac) /15562 Lube oil pumps (dc) /15562 Space heaters /15562 Lube oil cooler fans /15562 Cooling water pumps /15562 Evaporative cooling system /15562 Generator cooling system /15562 Rotor turning motor /15562 Hydrogen system seal oil pump /15562 Mist eliminator /15562 Control system /15562 Air conditioners /15562 Ventilation fans/blowers /15562 Fin-fan cooler fans /15562 Total at continuous baseload /15562 Total standby power /15562 Note: Auxiliary power data shall be for steady-state

operation at the guaranteed load condition on the indicated fuel.

15562 Startup and Shutdown Performance15562 Primary Fuel

15562Guaranteed normal cycle starting time from cold standby to continuous baseload, min

15562 Guaranteed rate of load change, kW/min15562 Total gross generation per start15562 Normal start, Btu15562 Total auxiliary power required per start15562 Normal start, Btu15562 Peak auxiliary power required per start

Page 141: RFP 40313 Addendum #1 - Grand River Dam Authority 40313 Addendum #1 ... Quotation Fill-In Information for Steam Turbine Generator ... 00300A.5.1 Attendance at the Purchaser's DCS Factory

GRDA Unit 3 Combined Cycle Project178592.67.9120

Combustion Turbine Generator/Steam Turbine Generator

Bid Issue25Oct2013

Source: 00300, 2009, v1.2

Section DCombustion Turbine Generator

Quotation Fill-In Information Page 28 of 44

Reference Document Submittal Item Tech Fill-In Data

15562 Fuel consumed per start (LHV)15562 Normal start, Btu15562 Noise Emissions15562 Guaranteed average near field noise levels at 3 feet

(0.914 meter) from the combustion turbine generator and any associated auxiliary equipment, oper-ating at full load, dBA to a reference of 20 micropascals

15562 Guaranteed far field noise levels at 400 feet (122 meters) from the combustion turbine enclosure boundary, operating at full load, dBA / dBC /

15562 Reference band levels, dBA15562 Octave band center frequency, hertz15562 3115562 6315562 12515562 25015562 50015562 1,00015562 2,00015562 4,00015562 8,00015562 Operational Performance

15562 Maintenance intervalsEquivalent operating hours (EOH) or

Fired hours or Starts15562 Combustion inspection15562 Hot gas path15562 Major overhaul15562 Equivalent operating hours data EOH15562 Each hour at baseload, gas fuel15562 Each hour at peak load, gas fuel15562 Each normal start15562 Each trip from full load15562 Each normal stop15562 Expected degradation data

15562Nonrecoverable degradation in baseload output, percent

15562 1,000 Hours (fixed hours of operation)15562 Gas Fuel Operation

15562Nonrecoverable degradation in baseload heat rate, percent

15562 Gas fuel operation15562 4,000 Hours (fixed hours of operation)15562 Gas Fuel Operation

15562Nonrecoverable degradation in baseload heat rate, percent

15562 Gas fuel operation15562 8,000 Hours (fixed hours of operation)15562 Gas Fuel Operation

15562Nonrecoverable degradation in baseload heat rate, percent

15562 Gas fuel operation

Page 142: RFP 40313 Addendum #1 - Grand River Dam Authority 40313 Addendum #1 ... Quotation Fill-In Information for Steam Turbine Generator ... 00300A.5.1 Attendance at the Purchaser's DCS Factory

GRDA Unit 3 Combined Cycle Project178592.67.9120

Combustion Turbine Generator/Steam Turbine Generator

Bid Issue25Oct2013

Source: 00300, 2009, v1.2

Section DCombustion Turbine Generator

Quotation Fill-In Information Page 29 of 44

Reference Document Submittal Item Tech Fill-In Data

15562 16,000 Hours (fixed hours of operation)15562 Gas Fuel Operation

15562Nonrecoverable degradation in baseload heat rate, percent

15562 Gas fuel operation15562 24,000 Hours (fixed hours of operation)15562 Gas Fuel Operation

15562Nonrecoverable degradation in baseload heat rate, percent

15562 Gas fuel operation15562 Miscellaneous15562 Bidder's definition of baseload15562 Bidder's definition of peak load15562 Has a factory fired operation test been completed for

the size and type of the unit proposed? Yes or No15562 If yes, provide details15562 General Data15562 Manufacturer15562 Location assembled15562 Combustion turbine model number15562 Number of units furnished15562 Gas delivery conditions15562 Minimum required, PSI / °F15562 Maximum allowed, PSI / °F15562 General Design Information15562 Type of combustion turbine15562 Shaft speed, rpm15562 Overspeed trip15562 Electronic, rpm15562 Mechanical bolt, rpm15562 Critical speeds15562 First critical, rpm / mode15562 Second critical, rpm / mode15562 Third critical, rpm / mode15562 Fourth critical, rpm / mode15562 Vibration Amplitude15562 Turbine15562 Nominal / Startup15562 Typical /15562 Alarm /15562 Trip /15562 Generator15562 Nominal / Startup15562 Typical /15562 Alarm /15562 Trip /15562 Unit Weights and Dimensions15562 Turbine engine weight, lbf15562 Generator stator weight, lbf15562 Generator rotor weight, lbf15562 Auxiliary Skid15562 Name

Page 143: RFP 40313 Addendum #1 - Grand River Dam Authority 40313 Addendum #1 ... Quotation Fill-In Information for Steam Turbine Generator ... 00300A.5.1 Attendance at the Purchaser's DCS Factory

GRDA Unit 3 Combined Cycle Project178592.67.9120

Combustion Turbine Generator/Steam Turbine Generator

Bid Issue25Oct2013

Source: 00300, 2009, v1.2

Section DCombustion Turbine Generator

Quotation Fill-In Information Page 30 of 44

Reference Document Submittal Item Tech Fill-In Data

15562 Length, in.15562 Width, in.15562 Height, in.15562 Weight, lb.15562 Shipping weight, entire unit, lbf15562 Heaviest piece handled during erection15562 Weight, lbf15562 Heaviest piece handled during major overhaul15562 Weight, lbf15562 Overall dimensions, including housing, in15562 Length15562 Width15562 Height15562 Component Descriptions15562 Inlet guide vanes15562 Type15562 Material15562 Description of operating limitations15562 Turbine15562 Number of stages: 015562 Stage Identification15562 Blade Material15562 Nozzle Material15562 Blade Coating15562 Nozzle Coating15562 Stage Identification15562 Blade Material15562 Nozzle Material15562 Blade Coating15562 Nozzle Coating

15562Describe how blades are secured to rotor and how nozzle is secured to casing.

15562 Cooling methods15562 Blades15562 Nozzles15562 Disks15562 Shaft15562 Accessory gear15562 Manufacturer15562 Type or model15562 Driven equipment15562 AGMA quality factor15562 Service factor15562 Maximum power rating, Btu/h15562 Compressor15562 Type15562 Number of stages15562 Blade material15562 Nozzle material15562 Coating material

15562Describe how blades are secured to rotor and how nozzle is secured to casing.

Page 144: RFP 40313 Addendum #1 - Grand River Dam Authority 40313 Addendum #1 ... Quotation Fill-In Information for Steam Turbine Generator ... 00300A.5.1 Attendance at the Purchaser's DCS Factory

GRDA Unit 3 Combined Cycle Project178592.67.9120

Combustion Turbine Generator/Steam Turbine Generator

Bid Issue25Oct2013

Source: 00300, 2009, v1.2

Section DCombustion Turbine Generator

Quotation Fill-In Information Page 31 of 44

Reference Document Submittal Item Tech Fill-In Data

15562 Turbine bearings15562 Type15562 Radial15562 Thrust15562 Quantity15562 Radial15562 Thrust15562 Temperature detectors15562 Manufacturer15562 Type/model15562 Description of internal lubrication system15562 Combustors15562 Type15562 Number of cans/silos15562 Expected life min15562 Liners15562 Nozzles15562 Spark plugs15562 Hot gas casing15562 Burner tiles15562 Transition pieces15562 Crossfire tubes15562 Materials15562 Combustor casing15562 Combustor liner15562 Combustor tiles15562 Transition pieces15562 Crossfire tubes15562 Type of ignitors15562 Number of ignitors15562 Type of flame detectors15562 Number of flame detectors15562 Description of nozzle15562 Starting system15562 General description15562 Maximum number of starts allowed in a 1 hour period

at maximum design temperature15562 Time required between start attempts, min

15562Minimum time between controlled shutdown and subsequent start, min

15562Minimum time between unit trip and subsequent start attempt, min

15562 Static start system15562 Manufacturer15562 Description15562 Drive capacity, kVA15562 Transformer size, kVA / Volts / Phase / /

15562Maximum load during combustion turbine starting, kW / kVA /

15562 Lubricating oil system15562 Lube oil type15562 Recommended manufacturer

Page 145: RFP 40313 Addendum #1 - Grand River Dam Authority 40313 Addendum #1 ... Quotation Fill-In Information for Steam Turbine Generator ... 00300A.5.1 Attendance at the Purchaser's DCS Factory

GRDA Unit 3 Combined Cycle Project178592.67.9120

Combustion Turbine Generator/Steam Turbine Generator

Bid Issue25Oct2013

Source: 00300, 2009, v1.2

Section DCombustion Turbine Generator

Quotation Fill-In Information Page 32 of 44

Reference Document Submittal Item Tech Fill-In Data

15562 System fill requirement, gal15562 Quantity of oil flowback on shutdown, gal15562 Retention time at Site load, min15562 Lube oil circulation, gpm15562 Lube oil filters15562 Number15562 Capacity, gpm15562 Mesh size, in15562 Mist eliminators15562 Type15562 Number15562 Lube oil pumps15562 Gear driven15562 Manufacturer15562 Type15562 Number15562 Ac motor driven15562 Manufacturer15562 Type15562 Number15562 Dc motor driven15562 Manufacturer15562 Type15562 Number15562 Lube oil coolers15562 Manufacturer15562 Number15562 Capacity, percent15562 Type (shell and tube or fin-fan)15562 Media (oil-to-water or oil-to-air)15562 Tube material15562 Tube surface area, in215562 Fan diameter, in15562 Fan speed, rpm15562 Radiator materials15562 Mechanical Accessory Equipment15562 Compressor wash system15562 On-Line / Off-Line15562 Flow to combustion turbine, gpm /15562 Water quality required /15562 Type of detergent Not applicable /15562 Quantity of detergent Not applicable /15562 Duration of wash, min /15562 Is resulting discharge a hazardous material? Not applicable / Yes or No15562 Tank capacity, gal /

15562Recommended cleaning frequency, operating hours on primary fuel /

15562 Fire detection and protection15562 Fire protection system15562 Type CO2 or FM200 or Water Mist15562 Detectors15562 Locations

Page 146: RFP 40313 Addendum #1 - Grand River Dam Authority 40313 Addendum #1 ... Quotation Fill-In Information for Steam Turbine Generator ... 00300A.5.1 Attendance at the Purchaser's DCS Factory

GRDA Unit 3 Combined Cycle Project178592.67.9120

Combustion Turbine Generator/Steam Turbine Generator

Bid Issue25Oct2013

Source: 00300, 2009, v1.2

Section DCombustion Turbine Generator

Quotation Fill-In Information Page 33 of 44

Reference Document Submittal Item Tech Fill-In Data

15562 Number15562 Nozzles15562 Locations15562 Number15562 Type15562 Number of releases allowed before recharge15562 Gas protection system15562 Type15562 Detectors15562 Locations15562 Number15562 Limits of detection15562 Inlet air filtration equipment15562 Manufacturer15562 Type15562 Filter media material15562 Efficiency15562 Means of filter support

15562Typical number of hours of operation before replacement of filter

15562 Number of filter modules15562 Number of filters15562 Pressure drop for15562 Clean conditions15562 End of media life15562 Inlet duct15562 Manufacturer15562 Dimensions15562 Length, in.15562 Width, in.15562 Height, in.15562 Material15562 Coating15562 Inlet silencer15562 Manufacturer15562 Dimensions15562 Length, in.15562 Width, in.15562 Height, in.15562 Internal materials15562 Evaporative cooler15562 Manufacturer15562 Type15562 Cooler media15562 Differential pressure drop, PSI15562 Fuel gas filter/separator15562 Type15562 Manufacturer15562 Filter mesh size, in15562 Shell material15562 Turbine blade cooling air booster air compressor15562 Type

Page 147: RFP 40313 Addendum #1 - Grand River Dam Authority 40313 Addendum #1 ... Quotation Fill-In Information for Steam Turbine Generator ... 00300A.5.1 Attendance at the Purchaser's DCS Factory

GRDA Unit 3 Combined Cycle Project178592.67.9120

Combustion Turbine Generator/Steam Turbine Generator

Bid Issue25Oct2013

Source: 00300, 2009, v1.2

Section DCombustion Turbine Generator

Quotation Fill-In Information Page 34 of 44

Reference Document Submittal Item Tech Fill-In Data

15562 Manufacturer15562 Number of stages15562 Speed, rpm15562 Turbine blade cooling air heat exchanger15562 Type15562 Manufacturer15562 Media, air-to-15562 Heat exchange material15562 Number of fans15562 Fan capacity, percent15562 Air temperature in, °F15562 Air temperature out, °F15562 Airflow, lbm/h15562 Combustion Turbine Generator Control System 15562 Local / Remote15562 Microprocessor15562 Manufacturer15562 Model No.15562 Number of processors15562 Quantity of spare I/O digital15562 Quantity of spare I/O analog15562 Quantity of spare alarm points15562 Quantity of spare message capacity15562 Cabinets15562 Number15562 Size15562 LCD monitor15562 Number of monitors15562 Manufacturer15562 Model No.15562 Size (diagonal) in15562 Data logging rate, points/time / /15562 Printer15562 Number of printers15562 Manufacturer15562 Model No.15562 Type15562 Power consumption (kVA)15562 120 volts ac15562 125 volts dc15562 Electrical generator control panels15562 Number15562 Size15562 Standard vibration detectors15562 Manufacturer15562 Model No.15562 Type15562 Quantity15562 Location

15562Supplier Furnished Materials and Associated Installation Quantities

15562 Inlet Filter, tons (Note 1)

Page 148: RFP 40313 Addendum #1 - Grand River Dam Authority 40313 Addendum #1 ... Quotation Fill-In Information for Steam Turbine Generator ... 00300A.5.1 Attendance at the Purchaser's DCS Factory

GRDA Unit 3 Combined Cycle Project178592.67.9120

Combustion Turbine Generator/Steam Turbine Generator

Bid Issue25Oct2013

Source: 00300, 2009, v1.2

Section DCombustion Turbine Generator

Quotation Fill-In Information Page 35 of 44

Reference Document Submittal Item Tech Fill-In Data

15562 Inlet Filter, pieces15562 Inlet Filter Field Seal Welding, lf15562 Exhaust Diffuser, tons15562 Exhaust Diffuser, pieces15562 Exhaust Diffuser, lf15562 Large Bore Pipe (>= 2 ½” in diameter, lf15562 Large Bore Pipe Spools, each15562 Large Bore Field Welds, each

15562Large Bore Field Welds (average dia), inches (Note 3)

15562 Small Bore Pipe, lf15562 Small Bore Pipe Spools, each15562 Small Bore Field Welds, each15562 Turbine Generator Enclosure, pieces15562 Turbine Generator Enclosure, sf15562 Platform and Stairs, tons15562 Platform and Stairs,pieces15562 Off Base Skids & Misc. Equipment, each15562 Pipe Insulation, lf15562 Insulation Blankets, sf15562 Power Cable, lf15562 Control Cable, lf15562 Thermocouple Cable, lf15562 Power Conductor Terminations, each (Note 4)15562 Control Conductor Terminations, each (Note 4)

15562Thermocouple Conductor Terminations, each (Note 4)

15562 Conduit, lf15562 Instruments, each15562 Technical Assistance Time, hours15562 Notes

15562

1. Inlet Filter includes all pieces of structural steel, ductwork, & expansion joints, but not fasteners, shims, gussets, etc.

15562

2. Exhaust Diffuser includes all pieces of structural steel, ductwork, & expansion joint, but not fasteners, shims, gussets, etc.

15562

3. Average Diameter for large bore pipe welds is the sum of the diameters for each individual large bore welds divided by the total number of large bore welds.

15562

4. Conductor is the number of wires contained in a cable that must be terminated, count both ends.

15562

Seal welding is defined as the number of lineal feet of weld placed multiplied by the number of sides from which the weld must be placed. Thus, a seal weld that must be placed from both the inside and outside is equal to the length of the weld multiplied by two (2).

16031 Cylindrical Rotor Generators .16031 Bidder's Name

Page 149: RFP 40313 Addendum #1 - Grand River Dam Authority 40313 Addendum #1 ... Quotation Fill-In Information for Steam Turbine Generator ... 00300A.5.1 Attendance at the Purchaser's DCS Factory

GRDA Unit 3 Combined Cycle Project178592.67.9120

Combustion Turbine Generator/Steam Turbine Generator

Bid Issue25Oct2013

Source: 00300, 2009, v1.2

Section DCombustion Turbine Generator

Quotation Fill-In Information Page 36 of 44

Reference Document Submittal Item Tech Fill-In Data

16031 Auxiliary Power16031

Guaranteed total electric load during normal operation for auxiliaries furnished with generator, ac load (kW)

16031 Total electric load during peak operation, ac load (kW)16031 Emergency dc electric load (kW)16031 Technical Data16031 Weight of generator stator, lb (kg)16031 Excitation system weight, lb (kg)16031 Shipping weight of generator, lb (kg)

16031Weight of generator stator winding water cooling unit (if required), lb (kg)

16031 Weight of generator rotor, lb (kg)16031 Continuous rating at maximum hydrogen pressure (if

applicable), rated power factor, and specified cooling water temperature, based on maximum shaft power developed by the prime mover, MVA

16031 Nominal rpm16031 Nominal frequency, hertz

16031Voltages at continuous operation and nominal frequency

16031 Nominal voltage, kV16031 Maximum voltage, kV16031 Minimum voltage, kV16031 Generator rated power factor (leading/lagging)

16031

Generator direct axis subtransient reactance in per unit value based on generator continuous kVA rating and nominal frequency (saturated at rated voltage) X"dv

16031 Estimated16031 Percent tolerance16031 Plus16031 Minus16031 Short-time capability expressed in terms of I22t

16031Short-circuit ratio at rated voltage and rated stator current

16031Continuous current unbalance expressed in terms of I2, percent

16031Generator winding capacitance to ground, all phases tied together, mfd

16031 Current transformers16031 Application16031 Relaying16031 ANSI C57.13 Accuracy Class16031 IEC 185 Accuracy Class16031 Metering16031 ANSI C57.13 Accuracy Class16031 IEC 185 Accuracy Class16031 Location16031 Line side16031 Quantity

Page 150: RFP 40313 Addendum #1 - Grand River Dam Authority 40313 Addendum #1 ... Quotation Fill-In Information for Steam Turbine Generator ... 00300A.5.1 Attendance at the Purchaser's DCS Factory

GRDA Unit 3 Combined Cycle Project178592.67.9120

Combustion Turbine Generator/Steam Turbine Generator

Bid Issue25Oct2013

Source: 00300, 2009, v1.2

Section DCombustion Turbine Generator

Quotation Fill-In Information Page 37 of 44

Reference Document Submittal Item Tech Fill-In Data

16031 Secondary current rating16031 Application Relaying16031 Laboratory calibration required16031 Yes or No16031 Line side16031 Quantity16031 Secondary current rating16031 Application Metering16031 Laboratory calibration required16031 Yes or No16031 Neutral side16031 Quantity16031 Secondary current rating16031 Application Relaying16031 Laboratory calibration required16031 Yes or No16031 Neutral side16031 Quantity16031 Secondary current rating16031 Application Metering16031 Laboratory calibration required16031 Yes or No

16031 Generator field voltage at maximum kVA output, volts

16031Generator field current at maximum excitation, amperes

16031Maximum temperature rise above 104° F (40° C) gas temperature

16031 Generator armature winding temperature rise, °F (°C)16031 Generator field winding temperature rise, °F (°C)16031 Generator core and mechanical parts adjacent to the

insulation temperature rise, °F (°C)

16031Maximum temperature rise above ambient air temperature of 104° F (40° C)

16031 Generator armature winding temperature rise, °F (°C)16031 Generator field winding temperature rise, °F (°C)16031 Collector rings temperature rise, °F (°C)16031 Telephone influence factor (IEEE Std. 115)16031 Calculated16031 Balanced16031 Residual16031 Guaranteed16031 Balanced16031 Residual16031 Wave form deviation factor (IEEE Std. 115)16031 Calculated16031 Balanced16031 Residual16031 Guaranteed16031 Balanced

Page 151: RFP 40313 Addendum #1 - Grand River Dam Authority 40313 Addendum #1 ... Quotation Fill-In Information for Steam Turbine Generator ... 00300A.5.1 Attendance at the Purchaser's DCS Factory

GRDA Unit 3 Combined Cycle Project178592.67.9120

Combustion Turbine Generator/Steam Turbine Generator

Bid Issue25Oct2013

Source: 00300, 2009, v1.2

Section DCombustion Turbine Generator

Quotation Fill-In Information Page 38 of 44

Reference Document Submittal Item Tech Fill-In Data

16031 Residual16031 Temperature detectors16031 Armature16031 Number16031 Type16031 Rotating exciter16031 Number16031 Type16031 Generator cold gas16031 Number16031 Type16031 Generator hot gas16031 Number16031 Type16031 Generator Loss Data

16031Generator calculated losses at continuous nameplate MVA, voltage, and frequency

16031 Total iron loss, kW16031 Generator stator I2R loss, kW16031 Generator rotor I2R loss, kW16031 Generator stray load loss, kW16031 Generator windage loss, kW

16031Total generator loss excluding bearings and excitation system, kW

16031 Static exciter losses, kW16031 Excitation transformer losses, kW16031 Generator efficiency, percent

16031Generator friction loss in bearings, seals, and collector rings, kW

16031 Heat Exchanger Data

16031Complete the following for each type of cooler required by the design

16031 Heat exchanger16031 Cooler description16031 Number of coolers16031 Number of sections per cooler

16031Generator kVA capability with one cooler section out of service, percent

16031 Cooling water required by each cooler16031 Inlet temperature, °F (°C)16031 Maximum flow, gpm (L/min)16031 Cleanliness factor16031 Heat duty at maximum load, each cooler

16031Tube side (waterside) pressure loss at maximum flow, gpm (L/min)

16031 Tube side (waterside) design conditions16031 Pressure, psi (kPa)16031 Temperature, °F (°C)16031 Tube size, in. (mm)16031 Tube wall thickness, in. (mm)16031 Tube material16031 Tubesheet material

Page 152: RFP 40313 Addendum #1 - Grand River Dam Authority 40313 Addendum #1 ... Quotation Fill-In Information for Steam Turbine Generator ... 00300A.5.1 Attendance at the Purchaser's DCS Factory

GRDA Unit 3 Combined Cycle Project178592.67.9120

Combustion Turbine Generator/Steam Turbine Generator

Bid Issue25Oct2013

Source: 00300, 2009, v1.2

Section DCombustion Turbine Generator

Quotation Fill-In Information Page 39 of 44

Reference Document Submittal Item Tech Fill-In Data

16031 Hydrogen Cooling System Data16031 Complete for hydrogen cooled generators16031 Hydrogen required to purge carbon dioxide, ft3 (m3)16031 Hydrogen required to fill system to maximum hydrogen

pressure after purging, ft3 (m3)

16031Guaranteed hydrogen consumption in 24 hours, ft3 (m3)

16031 Hydrogen seal oil flow, gpm (L/min)16031 Hydrogen seal oil pressure, psi (kPa)16031 Stator Winding Cooling Water System16031 Number of circulating pumps16031 Full- or half-capacity pumps16031 Stator cooling water demineralizer description16031 Excitation System16031 Excitation system description16031 Excitation system control system16031 Make and type of excitation system16031 Make and type of voltage regulator16031 Communication method to operator interface16031 Description of operator interface equipment16031 Rated output of excitation system, kW16031 Rated voltage, volts dc16031 Rated current, amperes dc16031 Excitation system response ratio, per unit16031 Ceiling voltage, percent minimum16031

Does the excitation system meet the definition of high initial response as defined in IEEE Standard 421.1?

1603116031 Yes or No16031 Protective Relaying16031 Generator protection relay type/model16031 Out-of-step (78) relay type/model16031 Dc Motors16031 Motors16031 Airside seal oil backup pump (dc)16031 kW16031 Volts16031 Enclosure16031 Quantity16031 Other dc motors16031 (Name of motor)16031 kW16031 Volts16031 Enclosure16031 Quantity

Page 153: RFP 40313 Addendum #1 - Grand River Dam Authority 40313 Addendum #1 ... Quotation Fill-In Information for Steam Turbine Generator ... 00300A.5.1 Attendance at the Purchaser's DCS Factory

GRDA Unit 3 Combined Cycle Project178592.67.9120

Combustion Turbine Generator/Steam Turbine Generator

Owner Review Issue08Aug2013

Source: 00300, 2009, v1.2

Section DCombustion Turbine Generator

Quotation Fill-In Information Page 40 of 44

Reference Document

Submittal Item Specification Tech Fill-In Data

19000 Combustion Turbine Long Term Services Specification

19000 General19000 Annual Operating Profile19000 Fired Hours per unit per year 600019000 Number of Starts per unit per year 15019000 Contract Term19000 Commencement COD under the EPC Contract19000 Expiration No sooner than at completion of

2nd Major Inspection for each unit

19000 Sunset Clause Not specified19000 Definitions19000 Calculation of FFH/EOH/AOH, etc. By Supplier19000 Planned Maintenance19000 Annual Borescope Inspection All Parts and Services1

19000 Combustion Inspections and Overhauls All Parts and Services1

19000 Combustion Inspection Interval19000 Hours (FFH, EOH, etc.) By Supplier19000 Starts (FS, ES, etc.) By Supplier19000 Hot Gas Path Inspections and Overhauls All Parts and Services1

19000 Hot Gas Path Inspection Interval19000 Hours (FFH, EOH, etc.) By Supplier19000 Starts (FS, ES, etc.) By Supplier19000 Major Inspections and Overhauls All Parts and Services1

19000 Major Inspection Interval19000 Hours (FFH, EOH, etc.) By Supplier19000 Starts (FS, ES, etc.) By Supplier19000 Generator Minor Inspections All Parts and Services1

19000 Generator Minor Inspection Interval19000 Hours (FFH, EOH, etc.) By Supplier19000 Starts (FS, ES, etc.) By Supplier19000 Generator Major Inspections All Parts and Services1

19000 Generator Major Inspection Interval19000 Hours (FFH, EOH, etc.) By Supplier19000 Starts (FS, ES, etc.) By Supplier19000 Technical Advisories affecting Planned Mainte All Parts and Services1

19000 Corrective actions required to maintain/restore expected performance, reliability or safety of any component/part

All Parts and Services1 (excludes Limited Scope Components)

19000 Parts and Services required to maintain emiss All Parts and Services1

19000 Limited Scope Components19000 Inspection Inspection, including removal or

access for inspection, cleaning and inspection services

19000 Replacement Not required19000 Items classified as Limited Scope ComponentsBy Supplier19000 Full Scope Components By Supplier19000 Onsite controls engineer to assist during startu Provided by Supplier

00300D.12 LTSA Technical Fill-In Data Required with Quotation

Page 154: RFP 40313 Addendum #1 - Grand River Dam Authority 40313 Addendum #1 ... Quotation Fill-In Information for Steam Turbine Generator ... 00300A.5.1 Attendance at the Purchaser's DCS Factory

GRDA Unit 3 Combined Cycle Project178592.67.9120

Combustion Turbine Generator/Steam Turbine Generator

Owner Review Issue08Aug2013

Source: 00300, 2009, v1.2

Section DCombustion Turbine Generator

Quotation Fill-In Information Page 41 of 44

Reference Document

Submittal Item Specification Tech Fill-In Data

19000 Disassembly, removal, cleaning and reassembly of enclosures, lagging, equipment and systems supplied under Equipment Purchase Specification necessary to access CTG to perform Planned Maintenance

Service provided by Supplier

19000 Unplanned Maintenance19000 Performance of Unplanned Maintenance Service provided by Supplier19000 All costs and expenses with respect to

Unplanned MaintenanceBy Purchaser, unless Unplanned Maintenance is caused by fault of Supplier scope of work

19000 Provision for Major Maintenance Parts necessary for Unplanned Maintenance

Provided by Supplier, Purchaser cost unless Unplanned Maintenance is caused by fault of Supplier scope of work

19000 Provision to perform Unplanned Maintenance on high-priority, 24/7 basis as required to remedy a condition resulting in a Forced Outage

Service provided by Supplier

19000 Major Maintenance Parts for Unplanned Maintenance

New and unused unless Purchaser elects to negotiate for refurbished parts

19000 Spare Parts; Tools/Tooling; TA19000 Initial Spare Parts19000 Costs incurred for procurement and shipping

to siteAll costs incurred borne by Supplier

19000 Parts condition, initial delivery of Spare Parts Inventory

New and unused

19000 Costs, replacement of Spare Parts used for Planned Maintenance

All costs incurred borne by Supplier

19000 Costs, replacement of Spare Parts used for Unplanned Maintenance

Purchaser cost unless Unplanned Maintenance is caused by fault of Supplier scope of work

19000 Parts condition, replacement of Spare Parts used for Unplanned Maintenance

New and unused, or refurbished consistent with Prudent Operating Practices and in accordance with Purchaser Approved Appendix 3 submittal

19000 Parts condition, replacement of Spare Parts used for Planned Maintenance

New and unused, or refurbished consistent with Prudent Operating Practices

19000 Time frame to replace used Spare Parts <2 months after removal19000 Parts condition, parts used for maintenance

of Limited Scope ComponentsNew and unused

19000 Data provided for refurbished parts proposed for use at Plant

Life history, including serial #'s, drawing or model #'s, factored hours/starts, trips and conditions, date(s) and type of repairs performed

19000 Procurement of all Major Maintenance Parts All costs incurred borne by Supplier, including shipping and inspection

Page 155: RFP 40313 Addendum #1 - Grand River Dam Authority 40313 Addendum #1 ... Quotation Fill-In Information for Steam Turbine Generator ... 00300A.5.1 Attendance at the Purchaser's DCS Factory

GRDA Unit 3 Combined Cycle Project178592.67.9120

Combustion Turbine Generator/Steam Turbine Generator

Owner Review Issue08Aug2013

Source: 00300, 2009, v1.2

Section DCombustion Turbine Generator

Quotation Fill-In Information Page 42 of 44

Reference Document

Submittal Item Specification Tech Fill-In Data

19000 Equivalent parts (to replace obsolete parts) Supplier provides same level or upgrade parts at no more than same cost as original parts

19000 Title to Replaced Parts Supplier19000 Tooling and equipment for all Major

MaintenanceProvided by Supplier at Supplier's sole cost

19000 Tool change scenario with price and part # Proposed by Supplier19000 Personnel19000 Services Director Serves as main Client - Supplier

interface19000 Guarantees19000 Planned Maintenance Components installed

or inspected during a Planned Maintenance event

Planned Maintenance Components shall provide reliable service until the next scheduled outage. All costs associated with a pre-mature failure or "Fall-out" of a Planned Maintenance Component shall be responsibility of Supplier

19000 Delivery time of all replacement parts (within scope) required for Planned Maintenance

At Site not less than 30 days prior to Planned Maintenance

19000 Plant Availability19000 Unplanned Outage, maximum aggregate

days for each CTG, 1st and 2nd years of operation

Proposed by Supplier

19000 Unplanned Outage, maximum aggregate days for each CTG, each year from 3rd year of operation to end of contract term

Proposed by Supplier

19000 Scheduled Outage Durations, Planned Maintenance

19000 Annual Borescope Inspections, each unit Outage duration proposed by Supplier, breaker to breaker or turning gear to turning gear basis

19000 Combustion Inspection and Overhaul, each unit

Outage duration proposed by Supplier, breaker to breaker or turning gear to turning gear basis

19000 Hot Gas Path Inspection and Overhaul, each unit

Outage duration proposed by Supplier, breaker to breaker or turning gear to turning gear basis

19000 Major Inspection and Overhaul, each unit Outage duration proposed by Supplier, breaker to breaker or turning gear to turning gear basis

19000 Generator Minor Inspection, each unit Outage duration proposed by Supplier, breaker to breaker or turning gear to turning gear basis

19000 Generator Major Inspection, each unit Outage duration proposed by Supplier, breaker to breaker or turning gear to turning gear basis

Page 156: RFP 40313 Addendum #1 - Grand River Dam Authority 40313 Addendum #1 ... Quotation Fill-In Information for Steam Turbine Generator ... 00300A.5.1 Attendance at the Purchaser's DCS Factory

GRDA Unit 3 Combined Cycle Project178592.67.9120

Combustion Turbine Generator/Steam Turbine Generator

Owner Review Issue08Aug2013

Source: 00300, 2009, v1.2

Section DCombustion Turbine Generator

Quotation Fill-In Information Page 43 of 44

Reference Document

Submittal Item Specification Tech Fill-In Data

19000 Performance degradation of Gross Electrical Output at 100% of CTG base load in each period of maintenance cycles

Proposed by Supplier

19000 Performance degradation of Gross Heat Rate at 100% of CTG base load in each period of maintenance cycles

Proposed by Supplier

19000 Performance Testing19000 Formulation for obtaining Gross Electrical

Output and Gross Heat Rate figures of "New and Clean" condition

Proposed by Supplier for Purchaser consideration/ acceptance

19000 Testing procedure for obtaining all guaranteed figures including the estimated uncertainty

Proposed by Supplier for Purchaser consideration/ acceptance

19000 Performance tests after each maintenance work

Performed by Purchaser

19000 Specification Appendices19000 LTSA Spec Appendix 1: Combustion Turbine I Mandatory, By Supplier19000 LTSA Spec Appendix 2: Spare Parts Price List Mandatory, By Supplier19000 LTSA Spec Appendix 3: Replacement Scenari Mandatory, By Supplier19000 LTSA Spec Appendix 4: Division of Work comp Mandatory, By Supplier19000 LTSA Spec Appendix 5: Manpower completed Mandatory, By Supplier19000 LTSA Spec Appendix 6: Field Service Rate com Mandatory, By Supplier19000 Remote Monitoring and Diagnostics 19000 All associated hardware, software and

telecom facilities for online monitoring of CTGs

Included

19000 Windows Compatibility Windows 719000 ERP Compatibility SAP ERP19000 Interface Security High security modem link or VPN

19000 Remote system administration services Required19000 Real-time process information by any Intranet

or Internet web browser on any connected PC (including necessary software licensing)

Required

19000 Remote monitoring parameters19000 Speed Required19000 Load Required19000 Fired Starts Required19000 Fired Hours Required19000 Site Barometric Reading Required19000 Temperatures19000 Inlet Ambient Required19000 Compressor Discharge Required19000 Turbine Exhaust Required19000 Turbine Wheelspace Required19000 Lube Oil Header Required19000 Lube Oil Tank Required19000 Bearing Metal Required19000 Bearing Drains Required19000 Exhaust Spread Required19000 Pressures19000 Compressor Discharge Required19000 Lube Pump(s) Required19000 Bearing Header Required19000 Cooling Water Required

Page 157: RFP 40313 Addendum #1 - Grand River Dam Authority 40313 Addendum #1 ... Quotation Fill-In Information for Steam Turbine Generator ... 00300A.5.1 Attendance at the Purchaser's DCS Factory

GRDA Unit 3 Combined Cycle Project178592.67.9120

Combustion Turbine Generator/Steam Turbine Generator

Owner Review Issue08Aug2013

Source: 00300, 2009, v1.2

Section DCombustion Turbine Generator

Quotation Fill-In Information Page 44 of 44

Reference Document

Submittal Item Specification Tech Fill-In Data

19000 Fuel Required19000 Filters (Fuel, Lube, Inlet Air) Required19000 Vibration Data for Power Train Required19000 Generator Required19000 Output Voltage Required19000 Field Voltage Required19000 Phase Current Required19000 Field Current Required19000 VARS Required19000 Stator Temperature Required19000 Load Required19000 Vibration Required19000 Start-Up Time Required19000 Coast-Down Time Required19000 Remote Services19000 Measure Equipment Condition19000 Combustion system performance vibration Required19000 Machine performance Required19000 Starting and shutdown characteristics Required19000 Diagnostics by communication with Plant

CEMRequired

19000 Comparison to baseline, design and fleet experience

Required

19000 Analyze equipment condition19000 Diagnostic and engr. services related to

alarm/error/malfunction that is not an in-service failure

Planned Maintenance

19000 Diagnostic and engr. services related to an in-service failure

Unplanned Maintenance

19000 Archive Plant historical data Required19000 Consultations between Remote Monitoring

Center and Plant O&M staffRequired

19000 Remote combustion tuning system to supervise and give recommendations for CTG tuning events

Provided by Supplier, tuning events warranted as Unplanned Maintenance

19000 Condition reporting Quarterly basis and interim (as required)

19000 RCA assistance Required

Notes1) "All Parts and Services" defined as: all planning, engineering, field repairs, shop repairs, replacement of parts,