RFB 6000000550 MANDATORY PRE-BID CONFERENCE * The material contained herein is for informational...

22
RFB 6000000550 RFB 6000000550 MANDATORY PRE-BID CONFERENCE MANDATORY PRE-BID CONFERENCE * The material contained herein is for informational purposes only 1

Transcript of RFB 6000000550 MANDATORY PRE-BID CONFERENCE * The material contained herein is for informational...

Page 1: RFB 6000000550 MANDATORY PRE-BID CONFERENCE * The material contained herein is for informational purposes only 1.

RFB 6000000550RFB 6000000550

MANDATORY PRE-BID CONFERENCEMANDATORY PRE-BID CONFERENCE

* The material contained herein is for informational purposes only

1

Page 2: RFB 6000000550 MANDATORY PRE-BID CONFERENCE * The material contained herein is for informational purposes only 1.

• Approximately 406 acres of canal Right-of-Ways‐ 3 Storm Water Treatment Areas (STAs)

• Approximately 45 access gates• Access roads of various widths, signs, telephone poles

and water control structures

2

Page 3: RFB 6000000550 MANDATORY PRE-BID CONFERENCE * The material contained herein is for informational purposes only 1.

3

Page 4: RFB 6000000550 MANDATORY PRE-BID CONFERENCE * The material contained herein is for informational purposes only 1.

4

Page 5: RFB 6000000550 MANDATORY PRE-BID CONFERENCE * The material contained herein is for informational purposes only 1.

• Work consists of side slope mowing of grassed and/or vegetated embankment areas with conventional high production style mowing equipment. Additionally, the use of small machine mowing and/or hand held equipment (string trimmers) shall be necessary.

• Mowing surface greater than a 3:1 ratio• Equipment: To include all tools or devices utilized by

the Contractor to complete services under the RFB

5

Page 6: RFB 6000000550 MANDATORY PRE-BID CONFERENCE * The material contained herein is for informational purposes only 1.

6

Page 7: RFB 6000000550 MANDATORY PRE-BID CONFERENCE * The material contained herein is for informational purposes only 1.

7

Rattlers!

7

Page 8: RFB 6000000550 MANDATORY PRE-BID CONFERENCE * The material contained herein is for informational purposes only 1.

8

• Obey all speed limit signs• Do not hunt, fish, approach, attack, harm, harass,

handle, or remove any animal or plant species

8

Page 9: RFB 6000000550 MANDATORY PRE-BID CONFERENCE * The material contained herein is for informational purposes only 1.

• 4 to 6 cycles per year• District can modify as needed• Monday thru Saturday excluding District holidays• Dawn to dusk• Changes to the work schedule must be approved in writing

9

Page 10: RFB 6000000550 MANDATORY PRE-BID CONFERENCE * The material contained herein is for informational purposes only 1.

• Areas, boundaries and limits have been pre-established• Area quantities have been inventoried and calculated

- Width of area calculated using a Westward Distance Wheel- Distance in feet calculated using JAMAR RAC Plus 1

10

Page 11: RFB 6000000550 MANDATORY PRE-BID CONFERENCE * The material contained herein is for informational purposes only 1.

•Contractor must obtain keys from the District to access work site(s). District Key Permitting current key deposit rates apply for each key requested •All gates and entry barriers must be IMMEDIATELY secured when entering or exiting a ROW

Change to OPEN

11

Page 12: RFB 6000000550 MANDATORY PRE-BID CONFERENCE * The material contained herein is for informational purposes only 1.

• Notice to Proceed Issued- Contractor receives NTP prior to each cycle- Contractor reviews start and end dates and acreage- Contractor starts work within 7 working days of receiving NTP

• Pre-Work Meeting- Contractor attendance mandatory- Contractor provides anticipated work schedule - Questions are resolved with the District Project Manager prior work

• Mowing Schedule- Contractor provides detailed schedule to be completed by the NTP end date- Mutual agreement dates for inspections- Revised mowing schedule: How and when to recover from slippage

12

Page 13: RFB 6000000550 MANDATORY PRE-BID CONFERENCE * The material contained herein is for informational purposes only 1.

• District Project Manager Inspects ROW- Contractor anticipates completion of each ROW and

provides advanced notification to the District Project Manager

- The District Project Manager will inspect the ROW within 2 business days

13

• Contractor Pre-Inspects ROW- Contractor mows ROWs- Contractor inspects completed ROW prior to requesting inspection

Page 14: RFB 6000000550 MANDATORY PRE-BID CONFERENCE * The material contained herein is for informational purposes only 1.

• Two way communication is vital for the success of the project

- Weekly status reports are due by 12:00 PM every Thursday during a mowing cycle

- Immediately telephone the District Project Manager when absent from the work site or delayed in mowing on a scheduled work day. Email follow up by 7:00 AM prior to the scheduled start of work.

- Respond to all phone calls and/or pages within 2 hours, followed by email and/or fax within the same business day

14

Page 15: RFB 6000000550 MANDATORY PRE-BID CONFERENCE * The material contained herein is for informational purposes only 1.

• Minimal equipment maintenance allowed on ROWs• Mowing blades must be maintained and kept sharp for optimal

results and to prevent scalping

15

Page 16: RFB 6000000550 MANDATORY PRE-BID CONFERENCE * The material contained herein is for informational purposes only 1.

• All Contractor employees, vehicles and mowing equipment must be clearly and visibly identified

• Each vehicle must contain a copy of the NTP under which work is being performed

16

Page 17: RFB 6000000550 MANDATORY PRE-BID CONFERENCE * The material contained herein is for informational purposes only 1.

• Tractor Safety- Seat Belt- Mirrors- Reflectors

• Personal Protection Equipment (PPE)- Protective Eyewear- Gloves- Proper Footwear- Hearing Protection- Reflective Safety Vests- Hard Hat- Seat Belt

17

Page 18: RFB 6000000550 MANDATORY PRE-BID CONFERENCE * The material contained herein is for informational purposes only 1.

• Contractor Removes Debris- Contractor pre-inspects ROWs and removes all debris- Debris over 150 lbs or 4’ in dimension will be removed by

the District

18

Page 19: RFB 6000000550 MANDATORY PRE-BID CONFERENCE * The material contained herein is for informational purposes only 1.

• Dense vegetation may require more than 1 pass• 6” height “+” or “-” 1”• Within 1’ of all structures

5-10 ft tall

6” cut

19

Page 20: RFB 6000000550 MANDATORY PRE-BID CONFERENCE * The material contained herein is for informational purposes only 1.

• Canal Bank Conditions

DO NOT MOW WHEN:- Soggy due to excessive wet conditions- Sandy due to excessive dry conditions

- Will cause rutting: Contractor responsible for repairs- Contact District Project Manager

20

Page 21: RFB 6000000550 MANDATORY PRE-BID CONFERENCE * The material contained herein is for informational purposes only 1.

Any damage to property that is caused by the Contractor shall be repaired within five (5) working days. In the case of scalping, rutting, gouging, or similar damage, there are two (2) methods of which the repairs shall be made.

Sod or Seeding: The Contractor is responsible for establishing a growing, healthy stand of turf over the area that was damaged.