GPMC Profile Rev. 6 (23‐12‐2013)
Global PMC (Private) Limited
The Project Management Consultants
Company Profile
Global PMC (Private) Limited
14/H, Block No. 6, P.E.C.H.S,
Karachi-75350, Pakistan.
Telephone No. 9221-34331351, 34221694
Email: [email protected]
Web: www.globalpmc.com.pk
7/21/2019 Rfinery PMC.pdf
http://slidepdf.com/reader/full/rfinery-pmcpdf 2/51
GPMC Profile Rev. 6 (23‐12‐2013) Page 2
Table of Contents
S. NO. Contents Page No.
1 INTRODUCTION 3
2 CONTACT INFORMATION 3
3 OUR PHILOSOPHY 3
4 OUR VISION 4
5 OUR MISSION 4
6 OUR VALUES 4
7 OUR STRENGTH 4
8 OUR CORPORATE GOVERNANCE 4
9 OUR CORE COMPETENCY 4
10 OUR EXPERIENCE 5
11 MAJOR PROJECTS HANDLED BY OUR TEAM MEMBERS 7
12 OUR TECHNICAL LIBRARY 13
13 OUR ENGINEERING RESOURCES 13
14 OUR TEAM 13
7/21/2019 Rfinery PMC.pdf
http://slidepdf.com/reader/full/rfinery-pmcpdf 3/51
GPMC Profile Rev. 6 (23‐12‐2013) Page 3
1)
INTRODUCTION
Global Project Management Consultants Private Limited (GPMC) wasincorporated in July 2010, though a young entity its team members (director & key
persons) have in-depth capabilities of providing services to oil & gas, petroleumrefining, chemicals, petrochemicals, storage terminals, pipeline, power plant, alternateenergy, sugar, textile industry, construction supervision, operation & maintenance,annual turnaround of plants, regulatory compliance audit, pre-shipment inspection,HAZOP’s, safety audits, feasibility studies, engineering audits & conservations,effluent treatment environmental studies and Facility Management Services.
Our key team members have been the main contributor’s with Oil & Gas RegulatoryAuthority of Pakistan (OGRA) in instituting regulatory compliance audit systemin Pakistan for LPG production, storage & bottling plants.
Our team members have also been involved in almost all the main projects ofRefineries, Petrochemical & Pipeline projects of Pakistan and some members have
extensive international experience.
The Global PMC (Private) Limited’s team mission is to become the prime & leadingconsultancy focused on providing Project Management, Design Engineering Services,Regulatory Compliance and Safety Audit and technical evaluation Services to theupstream & downstream oil & gas, petrochemical, energy and other engineeringindustries. From various platforms, our team members have provided services todifferent companies during the planning and development phase of projects. Our teammember’s clientele includes national & international companies for small to largescale projects.
2) CONTACT INFORMATION
Global PMC (Private) Limited
14/H, Block No. 6, P.E.C.H.S,Karachi-75350, Pakistan.Phone #: 9221-34221694,34331351Email: contact @globalpmc.com.pkWeb: www.globalpmc.com.pk
3)
OUR PHILOSOPHY
Global PMC has eyed on highly dedicated and professional attitude towards achievingclient’s target and in order to materialize truly the development of a highly productiveengineering industry with following criteria:
Timely completion with quality meeting international industry standards, bestengineering practices and safety standards.
Economic efficiency Preservation of the environment.
7/21/2019 Rfinery PMC.pdf
http://slidepdf.com/reader/full/rfinery-pmcpdf 4/51
GPMC Profile Rev. 6 (23‐12‐2013) Page 4
4) OUR VISION
Contribution in the development of industries with excellence.
5) OUR MISSION
Becoming an active participant and imperative organization as a global player in theindustry.
6) OUR VALUES
Act with integrity, loyalty and honesty. Focus on customer success. Create safe and health-conscious work environment.
7) OUR STRENGTH
Our management and technical team is group of highly skilled professionals who arededicated and committed for achieving the best results.
Technical Team with proven track record.
8) OUR CORPORATE GOVERNANCE
At Global PMC, we dedicate ourselves to earning the trust of our clients,employees, suppliers and customers by fostering a culture that emphasizescompliance with the law and ethical business behavior and byadopting strong principles of corporate governance, our constituents can feelconfident about their association with Global PMC.
The cornerstone of our compliance program is our Business Responsibilities of allGlobal PMC Employee.
We apply strict ethical standards to our financial audit practices. Our system of corporate governance based on board of directors
9) OUR CORE COMPETENCY
Project Management Services (PMC) Complex process simulation model development FEED Development Detail Engineering Procurement Services Site Supervision
Feasibility Studies, Safety & Engineering Audits and Conservations Regulatory Compliance Audits, industry codes and review of complete design package
for Third Party appraisal. Inspections & Witness Testing Asset evaluations
7/21/2019 Rfinery PMC.pdf
http://slidepdf.com/reader/full/rfinery-pmcpdf 5/51
GPMC Profile Rev. 6 (23‐12‐2013) Page 5
10) OUR EXPERIENCE
The Global PMC (Private) Limited’s team mission is to become the prime & leadingconsultancy focused on providing Project Management, Regulatory Compliance andSafety Audit and technical evaluation Services to the upstream & downstream oil & gas, petrochemical and other engineering industries. From various platforms, our team
members have provided services to different companies during the planning anddevelopment phase of projects. Our team member’s clientele includes national &international companies for small to large scale projects. Our team members have provided services to following clients from various platforms:
Major Clients inside Pakistan
Techno-consults International Limited (TCIL)
Pakistan State Oil Co., Ltd. (PSO)
Peoples Steel Mills (PSM)
Oil Industries Pakistan (OIP)
Unilever Pakistan Limited
Dalda Pakistan Limited
Beltexco Limited
Unicol Pakistan
Manshanat Brothers
Heavy Mechanical Complex (HMC)
Hub Power co. (HUBCO)
Cactus Fertilizer
HTG Chemicals
BP Pakistan Exploration & Production Inc. (BPP)
Karachi School Business & Leadership (KSBL)
Byco (Bosicor) Pakistan Ltd.
ENAR Petroleum Refining Facility I, II & III (EPRF)
Oil & Gas Regulatory Authority (OGRA).
Oil & Gas development corporation Limited (OGDCL).
Pakistan Petroleum Limited (PPL)
National Refinery Ltd. NRL
Nimar Chemicals (formerly Ravi chemicals)
7/21/2019 Rfinery PMC.pdf
http://slidepdf.com/reader/full/rfinery-pmcpdf 6/51
GPMC Profile Rev. 6 (23‐12‐2013) Page 6
Major Clients outside Pakistan
Fluor Iraq
ATG Hamriyah UAE
Typically, GLOBAL PMC team members have provided the following services to clients:
a) Project Management Consultancy Services
i) Feasibility Studies, Review of FEED and Design documents.ii)
Detail Engineering Design.iii)
Development/review of contract document for design engineering consultant andconstruction contractor.
iv) Development/review of procurement documents and bid evaluation reports.v)
Procurement assistance & sourcingvi)
Development/review of Construction documents and bid evaluation reports.vii)
Project planning, scheduling and updating progress reports.viii) Coordination with the consultants & construction contractors in all phases of work,
review of submittals and all documents pertaining to the project.ix)
Monitoring the project cost, cost variations due to changes in work quantum (ifrequired) and other such matters.
x)
Verifying work progress of Consultants/Contractors’ invoices.xi)
HAZOP & other related studies.xii) Supervision of site works to ensure compliance.xiii) Provide technical liaison between various vendors and Contractor.
b) Regulatory Compliance Audits
xiv)
Preparation of required documents for the verification of regulatory compliance ofhydrocarbon production, storage & filling facilities
xv)
Verification/inspection of production, storage & filling facilities for their regulatorycompliance as per OGRA’s requirements.
xvi)
Development of comprehensive audit reports and recommendations.
c) Inspections & Asset Valuation
i) Pre-shipment inspectionsii)
Mill/factory, on-site, off-site & stage inspectionsiii)
Witness/performance testingiv) Assets evaluations for owners and as third party.
v) Integrity Management & RBI
d) Technical Trainings
Onsite/Offsite training and certifications for:
i)
Materials & Metallurgyii) Welding & Welding Processesiii) Corrosion Inspection Techniquesiv)
ASME Sec. IX & VIIIv) API-510vi) Cathodic Protection
7/21/2019 Rfinery PMC.pdf
http://slidepdf.com/reader/full/rfinery-pmcpdf 7/51
GPMC Profile Rev. 6 (23‐12‐2013) Page 7
e) Engineering Services for Upstream & Downstream Projects:
i)
Pre feasibility, feasibility reports, Conceptual design, Process selection, FEEDii)
Process schemes, operations and maintenance philosophyiii) Offsites, utility, relief, blow down, venting/ flaring/ incineration systemsiv) Facility upgrades and debottlenecking.
v)
Plant, equipment layout & Detailed engineering (piping, civil & E&I)vi) Equipment design (vessels, columns, exchangers, heaters, storage tanks)vii) Piping stress / Pipeline surge analysis.viii)
System optimization and conceptual design of Flow & gathering lines.ix)
Route reconnaissance, Pipeline alignment drawings & crossings design.x)
Storage tanks, terminal & pumping stations design.xi)
Procurement support ( procurement documents & bid evaluations)xii) Vendor documentation review, Factory acceptance testing & inspectionsxiii) Inspection and refurbishment of equipment.xiv)
Preparation of commissioning manuals for process units, off sites and utilities.xv)
Punch list during pre-commissioning & commissioning.xvi) Ensure compliance with commissioning procedures during pre-commissioning and
commissioning phase.
11) MAJOR PROJECTS HANDLED BY OUR TEAM MEMBERS.
From Global PMC platform:
i) Designing of more than 30 vessels, columns & reactors for EPC bid for M/s Sefec
Engineering Limited. (In-Progress) ii) Designing of breather valve system for PMG Tanks at Mehmoodkot Depot (PSO).
(In-Progress) iii)
Designing of breather valve system for PMG Tanks at Shershah Depot. (PSO). (In-
Progress)
iv)
Process, Mechanical, Electrical & Instrumentation design of Several 3-PhaseSeparator Skids, Mercury Removal Vessels, Degassers etc. for ATG Hamriyah
UAE. (In-Progress)
v) Design and drawings (services) for RO Plant structure, pipe supports, sleeperfoundations etc. Unicol Pakistan.
vi)
Design and drawings (services) for CO2 Plant structure, skid foundations, pipe racks& supports, sleeper foundations, loading gantry etc. Unicol Pakistan
vii)
Detailed Technical & Commercial bid evaluation for the Supply of 212 KVARPower Factor for Dawood Public School
viii) Improvement in Unloading/Decanting Facilities at existing HSD gantry at KTC(PSO).
ix)
Consultancy services for the designing, construction supervision & commissioningof LPG-Air Mix Plant. Beltexco Limited.
x)
Study for the removal of moisture contents from transformer oil. OIPxi) Detailed feasibility study of polymer pipe manufacturing plant. TCIL
xii)
Complete Designing (Mechanical, Electrical & Civil) of 50’ Dia self supportedStorage Tank for Fluor Iraq
xiii) Enhancement of PMG loading capacity at Chackpirana Depot (PSO)
xiv)
Enhancement of PMG loading capacity at Machike Depot (PSO) xv) Enhancement of PMG loading capacity at Shikarpur Depot (PSO)
xvi) Project Management Services for Gas Sweetening Unit Project (for EPC Bid) forPeoples Steel Mills Pakistan
7/21/2019 Rfinery PMC.pdf
http://slidepdf.com/reader/full/rfinery-pmcpdf 8/51
GPMC Profile Rev. 6 (23‐12‐2013) Page 8
xvii)
Developed detailed engineering of electrical lighting system of Karachi School ofBusiness & Leadership. KSBL
xviii)
Developed detailed engineering package of 700 KW diesel generating sets forxix)
Karachi School of Business & Leadership. KSBL xx) Developed Process Simulation Model & detailed cost estimate of Gas Dehydration
Unit (for EPC Bid) for Peoples Steel Mills Pakistan
xxi)
Developed Process Simulation Model & detailed cost estimate of Gas Sweeteningunit (for EPC Bid) for Peoples Steel Mills Pakistan
xxii) Detailed study of hexamine plant for HTG Chemicals
xxiii)
Design verification of civil foundations for HUBCO
xxiv)
Design of fire fighting system for Formaldehyde plant for HTG Chemicals xxv) Development of BOQ & Fabrication drawings of Super Structure of Silver Rado-III
project of Futehally Chemicals Limited Uniliver Pakistan.xxvi)
Stress Analysis of Utility Pipe Rack lines of Byco Refinery Pakistan.xxvii) Developed Process Simulation Model of Gas Sweetening Unit (for EPC Bid) for
Heavy Mechanical Complex (HMC) Pakistanxxviii) Development of Civil & Piping packages for relocation of Dalda Edible Oil
Refineryxxix)
HAZOP study of LPG Unit of Pakistan Refinery Limited.
xxx)
Developed Process & Mechanical Engineering design package of Sulfuric AcidPlant for Cactus Fertilizer Plant
xxxi) Construction site management services for ENAR Petroleum Refining Facility-II.xxxii) Development of Process Simulation model for the Kausar field of MKK concession
with excel interface for engineers not familiar with Aspen-Hysis software. British
Petroleum Pakistan
xxxiii)
Facility Management Services for Horizon School (School for Children withspecial needs) Horizon School
xxxiv)
Facility Management Services for Aligarh Muslim University Academy
xxxv) Development of Detailed Engineering Design package of First Floor of Aligarh
Muslim University Academy.
7/21/2019 Rfinery PMC.pdf
http://slidepdf.com/reader/full/rfinery-pmcpdf 9/51
GPMC Profile Rev. 6 (23‐12‐2013) Page 9
From other Platforms:
b) Regulatory Compliance Audits for OGRA of following plants:
i)
BYCO Oil refining & LPG Production Plan
ii) OGDCL Dhakni Gas processing & LPG production Plant.
iii)
OPI Naimat Gas processing & LPG production Plant
iv)
PPL Adhi Gas processing & LPG production plant
v) JJVL Jamshoro LPG production Plantvi) SSGC Air Mix Plant Gawader
vii) Progas Port Qasim Terminal & Sarai Gadai Terminal
viii) Shell Faisalabad Terminalix) Akbar Associate Attock Facility
In Addition to above, Regulatory Compliance Audits for various LPG filling & bottling plants all over Pakistan were carried out.
c) As Project Sponsor/Manager, Plant/Site Managers / Project Leads &Engineers
Our team members worked on the following projects from various platforms:
Project Sponsor for the inspections of different plants for (OGRA). Our team was themain contributor with OGRA for the development of regulatory compliance auditsystem in Pakistan. This Project involved collection of technical data / documentation,visual inspection of plant and facilities, assessment of plants for compliance of Codes/standards and compilation of inspection report. – (OGRA).
Project Manager for the development of detailed feasibility report (EPRF III), for therelocation of 25,000 bbls deep conversion refinery from USA. Visited USA for the
detailed inspection, developed dismantling philosophy, packing, loading, transportationto USA port, sea transportation, re- simulation, re-engineering, refurbishing ofequipments, installation, erection, commissioning strategies were developed. The totalrelocated cost of the plant is $ 85 million. – (EPRF-III).
Project Manager for the grass root pilot refinery project, this project involves the basic and detailed engineering design of process unit, off sites & utilities, procurement,construction and commissioning. – (EPRF-II).
Engineering Manager for Design House of British Petroleum Pakistan, This designhouse consists of more than 32 Engineer’s & draftsmen and handled hundreds of projects in 2009 – (BP Pakistan).
Project Manager for the CDU unit revamp project, this project involves the
development of Engineering Design Specification (EDS) packages for process unit, offsites and utilities. After revamp the processing capacity of the CDU unit increasedfrom 12,000 bbls/day to 30,000 bbls/day. – (Bosicor Pakistan Limited).
Project Manager for the development of FEED for EPC Contractor. This projectinvolves the relocation of unused LPG plant to Dhodak.– (OGDCL).
7/21/2019 Rfinery PMC.pdf
http://slidepdf.com/reader/full/rfinery-pmcpdf 10/51
GPMC Profile Rev. 6 (23‐12‐2013) Page 10
Project Manger for the detailed engineering and inspection of LPG Plant for GarhiHassu (stored unused for last eight years) and assessment of the works required for therehabilitation and relocation to Dhodak field. – (OGDCL).
Engineering Manager for ADN-B Wellhead Platform Detailed Design Project
– (Addax Petroleum Development Nigeria Limited).
Engineering Manager for Concept Verification and Detailed Design ofH2S Scavenger System at BONGA FPSO – (Shell Nigeria).
Engineering Manager for Structural Design Projects at Mobil’s BRT & QIT Facilitiesunder Call-off Contract – (Mobil Nigeria)
Engineering Manager for ORWS Wellhead Platform Detailed Design Project – (Addax Petroleum Development Nigeria Limited).
Plant Manager, solely responsible for the operation, maintenance andannual turnaround of the EPRF-I during the first 18 months after the commissioningof grass root pilot refinery capable of processing 3000 bbls/day of local condensate.
This pilot project is the first of its kind in the country & providing strategic support tothe defense forces of the Pakistan. – (EPRF-I).
Project Manager for the detailed engineering design, coordination between companyand client, monitoring project progress, sourcing of material, coordination ofworkflow, ensuring budget and milestones are maintained. – (Gastec GmbH).
Site Manager for management of construction site, contractors, coordination ofworkflow, ensuring budget and milestones are maintained. – (BOBI LPG OGDCL).
Project Manager for process, mechanical, piping, electrical and instrumentengineers to carry out the front end engineering (FEED) of the project. Developed thetime schedule, performance curve and assisted project team to meet the schedule givein the Gantt’s Chart. Was also involved in the cost estimating (CAPEX & OPEX), planning and scheduling of the Project. – (Manzalai-1 MOL Pakistan).
Project Manager for technical assessment of various plants and refineries.Projects involved collection and compilation of technical data / documentation,review of process scheme of plants and refineries, visual inspection of plant andfacilities, assessment of condition of plant and facilities, estimation of remainingoperating life of plant and facilities, assessment of normal replacement / maintenancerequirements and revamps projects and identification of non-essential / non productiveassets.
Team Lead for complete cost estimate of gas gathering system from different wells tothe Central Processing Facilities. – (Uch Gas Gathering Project OGDCL).
Team Lead for complete cost estimate of Dakhni Train II and Dakhni BMR Project.The objective is to increase the processing capacity of the existing plant from 30MMSCFD to 50MMSCFD. – (Dakhni Train II Project OGDCL).
Team Lead for complete cost estimate of the grass roots refining complex capable of processing 120,000 bbls/day of crude oil. – (Coastal Refinery Project).
7/21/2019 Rfinery PMC.pdf
http://slidepdf.com/reader/full/rfinery-pmcpdf 11/51
GPMC Profile Rev. 6 (23‐12‐2013) Page 11
Team Lead for detailed design, Procurement, Construction andCommissioning of Light Naphtha Splitter to reduce C5 content from Isomerization unitfeed – ( Ruwais Refinery, TAKREER).
Assistant Engineering Manager for Zamzama North and B & D Tie-in Detail
Engineering Works with Zamzama Facility for BHP Pakistan.
Assistant Engineering Manager for Saqib-1A EWT & Latif-2 EWT Wellhead facilitydevelopment for Petronas Pakistan.
Assistant Engineering Manager for Conceptual and Front End Engineering Design(FEED) of Kandkhot Gas Purification Facility) for Pakistan Petroleum Limited.
Assistant Engineering Manager for Replacement of Condensate Degasser at RehmatGas Plant for Petronas Pakistan.
Lead Design Engineer for the grass root (3000 bbls/day) pilot refinery project. This project includes basic engineering, detail design, procurement, fabrication ofequipments and construction supervision. Pre-shipment inspection for columns, drums,
pipe & fittings, boilers, heaters were also performed. – (Condensate ProcessingFacility Project).
Lead Design Engineer, responsibilities includes pipeline route selection, survey,alignment drawings, wellhead piping, design, procurement, quality control/ assurancedocuments etc. – (Bobi Early Production Facilities Project of OGDCL).
Lead Design Engineer for Qadirpur Capacity enhancement Project for Gas purification Plant. (OGDCL).
Lead Design Engineer for Feed of Adhi LPG/NGL Plant – II for PPL
Lead Design Engineer for Detail Engineering of Kadanwari Well K-1 & K-6 for LASMO Oil Pakistan Ltd.
Lead Design Engineer for Engineering Study for Low Cost Low Pressure WellheadSystems for LASMO Oil Pakistan Ltd.
Lead Process Engineer for Basic and Detailed Engineering of Tajjal – 1 WellheadExtended Well Test Facility Development for OMV.
Lead Process engineer for Level – 3 ESD and Depressurization system for Satahcrude processing facilities located at Zirku Island for ZADCO.
Lead Process Engineer for De – bottlenecking study of Yanbu Refinery Atmosphericcolumn’s pump around circuits. Circuits included; Naphtha, Kero, LDO, HDO and Naphtha stabilizer and splitter section. (Saudi Aramco).
Lead Process Engineer for Study of upgrade of North Refinery flare system of RasTanura Refinery for Saudi Aramco
Lead Process Engineer for Conceptual design of Brazed Aluminum plate type heatexchanger for Berri Gas Plant, Ethane and NGL Unit for Saudi Aramco.
7/21/2019 Rfinery PMC.pdf
http://slidepdf.com/reader/full/rfinery-pmcpdf 12/51
GPMC Profile Rev. 6 (23‐12‐2013) Page 12
Lead Process Engineer for Zulf Artificial lift Project. Carried out the simulation,rating and evaluation of world’s largest Gas-Oil separation facility. Plant contains largenumber of separators, de-salters, dehydrators, heat exchangers, pumps, compressorstrains, gas dehydration and dew point control system, etc. (Saudi Aramco)
Lead Process Engineer for Study of up gradation of Relief system at Ras Tanura Refinery for Aramco.
Lead Process Engineer for Detailed design of CO2 pipeline for Kingdom Dry IceFactory (KDI KSA).
Lead Process Engineer for Condensate Processing Facility a pilot refinery to process3000 BPSD of condensate. Was involved in Conceptual design, detailed design, pre-commissioning, commissioning and startup phase. ENAR Petrotech Services (Pvt)
Limited.
Lead Process Engineer for Front End Engineering Design (FEED) of Adhi Gas Fieldto enhance the capacity of existing plant by installing a parallel train for Pakistan
Petroleum Limited (PPL).
Lead E & I Design Engineer for Kandhkot Field Gas Compression Project of PPL
Lead E & I Design Engineer for Qadirpur Gas Compression Project & Tando AllahYar Development Project of OGDCL
Lead E & I Design Engineer for Sinjhoro, Dakhni & Chanda Project of OGDCL
Lead E & I Design Engineer for Adhi Lpg / Ngl Plant – II Project of PPL
Process Engineer for Capacity enhancement study by relocating Garhi Hassu plant to process the additional fluids from Dhodak field – (OGDCL)
Process Engineer for Preliminary Feasibility Study of Tangri & Mazari Gas Fields toInstall Gas Sweetening & De-hydration plants for UTPI. ♦ Process Engineer forDevel opment of System Curves of Kadanwari Gas Field Gathering lines forLASMO Oil Pakistan Limited (LASMO).
Process Engineer for Capacity Enhancement Study of Turk Amine Plant for UnionTexas Pakistan Inc. (UTP).
Process Engineer for De – Bottlenecking study of Propane Recovery Unit for(NRL).
7/21/2019 Rfinery PMC.pdf
http://slidepdf.com/reader/full/rfinery-pmcpdf 13/51
GPMC Profile Rev. 6 (23‐12‐2013) Page 13
12) OUR TECHNICAL LIBRARY
Our team members have been providing Engineering Consultancy services to oil &gas / petrochemicals. We have a huge technical Library, consist of hard &softcopies of International Codes & Standards, Manuals, Technical Books,Procedures, Practices etc.
13) OUR ENGINEERING RESOURCES
Our team members have expertise in using engineering software for projects.Besides world renowned engineering software, our team members also developedsoftware in- house for engineering applications. We have expertise and access tofollowing software’s:
♦ ASPAN Hysys for Process Simulation
♦ OLGA for Dynamic Simulation Hydraulics Analysis
♦ Korf for Hydraulic Analysis
♦ Caesar-II for Piping Flexibility Analysis
♦
Coade Tank & E-Tank for Design / Rating of Storage Tank♦
Compress & PV Elite For Design of Pressure Vessel
♦ Natasha for Surge Analysis of Pipeline
♦ Staad Pro for Structural Analysis
♦ Cadworks, Autocad & Microstation for 3-D Plant Modeling
14) OUR TEAM
The present strength of Global PMC (Private) Limited is as under:
1. Process Engineers 032. Mechanical Engineers 033. Electrical / Instrumentation Engineers 024. Civil Engineers 035. Cad Designers / Cad Draftsmen 056. Secretarial / Administration / Accounts 01
7/21/2019 Rfinery PMC.pdf
http://slidepdf.com/reader/full/rfinery-pmcpdf 14/51
GPMC Profile Rev. 6 (23‐12‐2013) Page 14
REGISTRATION CERTIFICATE
7/21/2019 Rfinery PMC.pdf
http://slidepdf.com/reader/full/rfinery-pmcpdf 15/51
GPMC Profile Rev. 6 (23‐12‐2013) Page 15
7/21/2019 Rfinery PMC.pdf
http://slidepdf.com/reader/full/rfinery-pmcpdf 16/51
GPMC Profile Rev. 6 (23‐12‐2013) Page 16
NATIONAL TAXNUMBER
7/21/2019 Rfinery PMC.pdf
http://slidepdf.com/reader/full/rfinery-pmcpdf 17/51
GPMC Profile Rev. 6 (23‐12‐2013) Page 17
7/21/2019 Rfinery PMC.pdf
http://slidepdf.com/reader/full/rfinery-pmcpdf 18/51
GPMC Profile Rev. 6 (23‐12‐2013) Page 18
PAKISTAN ENGINEERINGCOUNCIL REGISTRATION
CERTIFICATE
7/21/2019 Rfinery PMC.pdf
http://slidepdf.com/reader/full/rfinery-pmcpdf 19/51
GPMC Profile Rev. 6 (23‐12‐2013) Page 19
7/21/2019 Rfinery PMC.pdf
http://slidepdf.com/reader/full/rfinery-pmcpdf 20/51
GPMC Profile Rev. 6 (23‐12‐2013) Page 20
RESUME’S OF KEY
PERSON’S
7/21/2019 Rfinery PMC.pdf
http://slidepdf.com/reader/full/rfinery-pmcpdf 21/51
GLOBAL PMC (PRIVATE)LIMITED
PERSONAL PROFILE
Name: MATEEN HAMEED Employee No: 0000
Designation: Chairman
Page 1 of 4
EDUCATION
• Bachelor of Electrical Engineering 1967
NED University of Engineering & Technology, Karachi, Pakistan
TRAINING / COURSES
• Completed numerous study courses on General and Project Management.
EMPLOYMENT HISTORY
Present
Chairman Feb. 2011 to-dateGlobal PMC (Private) LimitedKarachi, Pakistan
Previous
Project Manager Nov 2007 – Feb. 2011ETIMAAD Engineering (Private) Ltd
Karachi, Pakistan
Site Manager / Project Manager Mar 2006 – Oct 2007Descon Engineering Qatar L.L.CQatar
General Manager - Const ruct ion Management Services Jun'1986 – Feb’2006ENAR Petrotech Services (Private) LimitedKarachi, Pakistani
Petrofac International L td., Sharjah, U.A.E. Dec.1985 - Jun.1986Senior Project Engineer (On Assignment)
Maintenance / Engineering Superintendent Jan.1979 - Dec.1985 Abu Dhabi National Oil Company, Abu Dhabi, U.A.E.
Senior Plant Engineer / Operation Engineer Mar.' 67 - Dec.' 78National Refinery LimitedKarachi, Pakistan
EXPERIENCE PROFILE
Present
As Chairman in Global PMC (Private) Limited, leading a team of Engineers & Draftspersons forproviding services to oil & gas, petroleum refining, chemicals, petrochemicals, storage terminals,pipeline, power plant, textile industries and other related projects.
Previous
Have more than Forty-four years experience in the field of Design, Project, EngineeringManagement, plant operation & maintenance which includes Project Estimates, DetailedEngineering, Site/Construction Supervision, Regulatory compliance & safety Audits, Designvetting and Plant Operation & Maintenance of Oil & gas, Power & Petrochemical Plantsensuring timely project completion according to governing codes, standards using latestcomputer technology.
7/21/2019 Rfinery PMC.pdf
http://slidepdf.com/reader/full/rfinery-pmcpdf 22/51
GLOBAL PMC (PRIVATE)LIMITED
PERSONAL PROFILE
Name: MATEEN HAMEED Employee No: 0000
Designation: Chairman
Page 2 of 4
Provided leadership, direction and timely decisions, Budget, manpower requirements,Institute and conduct all phases of Project Management. Promoted progressive developmentof inter-personal and communication skills and team building. Developed, implementedoverall work plans and control work progress. Evaluated contracts and establishedappropriate project requirements and authorization limits. Established Hazop review andstandard requirements. Recruitment necessary staff for project
Set-up organized and supervised project groups for Review P&ID's and detail constructiondrawings. Developed contracts scope of work, prequalify contractors, review bid proposals,select contractors and award contracts. Prepare detail work plans and monitor work progress.Generate procurement packages, place purchase requisitions, review proposals and selectsuppliers/vendors. Coordinate total project activities, interface with project support groupsand prepare management information reports. Prepare check list for pre-commissioningequipment/plant, issue completion certificates and sign off for acceptance.The work details in projects are as follows:
Project Description Client Responsibility
Electrical light ing system KSBL(Global PMC Pvt. Ltd.) Karachi School of
Business
Project Manager for Developed detailedengineering of electrical lighting system ofKarachi School of Business & Leadership.KSBL
Engineering package of 700 KWdiesel generating sets(Global PMC Pvt. Ltd.)
Karachi School ofBusiness
Project Manager for Developed detailedengineering package of 700 KW dieselgenerating sets Karachi School of Business &Leadership. KSBL
P&G DRY LAUNDRY PLANT(ETIMAAD Engineering Pvt.Limited)
Proctor & Gamble(Nov 07 to Feb 11)
Project Manager for all the activities DryLaundry Project
Aisha Steel Mil l Project(ETIMAAD Engineering Private Ltd Aisha Steel(Nov 07 to Feb 11) Project Manager for all the activities for ColdRoll Steel Complex (CRSM)
Ethylene Cracker Project(DESCON Engineering).
TECHNIPFRANCE
(Mar' 2006 – Oct2007)
Site/Project Manager for all the activities onbehalf of subcontractor for the Cold Section ofEthylene Cracker Project (3
rd Largest Project of
its kind) being built by EPC Contractor
Revamp Project o f CrudeDistillation Unit(ENAR Petrotech Service Pvt. Ltd).
National RefineryProject Manager for all the activities ofincreasing its throughput from 35,000 BPD to50,000 BPD.
INSPECTION OF LPGPRODUCTION & BOTTLINGPLANTS(ENAR Petrotech Service Pvt. Ltd).
Oil & GasRegulatory
Authori ty (OGRA)Project Manager for the inspections of differentplants.
QADIRPUR 400MMSCFDPROJECT(ENAR Petrotech Service Pvt. Ltd)
Oil & GasDevelopmentCompany Ltd
Project Manager
increasing gas purificationcapacity from existing 250 to 400 MMSCFD.Include details engineering, procurementassistance, Construction supervision andproject management.
Condensate Processing FacilityProject (EPRF-I)(ENAR Petrotech Service Pvt. Ltd).
Enar Petro leumRefining Facility(Apr. 98 to Dec.02)
Project Manager for Procurement of Equipment/ Material Detailed Engineering andConstruction Supervision Services forprocessing 3000 barrels / day CondensateProcessing Facilities which includes all utilitiesand development of storage area.
7/21/2019 Rfinery PMC.pdf
http://slidepdf.com/reader/full/rfinery-pmcpdf 23/51
GLOBAL PMC (PRIVATE)LIMITED
PERSONAL PROFILE
Name: MATEEN HAMEED Employee No: 0000
Designation: Chairman
Page 3 of 4
Bobi Early Production Facilities
(ENAR Petrotech Service Pvt. Ltd).
Oil & GasDevelopmentCompany Ltd
Project Manager for establishment ofhydrocarbon gathering pipeline and separatingthe condensate from gas and recovery of LPG.The work includes detailed engineering,procurement and construction supervision.
Chanda Gas Processing Facili ty(ENAR Petrotech Service Pvt. Ltd).
Oil & GasDevelopmentCompany Ltd
Project Manager for re-location of LPG PlantDehydration Plant to increase LPG ProductionCapacity to 50 tons per day and produce 3000barrels per day condensate.
Omar Phase IV (Syria) WaterInjection Project.
(Petrofac International L t d . )
PetrofacInternational Ltd.,
Sharjah, U.A.E.
Senior Project Engineer for Design activitiesof expanding and improving the watertreatment, injection and distribution facilities.
Maintenance and engineering
Activi ties o f UAN Refinery.(Abu Dhabi National Oil Company)
Abu DhabiNational Oil
Company, AbuDhabi, U.A.E
Jan.' 79 - Dec.' 85
Maintenance / Engineering SuperintendentCompleted pre commissioning/commissioningactivities and signed off acceptance and
maintenance of 400 MMSCF of sour gas plant.
Supervised all the activities of maintenance andengineering departments of UAN Refinery.Responsible for maintenance and engineeringactivities of rotary equipment, stationaryequipment, electrical and power distributionsystems, instrumentation, process computers,selection of equipment, inventory managementand standardization.
Operations & Maintenance(National Refinery Limited)
National RefineryLimited, Karachi Mar.' 67 - Dec.' 78
Senior Plant Engineer / Operation Engineer Overall training in all the department of therefinery.Operation and maintenance of boilers, water
treatment & distribution facilities, utilities,electrical system, power distribution system andasphalt air blowing unit.Coordinator total shutdown maintenance (turn-around) of the refinery.Control of all the activities of generalengineering department which includemechanical, electrical, civil and instrumentationworks.Supervised contract, maintenance andmodification jobs.
COMPUTER SKILLS
MS Office & Other related engineering software’s
AFFILIATIONS
• Life Member – PEC (Pakistan Engineering Council)
• Member, Institute of Engineers of Pakistan
• Member, Petroleum Institute of Pakistan
PERSONAL
7/21/2019 Rfinery PMC.pdf
http://slidepdf.com/reader/full/rfinery-pmcpdf 24/51
GLOBAL PMC (PRIVATE)LIMITED
PERSONAL PROFILE
Name: MATEEN HAMEED Employee No: 0000
Designation: Chairman
Page 4 of 4
Date of Birth : July 01, 1944
Nationality : PakistaniReligion : IslamMarital Status : MarriedLanguages : English and Urdu
7/21/2019 Rfinery PMC.pdf
http://slidepdf.com/reader/full/rfinery-pmcpdf 25/51
GLOBAL PMC (PRIVATE)LIMITED
PERSONAL PROFILE
Name: Muhammad Alim ur Rahman Employee No: 0001
Designation: Chief Executive
Page 1 of 4
EDUCATION
B.E Mechanical Engineering 1993
NED University of Engineering & Technology Karachi, Pakistan
TRAINING / COURSES
Microsoft Certified System Engineer + I 2000
Pumps & Compressors – Short course held incollaboration of NED University & Petromen.
Project Management by PIM’s
2002
2008
EMPLOYMENT HISTORY
Present
Chief Executive July 2010 to-dateGlobal PMC (Private) Limited
Karachi, Pakistan
Previous
Principal Engineer June 2008 to-July 2010(Engineering Manager, British Petroleum Design House)JGC-DESCON Engineering (Pvt.) LimitedKarachi, Pakistan
Senior Mechanical Engineer June 1993 to May 2008ENAR Petrotech Services Private LimitedKarachi, Pakistan
EXPERIENCE PROFILE
Present
As Chief Executive Global PMC (Private) Limited, heading a team of Design Engineers &Draftspersons for providing services to oil & gas, petroleum refining, chemicals,petrochemicals, storage terminals, pipeline, power plant, textile industries, operation &maintenance services, regulatory compliance & safety audits, pre-shipment inspections,HAZOP’s and other related projects.
Previous
Have twenty years experience in the field of Project & Engineering Management, whichincludes Project Estimates, Detailed Engineering, Site/Construction Supervision, Regulatory
compliance & safety Audits, Design vetting and Plant Operation & Maintenance, Annualturnaround & Facility Management services of Oil & gas, Power & Petrochemical Plantsensuring timely project completion according to governing codes, standards using latestcomputer technology.Carried out number of activities like development of Engineering Calculations, Piping Plans,Isometrics, Pipe Supports, BM/BQ Preparation, Specifications for Materials, ProjectSchedules, procurement activities, Supervision/Planning for Site activities etc.Have excellent knowledge of engineering design codes such as ASME, NFPA, API, ANSI,MSS, etc. I also have excellent knowledge of P&ID’s, Mechanical, Civil, Structure,Instrumentation and Electrical drawings & Documents.While working in ENAR Petroleum Refining Facility as a Plant Manager, I gained in-depthknowledge of plant operation techniques, maintenance problems & schedules and annualturn around activities.
7/21/2019 Rfinery PMC.pdf
http://slidepdf.com/reader/full/rfinery-pmcpdf 26/51
GLOBAL PMC (PRIVATE)LIMITED
PERSONAL PROFILE
Name: Muhammad Alim ur Rahman Employee No: 0001
Designation: Chief Executive
Page 2 of 4
The work details in projects are as follows:
Project Description Client Responsibility
Case Study for Optimization ofTransformer Oil Plant(Global PMC Pvt. Ltd)
Oil industriesPakistan
Project Manager for Study of transformer oil process in
order to eliminate operational and process error for
achieving the required specifications
Feasibility Study onPolymer Pipes industry(Global PMC Pvt. Ltd)
TCILProject Manager for the development of detailedfeasibility for polymer pipes manufacturing plant.
Enhancing of PMGDecanting & LoadingCapacity at PSO ShikarpurTerminal(Global PMC Pvt. Ltd)
Pakistan State OilProject Manager for the enhancement pf PMChandling capacity at PSO Shikarpur project
Enhancing of PMG Loading
Points at PSO MachikeTerminal(Global PMC Pvt. Ltd)
Pakistan State Oil Project Manager for the enhancement pf PMChandling capacity at PSO Machike project
Enhancing of PMG LoadingPoints at PSO ChakpiranaDepot(Global PMC Pvt. Ltd)
Pakistan State OilProject Manager for the enhancement pf PMChandling capacity at PSO Chakpirana project
Development of detailedfeasibility study of smallcrude oil topping unit(Global PMC Pvt. Ltd.)
ManshanatBrothers
Project Manager for Development of detailedfeasibility study on small crude oil topping unit
Developed ProcessSimulation Model of GasDehydration Unit(Global PMC Pvt. Ltd.)
Peoples SteelMills Pakistan
Project Manager for Developed Process SimulationModel & detailed cost estimate of Gas DehydrationUnit (for EPC Bid)
Developed ProcessSimulation Model GasSweetening Unit(Global PMC Pvt. Ltd.)
Peoples SteelMills Pakistan
Project Manager for Developed Process SimulationModel & detailed cost estimate of Gas SweeteningUnit (for EPC Bid).
Development of FabricationDrawings for multi-storiedcomplex steel structure(Global PMC Pvt. Ltd.)
FutehallyChemicals(Uniliver)
Project Manager for the Development of FabricationDrawings for multi-storied complex steel structure anddetailed BOQ
Stress Analysis of UtilityPipe Rack(Global PMC Pvt. Ltd.)
Byco RefineryProject Manager for the stress analysis of utility piperack of under construction utility pipe rack.
Developmnt of HysisSimulation Model & Cost
estimate(Global PMC Pvt. Ltd.)
Heavy Mechanical
Complex
Project Manager for the Development of Process
Simulation model & Cost Estimate for the SinjhoroField of OGDCL.
Relocation of 300 tons/dayedible oil refinery(Global PMC Pvt. Ltd.)
Dlada FoodsProject Manager for the relocation engineering of 300tons/day edible oil refinery
Site Management Services(Global PMC Pvt. Ltd.)
Enar Petro leumRefining Facility-II
Site Consultant for the construction site of EnarPetroleum Refining Facility-II
220 tons/day Sulfuric AcidPlant(Global PMC Pvt. Ltd.)
Cactus fertilizerProject Manager for the development of Process &Mechanical Package of 220 tons/day Sulfuric Acidplant
7/21/2019 Rfinery PMC.pdf
http://slidepdf.com/reader/full/rfinery-pmcpdf 27/51
GLOBAL PMC (PRIVATE)LIMITED
PERSONAL PROFILE
Name: Muhammad Alim ur Rahman Employee No: 0001
Designation: Chief Executive
Page 3 of 4
Design House of Br itishPetroleum PakistanManaged by DIPL, formerlyJGC-Descon Engg. Pvt. Ltd.
British PetroleumPakistan
(Jun. 08 to Jul.2010)
Engineering Manager for the design house consistsof more than 32 Engineer’s & draftsmen and handled
projects of more than 200 millions of US $.
Inspection of LPGProduction & BottlingPlants.(ENAR Petrotech Service Pvt.Ltd).
Oil & GasRegulatory
Authority(OGRA) (Sep.05 – May 08)
Project Sponsor for the inspections of differentplants. I was the main contributor with OGRA for thedevelopment of regulatory compliance audit system inPakistan. This Project involves collection of technicaldata / documentation, visual inspection of plant andfacilities, assessment of plants for compliance ofCodes/ standards & compilation of inspection report.
Enar Petro leum RefiningFacility (EPRFIII) Project(ENAR Petrotech Service Pvt.Ltd).
Enar Petro leumRefining Facility
(Aug. 07 – Nov. 07)
Project Manager for the development of detailedfeasibility report, for the relocation of 25,000 bbls deepconversion refinery from USA. Visited USA for thedetailed inspection, developed philosophy /procedures for dismantling, packing, loading,transportation to USA port and sea transportation toKarachi. Developed strategies for re- simulation, re-engineering, refurbishment of equipments, installation,erection and commissioning The total relocated costof the plant are $ 85 M.
Enar Petro leum RefiningFacility (EPRFII) Project(ENAR Petrotech Service Pvt.Ltd).
Enar Petro leumRefining Facility
(Dec. 06 – May 08)
Project Manager for the grass root pilot refineryproject, this project involves the basic and detailedengineering design of process unit, off sites & utilities,procurement, construction and commissioning.
Bosicor Pakistan Limited’sCDU revamp Project(ENAR Petrotech Service Pvt.Ltd).
Bosicor PakistanLimited
(Dec. 05 - toDec.06)
Project Manager for the CDU unit revamp project,this project involves the development of EngineeringDesign Specification (EDS) packages for process unit,off sites and utilities. After revamp the processingcapacity of the CDU unit increased from 12,000bbls/day to 30,000 bbls/day.
Dhodak Expansion Project(ENAR Petrotech Service Pvt.Ltd).
OGDCL(Feb. 05 to Nov.05)
Project Manager for the development of FEED forEPC Contractor. This involves the relocation ofunused LPG plant to Dhodak to cater the increasedwell productions with integration to existing plant.
Garhi Hassu LPG plantrehabilitation Project(ENAR Petrotech Service Pvt.Ltd).
OGDCL(Jul. 04 to Feb. 05)
Project Manger for the detailed engineering andinspection of LPG Plant (stored unused for last eightyears) and assessment of the re-engineering & worksrequired for the rehabilitation and installation.
Enar Petro leum RefiningFacility (EPRFI) Project(ENAR Petrotech Service Pvt.Ltd).
Enar Petro leumRefining Facility
(Jan. 03 to Jun. 04)
Plant Manager, solely responsible for the O & MEPRF-I during the first 18 months after thecommissioning of refinery capable of processing 3000bbls/day of local condensate. This project is the first ofits kind in the country & providing strategic support tothe defense forces of the Pakistan.
Condensate ProcessingFacility Project (EPRF-I)(ENAR Petrotech Service Pvt.Ltd).
Enar Petro leumRefining Facility
(Apr. 98 to Dec.02)
Lead Design Engineer/Site Coordinator for thegrass root (3000 bbls/day) pilot refinery project. Thisproject includes basic engineering, detail design,procurement, & fabrication supervision of equipments,Pre-shipment inspection, construction supervision andcommissioning of the plant.
Uch Gas Gathering Project
(ENAR Petrotech Service Pvt.
Ltd).
OGDCL(Jun. 98 to Sep.98)
Team Lead for complete cost estimate of gasgathering system from different wells to the CentralProcessing Facilities.
7/21/2019 Rfinery PMC.pdf
http://slidepdf.com/reader/full/rfinery-pmcpdf 28/51
GLOBAL PMC (PRIVATE)LIMITED
PERSONAL PROFILE
Name: Zakiuddin Hussain Employee No: 0002
Designation: Consultant Mechanical Engineering
EDUCATION M. Sc. Petroleum Technology 1998
Karachi University, PakistanB.S Mechanical Engineering 1995NED University of Engineering & TechnologyKarachi, Pakistan
TRAINING / COURSES T – Bosiet
EMPLOYMENT HISTORY
Present Head Mechanical Engineering Jul. 2010 to-dateGlobal PMC (Private) LimitedKarachi, Pakistan
Previous Rotating Equipment Design Specialist Nov. 2009- Jun. 2010NETCO NigeriaEngineering Manager Jun. 2006- Oct. 2009Terra Engineering NigeriaSenior Mechanical Engineer Jun. 1995 to May 2006ENAR Petrotech Services Private LimitedKarachi, Pakistan
EXPERIENCE PROFILE
Present
As Head Mechanical Engineering Global PMC (Private) Limited, heading a team of Design Engineers &
Draftspersons for providing services to oil & gas, petroleum refining, chemicals, petrochemicals,storage terminals, pipeline, power plant, textile industries, operation & maintenance services, regulatorycompliance & safety audits, pre-shipment inspections, HAZOP’s and other related projects.
Previous Worked as Rotating Equipment Design Specialist with NETCO Nigeria. Duties include providingdirection and supervision to mechanical department. Providing the client the best engineering solutionbased on engineering standards and best practices. Oversee and assist the engineers in projectsdesign and develop specification of equipment. Assist and develop documentation to support newequipment implementation (User requirement specification, detailed design specification,Worked as Engineering Manager for Terra Engineering Nigeria. Duties include providing the client thebest engineering solution based on engineering standards and best practices. Oversee and assist theengineers in projects design and develop specification of equipment. Assist and develop documentationto support new equipment implementation (User requirement specification, detailed design
specification, operating and maintenance procedures, FAT, SAT and commissioning documents)engineering studies, technical support, QA, validation and other departments for process improvement,troubleshooting, change control and deviation resolution.Worked as Senior Engineer in ENAR Petrotech. ENAR is an Engineering Consulting Companyproviding project management and detailed engineering services to Refineries & Petrochemical Plants.Major Clients include OGDCL, NRL, PARCO, BP, OMV, Eni, MOL, PPL and PSO, etc.During the eleven (11) years of professional associations with EPSL gained experience in the ProjectManagement and Detailed Engineering Design. In the capacity of project manager carried out humanresource management, provide technical team leadership, involved in project planning, coordinatedwith all engineering discipline for smooth execution of project and liaised with client to embed concernsand updated the schedule in line with the new developments and revised scope of works. Alsoresponsible for detailed design while leading detailed engineering.
7/21/2019 Rfinery PMC.pdf
http://slidepdf.com/reader/full/rfinery-pmcpdf 29/51
GLOBAL PMC (PRIVATE)LIMITED
PERSONAL PROFILE
Name: Zakiuddin Hussain Employee No: 0002
Designation: Consultant Mechanical Engineering
The work details in ro ects are as follows:
Project Descript ion Client Responsibility
Associated Gas
Gathering Facility
Project (AG
Solution Project)
Shell Petroleum
Development
Company Limited
Nigeria
Oversee and assist the engineers in projects design and
develop specification of equipment. Assist and develop
documentation to support new equipment implementation
(User requirement specification, detailed design
specification.
Vent Captu re Projects
Chevron Nigeria
Limited.
Supervised mechanical department. Provided best
engineering solution based on engineering standards and
best practices. Oversee and assist the engineers in
projects design and develop specification of equipment.
ADN-B Wellhead
Platform Detailed Design
Project
Addax Petroleum
Development Nigeria
Limited
Oversee and assist the engineers in projects design and
develop specification of equipment.
Concept Verificationand
Detailed Design of H2S
Scavenger System at
BONGA FPSO
Shell Nigeria
Exploration &
Production Company
Provide engineering studies, technical support, QA,
alidation for process improvement, troubleshooting,
change control and deviation resolution.
StructuralDesign Projects at BRT& QIT Facilities underCall-off Contract.
Mobil Nigeria
Duties include providing the client the best engineering
solution based on engineering standards and best
practices.
ORWS Wellhead
Platform DetailedDesign Project
Addax Petroleum
Development NigeriaLimited
ssist and develop documentation to support new
equipment implementation (User requirement
specification, design specification, O & M procedures,FAT, SAT and commissioning documents).
Detailed Engineering
Project for Adhi field
of PPL
Gastec GmbH
Project manager on “”. Project involved engineering and
planning. Responsible for the engineering design,
coordination between company and client, monitoring
project progress, sourcing of material, coordination of
orkflow, ensuring budget and milestones.
Manzalai-1 EWT
Surface Facility Project
MOL Pakistan
Limited
s Project manager led a team of process, mechanical,
piping, electrical and instrument engineers to carry out
he front end engineering of the project. Developed the
ime schedule, performance curve and assisted project
eam to meet the schedule give in the Gantt’s Chart. Was
also involved in the cost estimating (CAPEX & OPEX),
planning and scheduling of the Project.
BOBI LPG Project.
Oil & Gas
Development
Corporation Limited
orked as a site manager for project and was also
involved in detailed engineering, planning and
construction of a LPG plant from design to completion.
Qadirpur Capacity
Enhancement Project
for Gas purification
Plant.
Oil & Gas
Development
Corporation Limited
Responsible for the detailed engineering design,
coordination between company and client, monitoring
project progress, sourcing of material, coordination of
orkflow, ensuring budget and milestones are
maintained.
7/21/2019 Rfinery PMC.pdf
http://slidepdf.com/reader/full/rfinery-pmcpdf 30/51
GLOBAL PMC (PRIVATE)LIMITED
PERSONAL PROFILE
Name: Zakiuddin Hussain Employee No: 0002
Designation: Consultant Mechanical Engineering
Technical assessment ofvarious plants andrefineries in Pakistan.
Various Clients
orked as project manager for Projects involvedcollection and compilation of technical data /
documentation, review of processing scheme of plantsand refineries, visual inspection of plant and facilities,assessment of present condition of plant and facilities,estimation of probable remaining operating life of plantand facilities, assessment of normal replacement /maintenance requirements and revamps projects andidentification of non-essential / non productive assets.
Inspection of LPGProduction & BottlingPlants.
Oil & Gas Regulatory Authority(OGRA)
Project Manager for the inspections of different plants. Ias the main contributor with OGRA for the development
of regulatory compliance audit system in Pakistan. ThisProject involves collection of technical data /documentation, visual inspection of plant and facilities,assessment of plants for compliance of Codes/ standardsand compilation of inspection report.
Detail Engineering ofKadanwari Well K-1 & K-6
LASMO Oil PakistanLtd
Led a team of process, mechanical, piping, electrical andinstrument engineers to carry out the front endengineering of the project. Developed the time schedule,performance curve and assisted project team to meet theschedule give in the Gantt’s Chart.
Engineering Study forLow Cost Low PressureWellhead Systems.
LASMO Oil PakistanLtd
Oversee and assist the engineers in detailed engineering
design and develop specification of equipment.
Cost evaluation Studyfor Dhurnal LPG Plant.
Orient Petroleum Inc. Projects involved collection and compilation of technicaldata / documentation, assessment of present condition of plant, estimation of remaining operating life of plant.
Dhurnal Gas Lift Project Orient Petroleum Inc.
as involved in detailed engineering and projectplanning of the project.
Kunnar LPG Project
Oil & Gas DevelopmentCorporation Limited
orked as a site engineer for project and was alsoinvolved in detailed engineering, planning andconstruction of a LPG plant from design to completion.
Condensate Processing
Facility Project.
Enar PetroleumRefining Facility
Design Engineer for Condensate Processing Facilityproject. Was involved in detail design.
Uch Gas DevelopmentProject.
Oil & Gas DevelopmentCorporation Limited
orked as a site engineer for project
Designing Fixed &
Floating Roof Crude
Storage Tanks
Various Clients
Detail Design & construction supervision of severalstorage tanks.
COMPUTER SKILLS
MS Office, MS Project, Autocad & Other related engineering software’s
AFFILIATIONS
Life Member – PEC (Pakistan Engineering Council)
PERSONAL
Date of Birth : 1970Nationality : PakistaniReligion : IslamMarital Status : MarriedLanguages : English and Urdu
7/21/2019 Rfinery PMC.pdf
http://slidepdf.com/reader/full/rfinery-pmcpdf 31/51
GLOBAL PMC (PRIVATE)LIMITED
PERSONAL PROFILE
Name: Nasirudd in Shaikh Employee No: 0003
Designation: - Process Consultant
Page 1 of 4
EDUCATION♦ Chartered Engineer from Institute of Chemical Engineers, United Kingdom.♦ Bachelor of Chemical Technology from University of Karachi. (1999) secured First Class First Position (80.0%).
♦ Master of Computer Science (MCS) from PAF-KIET (2002) with CGPA 3.33.♦ H.S.S.C. from Sind Muslim Science College, Karachi (1994)♦ S.S.C. from Govt. Tech. High School, Karachi (1992.
TRAINING / COURSES
In house training of Process Simulation using Hysys Advance Process Simulation Heat exchanger design using HTFS Installation and configuration of Fischer Delta V DCS Quality management system (ISO 9000:14000)
EMPLOYMENT HISTORY
Present
I. Global PMC Private limited (July 2010 to To date)
As Consultant Process Engineering for Global PMC (Private) Limited, providing process engineering services to oil &gas, petroleum refining, chemicals, petrochemicals, storage terminals, pipeline, power plant, textile industries,operation & maintenance services, regulatory compliance & safety audits, pre-shipment inspections, HAZOP’s andother related projects.
II. II. Litw in PEL, L.L. C. Abu Dhabi (Oct-2009 to To date)
Litwin is a well established engineering company, with more than 1000 references in Oil & Gas,Chemical & Industry, and Energy & Environmental projects. With about 1200 dedicated engineers,
technical specialists and project managers, Litwin provides comprehensive engineering services, fromfeasibility studies through construction of plants on a turnkey basis, for clients worldwide. Litwin works
in close partnership with major technology providers and develop alliances with reputable equipmentmanufacturers, seeking to optimize project management and technology-specific skills.
Worked in the capacity of Senior Process engineer and involves in the following on-going projects:
a. Keyi Field production facilities, Sudan, a green field project, involved gatheringnetwork, inlet separation, Condensate stabilization, Gas compression and allassociated utilities.
b. Leading the project for Isomerate Quality Improvement of Ruwais Refinery,TAKREER. Project scope includes, detailed design, Procurement, Construction andCommissioning of Light Naphtha Splitter to reduce C5 content from Isomerization unitfeed.
c. Involved in the technical proposal preparation for following:• Early Production facilities for IPRC in Syria• Early Production Facilities for OMV-IRAQ in Kurdistan Region
• Bitumen Production Plant for OMV-IRAQ in Kurdistan Region
Carry out Process Simulation using Aspen Hysys, prepare PFDs, preliminary sizing for all majorequipments, preliminary P&IDs for cost estimation purpose.
7/21/2019 Rfinery PMC.pdf
http://slidepdf.com/reader/full/rfinery-pmcpdf 32/51
GLOBAL PMC (PRIVATE)LIMITED
PERSONAL PROFILE
Name: Nasirudd in Shaikh Employee No: 0003
Designation: - Process Consultant
Page 2 of 4
Previous
III. Clough Engineering and Integrated Soluti ons (CEIS), Pty Ltd (May-07 to Jun-2009)The Clough Group is one of Australia's largest multidisciplinary engineering, construction and asset managementgroup's active in the international oil & gas, minerals, infrastructure and property industries with its Corporate HeadOffice located at Perth in the Western Australia. The Group's turnkey services range from complex front-endengineering design, construction, installation and commissioning to long term operations and asset maintenance.Major Clients of Clough Pakistan includes, Petronas Carigali, OMV, BHP, ENI, BP Pakistan, PPL, etc. Worked as
Assistant Engineering Manager
IV. Nama Mott MacDonald (Oil and Gas Division – Abu Dhabi) (Nov-2006 to May 2007)
Mott MacDonald one of the world's foremost Multi-disciplinary Independent Engineering Consultancies with itsCorporate Head Office located at Croydon in the UK. With a complement of 8,500 qualified staff worldwide providingan annual turnover in excess of 900 million US $, Mott McDonald have offices in more than 50 countries and a globalexperience spanning more than 130 countries. Major clients includes: ZADCO, ADCO, ADMA-OPCO, GASCO,TAKREER, ADGAS, QP, NPCC, etc. Worked as Senior Process Engineer
V. Dar-al-Riyadh Consul tants, Saudi Arabia (Sep-2005 to Oct-2006)
Dar-Al-Riyadh Consultants is a leading Consultancy firm of Saudi Arabia. Major clients include Saudi Aramco,SABIC, Petro Kemya, etc. Worked as Process Design Engineer and involved in the following Project/studies:
VI. Petrosin Engineering (Private) Limited (March-2004 to August-2005)
Petrosin Engineering Private Limited is a leading Company of Pakistan in engineering design, fabrication, installationand commissioning of oil and gas processing plants. Company is also involved with operations and maintenanceservices. Worked as Senior Process Design Engineer and involved in following projects/bids:
VII. ENAR Petrotech Services (Private) Limited (May-2000 to Feb-2004)
ENAR is a leading design, engineering and consulting organization providing services of feasibility studies, processdesign, detailed engineering, bid evaluation and recommendation, project monitoring, inspection and construction
supervision to the projects in the petroleum refining, storage and cross country pipelines, gas processing, chemicalfertilizer and other sectors of the process industry. Major clients include OGDCL, NRL, PARCO, PSO, BP Pakistan,OMV, LASMO, PPL, etc. Worked as Process Engineer
VIII. Clariant Pakistan Limited (Sep-1999 to Apr il 2000)
Worked as Trainee Officer in the following Sections
− Dyes/Chemicals Production &Utilities Generation− Quality Control− Environmental Safety & Health (ESHA)
EXPERIENCE PROFILE
Project Description Client Responsibility
ZAM North, ZAM B and ZAM D, tie-in detailengineering with Central Gas Processing Plant
BHP PakistanProcess Engineering and leading the ProcessTeam
Saqib-1A EWT Wellhead Development FacilityPetronasPakistan
Process Engineering and leading the ProcessTeam
Conceptual and Front End Design for Kandhkot GasPurification Plant
PPLProcess Engineering and leading the ProcessTeam
Latif-2 EWT Wellhead Development Facility OMV PakistanProcess Engineering and leading the ProcessTeam
Rehamat Gas Field De-Bottlenecking StudyPetronasPakistan
Process Engineering and leading the ProcessTeam
Tajjal-1 EWT Wellhead Development facility OMV PakistanProcess Engineering and leading the ProcessTeam
7/21/2019 Rfinery PMC.pdf
http://slidepdf.com/reader/full/rfinery-pmcpdf 33/51
GLOBAL PMC (PRIVATE)LIMITED
PERSONAL PROFILE
Name: Nasirudd in Shaikh Employee No: 0003
Designation: - Process Consultant
Page 3 of 4
Design House activities for BP to provide completerange of services for BP facilities in Pakistan
BP Pakistan All process engineering activities
Level – 3 ESD and Depressurization system for
Satah crude processing facilities ZADCO, UAE All process engineering activitiesNASR offshore field development project, Conceptualand FEED development
ADMA-OPCO,UAE
Process Simulation, PFDs, P&IDs, equipmentsizing, hydraulics
Zulf Artificial lift Project Saudi AramcoProcess Simulation, Equipment Sizing,Process Datasheets
De-bottlenecking study of Yanbu Refinery Atmospheric Distillation column’s pump aroundcircuits
Saudi AramcoProcess Simulation, Equipment Sizing,Process Datasheets
Conceptual design of Brazed Aluminum plate typeheat exchanger for Berri Gas Plant, Ethane and NGLUnit
Saudi AramcoProcess Simulation, PFDs, P&IDs, EquipmentSizing and Process Datasheets
Study of upgrade of North Refinery flare system ofRas Tanura Refinery
Saudi AramcoProcess Simulation, PFDs, P&IDs, EquipmentSizing and Process Datasheets
Study of up gradation of Relief system at Ras Tanura
RefinerySaudi Aramco
Process Simulation, PFDs, P&IDs, Equipment
Sizing and Process Datasheets
Detailed Engineering design of CO2 pipelineKDI, Saudi
ArabiaProcess Simulation, PFDs, P&IDs, EquipmentSizing and Process Datasheets
Preparation of Bid document of Pindori Gas plantExpansion Phase II
POL, PakistanProcess Simulation, PFDs, P&IDs, EquipmentSizing and Process Datasheets, Technical bidpreparation
Preparation of FEED study and Bid document forOrient Pakistan Inc. (OPI) Kausar and Umer fields
OPI, PakistanProcess Simulation, PFDs, P&IDs, EquipmentSizing and Process Datasheets, Technical bidpreparation
Condensate Processing FacilityENAR
Petrotech,Karachi
Process Simulation, PFDs, P&IDs, EquipmentSizing and Process Datasheets, Hydraulicscalculations, Design Philosophies
Front End Engineering Design and development ofsurface facilities for Extended Well Testing (EWT) for
Manazali – 1
MOL PakistanProcess Simulation, PFDs, P&IDs, EquipmentSizing and Process Datasheets, Equipment
list, Line list, Design philosophiesFront End Engineering Design for Relocation and up-gradation study of Fimakassar LPG Plant to ChandaGas Field
OGDCL,Pakistan
Process Simulation, PFDs, P&IDs, EquipmentSizing and Process Datasheets
Front End Engineering Design of Adhi Gas Field toenhance the capacity of existing plant
PPLProcess Simulation, PFDs, P&IDs, EquipmentSizing and Process Datasheets, Equipmentlist, Line list, Design philosophies
Front End Engineering Design of Mazarani Gas Fieldto Install Gas Sweetening, De-hydration and dewpoint reduction
PPLProcess Simulation, PFDs, P&IDs, Processdatasheets.
Dakhni Expansion studyOGDCL,Pakistan
Process Simulation, Plant Test Run
Capacity enhancement study of Dhodak field OGDCLProcess Simulation, Equipment sizing andrating.
Preliminary Feasibility Study of Tangri & Mazari GasField
BP PakistanFeasibility study, Process Simulation,Equipments datasheets and Specifications
Development of System Curves of Kadanwari GasField Gathering lines
LASMO OilPakistan
Plant Test run, Process and hydraulicssimulation, Study Report
Qadirpur Capacity enhancement projectOGDCL,Pakistan
Selection of Suitable membranes, hydraulicsanalysis, optimization of heat exchangers
Capacity Enhancement Study of Turk Amine Plant BP PakistanProcess Simulation, comparisons of differentamine solvents, rating of equipments
Relocation study of Dhurnal LPG Plant to HyderabadSSGC,
PakistanProcess Simulation, Rating and sizing ofequipments
De-Bottlenecking study of Propane Recovery Unit NRL, PakistanProcess Simulation, rating and sizing ofequipments, Plant Test run
Process Selection & Screening study of Mari GasField
OGDCLComparison of various processes for gassweetening and dehydration
7/21/2019 Rfinery PMC.pdf
http://slidepdf.com/reader/full/rfinery-pmcpdf 34/51
GLOBAL PMC (PRIVATE)LIMITED
PERSONAL PROFILE
Name: Nasirudd in Shaikh Employee No: 0003
Designation: - Process Consultant
Page 4 of 4
COMPUTER SKILLS
• Engineering Software (Aspen HYSYS, Complete HTFS Suit, WinSim (Design-II), SiNET, KORFHydraulics, AMSIM, Line Sizing, Pump Sizing, Control Valve Sizing, Relief Valve Sizing, etc.)
• Microsoft Windows 2000/XP/NT, LINUX & UNIX
• C/C++ & Object Oriented Programming, COBOL Programming
• Visual Tools (Visual C++, Visual Basic, Visual FoxPro, Visual InterDev)
• Web Development Tools (Flash, Dreamweaver, Java, ASP, FrontPage)
AFFILIATIONS
Associate Member, Institute of Chemical Engineers, UK
PERSONAL
Date of Birth : 2nd Nov. 1976Nationality : PakistaniReligion : IslamMarital Status : MarriedLanguages : English and Urdu
7/21/2019 Rfinery PMC.pdf
http://slidepdf.com/reader/full/rfinery-pmcpdf 35/51
GLOBAL PMC (PRIVATE)LIMITED
PERSONAL PROFILE
Name: Umair Baig Employee No: 0006
Designation: Process Consultant
Page 1 of 2
EDUCATION
Bachelor of Chemical Technology, University of Karachi, Karachi, Pakistan 2003
TRAINING / COURSES
Hysis 2003 Aspen Plus 2007
EMPLOYMENT HISTORY
Present
Process Consultant July 2010 to date Global PMC (Private) Limited
Senior Process Engineer May 2011 to dateFoster Wheeler Energy Limited, Readings, United Kingdom
Previous
Process Engineer July 2010 to May 2011Petrofac Sarjah
Process Engineer Feb. 2009 to July 2010Foster Wheeler Energy Limited, Readings, United Kingdom
Senior Process Engineer June 2003 to Feb. 2009ENAR Petrotech Services Private Limited, Karachi, Pakistan
EXPERIENCE PROFILE
Present
As Process Consultant for Global PMC (Private) Limited and Foster Wheeler Energy Limited, Readings,
United Kingdom, providing services to oil & gas, petroleum refining, chemicals, petrochemicals, storageterminals, pipeline, power plant, operation & maintenance services, regulatory compliance & safety audits,pre-shipment inspections, HAZOP’s and other related projects.
Previous
Have more than seven years experience in the field of Process Engineering and R&D works, which includesFEED, Process Design & HAZOP’s of Gas plants and refineries including Gas gathering & trunk lines, Gasoil separation plants, Gas treatment units (amine & glycol unit), LPG recovery units, Crude Preheat trains,gas condensate refining units, crude unit, Naptha splitting and stabilization system.Design of utility system such as fuel gas, hot oil system, condensate recovery system, steam distributionsystem, compressed air distribution system, etc.
Hydrocarbon based R&DPreparation & Development of HMB, PFD’s, P&ID’s, process datasheets, simulations reports and FEED’s
The work details in projects are as follows:Project Description Client Responsibility
PSR2 2-Phase Hydrocracker(Unit 30) TA Projects(Foster Wheeler Energy Limited)
Melaka Refinery
Malaysian Refinery
Co (Sep.09 – Apr. 10)
Process Engineer for the development PFD’s andP&ID’s for the implementation of hydrocracker revampproject
Ras Tanura Integrated Project(RTIP)(Foster Wheeler Energy Limited)
Saudi Aramco(Feb. 09 to Aug. 09)
Process Engineer for the development & optimization ofProcess design document for pre-feasibility estimate forall the utilities.
120,000 BPDS Milford HavenRefinery Relocation Project(ENAR Petrotech Service Pvt. Ltd).
Bosicor OilsPakistan Limited
(Jun. 08 – Feb.09)
Lead Process Engineer for the development ofSimulation model based on Qatar Marine Crude.
7/21/2019 Rfinery PMC.pdf
http://slidepdf.com/reader/full/rfinery-pmcpdf 36/51
GLOBAL PMC (PRIVATE)LIMITED
PERSONAL PROFILE
Name: Umair Baig Employee No: 0006
Designation: Process Consultant
Page 2 of 2
40,000 BPBS CDU RevampProject(ENAR Petrotech Service Pvt. Ltd).
Bosicor PakistanLimited
(Apr. 08 – Jun. 08)
Lead Process Engineer for the development of processsimulation from test run data to final EDS packages.
Mild Vacuum & Visbreaker Unit(ENAR Petrotech Service Pvt. Ltd)
ENAR PetroleumRefining Facility(Sep. 07 – Apr. 08)
Lead Process Engineer for the development of Vacuumunit to recover middle distillate from atmospheric bottomand visbreaker to reduce the pour point of the vacuumbottoms.
Enar Petroleum Refining Facility(EPRFIII) Project(ENAR Petrotech Service Pvt. Ltd).
Enar PetroleumRefining Facility (Jan. 07 – Sep. 07)
Lead Process Engineer for the development ofsimulation for the relocation and enhancing theprocessing capacity from 15000 BPDS of Libon & ShaleOil to 23000 BPDS of local condensate and light crude oil.
Visbreaker pilot scale study EnarR&D Project(ENAR Petrotech Service Pvt. Ltd).
Enar PetroleumRefining Facility (Jan. 07 – Jun. 07)
Lead Process Engineer for carrying out several test runson an in-house designed pilot scale visbreaker.
Enar Petroleum Refining Facility(EPRFII) Project(ENAR Petrotech Service Pvt. Ltd).
Enar PetroleumRefining Facility (Oct. 06 – Jan. 07
Lead Process Engineer for conceptual, simulation,preheat train, equipment sizing, line hydraulics, controlscheme, PFD’s, P&ID’s, flare system, offsit and utilities.
Simulation of Hydrotreater
(ENAR Petrotech Service Pvt. Ltd).
Pak Arab Refinery
(Jan. 06 – Oct. 06
Lead Process Engineer for the simulation of middle
distillate Hydrotreater and gas concentration units.
30,000 BPSD CDU revampProject(ENAR Petrotech Service Pvt. Ltd).
Bosicor PakistanLimited(Sep. 05 - to Jan. 06)
Lead Process Engineer for the simulation modelcovering preheat train modifications, addition of newpreflash column and fired heater, modification in existingatmospheric column, naptha splitting and LPG recoveryUnit.
FEED for TAY and SINJHOROdevelopment Project(ENAR Petrotech Service Pvt. Ltd).
Oil & GasDevelopmentCorporation Limited(Jun. 05 to Sep. 06)
Lead Process Engineer for the a complex surface facilityand its integration with the existing BOBI LPG Plant ofOGDCL. It includes process selection stydy, processsimulation, development of PFD’s & P&ID’s
HAZOP study of Bhit plant(ENAR Petrotech Service Pvt. Ltd).
ENI (LASMO)May 2005
Participated in the complete HAZOP study of the Bhitplant.
Enar Petroleum Refining Facility
(EPRFI) Project(ENAR Petrotech Service Pvt. Ltd).
Enar Petroleum
Refining Facility(Jun. 03 to Jan. 05)
Technical Services Engineer responsible for the testruns to identification of bottlenecks, process simulation of
plants, development of HMB across the columns, heatexchangers and furnaces. Carried out preflash overheadcorrosion control study and successfully implemented.
COMPUTER SKILLS
Hysis Aspen plus, Aspen B-JAC, Aspen HX-net Winsim Design II Pipesys, Pipesim Fisher First Vue HTFS+ Flarenet Korf HTRI Hands on DCS (DELTA V)
AFFILIATIONS
AMIChemE (working towards chartered Status)
PERSONAL
Date of Birth : 27th June 1982
Nationality : PakistaniReligion : IslamMarital Status : MarriedLanguages : English and Urdu
7/21/2019 Rfinery PMC.pdf
http://slidepdf.com/reader/full/rfinery-pmcpdf 37/51
GLOBAL PMC (PRIVATE)LIMITED
PERSONAL PROFILE
Name: M. Aquil ur Rahman Employee No: 0007
Designation: Senior Engineer (Civil)
Page 1 of 3
EDUCATION
Bachelor of Civil Engineering 1990NED University of Engineering & Technology, Karachi, Pakistan
TRAINING / COURSES
ROADCAL 2003 STAAD PRO 2007
EMPLOYMENT HISTORY
Present
Principal Engineer (Civil) July 2010 to-dateGlobal PMC (Private) Limited, Karachi, Pakistan
Previous
Cad Engineer (Self Employed) May 2005 to June 2010 Able Engineering & Construction Services, New Jersey, USA.
Site Engineer Mar. 2004 to Apr. 2005Tariq & Associates, Karachi, Pakistan
Cad Engineer (Self Employed) May 2000 to Feb. 2004 Able Engineering & Construction Services, New Jersey, USA.
Highway Design Engineer May 1996 to Apr. 2000Zafar & Associates, Karachi, Pakistan
Highway Design Engineer Oct. 1994 to Apr. 1996
Self Employed Oct. 1990 to Sep. 1994
EXPERIENCE PROFILE
Present
As Principal Engineer (Civil) in Global PMC (Private) Limited, leading a team of Engineers &
Draftspersons for providing services to oil & gas, petroleum refining, chemicals, petrochemicals,storage terminals, pipeline, power plant, textile industries and other related projects.
Previous
Have more than twenty years experience in the field of Civil Engineering and CAD drafting works,which includes Designing of buildings, roads, highways, flyovers etc.
7/21/2019 Rfinery PMC.pdf
http://slidepdf.com/reader/full/rfinery-pmcpdf 38/51
GLOBAL PMC (PRIVATE)LIMITED
PERSONAL PROFILE
Name: M. Aquil ur Rahman Employee No: 0007
Designation: Senior Engineer (Civil)
Page 2 of 3
The work details in projects are as follows:
Project Description Client Responsibility
Enhancing of PMGDecanting & LoadingCapacity at PSOShikarpur Terminal(Global PMC Pvt. Ltd)
Pakistan State OilSr. Civil Design Engineer for the enhancement pf PMChandling capacity at PSO Shikarpur project
Enhancing of PMGLoading Points at PSOMachike Terminal(Global PMC Pvt. Ltd)
Pakistan State OilSr. Civil Design Engineer for the enhancement pf PMChandling capacity at PSO Machike project
Enhancing of PMG
Loading Points at PSOChakpirana Depot(Global PMC Pvt. Ltd)
Pakistan State OilSr. Civil Design Engineer for the enhancement pf PMChandling capacity at PSO Chakpirana project
Development ofFabrication Drawings formulti-storied complexsteel structure(Global PMC Pvt. Ltd.)
FutehallyChemicals(Uniliver)
Sr. Civil Design Engineer for the Development ofFabrication Drawings for multi-storied complex steelstructure and detailed BOQ
Relocation of 300tons/day edible oilrefinery(Global PMC Pvt. Ltd.)
Dlada FoodsSr. Civil Design Engineer for the relocationengineering of 300 tons/day edible oil refinery
Design & Cad drafting
services.(Self Employed)
Able Engineering& Construction
ServicesNew Jersey, USA. (May 05 to Jun.10)
Cad Engineer for the services of design engineering &
drafting services to Able engineering for their high risebuildings, store sheds and other civil structures.
Construction of Govt.Degree College(Tariq & Associates)
SIndhGovernment
(Mar. 04 to Apr. 05)
Site Engineer for the supervision of the constructionactivities of the Degree collage.
Design & Cad draftingservices.(Self Employed)
Able Engineering& Construction
ServicesNew Jersey, USA. (May 00 to Feb. 04)
Cad Engineer for the services of design engineering &drafting services to Able engineering for their high risebuildings, store sheds and other civil structures.
Various Highway DesignProjects(Zafar & Associates)
Federal &Provincial
Government s (May 96 to Apr. 00)
Highway Design Engineer for various highway design
projects, flyover and buildings projects in Pakistan
Various Highway DesignProjects(Umar Munshi & Associates)
Federal &Provincial
Government s
(Oct 94 to Apr. 96)
Highway Design Engineer for various highway designprojects, flyover and buildings projects in Pakistan
Supply of constructionChemicals(Self Employed)
Various Clients (Oct. 90 – Sep. 94)
Had been engaged in promoting and supply ofconstruction chemicals to different industries andcontractors.
7/21/2019 Rfinery PMC.pdf
http://slidepdf.com/reader/full/rfinery-pmcpdf 39/51
GLOBAL PMC (PRIVATE)LIMITED
PERSONAL PROFILE
Name: M. Aquil ur Rahman Employee No: 0007
Designation: Senior Engineer (Civil)
Page 3 of 3
COMPUTER SKILLS
ROADCALC 13.1 L-AETABS 9.5.0SAFE 12.1.1STAAD PRO 2006
AUTO CADMS OFFICE
AFFILIATIONS
Life Member – PEC (Pakistan Engineering Council)
PERSONAL
Date of Birth : 26th November, 1961
Nationality : PakistaniReligion : IslamMarital Status : MarriedLanguages : English and Urdu
7/21/2019 Rfinery PMC.pdf
http://slidepdf.com/reader/full/rfinery-pmcpdf 40/51
GLOBAL PMC (PRIVATE)LIMITED
PERSONAL PROFILE
Name: Faraz Kazmi Employee No: 0008
Designation: Sr. Engineer (Electrical)
Page 1 of2
EDUCATION
• MBA (Industrial Management) from CBM (In Progress)Passed 1st semester 3.4 GPA
• Bachelor of Electrical Engineering 2005NED University of Engineering & Technology,Karachi, Pakistan
TRAINING / COURSES
Matrix (ERP Management) 2008
AEI software 2010
EMPLOYMENT HISTORY
Present
Sr. Engineer (Electrical) Jul 2010 to-dateGlobal PMC (Private) LimitedKarachi, PakistanPrevious
In Charge E&P / Electrical South Region July 2008 to Jul 2010ETIMAAD Engineering (Private) Ltd Karachi, Pakistan
Electrical Engineer Mar 2005 - Jul 2008ENAR Petrotech Services Private LimitedKarachi, Pakistan
EXPERIENCE PROFILE
Present
As Principal Engineer (Electrical) in Global PMC (Private) Limited, leading a team of Engineers &Draftspersons for providing services to oil & gas, petroleum refining, chemicals, petrochemicals,storage terminals, pipeline, power plant, textile industries and other related projects.
Previous
Have more than Six years experience in the field of Design, Project, Engineering Management,plant operation & maintenance which includes Project Estimates, Detailed Engineering,Site/Construction Supervision, Regulatory compliance & safety Audits, Design vetting and PlantOperation & Maintenance of Oil & gas, Power & Petrochemical Plants ensuring timely project
completion according to governing codes, standards using latest computer technology.Carried out number of activities like development of Engineering Calculations, specifications forgenerators, motors, cables, UPS, motor control center, transformers, development of powergeneration and distribution philosophy, load calculations, equipment and cable sizing,development of single line, wiring connection schematics, area classification and layout drawings,typical installation details, detailed BOQ, Technical bid evaluation for the project, Cost Estimationfor overall / parts of projects, Review / approval of equipment specification and data sheets, Pre-qualification of equipment suppliers / contractors, Technical and commercial evaluation work,Preparation of technical reports as part of feasibility studies, procurement activities,Supervision/Planning for Site activities etc. Have knowledge of engineering design codes such asNFPA, API, IEC.The work details in projects are as follows:
7/21/2019 Rfinery PMC.pdf
http://slidepdf.com/reader/full/rfinery-pmcpdf 41/51
GLOBAL PMC (PRIVATE)LIMITED
PERSONAL PROFILE
Name: Faraz Kazmi Employee No: 0008
Designation: Sr. Engineer (Electrical)
Page 2 of2
Project Description Client Responsibility
P&G DRY LAUNDRY PLANT(ETIMAAD Engineering PrivateLimited)
Proctor & Gamble(Jul 08 to Jul 10)
In Charge Electrical and Instruments at P&Gdry Laundry project Karachi, responsible for theoverall E&I construction and design review
BAHU DEVELOPMENT PROJECT(ENAR Petrotech Service Pvt. Ltd).
Oil & GasDevelopmentCompany L td
2007
Electrical Engineer for the development offeed document of Bahu well head facility
QADIRPUR 600MMSCFDPROJECT(ENAR Petrotech Service Pvt. Ltd)
Oil & GasDevelopmentCompany L td
2007-08
Electrical Engineer for the Detail engineeringdesign and construction supervision of theproject
INSPECTION OF LPG PRODUCTION& BOTTLING PLANTS(ENAR Petrotech Service Pvt. Ltd).
Oil & GasRegulatory
Aut hori ty (OGRA)
(Sep.05 – May 08)
Lead E&I Engineer for the inspections of differentplants. This Project involves collection of data /documentation, visual inspection of plant andfacilities, assessment of plants for compliance ofCodes/ standards & compilation of inspection report.
DAKHNI EXPANSION PROJECT(ENAR Petrotech Service Pvt. Ltd)
OGDCL2005
Electrical Engineer for the Detail engineeringdesign
Chanda Gas Field DevelopmentProject(ENAR Petrotech Service Pvt. Ltd)
Oil & GasDevelopmentCompany L td
2005-06
Electrical Engineer for the Detail engineeringdesign and construction supervision of theproject
NRL VALUATION OF ASSETS –TECHNICAL ASSESSMENT(ENAR Petrotech Service Pvt. Ltd)
Pak Hy Oils L td.2006
Electrical Engineer for the collection andcompilation of technical data / documentation,assessment of present condition of plant,estimation of probable remaining operating lifeof plant.
BOSICOR VALUATION OF
ASSETS – TECHNICAL ASSESSMENT(ENAR Petrotech Service Pvt. Ltd)
Bosicor Pakistan
Ltd.2006
Electrical Engineer for the collection andcompilation of technical data / documentation,assessment of present condition of plant,estimation of probable remaining operating lifeof plant.
ENAR PETROLEUM
REFINING FACILITY
ENAR Petrotech Services (Pvt.) Ltd.
ENAR PetrotechService Pvt. Ltd
2005-2008
In charge Electrical for the Operation &maintenance of the refinery
COMPUTER SKILLS
MS OfficeOther related engineering software’s
AFFILIATIONS
Life Member – PEC (Pakistan Engineering Council)
PERSONAL
Date of Birth : 14th May 1982
Nationality : PakistaniReligion : IslamMarital Status : MarriedLanguages : English and Urdu
7/21/2019 Rfinery PMC.pdf
http://slidepdf.com/reader/full/rfinery-pmcpdf 42/51
GLOBAL PMC (PRIVATE)LIMITED
PERSONAL PROFILE
Name: Rizwana Fatima Employee No: 0010
Designation: Principle Engineer Civil / Structural
Page 1 of 4
EDUCATION
B.E Civil Engineering 1989
NED University of Engineering & Technology Karachi, Pakistan
EMPLOYMENT HISTORY
Present
Principle Engineer Civil / Structural March 2011 to dateGlobal PMC (Private) L imited Karachi, Pakistan
Previous
Sr. Civil / Structural Engineer Jan 2009 to July 2011
M/S Petrochem Engineering Services (Pvt.) LimitedKarachi, Pakistan
Senior Structural Engineer 2008 to Jan 2009M/s Engineers Consortium Private LimitedKarachi, Pakistan
Senior Structural Engineer Jan 2008 to Jan 2009M/s Engineering Consultants International (Pvt.) Ltd. Karachi, Pakistan
Assistant Engineer May 1992 to Sep 1996M/s Engineering Consultants International (Pvt.) Ltd. Karachi, Pakistan
Senior Structural Engineer March 2005 to-Dec 2006
M/S Akbar and Associates (Pvt.) LimitedKarachi, Pakistan
Senior Structural Engineer Nov 2003 to Sept 2004M/S Qamar and Associates (Pvt.) LimitedKarachi, Pakistan
Team Leader Jan 2001 to Oct 2003M/S A.A. (Abdul Aleem) AssociatesKarachi, Pakistan
Assistant Engineer Apri l 1990 - to -May 1992 M/S Samiur Rahman Associates
Karachi, Pakistan
EXPERIENCE PROFILE
Present
As Senior Civi l /Structural Engineer Global PMC (Private) Limited, Supervi sing a team of Design Engineers &Draftspersons for providing services to petrochemicals, storage terminals, textile industries & Oil refinery
PreviousHave 21 years of experience in the field of Civil Engineering, which includes Design ing, Detailing, Bill ofQuantities of steel structures and RCC structures for Oil refinery, Petrochemical facilities, Storage facilities,
7/21/2019 Rfinery PMC.pdf
http://slidepdf.com/reader/full/rfinery-pmcpdf 43/51
GLOBAL PMC (PRIVATE)LIMITED
PERSONAL PROFILE
Name: Rizwana Fatima Employee No: 0010
Designation: Principle Engineer Civil / Structural
Page 2 of 4
Structural Designing and detailing of Multistory Buildings, Textile Industries, Hospital Buildings andEducational Institutes, Vetting of Buildings.
Major responsibilities included the detailed Structural Designing and Detailing of Drawings. Coordination for evaluatingand monitoring of Design projects along with uniformity, Consistency under approved Standards and Codes. AchieveTARGETS. Design and Detailing of Steel Structures, Pipe supports and equipment foundations. Dyke walls, Retainingwalls, Tanks foundations. Preparation of Bill of Quantities.
Project Description Client Responsibility
Relocation of 300 tons/dayedible oil refinery(Global PMC Pvt. Ltd.)
Dalda FoodsSr.Civil/Str. Engr. for Design & detailing of 300 tons/day edible oilrefinery
Oil Storage andInstallations at Machike(Petrochem EngineeringServices Pvt. Ltd.)
Hascol Pvt .LTD
Sr.Civil/Str. Engr for Designing, detailing and BOQ's facilities for Admin Block, Gate office, Workers/ retiring room, Watch Tower,septic tank , soak pit, Under ground tank , Over Head Tank, MainGate, Boundary wall, Mosque, Nala Crossing Structure, Generatorroom, Electrical Sub station room, Canteen, Workshop, CarParking, Foundation of Oil storage Tanks and Fire Water Tanks,Dyke walls, Retaining Walls, Pump House Meter Rooms/AdditiveInjection Skid, Foam Skid, Plate forms, Pipe supports, Gantry area& Equipment Foundations.
Oil storage and Installationsat Faisalabad.(Petrochem EngineeringServices Pvt. Ltd.)
Pakistan StateOil
Sr.Civil/Str. Engr for Designing, detailing and BOQ's for facilitiesof Admin Block, Gate office, Workers/ retiring room, Watch Tower,septic tank, soak pit, Under ground tank , Over Head Tank, MainGate, Boundary wall, Mosque, Generator room, LT Panel room,Canteen, Workshop, Car Parking, Gantry area, Foundation of Oilstorage Tanks and Fire Water Tanks, Dyke walls, Retaining Walls,Pump House Meter Rooms/Additive Injection Skid, Foam Skid,
Plate forms, Pipe supports and Equipment Foundations.Oil storage and Installationsat Machike and Rawalpindi.(Petrochem EngineeringServices Pvt. Ltd.)
APL
Sr.Civil/Str. Engr for Designing, detailing and BOQ's of Foundationof Oil storage Tanks and Fire Water Tanks, Dyke walls, RetainingWalls.
Oil storage and Installationsat Kemari.(Petrochem EngineeringServices Pvt. Ltd.)
Shell PakistanSr.Civil/Str. Engr Designing, detailing and BOQ's of Foundationof Oil storage Tanks and Dyke walls, Retaining Walls. Sheds,water reservoir, Pump House, pump foundations.
Oil & Storage Installation
( Petrochem Engineering
Services Pvt. Ltd.) Shell Hongkong
Sr. Civil/ Str. Engr for Designing detailing and BOQ's of PipeSupports and platforms.
Oil & Storage Installation
( Petrochem Engineering
Services Pvt. Ltd.).
Shell Dubai Sr. Civil/ Str. Engr for Designing detailing and BOQ's of Pipe
Supports, Steel structures & platforms
West Valve station
( Petrochem Engineering
Services Pvt. Ltd.).
ENI Sr. Civil/ Str. Engr for Designing detailing and BOQ's of PipeSupports, Steel structures & platforms
Chemical Sheds
( Petrochem Engineering
Services Pvt. Ltd.)
EngroChemicals
Sr. Civil/ Str. Engr for Design of sheds
Richmond San RafealBridge
( A.A.Associates)
Cultrans.California Team Leader for Detailing of steel structure.
.
7/21/2019 Rfinery PMC.pdf
http://slidepdf.com/reader/full/rfinery-pmcpdf 44/51
GLOBAL PMC (PRIVATE)LIMITED
PERSONAL PROFILE
Name: Rizwana Fatima Employee No: 0010
Designation: Principle Engineer Civil / Structural
Page 3 of 4
101. Bay shore BoulevardBridge over river crossingMR-144 city of SanFrancisco (A.A.Associates)
CultransCalifornia Team Leader for Detailing of steel structure.
Steam Power Plant at s iteMadinatul Yanbu Ltd). (A.A.Associates)
ArabianInternationalCompany
Team Leader for Detailing of steel structure
King Fisher Project
(A.A.Associates)
ArabianInternationalCompany
Team Leader for Detailing of steel structure
Oman India Fertili zer Co.(A.A.Associates)
ArabianInternationalCompany
Team Leader for Detailing of steel structure
Cherat Cement Factory
(A.A.Associates)
Cherat CementFactory
Team Leader Detailing of steel structure By using
software X-steel.
Dubai Police Band
Rehearsal Building. ARENCO
Project Coordinator/Sr.Str. Engineer responsibilities includes
coordination with Architect and Client, Lead the Team for design,detailing and Vetting of Design and Detailing Buildings.
Dubai Police FootballStadium.
ARENCOProject Coordinator/Sr.Str. Engineer responsibilities includescoordination with Architect and Client, Lead the Team for design,detailing and Vetting of Design and Detailing Buildings.
Rabia Enclave Gr + 17 Multistorey Building.
ShekhaniBuilders
Project Coordinator/Sr.Str. Engineer responsibilities includescoordination with Architect and Client, Lead the Team for design,detailing and Vetting of Design and Detailing Buildings.
16 Storied Building on plotNo. SB-21, Scheme 33,Gulshan-e-Iqbal, Karachi
ShekhaniBuilders
Project Coordinator/Sr.Str. Engineer responsibilities includescoordination with Architect and Client, Lead the Team for design,detailing and Vetting of Design and Detailing Buildings.
16 Storied Building on plotNo. 18, Firdous CooperativeHousing Society, Karachi.
(Engineers Consor.Pvt. Ltd)
ShekhaniBuilders
Project Coordinator/Sr.Str. Engineer responsibilities includescoordination with Architect and Client, Lead the Team for design,
detailing and Vetting of Design and Detailing Buildings.Federal Urdu Universit yKarachi Administ rationBlock. (ECIL)
Federal UrduUniversityKarachi
Sr. Structure Engineer, responsibilities includes coordination with Architect and Client, Lead the Team for design and detailing ofBuilding.
Federal Urdu Universit yKarachi Academic Block.(ECIL)
Federal UrduUniversityKarachi.
Sr. Structure Engineer, responsibilities includes coordination with Architect and Client, Lead the Team for design and detailing ofBuilding.
Dean Office Building ofKarachi University.(ECIL)
KarachiUniversity.
Sr. Structure Engineer, responsibilities includes coordination with Architect and Client, Lead the Team for design and detailing ofBuilding.
Camp Office Building ofMalir Development Authority. (ECIL)
MalirDevelopment Author ity.
Sr. Structure Engineer, responsibilities includes coordination with Architect and Client, Lead the Team for design and detailing ofBuilding.
Main Gate of Malir
Development Authority(ECIL)
Malir
Development Author ity.
Sr. Structure Engineer, responsibilities includes coordination with
Architect and Client, Lead the Team for design and detailing ofBuilding.
Islamabad to PeshawerMotorway.(ECIL)
NationalHighway Author ity
Assistant Structure Engineer , responsibilities includesPreparation of Bill of Quantities of all types of Highway structureslike Bridges, culverts, restaurants, check posts. Under passes.Site Progress reports, Planning of Construction schedules ofroads.
Farm to Market Roads.(ECIL)
NationalHighway Author ity.
Assistant Structure Engineer , responsibilities includesPreparation of Bill of Quantities of all types of Highway structureslike Bridges, culverts, restaurants, check posts. Under passes.Site Progress reports, Planning of Construction schedules ofroads.
7/21/2019 Rfinery PMC.pdf
http://slidepdf.com/reader/full/rfinery-pmcpdf 45/51
GLOBAL PMC (PRIVATE)LIMITED
PERSONAL PROFILE
Name: Rizwana Fatima Employee No: 0010
Designation: Principle Engineer Civil / Structural
Page 4 of 4
Gawader Ratto Dero Road.(Engineering Consultants
International Pvt Limited)
NationalHighway Author ity.
Assistant Structure Engineer, responsibilities includesPreparation of Bill of Quantities of Highway structures like Bridges,culverts, restaurants, check posts. Under passes. Site Progressreports, Planning of Construction schedules of roads.
Hashim Eye Hospital ofJinnah Post GraduateMedical Centre.
Jinnah MedicalCentre.
Design Engineer, responsibilities includes Designing anddetailing of all Buildings.
Samrina Tower Gr+8 Multi
storey Building.
LakhaniBuilders.
Design Engineer, responsibilities includes Designing anddetailing of all Buildings.
Hut of KPT Engineering. Karachi Port Design Engineer, responsibilities includes Designing anddetailing of all Buildings.
Build ing on p lot No. C-60,
Defence Housing Authority,
Karachi.
(Qamar and Associates)
Umair AssociatesBuilders &
developers.
Design Engineer, responsibilities includes Designing anddetailing of all Buildings.
Khadija oil Refinery FillingStation(Akbar and Associates)
Design Engineer, responsibilities includes Designing anddetailing of all types of civil facilities / services, like Admin Blocks,Labour Accommodations, toilet blocks, Parking sheds, Canteen,Mosque etc.
CODES UTILIZED
Uniform Building code ACI code API AISC/LRFD AASHTOWEST PAKISTAN HIGHWAY CODE
BS CODE
COMPUTER SKILLS
ETABS 9.5SAFE 9.1.1
SAP 14STAAD PRO 2007
X-STEEL (detailing of steel structure)
PCACOLMICROFEAP
RCC DESIGN SOFTWARES (LOCALLY MADE)
AUTOCAD 2010
MS-OFFICE
AFFILIATIONS
Life Member – PEC (Pakistan Engineering Council)
PERSONAL
Date of Birth : 26th March 1965
Nationality : PakistaniReligion : IslamMarital Status : MarriedLanguages : English and Urdu
7/21/2019 Rfinery PMC.pdf
http://slidepdf.com/reader/full/rfinery-pmcpdf 46/51
GLOBAL PMC (PRIVATE)LIMITED
PERSONAL PROFILE
Name: Tafseer Uddin Ahmed Employee No: 019
Designation: Sr. Civil & Structure Engineer
Page 1 of 3
EDUCATION
Masters of Structural Engineering 2011NED University of Engineering & Technology Karachi, Pakistan
B.E Civil Engineering 2006NED University of Engineering & Technology Karachi, Pakistan
TRAINING / COURSES
Training on EAGLE POINT(ROAD CALC.)
Training on AUTOCAD
EMPLOYMENT HISTORY
Present
Sr. Civil & Structure Engineer
Global PMC (Pvt.) Ltd. April 2011 to-date
Karachi, Pakistan
Previous
Civil & Structure Engineer
AL-MUHANDIS July 2010 to Apri l 2011
ENGINEERS CONSORTIUM July 2009 to June 2010
ARIF & ASSOCIATES February 2007 to July 2009
Present
I am working with M/s Global PMC (Pvt.) Ltd. under the designation of Sr. Civil & StructureEngineer and leading a team of site engineers and draftsman for Civil Structure, Foundationsand other complex works.
Previous
Have more than 6 years of experience in the field of Civil Engineering, which includesDesigning, Detailing, model of structure, Bill of Quantities of steel structures and RCCstructures for Oil refinery, Petrochemical facilities, Storage facilities, Structural Designingand detailing of Multistor y Buildi ngs, Textile Industries, Hospital Buildings and EducationalInstitutes, Vetting of Building s.
Major responsibilities included the detailed Structural Designing and Detailing of Drawings.Coordination for evaluating and monitoring of Design projects along with uniformity, Consistencyunder approved Standards and Codes.
7/21/2019 Rfinery PMC.pdf
http://slidepdf.com/reader/full/rfinery-pmcpdf 47/51
GLOBAL PMC (PRIVATE)LIMITED
PERSONAL PROFILE
Name: Tafseer Uddin Ahmed Employee No: 019
Designation: Sr. Civil & Structure Engineer
Page 2 of 3
The work details in projects are as follows:Project Description Client Responsibility
Enhancing o f PMGDecanting & LoadingCapacity at PSO ShikarpurTerminal(Global PMC Pvt. Ltd)
Pakistan StateOil
Lead Civil & Structure Engineer for theenhancement of PMG handling capacity at PSOShikarpur project
Enhancing of PMG LoadingPoints at PSO MachikeTerminal(Global PMC Pvt. Ltd)
Pakistan StateOil
Lead Civil & Structure Engineer for theenhancement of PMG handling capacity at PSOMachike project
Enhancing of PMG LoadingPoints at PSO Chakpirana
Depot(Global PMC Pvt. Ltd)
Pakistan State
Oil
Lead Civil & Structure Engineer for theenhancement of PMG handling capacity at PSO
Chakpirana project
Development of detailedfeasibility study of smallcrude oil topping unit(Global PMC Pvt. Ltd.)
ManshanatBrothers
Lead Civil & Structure Engineer forDevelopment of detailed feasibility study onsmall crude oil topping unit
Developed ProcessSimulation Model of GasDehydration Unit(Global PMC Pvt. Ltd.)
Peoples SteelMills Pakistan
Lead Civil & Structure Engineer for DevelopedProcess Simulation Model & detailed costestimate of Gas Dehydration Unit (for EPC Bid)
Developed ProcessSimulation Model GasSweetening Unit(Global PMC Pvt. Ltd.)
Peoples SteelMills Pakistan
Lead Civil & Structure Engineer for DevelopedProcess Simulation Model & detailed costestimate of Gas Sweetening Unit (for EPC Bid).
Development of FabricationDrawings for multi-storiedcomplex steel structure(Global PMC Pvt. Ltd.)
FutehallyChemicals(Uniliver)
Lead Civil & Structure Engineer for theDevelopment of Fabrication Drawings for multi-storied complex steel structure and detailedBOQ
Development of HysisSimulation Model & Costestimate(Global PMC Pvt. Ltd.)
HeavyMechanical
Complex
Lead Civil & Structure Engineer for theDevelopment of Process Simulation model &Cost Estimate for the Sinjhoro Field of OGDCL.
Relocation of 300 tons/dayedible oil refinery(Global PMC Pvt. Ltd.)
Dlada Foods Lead Civil & Structure Engineer for therelocation engineering of 300 tons/day edible oil
refinery.
SQUARE ONE MALL
(AL-MUHANDIS) Plot # 118 Dis.East Karachi
Civil & Structure Engineer for 7 storiedbuilding
ALPHA PRIME
(AL-MUHANDIS)
VIEW plot #43 sector 51-A
scheme 33
Civil & Structure Engineer for 12 storiedbuilding.
KASB BANK COMMERCIAL
(AL-MUHANDIS)
2/4 block # 1KDA scheme 5
Clifton
Civil & Structure Engineer for 32 storiedbuilding.
JS TOWER
(ENGINEERSCONSORTIUM)
Plot # 28 SB-5Sadar Bazar
Civil & Structure Engineer for 20 storiedbuilding.
AL AMIN TOWER
(ENGINEERSCONSORTIUM)
Plot # A-909sec. 11-B North
Karachi
Lead Civil & Structure Engineer for 5 storiedbuilding.
7/21/2019 Rfinery PMC.pdf
http://slidepdf.com/reader/full/rfinery-pmcpdf 48/51
GLOBAL PMC (PRIVATE)LIMITED
PERSONAL PROFILE
Name: Tafseer Uddin Ahmed Employee No: 019
Designation: Sr. Civil & Structure Engineer
Page 3 of 3
MASJID ALLAHABAD
(ENGINEERSCONSORTIUM)
KandyaroSINDH
Civil & Structure Engineer for 100 dome andother structures
HASNI TOWER
(ARIF & ASSOCIATES)
SB-1 sec. 1Surjani Town
Karachi
Civil & Structure Engineer for 5 storiedbuilding.
SUM SUM TOWER
(ARIF & ASSOCIATES)
Plot # 1/Ascheme 33
Karachi
Civil & Structure Engineer for 14 storiedbuilding.
AQILA ARCADE
(ARIF & ASSOCIATES)
Plot # 3 block3 KMCHS
Karachi
Civil & Structure Engineer for 11 storiedbuilding.
INDUSTRIAL SHED
(ARIF & ASSOCIATES) METTATEX(PVT) LTD
Civil & Structure Engineer for complete designof large Industrial shed and allied facilities
PORT QASIM
(ARIF & ASSOCIATES) Plot # 22,23 &
24
Civil & Structure Engineer for complete designof large Industrial shed and allied facilities
GUARDS SHOPPING MALL
(ARIF & ASSOCIATES)
BAB-E-BALOCHISTAN
HUB
Civil & Structure Engineer for 4 storiedbuilding.
SUPER COMPOUND (PVT)
LTD (ARIF & ASSOCIATES)
LX3/1 LANDHIINDUSTRIAL
AREA
Civil & Structure Engineer for complete designof large Industrial shed and allied facilities
COMPUTER SKILLS
MS Office AUTOCAD
ETABS
SAFE
SAP
STAAD
AFFILIATIONS
Member – PEC (Pakistan Engineering Council)
PERSONAL
Date of Birth : 05th May 1982Nationality : PakistaniReligion : IslamMarital Status : SingleLanguages : English and Urdu
7/21/2019 Rfinery PMC.pdf
http://slidepdf.com/reader/full/rfinery-pmcpdf 49/51
GLOBAL PMC (PRIVATE)LIMITED
PERSONAL PROFILE
Name: Ahsan Abdul Ghani Employee No: 0023
Designation: Process Engineer
EDUCATION M.E Chemical Engineering (In Progress) 2013
NED University of Engr. & Tech.Karachi, PakistanB.E Chemical Engineering 2010University of KarachiKarachi, Pakistan
SKILLS PROFILE ASPEN HYSYS (7.3)HTRI (Exchanger Suit 6.0)KORF (3.0)
EMPLOYMENT HISTORY
Present
Process Engineer December. 2010to-dateGlobal PMC (Private) LimitedKarachi, Pakistan
Visiting Faculty Jan. 2011 to-dateDept. of Chemical EngineeringUniversity of KarachiKarachi, Pakistan
EXPERIENCE PROFILE
Present
In Process Engineering Division Global PMC (Private) Limited, work with a team of Junior Process Engineers &Draftspersons for providing services to oil & gas, petroleum refining, chemicals, petrochemicals, storageterminals, pipeline, power plant, textile industries, operation & maintenance services and other related projects.
As Visiting Faculty Member University of Karachi, teach students, the following subjects:
Chemical Process Design & Simulation (Aspen Hysys, Korf, HTRI)Instrumentation and Process ControlGas EngineeringPetroleum Refinery EngineeringFluid MechanicsHeat TransferChemical Process Principles (Energy And Material Balance Calculations)
Page 1 of 3
7/21/2019 Rfinery PMC.pdf
http://slidepdf.com/reader/full/rfinery-pmcpdf 50/51
GLOBAL PMC (PRIVATE)LIMITED
PERSONAL PROFILE
Name: Ahsan Abdul Ghani Employee No: 0023
Designation: Process Engineer
The work details in ro ects are as follows:
Project Descript ion
Client
Responsibility LPG-Air Mix Plant Beltexco
Limited Consultancy services for the designing, construction
supervision & commissioning
Study for the removal of
moisture contents from
transformer oil
Oil Industries
Pakistan
Re-engineering of transformer oil process in order to eliminate
operational and process errors for achieving the required
specifications
Detailed feasibility study of
polymer pipe manufacturing
plant
TCIL
Complete feasibility study and process specifications
Improvement in
Unloading/Decanting Facilities
at existing HSD gantry
KTC (PSO) All process engineering activities
Design for Skid Mounted
Three Phase Oil & Gas Test
Separator Operated at OGDCL
Field
ATG Hamriya Designing, P&ID development and documentation, preparation of
data sheets for separator vessel (Class 600), filters, instruments etc.
Employ as a mobile test separator at Maru Reti gas field operated by OGDCL to handle condensate, gas and water.
Enhancing of PMG Decanting
& Loading Capacity PSO
Shikarpur Terminal
Pakistan State OilRating & Sizing of Liquid Line hydraulics, Pump calculations,Thermal relief valve, pressure control valve control scheme, PFD’s,
P&ID’s and Equipment data sheets.
Enhancing of PMG Loading
Points PSO Machike Terminal Pakistan State OilRating & Sizing of Liquid Line hydraulics, Pump calculations,
Thermal relief valve, pressure control valve control scheme, PFD’s,P&ID’s and Equipment data sheets.
Enhancing of PMG Loading
Points PSO Chakpirana Depot
Pakistan State OilRating & Sizing of Liquid Line hydraulics, Pump calculations,Thermal relief valve, pressure control valve control scheme, PFD’s,
P&ID’s and Equipment data sheets.
Detail Feasibility Study of
Small Crude Oil Topping Unit.Manshanat
Brothers
Process Engineering for the development of Simulation model (on
Aspen Hysys), Market Analysis, Crude Oil Selection, Datasheetcompletion
Developed Process Simulation
Model & detailed cost estimate
Gas Sweetening Unit Project
Peoples Steel
Mills Pakistan
All process engineering activities
Developed Process Simulation
Model & detailed cost estimate
of Gas Dehydration Unit (for
EPC bid)
Peoples Steel
Mills Pakistan
All process engineering activities
Page 2 of 3
7/21/2019 Rfinery PMC.pdf
http://slidepdf.com/reader/full/rfinery-pmcpdf 51/51
GLOBAL PMC (PRIVATE)LIMITED
PERSONAL PROFILE
Name: Ahsan Abdul Ghani Employee No: 0023
Designation: Process Engineer
Developed Process Simulation
Model & detailed cost estimate
of Gas Sweetening unit (forEPC Bid)
Peoples Steel
Mills Pakistan
All process engineering activities
COMPUTER SKILLS
MS Office, Autocad & Other related engineering software’s AFFILIATIONS
Life Member – PEC (Pakistan Engineering Council)
PERSONAL
Date of Birth : 1988Nationality : Pakistani
Religion : IslamStatus : SingleLanguages : English and Urdu
Page 3 of 3